ROAD WORKS, CLOSURES AND SPECIAL EVENTS IN

ROAD WORKS, CLOSURES
AND SPECIAL EVENTS IN
LEEDS DISTRICT
From:
To:
19 February 2015
1 March 2015
Issued by Metro
West Yorkshire Combined Authority
Wellington House
40 - 50 Wellington Street
LEEDS
LS1 2DE
Tel. 0113-251 7299
ROAD CLOSURES & SPECIAL EVENTS IN LEEDS DISTRICT
Date of Issue: 19 February 2015
SECTION OF
EVENT and DIVERSION
DATES OF
BUS
ROUTE
WORK
OPERATOR
Bridge Road
Boston Spa
Bridge Works
Transdev will divert via Moor End,
A168 before re-joining its usual route
on Walton Road.
Transdev will still access all stops on
High Street, Boston Spa before
turning and going on the diversionary
route.
As such stops on The Village,
Dowkell Lane, Walton Road (at HMP
Wealstun Prison), Wetherby Road,
Walton Road will be missed.
Bell Lane
Bramley
Broadlea Hill
Bramley
Tinshill Drive
Cookridge
Foundry Lane
Gipton
Saturday 14
Transdev
– Sunday 15 770 771
February &
Saturday 21
– Sunday 22
February &
Saturday 28
February –
Sunday 01
March.
Works will
start at 0800
on the
Saturday and
continue until
1800 Sunday.
Weekend
Works Only
Gas works
Monday 2 –
Buses will operate via Upper Town
Friday 13
Street and Broad Lane
March
Resurfacing
Monday 16 –
Buses will operate via Broad Lane
Friday 20 and
Monday 23 –
Friday 27
February
0930 – 1530
each day
Gas works
Monday 16 –
Buses will operate via Otley Old Road Friday 27
and Tinshill Road
February
Resurfacing Works
Monday 23
Buses will divert via Wykebeck Way,
February –
Foundry Mill Drive and vice versa.
Friday 06
March, 0930
– 1530.
Weekday
works only.
Yorkshire Tiger
80
First
49
Harrogate
Coach Travel
940
First
11 11a
Halton Moor Ave
Halton
Resurfacing Works
During this closure, First services 5 &
91 will divert from Neville Parade via
(R) Halton Moor Avenue and Halton
Moor Road back onto route at
Osmondthorpe Lane.
A shuttle service will be in operation
from 0930 until 1600:
Halton Moor Ullswater Crescent stop
24987: 0930 0950 1010 then 30 50
10 until 1550
Selby Road Wykebeck Mount stop
10770: 0936 0956 1016 then
36 56 16 until 1556
Monday 2
February –
Tuesday 11
February,
0930 – 1700
First
5 91
Works will
recommence
on:
Monday 16
February –
Friday 20
February
Weekday
Works
Selby Road Dunhill Rise stop 12807:
0938 0958 1018 then 38 58 18 until 1558
Halton Moor Ullswater Crescent stop
24987: 0946 1006 1026 then 46 06 26
until 1606
Brownberrie Lane
Horsforth
Gibson Road
Kippax
Abbey Road
Kirkstall
New York Road
(westbound)
Leeds
New Forest Way
Middleton
Installation of traffic calming
Buses will operate as follows: from
Leeds via normal route to North
Broadgate Lane, then via L Town
Street, Fink Hill, R Broadway, R
Rawdon Road, R Layton Lane, L
Town Street to resume normal route
and vice versa.
Installation of Speed Cushions
All services divert via Leeds Road.
Resurfacing
Abbey Road will be closed – towards
Leeds only – on Sundays. On other
days temporary lights will be in
operation. During the closure, buses
will operate via Abbey Walk, Morris
Lane and Kirkstall Lane.
Repairs to Woodhouse Tunnel
Diversion via Marsh Lane and York
Street to Leeds Bus Station
Poor Condition of Road
Buses will divert via Sharp Lane,
Throstle Road North, Ring Road, and
vice versa.
Sundays
22 February
1 8 March
0700 – 1600
First
97
Wednesday
25 – Friday
27 February,
0930 – 1800,
daily.
Sundays only
15 22
February
1 8 15 22
March
Arriva
163 166 x60
Ongoing for
12 – 24
months
On-going
until road
condition is of
a high
enough
quality.
Transdev
770 771
First
33 33A
Yorkshire Tiger
757
First
9 74
Valley Road
Pudsey
Resurfacing works
Buses will be diverted as follows
during the works
62A via Lowtown and Kent Road
711 via Lowtown
X14 via Lowtown and Robin Lane
Junction 44
Roundabouts
Stourton
Junction 44 Pinch Point Scheme
During this closure Arriva services
167 168 189 410 will divert via the
446 route: A639, Wakefield Road,
Wood Lane, Haigh Road and vice
versa.
Rein Road
Tingley
Sewer repair works
Road closure towards Morley only.
