"TECHNICAL REPORT" Name of Work: Estimated Cost: CONSTRUCTION OF LOW COST COW SHED ( 2 UNITS ) ` 56,749/- Rupees ( Fifty Six Thousand Seven Hundred and Forty Nine ) Design: The Engineering cell of the Department was directed to prepare the architectural plans and detail estimates for the construction of a low cost Cow Shed (2 units) considering the modern day requirements. In view of the same,the plan shows a single storey structure size of (2.7 X 3.0) sqm with a total built up area of 8.10 sqm(87.16 sq ft). The architectural plan accomodates 2 nos of the animal with free working space for the caretaker of the same. Scope of Work: The structure has been built using MS Tubular Pipes of 50mm dia acting as the columns for the shed (4nos in each column) with the 24 BWG GCI Sheet roofing embedded in the MS Tubular Truss sections. The estimate provides for laying of stone soling of 150mm thick and two layers of cement concrete in 1:3:6mix ratio of 100mm and 75mm thick respectively for the total floor area. The scope of work involves provision for a urine pit of size (1.2mx1.2m) built in 1:2:4 mix plum concrete and a fodder trough of dimensions (2.7mX0.45mX0.6m) is provided with same. U Shaped drain (23cmX23cm) connects the animal wastes to the urine pit. Rates: Mode of execution: Time: Assistant Engineer, AH,L,F&VS Department Government of Sikkim. SOR 2012 Departmental. One Month Divisional Engineer, AH,L,F&VS Department Government of Sikkim. ESTIMATE FOR THE CONSTRUCTION OF LOW COST COW SHED ( 2 UNITS ) Sl Particulars 1 Manpower engaged for Jungle clearance, Site Preparation,levelling and throwing of spoils etc all complete. 2 x 3 = 6.00 mdays labours days 2 Earth work in excavation in mixed soil in foundation trenches i/c dressing of all sides, watering and ramming i/c disposal of excavated earth upto 30 m lead and lift upto 1.5 m, disposed earth to be leveled and neatly dressed as per the direction of Engineer - in - charge all complete. Columns: 4 x 0.60 x 0.60 x 1.20 = 1.73 cum Plinth Area: 1 x 2.70 x 3.00 x 0.45 = 3.65 cum Urine Pit: 1 x 0.90 x 0.90 x 0.90 = 0.73 cum = 6.10 cum 3 Providing and laying hand packed stone soling in building works with clean hard selected stones all complete. Columns: 4 x 0.60 x 0.60 x 0.15 = 0.22 cum Plinth Area: 1 x 2.70 x 3.00 x 0.20 = 1.62 cum Urine Pit: 1 x 0.90 x 0.90 x 0.15 = 0.12 cum = 1.96 cum 4 Providing & Laying in position cement compacting curing etc. all complete. Columns: 4 x 0.60 x 0.60 Plinth Area: 1 x 2.70 x 3.00 1 x 2.70 x 3.00 Urine Pit: 1 x 0.90 x 0.90 Quantity Rate Amount 6.00 mdays 200 /day ` 1200 6.10 cum 1.96 cum 164.74 /cum ` 1005 560.280 /cum ` 1097 concrete of 1:3:6 mix, including x 0.10 = 0.14 cum x 0.10 x 0.075 = = 0.81 cum 0.61 cum x 0.10 = 0.08 cum = 1.64 cum 1.64 cum 5 Providing U shaped drain of 23cm (ht) x 23 cm (width) of internal dimension with 1:2:4 Plum concrete (40mm & down) side wall thickness of 23 cm on both side with 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including 1:3 cement plaster with neat cement polishing & rounding of junction, as per the direction of the Engineer in Charge. All four sides: 1 x 10.20 = 11.40 mtr Connecting drain to Cow dung / urine Pit: 1 x 2.00 = 2.00 mtr = 13.40 mtr 13.40 mtr 6 Providing, fitting, fixing of 24 BWG GCI sheet roofing with lapping of 150mm (two corrugation) with G.I. hooks, bolts and nut 8mm dia with bitumen, GI limpet washers filled with white bad including coat of approved steel primer and two coats of approved paint, on overlapping of sheet excluding carriage all 3821.970 /cum ` 6278 694.290 /mtr ` 9303 complete. 