Airport Special Systems Integration, Construction Projects: Lessons Learned April 2015 © 2014 Rockwell Collins. All rights reserved. DUBAI Terminal 3 © 2014 Rockwell Collins. All rights reserved. |2 Doha Hamad International Airport © 2014 Rockwell Collins. All rights reserved. |3 Design / Build Lessons Learned • Design Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination Perform and initial building design. Design special systems requirements. Design all LAN usage including systems, individual users. © 2014 Rockwell Collins. All rights reserved. |4 Design / Build Lessons Learned • Design Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination Determine percentage of spare LAN ports and structured cabling. Perform initial LAN Design. Calculate LAN rack space, power, and HVAC requirement for each Technical Room. © 2014 Rockwell Collins. All rights reserved. |5 Design / Build Lessons Learned • Design Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination Determine percentage of spare rack space, power and HVAC (25-50%). Redesign Building (technical rooms) including rack space, power and HVAC as well as Structured cabling. Ensure redundancy extends to power to network and other key system racks. © 2014 Rockwell Collins. All rights reserved. |6 Design / Build Lessons Learned • Structured Cabling Start enabling works and cable pulling early. Post termination testing is essential. Accuracy of cable and IMO labeling will reduce time to take a system live. An accurate and verifiable Cable Management System is helpful. © 2014 Rockwell Collins. All rights reserved. Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination |7 Design / Build Lessons Learned • Security Systems Construction companies are not the best candidates for security design. CCTV Cameras, lenses and housings are long lead items. © 2014 Rockwell Collins. All rights reserved. Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination The security design must be completed early. Post design changes can add considerable delay in the schedule. Involve end user early. |8 Design / Build Lessons Learned • FOCB Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination Ensure equipment is not purchased too early. Better to have one supplier/ vendor for supply and installation rather than multiples. © 2014 Rockwell Collins. All rights reserved. |9 Design / Build Lessons Learned • Access Control System Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination The more contractors involved in an ACS door will result in a more complicated and time consuming commissioning process. Either use one contractor for all ACS door work including: • • • • • Door Jam installation. Door installation. Lock mechanism selection and installation. ACS system installation. Perform total door commissioning. © 2014 Rockwell Collins. All rights reserved. | 10 Design / Build Lessons Learned • Access Control System Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination Or require a joint commissioning of ACS doors by all providers and do not pay any provider till all components work properly. Get users involved early in final door functionality to reduce post opening changes in functionality. Once the doors are hung define and enforce construction entrance and exit routes. • Doors are commonly place out of alignment by construction workers propping doors open with whatever they have. • It is not uncommon to perform reworks on 25+% commissioned works when construction access is not controlled. © 2014 Rockwell Collins. All rights reserved. | 11 Design / Build Lessons Learned • WiFi Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination Determine how WiFi will be provided to passengers. • • • • • Will it be free? Will it be Pay as you go? Will airport employees have access? Will it be filtered? Will there be airport / airline use of the WiFi? How many concurrent connections? • How many concurrent connections are expected? • Will multiple SSIDs be required? • All of the above will determine bandwidth required and affect the LAN design. © 2014 Rockwell Collins. All rights reserved. | 12 Design / Build Lessons Learned • WiFi Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination Design coverage to meet requirements. Verify coverage with coverage mapping tools. Also consider making WiFi available to ORAT trial passengers. © 2014 Rockwell Collins. All rights reserved. | 13 Design / Build Lessons Learned • Airport Operational Systems AODB, GMS/RMS. Compile Reference Data as soon as possible and populate systems. Determine hard and soft rules, implement and test at every opportunity. User involvement is essential. © 2014 Rockwell Collins. All rights reserved. Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination | 14 Design / Build Lessons Learned • Integrations Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination Design and build Integrations as soon as possible. Establish a representative test system early to allow integration testing and follow-on support of live operations. © 2014 Rockwell Collins. All rights reserved. | 15 Design / Build Lessons Learned • CUTE Coordination with furniture provider essential to allow for efficient agent and passenger experience. Establish a “CUTE Club” with agent supervisors to address training and proficiency issues. Ensure that future technology is accounted for within design and deliverables. CUSS, Common bag drop – Understand how these will be used. © 2014 Rockwell Collins. All rights reserved. Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination | 16 Design / Build Lessons Learned • Schedule Create a consolidated schedule with appropriate dependency milestones immediately after design is complete. Maintain a consolidated schedule. © 2014 Rockwell Collins. All rights reserved. Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination Milestones must be clear and definitive. Accurate dependencies will allow early warning of slippages. Review and update regularly. | 17 Design / Build Lessons Learned • Contractual Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination Work with bidders to develop readiness checklist where dependencies on others works may delay their works. Use the checklist as milestones in contractor’s contract. • E.g. The manhole acceptance checklist for the FOCB contractor would be a milestone in the manhole construction contractor contract. • E.g. The technical room checklist from the LAN and Server contractors would be included in the construction contractor responsible for the build of the technical room. © 2014 Rockwell Collins. All rights reserved. | 18 Design / Build Lessons Learned • Change Control Board – Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination [Construction and all system providers] Establish a Change Control Board. Participants include: • Client, Engineer/Consultant, Architect, Main Contractor, special systems representative. • Any contractor that may be affected by a change. © 2014 Rockwell Collins. All rights reserved. | 19 Design / Build Lessons Learned • Change Control Board Most proposed changes affect more than the contractor who must perform the proposed change. One approved change may result in multiple change orders. Gathering all the resultant ripple effect changes will allow a better understanding of the total cost in money and time of a proposed change. Procurement lead times are always a consideration. © 2014 Rockwell Collins. All rights reserved. Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination | 20 Design / Build Lessons Learned • Administrative Maintain an electronic document control system that is optimized for searching. Do not conduct training too early – these are perishable skills. Personnel attending training should be assigned to the training in lieu of normal daily duties. A dedicated user/operator team should be assigned to the project from the start to ensure everything is designed and built to support the way the operator envisions operating the airport. © 2014 Rockwell Collins. All rights reserved. Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination | 21 Design / Build Lessons Learned • Construction and Special Systems Coordination Design Integrations Structured Cabling CUTE Security Systems Schedule FOCB Contractual Access Control System Change Control Board WiFi Administrative Airport Operational System Construction & Special Systems Coordination Construction and Special Systems Coordination • Use Weekly Special Coordination meetings between Special Systems and Construction contractors to: • Clear obstacles needing management involvement. • Work Construction obstacles. • Prioritize and allocate resources. Joint onsite team meetings daily: • Plan the day to ensure special systems contractor is working in the area with the least obstacles. • Plan for the following days to prioritize construction personnel to clear obstacles for special systems works. • Conduct Joint works where practical. © 2014 Rockwell Collins. All rights reserved. | 22 Questions? Contact Mike Perry [email protected] +974 55374058 +1 443 454 2813 © 2014 Rockwell Collins. All rights reserved. | 23
© Copyright 2024