The Weekly Bulletin

The Weekly Bulletin
Serving the Construction Industry and Bay Area Community since 1932
2015 BOARD OF DIRECTORS
May 15, 2015
OFFICERS
Duty of Care?
Lydia Roze, President
Vista Universal, Inc.
Eric Kavert, Vice President
Pacific Coast General Engineering,
Inc.
Greg Adams, Secretary
Shimmick Construction Co., Inc.
Forrest Towe, Treasurer
Anvil Builders
Nancy Brinkerhoff, Immediate Past
President, Ir onwood Commer cial
Builders, Inc.
DIRECTORS
Thom Miles
TMA Construction Services.
John Parker
Janus Corporation
Ken Regevig
K. Regevig Roofing
John C. Roeber, Past President
J. Roeber & Associates
EXECUTIVE DIRECTOR
Scott P Leary
DIRECTOR OF OPERATIONS
Denice McDavid
The Weekly Bulletin (USP3 3633) is published
every Week by the BAY AREA BUILDERS
EXCHANGE, 3055 Alvarado Street, San
Leandro, CA 94577-5711. Subscription rate
for non-members is $525 per year.
POSTMASTER:
Send address changes to BAY AREA
Builders Exchange , 3055 Alvarado Street,
San Leandro, CA 94577-5711.. Tel.:
510.483.8880. Fax 510.352.1509.
***
www.bayareabx.com
By Kenneth S. Grossbart, Abdulaziz, Grossbart & Rudman
The case of Beacon Residential Community Association v. Skidmore,
Owings & Merrill LLP was decided in July of 2014. The issue this
decision discusses is whether or not design professionals (architects,
engineers, and other design professionals) owe a duty of care to home
owners associations.
In this case, a developer came up with a multi-unit project to be a condo
development. Upon completion of the project, the units were rented as
apartments for about two years and then sold as condominiums. The
homeowners association ("HOA") eventually filed a construction defect
lawsuit against several parties involved in the construction of the
condominiums for design defects and construction defects. The HOA
contended that the defendants owed a duty of care towards the HOA and
its members.
The principal project architect argued that its input consisted of
recommendations only and it did not control the owner's decision on how
to proceed with the construction of the project and further they should not
be held liable to the third party homeowners for the alleged defects
resulting from those decisions.
The trial court initially agreed with the defendants. However, the matter
was appealed and the Court of Appeal reversed the trial court's decision
stating that the Right to Repair Act expressed a legislative intent to
impose on design professionals a duty of care to future homeowners.
The matter was appealed again and the Supreme Court of California heard
the matter. The Supreme Court also reviewed the Right to Repair Act,
which establishes a set of building standards for new residential
construction and provides that builders and other entities shall be liable
for violation of those standards. The Right to Repair Act states that
builders and other entities are liable for the residential construction,
design, specifications, surveying, planning, supervision, testing, or
observation of construction of a dwelling unit. It further states that this
applies to general contractors, subcontractors, material suppliers, product
Continued on the next page ...
Duty
continued from front page …
manufactures and design professionals to the extent that they caused a violation of any standard
because of a negligent act or omission or breach of contract. Keep in mind that Civil Code
section 937 clearly states that the definition for design professionals include architects and
architecture firms. After reviewing the Right to Repair Act as well as other supporting cases,
the Supreme Court affirmed the Court of Appeals decision. Design professionals do owe a duty
of care to homeowner associations and its members (third party homeowners).
What does this mean for the construction industry? Design professionals may negotiate higher
prices or tougher liability clauses in contracts in order to account for the risk that may be
brought into a lawsuit involving third parties.
Kenneth Grossbart is recognized as one of the foremost authorities in California construction
law. Over the past 30 years, Ken has become a respected speaker on Mechanic's Liens and other
construction related issues. Abdulaziz, Grossbart & Rudman provides this information as a
service to its friends & clients and it does not establish an attorney-client relationship with the
reader. This document is of a general nature and is not a substitute for legal advice. Since laws
change frequently, contact an attorney before using this information. Ken Grossbart can be
reached at Abdulaziz, Grossbart & Rudman: (818) 760-2000 or by E-Mail at [email protected], or
at www.agrlaw.com
***
Gary A. Duckworth, CPCU, ARM
Insurance Broker / Cook, Disharoon & Greathouse, Inc. / Oakland, CA
Workers’ Compensation PLUS Program
* Comparative Pricing * Bureau Review * Classification Review
* Audit Review * Claims Management * Local Representation
Ph. 510-437-1900, x 2006
/ Fax 510-437-1979
[email protected] . www.cdginsurance.com
Executive Office Space for Lease
Ideal space for satellite office, estimators, sales & service representatives
San Leandro
3055 Alvarado Street
San Leandro, CA
94577
510-483-8880
Concord
2440 Stanwell Drive
Concord, CA 94520
925-685-8630
For more information call Scott Leary or Denice McDavid at 510-483-8880
Attract and keep top employees
Offering a retirement plan is a smart way to make your company more
competitive when it comes to attracting and retaining the best employees. A
good retirement plan can help you:



Attract talented people in today's challenging job market.
Retain valuable employees who want retirement options in their benefits
package.
Enjoy tax advantages that may be available to you as an employer offering
the plan.
Garner Financial Management has the experience and knowledge to help you
to determine what type of retirement plan is right for your company and how
to get it established. Please contact us to discuss starting a plan for your
company or the suitability of your current plan.
(925) 282-5500.
www.garnerfm.com
[email protected]
"Primed Redwood Finger Jointed Exterior Siding"
Manufacturer exterior siding liquidation priced by the lineal foot as follows:
1x6: $.80 per lineal foot
1x8: $1.07 per lineal foot
1x10 $1.33 per lineal foot
Available in:
V-Rustic
Channel Shiplap
Cove Shiplap
Rabbeted Bevel
2&3 lap
Material is located at 1208 Hensley St., Richmond, CA 94801 and will be
available to be viewed/purchased upon request. This is a discontinued line
manufactured by Windsor Mill, sizes and qty are limited. 16' and 20' lengths
are available. All sales are final with no implied warranties or returns. Contact
Thomas at 415-902-0100 with questions or to set up a time to view the
material.
BAY AREA BUILDERS EXCHANGE - TELEPHONE (510) 483-8880. FAX (510) 352-1509
WEEKLY PLAN LIST - Friday, May 15, 2015
To view plans online go to: www.beac.com
Bid Date Bid Time Location
Plan Name / Scope of Work
5/15/2015 1:00 PM
Slurry/Overlay Asphalt Project (Informal Bid)
Hayward
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 5/11 @ 10AM at 2184 Thayer Ave., Hayward
Slurry Seal & Overlay Asphatl at six (6) Hayward Unified School Dist school sites.
1:00 PM
Fairfield
10:00 AM
Sacramento
10:00 AM
Sacramento
Various High School Gym Floor Refinishing
2:00 PM
San
Lorenzo/San
Leandro
Elementary School, Del Rey Elementary School and Bay Elementary
School
ONLINE
New Pedestrian Pathway at Laurel Creek
5/5 @ 10AM at 2490 Hilborn Rd., Fairfield
Construction of a new concrete pedestrian pathway from Cement Hill Road to Laurel Creek Elementary School through Laurel Creek Park
El Camino HS Sitewide Exterior Paint
MAND 4/30 @ 3:30PM
Sitewide prep & exterior paint of high school
$365000
MAND 5/8/15 @ 9am
The Contractor shall furnish and install all labor, material, and equipment for all work shown and/or specified in accordance with the Contract Documents for Bid
#15-131. The project consists of, but is not limited to the following scope(s) of work: Awarded contractor will screen gym floor, prep and recoat with approved
finish.
Campus Wide Painting at Adult Education School, Dayton
MAND 5/6 @ 10:30AM at 1500 Dayton Ave., San Leandro
The Project consists of but is not limited to the following work located at three (3) campuses (Adult Education School, Dayton and Del Rey Elementary Schools):
A. Campus-wide lead abatement, preparation and painting of all buildings.
a. lead abatement and preparation at existing railings, curbs and posts & seal w/ Primer.
b. lead abatement, preparation and paint remaining previously painted surfaces.
c. lead abatement, preparation of wall surfaces both previously painted and stained surfaces and the painting of one (1) interior Multipurpose Room located on
the Bay Elementary School Campus
Page 1 of 63
ONLINE
Online O
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
5/15/2015 2:00 PM
San Pablo
Prop 39 CCC Exterior LED Lighting Retrofit
Site Visit at Bidder's Own Time
- Remove (13) existing pole-mounted 100 watt Metal Halide exterior walkway light fixtures in the Arboretum area of Contra Costa College, between the Music
and Art Buildings.
- Dispose of all removed equipment.
- Replace (13) existing 100 watt Metal Halide fixtures with lower wattage, high efficiency LED pole-mounted fixtures (e.g. Lithonia DSX0 20C 700mA 40K
MVOLT, or equivalent). The proposed LED fixture will have a rated wattage lower than 100 watts but will have a comparable light output with no significant
decrease in rated lumens per lamp between the two fixture types.
- All replacement LED fixtures must be eligible for PG&E incentives. See the list of approved fixtures on the California Statewide Lighting Program Qualified LED
Products List at http://www.lightingfacts.com/ca. Any fixture not on this list shall be considered ineligible for this scope of work.
- Contractor will be responsible for complying with Proposition 39 requirements. Contractor is required to report all on-site full time employee and
trainee/apprentice hours worked on this project on a Form J after project completion. Contractor must complete the sections at the top and bottom of the form
and sign the form. See attached ‘Contra Costa College Exterior Lighting Form J’ for reference on what will be required from Contractor at the end of the project.
Contractor will also provide detailed itemized invoices after project completion to meet PG&E and Proposition 39 requirements. If invoices are found to not be in
enough detail, the Contractor will be required to revise the invoices and submit new ones.
ONLINE
Pleasanton
Scoreboard Replacement at Ken Mercer Sports Park
ONLINE
2:00 PM
Prebid Information
The City of Pleasanton is soliciting proposals for the replacement and installation of four (4) existing scoreboards at its adult softball complex located within the
Ken Mercer Sports Park, 5800 Parkside Drive.
Nilo Velazquez @ 925-931-3439
2:00 PM
Pittsburg
2:00 PM
Napa
2:00 PM
Larkspur
L-001 Journalism Lab Renovation Phase 2 - REBID
MAND 05/07/15 @ 10:00 am at site
$100000 $150000
In general, the Work consists of demolishing and converting a storage room into common lab space, adding a storage room with floor to ceiling casework,
converting a darkroom into a work area/kitchenette, alteration/addition to the exterior concrete slope at door for ADA, and adding cabinetry and display cases
within a 1,086 square foot classroom located at Los Medanos College, 2700 East Leland Drive, Pittsburg, CA as shown in drawings and specifications prepared
by tBP Architecture.
$1500000
Carither Earthquake Repairs-Phase 2 Project
MAND 4/27 @ 2PM & 5/1 @ 9AM at 1127 First St., Napa
Div_02-selected demolition; Div_05-cold-formed metal framing; Div_06-miscellaneous rough carpentry, interior finish carpentry, plastic laminate-faced arch
cabinets, plastic paneling; Div_07-roofing modifications & repair, thermal insulation, sheet metal flashing & trim, penetration firestopping, joint sealants; Div_08hollow metal doors & frames, flush wood doors, access doors & frames, aluminum windows, door hardware, glazing; Div_09-non-structural metal framing,
cement plastering, gypsum board, tiling, acoustical panel ceilings, water vapor control for flooring, resilent base & accessories, resilient tile flooring, tile carpeting,
interior & exterior painting; Div_10-toilet/bath & laundry accessories, fire protection cabinets, metal shelving system; Div_11-transaction drawer; Div_12-plasticlaminated clad countertops; Div_21-fire protection; Div_22-plumbing; Div_23-HVAC; Div_26-lighting, electrical; Div_28-fire alarm system
$1115000
Bon Air Road Bridge, AT&T Facilities Relocation
MAND 5/8 @ 10AM at 400 Magnolia Ave., Larkspur
The project shall construct new facilities including casing/ductwork, manholes, structures, and other items to allow for the relocation of existing AT&T fiber optic
cables from their current location beneath the existing Bon Air Bridge. This project will provide the new empty
conduits and structures to allow AT&T to install new fiber optic cable and splice the new cables into the existing cable facilities. No cable installation or splicing of
AT&T facilities are included in this project.
Page 2 of 63
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
5/15/2015 2:00 PM
Kentfield
2:00 PM
Dublin
2:00 PM
Hayward
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$50000
NEW New Academic Center - Corner Monument Sign
MAND 5/8 @ 2PM
A design-build contract for the fabrication and installation of a corner monument sign at the corner of Sir Francis Drake Blvd. and College Ave. on the Kentfield
campus of College of Marin. The sign is to be a board-formed concrete base with a stone face with inset lettering; and concrete foundation, refer to contract
documents and renderings for specific details.
East County Hall of Justice BP5
4/7 @ 11AM at 5151 Gleason Dr., Dublin
The Project involves the construction of a new complex of buildings on a 20-acre site in the northeastern part of Dublin. The buildings will include a new 5-story
Courthouse Building containing 13 criminal courtrooms and associated support spaces and facilities (a total of approximately 146,000 GSF); a new 2-story
County Building providing space for the Public Defender, District Attorney, and Probation Department (approximately 42,000 GSF); and a central lobby/security
screening entrance area connecting the two main building elements.
ONLINE
ONLINE
ONLINE
Hayward Senior Apartments
New Construction: 60 Units Senior Housing, 4 Stories (3 over Concrete Podium) with 5,432 SF Commercial space and surface parking at rear of property
Trades required: Grading, Paving, Utilities, Site Demo, Site Furnishings, Landscaping & Irrigation, Site Concrete, Concrete Foundations, Podium Concrete, CMU
Masonry, Structural & Misc Steel, Rough Carpentry, Interior Finish Carpentry, Waterproofing, Insulation (batts & spray-on), Built-Up Roofing, Architectural Sheet
Metal, Doors, Windows, Storefront, Door Hardware, Drywall, Heavy & Light Gauge Steel Stud Framing, Stucco, Tile, Acoustic Ceiling, Carpet, Vinyl Tile,
Resilient Base, Trash Chute, Mailboxes, Restroom Accessories & Partitions, Kitchen Appliances, Window Coverings, Cabinetry & Countertops, Fire Sprinklers,
Plumbing, HVAC, and Electrical work.
2:00 PM
Sonoma
2:00 PM
Milpitas
3:00 PM
San Jose
Fetters Apartments Sonoma Springs Mixed-Use Project
$16000000
Fetters Apartments (formerly known as “Sonoma Springs”) is located at 17360 Highway 12, Sonoma, on a 6.76 acre, 3 parcel site. Phase 1 includes Parcel B a family complex with its associated community services and parking; and Parcel C - a neighborhood commercial center and parking area. (Parcel A –
Community Garden and Bike Path with infrastructure for future senior housing, to be part of another phase.)
Milpitas Sports Center Pool Repair Prequalification
MAND 4/30 @ 2PM & 5/4 @ 10AM at 1325 E. Calaveras
Blvd., Milpitas
The City of Milpitas ("City") has determined that all prospective bidders for the Project shall be pre-qualified prior to submitting a bid on this Project. It is
mandatory that all Contractors who intend to submit a bid fully complete the Pre— Qualification Statement (PQS), provide all material requested herein, attend a
mandatory pre-qualification meeting, and be approved by the City of Milpitas to be on the Pre-qualified Bidders List ("Bidders List"). The City will not accept bids
from Contractors that are not on the Pre-Qualified Bidders List for this Project. If two or more business entities submit a bid as part of a Joint Venture, each entity
within the Joint Venture must be on the Prequalified Bidders List
Fountain Maintenance and Repair Services
Bidders must send request to
[email protected] by April 27, 2015.
The City of San Jose (hereinafter "City) is seeking quotes from qualified contractors to provide all labor, equipment and materials to perform maintenance and
repair services of various fountains located within the City. Contractor shall warrant all labor and material for a period of 12 months from the date of the
purchase order.
The RFQ consists of two (2) packages as listed below. The City intends to award up to two contracts as a result of this RFQ and will issue one purchase order
for each package. Bidders may submit bid for one or both packages.
1) Package 1: Fountains managed by Department of Transportation (DOT)
2) Package 2: Fountains managed by Department of Parks, Recreation and Neighborhood Services (PRNS)
Page 3 of 63
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/15/2015 3:00 PM
Safeway 0676
Albany
3:00 PM
Fremont
4:00 PM
Richmond
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Trades needed are: Slurry, Striping, Landscaping, ADA Concrete Ramps & Curb, Concrete Scan, Concrete Cutting, Concrete Pour Back, Demolition, Plumbing,
HVAC, Electrical, Painting, Referidgeration, Fixtures, Relaminate Checkstands, Decor, Specialties, RR accessories, Doors & Hardware, Flooring, Epoxing
Flooring, Framing, Drywall, Acoustical Cieliings, Cooler box install, Fire alarm, Fire Sprinklers. If you have any questions call or email Zach Rossberg 801-8783574 [email protected]
$2600000 Rubber Dam No. 1-Fabric Replacement
Encouraged 4/30 @ 10AM at 43885 S. Grimmer Blvd.,
$3100000
Fremont
The scope of work consists of the following elements: 1) installation and later removal of a chain link fence for project security and public safety; 2) construction
of and later removal of a Contractor designed earthen access ramp into the Alameda County Flood Control channel; 3) design, installation and later removal of
water management facilities to permit bypassing approximately 35-60 cfs (15,000 to 26,900 gal/min) of existing creek flows around the project site during
construction; 4) removal of the existing rubber dam fabric (approximately 10,000 square feet of rubberized material); 5) removal of the existing rubber sealing
sheet (approximately 3,500 square feet of rubberized material); 6) modification of the existing concrete foundation; 7) installation of the new District-furnished
rubber dam anchorage system; 8) installation of the new District-furnished rubber sealing sheet; 9) installation of the new District-furnished rubber dam fabric;
and 10) startup and testing of the completed installation.
North Richmond Multicultural Family and Senior Center
MAND 5/4 @ 11:30AM at 515 Silver Ave., Richmond
Community Housing Development Corporation (CHDC) invites the submission of sealed bids from qualified, licensed General Contractors for tenant
improvements at the North Richmond Multifamily and Senior Center located at 515 Silver Avenue, Richmond, CA 94801.
ONLINE
ONLINE
Plans will be posted once available
5:00 PM
5:00 PM
Fort Bragg
Mountain
View
Chestnut Street Corridor Improvement Project Final Design Services
& Preparation of Construction Documents
Chestnut Street was identified as a street in need of improvements in the City of Fort Bragg’s 2010 Residential Streets Safety Plan (RSSP). Chestnut Street is a
busy collector roadway that also provides pedestrian and bicycle access to the Fort Bragg High School, Redwood Elementary School, Dana Gray Elementary
School, and residential neighborhoods. In 2011, the City Council directed staff to develop feasible alternatives addressing the Right of Way (ROW) and existing
conditions of the corridor as well as obtain input and participation from the community. KASL engineering was hired to look at these issues and developed the
Chestnut Street Corridor Conceptual Plan and Right of Way Feasibility Study, which was completed in November 2012
RFQ Hotel Development Opportunity Hope Street Lots
4/24 @ 10AM
ONLINE
ONLINE
The City of Mountain View (California) is pleased to announce a hotel development opportunity on two surface parking lots in the vibrant downtown close to the
intermodal Mountain View Transit Center. Information about the offering, the process, expected project milestones and City objectives are described in detail in
the Request for Qualifications (RFQ)
5:00 PM
Novato
ONLINE
Novato Village
New-construction 48 unit senior apartment project.
Non-prevailing wage, privately funded.
Page 4 of 63
Bid Date Bid Time Location
5/15/2015 5:00 PM
Walnut
Creek
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
NEW Juanita Drive Remodel-Framing
Framing all new floor, wall & roof systems complete with all necessary hardware as specified in the plans; laying out locations of hodown rods in concrete;
exterior & insterior structural shear walls with specified hardware as noted in plans; backing for sheetrock; cathedral & vaulted ceilings as noted on plans;
installing extrior doors, windows & skylights
Please fax bid proposals to Nicole Salde @ [email protected]
NOTE: This project is in progress and will be ready to start in two weeks
5:00 PM
5/18/2015 10:00 AM
2:00 PM
2:00 PM
Citrus
Heights
Berkeley
Thornton
Contra
Costa
County
RFP-City Campus Moving and Relocation Services
ONLINE
MAND 4/23 @ 2PM
Provide relocation & moving services for the City of Citrus Heights
NEW Peets Coffee
Minor renovation of a coffee & tea shop, including installation of new interior finishes, fixtures, furniture, casework, millwork, electrrcal, lighting
ONLINE
ONLINE
RFQ-Civil Engineering Services-Plan of Study for Wastewater
Treatment Plant
The Housing Authority of the County of San Joaquin (HACSJ) is seeking proposals from licensed and bonded Civil Engineers (Proposers) with experience in
wastewater treatment facilities to provide a Plan of Study requested by the State of California’s Water Resources Control Board (SWRCB) to complete the
Housing Authority’s application for Facilities Planning funding through the Clean Water Revolving Fund
$1635000
2015 Asphalt Rubber Cape Seal Project
Recommended 4/27 @ 10AM
ONLINE
The work to be done generally consists of applying an asphalt rubber chip seal covered with a type II slurry seal to approximately 259,020 square yards of
roadway located at two sites within Contra Costa County. Site 1 is located in East Richmond Heights area of west Contra Costa County and has a total roadway
area of 172,430 square yards. Site 2 is located in the Shadow Creek area of Blackhawk in the East Contra Costa area and has a total roadway area of 86,590
square yards. Work will also include installation of 40 survey monuments, surface preparation (Not including base failure repairs and crack sealing by others),
striping removal, and placement of thermoplastic striping and pavement markings.
2:00 PM
Alameda
ONLINE
RFQ-Construction of a Modular Recreation Building at Krusi Park
The City of Alameda Recreation and Parks Department is seeking contractors interested in the design and construction services for a Recreation Center utilizing
prefabricated components. The project is located at Krusi Park on the southeast side of Alameda and is bordered by Otis Drive, High Street, Mound Street and
Otis Elementary School. The scope of work will not include the demolition of the existing recreation center or site work associated with the new building, but the
selected contractor must agree to work in close coordination with the general contractor selected to perform that work. The pre-fabricated building is anticipated
to cost approximately $1,000,000 including the slab-on-grade, structure, systems, equipment, finishes and furnishings. It is funded solely through East Bay
Regional Parks District Measure WW bond funds.
2:00 PM
Sacramento
$76007
Triangle Park Improvements
The work to be performed consists of the Triangle Park improvements in Sacramento at
2579 Traction Avenue. The improvements will consist of removal concrete flatwork, installation of play equipment, playground wood fiber, site furniture, soccer
goal, sprinkler head relocation and landscape planting
Page 5 of 63
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/18/2015 2:00 PM
Photovoltaic System for The Academic Services Building
Hayward
Prebid Information
MAND 5/4 @ 2PM at 25800 Carlos Bee Blvd., Student
Admin Bldg, Hayward
Engineers # of
Plan
Estimate Addenda #
$500000
ONLINE
Install a complete photovoltaic energy system for the Academic Services Building
3:00 PM
San
Francisco
Expansion Joints for the Moscone Convention Center Facilities
Expansion Project
ONLINE
The City seeks Trade Subcontractors with significant experience in major urban, multi-story civic, institutional or convention center projects which included
EXPANSION JOINTS on existing and new structures. Qualified Trade Subcontractors shall have successfully completed projects that are LEED® Gold certified
or better
5/19/2015 1:00 PM
San Jose
1:30 PM
Daly City
$1100000
MAND 5/11 @ 9AM at 2100 Moorpark Ave, San Jose
The project entails installation of underground infrastructure necessary to support upcoming construction throughout campus, including new water services,
electrical, and hydronic heating and cooling.
