Last updated on 25/02/2015 PROGRESS OF PROJECTS IN CRIS (A) S. No. 1. 2. STATUS OF PROJECTS AT A GLANCE Project Group Project Status Freight Operations FOIS Phase-II (TMS More than 99.9% RR’s booked Information Expansion) through TMS. System (FOIS) IREPG E-Payment facility extended to a total of 823 customers, covering 77.11% of all RRs. Passenger PRS Expansion 3153 locations, 11,288 PRS terminals; Reservation 4.91 crore passengers booked, earning Systems (PRS) `2856.22 crore in January 2015. WAP & SMS The SMS Gateway for sending alerts Gateway for PRS to passengers in case of status change and NTES Website in the PRS tickets has been launched. Approx 1.6 lakh messages being sent daily. Next Generation E- Number of maximum concurrent sessions on nget.irctc.co.in were ticketing (NGeT) 1,66,587 on 22nd January 2015. DR System for PRS Data is continuously replicated from all PRS centres to PRS DR centre at Secunderabad. Drills have been conducted to fail over primary sites to the DR site and switch back to primary. Secondary DR links are being developed by Railtel. 3. Unreserved Unreserved Ticketing System Ticketing System (UTS) including expansion to A,B,C,D,E category stations Automatic Ticket Vending Machines and their Expansion across Zonal Railways Capacity enhancement and Disaster Recovery System for UTS Unreserved Ticketing System through Mobile at Mumbai and UTS is implemented in 5826 locations; 58.54 Crore passengers booked, earning `1454.73 crore during January, 2015, covering more than 90% of unreserved tickets. 1299 ATVMs commissioned over WR, CR, SR, SCR, NR, ER, SER, and ECoR over major suburban / nonsuburban stations. UTS server capacity enhanced; DR for connected client is set up for all Zonal Railways. Set up for thin clients / ATVMs is in progress. The detailed estimate has been sanctioned by Railway Board. At a total cost of Rs. 5.467 crore on 10.03.2014. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 1 of 22 S. No. Project Group Project Status Chennai suburban region (as pilot for one year) Windows and Android Mobile Application have been developed. The pilot project has been inaugurated by Hon’ble Minister of Railways on December, 27, 2014 at Dadar suburban station, Mumbai with Windows & Android Application. Data warehouse for UTS 4. 5. 6. (a) (b) Control Office Application (COA) Crew Management System (CMS) Integrated Coaching Management System (ICMS) National Train Enquiry System (NTES) 7. IR Web Portal 8. Material Management COA CMS Modules are COIS, PAM (Punctuality), and Coaching Maintenance Module (CMM) Pilot NTES – web interface Presently the tickets are printed through existing ATVMs at stations. Tender for procurement of printing kiosks has been floated on 29.12.2014. For the purpose of UTS Data warehouse, the replication of data of all Railways has been completed. Data model for Data Warehouse is prepared. ETL mapping and data validation are in progress. Application is running in all 77 division / area Control Offices. Implemented in 369 lobbies. 50,000 crews being booked daily. PAM and COIS are in operation. Coaching Maintenance Management (CMM) pilot is running in three pilot depots namely, BCT/WR, NDLS/NR and LKO/NR. An Android App for NTES (Train Enquiry) was launched on 22/10/2014 to provide convenient access to passengers to train timetables and train running position. A mobile Application for Android has also been launched. Indian Railway Web 39 Railway websites are hosted on the Portal IR Web-Portal. SMS and Web-based Complaint Management System operational. Booking of Retiring Rooms is available for 436 stations through station terminals and 436 stations through the Internet. E-procurement E-Tendering module working on all System (EPS) the Zonal Rlys, Production Units and other units of IR. More than 6.46 lakh tenders published through the EProcurement System. Over Rs. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 2 of 22 S. No. Project Group Project Status 5382.92 crore worth of scrap material auctioned through E-Auction system. 9. Asset Management Extension of EProcurement System to Depots, Divisions and other units Material Management Information System (MMIS) Locomotive Management System (LMS) - Diesel Locos (pilot project) MOU between NR and CRIS has been signed on 28.03.2014. MOU for Implementation of ERP based integrated MMIS on Indian Railways signed by CRIS and Northern Railway in October, 2014. As desired by Board, report on LMS & SLAM was forwarded to Railway Board on 29.5.2014. The revised estimate of LMS is also with Board for sanction. Freight Management Module (FMM) – for Revised estimate for FMM pilot is Freight Stock (pilot pending in Railway Board since August 2013. project) Software for Locomotive Asset Mgt (SLAM) Electric Loco WISE Phase-II (Workshop Management System) HMIS ERP in ICF Pilot Phase completed in July 2014 System launched at Raipur Work shop, Lower Parel, Charbagh and Lallaguda. Advice from Board regarding restructuring of project is awaited. MOU for Operations and Maintenance Contract with ICF for Rs. 3.27 crore has been signed. Rail Wheel Plant MOU has been signed for setting up Bela, Patna Bihar of integrated ICT systems at RWPBELA. DPR and Budget estimate submitted in May, 2014 MOU signed for planning and setting ERP Project for up ERP project at DLW Varanasi. DLW Varanasi Infrastructure planning & Data Center design in progress. User requirement specification completed. Rail Coach Factory, MOU has been signed for setting up Rae Bareli of integrated ICT systems at RCF, RBL. Tender for setting up datacentre has been floated on Dt: 20.11 2014. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 3 of 22 S. No. 10. 