1 x 3.30 x 3.90 = 12.87 sqm 12.87 sqm 853.44 /sqm ` 10984 7 Supplying, fabricating, fitting and fixing steel tubular trusses including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, welded and bolted including special shape washer etc as per the standard specification and design and direction of Engineer - in- Charge all complete. MS Pipe 50mm dia: Columns: 4 Supports to the 1 Roofing: 1 x x x 4 5 5 x x x 3.90 3.30 3.90 = 62.40 Rm = 16.50 Rm = 19.50 Rm = 98.40 Rm 98 x 3.80 kgs/Rm = 373.92 kg 373.92 kg 8 Providing and laying in position Plum concrete in 1:4:8 mix with stone aggregate of size 20mm down all complete. Fodder Trough: 2 x 2.70 x 0.90 x 0.15 = 0.73 cum 1 x 2.70 x 0.45 x 0.20 = 0.24 cum 2 x 0.45 x 0.90 x 0.15 = 0.12 cum Urine Pit: 4 x 0.90 x 0.90 x 0.20 = 0.65 cum = 1.74 cum 1.74 cum 9 Carriage of stock materials. Cement: 10 Kms v.i.no.( 4 ) = 1.64 x 4.400 = 7.23 bags v.i.no.( 5 ) = 13.40 x 0.254 = 3.40 bags v.i.no.( 8 ) = 1.74 x 1.700 = 2.96 bags = 13.59 bags say = 6.80 qtls MS Pipe: v.i.no.( 7 ) = 3.74 qtls = 10.53 qtls = 1.05 MT 1.05 MT (carriage of materials per MT/Km.) = 5.57 1.05 MT Loading and unloading of cement or steel by manual means and stacking. 10 Carriage of non stock materials. 10 Kms Sand: v.i.no.( 4 ) = 1.64 x 0.470 = 0.77 cum v.i.no.( 5 ) = 13.40 x 0.063 = 0.84 cum v.i.no.( 8 ) = 1.74 x 0.224 = 0.39 cum = 2.01 cum = 3690 kgs = 3.69 MT 3.69 MT (carriage of materials per MT/Km.) = 5.57 Loading and unloading of stone boulders / stone aggregates / sand / kankar / moorum. 2.01 cum 10 Kms Stone: v.i.no.( 3 ) = 1.96 x 0.950 = 1.86 cum v.i.no.( 5 ) = 13.40 x 0.115 = 1.54 cum v.i.no.( 8 ) = 1.74 x 0.500 = 0.87 cum = 4.27 cum = 9397 kgs 65.580 kg ` 24522 2705.71 /cum ` 4712 55.700 /MT ` 59 153.580 /MT ` 162 55.7 /MT ` 206 87.000 /cum ` 174 = 9.40 MT (carriage of materials per MT/Km.) = 5.57 Loading and unloading of stone boulders / stone aggregates / sand / kankar / moorum. 10 Stone Chips: v.i.no.( 4 ) v.i.no.( 5 ) v.i.no.( 8 ) Kms = = = = 1.54 cum = 1.42 cum = 0.77 cum = 3.74 cum = 7684.3 kgs = 7.68 MT (carriage of materials per MT/Km.) = 5.57 Loading and unloading of stone boulders / stone aggregates / sand / kankar / moorum. 9.40 MT 55.7 /cum ` 523 4.27 cum 87.000 /cum ` 372 7.68 MT 55.7 /cum ` 428 1.64 x 0.940 13.40 x 0.106 1.74 x 0.445 3.74 cum 87.000 /cum Structure Cost= Deduction of 7.5% Contractors' Profit Total= ` ` ` ` 325 61350 4601 56749 Rupees ( Fifty Six Thousand Seven Hundred and Forty Nine ) Only Junior Engineer AH,L,F& VS Department Govt. of Sikkim Assistant Engineer AH,L,F& VS Department Govt. of Sikkim DETAIL FINANCIAL COMPONENT WISE BREAK-UP (LABOUR / SUPPLY COMPONENTS) FOR THE WORK "CONSTRUCTION OF LOW COST COW SHED ( 2 Sl Particulars A) Labour Components: 1 Manpower engaged for Jungle clearance, Site Preparation,levelling and throwing of spoils etc all complete. 2 Earth work in excavation in mixed soil in foundation trenches i/c dressing of all sides, watering and ramming i/c disposal of excavated earth upto 30 m lead and lift upto 1.5 m, disposed earth to be leveled and neatly dressed as per the direction of Engineer - in - charge all complete. 3 Providing and laying hand packed stone soling in building works with clean hard selected stones all complete. 4 Providing & Laying in position cement concrete of 1:3:6 mix, including compacting curing etc. all complete. 