Heating, Ventilation and Airconditioning Services for the Daly City
MAND 5/7 @ 10AM at 1500 Sullivan Ave., Daly City
Utilities Upgrade Phase II
ONLINE
ONLINE
DMV Field Office
The Department of Motor Vehicles (DMV) is inviting responses for the HVAC duct cleaning services for the Daly City DMV field office. Term: 15 calendar days
Allsion Stanek @ 916-657-9810
1:30 PM
Hayward
Renovation of Greenwood Park
$2000000
MAND 5/5 @ 9AM
The scope of work includes a complete renovation of the entire park. The project will include a plaza with group picnic areas, a new play area, basketball courts,
a skate plaza, a community art piece, and open turf space. The project also includes installation of a prefab restroom building that has already been purchased
by the District.
ONLINE
10:00 AM
Concord
Citywide Bridge Repair Program-Group 1 Bridges
ONLINE
Constructin maintenance repairs for six city brisges
10:00 AM
10:00 AM
11:00 AM
11:00 AM
11:00 AM
Pleasant Hill
Tennis Court Resurfacing at Pleasant Hill Middle School
MAND 5/5 @ 10AM at 1480 Gasoline Alley, Comcord
The scope of the work includes but is not limited to, the removal of existing tennis court surface and the installation of a Slipsheet surfacing system and an
additive alternate the removal and replacement of fencing as shown herein the attached drawings and specifications
Network Operations Center (NOC) Upgrade
MAND 5/6 @ 10AM
Watsonville
Upgrade and modernization of the existing 240 SF School Network Operations Center (NOC) Upgra
NEW Learning Resoures Center Voluntary Seismic Upgrade
MAND 5/8 @ 10AM
Larkspur
Micropiles, concrete, dewatering, trenching & backfilling, cement deep soil mixing, aggregate base, asphaltic concrete paving, concrete curbs, gutters & walks,
pavement marking, utilities
$50000
Electrical Upgrade at Rio Vista Elementary School
MAND 5/5 @ 1PM at 1480 Gasoline Alley, Concord
Contra
Costa
County
Electrical Upgrade at Rio Vista Emenentary School
Sunrise Village Homeless Shelter Evaporative Cooling System
MAND 5/4 @ 11AM at 588 Brown Rd., Fremont
Fremont
Replacement
Removal and replacement of the existing commercial kitchen evaporative cooling system.
Page 6 of 63
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
5/19/2015 12:00 PM
Martinez
Concrete Kiosk Fabrication
$10000
MAND 5/7 @ 10AM at 2500 Alhambra Ave., Martinez
The County of Contra Costa is seeking qualified vendors interested in replacing a tempory concrete kiosk at a County facility. The County intends to accept bids
submitted on line through Bidsync, and award a purchase order to the lowest responsive and responsible contractor for completion of this project.
ONLINE
Sacramento
Rite Aid #6264-Sacramento
ONLINE
12:00 PM
Prebid Information
Remodel of a16,625 sf space.
2:00 PM
Oakland
2:00 PM
Millbrae
2:00 PM
Windsor
ONLINE
Waste Collection and Hauling Service in Oakland
The Contractor agrees to provide to the California Department of Transportation (Caltrans), all of the labor, tools, materials, vehicles, licenses, permits, and
equipment necessary to remove, haul, and legally dispose of non-hazardous solid waste (trash or garbage) from a Caltrans-owned, 30-yard, self-contained trash
compactor. The services shall be provided at the District 4 Office Facility, located at 320 22nd Street, Oakland, CA. 94612.
Replacement of Existing Carpet at Millbrae Police Bureau
MAND 5/5 @ 10AM at 621 Magnolia Ave, Millbrae
Remove & dispose of existing carpet at Millbrae Police Bureau & replace with new carpet, approximately 10,000 square feet
$88845
Windsor Creek Trail Improvements
Grading and paving (2” AC over 6” AB) an existing 450 ft decomposed granite multi-purpose
trail along Windsor Creek between Natalie Drive on the north side and existing AC trail on the south side. Trail shall be ten feet wide with two-foot gravel
shoulders. This work also includes clearing and grubbing existing vegetation, erosion control measures, the removal and replacement of cyclone fence and
bollards across the north end of the trail, removal and reconstruction of ADA-compliant concrete driveway ramp, sidewalk, curb and gutter where trail meets
Natalie Drive, pathway lighting, and ancillary work as indicated and specified in the contract documents
$350900
Flooring Finish Replacement Phase 3
4/28 @ 1PM
Flooring work
ONLINE
ONLINE
ONLINE
2:00 PM
Watsonville
2:00 PM
Ukiah
ADA Curb Ramps Phase 6B
ONLINE
2:00 PM
Santa Rosa
Saw cut concrete, saw cut asphalt concrete, portland cement concrete removal, asphalt concrete removal, waterin, earrthwork, subgrade preparation, aggregate
basem, sign relocation & placement, minor concrete, asphalt concrete, traffic stripes & pavement markings, wheel stops
MADF R-Mod Dividing Walls and Door Hardening
MAND 4/30 @ 2PM
The Work consists of construction of. County’s MADF R-Mod Dividing Walls and Door Hardening, at 2777 Ventura Avenue, Santa Rosa, California. The Work
includes, but is not limited to, the construction of day room dividing walls and replacement of selected cell doors.
ONLINE
2:00 PM
San Jose
Ironworkers Training Center
2:00 PM
Sacramento
$1100000
5/11 @ 11AM at 2100 Moorpark Ave, San Jose
The project entails the upgrading of electrical and mechanical services to facilitate the construction of a twenty (20) booth welding workshop. Construction works
will include but not limited to; non-structural demolition & refurbishment / renovation works including a ‘smart’ classroom and two (2) work spaces approximately
440sq.ft in area
Replace Chilled Water Piping Library And Courts Annex Building
MAND 4/28 @ 10AM
Rebid
The Contractor shall provide all labor, equipment and materials required to replace chilled water piping, associated fittings, valves, and insulation.
Replace existing 2” (approximately 385 feet) and 2½” (approximately 44 feet) chilled
water supply & return pipes with new seamless pipes, associated fittings, and insulation.
Page 7 of 63
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/19/2015 2:00 PM
A/C and Concrete Paving Replacement at Tahoe Elementary School
Sacramento
Prebid Information
Engineers # of
Plan
Estimate Addenda #
2:00 PM
Orinda
MAND 4/27 @ 9AM at 3110-60th St., Sacramento
Div_02-demolition, earthwork, trenching & backfilling, soil treatment, erosion contriol, site drainage, asphalt concrete paving, site work painting, chain link
fencing; Siv_03-site concrete; Div_05-metal fabrications; Div_10-signs; Div_11-athletic equipment
$720000
Ivy Drive Pavement Rehabilitation
5/7 @ 10AM
The work along Ivy Drive, between the northern end of Moraga Way and the northern end of Fiesta Circle, shall include pavement rehabilitation inclusive of AC
grinding, base failure repairs, and hot mix asphalt paving. In addition, minor concrete work inclusive of replacing curbs, gutters, sidewalk, curb ramps, and
drainage swales; striping; and adjusting utility boxes to finished grade shall be included.
2:00 PM
Novato
Nave Drive Multi Use Path
2:00 PM
Morgan Hill
2:00 PM
Daly City
$450000 $500000
The work to be done consist of: construction of new hot mix asphalt surfaced and ADA compliant multi-use pathway (MUP) on Nave Drive from Bolling Drive to
Main Gate Road. Work includes concrete retaining wall, clearing and grubbing, tree removal and replacement, new driveway approaches, curb and gutter, a
bioretention facility and self-retaining area, pathway lighting, grinding, roadway widening, bollards, concrete stairway, fencing/railing, new pavement markings
and striping, landscaping berms, hydroseeding, signage, temporary erosion and sediment control and other items or details not mentioned above that are
required by the plans, standard specifications, or these special provisions to be performed, placed, constructed, or installed.
Live Oak High School Electrical Connection for Announcer's Booth MAND 5/5 @ 3:30PM at 1505 E. Main Ave., Morgan Hill
Electrical and low voltage connection for an existing announcer’s booth. This includes, but is not limited to installation of: site underground power and low voltage
construction, grounding, finish work, trenching, patching, and testing as specified in the contract documents
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
2015-16 Concrete Safety Improvement Program
Work shall be performed on an "on-call" work order basis at designated locations throughout the City, ranging from small significant quantities of sidewalk,
driveway, ramps, curb, or curb & gutter areas within the City's right-of-way.
2:00 PM
Brentwood
2:00 PM
Burlingame
2:00 PM
Catroville/Ma
rina
2:00 PM
Orinda
2:00 PM
Contra
Costa
County
Pavement Management Program-2015 (Balfour Road Overlay)
$500000
Mobilization, construct areas signs, remporary pavement delineation, remove cement concrete, site preparation/clearing & grubbing, cold plane milling/wedge
cut, asphalt concrete pavement, concrete sidewalks, concrete curb & gutter, concrete curb ramp & gutter, thermoplastic pavement markings & thermoplastic
traffic stripes, pavement markers, miscellaneous iron & steel, finishing roadway, construction project funding signs
Burlingame Elementary School Site Improvements
MAND 4/28 @ 10AM
The Project consists of demolition and removal of site paving and other existing site improvements, preparation and installation of new paving at various
locations, installation of various new site play equipment, installation of various new plumbing fixtures, new site appurtenances, new slurry coat and playground
striping, new fencing, gates, and fencing repair, various new metal handrails, irrigation installation, landscape improvements.
Castroville and Fort Ord Pump Station Doors Replacement Project
MAND 4/28 @ 10AM
Fiberglass reinforced plastic doors & fiberglass resin transfer molded door frames, finish hardware
Ivy Drive and Coral Drive Sidewalk Improvements
5/7 @ 9AM
The work to be done generally consists of approximately 780’ of 5’-wide concrete
sidewalk, partial curb and gutter, concrete driveways, and ADA curb ramps
Miranda Ave Sidewalk Improvements
5/4 @ 10AM
ONLINE
ONLINE
$170000
ONLINE
$226000
ONLINE
The work to be done generally consists of widening the roadway to accommodate Class II bike lanes and paved shoulders for parking, installation of drainage
improvements and ADA compliant curb ramps, curb, gutter and sidewalk along the west side of Miranda Avenue fronting Stone Valley Middle School.
Page 8 of 63
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
5/19/2015 2:00 PM
Station Access, Parking, Path and Wayfinding Improvements
Dublin/Pleasanton
4/30 @ 10AM at 300 Lakeside Dr., 17th Fl, Oakland
Dublin
2:00 PM
Kentfield
2:00 PM
Fairfield
2:00 PM
Antioch
2:00 PM
Foster City
Engineers # of
Plan
Estimate Addenda #
$825000 $850000
Mobilization, construction phasing, demolition, excavation, site preparation, traffic control & mainetnance during construction, removal of excess material & clean
up after construction; replace concrete topping slabs, sidewalk, curbs & curb ramps; replace asphalt concrete; provide signage, tactile strips & truncated doems;
replace pavement markings & striping; provide & install a bus shelter, miscellaneous & incidental work.
$900000
NEW Austin Demolition Project (301B)
MAND 5/13 @ 10AM at 835 College Ave., Bldg MS-3,
Kentfield
Div_02-demolition, asbestos/lead/hazardous materials abatement, asbestos rtemoval, asbestos roofing removal; Div_26-exterior lighting, electrical; Div_27-voice
& data communications; div_31-site clearing, tree removal, earthmoving, de-watering, trenching & backfilling; Div_32-aggregate base, asphaltic concrete paving,
concrete curbsw, gutters & walks, precast parking bumpers, pavement marking, irrigation, planting, tree relocation; Div_33-utilities
District Monitoring and Repair Services (Intrusion Alarm)
MAND 5/5 @ 9AM at 2490 Hilborn Rd., Fairffield
Monitoring & repair services
$145000
Curb Ramps Improvements at Various Locations
ONLINE
ONLINE
ONLINE
ONLINE
Mobilization, traffic control, concrete curb ramp, curb, gutter & sidewalk repair
2:00 PM
Hercules
2:00 PM
Concord
2:30 PM
San
FRancisco
070C
Street Rehabilitation Project FY 2014-2015
Traffic control, edge grinding, full width grinding, full depth asphalt repairs, pavement markings, minor grade adjustment of various existing utility box grames &
grates on existing streets, installation of concrete curb ramps. concrete curb & gutter & concrete sidewalk.
Landscape Maintenance Annual Contract for City Landscape Districts MAND 5/5 @ 2PM
The City of Hercules (“City”) is inviting proposals (“Proposals”) from qualified landscape contractors (“Proposers”) for the contract to furnish all labor, materials
and equipment required for annual landscape maintenance for one or more of five separate landscape districts within the City, which include citywide parks and
facilities, neighborhood parks, medians, roadside landscaping, parkway strips, and open spaces
$1360000
Buchanan Field Airport East Ramp Hangar Taxi Lane Reconstruction Recommended 5/4 @ 10AM
General work description: The work to be done generally consists of pavement reconstruction with lime treatment for the east ramp hangar taxi lanes, traffic
striping, traffic marking, construction of chain link fence and concrete drainage ditch with small retaining wall in the Buchanan Field Airport in the Concord Area
$355000
NEW Hallidie Plaza Elevator Replacement (Informal Contract)
ONLINE
ONLINE
ONLINE
The work is located at Hallidie Plaza in San Francisco, California, at the entrance to the Powell Street BART and MUNI station, and includes total replacement of
all elevator system and equipment as specified in these specifications
Steve Shih, Proj Mgr, @ 415-695-2088
3:00 PM
San Jose
Cedro Transformer and FCU Upgrade
MAND 5/12 @ 10AM at 4750 San Felipe Rd., San Jose
ONLINE
HVAC & Electrcal Work
3:00 PM
San
Francisco
Window Treatments for Moscone Convention Center Facilities
Expansion Project
The City seeks Trade Subcontractors with significant experience in major urban, multi-story civic, institutional or convention center projects which included
WINDOW TREATMENTS on existing and new structures. Qualified Trade Subcontractors shall have successfully completed projects that are LEED® Gold
certified or better.
Page 9 of 63
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
5/19/2015 3:30 PM
Analy and El Molino High School Stadium Projects
MAND 4/6 @ 11AM
Analy - modernization of the existing football stadium including 980 seat aluminum bleachers, replacement of existing natural turf field with artificial turf, stadium
lighting and associated site work.
Forestville
Prebid Information
ONLINE
El Molino - modernization of the existing football stadium including 667 seat aluminum bleachers with press box ,replacement of existing natural turf field with
synthetic turf, resurface track, new accessible parking, pathway lighting and associated site work. Re-lamping of existing sports field lighting to be part of this
work.
4:00 PM
Belmont
4:00 PM
Rio Vista
4:00 PM
Yolo County
NEW RFP-Traffic Signal On-Call Services
5/12 @ 2PM
The City of Belmont is requesting proposals from qualified licensed Contractors to provide
traffic signal on-call services for six (6) City owned traffic signals located throughout the City
Front Street Sewer and Alley Water
5/12 @ 10AM at One Main St., Rio Vista
Removing & replacing existing sewer pipe & manholes; the installation of new sewer pipe & manholes; reinstatement of sewer service connections; removal &
replacement of water lines; installation of water valves; water services & meter boxes; sawcutting; trench patching; paving' traffic control & all othe related work.
ONLINE
ONLINE
ONLINE
Trucking & Hauling Services
The County of Yolo is requesting quotes/bids from qualified Suppliers to provide Trucking & Hauling Services for the Yolo County PPW-Roads Department per
specifications outlined in this Request for Proposal (RFP
5:00 PM
Sonoma
ONLINE
RFQ Sonoma Creek Diversion Structure
The Real Estate Services Division (RESD), Project Management and Development Branch (PMDB), is requesting submittals from professional engineering
consulting services to investigate and determine the needed improvements to repair/replace a water diversion intake structure at Sonoma Creek. The structure is
operated and used by the Sonoma Developmental Center (SDC) to divert water for use by consumers and staff. The Sonoma Creek diversion is associated with
two water diversion licenses that date back to the mid to late 1930s. Consultant will be requested to provide services to ensure the Department’s water rights are
preserved.
Services shall include, but not be limited to, identification of the needed repairs, develop initial design parameters including environmental constraints, provide
field investigations, establish the criteria required to prepare design documents, obtain geotechnical reports for structural concerns and for recommended
foundation systems, attend meetings, perform seismic analysis, study existing systems, provide engineering reports including estimated construction/repair
costs, prepare plans and specifications, review shop drawings, provide inspection or observation of the work, provide construction administration, and prepare
as-built drawings.
5:00 PM
Ukiah
ONLINE
Summer 2015 Street Reconstruction Project
Request proposals from firms to prepare plans, specifications, and estimates for street reconstruction, ADA curb ramps, water main replacement, and sewer line
replacement.
Page 10 of 63
Bid Date Bid Time Location
Plan Name / Scope of Work
5/19/2015 7:00 PM
El Cerrito Relief Line Project (Prequalified Contractors Only)
San Mateo
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Only Contractors that meet all the requirements below will be allowed to submit a bid on the above referenced project. All other bids will not be accepted by the
City of San Mateo.
1. Deemed prequalified for the El Cerrito Relief Line Project via Request for
Prequalification advertised in December 2014
2. Licensed by the State of California as a Class A Contractor
3. Registered with the Department of Industrial (DIR) to bid on Public Works
contracts in California
The work to be performed under this contract shall include, but not be limited to, the following:
Upsizing of an existing, 18-inch sewer line to a 27-inch line approximately 4,150 feet long along El Cerrito Avenue and Tilton Avenue, between the City limit and
North Grant Street, and a 30-inch sewer pipeline for the remainder of the alignment, approximately 5,700 feet long, will also be constructed in a new alignment.
Approximately 580 feet of the proposed 30-inch sewer line in the Gateway Park will be installed using Pilot Tube Guided Boring. This project will also replace the
existing 10-inch VCP sewer line with a 10-inch PVC pipe for approximately 2,300 feet long along El Cerrito Avenue and Tilton Avenue, between the City limit and
North Railroad Avenue. Installation and replacement of sanitary sewer manholes, stabilization of existing utilities using ground stabilization method and other
associated work, together with the miscellaneous items of work indicated on the official plans prepared therefore
5/20/2015 1:00 PM
Castro
Valley
Removal and Replacement of Roofs at Castro Valley High School and MAND 5/1 @ 1:30 PM at 19400 Santa Maria Ave., Castro
District Office
Valley
Cupertino
Site Work for Summer 2015 Modulars (20) Installation
ONLINE
Removal & replacement of roofs at Castro valley High School & District Office
1:00 PM
MAND 5/6 @ 11am
Selective demolition and construction necessary for installation of one (1) 12’x40’ modular restroom at Faria Elementary, five (5) 24’x40’ modular classrooms at
Hyde Middle, three (3) 24’x40’ modular classrooms at Miller Middle, three (3) 24’x40’ modular classrooms at Kennedy Middle, installation of two (2) 24’x40’
modular offices at Operations Center, one (1) 12’x40’ modular restroom at Stocklmeir Elementary, and installation of five (5) 24’’x40’ modular classrooms at
West Valley Elementary.
Demolition of three (3) 24’x40’ modulars at Kennedy Middle, five (5) 32’x30’ modulars at West Valley, one (1) 12’x60’ and one (1) 24’x40’ at the Operations
Center is required in this contract.
Complete documents will be posted once available
Page 11 of 63
ONLINE
Bid Date Bid Time Location
5/20/2015 1:00 PM
1:30 PM
Redwood
City
Oakland/Bla
ckhawk
1:30 PM
Porterville
1:30 PM
San Jose
10:00 AM
Sacramento
11:00 AM
Lodi
11:00 AM
San Jose
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
NEW Woodside Library
1. The Project consists of interior renovations of an existing library building. Exterior
work includes removal and replacement of the existing wood ‘window wall’ to make
more space available inside the building. The interior finishes include refurbishment
of existing wood beams and columns, wall finishes, acoustical and wood ceilings,
carpet tile, resilient flooring, interior woodwork, shelving, visual display surfaces,
lockers and accessories.
2. Equipment includes book depositories, shelving, projectors and projection screens,
appliances, and mechanical equipment.
3. Owner will require services to a new automated book depository.
4. The Project is located at 3140 Woodside Road in Woodside, California, as shown on
Documents prepared by Group 4 Architecture, Research + Planning, dated May 31,
2011.
Acorn and University Reservoirs Replacement and Stonewall
4/28 @ 8:30AM
Reservoir Demolition
$7000000 $8000000
Work includes three sites: 1) At the Acorn Reservoir site in Blackhawk: Demolish the existing 1.2-MG welded steel reservoir, construct 0.4-MG and 0.6-MG prestressed concrete reservoirs, valve pits, associated piping and earthwork. 2) At the University Reservoir site in Oakland: Demolish the existing 0.5-MG welded
steel reservoir, construct two 0.09-MG steel reservoirs, concrete valve pits, and associated piping. 3) At the Stonewall Reservoir site in Oakland: Demolish
existing 0.2-MG steel reservoir, remove piping and restore site.
Dismantle Observation Towers
MAND 04/29/15 @ 9:00 am
Contractor shall furnish all labor, materials, tools, equipment, and transportation necessary to dismantle and remove three (3) observation towers. The
observation towers are steel structures erected on a concrete slab. Utilities will be disconnected by Porterville Developmental Center prior to dismantling.
Pavement Maintenance Service FY2016-2020
4/21 @ 11AM at 3331 N. First St., Bldg A, San Jose
Paving repair & replacement services at the designated Santa Clara Valley Transportation Authority Facilities, including but not limited to plugging & AC
replacement as designated, monolithic concrete curb & gutters or other small concrere replacement tasks, crack fill, slurry sealing, chip sealing, pot holing &
striping
Restroom Remodels @ Leo A. Palmiter Jr / Sr High School
MAND 5/6 @ 7:30AM
Includes conversion of a women's restroom to a boy's restroom, conversion of a boy's restroom to a women's restroom, enlarging and existing staff restroom to
be an accessible men's restroom, installation of epoxy flooring with integral coved base, updating the finishes in the existing girl's restroom, installation of new
fixtures at restrooms and repainting the restrooms / updating finishes.
$1000000
NEW 2015 Pavement Surface Treatment Project
The work consists of rehabilitating 154,800 square yards of asphalt concrete pavement with fiberized slurry seal, asphalt rubber cape seal, and other incidental
and related work, all as shown on the plans and specifications for the above project.