11 12 Project Group Project Status Parcel Management System (PMS) Expansion of Hand Tender document preparation for Held Terminals for replacement of HW and SW at central TTEs site CRIS and procurement of HW for locations has been put up to CRIS Finance for concurrence & vetting. Replacement of HW Tender document preparation for at Central Site CRIS. replacement of HW and SW at central site CRIS and procurement of HW for locations has been put up to CRIS Finance for concurrence & vetting. Pilot project of HHT Pilot project has been completed on for TTEs 11 pair of trains. Human Resource HRMS Revised approach being finalized with Management Board. System (HRMS) IT Infrastructure DR Data Centre at Racks for DR System will be hosted Secunderabad. in Railtel datacenter in Secunderabad. 13 GIS Map & Geospatial Database for Indian Railway assets (GIS) 14 Software Aided SATSaNg / TTMS Timetable Management System SATSaNG project is in red with negative fund balance of Rs 4.56 Crores as on 31st Jan 2015. Project activities of the system are getting adversely affected. Funds are urgently required. 15 Civil Engineering Implementation of Projects Track Management System(TMS) on balance divisions of IR Indian Railway Projects Sanction and Management (IRPSM). System successfully implemented in 28 divisions of IR. Continuous support provided to users of the implemented modules. GIS Map & Geospatial Database for Indian Railway assets (GIS) 32 offers received against EoI. Detailed Part Estimate of Rs. 2.26 Crore has been sanctioned for implementation of Station Navigation Information Systems(SNIS). i) Works programme processing and sanctioning module implemented and running on entire Indian Railways. ii) IRPSM Phase II detail estimate not yet sanctioned by Rly Board. iii) No funds since Jan.13, excess expenditure of `16 lakhs incurred Railway Land i) Management System-pilot project for 1 division (ADI). ii) Various reports related to earning from various sources have been developed and are under testing. Detailed estimate not yet sanctioned by the Railway Board. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 4 of 22 S. No. 16 Project Group Project Security Application 17 Electrical Project RPF Security Revenue Estimate for O&M activities Management System of RPF Security Management System (RSMS) on IR (RSMS) amounting to Rs. 99.56 lacs, has been sent to Railway Board for onward action after having been concurred by Northern Railway finance. All India RPF Railway Board had decided to launch Security Helpline for a Manual RPF Security Helpline in passengers Northern Railways in the month of February 2014 and to extend it to other Railways as well. The order however did not mention anything about the future course of action for IT enabled RPF Security Helpline Project sanctioned as Plan Head 17 Project in 2010-11. EEMS – Electrical 1. The EEMS website and Energy Management Application for manual Data entry System forms for various Energy Data Modules have been designed, developed and deployed on test bed environment. 2. “Rail Saver” Website has been now secured and available on public network through secure URL https://www.railsaver.gov.in. 3. Tender for “Pilot demonstration of Energy Efficient Technology on IT platform through 500 AMR Meters” completed. PO has been issued to M/S HCL Technologies Ltd. on 31.10.2014. TDMS – Traction The Detailed estimate is pending with Distribution and RDSO/ Railway Board for sanction. Management System SECROADS – E The system is under remote support Working AMC from 1st Aprl 2014 through resource posted at CRIS HQ office. Enhancement of • Test Bed implementation of Case Monitoring proposed enhancement for System extension of software upto GM’s level has been done for 4 zonal Railways viz. SCR, ECR, NWR and ECoR. • Integration with PAMS and MR Cell RFMS has been done. • O&M support is provided to already implemented modules. 18 Status C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 5 of 22 S. No. 19 Project Group Project Status Communication Networks Implementation of Network Security Infrastructure at 05 PRS/UTS data centres and Railways’ Internet Data centre (RIDC) at CRIS and implementation of IPSec over Unified Ticketing Network (UTN) SMMS: Signalling maintenance management systems (Pilot Phase to be implemented on BHD-SNP section of Delhi Division and UMP (Ex)-RPJ (Ex) section of UMB division.) Real-time Train Information System (RTIS) Upgradation of Network Management System (NMS) for Unified Ticketing Network and FOIS Network. Detailed estimate has been sanctioned by Railway Board on 11.4.2014 and MoU to be signed with NR. PO placed. Delivery is under process. Detail estimate has been sanctioned by Railway Board. Railway Board has decided to hold till allotment of S-MSS bandwidth by ISRO. Project was delayed due to unavailability of funds. Out of 16, Funds / commitment received from only 12 Zonal Railways. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 6 of 22 (B) PROJECT STATUS 1 FREIGHT OPERATIONS INFORMATION SYSTEM (FOIS) IREPG E-Payment facility for 08 new customers was commissioned during January 2015. The E-payment facility has been provided to a total of 823 customers. In addition, facility of 60 existing customers was also extended due to expiry of LC/BG. A total of `7798 crores (`251.55 crores per day) of freight payment was done through E-payment during January 2015 which is around 77.11 % of the total freight. 