5 Providing U shaped drain of 23cm (ht) x 23 cm (width) of internal dimension with 1:2:4 Plum concrete (40mm & down) side wall thickness of 23 cm on both side with 1:3:6 (20 mm & down) base concrete of thickness of 15 cm with standard specification over 15 cm stone soling including 1:3 cement plaster with neat cement polishing & rounding of junction, as per the direction of the Engineer in Charge. 6 Providing, fitting, fixing of 24 BWG GCI sheet roofing with lapping of 150mm (two corrugation) with G.I. hooks, bolts and nut 8mm dia with bitumen, GI limpet washers filled with white bad including coat of approved steel primer and two coats of approved paint, on overlapping of sheet excluding carriage all complete. 7 Supplying, fabricating, fitting and fixing steel tubular trusses including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, welded and bolted including special shape washer etc as per the standard specification and design and direction of Engineer - in- Charge all complete. MS Pipe 50mm dia: 8 Providing and laying in position Plum concrete in 1:4:8 mix with stone aggregate of size 20mm down all complete. 9 Carriage of stock materials. Loading and unloading of cement or steel by manual means and stacking. 10 Carriage of non stock materials. Loading and unloading of sand. Loading and unloading of stone. Loading and unloading of stone chips. al Labour Component (A)= Amount ` 1200 ` 1005 ` 662 ` 2072 ` 3070 ` 3625 ` 7357 ` 1555 ` 162 ` ` ` ` 174 372 325 21579 B) Supply Components: Particulars Quantity Unit 1 Sand 70.93 2 3 4 5 6 7 8 Stone Stone chips G.C.I Sheets (3 'x 8') M.S pipes. Cement. Mixed Nails. Carriage of materials. 150.67 131.97 6 373.92 14 2 1 cft Rate 21 Unit ` cft ` to be beneficiary 1490 contribution ` ` ` ` ` ` ` ` ` to be beneficiary 2712 contribution 3959 4473 16266 4900 170 1200 35170 56749 cft 18 cft cft 30 cft nos 745.5 nos kgs 43.5 kgs bgs 350 bgs kgs 85 kgs trip 1200 trip tal SupplyComponent (B)= Total Amount (A + B )= Rupees ( Fifty Six Thousand Seven Hundred and Forty Nine ) Only Amount Junior Engineer AH,L,F& VS Department Govt. of Sikkim Assistant Engineer AH,L,F& VS Department Govt. of Sikkim MGNREGA Harmonization of the SPWD SOR 2012 Estimate Total cost as per SOR 2012 Total supply component Total supply component - 7.5% contractor profit Total wage component Total wage component - 7.5% contractor profit Unskilled wage component (70%) Skilled wage component (30%) Unskilled Persondays Stone instead of stone chips (resulting in additional persondays of 131.97 x 12 / 135 Total persondays Local material of stone and local wood to be beneficiary contribution Revised supply component as per MGNREGA Revised unskilled wage component as per MGNREGA Revised Skilled wage component under MGNREGA Revised cost as per MGNREGA 1% contingency Total cost Wage material ratio 56,749 35,170 32,532 21,579 19,961 13,972 5,988 70 12 82 28,330 12,647 5,988 46,965 470 47,435 36% 64% 12,647 34,788 Wages Material x' x' Fodder Trough THIS DRAWING IS A PROPERTY OF AH,LF & VS DEPARTMENT GOVERNMENT OF SIKKIM THE DRAWING OR ANY PART OF THE DRAWING IS NOT TO BE REPRODUCED WITHOUT THE PERMISSION OF THE DEPARTMENT x NOTES Plan 1. THIS DRAWING IS TO BE READ AND NOT MEASURED 2. ALL THE DIMENSIONS ARE IN METERS UNLESS SPECIFIED 3. THE DRAWING SHALL BE READ IN CONJUNCTURE WITH ALL SERVICES,STRUCTURAL AND OTHER RELEVANT DRAWINGS Urine Tank PROJECT G.c.i Sheet Roofing 0.45 CONSTRUCTION OF A LOW COST COW SHED (2 UNITS) 2.40 0.2 0.1 0.08 0.45 Fodder Trough 0.45m wide and 0.60m ht. DRN. BY G.L Cement Concrete (1:3:6 mix) Stone Soling 3.0 Urine Tank JUNIOR ENGINEER AH,LF & VS DEPARTMENT CHECKED BY ASSISTANT ENGINEER AH,LF & VS DEPARTMENT Cross Section at X-X' APPROVED BY DIV. ENGINEER AH,LF & VS DEPARTMENT
© Copyright 2024