Site Work for Summer 2015 Modulars (8) Installation
MAND 5/6 @ 2PM at 5050 Moorpark Ave., San Jose
The project consists of: Selective demolition and construction necessary for the installation of four (4) 24’x40’ modular classrooms at De Vargas Elementary,
three (3) 24’x40’ modular classrooms at Dilworth Elementary, and one (1) 36’x40’ modular classroom at McAuliffe Elementary
Page 12 of 63
B003
ONLINE
E408B/0
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/20/2015 11:00 AM
Sacramento
Central Plant Utilities Extension-Emergency Generator Building 41
11:00 AM
Morgan Hill
11:00 AM
Mill Valley
2:00 PM
Sacramento
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 5/6 @ 10AM at 4800-2nd St., Suite 100, Sacramento
Project consists of installation of a mobile generator AB pad and fencing; installation of new OFCI manual transfer switch; re-working existing electrical wiring,
feeders and components within Building 41 to support new electrical components; installation of new feeder cabling, conduit and conduit tray; rewiring existing
ATS components; site fencing, concrete and pads to support project; and testing and verification of all systems
District Office - Technology Implementation Project
MAND 05/08/15 @ 2:30 pm at 15600 Concord Circle,
Morgan Hill
The project consists of, but is not limited to, the procurement and installation of structured cabling, uninterrupted power supply (UPS), MDF/IDF cabinets along
with the installation of the network switches, wireless access points, clocks/speakers, VoIP phones and all other work as described in the contract drawings,
front end documents, and specifications. Some products are owner furnished, contractor installed (OFCI) and require detailed coordination and management by
this Contractor. The school sites are occupied and work hours
are limited to after school hours, weekends, and holidays
SASM MCC-1 and MCC-1A Replacement Project
MAND 4/30 @ 10AM at 450 Sycamore Ave., Mill Valley
The proposed scope of work includes, but is not limited to, demolition and replacement of two motor control centers (MCC-1 and MCC-1A), two new variable
frequency drives complete with enclosures (Effluent Pumps No. 1 and No. 6), replacement of main and feeder cables for motor control centers, installation of
Agency provided 25 KVA transformer in same location as existing 25 KVA transformer at the Recirculation and Effluent Pump Building, and all other work as
shown on the Plans and as called for in the Special
Provisions and as directed by the Engineer.
ONLINE
Mid Sacramento Class 1 Bikeways Maintenance
ONLINE
ONLINE
ONLINE
Provide all labor, equipment, and materials necessary to maintain the Mid-Sacramento Class 1 Bikeways Maintenance as specified in the Scope of Services,
and the City of Sacramento Landscape Maintenance Services General Specifications and Provisions, LS14.
2:00 PM
Walnut
Creek
2:00 PM
Sunnyvale
2:00 PM
Stockton
ONLINE
NEW Fed Ex Office Remodel Project (Specs on Plans)
Minor construction pertaining to the tenant imporvements for a existing FedEx office, including concrete, handrails & railings, miscellaneous carpentry, bulding
insulation, sprayed fire-resistive materials, through-penetration firestop systems, joint sealants, steel doors & frames, flush wood doors, door hardware, gypsum
board, acoustical panel ceilings, ceramic tile, resilinet tile flooring, sheet vinyl floor coverings, carpet, wall coverings, painting, toilet compartments, impact
resistant wall protection, fire protection specialties, toilet & bath accessories, plumbing, mechanical, lighting, electrical & communications
Cupertino Middle School Bldg 100, 200 and 300 Re-Roofing
MAND 4/22 @ 1PM at 1650 S. Bernardo Ave., Sunnyvale
Installation of new roofing at Buildings 100, 200 & 300
Security Communication Tower Project
ONLINE
MAND 4/20 @ 10AM at 120 Hooper Dr., Stockton
ONLINE
MAND 5/6 @ 4PM at 1870-19th St., San Pablo
ONLINE
Installation & maintenance of communications equipmenmt/towers
2:00 PM
2:00 PM
San Pablo
San Jose
Dover Elementary School Synthetic Playfield
Replacement of existing grass play field with synthetic turf play field system and
associated drainage for synthetic turf system. Scope also includes landscape and irrigation and associated site work and grading.
RFQ Berryessa Station Campus Area and Roadways 15002F
4/22 @ 10AM
Request for Pre-Qualification of Bidders for the BART Silicon Valley Berryessa Extension
Page 13 of 63
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
5/20/2015 2:00 PM
Repair Hippo Fountain Project at the Yerba Buena at the Children’s
Play Circle
5/1 @ 2:30 PM at 750 Howard St., San Francisco
2:00 PM
San
Francisco
San
Francisco
Engineers # of
Plan
Estimate Addenda #
ONLINE
The Project is to provide the following: Refurbish/improve the Hippo Splash Pad/Play Stream and perform all repairs necessary to comply with the 2010 Title 24,
Part 2, Vol. 2, California Building Code, Section 3102B. SBE/LBE/MBE/WBEs encouraged to submit bids.
Heating Ventilation and Air Conditioning Work at Yera Buena Gardens 5/1 @ 1PM at 750 Howard St., San Francisco
ONLINE
Remove and replace boilers and install HVAC controls at the Yerba Buena Gardens Management Office, Children’s Creativity Museum, Children’s Development
Center, Bowling Alley, and Ice Skating Rink. SBE/LBE/MBE/WBEs encouraged to submit bids.
2:00 PM
Sacramento
ONLINE
South Sacramento Class 1 Bikeways Maintenance
Provide all labor, equipment, and materials necessary to maintain the South Sacramento Class 1 Bikeways Maintenance as specified in the Scope of Services,
and the City of Sacramento Landscape Maintenance Services General Specifications and Provisions, LS14.
2:00 PM
Sacramento
2:00 PM
Emeryville
2:00 PM
Sacramento
$5221000
Land Park Water Main Replacement Phase 2
The work to be performed under these Special Provisions generally consists of
furnishing and installing 6-inch, 8-inch, and 12-inch diameter water mains. Also included is furnishing and installing all required fittings, valves, blow offs, system
ties, fire hydrants and other appurtenances, water services, meter setters, meter boxes, meter lids, and meters at various commercial and residential properties
within designated areas of the City of Sacramento as indicated on the plans, and connecting to the existing distribution system and transmission systems as
indicated on the Plans. This contract also covers connecting city water services to existing residential water services, removing existing fire hydrants and
abandoning existing mains as shown on the Plans and in these Special Provisions.
NEW 6425 Christie Street Medical Records Retention
MAND 5/7 @ 8AM
Remodel of existing office space. Scope of work includes selective demolition of non-rated partitions, electrical systems, etc. Installation of non-rated partitions,
floor finishes, painting, and minor modifications to existing electrical and HVAC
ONLINE
ONLINE
Donald Orlando, Proj Mgr, @ 415-353-1923
ONLINE
West Natomas Class 1 Bikeway Maintenance
Provide all labor, equipment, and materials necessary to maintain the West Natomas Class 1 Bikeways Maintenance as specified in the Scope of Services, and
the City of Sacramento Landscape Maintenance Services General Specifications and Provisions, LS14.
2:00 PM
Daly City
ONLINE
2015-16 Street Resurfacing
Street marking removal, traffic stripiing & signing, preservation of property, trees on Midway Drive, adjustment to grade of existing manhole frames & covers,
asphalt concrete grindings found in collection system, removalof pavement in fabric, storm water pollution prevention, recylcing of construction materials
2:00 PM
Sacramento
ONLINE
East Natomas Class 1 Bikeways Maintenance
Provide all labor, equipment, and materials necessary to maintain the East Natomas Class 1 Bikeways Maintenance as specified in the Scope of Services, and
the City of Sacramento Landscape Maintenance Services General Specifications and Provisions, LS14.
Page 14 of 63
Bid Date Bid Time Location
5/20/2015 2:00 PM
2:00 PM
2:00 PM
2:00 PM
2:00 PM
2:00 PM
2:00 PM
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Academic Core Buildings Ohlone College Project Inspector Services
The scope of services for this project includes providing project inspector (PI) services including inspection, observation, reporting, and coordinating of other third
party inspections/special tests required to meet applicable codes, regulations, and DSA requirements for all newly installed work. These services shall be
provided as required by the project documents and DSA requirements. Documents required by this contract include, but are not limited to, daily site visit reports,
semi-monthly progress reports, and project inspection cards. Related meetings may include, but are not limited to, pre-installation meetings, weekly construction
meetings, and meetings to resolve specific issues which arise during the course of construction. On time completion of construction is of critical importance to
mitigate any impact to college operations, and construction duration is limited due to the availability of the facilities. Competent qualified staff, available resources
and testing facilities are required for a successful outcome of the project objectives in regards to scope and schedule.
$600000
Treatment Plant Safety Enhancements Phase 4 Revised
5/6 @ 10AM at 5019 Imhoff Pl, Martinez
Martinez
The work generally consists of safety improvements to existing facilities in the treatment plant and ADA improvements.
2015 Pavement Rehabilitation Project at Milpitas High School
MAND 5/13 @ 1PM at 1285 Escuela Parkway, Milpitas
Milpitas
Site demolition, site utility repair, sitework concrete, headerboards, excavation, grading & backfill, lime cement soil/aggregate satabilization, asphalt joint & crack
filling, hot mix asphalt pavement repair, asphalt emulsion sealer, pavement marking, chain link fencing
Togo's
Oakdale
NEW
Oakdale
Tenant Improvement to existing 1690 sq. ft. space for future Togo's restaurant. Trades Include: Demolition, Finish Carpentry, Doors/ Frames/ Hardware, Drywall
& Metal Studs, Ceramic Tile, Acoustic Ceiling, Painting, FRP, Toilet Partitions/ Accessories, Fire Suppression, Fire Sprinklers, Plumbing, HVAC, Electrical, etc.
Party
City-Pleasant Hill
Pleasant Hill NEW
Alteration of existing Party City space & expansion in adjacent space, including florring, ceilings, structural steel frame, overhead rolling doors, aluminum
storefront framing system, automatic sliding doors & frames, storefronts security grille, skylights, signage, painting, asbestos removal, fixtures, plumbing, HVAC,
fire protection, lighting, security system, millwork & shelves, fire alarm system
$1796000
2015 Street Seal Coat Project and 65th Street Bike Lane
Sacramento
The work to be performed under these Special Provisions consists of resurfacing (slurry seals,microsurfacing, and chip seals) various residential, collector,
arterial streets, and bike paths (see Appendix A and B) within the City of Sacramento. This work shall consist of mixing asphaltic emulsion, aggregate, setcontrol additives, water, and spreading the mixture on properly prepared surfacing and any other work involved in constructing or placing material. This work
shall also include the removal and placement of traffic striping, markings, signs, and raised pavement markers. Selected manholes and water valves shall be
raised to the new grade. Pavement grinding at selected curb ramps will be included to meet ADA requirements. The work also includes removal and
replacement of curb ramps and removal and reconstruction of curb and gutter and concrete median on 65th Street.
ONLINE
Cupertino
ONLINE
Fremont
ESA Eco Lab Building Roof Replacement
MAND 4/30 @ 11AM at 21250 Stevens Creek Blvd., Rm
106, Cupertino
ONLINE
094C
ONLINE
ONLINE
ONLINE
Roof replacement project
2:30 PM
San
Francisco
Potrero Avenue Roadway Improvements
4/15 @ 10AM at 30 Van Ness Ave., San Francisco
$20000000
The Work to be done under this contract is located on Potrero Avenue from Alameda to 25th Street, and consists of water, paving and streetscape work. The
work includes traffic routing, sewer and drainage, water main installation, streetlight work, traffic striping and traffic signal work, sidewalk construction, landscape
and irrigation, overhead contact system and traction power work, and pavement renovation, and all appurtenant work in accordance with specifications and
drawings
Cristina Olea, Project Manager, @ 415-558-4004
Page 15 of 63
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
5/20/2015 2:30 PM
Pavemement Renovation and Sewer Replacement-Guerrero St., San
Jose Ave. and Corbett Ave
4/29 @ 1:30PM at 1680 Mission St., 3rd Fl, San Francisco
San
Francisco
$6000000
ONLINE
Pavement renovation, curb ramp, bulbout and island construction, sewer replacement, drainage and water work, traffic routing, and all associated work.
Ramon Kong, Project Mgr, @ 415-554-8280
2:30 PM
San
Francisco
SFGH Mod Building 3 Ramp Accessibility Upgrade
5/7 @ 3:30PM
$450000
ONLINE
The Work to be done under this contract is located at San Francisco General Hospital 1001 Potrero Avenue, San Francisco, CA 94110. This is an ADA barrier
removal project to meet accessibility requirements and consists of construction of new accessible ramp and stair, new paving, installing new concrete flatwork,
re-striping, landscaping and irrigation, site lighting and other related work
Marilyn Thompson, Proj Mgr, @ 415-557-4681
3:00 PM
Santa Cruz
ONLINE
Applied Sciences (Baskin Engineering) - BSL2+ Research Lab Room MAND 5/6 @ 3PM at 11456 High St., Barn G, Santa Cruz
287 Remodel
Construction of the Biomolecular Engineering Bio-safety Level 2+ Research Lab at the UCSC Baskin Engineering Building involves modifications to the existing
room including new walls, casework, sinks, lighting, flooring as well as modifications to the electrical, data, plumbing and HVAC systems
Complete documents will be posted once available
3:00 PM
Vacaville
3:00 PM
South San
Francisco
3:00 PM
Redwood
City
ONLINE
Brass Tap Restaurant
Interior improvements, electrical, HVAC, plumbing, outdoor seating
NEW Smart Parking Meters and Related Services
ONLINE
Provide the installation of approximately 650 new smart parking meters.
$870000
Sanitary Sewer Pump Station Improvements Project Marina PS, PS
No. 17 and PS No. 19
ONLINE
Div_02-demolition, precast concrete utility vaults, stormwater pollution prevention, demolition & salvage, earthwork, trenching & backfill, asphalt paving &
surfacing, flexible ball joints, concrete improvements, cathodic protection, sanitary sewers, flow bypass systems, wet well protective coatings; Div_03-concrete;
Div_05-metal fabrications, anchor bolts; Div_07-sealants; Div_08-acccess hatches; Div_09-surface preparation & coatings systems, miscellaneous protective
coatings; Div_11-electrical motor drive, submersible wastewater pump operations, submersible pumps, fiberglass pressure blowers; Div_15-piping system;
Div_16-standby siesel engine-generator sets, electrical; Div_17-instrumentation & controls
Joel Evora, Proj Engineer, @ 650-780-7328
3:00 PM
El Dorado
Hills
3:00 PM
Napa
El Dorado Hills Wastewater Treatment Plant Digester 1 Repairs
MAND 5/4 @ 9AM at 4625 Latrobe Rd., El Dorado Hills
$350000
ONLINE
Repair and re-paint digester 1, including concrete and mechanical features.
ADA Ramp Sidewalk Curb and Gutter Replacement Project
Retrofitting of ADA ramps, sidewalk tie-in, curb & gutters installations at various locations throughout the City
Page 16 of 63
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/20/2015 3:00 PM
Food Service Equipment for the Moscone Convention Center
Facilities Expansion Project
San
Francisco
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
The City seeks Trade Subcontractors with significant experience in major urban, multi-story civic, institutional or convention center projects which included
FOOD SERVICE EQUIPMENT on existing and new structures. Qualified Trade Subcontractors shall have successfully completed projects that are LEED® Gold
certified or better.
4:00 PM
Hillsborough
ONLINE
Datum Upgrade Project
The goal of this project is to catalog and recover existing survey monuments and benchmarks within the Town and relate them to a common vertical control
datum, the North American Vertical Datum of 1988 (NAVD88). Additionally, where sufficient monuments do not exist within the Town, the project will install new
monuments at an appropriate density to facilitate
ONLINE
4:00 PM
Richmond
4:00 PM
Union City
Fremont Lift Station Fence Installation Project
ONLINE
Union City
Contractor shall provide all labor, equipment, mobilization, demobilization, and superintendence to install new fencing at the Fremont Lift Station in accordance
with the following requirements and attached drawings and technical specifications
Digester Gas Treatment Vessel Media Replacement
05/14/15 @ 9:00 am at 5072 Benson Road, Union City
Work Included: Furnish labor, services, materials, equipment, transportation, permits, fees, applicable taxes and others as necessary to complete the
replacement of Gas treatment vessel media on a schedule to be determined by the District.
ONLINE
4:00 PM
NEW Lead Abatement Services
The City of Richmond Housing Authority Project REAL IV (Richmond Effort to Abate Lead) program is seeking the services of multiple qualified Lead Hazard
Control Contractors to conduct lead-based paint hazard control and healthy homes remediation in residential housing units.
Open Gas Treatment Vessels and remove interior contents of Gas treatment Vessel.
Allow time for District inspection and repair of Vessel.
Perform new media installation and reseal Gas Treatment Vessel
Haul and dispose of the removed materials to an approved off-site disposal location.
Provide safety measures for all the work described herein, including confined space entry equipment and barricades around the site.
5:00 PM
Sacramento
Interior Office Space Planning Office Design & Remodeling
$950000
5/6 @ 1PM
The Proposer shall provide all labor, material, and equipment required to perform the Service described as: INTERIOR OFFICE SPACE PLANNING, OFFICE
DESIGN & REMODELING. Services are needed from approximately June 1, 2015 through May 31st, 2018.
ONLINE
5:00 PM
San Mateo
WWTP Digester Gas to Compressed Natural Gas Infra and Vehicle
Fueling System-Prequalification
ONLINE
The City of San Mateo is requesting proposals for the prequalification of general contractors for bidding on the construction of a unique Digester Gas to
Compressed Natural Gas project at its Wastewater Treatment Plant located at 2050 Detroit Drive, San Mateo, CA
5/21/2015 1:00 PM
Union City
Alvarado-Niles Road Pedestrian Safety Improvements
Environmental protection, traffic control & construction area signs, cold plane asphalt concrete pavement, remove base & bituminous surfacing, relocate
roadside sign, remove concrete & curb, hot-mix asphalt base, concrete trench drain & grate, median column & fence, concrete sidewalk, concrete curb & gutter,
concrete curb ramp, remove existing pavement marking & striping, install new sign panel on existing post, install new sign on signal mast arm, thermoplastic bike
lane line, signals & lighting
Page 17 of 63
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/21/2015 1:30 PM
Resurfacing of Tennis Courts at Mt. Eden Park
Hayward
Prebid Information
MAND 5/7 @ 9AM at 2451 W. Tennyson Rd., Hayward
Engineers # of
Plan
Estimate Addenda #
$50000
ONLINE
Lump Sum Base Bid: Resurfacing of 4 tennis courts.
Add Alt: Cost per Linear Foot to add RiteWay Tennis Court Repair System, or equal
E424B/0
10:00 AM
San Rafael
10:00 AM
Windsor
2015 Pavement Preservation Oak Creek Neighborhood
10:00 AM
Concord
Cowell Road Safety Improvements
Multi-Use Pathway Repairs
Pathway repairs of the Bahia Vista School, Mahon Creek & Shoreline Park
11:00 AM
Petaluma
$861000
5/5 @ 10:30AM at 8400 Windsor Rd., Windsor
The work is more specifically defined in the Contract Documents, but in general consists of installing storm drainage; pavement repairs; keycuts, leveling course,
fabric and asphalt pavement overlay; adjusting utility covers to grade; replacing pavement striping and legends; and other related items of work.
$50000 $100000
Mobilization, dust control, construction area traffic control, clearing & grubbing, concrete curbs, gutters, curb ramps, sidewalks & valley gutters, hot-mix asphalt,
drainage, cold plane asphalt concrete pavement, construction staking, traffic stripes & pavement markings, roadside sign, electrical systems
NEW Casa Grande High School New Athletic Facility
MAND 5/7 @ 11AM
New athletic facility that includes a new synthetic turf field and rubberized running track, a new restroom building and ticket booth, and all demolition, site
clearing, excavation, utilities, site paving, and landscaping as shown on the drawing
ONLINE
ONLINE
ONLINE
Documents will be posted once available
2:00 PM
San Jose
2:00 PM
Rio Vista
2:00 PM
Sacramento
2:00 PM
Sacramento
5/7 @ 10AM at 101 Skyport Dr., Rm 101, San Jose
Roadway excavation, crack sealing, type II microsurfacing, removal & replacement of traffic stripes, pavement markings, pavement markers & other details of
work
$250000
Rio Vista Transportation Yard New Fuel Aboveground Storage Tank MAND 5/8 @ 10AM at 940 St. Francis Way, Rio Vista
Mechanical, electrical, grading, factory-fabricated fuel storage tank
038C
Jenkins Hall Exterior Painting 2015
Online O
Capitol Expressway Pavement Resurfacing
The work performed under this contract consists of furnishing all material, labor, tools,
equipment and services necessary to complete the work specified herein and shown or
noted in these contract documents. The project includes, but is not limited to:
Prepare exterior building, clean, repair, patch and re-paint entire building exterior with
elastomeric coating. Included in this contract is installing thin brick University supplied
thin brick veneer at entrance portion of building. Project start date is July 1, 2015 and
project must be completed by August 8, 2014, Jenkins Hall will be unoccupied
during the construction.
$807000
Sacramento International Airport East Runway Projects
MAND 4/27 @ 1PM
The work to be performed under this contract includes the furnishing of all
labor, materials, equipment, transportation and services necessary for removal of existing centerline and lead-in lines, saw and reseal joints, and repair spall
areas all on Runway 16L/34R. The project will also include reconstruction of existing expansion joints on Taxiways Delta 5 and Delta 9.
Page 18 of 63
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
5/21/2015 2:00 PM
El Camino Avenue - Phase 2 - Street and Sidewalk Improvements
5/6 @ 1:30PM at 9700 Goethe Rd., Dte D, Sacramento
2:00 PM
2:00 PM
Sacramento
San
Francisco
San
Francisco
Engineers # of
Plan
Estimate Addenda #
$2020000 $2020000
ONLINE
The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for clearing and grubbing, pavement grinding and
removal, tree removal, roadway excavation, installation of curb gutter & sidewalk, installation of drainage pipes, manholes & inlets, aggregate base and asphalt
pavement, traffic striping, traffic signal modifications, street lighting, median construction, placement of landscaping and other incidental work.
TG16.0 Interiors/Finishes Construction Services Transbay
3/5 @ 2PM
ONLINE
Webcor/Obayashi Joint Venture seeks General Contractors that have significant experience with interiors and finishes including but not limited to, concrete
masonry units, metal framing, drywall, building insulation, penetration firestopping, toilet accessories, miscellaneous metals for own work, bird deterrent, ballistic
resistant panels, acoustic ceiling tiles, acoustic wall treatments, tile, tile carpeting, resilient base, painting, site paints, high performance coatings, doors, frames,
hardware, low voltage wiring for own scope of work, interior architectural woodwork, countertops, prefabricated buildings, photo-luminescent exit accessories
(PLEA), and final cleaning on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems in
the following trade: TG16.0 Interiors/Finishes
$446000
College Hill Learning Garden
Networking Conference 4/22 @ 10AM
ONLINE
The objective of the project is to landscape a lot near the College Hill Reservior in San Francisco, including grading and earthwork, concrete foundations, paving,
fencing, custom fixture installation for solar panels, electrical, plumbing, irrigation installation, various landscape features, and animal housing units
2:00 PM
San Mateo
Monte Diablo Avenue Street Rehabilitation Project
$485000
E426B/0
Asphalt concrete pavement imprpvements, wheelchair ramp installation, curb & gutter, sidewalks repair as necessary to improve stormwater surface runoff; new
signs & striping for bicycle improvement
2:00 PM
San Rafael
2:00 PM
Santa Rosa
2:00 PM
Stockton
2:00 PM
Vallejo
ONLINE
Warner Court Sewer Improvements
Sewer Improvements
Roseland Village Neighborhood Center Project
Optional 4/24 @ 3:30PM at 1440 Guerneville Rd., Santa
Rosa
The Sonoma County Community Development Commission (SCCDC) is soliciting preliminary proposals from qualified developers for construction of a multi-use
development on its Roseland Village Property in Santa Rosa, California.
$2845000
Soccer Facilities Improvements
MAND 4/28 @ 11AM
This project is in the process of being reviewed by the Division of State Architect (DSA). The bid opening will be contingent on DSA approval. The Project
generally consists of, but not limited to: Demolition and removal of existing tennis courts and natural grass practice field, to be replaced with synthetic turf soccer
field with a chemically-treated subgrade, rock base, geotextile fabric, concrete header, and athletic field striping. Site improvements include soccer goals and
corner flags, perimeter fencing and containment netting, and a public address system. Site work also includes resurfacing five (5) existing tennis courts with a
new color coat, court striping and accessible gates.
