Cattle shed estimate 2014-2015

"TECHNICAL REPORT"
Name of Work:
Estimated Cost:
CONSTRUCTION OF LOW COST COW SHED ( 2 UNITS )
` 56,749/-
Rupees ( Fifty Six Thousand Seven Hundred and Forty Nine )
Design:
The Engineering cell of the Department was directed to prepare the
architectural plans and detail estimates for the construction of a low cost Cow
Shed (2 units) considering the modern day requirements. In view of the
same,the plan shows a single storey structure size of (2.7 X 3.0) sqm with a
total built up area of 8.10 sqm(87.16 sq ft). The architectural plan
accomodates 2 nos of the animal with free working space for the caretaker of
the same.
Scope of Work:
The structure has been built using MS Tubular Pipes of 50mm dia
acting as the columns for the shed (4nos in each column) with the 24 BWG
GCI Sheet roofing embedded in the MS Tubular Truss sections. The estimate
provides for laying of stone soling of 150mm thick and two layers of cement
concrete in 1:3:6mix ratio of 100mm and 75mm thick respectively for the total
floor area. The scope of work involves provision for a urine pit of size
(1.2mx1.2m) built in 1:2:4 mix plum concrete and a fodder trough of
dimensions (2.7mX0.45mX0.6m) is provided with same. U Shaped drain
(23cmX23cm) connects the animal wastes to the urine pit.
Rates:
Mode of execution:
Time:
Assistant Engineer,
AH,L,F&VS Department
Government of Sikkim.
SOR 2012
Departmental.
One Month
Divisional Engineer,
AH,L,F&VS Department
Government of Sikkim.
ESTIMATE FOR THE CONSTRUCTION OF LOW COST COW SHED ( 2 UNITS )
Sl
Particulars
1 Manpower engaged for Jungle clearance, Site Preparation,levelling and throwing
of spoils etc all complete.
2
x
3
=
6.00
mdays
labours
days
2 Earth work in excavation in mixed soil in foundation trenches i/c dressing of all
sides, watering and ramming i/c disposal of excavated earth upto 30 m lead and
lift upto 1.5 m, disposed earth to be leveled and neatly dressed as per the
direction of Engineer - in - charge all complete.
Columns:
4
x 0.60
x
0.60 x 1.20
=
1.73 cum
Plinth Area:
1
x 2.70
x
3.00 x 0.45
=
3.65 cum
Urine Pit:
1
x 0.90
x
0.90 x 0.90
=
0.73 cum
=
6.10 cum
3 Providing and laying hand packed stone soling in building works with clean hard
selected stones all complete.
Columns:
4
x 0.60
x
0.60 x 0.15
=
0.22 cum
Plinth Area:
1
x 2.70
x
3.00 x 0.20
=
1.62 cum
Urine Pit:
1
x 0.90
x
0.90 x 0.15
=
0.12 cum
=
1.96 cum
4 Providing & Laying in position cement
compacting curing etc. all complete.
Columns:
4
x 0.60
x
0.60
Plinth Area:
1
x 2.70
x
3.00
1
x 2.70
x
3.00
Urine Pit:
1
x 0.90
x
0.90
Quantity
Rate
Amount
6.00 mdays
200 /day
` 1200
6.10
cum
1.96 cum
164.74 /cum ` 1005
560.280 /cum ` 1097
concrete of 1:3:6 mix, including
x
0.10
=
0.14 cum
x 0.10
x 0.075
=
=
0.81 cum
0.61 cum
x
0.10
=
0.08 cum
=
1.64 cum
1.64 cum
5 Providing U shaped drain of 23cm (ht) x 23 cm (width) of internal dimension
with 1:2:4 Plum concrete (40mm & down) side wall thickness of 23 cm on both
side with 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with
standard specification over 15 cm stone soling including 1:3 cement plaster with
neat cement polishing & rounding of junction, as per the direction of the
Engineer in Charge.
All four sides:
1
x 10.20
=
11.40 mtr
Connecting drain to Cow dung / urine Pit:
1
x 2.00
=
2.00 mtr
=
13.40 mtr
13.40 mtr
6 Providing, fitting, fixing of 24 BWG GCI sheet roofing with lapping of 150mm
(two corrugation) with G.I. hooks, bolts and nut 8mm dia with bitumen, GI
limpet washers filled with white bad including coat of approved steel primer and
two coats of approved paint, on overlapping of sheet excluding carriage all
3821.970 /cum ` 6278
694.290 /mtr
` 9303
complete.
1
x
3.30
x
3.90
=
12.87 sqm
12.87 sqm
853.44 /sqm ` 10984
7 Supplying, fabricating, fitting and fixing steel tubular trusses including cutting,
hoisting, fixing in position and applying a priming coat of approved steel primer,
welded and bolted including special shape washer etc as per the standard
specification and design and direction of Engineer - in- Charge all complete.