2 PASSENGER RESERVATION SYSTEM PRS is working at 3153 locations with 11,288 PRS terminals. On an average, 4.91 crore passengers are being booked in PRS with average Passenger Earnings of `2856.52 crores during January 2015. In the corresponding period of January 2014, total 4.92 crore passengers had been booked from 9333 PRS terminals at 3043 Locations resulting in total earnings of `2522.34 crore. WAP & SMS Gateway for PRS and NTES Website The SMS Gateway project for sending SMS alerts to passengers in case of status change in the PRS tickets, as compared to the initial booking status (For ex. W/L to RAC, RAC to Confirm, W/L to Confirm) was launched by Hon’ble Minister of State for Railways on 03.03.2014. The Pre-Chart SMS alerts are being sent once a day, beginning from 5 days before the journey date and also after post charting (which is done approx. 3-4 hours before train departure). The post chart SMS alerts convey the actual Berth No., Coach No. and RAC Seat No. for those passengers whose final Charting status has changed as compared to the initial booked status. In case of any ticket upgradation or seat re-allotment SMS alerts are being sent. On an average approximately 1.6 lac SMS alerts are being sent on daily basis. Next Generation E-ticketing (NGeT) Number of maximum concurrent users on nget.irctc.co.in as on 22nd January, 2015 had been 1,66,587. Ticket Booking Statistic Maximum bookings per day was registered on 7th January, 2015 Maximum bookings during the period of 08-09 hrs was recorded on 7th January, 2015 Maximum bookings during the period of 10-11 hrs was recorded on 22nd January, 2015 Maximum bookings per minute was recorded on 10th January, 2015 Maximum bookings per sec. was recorded on 28th January, 15 4,96,114 33,445 1,53,499 14,128 330 C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 7 of 22 Average transaction response time for user to book ticket on NGeT excluding payment is 50-60 sec. Application changes have been done as per requirement of IRCTC/Railways: E-Ticketing a) Enabling booking of Physical Handicap quota on NGeT with concession. b) Addition of TABS on home page for • Link to “Taj E-Ticketing” • Link to "E-Catering" c) Addition of new sections on user feedback form to take user inputs on Bedroll Services in non -AC trains. d) Different type of noise is added to Captcha of NGET application dynamically to stop bookings via scripting by users. e) Changes done in e-ticketing application to enable visually impaired person to carry out bookings. Some of the major changes are given below:- f) • Option provided to user for requesting OTP on registered mobile at the time of login and booking in place of displaying/capturing captcha. • Changes to provide accessibility of complete application menu via keyboard. • Changes done for ERS printing. • Provided option for re-sending OPT to the user. • Allow user with blindness to fill the complete form / pages with keyboard. Bug fixing for bank TXN ID. g) Changes done for not showing the in progress TXN under failed txn history enquiry Dash Board: a) New report designed: • Pending Cancellation Report • Chart Status Report • Drop waitlist cancellation report fail due change in status from waitlist to release and ISL not passing b) Bug fixed: case of no more refund error in TDR registration. Case would be closed and also would NOT be retry c) Changes/modification done in mail format:-Auto generate mail would be sent to the respective zonal railway after TDR registration C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 8 of 22 d) Changes/modification done in letter printing format:- Generate dynamic letter as "Refund of fare of E-ticket booked through IRCTC Internet System" with proper ticket details enclosed with it and option to print it. e) Changes/modification done in automatic re-registration of those transfer cases which is 10 days old and status is not updated f) Automatic handling of for-CAN cases for I-ticket g) Changes done for allowing Batch execution for bank even if bank is disabled h) Changes have been done in file processing of refund to cater partial cancellation of I-ticket multiple times. i) Issue of uploading file in I-ticket print Admin has been resolved DR System for PRS Data is being replicated from all the primary systems to Secunderabad DR system. DR Drills on production data with live transactions from counters and IRCTC Internet booking has been carried out from Chennai. Approximately 11000 transactions have been executed on the DR system and switched back to the primary system. Secondary DR links are being developed on Railtel network. 3 UNRESERVED TICKETING SYSTEM Unreserved Ticketing System including expansion to A,B,C,D,E category stations A total of 58.54 crore passengers were served, resulting in total UTS earning of Rs. 1454.73 crores during Jan, 2015 as compared to 61.89 crore passengers and UTS earning of Rs. 1307.29 crores during Jan’ 2014, thereby showing a decrease of 5.41% in total passengers and an increase of 11.27% in total earnings, respectively. On an average, UTS served 1.89 crore passengers and earned `46.92 crore each day in January 2015. At present UTS is functioning at 5826 locations and running at 11244 Counters. Automatic Ticket Vending Machines and their Expansion across Zonal Railways 1299 ATVMs commissioned over WR, CR, SR, SCR, NR, ER, SER, and ECoR over major suburban / non-suburban stations. Capacity enhancement and Disaster Recovery System for UTS UTS server capacity enhanced; DR for connected client is set up for all Zonal Railways. Set up for thin clients / ATVMs is in progress. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 9 of 22 Unreserved Ticketing System through Mobile at Mumbai and Chennai suburban region (as pilot for one year) The detailed estimate has been sanctioned by Railway Board. At a total cost of Rs. 5.467 crore on 10.03.2014. Windows and Android Mobile Application have been developed. The pilot project has been inaugurated by Hon’ble Minister of Railways on December, 27, 2014 at Dadar suburban station, Mumbai with Windows & Android Application. Presently the tickets are printed through existing ATVMs at stations. Tender for procurement of printing kiosks has been floated on 29.12.2014. 4 COMPUTERIZED CONTROL CHARTING COA Application is running in all the 77 divisions/area Control Offices of the Indian Railways. Integration between COA and FOIS, adjoining COA, NTES and ICMS is completed in all 68 divisional control offices. New Time table schedules were created in ICMS application, and the data was successfully transferred to the COA application to ensure updated time table availability with the section controllers. 5 CREW MANAGEMENT SYSTEM (CMS) Number of lobbies commissioned Daily call served through CMS system at present Crew Bio data in CMS system 369 Nearly 50,000 99,132 Total lobbies commissioned are 369 (367 + 2 training schools at UDZ & MLY). Last lobby commissioned – Hapur (NR/MB on 30.01.2015). 6(a) INTEGRATED COACHING MANAGEMENT SYSTEM (ICMS) The ICMS application is hosted on central server located in CRIS, Chanakyapuri accessed over FOISNET. It is a browser based application and can be run from any client on FOISNET. Approx. 1000 clients are running on FOISNET on thin clients/PCs. This has three applications as Punctuality Analysis and Monitoring (PAM), Coaching Operations Information System (COIS), Coach Maintenance Management (CMM) pilot. First two modules of application are already deployed over IR, third module Coaching Maintenance Management (CMM) pilot was made Go-live at three pilot depots namely, BCT/WR, NDLS/NR and LKO/NR. The CMM application is built on the core of an EAM software MAXIMO. Apart from this the Central Application has been made available to all Zonal Railway HQs on 25.11.2013. It has modules on Passenger complaints, Contracts monitoring, Machinery & Plant, Coach Condemnation, Pit charts, Special drives, Project tracking, Trial monitoring, Budget trains and Documentation. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 10 of 22 ICMS infrastructure was set up in 2005-06 and asset has become overdue replacement as servers are running 9th year. Sanction of the Detailed estimate has been received. Five new reports have been implemented for CMM in various depots. Detailed estimate for rollout of CMM project has been sanctioned by Railway Board. 6(b) National Train Enquiry System The National Train Enquiry System (NTES) is meant for providing updated arrival/departure information of passenger trains to the public through internet website (www.trainenquiry.com/enquiry.indianrail.gov.in) and nationwide rail enquiry number 139. Recently, new web interface alongwith mobile interface has been launched. NTES is the core application feeding information to all interfaces. A Mobile App & Desktop App for Window 8.0 platform has been developed and launched. A mobile Application for Android has also been launched. Hardware of NTES is nearing the end of its codal life, running 7th year. Detailed Estimate for Assets replacement and essential upgradation of National Train Enquiry System (NTES) including WebNTES at the cost of Rs 4.90 Crore has been sanctioned by Railway Board. MOU for this work has been signed by NR associate finance and file has been put up for GM/NR for approval. 7 IR WEB PORTAL i. Complaint Management System (CMS) The Web Complaint Management System (Web CMS) can be accessed through the IR Portal home page, www.indianrailways.gov.in , complaint and suggestions section. It can also be directly accessed through the URL, http:// www.customercare.indianrailways.gov.in. Divisional Work Flow has been made online so that divisional level escalation can be configured. The SMS based Complaint Management System is also operational. ii. Cloak Room Application: This application is operational at New Delhi Station (Ajmeri Gate and Paharganj). During the month of January 2015, no booking has been taken place. Total Package Booked : Nil Total Package Delivered : Nil Total Earning : Nil Retiring Room: Retiring Room Application is now running at 436 stations through Terminals. At 436 stations booking for Retiring Rooms can be made on the Internet. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 11 of 22 Earnings from booking of Retiring Rooms during the month of November 2014: Booked on Terminals: Rooms Booked : 44,909 Net Earnings : `89,71,680/- Booked on Internet: Rooms Booked : 17,528 Net Earnings : `76,94,152/- Portal websites All the 39 Websites have been migrated with standardized and uniform look & feel. 8 MATERIAL MANAGEMENT E- PROCUREMENT SYSTEM (EPS) Implementation of E-Procurement System on all 16 Zonal Railways, 7 Production Units (viz. RCF, ICF, DLW, CLW, DMW, RWF and RCF/RBL) and RDSO, RAILTEL, Core/ALD and Metro Railway, Kolkata completed. More than 6.46 Lakh tenders have been uploaded by different Railways. 24,360 vendors have been registered on the system. E-Auction module software has been implemented in CR, ER, ECR, ECoR, NR, NCR, NER, NFR, NWR, SR, SCR, SER, SECR, SWR, WR, WCR Including 4 PUs RCF, ICF, DLW, RWF. Over 5382.92 crore worth of material auctioned through EAuction system. Extension of E-Procurement System to Depots, Divisions and other units The detailed estimate has been sanctioned by Railway Board on 31.12.3013. MOU between NR and CRIS has been finalized on 28.03.2014. IREPS has been extended to 236 Depots/Divisions in Zonal Railway. MATERIAL MANAGEMENT INFORMATION SYSTEM MOU for Implementation of ERP based integrated MMIS on Indian Railways signed by CRIS and Northern Railway in October, 2014. 