Denton Court II Sanitary Sewer Replacement Project
$280010
The work consists of replacing approximately 775 linear feet of 12 inch Sanitary Sewer Main by Pipebursting Method, 170 linear feet of 12 inch Sanitary Sewer
Main by Open Trench Method, 383 linear feet of 6" Sanitary Sewer Main by Pipebursting Method, and miscellaneous appurtenances complete and in place
Page 19 of 63
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/21/2015 2:00 PM
DVC Seal Coat & Strip Overflow Parking Lot
Pleasant Hill
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$140000
MAND 5/12 @ 10AM at 321 Golf Club Rd., Pleaasant Hill
1. Per specifications, provided by the Asphalt Sealcoat Manufacturers Association, asphalt sealcoat work shall conform to the ASMA specification 1-3 ASPHALT
SEALCOATS, including, material-mix certification by an independent lab and scale tags with tare weights.
ONLINE
2. Remove approximately 4200 sq ft (contractor must verify) of main traffic lane and replace with two 3 inch lifts of standard roadway asphalt.
3. Prepare entire surface of asphalt by commercial sweeper and blowers. Remove all vegetation and debris. Clean out all cracks ½ inch or larger.
4. Crack fill all cracks ½ inch or larger with hot-pour emulsified crack sealer per manufacturer’s recommendations. (Approximately 10,000 linear feet - contractor
must verify)
5. Apply one heavy squeegee coat of ASMA approved asphalt emulsion sealer to the entire asphalt surface. Approximately 382,000 sq feet (contractor must
verify). Dilutions and application in strict accordance with manufacturer’s recommendation. After first coat is thoroughly dry apply a second coat to the entire
asphalt surface.
2:00 PM
2:00 PM
West
Sacramento
Marin
County
2:00 PM
Vallejo
2:00 PM
Dublin
6. Layout and stripe approximately 1100 8 ft 6 inch parking stalls per plan, with exception of 8 foot spacing as noted that should be marked “Compact Only”.
Reapply directional arrows and stop bars to match existing. Use approved traffic paint, applied in a thick coat to fill all voids and holidays.
$2580464
Sycamore Park Project
5/4 @ 10AM
ONLINE
The work consists of grading, joint trench of major utilities, water, sewer, and storm drain connection, hardscape, basketball court, lighting, shade shelter, play
equipment, irrigation, planting of turf, shrubs, trees, fencing, and community garden. The contractor shall provide labor, materials, tools, and equipment, and
shall perform all work necessary to complete project as shown on the plans, drawings, and specified herein. The work shall be so performed so that upon
contract completion the project shall be ready to use
$45000
NEW SecureAll Electronic Hardware Infrastructure Installation-Phase 2
MAND 5/7 @ 2PM
ONLINE
Data cabling installation & terminations in building IDF or MDF rooms for future SecureAll electronic hardware system in the following buildings on
campus:Performing Arts, Learning Resources Center, Fine Arts, Fusselman Hall & Student Services
$2230000
Downtown Vallejo Streetscape Project Phase 3
5/7 @ 2PM
The work to be done includes: providing traffic and pedestrian control, remove existing sidewalk and road pavement, install new curb & gutter and decorative
sidewalk, stage construction, remove and replace storm drain catch basins, remove and replace sanitary sewer laterals, adjust manholes and water valves to
new grades, coordinate with utility companies, remove existing and install new traffic signal system, remove existing street lighting, providing temporary safety
lighting during stage construction, install new decorative street lights, install new landscape and irrigation system. The bidder shall include in his bid and provide
all labor, tools and materials for a complete and working project in conformance with the intent shown on the drawings and specified herein.
$3900000
Recycled Water Expansion Phase I - Distribution to West Dublin
MAND 5/12 @ 10AM at 7051 Dublin Blvd., Dublin
Work under this project can be generally described as: Furnish all labor, all materials except expressly stated herein, equipment, tools and other incidentals to
construct approximately 19,700 lineal foot of 4 to 8 inch diameter recycled water pipelines and pipeline appurtenances such as isolation valves, air valves and
blow offs within City of Dublin. Majority of the pipelines are PVC pipes. The pipeline alignments include major City roads such as Amador Valley Boulevard, San
Ramon Road and Dublin Boulevard as well as other smaller roads such as Shannon Road, Peppertree Lane, Juarez Lane, Castilian Road, Iglesia Drive,
Donohue Drive and Donlon Way.
Page 20 of 63
ONLINE
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
5/21/2015 2:00 PM
Carmichael
District Office Carpet Replacement
$135000
MAND 5/4 @ 7AM
Demolition, removal, preparation & replacement of carpeting throughout the District office. Construction to take place after hours & will be phased into sections
ONLINE
Citrus
Heights
Sunrise Memory Care Facility
ONLINE
2:00 PM
2:00 PM
Merced
2:00 PM
Davis
2:00 PM
Oakville
2:00 PM
East Palo
Alto
2:00 PM
Fremont
2:00 PM
Healdsburg
2:00 PM
Los Altos
Hills
Prebid Information
Ground up wood framed memory care facility work to include: surveying, earthwork, SWPPP, utilities, pavement markings, fountains, fencing, landscaping,
concrete, concrete sealer, masonry, structural steel, rough carpentry, finish carpentry/cabinetry, FRP, insulation, siding, roofing, sheet metal, joint sealer, doors
& hardware, storefront, vinyl/aluminum windows, lath & plaster, drywall, tile, acoustical ceiling, resilient flooring, epoxy flooring, painting, toilet accessories, fire
protection, plumbing, HVAC, electrical, fire alarm
$760000
Well #3C GAC Adsorption System
5/6 @ 10AM at 678 W 18th St., Merced
Bolts, washers, anchores & eyebolts; painting and coatinf; fusion bonded epoxy linings and coatings; granular activated carbon adsoption system
$86000
Veterinary Medicine Student Services & Administration Center
MAND Second Pre-Bid on 05/13/15 @ 10:00 am at 255
Cousteau Place, Davis
See Amendment A for description and instruction.
Dwyer Road Pump Station Wing Wall Construction
MAND 5/11 @ 2PM
Construction of two wing walls on a 36-inch potable water transmission pipeline near Dwer Rd in Oakville, prior to the replacement of the pump station at the
site. The wing walls are necessary to stabilize the pipeline during the pump station construction project
Street Light Upgrade-Neighborhood Request for Led
Mobilization, construction area sisgns, traffic control system, dust control, reinforcement, demolition, earthwork, watering, excavation, aggregate base, portland
cement concrete, conduit & wiring, led streetlight, mast arm, pull box
Senior Center ADA Restroom Upgrade
MAND 4/16 @ 10AM & 4/17 @ 10AM at 40086 Paseo Padre $280000
Parkway, Fremont
Div_02-building demolition, site concrete; Div_03-concrete; Div_06-rough carpentry, finish carpentry; Div_07-bldg insulation, slab on grade vapor retarder,
building envelope underlayments, wood siding, built-up bituminous roofing, flashing & sheet metal, firestopping, joint sealers; Div_08-steel doors & frames, wood
doors, access doors & panels, aluminum entrances & storrefronts, silding automatic entrances, door hardware, low energy door operators, glazing; Div_09gypsum board assemblies, tile, paints & coatings; Div_10-metal toilet compartments, quartz surfacing countertops, lockers, toilet accessories; Div_15-plumbing,
HVAC
Victory Studios Transitional Housing Upgrades (11-Units)
MAND 5/4 @ 11am
Roof inspection, exterior needs re-inspection & prep & full paint, slide gate installation, water heater installation, smoke detectors installation, installation of toilet
accessories, doors & hardware
Training Room Renovation
MAND 4/29 @ 10AM at 12345 El Monte Rd., Bldg D160,
Los Altos Hills
Div_02-selective demolition; Div_03-concrete; Div_06-rough carpentry, finish carpentry; Div_07-bldg insulation, cedar shingles, sheet metal flashing & trim, joint
sealants; Div_08-safety glazing films; Div_09-gypsum wallboard systems, resilient base & accessories, carpet tile, wall coverings, acoustical wall treatment,
painting; Div_10-marker boards, identification signage, fire extinguishers & cabinets; Div_11-audio visual equipment & accessories, projection screens; Div_12roller shade systems; Div_23-HVAC; Div_25-bldg automation system; Div_26-electrical; Div_27-voice & data infrastructure
Page 21 of 63
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/21/2015 2:00 PM
2015 Road Rehabilitation Project Southern Region County
2:00 PM
Marin
County
Merced
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$1500000
Asphalt grinding, asphalt concrete resurfacing, digout repairs, open graded bond wearing course, crack sealing; replacing curb, gutter; construcying new catch
basins, installing new storm water pipes, fold and form culvert repair, installing paving & geotecxtile fabric, adjusting utility covers, replacing guardrail & roadway
striping
John Muir Elemernentary School Relocatable Building and
5/12 @ 12PM at 300 W. 26th St., Merced
E425B/0
ONLINE
Associated Site Work (Lease Leaseback Project)
Lease Leaseback General Contractor seeking sub bids for site work – including SWPPP, demo, earthwork, fencing, concrete, asphalt paving, landscape and
irrigation, site utilities, plumbing, electrical, etc… Includes storm drain and sump pump/lift station.
2:00 PM
Oakland
2:00 PM
Oakland
2:00 PM
Citrus
Heights
2:30 PM
Mendocino
County
$20000000 $30000000
Oakland Zoo California Trail
California Trail will feature 20 acres for new animal enclosures, an interpretive overlook, a California Interpretive Center, a camping area with platform tents for
overnight experiences, and children’s play and learn area. Work includes large enclosures that support natural habitats, for the grey wolf, grizzly bear, black
bear, mountain lion, bison, Tule elk, bald eagle, and California condor. Work scope includes site grading, a new service road, Lower Gondola Loading
Building,Pump Station, pumps, and piping, Visitor’s Center building, Interpretive Center building, site utilities (water, power, sewer), storm drainage, stubs and
lines to rockwork and future phases,reclaimed water system, pumps, water tanks, boardwalk, railings, animal night houses, viewing buildings, exhibit poles and
concrete, plaza between Visitors and Interpretive, concrete.20% LBC/SLBE participation requirement per the City of Oakland Local and Small Local Business
Enterprise Program. These businesses MUST be certified by the City. Prevailing Wages Apply.Project Cost Estimate: $25 to $30 Million Dollars.
$2959350
Sausal Creek Restoration in Dimond Park
MAND Third pre-bid 5/7 @ 10AM
The proposed work consists, in general, of restoration of 745 linear-feet of a natural and partially-buried creek including removing 180 linear-feet of buried creek
culvert, removing a broken concrete spillway, creating a new culvert entrance to the natural creek, grading creek banks, stabilizing creek banks with rock and
plant materials, landscaping with native plants and trees, demolition of an existing restroom, construction of a new restroom, and creation of an ADA-accessible
walking path with interpretive features adjacent to the creek.
Sylvan Road Accessibility & Safety Improvements Project
MAND 5/6 @ 10AM at 6237 Fountain Square Dr., Citrus
Heights
Includes reconstruction of curb, gutter and sidewalk to meet accessibility standards; traffic signal modification at the Stock Ranch Road intersection; grinding and
replacement of 2" of pavement; landscaping at the intersection of San Juan Avenue and Sylvan Road; minor drainage improvements; construction and
reconstruction of accessible curb ramps and driveways; installation of pedestrian enhancements at existing traffic signal; etc.
Eel River Bridge on Eel River Road Joint Seal Replacement,
Branscomb Bridge @ Redwood Creek & Branscomb Bridge @ South
Fork on Eel River
Dust control, mobilization, construction area signs, , watering, clearing & grubbing, cold planing ashalt concrete pavement, earthwork, aggregate base, hot mix
asphalt concrete, warm mix asphalt concrete, adjust utility covers to grade, rock slope protection, concrete structures, slurry cement backfill, bridge deck
grinding, polyster concrete overlay, reinforcement, joint seals, markers & delineators, painted traffic stripes & pavement markinhs, pavement markers, erosion
control, damage repair, roadside sign installation, street name sign installation, survey monuments
Page 22 of 63
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
5/21/2015 2:30 PM
San
Joaquin
County
Plan Name / Scope of Work
Prebid Information
NEW Levee Maintenance Project 2015 Erosion Repairs at Various
Engineers # of
Plan
Estimate Addenda #
$100000
E436B
Locations Along Grant Line Canal Between Station 642+85± and
Station 853+30±
2:30 PM
Sunnyvale
Preparing the waterside levee erosion sites for slope protection and furnishing and
placing approximately 2,320 tons of 18-inch minus quarry stone riprap along the designated
sites, including mobilization, levee/access/haul roads, clearing, grubbing & levee work, waterside embankment slope grading, 18 inch minus quarry stone riprap,
3/4" class 2 aggregate base material
West Valley Field Restoration Project
MAND 5/7 @ 2:30 PM at 1635 Belleville Way, Sunnyvale
Restoration of field, turf and paths as a result of the removal of eleven (11) portables from the site. Scope includes the disconnection of existing utilities at the
portables, capping and installation of traffic rated Christy boxes for said utilities. Utilities included gas, water, electrical, data, fire alarm and sanitary lines.
Removal of existing fire alarm system and coordination with the main campus system to ensure a fully functioning system. Coordinate and schedule the removal
of portables from the site directly with Mobile Modular and field restoration with the City of Sunnyvale, CA
2:30 PM
Union City
2015-16 Citywide Overlay
$1550000
ONLINE
Richmond
Hauling, mobilization, water & dust control, remove & replace pavement markers, adjust manhole & monument frames & covers to grade, full depth AC spot
repair, hot mix asphalt concrete overlay, maintaining traffic, pavement fabric removal, construction area signs, traffic stripes/pavement markings
(signing)/pavement markers, barricades, finishing roadway, removal of roots, clearing & grubbing, grading & soil off-haul, curb ramp construction, concrete
retainig curb, hot mix asphaly (wheelchair ramps), aggregate base (wheelchair ramps), portland cement concrete, concrete curb/gutter/sidewalk, traffic signal
loop detector
$4400000
Richmond Transit Village Phase II:Nevin Avenue BART-19th
MAND 3/30 @ 2PM at 440 Civic Center Plaza, Richmond
ONLINE
3:00 PM
ONLINE
Construction
3:00 PM
San Leandro
3:00 PM
San
Francisco
Aggregate base, asphalt concrete, construction signs, disposal of materials, removal of asbestos & hazardous substances, watering, saw cutting, site demolition,
earthwork & grading, concrete structures, electrical system & lighting, landscape maintenance & plant establishment, irrigation systems, site & street furnishings,
fencing, landscape planting, cold-formed metal framing, metal fabrications, metal railings, decorative metal, rough carpentry, self-adhering sheet waterproofing,
metal roof panels, composite wall panels, sheet metal flashing & trim, joint sealers, steel doors & frames, translucent wall & roof assemblies, door hardware,
fixed metal wall louver & grilles, gypsum board systems, painting, graffiti-resistant coatings, plastic & metal signs, safety specialties, hydraulic elevators, concrete
surface textures, common work results for HVAC
Annual Overlay/Rehabilitation 2014-15
Encouraged 5/14 @ 10AM at 835 E. 14th St., San Leandro
The work to be done consists of roadway reconstruction and rehabilitation,and doing all appurtenant work in place and ready for use
Interior Glazing for the Moscone Convention Center Facilities
Expansion Proiect
ONLINE
ONLINE
The City seeks Trade Subcontractors with significant experience in major urban, multi-story civic, institutional or convention center projects which included
INTERIOR GLAZING on existing and new structures. Qualified Trade Subcontractors shall have successfully completed projects that are LEED® Gold certified
or better
3:00 PM
East Palo
Alto
ONLINE
Street Sweeping Signage Project
Mobilization, traffic control system, dust control, reinforcement, demolition, earthwork, watering, excavation, aggregate base, portland cement concrete, pole
installation, no parking signs, sign mounting hardware
Page 23 of 63
Bid Date Bid Time Location
5/21/2015 3:00 PM
Chico
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$2500000
NEW Galaxies Restaurant & Arcade (No GC Openings)
Construct a new 18,000 SF two-story wood and metal stud framed building; trades needed include earthwork, concrete, masonry, metals, framing, plaster,
interior finishes, specialties, elevator, furnishings, plumbing, HVAC, electrical, etc.
ONLINE
**Do NOT contact owner or architect
3:00 PM
San
Francisco
3:00 PM
Palo Alto
4:00 PM
Citrus
Heights
Encouraged 5/6 @ 10AM at 1 S. Van Ness, 3rd Fl, San
Francisco
Demolition, site clearing, rough grading for soil, excavation & backfilling for structures, site furnishings, asphalt paving, concrete work, safety surface, subsoil
drainage, drainage structures, storm drainage utilities, irrigation, chain link fencing, site signage, staircase tile art coordination, planting preparation, planting,
concrete, ligting & electrical work
Renewable Electric Power
5/1 @ 10:30AM
Through this Request for Proposal for Utility Commodities, entitled Renewable Electric Power (RFP), the City is seeking proposals to the RFP (Proposals) to
provide electric power generated by renewable resources to meet the City’s long-term renewable portfolio needs. The City intends to negotiate and execute one
or more Power Purchase Agreements (PPAs), for terms of 5 to 30 years, with one or more selected bidders (Bidders or Selected Bidders) through this
solicitation. The City’s resource eligibility standards are the same as those established by the California Energy Commission. However, the City has a very
strong preference for Proposals that would qualify as Portfolio Content Category 1 (PCC1).
Each Proposal submitted in response to this RFP shall be for only one proposed energy resource, and can include more than one generator of like kind. Bidders
may, however, submit more than one Proposal. Each Proposal may also include several different price structures, project terms, and business/ownership
structures. However, at minimum each Proposal shall include a standard PPA price structure with a fixed, non-escalating price over the entire contract term.
Proposals should include the Bidder’s best and final price offering; there will be no opportunity to re-price after the Proposal deadline.
ONLINE
Capital Nursery Plaza - Site Development
ONLINE
Unity Plaza Development Project
ONLINE
Onsite and offsite work including underground utilities, grading & paving,
and construction of (5) building pads.
5:00 PM
Ukiah
ONLINE
Park Planning, Design and Operations Consultant Services
The City of Ukiah is requesting proposals for park planning, design, and operation consultant services on an as-needed basis. Proposals from qualified firms with
recent experience in park facility planning and operations are to provide professional services related to the design and maintenance of various park, open space
and landscape facilities for the City.
5/22/2015 10:00 AM
Citrus
Heights
MAND 5/14 @ 10AM at 6401 TRenton Way, Citrus Heights $95000
NEW Arlington Heights ES Playground Expansion
Playground expansion to include concrete & sidewalks
Complete documents will be posted once available
Page 24 of 63
Docs Pe
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
5/22/2015 2:00 PM
On-Call Solid Waste Facility Maintenance Contractor
5/11 @ 9AM at 6484 N. Waverly Rd., Linden
San
Joaquin
County
Engineers # of
Plan
Estimate Addenda #
ONLINE
Typical work tasks include (but are not limited) to the following:
1 General earthwork, including excavation, hauling soil at the site,
backfilling and compacting.
2 Excavating drainage ditches, trenches for Landfill Gas piping.
3 Grading work on landfill’s top deck, roadways and floor pads.
4 Clearing and grubbing and drainage ditch cleaning.
5 Minor concrete demolition and clean up.
$95000
MAND 5/8 @ 1PM
The project generally consists of: Completion of various outstanding punch list and warranty items at the Science & Mathematics Complex, including but not
limited to clean-up, concrete repair, carpentry, waterproofing repair, acoustical ceiling repair, plaster repair/refinishing, gypboard repair/refinishing, painting,
miscellaneous (minor) HVAC, plumbing (leak) and electrical.
SJCC Pathway/Parking Lot Improvement
MAND 5/11 @ 1PM at 2100 Moorpark Ave., Dan Jose
Site clearing, grading, asphalt paving, concrete paving, pavemenr markings & signage
2:00 PM
Stockton
2:00 PM
San Jose
2:00 PM
$550000 Pleasanton NEW Bridge Preventive Maintenance Program for 7 Various Bridges
See specs for the different scopes for each individual bridge. Bridges are Main Street, Bernal Ave, Valley Ave, Hopyard Road-Left & Right, Stoneridge Dr, and
W Las Positas.
1111 Jackson Tenant Improvements Prequalification
Oakland
HVAC Job walk on 5/01 @ 1:30 PM at 1111 Jackson St., $14000000
Oakland
The COUNTY OF ALAMEDA, acting by and through its GENERAL SERVICES AGENCY (“County”), will receive competitive sealed Proposals from pre-qualified
Design-Build Entities (“DBEs”) for the following public work: 1111 JACKSON TENANT IMPROVEMENT
2:00 PM
Science & Math Punch/Warranty Completion
ONLINE
ONLINE
028C
ONLINE
The General Services Agency (GSA) has developed a design for the Tenant Improvement of 150,000 SF of an existing 8-story building with basement into new
offices for a variety of County office needs. The two client County agencies moving into the building are Probation Department and Social Services Agency
(SSA).
2:00 PM
Moss
Landing
$4615000
NEW North Harbor Restaurant Construction Project
ONLINE
Construction of a waterrfont restaurant
2:00 PM
2:00 PM
Milpitas
Berkeley
ONLINE
LED Retrofit Street Light Fixtures
Supply 1250 LED retrofit 70 Watt High Presure Sodium Cobra Head roadway lighting fixtures and 500 100 Watt High Presure Sodium Cobra Head roadway
lighting fixtures.
$700000
NEW Barrows Hall Classroom Renovations CRP15
MAND 5/8 @ 1PM
Refurbish and renew Barrows Hall Classrooms 110, and 122 located on the UC Berkeley
campus. Scope includes but is not limited to demolition of existing finishes and fixed seating, finish carpentry, electrical modifications, A/V equipment, painting,
and window and wall coverings
Page 25 of 63
ONLINE
Bid Date Bid Time Location
5/22/2015 2:00 PM
Palo Alto
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Install Handrails Bldg 7
5/13 @ 10AM
Contractor shall provide all disposal, equipment, labor, materials, tools, supervision, transportation, safety measures,and professional services required, but not
necessarily limited to the installation of handrails in Building 7 on both sides of a 100 foot long hallway, PM&R Section at the VA Palo Alto Healthcare System
NEW Moving Services for the Sylvester Greenwood Academy
MAND 5/15 @ 3PM at 2465 Dolan Way, San Pablo
The West Contra Costa Unified School District will solicit proposals from responsible & qualified movers for the services to pack, store & move administration
items & files; educational materials, equipment & miscellaneous items from the two (2) sites to the new campus.
NEW Phase 1B-Flashing and Sheetmetal Bid Package
ONLINE
Docs Pe
2:00 PM
San Pablo
2:30 PM
San
Francisco
3:00 PM
Modesto
Welding Shop and Equipment Storage Building
MAND 5/13 @ 3PM
Modesto City Schools (MCS) is seeking proposals from qualified firms for furnishing all labor, materials and equipment, and performing all work necessary and
incidental to constructing a pre-engineered metal building in accordance with plans, specifications, and contract documents
1) Design:
a. Provide architectural drawings wet-stamped by a California licensed architect/engineer to include a limited site plan with location of the structure on the
property, plan views of the structures, elevation views of the structures, and door schedule.
b. Provide pre-engineered metal building drawings and calculations wet-stamped by a
California licensed engineer.
c. Provide structural foundation drawings based upon the recommendations of the geotechnical report. All structural drawings to be wet-stamped by a California
licensed engineer.