MS Pipe 50mm dia:
Columns:
4
Supports to the
1
Roofing:
1
x
x
x
4
5
5
x
x
x
3.90
3.30
3.90
=
62.40 Rm
=
16.50 Rm
=
19.50 Rm
=
98.40 Rm
98
x
3.80
kgs/Rm =
373.92 kg
373.92 kg
8 Providing and laying in position Plum concrete in 1:4:8 mix with stone aggregate
of size 20mm down all complete.
Fodder Trough:
2
x 2.70
x
0.90 x 0.15
=
0.73 cum
1
x 2.70
x
0.45 x 0.20
=
0.24 cum
2
x 0.45
x
0.90 x 0.15
=
0.12 cum
Urine Pit:
4
x 0.90
x
0.90 x 0.20
=
0.65 cum
=
1.74 cum
1.74 cum
9 Carriage of stock materials.
Cement:
10
Kms
v.i.no.( 4 )
=
1.64 x 4.400
=
7.23 bags
v.i.no.( 5 )
=
13.40 x 0.254
=
3.40 bags
v.i.no.( 8 )
=
1.74 x 1.700
=
2.96 bags
=
13.59 bags
say
=
6.80 qtls
MS Pipe:
v.i.no.( 7 )
=
3.74 qtls
=
10.53 qtls
=
1.05 MT
1.05 MT
(carriage of materials per MT/Km.)
=
5.57
1.05 MT
Loading and unloading of cement or steel by manual means and stacking.
10 Carriage of non stock materials.
10
Kms
Sand:
v.i.no.( 4 )
=
1.64 x 0.470
=
0.77 cum
v.i.no.( 5 )
=
13.40 x 0.063
=
0.84 cum
v.i.no.( 8 )
=
1.74 x 0.224
=
0.39 cum
=
2.01 cum
=
3690 kgs
=
3.69 MT
3.69 MT
(carriage of materials per MT/Km.)
=
5.57
Loading and unloading of stone boulders / stone aggregates / sand / kankar /
moorum.
2.01 cum
10
Kms
Stone:
v.i.no.( 3 )
=
1.96 x 0.950
=
1.86 cum
v.i.no.( 5 )
=
13.40 x 0.115
=
1.54 cum
v.i.no.( 8 )
=
1.74 x 0.500
=
0.87 cum
=
4.27 cum
=
9397 kgs
65.580 kg
` 24522
2705.71 /cum ` 4712
55.700 /MT
` 59
153.580 /MT
` 162
55.7 /MT
` 206
87.000 /cum ` 174
=
9.40 MT
(carriage of materials per MT/Km.)
=
5.57
Loading and unloading of stone boulders / stone aggregates / sand / kankar /
moorum.
10
Stone Chips:
v.i.no.( 4 )
v.i.no.( 5 )
v.i.no.( 8 )
Kms
=
=
=
=
1.54 cum
=
1.42 cum
=
0.77 cum
=
3.74 cum
=
7684.3 kgs
=
7.68 MT
(carriage of materials per MT/Km.)
=
5.57
Loading and unloading of stone boulders / stone aggregates / sand / kankar /
moorum.
9.40 MT
55.7 /cum ` 523
4.27 cum
87.000 /cum ` 372
7.68 MT
55.7 /cum ` 428
1.64 x 0.940
13.40 x 0.106
1.74 x 0.445
3.74 cum
87.000 /cum
Structure Cost=
Deduction of 7.5% Contractors' Profit
Total=
`
`
`
`
325
61350
4601
56749
Rupees ( Fifty Six Thousand Seven Hundred and Forty Nine ) Only
Junior Engineer
AH,L,F& VS Department
Govt. of Sikkim
Assistant Engineer
AH,L,F& VS Department
Govt. of Sikkim
DETAIL FINANCIAL COMPONENT WISE BREAK-UP (LABOUR / SUPPLY
COMPONENTS) FOR THE WORK "CONSTRUCTION OF LOW COST COW SHED ( 2
Sl
Particulars
A) Labour Components:
1 Manpower engaged for Jungle clearance, Site Preparation,levelling and
throwing of spoils etc all complete.
2 Earth work in excavation in mixed soil in foundation trenches i/c dressing
of all sides, watering and ramming i/c disposal of excavated earth upto 30 m
lead and lift upto 1.5 m, disposed earth to be leveled and neatly dressed as
per the direction of Engineer - in - charge all complete.
3 Providing and laying hand packed stone soling in building works with clean
hard selected stones all complete.
4 Providing & Laying in position cement concrete of 1:3:6 mix, including
compacting curing etc. all complete.