Buses will operate via Dewsbury
Road and Bradford Road.
Locate and Excavate Blockages
22 will divert via A645 and Station
Lane to normal route.
Pottery Lane
Woodlesford
Kirk Lane
Yeadon
SECTION OF
ROUTE
Old Lane
Beeston
Stanningley Road
Bramley
Town Street
Henconner Lane
Bramley
Town Street
Bramley
Hail and ride area of route.
Resurfacing
Buses will operate via Henshaw Lane
Tuesday 3
February
For up to six
weeks
0930 – 1530
Monday –
Friday only
Thursday 22
& Friday 23
both nights –
2000 – 0530
With the
closure
recommencin
g Monday 9
February for
two weeks,
2000 – 0530
First
X14
Geldard’s
711
Yorkshire Tiger
62A
Monday 16 –
Friday 20
February
Arriva
205 425
Stagecoach
154
Square Peg
22
Monday 02
March –
Wednesday
04 March
Monday 23 –
Friday 27
February
Arriva
167 168 189
410
Yorkshire Tiger
747
ROAD WORKS IN LEEDS DISTRICT
Date of Issue: 19 February 2015
NATURE AND EFFECT OF WORK DATES OF
BUS
WORK
OPERATOR
Footway and carriageway works
Monday 5
First
Controlled by temporary lights as
January –
64 74
required
Friday 27
February
Gas connection works
Monday 2 –
First
Controlled by temporary lights as
Friday 20
72
required
March
Construction of cycleway
Saturday 1
First
Controlled by lane closures as
November
16 16A 49 85 86
required
2014 –
87 91
Thursday 31
Yorkshire Tiger
December
80
2015
Works to traffic signals
Monday 23 –
First
Controlled by temporary lights as
Friday 27
16 16A 49 85 86
required
February
87 91
Yorkshire Tiger
80
Otley Old Road
Cookridge
Gas main replacement works
Controlled by temporary lights as
required
Saturday 14 –
Sunday 22
February
Tinshill Road
Cookridge
Gas connection works
Controlled by temporary lights as
required
Kerbing and footway works
Controlled by temporary lights as
required
New connection
Controlled by stop / go boards as
required
Monday 16 –
Friday 20
February
Monday 9 –
Sunday 22
February
Monday 9
February –
Sunday 8
March
Ongoing until
July 2015
Easy Road
Cross Green
Domestic Street
Holbeck
First
6
Harrogate
Coach Travel
940
Ladies Only
31 32
Harrogate
Coach Travel
940
Yorkshire Tiger
61 62 62A
First
55 64 74 86
Broadway
New Road Side
Roundabout
Horsforth
Signalisation and remodelling of the
roundabout
Controlled by lane closures as
required
Bridge Road
Kirkstall
Junction works
Controlled by temporary lights and
lane closures as required
Monday 19
January –
Monday 30
March
Boar Lane
at the jct with
Lower Basinghall
Street
Leeds City
Centre
Leeds Road
Otley
Gas works
Controlled by temporary lights as
required
Monday 2
February for
up to 4 weeks
Repair damaged fence and stone
wall
Controlled by temporary lights as
required
Gas works
Controlled by temporary lights as
required
Monday 16 –
Thursday 19
February
First
X84
Monday 19
January –
Friday 20
February
Gas works
Controlled by temporary lights as
required
Kerbing and channel block works
Controlled by temporary lights as
required
Tuesday 17 –
Wednesday 25
February
Monday 9 –
Sunday 22
February
First
4 4A 9 90 x14
Geldard’s
711
Yorkshire Tiger
62
First
97
Lowtown
Pudsey
Town Street
Rawdon
Pontefract Lane
Richmond Hill
First
9 33 33A x33
Fourways
30
Ladies Only
31 32
Yorkshire Tiger
757
First
38 49 91 508
670 671
Transdev
Keighley
760
Arriva
First
Yorkshire Tiger
Yorkshire Tiger
61 62 62A
Rodley Lane
Horsforth New
Road
Roundabout
Rodley
Signalisation and remodelling of the
roundabout
Controlled by lane closures as
required
Ongoing until
July 2015
Town Street
Stanningley
Construction of cycle superhighway
Lane closure along the whole road
as required
Thornbury
Roundabout
Thornbury
Highway reconstruction works
Controlled by lane closures and
temporary lights as required.
Monday 1
December –
Thursday 31
December
2015
Ongoing
Westerton Road
West Ardsley
Delays likely.
Gas main replacement works
Controlled by temporary lights as
required
Holmsley Lane
Woodlesford
Leaking Communication Pipe
Two way Signals
First
9 670 671
Harrogate
Coach
8 8A
Transdev
Keighley
760
First
9 14 16 16A 72
91
First
72 508 611 x6
Geldard’s
711
Saturday 14 –
Sunday 22
February
Arriva
117 205 425
First
85 87
Thursday 26
Feb –
Wednesday 04
March
Square Peg
22
Arriva
167 168 446