ONLINE
3:00 PM
San
Jose/Gilroy
Electrical Service to Inspection Modulars at Coyote Lake and Calero 5/15 @ 10AM
County Parks
ONLINE
ONLINE
The Work is Flashing and Sheetmetal for the Moscone Expansion Project
The County of Santa Clara is requesting quotes from qualified contractors to provide underground electrical service to two existing inspection station modular
buildings. Work shall include all labor and materials for sawcutting of pavement, trenching, excavation, disposal of excess material off-site, conduit, wire, boxes,
connection to existing service panels and modulars, and closure of trenches per plans and specifications available herein.
3:00 PM
3:00 PM
San Jose
Pollock
Pines
ONLINE
Lake Management and Maintenance Services
The City of San Jose is seeking quotes from qualified contractors to provide all labor, materials, and equipment necessary for lake management and
maintenance services as specified in Attachment A Scope of Services.
NEW RFP-Professional Services for the Design of the Upper Main Ditch
MAND 5/8 @ 9:30A
Piping Project
El Dorado Irrigation District is accepting proposals for professional engineering services for the District's Upper Main Piping Project
Page 26 of 63
ONLINE
Bid Date Bid Time Location
5/22/2015 3:00 PM
Richmond
4:30 PM
San Mateo
5:00 PM
San Jose
Plan Name / Scope of Work
Prebid Information
NEW RFP-On-Call Transportation Engineering Services
The City of Richmond, Engineering Services Department is seeking qualified firms to
provide a 3-year on-call design services contract in the amount of $450,000 with a
potential two year extension for a variety of traffic and transportation improvement
projects including safety improvement projects, development projects, maintenance
projects including pavement rehabilitation, traffic striping design, pedestrian and bicycle
projects, bicycle facilities, traffic signal design, traffic calming, street light improvements,
traffic signal modification and synchronization, and railroad crossing improvements.
The services required may include preparation of environmental documents and
permitting, field observation and site reconnaissance, investigation and evaluation of
existing traffic conditions, data collection and analysis, preparation of documents
required by funding entities, survey, preparation of exhibits, presentations, preparations
of plans, specifications, cost estimates and design services during construction. Some
projects might use federal funds for the construction phase and will require additional
services in terms of record-keeping, environmental work and documentation as required
by federal-aid guidelines. Areas of expertise may include traffic safety, traffic signals,
lighting, and bicycle and pedestrian improvements
Engineers # of
Plan
Estimate Addenda #
$450000
Pump Station and Force Main Condition Assessment
Condition assessments shall be conducted for 20 of the City’s pump stations (scope does not include the Dale Avenue, 42nd Avenue, Mariners Island #5,
Mariners Island #6, and Flint/Norfolk pump stations) and 21 of the City’s corresponding force mains (scope does not include the Dale Avenue, 42nd Avenue,
Mariners Island #6, and Flint/Norfolk force mains). The condition assessments shall include reliability assessment, maintainability assessment, remaining useful
life determination, feasibility assessment for continued operation, prioritized recommendations for improvement and renewal, and an estimated Class 3
construction cost (conforming to AACE International Recommended Practices for Cost Estimating) for the capital improvements necessary at each pump station
and force main. This work shall consist of an initial review of City assets inventory, conducting a workshop with City staff, performing a field assessment of these
assets, and developing a report summarizing the condition assessment findings.
Restoration Design in Calero County Park
5/13 @ 10AM
The Santa Clara Valley Habitat Agency is inviting proposals from qualified consulting firms, groups, or individuals for the development of a wetland/pond
restoration design, and implementation oversight for this restoration project located in Calero County Park in Santa Clara County Project goals are as follows:
1. Restore pond function through regulated hydrologic processes.
2. Improve ecological processes through native plantings.
3. Create breeding habitat for California red-legged frog and California tiger salamander.
4. Restore wetland function through cattle exclusion.
5. Protect and improve habitat for Mt. Hamilton thistle.
6. Improve water availability for cattle through development of off-pond watering facilities.
7. Develop and implement a design that responds to the previous goals while considering a changing climate.
Page 27 of 63
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
5/25/2015 2:00 PM
2:00 PM
Hayward
Oakland
Plan Name / Scope of Work
Prebid Information
NEW 12kV Loop System Upgrade Phase B
MAND 5/15 @ 2PM at 25800 Carlos Bee Blvd., Student
Admin Bldg, Hayward
Miscellanoeus cast-in-place concrete, electrical, site clearing, earth moving, electric manholes, underground ductbanks
Engineers # of
Plan
Estimate Addenda #
$4387000
BASE BID
1 Provide all new conduits in underground concrete duct bank from main MSB substation up to exist manhole #2 for feeder 1, 2 & 3 and all new conduits in
underground concrete duct bank along the route of feeder #3 as shown the Civil drawings.
2 Provide all new manholes and concrete pads for sectionalizing 12kV switches as shown the Civil drawings.
3 All Base Bid work shall be performed only between 15th June and 15th September 2015.
City Slicker Farms West Oakland Farm and Park Project
MAND 5/7 @ 10AM at 2847 Peralta St., Oakland
In general, the work to be performed includes, but not limited to demolition, tree removal, earthwork, excavation, paving, storm drain, utility construction,
landscaping, trees, irrigation, park structures, fencing & gates, site elements & furniture, site lighting, electrical, plymbing, mechanical, fire sprinkler, etc.
ONLINE
ONLINE
NOTE:Please email bid proposals & questions to Ariel Dekovic @ [email protected]
NO PHONE CALLS PLEASE
5/26/2015 1:00 PM
11:00 AM
12:00 PM
2:00 PM
Santa Clara NEW RFP-2015-16 Annual Various City Streets Surface Reseal Project
Surface sealing various various streets by the application of slurry seal & removal & replacement of portions of existing distressed pavement with new asphaltic
concrete pavement (deep lift) in nine of the streets
$60000
Tenderloin Elementary School Basement and Play Yard
MAND 4/30 @ 11AM at 627 Turk St., San Francisco
San
Waterproofing
Francisco
The application of fluid applied waterproofing along the basement perimeter walls. At the play yard, remove the rubberized surfacing and underlying membrane,
and apply deck coating at the play yard area. The rubberized surfacing under the play structure will be salvaged, and re-installed after the application of the deck
coating. The existing play structure is to remain.
Discount Tire-Rohnert Park
Rohnert
Park
Div_02-demolition; Div_03-concrete; Div_04-masonry; Div_05-structural metal framing, open-web steel joists, steel deck, load-bearing metal stud system, metal
fabrications, handrails & railings; Div_06-rough carpentry, finish carpentry, arch woodwork; Div_07-bituminous sheet membrane waterproofing, water repellents,
bldg insulation, exterior insulation & finish systems, weather resistive barriers, TPO roof, flashing & sheet metal, roof accessories, fire stopping, joint sealers;
Div_08-steel doors & frames, coiling doors & grilles, sectional overhead doors, aluminum entrances & storefronts, metal-framed skylights, door hardware,
glazing, insulated unit glazing; Div_09metal support assemblies, portland cement plaster (tucco), gypsum board, exterior gypsum sheathing, tile, cast in place
tactile detectable warning surface tile, acoustical ceilings, resilient tile flooring, FRP wall panels, acoustical insulation, painting; Div_10-louvers, wall protection,
signage, fire protection specialties, restroom accessories; Div_21-fire suppression; Div_22-plumbing; Div_23-HVAC; Div_26-lighting, electrical; Div_31earthwork, termite control, vegetation control; Div_32-asphaltic concrete paving, pavement markings, concrete curbs, gutters, sidewalks & driveways, landscape
irrigation system, parking bumpers, traffic control signs, landscaping; Div_33-utilities
FY 15-16 Vacant Apartment Cleaning
Sacramento
Cleaning vacant apartments at various locations
Page 28 of 63
ONLINE
ONLINE
ONLINE
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
5/26/2015 2:00 PM
Manhole Frame Replacement in Concrete Deck Mare Island Crossing
$60000
ONLINE
1, Remove and dispose 6-foot square portion of existing concrete in bridge deck. Remove 2-foot diameter cast iron manhole frame and cover.
2, Replace the removed concrete with new poured-in-place concrete, including new 3-foot cast iron fame and cover.
3, Temporary measures (supports, netting, forms, etc.) as required to facilitate the above activities
Miscellaneous Sanitary Sewer Spot Repairs Project Phase VI
MAND 5/13 @ 10AM at 5072 Benson Rd., Union City
$350000
ONLINE
2:00 PM
Vallejo
Union
City/Fremont
2:00 PM
Stockton
2:00 PM
South San
Francisco
2:00 PM
Salinas
Prebid Information
Div_02-abandonement of pipelines & structures, demolition, site preparation, excavation dewatering, sewer flow control, shoring, earthwork, AC paving, sanitary
sewer system testing, traffic control, site restoration; Div_03-concrete reinforcement, cast-in-place concrete; Div_15-general piping
$33000
Shima Art Class Ventilation Project
MAND 5/14 @ 1:30PM at 5151 Pacific Ave, Low Danner
Hall, Stockton
The Project generally consists of: Installation of new Owner Furnished ventilation units, spray booth and fume extraction arm, and installation of new Contractor
furnished exhaust fan and humidifier, along with associated ductwork, electrical service and support
Los Cerritos School West Orange Avenue Improvement Project
MAND 5/12 @ 2PM at 315 Maple Ave, South San Francisco $331672
ONLINE
ONLINE
Install bulb-outs, curb ramps, crosswalks, and new pavement in vehicle travel-way.
ONLINE
Sanborn Road and John Street Traffic Signal Upgrade
In general, the work shall include, but it is not limited to removal and construction of curb and gutter; removal and construction of sidewalk; construction of ADA
compliant pedestrian access ramps; removal and installation of crosswalk striping; installation of a traffic signal system at Sanborn Road and John Street; and all
incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions.
2:00 PM
Sacramento
2:00 PM
Sacramento
ONLINE
FY 15-16 Window Covering Cleaning and Repair
Cleaning & repairs ; restring, replace slats and/or any external & internal parts as required to make repairs
ONLINE
FY 15-16 Window and Awning Cleaning Admin Office
Window and awning cleaning
2:00 PM
Sacramento
2:00 PM
Contra
Costa
County
ONLINE
FY 15-16 Master Sewer and Drain Service
Sewer & drain service
Countywide Overlay
5/11 @ 10AM
$2430000
ONLINE
The works include cold planing , base failure repair, cold-in-place recycle of existing pavement, hot mix asphalt overlay, adjust utility covers to grade,
replacement of traffic signal loops, driveway conforms, signing, striping and pavement markings
2:00 PM
Sacramento
2:00 PM
Antioch
FY 15-16 Window and Awning Cleaning Various Locations
ONLINE
Window & awning cleaning various locations
ONLINE
City Sports Club
Construction of a 38,000 square foot, state-of-the-art sports club based on drawings and specifications prepared by MCG Architecture. Scope of this project
shall include building shell, all interior improvements and site-related work including grading, paving, utilities, lighting, landscaping plus building amenities
including exercise areas, lap pool and spa, and basketball court, aerobics and spinning rooms, locker rooms, saunas, and related HVAC, Plumbing, Fire
Protection and Electrical Systems
Page 29 of 63
Bid Date Bid Time Location
Plan Name / Scope of Work
5/26/2015 2:00 PM
FY 15-16 Interior Painting-Vacant/Occupied and Common Areas
Sacramento
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Interior painting of vacant or occupied common areas
2:00 PM
Contra
Costa
County
2:00 PM
Echo Lake
2:00 PM
Hercules
2015 Slurry Seal Project
Recommended 5/11 @ 11AM
$514000
The project consists of applying slurry seal treatment to streets in the Pleasant Hill and El Sobrante areas as shown on the plans. Work will also include surface
preparation (Not including base failure repairs and crack sealing by others), tree trimming, striping removal and adjustment and placement of thermoplastic
striping and pavement markings
NEW Echo Lake Camp - Commercial Kitchen Hood/Ventilation Upgrade
MAND 5/19 @ 11AM at 7 Echo Lakes Rd., Echo Lake
The work done under these specifications and plans includes but is not limited to installation of new commercial kitchen mechanical equipment and structural
strengthening of the existing roof, ceiling, and endwall framing to accommodate the proposed equipment, including a new make-up air unit, new Type 1
ventilation hood, and demolition and removal of existing equipment and framing as required for the proposed installation. This work includes upgrading existing
fire suppression and plumbing systems and integrating new equipment into existing systems. The work includes structural, mechanical, electrical, and plumbing
components. All work shall be performed in accordance with these specifications and plans. See Division 1 Section 01000 of the Specifications for the full Scope
of Work.
Ohlone Elementary School Parking and Landscape CompletionMAND 5/7 @ 3:30 PM at 1616 Pheasant Dr., Hercules
ONLINE
ONLINE
ONLINE
Phase 4B
2:00 PM
Morgan Hill
2:00 PM
Oakland
2:00 PM
Pleasant Hill
2:00 PM
Sacramento
Site preparation, earthwork & grading, trenching, backfilling & compaction, subgrade preparation & base material, landscape concrete, storm drainge, landscape
drainage, paving & surfacing, pervious concrete, pavement markings, irrigation, chain link fences & gates, ornamental picket fences & gates, site furnishings,
planting, restoration of surfaces
Live Oak High School Building 700 and Library Roof Replacement
MAND 5/19 @ 3:30PM at 1505 E. Main Ave., Morgan Hill
Removal and replacement of roofing. Replace the roofs at the Library and Building 700 at Live Oak High School with new TPO roof, also include new metal
counterflashings, new crickets, new overlayment board, new drains, roof up and over walls, and all accessories, etc. as specified in the contract documents,
specifications and drawings
Leimert Bridge Seismic Retrofit Design
MAND 5/7 @ 2PM at 250 Frank Ogawa Plaza, 4th Fl,
Oakland
The City of Oakland is soliciting proposal submittals from qualified Civil Engineering-led teams with experience in concrete arch bridge design for the seismic
retrofit desi n, Right of Way certification, NEPA documents preparation, and Construction Support for Leimert Street Bridge Seismic Retrofit Project. The
reinforced concrete arch bridge structure is a City landmark status and connects Park Blvd to the Oakmore neighborhood over Sausal Creek in Dimond Canyon,
Oakland
D-634 Softball Bleachers at Diablo Valley College
5/12 @ 1PM at 321 Golf Club, Pleasant Hill
Div_02-utility & pavement demolition, earthwork, asphalt concrete pavement; Div_03-cast-in-place concrete; Div_13-elevated bleachers
FY 15-16 Emergency Water Extraction and Floor Cleaning
Emergency water extraction and floor cleaning at various locations
Page 30 of 63
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
5/26/2015 2:30 PM
Clarke Swim Center Improvements
5/12 @ 10AM
Walnut
Creek
Engineers # of
Plan
Estimate Addenda #
$70000
ONLINE
Remove and install damaged concrete deck and grind all uplifting concrete edges at control joints as shown on plans at shack area pool deck. Remove coping
and deck as shown on plans. Replace existing deck with pre-cast concrete coping and cast-in-place pool deck. Install new pool deck signage and fixtures at
training pool.
$15000
MAND 5/8 @ 11AM at 69310 N. Hwy 101, Leggett
Complete bathroom repair to finished condition. Currently all fixtures have been removed and stored. Plywood has been tacked back on floor and walls to make
safe.
3:00 PM
Leggett
Leggett Bathroom Project II @ California Conservation Corps
3:00 PM
Palo Alto
Alma Street and Middlefield Road Paving Project
3:00 PM
Palo Alto
5:00 PM
Newark
5/27/2015 1:00 PM
Rocklin
$1500000
Street resurfacing project of two sections along Middlefield Road and one section along Alma Street includes, but is not limited to: asphalt concrete milling;
placing asphalt concrete overlay; placing rubberized concrete overlay; asphalt concrete pavement repair and replacement; Portland cement concrete road base
repair, removal and replacement of damaged sidewalk, curb, gutter and driveways; installing or replacing curb ramps; removal and replacement of concrete
median curbs; installing truncated domes; tree trimming; traffic control; crack sealing; potholing; surveying; striping; placing legends and pavement markers; site
preparation; lowering manholes, catch basins, utility boxes, vaults and then raising back to grade following paving.
2015-2018 Utility Trench and Substructure Installation
MAND 5/12 @ 9AM at 1007 Elwell Ct., Palo Alto
Provide utility trench and substructure installation services on an annual basis for a potential three- year contract. The quantities are based on prior year’s
activity and on current estimates. City makes no guarantee of actual work to be authorized
ONLINE
ONLINE
ONLINE
ONLINE
Tree Maintenance Services Fiscal Year 2015/16
Traffic control, dust control, tree pruning, final clean up
Rocklin Campus Roofing Project (11 Buildings)
ONLINE
MAND 5/6 @ 10AM at 5000 Rpcklin Rd., Rocklin
Roofing services at buildings: C, D, G, GME, I, LRC, ME-1, N, T, W and Z
1:00 PM
Ukiah
1:30 PM
Oakland
1:30 PM
Oakland
$30000
NEW Ukiah Women's Shower Repair
MAND 5/14 @ 9AM at 2600 Old River Rd., Ukiah
The contractor shall provide all material, labor, equipment, and supervision required to accomplish this project. The contractor shall remove the existing flooring,
base and sink counter and replace, re-paint interior, add hand air drier, GFI receptacle(s) and exhaust fan with hemostat controller. The shower building is
approximately 300 s.f.
$3600000 Main Wastewater Treatment Plant Flares 1H and 2H-Installation
4/28 @ 10:30AM at 2020 Wake Ave., Oakland
ONLINE
ONLINE
$4200000
Work includes pile supported foundations; approximately 330 linear feet of stainless steel piping, varying in size from 12 to 36-inches; galvanized steel pipe rack
and supports; pneumatic operated valves; storm drain, natural gas, air, water, electrical and communication utilities; a self-contained pre-cast concrete building
for electrical gear; UPS backup power; electrical distribution equipment; conduit and wiring; installation of District-furnished flares and local control panel;
coordination with the District and the Flare Manufacturer during flare testing and startup; paving and concrete resurfacing; and handling and disposal of
hazardous soils and groundwater. All equipment installed in the vicinity of the flares must be rated for operation in a classified area as described by NFPA 820.
HVAC Duct Cleaning Service at Oakland Coliseum DMV Field Office MAND 5/7 @ 1PM at 501-85th Ave, Oakland
HVAC duct cleaning services at the Oakland Coliseum DMV Field Office. Term: 30 calendar days
Julie Phang @ 916-651-2556
Page 31 of 63
ONLINE
Bid Date Bid Time Location
5/27/2015 10:00 AM
10:00 AM
11:00 AM
11:00 AM
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 5/22 @ 1PM at 4665 Bernal Ave., Pleasanton
Pleasanton NEW Bernal Site & Kid's Club Sites Upgrades
Div_06-plastic laminate-clad cabinets; Div_09-acoustical ceilings, painting & coating; Div_10-impact resistant wall protection; Div_12-horinzontal louver blinds
San Rafael NEW Biosolids Hauling
Provide all labor, equipment, materials and supervision necessary to receive, transport & unload biosolids, Monday thru Saturday
$188000
NEW 2015-2016 Landscape Maintenance of Miscellaneous Areas (Rebid)
Lodi
The work consists of maintaining approximately 256 landscaped areas throughout the City of Lodi. The areas are separated into five (5) Groups (A through E)
that consist of City Facilities and the Consolidated Landscape Maintenance Assessment District zones. The areas total approximately 1.9 million square feet
.
The length of the contract will be twelve (12) months, starting July 1, 2015 and ending
June 30, 2016. The contract may be extended annually with the same prices and terms
if mutually agreed upon by the Contractor and City.
$25000 Santa Cruz NEW Cedar/Locust & Soquel/Front Garage Cable Repair
ONLINE
ONLINE
ONLINE
ONLINE
$30000
This project consists in general of re-tensioning or replacing 1/2-inch diameter steel cables located in the Cedar/Locust and Soquel/Front parking garages in
Santa Cruz. The
steel cables are part of existing cable barriers.
2:00 PM
Tracy
2:00 PM
Pittsburg
NEW Police Radio Equioment Room Fire Suppression System
The Project is more specifically defined in the Contract Documents, but generally includes the following work to be done: Design-build an independent FIRE
SUPPRESSION system for radio equipment rooms in the police building. Comply with all requirements for a City permit (no cost for permit) and the Exhibits. The
Engineer’s cost estimate will not be released until the Informal Bids are publicly opened.
$1100000
Railroad Avenue Pavement Rehabilitation
ONLINE
ONLINE
Construction signage; repair & replacement of existing sidewak; curb & gutter, curb ramps; adjustment of utility structures to grade; roadway cold planing &
asphalt concrete inlay paving; paving mat; removal of roadside signs; traffic signal detector loop replacement; pavement delineation
2:00 PM
2:00 PM
2:00 PM
Complete documents will be posted once available
$200000
MAND 5/22 @ 10AM at 1125 Concord St., Pleasanton
Pleasanton NEW Vintage Hills Fire Alarm & Intercom Replacement
Div_03-concrete; Div_06-rough carpentry; Div_07-firestopping, joint sealants; Div_09-gypsum board assemblies, painting & coating; Div_26-electrical; Div_27installation & identification of signal cables, public address & clock system; Div_28-fire detection & alarm system; Div_31-trenching; Div_32-flexible (asphalt)
paving
MAND 5/18 @ 2PM at 4300 Cutiing Blvd., Richmond
Richmond NEW Kennedy High School Digital Fabrication Laboratory Parking
Project consists of demolition/removal of sawdust collector fencing and removal of asphalt. Placement of new concrete paving and asphalt, including slurry
sealing and painting of parking lot for ADA parking.
$60000
Recreation Building Fitness Room Flooring, Second Reception
Recommended 5/8 @ 11AM
Rohnert
Counter
Park
This project consists of furnish all labor, materials, tools, equipment, apparatus, facilities, transportation, and permits to demolish existing flooring and reception
counter, and provide new flooring and casework at the Recreation Center
Page 32 of 63
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/27/2015 2:00 PM
RFQ-Trucking and Hauling Services (Asphalt, Debris and General)
San Jose
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
The City of San Jose is seeking qualified contractors to provide Asphalt, Debris & General Trucking and Hauling Services as described in attached Scope of
Work on an as-needed basis. The City reserves the right to award one or multiple purchase orders from the result of this RFQ. The City shall issue a blanket
purchase order(s) to the successful bidder(s) for an initial twelve month period.
After the initial period, the City reserves the right to exercise four (4) additional one-year period extensions for
a total of five (5) years
2:00 PM
San Mateo
2:00 PM
Palo Alto
$1700000 NEW Delaware Trunk Sewer Rehabilitiation Project
Work as shown on the contract dawings No. 14-10-001 and as described in this contract book and Greenbook standard specifications for PW Construction, 2012.
2015 Sewer Pipe Repair Project
031/R01
E429B/0
5/7 @ 10AM
Earthwork, pipelines & manholes; sewer installation and open trench construction
2:00 PM
Stockton
2:00 PM
Modesto
MAND 5/13 @ 8:30AM at 5151 Pacific Ave., Lower Danner $825000
Hall. Stockton
The project has been reviewed and approved by the Division of State Architect (DSA) and it generally consists of: Removing the existing roofing and flashings
down to the structure, adding roof crickets, and installing new single-ply roofing and flashings at the flat roof areas of the Administration, Shima, Locke, and
Atherton buildings as well as specific portions of flat roof areas on the Budd, Danner and Holt Buildings.