9 ASSET MANAGEMENT LOCO SHED MANAGEMENT SYSTEM (LMS) As desired by Board, report on LMS & SLAM was forwarded to Railway Board on 29.5.2014. It is important that the roll-out of LMS is sanctioned early. Expenditure is being incurred on maintenance of the pilot system and the discontinuity between the sanction of the pilot and the roll-out is leading to unlearning and cost overruns without commensurate benefits being realized. The revised estimate is also with board for sanction. O&M estimate for 2014-15 amounting to Rs. 84.85 lakhs has been sent to CME/NR. It is requested that Revised Estimate of the pilot and roll-out project of LMS be sanctioned early by Board. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 12 of 22 FREIGHT MAINTENANCE MANAGEMENT MODULE (FMM) Roll-out of the Freight Maintenance Management System is awaiting Board’s sanction. It is important that the project is sanctioned early with a view to avoid cost overruns on account of pilot maintenance. The revised estimate of FMM pilot is also with board for sanction. In addition, O&M Estimate amounting to Rs.2.25 Crs. for the period of 2012-13 to 2014-15 has been submitted to FOIS for sanction. It is requested that Revised Estimate of the pilot and roll-out project of FMM be sanctioned early by Board. SOFTWARE FOR LOCOMOTIVE ASSET MANAGEMENT (SLAM) Application is running in TKD and GZB loco sheds. Pilot Phase completed in July 2014 vide letter no. 2013/CRIS/NDLS-HQ/CMS/Implement/SLAM/0048/Pt-1, Dated 23.07.2014. Proposal for extending 4 shed in SLAM i.e. BRC, BL, AJNI & BZA, at an estimated cost of Rs 96.0 Lakh. Tender document under vetting. “SLAM ROLLOUT” with estimated cost of Rs.48.67 Cr. Sent to RB for sanction. WORKSHOP MANAGEMENT SYSTEM (WISE PHASE II ) LILUAH:Distributions of all the hardware items to different specified locations have been completed.Net connection of BSNL leased line which was out of order for a considerable period has had been restored. Problems in various Applications of the system in shops have been identified to a great extent and necessary arrangements are in the offing to solve those issues. Data entry processes in AB/l, Rep. Bay/MR are in progress and so also staff detail entry in A-shop, H-shop, Eshop, C-shop, K-shop, L-shop LOWER PAREL: All incoming coaches are entered in the system. Work Orders are created by all section. Work Orders are released and job allocation, job assignment and time confirmation is carried out by almost all section except CR1C (since 29/10/2014) and CR2C & F (since 01/01/2015) having difficulties in job allocation and partly time confirmation. Due to MMIS integration issue material assignment is not possible for all shops.48 Nos. New RFID cards received are yet to be distributed as their personal data, family data and address data are not uploaded in the system.55 Nos. new RFID cards awaited after printing. Data already sent for printing of cards. One Think client is not working properly, even after loading of new host file. Intermittent Network failure is frequent causing slackness in work. CHARBAGH: After having updated the vendor master and material master, we have been able to withdraw material from the system successfully. Likely to be more withdrawal from the system from this month i.e. Feb 2015. Basic Revision Training to desired users are completed last week. All the rolling stocks of DSL shop and DEMU were turned out from wise system. We are still working to restore network in Lab. Employee master is completed. Out of 97 secs 67 secs are marking their regular attendance in Wise system. Remaining 30 secs are also likely to be ready for marking their attendance shortly. RFID cards data are also under preparation and most likely by 15-2-2015, will be sent for making RFID cards. Lalaguda:Due to renovation of Computer Center WISE couldn’t be effectively used for a week this month. Generated 310 IR Sheets and Job Cards. Deficit items C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 13 of 22 are mapping with transportation code, for generating Deficiency report. Total No. of Rolling stock detached to workshop is 119 and Rolling stock returned to division are 109.All stock and Non-Stock Indents are generated in WISE only. Generation of indents using local software is discontinued. Approximately 20 additional PL No’s were included in the material management module. In this month, Non-stock Indents created for 28 items and generated Stock Indents for 250 items approximately. Vendor details and Stock master are being updated. Updating of Staff list has been done partly in to WISE-HRESS.04 new issues raised in SOLMAN (8000001586, 1590, 1596, 1602).14 Issues raised in SOLMAN were closed. (8000001148, 1235, 1456, 1455, 1241, 1230, 0365, 1099, 1277, 1281, 0356, 1224, 1517, 1232). Raipur:All Stock Indents are generated in WISE only. Additional PL No’s were included in the material management module. Vender details and Stock master are being updated. 10 New employees are added in the DATA BASE. 5 Retired/Expired employees are separated In Body I ,Body II , Wheel ,Bogie ,Fitting ,Airbreak Gang wise attendance report generated. Applying Leave through WISE ID is going good. All Holiday’s Sheet Updated of Year 2015. 13 Issues raised in SOLMAN were closed (800001521, 800001592, 800001570, 800001601, 800001174, 800001600, 800001583, 800001585, 800000502,800001550, 800000597, 800001530, 800001539). 