5 Providing U shaped drain of 23cm (ht) x 23 cm (width) of internal
dimension with 1:2:4 Plum concrete (40mm & down) side wall thickness of
23 cm on both side with 1:3:6 (20 mm & down) base concrete of thickness
of 15 cm with standard specification over 15 cm stone soling including 1:3
cement plaster with neat cement polishing & rounding of junction, as per the
direction of the Engineer in Charge.
6 Providing, fitting, fixing of 24 BWG GCI sheet roofing with lapping of
150mm (two corrugation) with G.I. hooks, bolts and nut 8mm dia with
bitumen, GI limpet washers filled with white bad including coat of approved
steel primer and two coats of approved paint, on overlapping of sheet
excluding carriage all complete.
7 Supplying, fabricating, fitting and fixing steel tubular trusses including
cutting, hoisting, fixing in position and applying a priming coat of approved
steel primer, welded and bolted including special shape washer etc as per
the standard specification and design and direction of Engineer - in- Charge
all complete.
MS Pipe 50mm dia:
8 Providing and laying in position Plum concrete in 1:4:8 mix with stone
aggregate of size 20mm down all complete.
9 Carriage of stock materials.
Loading and unloading of cement or steel by manual means and stacking.
10 Carriage of non stock materials.
Loading and unloading of sand.
Loading and unloading of stone.
Loading and unloading of stone chips.
al Labour Component (A)=
Amount
` 1200
` 1005
` 662
` 2072
` 3070
` 3625
` 7357
` 1555
` 162
`
`
`
`
174
372
325
21579
B) Supply Components:
Particulars
Quantity Unit
1
Sand
70.93
2
3
4
5
6
7
8
Stone
Stone chips
G.C.I Sheets (3 'x 8')
M.S pipes.
Cement.
Mixed Nails.
Carriage of materials.
150.67
131.97
6
373.92
14
2
1
cft
Rate
21
Unit
`
cft
`
to be beneficiary
1490 contribution
`
`
`
`
`
`
`
`
`
to be beneficiary
2712 contribution
3959
4473
16266
4900
170
1200
35170
56749
cft
18 cft
cft
30 cft
nos 745.5 nos
kgs 43.5 kgs
bgs
350 bgs
kgs
85 kgs
trip 1200 trip
tal SupplyComponent (B)=
Total Amount (A + B )=
Rupees ( Fifty Six Thousand Seven Hundred and Forty Nine ) Only
Amount
Junior Engineer
AH,L,F& VS Department
Govt. of Sikkim
Assistant Engineer
AH,L,F& VS Department
Govt. of Sikkim
MGNREGA Harmonization of the SPWD SOR 2012 Estimate
Total cost as per SOR 2012
Total supply component
Total supply component - 7.5% contractor profit
Total wage component
Total wage component - 7.5% contractor profit
Unskilled wage component (70%)
Skilled wage component (30%)
Unskilled Persondays
Stone instead of stone chips (resulting in additional
persondays of
131.97 x 12 / 135
Total persondays
Local material of stone and local wood to be beneficiary contribution
Revised supply component as per MGNREGA
Revised unskilled wage component as per MGNREGA
Revised Skilled wage component under MGNREGA
Revised cost as per MGNREGA
1% contingency
Total cost
Wage material ratio
56,749
35,170
32,532
21,579
19,961
13,972
5,988
70
12
82
28,330
12,647
5,988
46,965
470
47,435
36%
64%
12,647
34,788
Wages
Material
x'
x'
Fodder Trough
THIS DRAWING IS A PROPERTY OF
AH,LF & VS DEPARTMENT
GOVERNMENT OF SIKKIM
THE DRAWING OR ANY PART OF THE DRAWING
IS NOT TO BE REPRODUCED WITHOUT THE
PERMISSION OF THE DEPARTMENT
x
NOTES
Plan
1. THIS DRAWING IS TO BE READ AND NOT MEASURED
2. ALL THE DIMENSIONS ARE IN METERS UNLESS SPECIFIED
3. THE DRAWING SHALL BE READ IN CONJUNCTURE WITH ALL
SERVICES,STRUCTURAL AND OTHER RELEVANT DRAWINGS
Urine
Tank
PROJECT
G.c.i Sheet
Roofing
0.45
CONSTRUCTION OF A LOW COST COW SHED
(2 UNITS)
2.40
0.2
0.1
0.08
0.45
Fodder Trough
0.45m wide
and 0.60m ht.
DRN. BY
G.L
Cement Concrete
(1:3:6 mix)
Stone Soling
3.0
Urine
Tank
JUNIOR ENGINEER
AH,LF & VS DEPARTMENT
CHECKED BY
ASSISTANT ENGINEER
AH,LF & VS DEPARTMENT
Cross Section at X-X'
APPROVED BY
DIV. ENGINEER
AH,LF & VS DEPARTMENT