Flat Roof Replacement Project
ONLINE
ONLINE
NEW Specialty Autopsy Equipment - Lighting and Digital Capture System
for Stanislaus County Coroner's Office
The work includes engineering services and the supply of equipment, including an Autopsy Lighting and Digital Capture Equipment for the Coroner’s Facility
Project at 921 County Center III Court, Modesto, California ("Equipment"). Bidders shall fabricate and deliver the Equipment to the Owner. The Owner's existing
general contractor, Simile Construction Service, Inc. of Modesto, California (209-545-6111) is responsible for installation of the Equipment. If the successful
Equipment bidder desires to make a proposal to Simile to install the Equipment, the successful bidder should contact Simile.
2:00 PM
2:00 PM
2:00 PM
Tuolumne
Geer Road Bridge at Tuolumne River
San Pablo
Water pollution control, clearing & grubbing, earthwork, aggregate bases, piling, concrete structures, wood & plastic lumber structures
C-524 Parking Lot 16 Repair
MAND 05/05/15 @ 10:00 am at site
Oakland
$148000
ONLINE
$200000 $350000
ONLINE
In general, the Work consists of: General construction including, but not limited to, site work, demolition, new construction and utilities at Parking Lot 16 at Contra
Costa College located at 2600 Mission Bell Drive, San Pablo, California 94806.
$100000
Furnishing Labor, Materials and Equipment for Inspecting and
Recommended 5/13 @ 9AM at 530 Water St., 2nd Fl,
Cleaning Port of Oakland Sanitary Sewers for the Period
Oakland
Commencing July 1, 2015 and Ending June 30, 2016, 2017 or 2018
The work of this annual contract consists generally of furnishing all labor, materials, equipment, traffic control, and incidentals necessary for inspecting and
cleaning sanitary sewer lines and manholes as described in the Contract Documents. Closed Circuit Television (CCTV) Inspection of sanitary sewers shall be
performed by a certified National Association of Sewer Service Companies (NASSCO) Pipeline Assessment and Certification Program PACP trained operator
using established PACP coding and observations. The work may also include minor sewer pipeline repairs necessary to complete sewer line inspection and
cleaning.
Page 33 of 63
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/27/2015 2:00 PM
2013-14 Street Resurfacing Program, Project 14-01 and 2013-14
Slurry Seal Program, Project 14-03
Mountain
View
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$680000 $720000
ONLINE
This project includes repairing pavement failures, wedge cutting, resurfacing asphalt concrete and slurry sealing streets, adjusting utility manholes and boxes,
reinstalling pavement markings and markers, reinstalling traffic detector loops, and doing other incidental work necessary to complete the project as shown on
the plans and as described in the Contract Documents and Specifications.
2:00 PM
Modesto
2:00 PM
Modesto
2:00 PM
Milpitas
NEW Single Family Residence 1312 Pearson Ave Modesto
On site security & storage, site preparation & grading, replacment of dwelling, truss roof system, on site cleanup
NEW Single Famiily Residence 1022 Atlantic Dr.
On site security & storage, site preparation & grading, replacment of dwelling, truss roof system, on site cleanup
Lower Berryessa Creek Flood Protection Project Phase 1
MAND 4/16 @ 9:30AM
ONLINE
ONLINE
$16000000 $18000000
Prfepatory work, earthwork, surfacing & pavements, site utilities, traffic control, miscellaneous items, concrete, special concrete structrues, planting
CMAQ-Traffic Synchronization Project
MAND 5/13 @ 10AM at 678 W. 18th St., Merced
Dust control, signals & electrical systems, wireless communications systen, fiber optic branch & trunk cables, pull boxes, traffic signal controller assembly, PTZ
closed-circuit television camera
$260000 Austin Creek State Recreation Area Pond Farm Stabilization &
MAND 5/13 @ 11AM at 17000 Armstrong Woods Rd.,
$320000
Weatherization
Guerneville
Furnish all labor, materials, tools and equipment necessary to stabilize and weatherize the existing barn and residence. Improvements include: blocking, new
roofing, siding windows and shear walls along with associated improvements at AUSTIN CREEK SRA in Sonoma County, California, complete and in
accordance with the plans and specifications therefore and such addenda thereto as may be issued prior to bid opening date
2:00 PM
Merced
2:00 PM
Guerneville
2:00 PM
Fremont/Ne NEW Truck Hauling Services-Solids & Sludge
wark/Union
City
The Alameda County Water District (District) invites qualified and licensed Contractors to
respond to this Invitation for Bids (IFB) for the provision of truck hauling services. The
District has three facilities within its service area, the cities of Fremont, Newark and Union
City, located in Alameda County, where the services shall be performed. The District’s
intent is to issue a Contract with a one-year base term and four one-year options to renew.
The District estimates an approximate yearly expenditure of $50,000.00 per year, with
possible spend of $250,000 over the potential five (5) year term of the contract
Page 34 of 63
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
5/27/2015 2:00 PM
Plan Name / Scope of Work
Prebid Information
El Sobrante NEW Crespi Middle School Hot Water Boiler Replacement
The Project consists of, but not be necessarily limited to the following:
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 5/18 @ 11AM at 1121 Allview Ave., El Sobrante
a. Demolition and removal of two (2) existing forced draft hot water heating boilers, two (2) elevated compression type expansion tanks and supports structure,
three (3) base mounted pumps, connecting piping, valves, electrical power connections and appurtenances.
b. Installation of three (3) owner furnished hot water heating boilers (B-1, B-2 and B-3). Furnishing and installing new heating hot water piping with connections
to the owner finished boilers and existing distribution piping mains as indicated on the drawings, including furnishing and installing three (3) new base mounted
pumps, piping, valves, fittings, Variable Frequency Drives (VFD's), air Separator, Expansion Tank, Chemical Treatment Pot-Feeder, pipe insulation, piping
supports, concrete housekeeping pads, equipment anchorage, Direct digital Controls (DDC), and Testing, Adjusting and Balancing of the hydronic system.
2:00 PM
Burlingame
c. Removal of two (2) pneumatic control air compressors and one (1) remote 60 gallon receiver tank. Furnish and install one (1) new Tank mounted Duplex
Control air compressor, filters, automatic Drain Valve, Refrigerated Air Drier and new compressed air piping connection to existing pneumatic control air
distribution main piping as indicated on the drawings.
d. Add-Alternate #1: Provide and install one (1) additional heating hot water boiler (B-4) of type and size as scheduled on the drawings complete with piping,
valves, fittings and appurtenances and connection to the heating hot water distribution system.
e. Add Alternate #2: Shut-down and remove the existing domestic hot water heating system serving the gymnasium, including disconnection of cold water supply
to the existing storage tank, domestic hot water supply outlet, domestic hot water return pump and piping and boiler water supply and return to tank mounted
heat exchanger. Furnish and install two (2) new electric water heaters. One (1) at the girl's gym instructor's area and one (1) at the boy's gym instructor’s area.
complete with thermostat mixing valve, thermal expansion tank, seismic support straps, and cold and hot water piping connections as indicated on the drawings.
Sanchez Bypass and Neighborhood Sewer Rehabilitation Project
MAND 5/12 @ 10AM
091C
Phase 4
2:00 PM
2:00 PM
Alameda
County
Oakland
Constructing approximately 7,800 LF of new 8-inch through 18-inch sanitary sewer of sanitary sewer pipe throught the City using open cut, pipe bursting, curedin-place pipe, sliplining, or horizontal directional drilling methods in public right-of-way, along easement areas and in provate properties. Other related works
include installation & replacement of manholes, cleanouts and laterals by pipe bursting, CIPP, or open cut, rehabilitation of manholes, temporary bypass
pumping, connecting all laterals & other miscellaneous works.
Job Order Contracting 2015-2016
MAND 5/5 @ 1PM & 5/7 @ 9AM
Four Job Order Contracts (JOC) with an indefinite quantity contract pursuant to which
the Contractor will perform a variety of projects, consisting of specific construction tasks,
at different locations. The scope of the General Construction JOC Contracts are for
general major maintenance, ADA improvements, repair, remodel and other repetitive
related work to be performed for the County of Alameda. The County has published a
Construction Task Catalog® (CTC) containing a series of tasks with preset Unit Prices.
The CTC was developed using experienced labor and high quality materials. All Unit
Prices are based on local labor, material and equipment prices including the current
prevailing wages. The Contractor will bid Adjustment Factors to be applied to the Unit
Prices. The price of an individual project will be determined by multiplying the preset
Unit Prices and the appropriate quantities by the appropriate Adjustment Factor
Oakland Campus Tenant Improvement
MAND 5/11 @ 2PM at 1000 Broadway, Ste 109, Oakland
Renovation of an office space
Page 35 of 63
$900000
ONLINE
ONLINE
Bid Date Bid Time Location
5/27/2015 2:30 PM
San Pablo
2:30 PM
San
Francisco
2:30 PM
Healdsburg
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Exterior Painting Blume, Bunk and Texeira House (Informal Bid)
The City of San Pablo intends to: Repaint the exterior of the Blume House, Bunk House, and Texeira House located at 13831 San Pablo Avenue, San Pablo,
California. The requirements below are the basis for the refurbishment. The refurbishment shall use only high quality, first class materials and fittings.
Earthquake Safety & Emergency (E.S.E.R.) Bond 1 Fire Station No. 16 3/25 @ 1PM at 30 Van Ness Ave, San Francisco. Follow up $6800000
(Prequalified Contractors Only)
site visit 4/8 @ 10AM at 2251 Greenwich St., San Francisco
The Work inlcudes a complete and total demolition of the existing fire station; hazardous material abatement as required; removal of underground fuel tanks;
reconstruction of street and sidewalk as identified in the contract documents and as required for new construction. Construction of new two story Fire Station
with elevator. Fire Station 16 is pursuing LEED Building Design and Construction v2009 Gold certification.
ONLINE
ONLINE
ONLINE
Striping Maintenance
Provide striping maintenance service for existing public streets & parkink lots
2:30 PM
Pittsburg
$180000
School Area Safety Improvement Project
ONLINE
The work of this Contract consists in general of the installation of pedestrian safety
improvement as various locations in the City of Pittsburg. Items of work include, but are not
limited to, rectangular rapid flashing beacons, signs, sign posts, replacement of existing
sidewalk, curb and gutter, and curb ramps, modifications to existing storm drainage, fencing, asphalt patching, pavement delineation and all other work
necessary for a complete project in accordance with the Plans and Specifications
2:30 PM
San Pablo
Complete documents will be posted once available-rco
NEW Wood Destroying, Pest and Organism Repairs at Blume, Bunk and
ONLINE
Texeria House (Informal Bid)
2:30 PM
San
Francisco
The City of San Pablo intends to: Repair the wood destroying pest and organism damage of the Blume House, Texeira House, and Bunk House located at
13831 San Pablo Avenue, San Pablo, California.
Clement Street Pavement Renovation and Sewer Replacement
2/19 @ 1:30PM at 1680 MIssion St., 3rd Fl, San Francisco $1700000
ONLINE
Demolition, pavement renovation, sewer replacement & drainage work, curb ramp construction, traffic control
Ramon Kong, Project Manager, @ 415-554-8280
3:00 PM
San Martin
NEW San Martin-Gwinn Elementary School-Shade Structures &
MAND 5/13 @ 1PM & 5/20 @ 1PM
ONLINE
Environmental Science Courtyard
Intallation of two (2) shade structures & environmental Science courtyard sitework
3:00 PM
Santa Clara
Winter 2015/16 Work-Phase Shifting Transformer Project
Voluntary 5/13 @ 9:30AM at 1500 Warburton Ave, Santa
Clara
Construction of infrastructure and installation of a 230kV Phase Shifting Transformer and related equipment in the existing and operational SVP Switching
Station located in San Jose, California and Northern Receiving Station located in Santa Clara, California
Page 36 of 63
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
5/27/2015 3:00 PM
Sunnyvale
SMart Station Underground Diesel Storage Tank Removal
MAND 5/20 @ 1:30PM at 301 Carl Road, Sunnyvale
Furnishing all labor, materials, and equipment and performing all work necessary and incidental to the completion of the project known as SMaRT Station
Underground Diesel Storage Tank Removal consisting of providing all labor, equipment and materials necessary for the excavation (including shoring and
dewatering), removal and proper disposal of a 2,000 gallon underground diesel storage tank, its contents and all associated piping and pumps. The work
includes coordination with the City’s consultant for collection of soil samples, lab testing, and tank closure documentation as well as proper backfill of the
excavation and restoration of the site, according to plans and specifications prepared by the City of Sunnyvale and according to the contract documents.
ONLINE
Napa
Meritage Commons
ONLINE
4:00 PM
Prebid Information
The Meritage Commons Resort Expansion in Napa, California includes 134 guest rooms & suites, one podium level, and three levels with guest rooms. The
project (excluding parking) is estimated to be 170,626 SF.
The east side on the First Floor will include a wellness center, retail, fitness center, locker rooms, message rooms, lounges, break rooms, guest rooms, and back
of house (BOH) spaces. An outdoor pool will be located across from the guest rooms.
The west side on the First Floor will include a market, kitchens, dining, Trinitas, tasting rooms, break rooms, and BOH spaces.
The Second, Third, and Fourth Floors will include guest rooms, corridors, and BOH spaces.
Spaces will also be allocated for data and electrical rooms.
4:00 PM
Yolo County
ONLINE
Street Sweeping Services
The County of Yolo is requesting quotes from qualified Suppliers to provide Street Sweeping Services for various departments countywide per specifications
outlined in this Request for Quote (RFQ).
5/28/2015 1:00 PM
Woodland
1:00 PM
San Jose
1:30 PM
Escalon
$700000 $800000
County Road (CR) 27 Rehabilitation Project
Work includes, but is not limited to: Place construction area signs and road detour signs for road closure. Pulverize existing road, move material and grade to
final FDR grades. Add portland cement to pulverized road surface, mix and compact in place. Overlay FDR surface with HMA. Remove existing culverts and
headwall. Place RCP drainage culvert. Place shoulder backing. Place pavement stripes, pavement markings, pavment markers and reset monuments.
Installation
of Security Fencing at Four School Sites (Rebid)
NEW
MAND 5/14 @ 1PM at 945 Piedmont Rd., San Jose
Installation of chain link security link security fencing & gates at afour school sites
Carrolton Road Resurfacing (Lone Tree Road to Dodds Road)
ONLINE
ONLINE
$447000
ONLINE
$1125500 $1159500
ONLINE
Water pollution control, clearing & grubbing, watering, earthwork, driveways, bituminous seals, hot mix asphalt
1:30 PM
Escalon
Dodds Road Resurfacing (Escalon-Bellota Road to Henry Road)
Water polluiion control, clearing & grubbing, watering, earthwork, driveways, bituminous seals, hot mix asphalt, monuments, adjusting street facilities to grade,
survey monument frame & cover
1:30 PM
Linden
Wall Road Resurfacing (State Route 26 to Comstock Road)
$423000 $516000
Water pollution control, clearing & grubbing, watering, earthwork, driveways, aggregate bases, bituminous seals, hot mix asphalt, monuments, survey
monumental installation, survey monument frame & cover
Page 37 of 63
ONLINE
Bid Date Bid Time Location
5/28/2015 10:00 AM
10:00 AM
10:00 AM
10:00 AM
10:00 AM
10:00 AM
10:30 AM
10:30 AM
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 5/18 @ 10AM at 4601 Norwood Ave., Sacramento
Sacramento NEW Norwood Middle School Kitchen HVAC Replacement Project
Structural & miscellaenous metals, rough carpentry, built-up bituminous roofing, gypsum boad, painting, plumbing, HVAC, elelctrical
MAND 5/21 @ 10AM at 2655 Grant Ave., San Lorenzo
San Lorenzo NEW Digester Area Coatings Project 2015
The preparation, coating and/or painting of the Digester area including digesters, piping, supports, and all associated appurtenances as shown on the Plans and
Specifications.
$340000
NEW Larkspur Pipeline Replacement Project
Larkspur
This contract is for furnishing labor and equipment for the installation of 900 feet of 18-inch welded steel pipe and 610 feet of 6-inch polyvinyl chloride (PVC) pipe
with valves, fittings and appurtenances
$18000
Elk Grove NEW Bartholomew Park Sidewalk Repairs
Remove existig concrete & replace with 3 5/8: concrete sidewalk with 4" aggregate base, construction site management , temporary concrete washout
(portable), unsuitable excavation
2015
Pavement Rehabilitation Project
MAND 5/7 @ 1:30PM at 450 Cicic Center Plaza, Richmond $4048055
Richmond
In general, the work consists of pavement rehabilitation of street throughout the City. Work is to include, but is not limited to, base failure repairs, crack sealing;
pavement grinding; placement of conventional hot mix asphalt and rubberized hot mix asphalt; placement of traffic striping; in-roadway warning lights and
associated hardware; video detection systems and associated hardware and for all other work, items, or details note mentioned above that are required by the
Drawings, Standard Specifications, of these Special Provisions.
Liquid Emulsion Polymer Supply
San Rafael
Furnish and deliver a liquid emulsion polymer for the purpose of conditioning anaerobically digested biosolids at CMSA wastewater treatment facility, located in
San Rafael, California.
The polymer is injected into the sludge feed of three high speed dewatering centrifuges to attract and bind the solids in the sludge feed to improve de-watering
and increase total solids content of the biosolids cake. CMSA estimates an annual production of 1,800 dry tons of digested biosolids. The Vendor will deliver and
transfer polymer into CMSA polymer bulk storage tank, which has a working capacity of approximately 5,675 gallons.
$215000
NEW Madrone Avenue Pipeline Replacement Project
Larkspur
Earthworkm asphaltic concrete paving & resurfacing, sitribution piping system, monor concrete, control density fill, field applied tape coating system,
environmental protection
MAND 5/19 @ 9AM at 701 Laurel St., Menlo Park
Menlo Park NEW Multi-year Preventative Maintenance Contract for the Heating,
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Ventilation, and Air Conditioning
The City of Menlo Park is seeking a well-qualified firm to provide a comprehensive heating-ventilation-air conditioning HVAC maintenance and repair program for
all City buildings. The work will include the provision of a total maintenance/management program including, but not limited to the inspection,
periodic/preventative maintenance, repairs, service calls and other tasks and services necessary to insure safe, well maintained HVAC systems providing quality
air for City employees and the public.
11:00 AM
Lodi
11:00 AM
Oakland
$15500
NEW 2015-2016 Transit Station Landscape Maintenance
The work consists of maintaining approximately 15,500 square feet of landscaped area at the Lodi Transit Station and Parking Structure. The planters at the
Arch between the Lodi Transit Station and the Parking Structure are also included in this contract.
NEW RFP-Classroom Schedule IT Project
MAND 5/13 @ 10AM at 333 W. 8th St. Oakland
The Peralta Community College District (PCCD) is seeking proposals to implement a software solution that will maximize space optimization and allow Peralta
Colleges to schedule its space more effectively and efficiently by assuring consistent and accurate data and measures across the District. Through consistent
data integrity, this project will define a more objective process that will allow each location and the system to tell the full story of its space utilization and improve
the quality of space management decisions.
Page 38 of 63
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/28/2015 11:00 PM
San Mateo Medical Center 2nd Floor Post-OP Recovery Expansion
2:00 PM
San Mateo
Berkeley
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 4/27 @ 10AM
The work to be done consists, in general, of providing all labor, materials, tools, appurtenances, and equipment required to expand the San Mateo Medical
Center’s 2nd floor post-op recovery area in accordance with plans and specifications approved by OSHPD on February 15, 2015, as well as any other items and
details not mentioned above but required by the Contract Documents and as directed by the Director of Public Works.
NEW Sanitary Sewer Rehabilitation - Hopkins, Peralta, Monterey, The
$3254000
ONLINE
ONLINE
Alameda, Boynton and Backlines
The work to be done consists of, but is not limited to, the rehabilitation and construction by:
a) Cured-In-Place-Pipe (Method ‘A’) of approximately 194 linear feet of 8-inch diameter sanitary sewer.
b) Pipebursting (Method ‘B’) of approximately 8,592 linear feet of 8-inch diameter, 10-inch diameter, 12-inch diameter, 14-inch diameter, 16-inch diameter, and
24-inch diameter sanitary sewer.
c) Traditional Open-trench (Method "C") of 1,016 linear feet of 6-inch diameter, 8-inch diameter, 10-inch diameter, 12-inch diameter, 14-inch diameter, and 16inch diameter sanitary sewer.
2:00 PM
Sacramento
Reconstruction of approximately 4,020 linear feet of 4-inch and 6-inch diameter sanitary sewer laterals. Construction and rehabilitation of manholes including
excavation and related work.
Natomas Levee Improvement Project American River Mile RM 0.5R
4/22 @ 10AM
E423B/0
Mitigation Site Grading and Sacramento River East levee Reach 19A
Seepage Berm Construction
2:00 PM
Sacramento
The excavation & off-haul of approximately 60,000 cubic yards of flood plain material & installation of instream woody material structures at the American River
$550000 Natomas Levee Improvement Project American River Mile 0.5 Aquatic 4/9 @ 1:30PM at 2020 L St., Sacramento
$635000
and Riparian Habitat Creation
Work consists of conducting specialized California aquatic and riparian habitat planting and native perennial grassland seeding and establishment activities,
which includes pre-planting weed management, installing irrigation systems, preparing soil for planting and seeding, seeding native grasses and forbs, installing
trees and shrubs and maintaining these habitat areas for up to five years following initial installation activities.
Page 39 of 63
E403B/0
Bid Date Bid Time Location
Plan Name / Scope of Work
5/28/2015 2:00 PM
CA State Prison Sacramento Health Care Facility Improvement
MAND 5/7 @ 10AM
Program and Folsom State Prison Health Care Facility Improvement
Program, Folsom State Prison Upsize Emergency Generator
Sacramento/
Folsom
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
The California Department of Corrections and Rehabilitation (CDCR) intends to receive bids and award a contract for the construction of the Health Care Facility
Improvement Project at California State Prison- Sacramento, Health Care Facility Improvement Project at Folsom State Prison, and the Upsize Emergency
Generator at Folsom State Prison located in Folsom, California
The Projects at California State Prison – Sacramento (SAC) and at Folsom State Prison (FSP) are part of the Health Care Facility Improvement Program
(HCFIP). The purpose of the sub-projects at SAC and FSP are to remedy deficiencies in its existing health care components. Each Project consists of various
sub-projects. The project at FSP requires demolition of existing buildings and phasing of work to accommodate construction. FSP also has an upsize emergency
generator and a new fire water line installation.
2:00 PM
San Andreas
The new buildings at SAC and FSP will be slab-on-grade. The structures at SAC and FSP will be fully grouted exterior Concrete Masonry Unit walls, metal
framed interior partitions, and single-ply roofing membranes over rigid insulation, and site work. All new buildings will be provided with automatic sprinkler system
and fire alarm systems in accordance with the California Building Code requirements. Site grading, paving, and utility relocation will be necessary for the
construction of new buildings, including but not limited to communication/signal, electrical, storm drain, water, and sewer lines.
$333890
Maury Rasmussen Field Airport Runway and Taxiway Pavement
Highly Encouraged 5/13 @ 10AM
ONLINE
Rehabilitation
2:00 PM
San
Francisco
2:00 PM
San
Francisco
2:00 PM
San Mateo
2:00 PM
Tamalpais
Rehabilitation of airfield pavement for runway and taxiways. Includes: Asphalt Concrete Surface Prep; Pavement Marking Removal; Crack Seal Application;
Slurry Seal; Pavement Markings Application. Contractor(s) must be registered with the Dept of Industrial Relations to bid or perform work on this project. This
project is funded by Federal Aviation Administration; strict federal guidelines and requirements apply. These are detailed in the project specifications.