1 New Issues raised in SOLMAN (8000001588)Network Connectivity is going good after Secondary Lease line from DRM/R. Data Entry Opertion is going Regulary (Employee T. No Changed,Gang ID chnaged, RFID Card Problem ,Leave issue ). Networking & Hardware Problem in any Think Client , KIOSK OR Switches is solved Same day. HMIS APPLICATION FOR RAILWAY HOSPITALS A Committee has been formed in Board to scrutinize all aspects of the application. TURNKEY IMPLEMENTATION OF ERP AT ICF, CHENNAI Project Completion Certificate for the Developmental phase of the project was delayed due to resolution of certain issues in Inventory module . Early issue of PCC is being considered keeping in abeyance the pending 2 MM issues as ICF could not be accommodated into SAP processes as per ICF’s legacy requirements however reserving the right of CRIS to make appropriate deductions from the SI within Contractual conditions of CRIS LOA issued on M/s L&T infotech. G.M/CRIS had met General Manager/ICF who stressed on the action plan for the unused functionalities of the implemented Phase-I modules in MM,PP,PM,QM. This is under preparation in association with IT Centre . For extension of O&M Contract for ICF ERP Project for the period from 26.04.2014 to 25.04.2015 along with the revised estimate for the same has been duly vetted by CRIS Finance. Justification for the extension of the post of G.M/CRIS beyond 2/12/2014 till the end of the O&M period has been given to ICF for consideration. Based on the reply from ICF, a revised estimate for the supplementary O&M will be prepared and MOU will be executed with the approval of Competent Authority. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 14 of 22 Integrated ICT System project at RWP-BELA, PATNA/ BIHAR An MOU has been signed on 12.12.2012 for setting up of integrated ICT system at RWP-BELA, Patna, Bihar. DPR for the project is finalized and expected to be submitted shortly. Sl No 1 2 Description Hiring of Man Power Accommodation Hiring 3 4 Training (Level I &II) User requirement specifications 5 Tender document 6 Project report Status Already hired and working Leased Accommodation vacated on 31.08.2014. Training completed. Submitted, Presentation to users done in March 2014. DPR along with Functional requirement specifications approved by Bela. Draft tender document submitted to WPO/Patna and is under approval DPR along with Functional requirement specifications approved by Bela Revised budget estimate under vetting with RWP/Bela. iPAS Implementation: Salaries are being generated from iPAS system. System study of existing Accounting System at RWP Bela is under progress. Accounting Module of iPAS system proposed to be implemented. CAO/Bela has written to CRIS to implement MMIS at RWP/Bela expeditiously. Budgetary Estimates and Procurement:(a) Budgetary estimate for DMS and e-filing solution for internal offices users of WPO offices is submitted for approvals. (b) Budgetary estimate for ERP implementation at three workshops which comes under administrative control of WPO is submitted for approvals. (c) Initiated case for procurement of 1 Layer-3 switch for core networking activities. ERP Project-DLW An MOU was signed on 14.02.2013 for planning and setting up ERP project at DLW/Varanasi. DPR for the project is under finalization and expected to be submitted shortly. S Description No 1 Hiring of Man Power 2 Status Man Power hired from NIELIT and CRIS is working in the project. Logistics and 2 tenders pertaining to civil works on site and Procurement of Desktop procurement of 20 desktop PCs vetted by CRIS PCs finance and asked to pend floating of tender till C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 15 of 22 3 Training (ERP) 4 6 User requirement specifications Functional requirement specifications Project report 7 Tender document 5 availability of funds. Tender finalized and award of contract is awaited for receipt of funds from DLW. Completed Finalized and submitted DPR for 11 modules submitted and awaiting approval. Freezing of FRS for publishing in tender is awaited from DLW end. Due to lack of funds visit of CRIS team members at DLW is pending. A draft tender document was already submitted to DLW. Integrated ICT System project at Rail Ral Coach Factory at Rae Bareily • • • • • • • Project progress was reviewed in a meeting with CAO/RCF-RBL by MD CRIS on 16.12.2014. Network tender has been opened. Technical scrutiny has been completed and is being reviewed by TC. Tender for setting up data-centre has been opened on 06.01.15. A proposal for procurement of AADHAR certified Attendance devices for administrative building has been prepared and sent to RCF-RBL on 05.01.2015. It comprises of two options. RCF-RBL has to advise which option is to be used. During board meeting on 22.12.2014, it has been agreed that a common tender document may be floated for RCF-RBL and RWP-BELA. Preparation of tender document is in progress and will be completed shortly and sent to RCFRBL for approval. A payment of Rs. 26,60,031/- has been released by RCF-RBL on 19.12.2014 against bill no. 803 raised by CRIS on 27.11.2014. Bill for quarter ending 30.09.12 alongwith projections for next two quarters(Oct-Dec14) & (Jan-March15) against bill no. 806, amounting to Rs. 9,23,90,000/- was sent to RCF-RBL on 01.01.2015. Payment has been received recently. 10 PARCEL MANAGEMENT PARCEL MANAGEMENT SYSTEM (PMS) Parcel Management System was inaugurated by Shri Suresh Prabhu, Hon’ble Minister for Railways on 27.12.2014 at Mumbai in which GM/Central Railway, Sh. S K Sood and GM/Western Railway, Shri Hemant Kumar were also present in this occasion. Commissioning of PMS terminals completed in NDLS-BCT corridor. Commissioning in progress at remaining corridors NDLS-MAS, HWH-CSTM, HWH-MAS. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 16 of 22 Expansion of Hand Held Terminals for TTEs Tender document preparation for replacement of HW and SW at central site CRIS and procurement of HW for locations has been put up to CRIS Finance for concurrence & vetting. Replacement of HW at Central Site CRIS Tender document preparation for replacement of HW and SW at central site CRIS and procurement of HW for locations has been put up to CRIS Finance for concurrence & vetting. Pilot project of Hand Held Terminals for TTEs. Pilot project has been completed on 11 pair of trains. Rs. 46.24 Lacs for project cost and Rs. 217 Lacs for maintenance are yet to be released although all bills issued to concern Railways for release of funds. 11 HUMAN RESOURCES MANAGEMENT SYSTEM Revised approach being finalized with Board. 12. IT INFRASTRUCTURE Disaster Recovery Data Centre at Secunderabad After the Scrutiny of Technical Bids, Financial bids have been opened and are under consideration of TC. Offers received exceed the estimate, case is under evaluation. In the meantime, rack will be placed in Railtel datacenter in Secunderabad. 13. GIS Map & Geospatial Database for Indian Railway assets (GIS) 32 offers received against EoI. Detailed Part Estimate has been sanctioned for Rs. 2.26 for implementation of Station Navigation Information System(SNIS). 14 SATSaNg / TIME TABLE MANAGEMENT SYSTEM SATSaNG project is in red with negative fund balance of Rs 4.56 Crores as on 31st Jan 2015. Project activities of the system are getting adversely affected. Funds are urgently required. 15 CIVIL ENGINEERING PROJECTS TRACK MANAGEMENT SYSTEM: Scope of Work – 1. Design, Development, implementation and hand holding support for Track Management System. 2. Design and development of Rail-Road Crossing GAD Approval System. 3. Design and development of On-line Monitoring of Railway’s Private Siding Projects. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 17 of 22 4. Design and development of Way Leave/Easement Right Application Monitoring System. A. Activities performed during the month (Track Management System): “Inspection Top Sheet” Report has been developed during the month. Gang Work module has been redesigned during the month for suspended authorities and associated modifications have been done in following forms and reports: 1. Gang Work Entry 2. Gang Work Report 3. Gang Analysis Report USFD due/overdue have been redesigned for calculation of test free length for continuous 500m patches. Accordingly logic and due/overdue reports, alerts have been modified. Innovation module has been redesigned for entry from JE to Board level users. Welder performance report has been developed during the month Welder certification report enhanced for showing welding certificate. Provided hand holding support to the field users of TMS application during the month and resolved their issues. Indian Railway Projects Sanctions and Management (IRPSM) Works programme processing and sanctioning module implemented and running on entire Indian Railway. A new report for showing defeciencies in MEA of all the stations was created and deployed on server. Various input screens and reports were modified as per instructions given by Board. ii) IRPSM Phase II detail estimate not yet sanctioned by Rly Board. iii) No fund since jan.13, excess expenditure of 16 lakhs incurred. i) Railway Land Management System-pilot project for 1 division (ADI) i) Various reports related to earnings from various sources have been developed and are under testing. ii) Detail Estimate not yet sanctioned by Railway Board. 16 Security Applications RPF Security Management System (RSMS) on IR Application running in Production environment since March 2013. Module wise application progress during the month is as follows: Control Room Messaging (CRM), Special Intelligence Bureau (SIB) and Crime Records and Registers (CRR) Modules, Miscellaneous Crimes (MC) and Monthly Crime Review (MCR – All are working in live environment and no major problem reported during the month. Revenue Estimate amounting to Rs. 99.56 lacs for O&M activities of RPF Security Management System (RSMS) has been sent to Railway Board for onward action after having been concurred by Northern Railway finance. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 18 of 22 All India RPF Security Helpline for passengers Railway Board had decided to launch a Manual RPF Security Helpline in Northern Railways in the month of February 2014. Railway Board through an order subsequently decided to extend the manual RPF Helpline as initiated in Northern Railway to other Railways as well. The order however did not mention anything about the future course of action for IT enabled RPF Security Helpline Project sanctioned as Plan Head 17 Project in 2010-11. 17 Electrical Projects EEMS – Electrical Energy Management System Scope of Work is development of Website for Centre of Excellence (COE) and Pilot demonstration of Energy Efficient Technology on IT platform. a. The EEMS website and Application for manual Data entry forms for various Energy Data Modules were designed, developed and deployed on test bed environment. b. “Rail Saver” Website has been now secured and available on public network through secure URL https://www.railsaver.gov.in. c. Tender for “Pilot demonstration of Energy Efficient Technology on IT platform through 500 AMR Meters” has been opened on 15.05.2014 and Technical evaluation of the Tender is completed and PO has been issued on 31.10.2014. TDMS – Traction Distribution and Management System The scope of Pilot project is to design, develop and implement the system on two divisions of Central Rly / Western Rly. Current Status: • The revised detailed estimate for four Divisions sent to Railway Board / CEE(NR) /CEE(WR) for sanction. • Railways Electrical Network Masters have been designed and being tested. • Jurisdiction Master being tested. • Existing Railways Network data of TMS has been ported into TDMS Database. 