Bryant Street Sewer Replacement and Pavement Renovation
Encouraged 5/12 @ 10AM at 1680 Mission St., 2nd Fl, San $1700000
Francisco
The objective of the project is to replace the existing sewer and street pavement on the subject streets. The work is to be performed in San Francisco, California.
As-Needed Main Sewer Replacement
Encouraged 5/12 @ 11AM at 1680 Mission St., 2nd Fl, San $8400000
Francisco
The objective of the project is to provide contingency-based as-needed main sewer replacement on short notice at locations to be determined within the City and
County of San Francisco
$240000
NEW 2015 Citywide Slurry Seal Project
Mobilization, traffic & pedestrian control, street sweeping, temporary striping, signage, remove thermoplastic pavement markings, striping, legends & lane
markers, polymer modified slurry seal, thermoplastic stripes
NEW Kay Park Trunk Sewer Rehabilitation Flamingo Rd and Shoreline
5/20 @ 11am
ONLINE
ONLINE
E432B/0
095C
Highway
Furnish all labor, materials and equipment for the construction of the sewer rehabilitation project, including excavation, pipelaying, backfill, AC grind and overlay
and surface restoration, toghether with all appurtenances, connections and testing, for the completed and operatonal project as shown on the plans.
2:00 PM
West
Sacramento
City of West Sacramento Road Striping Project
Installing traffic lane markings, symbols & lane reflectors
Page 40 of 63
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/28/2015 2:00 PM
American River Bicycle Trail Repaits 2015 Project
Sacramento
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$403000
ONLINE
The project will address maintenance repairs to approximately two point seven miles of the American River Bicycle Trail system. The work entails heaved and/or
cracked pavement remediation, minor pavement reconstruction, asphalt concrete overlay, asphalt concrete leveling course, decomposed granite shoulder
reconstruction, slurry seal, pavement
striping, minor embankment reconstruction, pavement planing and wedge grinding, and bicycle trail
2:00 PM
Tracy
2:00 PM
Placer
County
2:00 PM
Oakley
NEW Police Communication Tower Access Driveway
The Project is more specifically defined in the plans and specifications, but generally includes the following work to be done: Construct a 12 FT wide,
approximately 3100 LF unpaved private access road including earthwork, grading, compaction, class 2 aggregate base, barbed wire and chain link fencing and
gates, telephone conduit.
$864500
Ralston & Hell Hole Rockfall Barrier Protection Project
MAND 5/13 @ 9AM
ONLINE
ONLINE
Rockfall barriers, cast-in-place concrete
FY2014/15 Curb, Gutter and Sidewalk Repair and Reconstruction
Project
$100000
The work to be performed under this contract generally consists of, but is not limited to the following: Mobilization and demobilization; traffic control and
construction signage; removal and replacement of concrete curbs, gutters, and sidewalks, concrete grinding, stamped concrete, hot-mix asphalt (HMA) paving;
tree and stump removal; root pruning, tree installation; and other work as specified in the Contract Documents, and as directed by the City Engineer.
$391361
Caldecott Tunnel Area Improvements Projects 5 & 6
5/12 @ 10AM
The proposed work includes adjusting pathway grade, pavement repair, signage, striping, markings, adding bike lanes, and installing concrete sidewalk,
driveways, curb ramps, crosswalk, and flashing beacon.
Ferrous Chloride Tank Replacement
5/7 @ 10AM at 3800 Arthur Rd., Martinez
Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of the Ferrous Chloride Tank Replacement
including: Demolition of existing facilities, earthwork, concrete pad, provision and installation of double walled polyethylene tank, chemical piping and other work
as described in the Contract
Documents.
2:00 PM
Oakland
2:00 PM
Martinez
2:00 PM
Hollister
NEW Water and Wastewater Treatment Plant Operation and Maintenance
2:00 PM
Hercules
Provide operational and maintenance services to County CSA Water and Wastewater treatment plants in the defined scopes. Services to be performed in
accordance with State, Federal, and Local regulations governing the operation and maintenance of Domestic Water and Wastewater Treatment Plants in San
Benito County
NEW Lupine Hills Elementary School Exterior Painting
MAND 5/19 @ 1OM at 1919 Lupine Rd., Hercules
Exterior Painting of existing buildings. Scope also includes selective demolition and surfaces preparation, including associated exterior repairs of cracks and
other patching, surface sanding or roughing, and protective wrapping of mechanical and/or electrical elements work as indicated in the Drawings and
Specifications.
2:00 PM
Healdsburg
Healdsburg 2015 Measure V Pavement Rehabilitation
$145000 $155000
$800000
Pavement surface rehabilitation through reconstruction of steel sections, application of asphalt rubber chip seal & micro surfacing & will include traffic control,
preparing all surfaces to be treated , thermoplastic pavement markings/striping removal & re-marking/re-striping
Page 41 of 63
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
5/28/2015 2:00 PM
Fremont
Plan Name / Scope of Work
Prebid Information
NEW Modular Work at American, Hirsch, Horner, Olivieira and Thornton
Engineers # of
Plan
Estimate Addenda #
MAND 5/5 @ 10AM
ONLINE
Schools
2:00 PM
Concord
2:00 PM
Berkeley
2:00 PM
Redwood
City
2:30 PM
Seaside
3:00 PM
San Jose
3:00 PM
San
Francisco
Electrical, fire alarm, site clearing, earthmoving, asphalt paving, water utility distribution piping
$470000 Centre Concord-Movable Walls and Coverings
MAND 5/7 @ 2PM & 5/13 @ 11AM at 5298 Clayton Rd.,
$550000
Concord
Div_02-selective demolition; Div_05-cold-formed metal framing; Div_08-hollow metal frames, flush wood doors, aluminum framed storefronts, door hardware,
glazing; Div_09-gypsum board, acoustical ceilings, resinous flooring, wall coverings, acoustical finish, tackable/acoustical wall system; Div_10-signage, operable
partitions, guards, toilet accessories, fire extinguisher cabinets; Div_21-fire protection sprinkler system; Div_32-cement & concrete for exterior improvements,
base courses, flexible paving, concrete curbs & curb ramps
$803000
NEW Flare Station Replacement and Wellfield Upgrades
5/19 @ 10AM at 11 Spinnaker Way, Berkeley
Work of Contract comprises the surveying and staking the locations of earthworks improvements, the LFG header alignments, and Blower/Flare Station;
furnishing, installing and testing skid-mounted Flaring System, including grading, pouring reinforced concrete pad for skid-mounted flaring system, placing the
flaring skid on the concrete, installing enclosed flare stack on the concrete pad, making connection between flare and blower skid, making all necessary pipe,
wires and conduit connections, conducting all testing and inspection, and electrical work; furnishing all labor, materials, equipment, and related items to complete
demolition of the existing Blower/Flare Station and removing all materials off-site, including grading and restoring work area; making connection between LFG
laterals and existing laterals; making connection between existing and new header; complete site electrical work, including all necessary removal/abandonment
of existing electrical system, in and around blower/flare station; re-grading the work area, as shown on the Contract Drawings; and furnishing and modifying the
LFG extraction well heads and the laterals, including excavation backfilling and compaction, lateral piping and valves, and Christy boxes for the City of Berkeley
(“City”), located at 11 Spinnaker Way, Cesar Chavez Park, Berkeley, and ancillary work in accordance with the terms and conditions of the Contract Documents.
NEW 3W System Improvement Project
MAND 5/14 @ 10AM at 1400 Radio Rd., Redwood City
Non-shrink grout, paints & coatings, identifying devices, piping system, water system
$25000
HVAC Duct Cleaning Services - Seaside DMV
MAND 5/6 @ 1PM at 1180 Del Rey Blvd., Seaside
The Contractor, agrees to provide the Department of Motor Vehicles (DMV) all labor, tools, materials, equipment, and travel necessary to perform HVAC duct
cleaning services at the Seaside DMV Field Office for the term of this Agreement.
The services shall be performed at: 1180 Canyon Del Rey Blvd., Seaside, CA 93955. The services shall be performed after normal DMV business hours or
weekends.
NEW Children's Discovery Museum (Chiller Replacement Project)
MAND 5/12 @ 10AM at 180 Woz Way, San Jose
HVAC
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Edwin Garcia, Proj Mgr, @ 408-975-7249
$5200000
5/12 @ 10AM at 1 S. Van Ness. 3rd Fl, San Francisco. It
will be followed by pre-bid site visit at 11:30AM, May 12
Div-02-demolition, trenching & backfilling, pavement cutting & excavation, boring & jacking, street work not in contract damaged by contractor, adjustment
frames & castings, aggregate base courses, sanitary sewerage system, asphalt paving, concrete paving, cold milling asphalt paving, brick pavers, landscape
irrigation, planting; Div_03-concrete; Div_05-structural streel, metal fabrications, tapered steel trolley poles & accessories, basic trackwork materials & methods,
special trackwork, rail welding; Div_09-cast-in-place detectable surface tiles; Div_16-roadway lighting (LED), electrical work; Div_17special work
Balboa Park Station Area and Plaza Improvements Project
Page 42 of 63
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/28/2015 3:00 PM
Toilet Compartments, Accessories and Specialties for the Moscone
Convention Center Facilities Expansion Project
3:00 PM
3:00 PM
San
Francisco
Prebid Information
Engineers # of
Plan
Estimate Addenda #
The City seeks Trade Subcontractors with significant experience in major urban, multi-story civic, institutional or convention center projects which included
TOILET COMPARTMENTS, ACCESSORIES, SPECIALTIES on existing and new structures. Scope includes furnish and install specialties, including but not
limited to, grab bars, paper towels dispensers, bathroom partitions, fire extinguisher cabinets, soap dispensers, trash cans, coat hangers, etc.
MAND 5/18 @ 3PM
Fort Bragg NEW Fort Bragg High School CTE MCOE Building Re-Roo
Remove the existing skylights and ridge vents at the MCOE Building and infill these openings, install a new metal roof over the existing metal roof and install fire
alarm upgrade to the building.
$90000
Menlo Park NEW Menlo Park Citywide Street Striping and Signing Program (Informal
ONLINE
ONLINE
ONLINE
Bid)
The City of Menlo Park is requesting informal bids for a citywide street striping and signing program for an “on-call / as-required” basis for various City projects
for the fiscal year of July 2015 - June 2016 with an annual renewal option up to a maximum of three (3) years. These services are needed along the
approximately 90 miles of roadway within Menlo Park.
The City of Menlo Park is prepared to hire a contractor (or contractors if found to be in the best interest of the City) on an “on-call / as-required” basis, with the
total Contract dollar amount not to exceed $90,000 per year or in an amount as approved by the City Council during the one (1) year period.
5/29/2015 1:00 PM
Dublin
Upgrade Fire Alarm System Phase 1 at the Federal Correctional
Institution
ONLINE
The selected contractor shall provide all materials, labor, and equipment to complete the Upgrade Fire Alarm System – Phase I at the Federal Correctional
Institution (FCI Dublin), located in Dublin, California, in accordance with the attached Statement of Work.
Work includes:selective structure demolition, access doors & frames, gypsum board, painting, electrical, fire detection & alarm system, security monitoring
system
10:00 AM
Concord
NEW Concord Community Park Irrigation Pump
The City requests bids for the provision and installation of a replacement Rain Bird UL Listed prepackaged variable speed vertical turbine pumping station built
with custom fabricated steel piping, valves, industrial control panel, and supporting structural steel skid
ONLINE
The manifolds, pipes, and structural skid are to be powder coated green for maximum corrosion and impact protection. The controls shall be mounted inside a
UL Listed and NEMA rated industrial control cabinet
10:15 AM
Concord
10:30 AM
Concord
11:00 AM
Oakland
NEW Pavement Markings Project
The work to be completed in general consists of mobilization; traffic control and construction signage; Caltrans striping details and as specified in these
provisions
Senior
Center Lighting Retrofit Project
NEW
05/19/15 @ 8:00 am at 2727 Pakside Circle, Concord
Installation of new lighting control syste at the Concord Senior Office
$235000
NEW Laney College Reroofing Project
MAND 5/19 @ 9AM at 333 E. 8th St., Oakland
Selective demolition, lead remediation, vertical metal ladders, rough carpentry, sheet metal waterproofing, built-up bitumonous roofing, exterior painting
Page 43 of 63
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
5/29/2015 11:00 AM
Hopper Creek Improvements Project
Yountville
2:00 PM
San Jose
3:00 PM
Yolo County
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 5/13 @ 9:30AM at 6550 Yount St., Yountville
Div_02-precast concrete utility structures, demolition & salvage, site clearing & grubbing, earthwork, trench excavation & backfill, controlled low strength
materials, shoring & trench safety, storm drainage system, rock structures, seeding, erosion control, planting & maintenance; Div_03-concrete; Div_05miscellaneous metals; Div_16-electrical
NEW Concrete Parking Deck and Ramp Repair Services
MAND 5/12 @ 10AM at 201 W. Mission St., San Jose
The City of San Jose is seeking qualified contractors to provide Concrete Parking Deck and Ramp Repair Services
Pre-Qualification Contractor List for Juvenile Multuipurpose Bid
ONLINE
ONLINE
ONLINE
The County of Yolo is creating a final Qualified Bidders list for the Juveille Detention Center Mulitpurpose Facility. All General Contractors who intend to bid on
the project must complete the Request for Qualifications (RFQ). Bids will only be accepted from contractors on the Qualified Bidder List
3:00 PM
San
Francisco
NEW Coiling Doors for Moscone Convention Center Facilities Expansion
ONLINE
Project
The City seeks Trade Subcontractors with significant experience in major urban, multi-story civic, institutional or convention center projects which included
COILING DOORS on existing and new structures. Scope includes furnish and install all coiling doors of all sizes up to 18’x9’.
4:00 PM
Marina
RFP Inspection and Cleaning of Potable Water Tanks
ONLINE
The Marina Coast Water District is soliciting Request for Proposals for inspection and cleaning services for the following water storage tanks:
1. Reservoir 2
2. Sand Tank
3. Reservoir B
4. Reservoir C1
5. Reservoir C2
6. Reservoir D
7. Intermediate Reservoir
8. Huffman Tank
4:00 PM
Stockton
NEW Construction Management Services For The McHenry Avenue
ONLINE
Corridor Improvement Project
The San Joaquin County Department of Public Works (SJCDPW) requests technical proposals from qualified construction management (CM) firms to undertake,
perform, and complete the tasks set forth in Request for Proposals – SJCDPW-RFP-15-03. The selected CM firm will perform professional and technical
engineering services for Phase I and Phase II of the proposed McHenry Corridor Improvement Project (PROJECT). The selected CM firm will be the highest
ranking firm that has successfully negotiated the terms for award of a consultant services agreement. The selected CM firm and/or CM team (CM) will be
requested to enter into a consultant services agreement with San Joaquin County.
5:00 PM
Oakland
NEW Cleak Residence New Single Family Dwelling 7085 Skyline Blvd
Foundation, Framers, Stucco, Plumbing, electrical, sheetrock, Paint, etc.
Please email bid proposals to Geoff Cleak to [email protected]
Page 44 of 63
ONLINE
Bid Date Bid Time Location
5/29/2015 5:00 PM
San Jose
1:00 PM
San Jose
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Christo Rey High School Classrooms & Admin Building
Construction of a two-story administration & classroom building & related site work, includung civil, landscaping, architectural, structural, plumbing, HVAC,
lighting & electrical systems
ONLINE
Please email your bid to: [email protected] or [email protected]
6/1/2015
ONLINE
Electrical Contracting Services Public Works Overflow
The City of San José (hereinafter “City”) is soliciting proposals for electrical contracting services in support of the Public Works Department.
1:00 PM
San Jose
Electrical Maintenance & Repair of Police Firing Range Target System
$39000
ONLINE
The City of San Jose is seeking a contractor to provide all labor, equipment and materials to perform electrical maintenance and repair services on the
MANCOM Police Firing Range Target System at the City of San Jose Police Firing Range. Contractor shall warrant all labor and material for a period of 12
months from the date of the purchase order
1:00 PM
San Jose
$100000
RFQ-Levee Repair Services
ONLINE
The City of San Jose is seeking qualified contractor to provide Levee Repair Services including all labor, equipment and materials as may be required. In
addition, contractor shall provide any design and engineering services if or when required in relation to the repair services, including plans and specification for
repair of the levee. The levee is located along the Artesian Slough and Pond A-18 at the end of the Outfall road at the City of San Jose/Santa Clara County
Water Pollution Control Plant (WPCP).
2:00 PM
Rocklin
2:00 PM
Atherton
2:00 PM
3:00 PM
Menlo Park
Stockton
ONLINE
NEW Applebee's Rocklin (Specs on Plans)
This will be a new construction, ground up project, on an existing curb in site.
Menlo-Atherton High School, New Classroom Building Increments 1
and 2
$21266321
This project consists of the demolition of three buildings, and the construction of a new twenty classroom, two- story building on the Menlo-Atherton High School
Campus. The classroom building consists of structural steel, metal stud framing, and portland cement plaster exterior. The project includes the removal,
relocation, and installation of new underground utilities.
$500000 MPD Demo Building 205
4/16 @ 9AM
ONLINE
ONLINE
$1000000
The Contractor will provide all labor, materials, equipment, services and supervision necessary to demolish building 205, to include the entire foundation system,
concrete sidewalk, all remaining equipment and furniture within the building, all external elements associated with the building as well as any remaining
hazardous abatement. All utility lines into the building shall be cut either at the adjacent manhole or right before the building. Provide new valves and cap all civil
and mechanical lines. Electrical lines shall be capped. Provide new valve box for all capped utility lines. The contractor shall backfill and compact soil in the
foundation void to match existing grade and provide sod and additional irrigation sprinklers to cover the area.
$900000
Shima Heavy Equipment-Phase II
MAND 5/12 @ 11AM
The project has been reviewed and approved by the Division of State Architect (DS) and it generally consists of: Enclose the Mezzanine area of the existing
Shima Building with rated walls and add a interior stairway as well as an exterior elevator and machine room to serve the Mezzanine area. Add mechanical
exhaust fans; upgrade the pneumatic air system; relocate the existing booster pump; modify lighting control switching; install sliding gates with power and data,
and add data/power outlets in the Holt Building.
Page 45 of 63
ONLINE
Bid Date Bid Time Location
6/1/2015
3:30 PM
Placer
County
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$1580000
Lower Chipmunk and Outfall Water Quality Improvement
ONLINE
The scope of work, in general, includes, but is not limited to, storm water quality improvements including construction of water quality improvements, including
drainage pipe and pervious concrete road shoulders. Other items and details not mentioned above, that are required by the Plans, Specifications, or Special
Provisions, shall be performed, placed, and constructed, and/or installed
6/2/2015
11:00 AM
Modesto
Downstream Water System Improvements - Tier 1 - North Tank 11
and Pump Station
MAND 4/30 @ 1:30PM
$12467500
ONLINE
This project will construct a 6 million gallon reinforced concrete water reservoir, booster pump station, emergency generator, and security fencing. These new
facilities will enable the City’s water system to better meet peak demands, maintain sufficient service pressures, and offset wells out of service.
12:00 PM
Sunnyvale
2:00 PM
Dublin
2:00 PM
San
Francisco
2:00 PM
Represa
2:00 PM
Oakland
NEW Orchard Supply Hardware-Cupertino
Renovation & conversion of an existing one-story concrete block retail grocery store & pharmacy into Orchard Supply Hardware store with attached enclosed
nursery, including demolition & removal of existing mezzanines, exterior soffits, interior walls, electrical/plumbing/mechanical systems, fire sprinkler system,
sidewalks; new fire sprinkler, electrical & mechanical/plumbing systems; new exterior walls & roofr insulation; new facade at south & west elevations
$650000
Santa Rita Jail Condenser Water System Upgrade
MAND 5/19 @ 8:30AM at 5325 Broder Blvd., Dublin
The Work of this Contract consists of replacing all condenser water system equipment that serves a chilled water plant located in the Santa Rita Jail chiller
refrigeration room #322 at 5325 Broder Boulevard. The scope of work includes the demolition and installation of two 800-ton cooling towers, two condenser
water pump variable frequency drives, central plant water softener, the installation of a new water filtration system, the installation of a chemical treatment
system, and all ancillary equipment and controls
SFO-Program Management Support Services for AirTrain Extension 5/5 @ 10AM
ONLINE
ONLINE
ONLINE
and Improvements Program
The PMSS Contractor will provide overall design and construction management services, project controls, contract administration, cost estimating services, field
inspections, and specialized services related to the systems work for this Program. This Program will provide for the design and construction of the following
projects through one design-build contract: 1) An elevated concrete guideway extension of roughly one mile from its current termination point at the Rental Car
Center to Lot DD; 2) A new four-car station to serve Lot DD and the future Long Term Parking Garage No. 2; 3) A new four-car station to serve the future Airport
Hotel; 4) Design, installation, testing, and commissioning of related AirTrain Operating System upgrade work 5) An upgrade from the 2001-era Train Control
System to a new technology Line-of-Sight Train Control System for the entire AirTrain operating system.
Folsom Maintenance Hangar Roof Replacement
MAND 5/14 @ 10AM at 300 Prison Rd., Represa
Div_02-demolition, lead abatement; Div_05-metal decking; Div_06-rough carpentry; Div_07-roof & deck insulation, metal roof panels, flashing & sheet metal, roof
accessories, joint pprtection
$660000
Highland Hospital Acute Care Tower AV and TV Systems Equipment MAND 4/28 @ 3PM at 1411 E. 31st St., Oakland
ONLINE
ONLINE
and Installation
Furnish and install audio-visual equipment and television equipment in the new acute care tower building fdr the Highland ATR project
2:00 PM
Novato
NOTE:Non-Mandatory networking conference will be held 4/29 @ 11AM
NEW Measure A Group 7 Pavement Rehabilitation Contract 2
$425000 $450000
The work to be done includes, but is not limited to: traffic control, applying rejuvenating scrub seal, micro-surfacing, and placement of thermoplastic striping and
markings and other items or details not mentioned above that are required by the standard specifications, or these special provisions to be performed, placed,
constructed, or installed.
Page 46 of 63
ONLINE
Bid Date Bid Time Location
6/2/2015
2:00 PM
Cupertino
2:00 PM
Monterey
2:00 PM
Winters
2:00 PM
Daly City
2:00 PM
Cupertino
2:00 PM
Cupertino
2:00 PM
2:00 PM
Contra
Costa
County
Concord
Plan Name / Scope of Work
Prebid Information
Roof Replacement for Hyde MS Buildings 940 (Multipurpose) & 941
(Gym)
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 5/18 @ 10AM at 19325 Bollinger Rd., Cupertino
Furnish and install specified roofing and roof restoration to Hyde Middle School, buildings 940 (multipurpose) and 941 (gym). Scope of work includes removal
and replacement of all designated roofing and insulation. Removal of District-designated abandoned equipment/supports. Localized deck
reattachment/repair/replacement. Installation of a new roofing system per bid documents and specifications
Citywide Sidewalk Repair Project-Spring 2015
5/20 @ 10AM at 353 Camino El Ester, Monterey
In general, the work consists of: The removal and replacement of approximately 18,000 SF of
Portland Cement Concrete (PCC) sidewalks and installing tree wells with cobble stones at
various locations in the City of Monterey.
Putah South Canal Headworks Improvements & Modifications
MAND 05/20/15 @ 1:30 pm
The installation of a new Ovivo (Brackett Bosker) automatic vegetation raking system.