18 OAEW Projects SECROADS – E Working AMC Scope of Work– Operation and Maintenance support of the SECROADS including minor modifications to the application software. The system is under remote support from 1st April 2014 through resource posted at CRIS HQ office. Work undertaken during the month: • Modifications made to the Leave and Tour IDP. While applying Leave or Tour an option has been provided to the applicant to mention the availability/leave/tour program me of other officers during the leave period mentioned by the applicant. This information makes it easy for sanctioning authority to take a decision. This functionality has been made available only to the officers from and above junior scale officers. C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 19 of 22 • Created an agent to get the number of design element like forms, views, agents in each database. Case Monitoring System for OSD/PRI, Railway Board Scope of Work – Design, Development and implementation of Case Monitoring System for OSD/PRI to be implemented in Railway Board and its replication to Zonal Railways as part of enhancement. Activities performed during the month: • Procurement process for H/W and System S/W is in progress. The tender documents have been sent to local finance for vetting. • Operation and Maintenance (O&M) support has been provided to the application modules already implemented for the users of Railway Board & Zonal Railways. 19 Communication Networks : i. Network Security Infrastructure Name of Project / Work Year of Sanction Pink Book Item No. (if any) Total sanctioned Cost of Project CRIS Portion of Cost Implementation of Network Security Infrastructure at 05 PRS/UTS data centres and Railways’ Internet Data centre (RIDC) at CRIS and implementation of IPSec over Unified Ticketing Network (UTN) 2012 Item No. 152 of pink book 2012-13 Item No. 160 of pink book 2013-14 12.0 Crores a) CRIS portion : 12.11 crores b) Railway Establishment charges : 80.16 lakh Total detail estimate cost : 12.91 crores Detail estimate has been sanctioned by Railway Board and MoU to be signed with NR. Current Status of Project (in bullet pionts) Major achievements till date (in Bullet points) PO placed. Delivery is under process. Issues pending with Signing of MoU and Fund transfer by Rlys/Rly Board N. Rly. ii SMMS Signalling maintenance management systems Name of Project / Work SMMS: Signalling maintenance management systems (Pilot Phase to be implemented on BHD-SNP section of Delhi Division and UMP (Ex)-RPJ (Ex) section of UMB division.) Year of Sanction 2013 Pink Book Item No. (if any) Item No. 167 of pink book 2013-14 C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 20 of 22 Total sanctioned Cost of Project Current Status of Project (in bullet points) 3.0 Crores Detailed estimates along with User requirement specifications, Software requirement specifications and solution architecture are being prepared. Detail estimate has been sent to to NR for sanction. Detailed estimates awaiting sanction Future planning Detail estimate has been sanctioned by Railway Board. All India Roll Out iii. Real-time Train Information System (RTIS) Name of Project / Work Real-time Train Information System (RTIS) Year of Sanction 2012 Pink Book Item No. (if any) Total sanctioned Cost of Project Item No. 456 of NCR pink book 2011-12 CRIS Portion of Cost Current Status of Project (in bullet pionts) 52.3 Crores Major achievements till date (in Bullet points) 123.69 Crores Signing of MoU is pending with IRPMU and funds are awaited. Technical specifications for the loco-equipment have been finalized and sent to IRPMU. Tender for procurement of loco equipment is to be done by IRPMU. Revised cost estimate has also been sent to IRPMU. Railway Board has decided to wait till allotment of S-MSS bandwidth by ISRO 1) RTIS trials conducted successfully in Chennai region of S. Rly. 2) Tech. Specs for Loco unit finalized and sent to IRPMU for procurement. 3) Tech. Specs of some other backend subsystems completed Issues pending with Rlys/Rly Board Allotment of S-MSS bandwidth by ISRO Detailed estimates awaiting sanction Future planning Revised cost estimate sanction awaited from IRPMU PAN India Rollout iv Upgradation of Network Management System (NMS) for Unified Ticketing Network and FOIS Network. Name of Project / Work Upgradation of Network Management System (NMS) for Unified Ticketing Network and FOIS Network. Year of Sanction 2012 C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 21 of 22 Total sanctioned Cost of Project Amount Received till March 2014 13.5 Crores 6.67 crores (Approx.) Project is delayed due to unavailability of funds. Out of 16 Railways, Funds/commitment received from only 12 Zonal Railways. However, a tender process has already been Current Status of Project (in initiated for addressing the composite bullet pionts) requirement of FOIS and UTN Network. Bids received on 12 Feb. 2014 for consolidated tender for upgradation of NMS for UTN & FOIS Network. Evaluation report for PreQualification (PQ) has been prepared and forwarded to Tender Committee. Tenchinal evaluation is in progress. Earlier Project was delayed due to unavailability of funds. Out of Major achievements till date 16, Funds/commitment received from only 12 (in Bullet points) Zonal Railways. Issues pending with Rlys/Rly Fund transfer from remaining Zonal Railways Board C:\Users\Acer\Downloads\Progress_of_IT_projects_new_format_25022015.doc 22 of 22
© Copyright 2024