Clearing and grubbing of site, earthwork grading, over-excavation (approximately 680 cubic yards (C.Y.)), placement of roadway compacted embankment fill
(approximately 680 C.Y.), placement of compacted aggregate base (approximately 150 C.Y.), construction of a new reinforced concrete access road
(approximately 3,000 square feet), construction of a reinforced concrete retaining wall (approximately 37 C.Y.), placement of reinforced concrete slabs
(approximately 5,000 square feet), construction of structural reinforced concrete grade beams (approximately 107 C.Y.), the drilling and construction of 11 each
36-inch diameter by 35 feet (±) deep cast in place reinforced concrete drilled piers, the installation of new electrical service including the replacement and
installation of new electrical conduits, lights, supplying and installing a new emergency propane generator, chain link fencing, and other miscellaneous
appurtenances.
$5500000 Balboa Park Station-Phase 2
4/29 @ 10AM
ONLINE
089C
B002/03
$6500000
Constructing a new eastside glazed headhouse over the north entrance connecting he west side walkway to new east side walkway, a new San Francisco
Municipal Transportation Agency train platform, a new passenger connector brisge; additional proposed station improvements (confined mostly to the concourse
level); new lighting, ceiling treatment, wall finishes (including use of 'image' glazing), signage & 5' high separation barrier between free/paid areas
2015 Contractual Janitorial Services
MAND 5/20 @ 9AM at 10300 Torre Ave, Cupertino
Specified janitorial manitenance is to occur at City of Cupertino building facilities & at various street side containers.
ONLINE
2015 Pavement Maintenance Project-Phase 2
ONLINE
Placing various roadway surfaces treatments including micro surfacing, slurry seal, conventional chip seal & rubberized chip seal, replacing traffic striping &
pavement markers & other miscellaneous work
$850000
District Wide Sewer CCTV Inspection Project
5/20 @ 10AM at 5019 Imhoff Pl, Martinez
ONLINE
The work generally consists of providing all equipment, material and traffic control to inspect sanitary sewers using CCTV, and record video and condition
assessment data.
NEW Pear Drive, Willy Way and Cameron Court Main Replacements
5/19 @ 10AM at 2411 Bisso Lane, Concord
Dewatering, soil & aggregate materials, excavating/backfilling/compacting, paving & surfacing, utility piping, testing & disinfection of water distribution systems,
cast-in-place concrete
Page 47 of 63
E434B
Bid Date Bid Time Location
6/2/2015
2:00 PM
Belmont
2:00 PM
Davis
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Ralston Avenue and Mountain View Avenue Storm Drain Repair
5/26 @ 2PM at One Twin Pines Ln., Ste 385, Belmont
Providing traffic control, providing construction area signs, providing water pollution control, installing 137LF of reinforced concrete pipe (RCP), installing 94LF of
12”HDPE, installing drain box, cleaning of the site at the end of the job, and the furnishing of all labor, materials,
tools, equipment, mechanical workmanship, transportation, and services necessary to be done in order to perform a complete job in all respects as indicated on
the plans, and by reference made a part hereof, as specified herein, and as directed by the Engineer at various locations (the “Work”).
$70000
Varsity Theatre HVAC
ONLINE
ONLINE
The work includes: removal and disposal of existing 25-ton HVAC unit; installation of new, 6-ton unit; removal and disposal of existing ductwork; installation of
new ductwork; functional testing; and startup of the system per the plans and specifications included herein.
2:00 PM
Daly City
2:30 PM
Modesto
2:30 PM
San
Francisco
$65000
NEW 2015 Traffic Signal Painting
Paint the traffic signal equipment at various locations
NEW Stanislaus County Parking Lot Resurfacing and Repairs
MAND 5/18 @ 8AM at 3800 Cornucopia Way, Modesto
Fabricate and furnish all labor, material, and equipment to perform parking lot repair and rehabilitation services including, but not limited to, demolition, asphalt
concrete work, seal coating, curb stop installation, and parking lot striping work. Stanislaus County General Service Agency contemplates issuing an award on
the basis of a single bid for a complete project. As part of this Bid, the Bidder is required to submit all required pricing which will be incorporated into the final
contract agreement at the time of award.
ONLINE
ONLINE
ONLINE
RFQ-As-Needed Surveying Services 2015
San Francisco Public Works (Public Works), City and County of San Francisco (City) announces a Request for Qualifications (RFQ) for the provision of
professional Land Surveying and related services on an as-needed basis.
3:00 PM
3:00 PM
As-Needed Professional Surveying Services that include: topographic surveys; boundary surveys; precise
digital leveling; legal descriptions; general surveying services; photogrammetry; airborne lidar; laser 3D scanning and post data processing; mobile scanning;
technological training; AutoCad Civil 3D drafting; GIS and data entry; map checking; title company support; geodetic services; geospatial data integration; and
monument preservation
RFP-Automated Parking, Bicycle & Pedestrian Count System
Teleconference 5/13 @ 10AM
Palo Alto
The City of Palo Alto is seeking proposals from qualified firms to provide professional services for the installation of field hardware on City-owned streetlight
facilities and field sensors to monitor and gather data for parking management and bicycle/pedestrian counting. The required services and performance
conditions are described in the Scope of Work (or Services).
$92000
Brommer
Park Groundwater Recharge Enhancement Project
Strongly Encouraged 5/19 @ 10AM
Santa Cruz NEW
This project is for licensed contractors with a Type A, General Engineering Contractor license to install a bioretention swale pretreatment and subsurface gravel
seepage pits designed to capture runoff from the main parking area at Brommer Park
Volume III (only available to paid plan holders)
Page 48 of 63
ONLINE
ONLINE
Bid Date Bid Time Location
6/2/2015
3:00 PM
3:00 PM
San Jose
Palo
Alto/Los
Altos Hills
3:00 PM
Palo Alto
3:00 PM
Palo Alto
Plan Name / Scope of Work
Prebid Information
RFQ Design Build Entities For The San Jose Santa Clara Regional
Wastewater Facility Cogeneration
5/5 @ 10:30AM at 700 Los Esteros Rd., San Jose
Engineers # of
Plan
Estimate Addenda #
$65000000
The new Cogeneration Facility will consist of advanced generation internal combustion engines. This technology was selected based on its low capital cost, high
electrical efficiency, and high availability of high-grade heat for the anaerobic digestion tanks and sludge drying processes. The new engines will replace all
existing Wastewater Facility engines with the exception of the recently installed Fuel Cell. Accounting for the Fuel Cell, power output from the new Cogeneration
Facility is expected to meet the Wastewater Facility’s projected power demands through 2036. In addition, the Cogeneration Facility project scope will include a
new digester gas treatment system, boilers, control system and monitoring system with connectivity to the Wastewater Facility’s Distributed Control System
(DCS), electrical switchgear, various additional appurtenances in support of the engines and building, a new digester gas pipeline, a new natural gas pipeline,
new heat recovery systems, and civil work including parking areas and utilities (water, stormwater and
sanitary sewer lines
NEW Open Space Site Amenities Projec
5/19 @ 10AM
Provide all labor, equipment material and transportation to perform the Work for the Open Space Site Amenities Project located at three different City locations.
Work under this contract includes, but is not limited to the removal of existing amenities; drinking fountains and park benches and replacing with new, site
grading for concrete slab that new benches and fountains will attach to, concrete and asphalt pathway repairs, natural turf repair and sod replacement, irrigation
repairs, including all incidental and related work as required by the Scope of Work in the IFB available upon request
$394274
NEW Tennis Court Renovation Project
MAND 5/21 @ 10AM
Work under this contract includes, but is not limited to traffic control, control of sediment and erosion, removal of existing tennis court benches, demolition of the
existing (2) two tennis court pavement surfaces, poles, netting, and windscreens and windscreen hardware, site grading, earthwork, and excavation of tennis
court subgrade, natural turf removal, installation of tennis court subgrade and asphalt pavement for (2) two tennis courts, installation of tennis court color
coatings and striping for (2) two doubles tennis courts, installation of new tennis equipment, repair and reconnection of existing chain link fencing, concrete and
asphalt pathway repairs, natural turf repair and sod replacement, irrigation repair, bark mulch surfacing, including all incidental and related work as required by
Construction Documents herein (Project).
NEW MSC Security Camera System Upgrade and Security Card Access
MAND 5/20 @ 9AM at 3201 Bayshore Rd., Palo Alto
ONLINE
ONLINE
ONLINE
ONLINE
Expansion
The work consists of all labor, material, tools, equipment, etc. for completing the following scope of work at Municipal Service Center at 3201 East Bayshore
Road, Palo Alto and Utility Control Center at 3241 East Bayshore Road, Palo Alto. Install four AMAG card access readers on exterior doors at MSC – C; Demo
the existing old security camera system in the MSC yard and Utility Control Center building and server room; Install 40 IP security cameras throughout the MSC
yard and Utility Control Center; Install one Network Video Recording Server in the Utility Control Center server room for the new security camera system; Install
one new LED flat panel video monitor, minimum 20”, for server; Install the Network Video Management Software on the server and supply the licenses for the 40
cameras. Install client software on 16 clients PCs. PCs are City supplied. There shall be no cost for technical support for this system; Provide three years of
software upgrades for IPVSSP base application and recorder application (recorder application is a per camera cost, which totals 40 cameras); Provide onsite
and vendor offsite system training. (Project)
3:00 PM
3:00 PM
Napa*
NEW South Napa Earthquake-Water Leak Excavation Paving Project
Mobilization, water pollution control, constructiuon area signs, dust control, earthwork, hot-mix asphalt
San Carlos NEW On-Call Sanitary Sewer Lateral Replacement
$296150
E433B/0
$450000 $500000
E435B
Dust control, mobilization, construction area traffic control devices, water pollution control, clearing & grubbing, aggregate bases, asphalt concrete, concrete
curbs & sidewaks, monuments, traffic stripes & pavement markings, signals, lighting & electrical systems, asphaltic emuslion, pipe & structures, trench
excavation, bedding & backfill, pipe installation, acceptance tests for sanitary sewers, sanitary sewer rehabilitation
Page 49 of 63
Bid Date Bid Time Location
6/2/2015
6/3/2015
3:30 PM
Placer
County
5:00 PM
San
Francisco
1:00 PM
Martinez
10:00 AM
Concord
11:00 AM
Watsonville
2:00 PM
Fremont
Plan Name / Scope of Work
Prebid Information
Kings Beach Commercial Core Improvement Project-Construction of
Rainbow and Salmon Parking Lots and Bus Shelters
Engineers # of
Plan
Estimate Addenda #
$675400
Clearing & grubbing, landscape, erosion control, bituminous seals, hot-mix asphalt, bus shelter, concrete curbs & sidewalks, fences, traffic stripes & pavement
markings, electrical systems, geosynthectics, concrete
San Francisco Asphalt and Concrete Sustainable Recycling
Voluntary 4/20 no time issued at 30 Van Ness, 5th Fl,
Production Facility and Lease Opportunity Pier 94/Sewall Lot 50
Sanm Francisco
The City and County of San Francisco, acting by and through the San Francisco Port
Commission (“Port”), owns approximately 4.7 acres of property in its southern waterfront portfolio on a site known as Seawall Lot 352. The Port Commission has
authorized San Francisco Public Works (“Public Works”) to issue a Request for Qualifications/Proposals (“RFQ/P”) for 1) a lease opportunity for the development
and operation of an asphalt and concrete recycling and production facility on this site, and up to several acres of additional nearby land which may be required to
facilitate this operation and 2) a companion long-term, non-exclusive agreement to supply recycled asphalt and concrete to the City and County of San Francisco
(“City”) and its contractors according to a pricing formula or price-setting methodology, the terms for which will be set forth in the purchase contract. The City will
require innovative asphalt, concrete and aggregate base mix designs utilizing asphalt grindings, crushed concrete and other recyclable materials
Patrick Rivera, Project Mgr, @ 415-554-8221
Remodel of Building 19
5/12 @ 4PM at 150 Muir Rd., Martinez
The contractor will furnish labor and materials needed to perform all demolition, renovation, replacement, and installation, finishes and commissioning required
by this scope located at the VA Northern CA Medical Center, Martinez Campus, as required by specifications
Painting at Concord High School
MAND 5/12 @ 10AM at 4200 Concord Blvd., Conocrd
Sealants & caulking, painting
$525000
Ramsay Park Skate Park
5/19 @ 11AM at 1301 Main St., Watsonville
The project consists of construction of an 11,000 SF concrete skate park with work including demolition, clear and grubbing, site work, concrete finishing,
fencing, sidewalk, curb and gutter, AC conform, and bioretention areas.
$700000
Sidewalk Realignment at Northgate Community Park & Northgate
5/18 @ 2PM
Community Park Cricket Batting Cages
These two Projects are to be bid together and are more specifically defined in the Contract Documents, but generally includes the following items of work: – The
Sidewalk Realignment at Northgate Community Park (PWC8830) includes the replacement of an existing concrete pathway with a realigned pathway. Work
includes the demolition of a portion of
existing concrete paving, chain link fencing, rough and finish grading of the area, removal and relocation of four existing pathway luminaires with conduit and
wiring, removal and
repair of existing turf and irrigation adjacent to the realigned pathway, improvements to the existing drainage and tree planting. The Cricket / Baseball Batting
Cages Project (PWC8838) includes the construction of an enclosed chain link perimeter fence batting cage structure. Work includes the demolition of existing
turf area, removal and repair of existing turf and irrigation, rough and fine grading of the batting cage area and surrounds, installation of concrete banding and
paving, installation of a chain link perimeter fence structure, with chain link roof enclosure and three separate batting areas, installation of cricket grade synthetic
turf over concrete pads and aggregate base rock, individual entry gates, magnetic keypad access, cellular system control, panic exit hardware, pole mounted
electrical receptacles with conduit and wiring, and internal safety netting hung in each batting area and any other such items that are required by plans, standard
specifications and special provisions.
Page 50 of 63
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
6/3/2015
2:00 PM
2:00 PM
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
Sacramento NEW Badger Orion SE Meter Interface Unit Installation and Programming MAND 5/20 @ 10AM at 1391-35th Ave, Sacramento
The City of Sacramento, Department of Utilities is actively seeking bids from qualified bidders, hereinafter referred to as the Contractor, for the purpose of
replacing existing and/or installing new Meter Interface Units (MIU) and programming approximately 40,000 City supplied Badger Meter ORION SE (Smart
Endpoint) MIUs. The quantity of MIUs shown on the scope of work is the City’s best estimate of the MIU units to be installed. The unit price indicated for MIUs
will not be adjusted because the actual number of required installations varies from the quantity shown on the bid proposal. The successful bidder agrees to
furnish all necessary labor, tools, equipment and services required to perform and complete all work required for the installation of the Badger Meter ORION
Smart endpoints (SE) on assigned routes. Installations will be conducted in full accordance with the specifications, terms, and conditions contained in this Bid.
The Contractor will be experienced in the installation and programming of the Badger Meter ORION SE on Pulse and Encoder registers. The Contractor must
have at least 5 years’ experience in automated meter reading and meter interface units (MIU) installation, and will submit a minimum of 3 customer references
that demonstrate performance and implementation of similar projects.
County Road 98 & 29 Tree Mitigation & Habitat Restoration
MAND 5/20 @ 10AM
Yolo County
Tree mitigation work at the Woodland Reiff Site includes, but is not limited to: clearing plant location areas; field plant locations; construct mulch trail; furnish and
install native plant stock; design, build and operate irrigation water supply system; fabricate, install and maintain habitat restoration signs. This work includes 5
years of tree mitigation plant establishment work beginning immediately after the Engineer has accepted initial plant installation.
ONLINE
ONLINE
Giant Garter Snake habitat restoration work at the Dry Slough and Willow Slough Sites includes, but is not limited to: clearing and grubbing plant location areas;
field locating plant locations; furnish and install native plant stock; design, build and operate irrigation water supply system. This includes 1 year of habitat
restoration plant establishment work beginning immediately after the Engineer has accepted initial plant installation.
$700000 $800000
2:00 PM
Suisun City
2:00 PM
The work to be done, in general, consists of supplying all labor, materials, tools,
equipment, implements and methods of process to complete the following work:
Constructing a basketball court (half court), dog areas, and concrete pathways, mow band and seatwall; installing site furnishings, sail shades, drinking
fountains, decomposed granite paving, plastic header boards, rubberized play area surfacing, drinking fountains, chain link fencing, metal fencing and gates,
street lighting, and irrigation; hydroseeding turfgrass; and planting trees and shrubs; as well as completing the incidentals which include but are not limited to
construction surveys, clearing and grubbing, grading and providing erosion control measures. If budget allows, the project may include additive alternates which
may include additional hydroseeding turfgrass and irrigation; installation of decomposed granite, plastic header boards, chain link fencing, solar LED lights, and
restroom screen fencing; and construction of mow band.
SMART
(Sonoma Marin Area Trail Transit) Trail Hearn Avenue to Joe MAND 5/26 @ 3PM
Santa Rosa NEW
Lawler Ranch Park Improvements-Phase 2
ONLINE
ONLINE
Rodota Trail
Dust control, mobilization, traffic control, clearing & grubbing, earthwork, aggregate base, asphalt concrete, concrete structures, prefabricated steel pedestrian
brisge, signs, soil & groundwater disposal, storm drain, slope protection, minor concrete, fences, traffic stripes & pavement markings, rectangular raoid flashing
beacon, material recycling
2:00 PM
Ken Tam, Proj Mgr, @ 707-565-2041
$155000
5/20 @ 9:30AM at 1391-35th Ave, Sacramento
Sacramento NEW Combined-Sewer Large Flow Meter Replacement
Work includes, but is not limited to, removing existing meter transmitters, sensors, and sensor-to-transmitter cabling; installing mounting rings or comparable inpipe sensor supports; installing some new conduits; installing the new meter transmitters, sensors, and sensor-to-transmitter cabling and making all power &
sensor connections; sealing all pipe/wall penetrations; factory calibration of the new meters; and meter manufacturer’s post-installation assistance with data
verification. Connection of the transmitters to the City’s SCADA system will be by others. Project requirements include at least a 5% minimum participation level
of local business enterprise (LBE) firms.
Page 51 of 63
ONLINE
Bid Date Bid Time Location
6/3/2015
2:00 PM
Ceres
2:00 PM
Merced
2:00 PM
Sacramento
2:00 PM
2:30 PM
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$6207000
Sacramento NEW South Natomas Water Meter Retrofit
The work to be performed under these Special Provisions generally consists offurnishing and installing meter setters, meter boxes, lids, meter valves and water
metersat various commercial and residential properties within designated areas of the City ofSacramento as indicated on the project area map found in the
Appendix. The work to beperformed includes excavation, backfill, surface restoration, retrofitting water meters onexisting water services, and any other work
required to complete the project asspecified in the Special Provisions.
2:00 PM
2:00 PM
Plan Name / Scope of Work
The Contractor shall provide all labor, materials, tools, and equipment to completemeter retrofits in place and all work necessary to furnish, install, remove,
abandon,pressure test, disinfect, and connect the water pipe and appurtenances as shown in thePlans and as specified in these Special Provisions. The work
shall be so performedthat upon contract completion the project shall be ready for use as described in theSpecial Provisions.
$540000
NEW Wastewater Treatment Plant Support Facility
MAND 05/19/15 @ 2:00 pm at 4200 Morgan Road, Ceres
Construction of a 30’x48’ building for the City of Ceres Wastewater Treatment Plant Support Facilities. Work to include new electrical, mechanical, and plumbing
systems, interior and exterior finishes, casework, utilities, window systems and ceiling systems.
NEW Public Parking Lot Rehabilitation Downtown Merced
5/19 @ 10AM at 678 W. 18th St., Merced
Type II slurry seal, crack sealing (asphalt), striping & paving markings, 6" concrete vertical curb, wheel stop, relocate wheel stop, plaque, relocarte sign, Ac
pavement repairs
$562588
Acacia Avenue Safe Routes to School
The work includes regrading half of the intersection at Altos Avenue, widening existingpavement, placing new striping, placing new curbs, gutters, sidewalks,
driveways placing aslurry seal, and signing and striping. Removing and replacing curb ramps with ADA complianthandicap ramps.The underground work
includes installing new drain inlets and leads, and adjusting drain inletsand water valves to match new grades.The electrical work to be performed under these
Special Provisions includes furnishing andinstalling all necessary equipment and material to install a new traffic signal at the intersection ofAcacia Avenue and
Rio Linda Boulevard and installing street lighting as indicated on the Plansheets and these Special Provisions.
$600000
Pleasant Valley Road at Oak Hill Road Intersection Improvements
El Dorado
5/21 @ 2PM at 2441 Headington Rd., Placerville
Construction of a left turn pocket lane, improve sight distance, upgrade safety standards, including stage construction to facilitate grading, earthwork excavation
and embankment, rock base, asphalt concrete paving, signing and striping, permanent and temporary erosion control. Also installing or upgrading existing dikes,
signs and stripping.
ID
Badge Reader Upgrade for Smart Card
5/12 @ 10AM
Sacramento
Contractor must provide all parts, labor & materials to remove 132 existing HID Badge readers & replace with 132 IDENTIV Model 8110ABT0000 Smart card
readers
NEW Seacliff Village Park Project
MAND 5/26 @ 1:30PM
Aptos
Selective demolition, site clearing, grading and paving, installation of playground equipment, landscaping, irrigation, sanitary sewer system, electrical system,
fencing, site furniture and related elements
Volume III (only available to paid plan holders)
Page 52 of 63
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
6/3/2015
2:30 PM
Felton
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$171840
NEW Quail Hollow Brook Restoration/Stabilization Project
MAND 5/26 @ 10AM at 800 Quail Hollow Rd., Felton
This work generally consists of pond outlet and gully stabilization, sediment control structures, temporary erosion control, slope drains temporary fencing and
erosion control seeding at Quail Hollow Ranch Park in Felton
ONLINE
Volume III (only available to paid plan holders)
2:30 PM
San
Francisco
5/13 @ 1:30PM at 30 Van Ness Ave., 3rd Fl, San Francisco $600000
NEW Ocean Avenue Streetscape Improvements
ONLINE
The Work is located between Fairfield Way and Brighton Avenue along Ocean Avenue and consists of sidewalk demolition, unit paver installations, planting area
expansions, potted planter installations, palm tree planting infills, irrigation systems, traffic routing, and associated work.
3:00 PM
Petaluma
3:00 PM
San
Francisco
3:00 PM
El Dorado
Hills
John Dennis, Project Mgr, @ 415-558-4495
NEW Stream and Precipitation Gauge Installation
5/14 @ 9AM at 202 N. McDowell Blvd., Petaluma
Installation of stream and precipitation gauge equipment at various Petaluma River and creek locations in the city of Petaluma
NEW Tile and Stone Work for the Moscone Convention Center Facilities
ONLINE
ONLINE
Expansion Project
The City seeks Trade Subcontractors with significant experience in major urban, multi-story civic, institutional or convention center projects which included TILE
AND STONE WORK on existing and new structures. Furnish and install the Tile and Stone work in accordance with the requirement of the Contract Documents.
This shall include, but is not limited to, substrate preparation, moisture protection, waterproofing. Potential bidders should note that the stone work is for a design
build exterior cladding system which will require engineering drawings and calculations by a Professional Engineer registered with the State of California.
Subcontractor will participate in design meetings to finalize the exterior work. Qualified Trade Subcontractors shall have successfully completed projects that are
LEED® Gold certified or better.
$290000
Mormon
Island - Lakeridge Oaks Lift Station Elimination
NEW
5/19 @ 10AM
ONLINE
Div_02-demolition & site preparation, earthwork, trench excavation/backfill/compaction, sheeting/shoring/bracing, asphalt concrete paving, manholes,
landscaping & restoration; Div_03-concrete; Div_13-composite manhole cover & frame; Div_15-pvc pipe
6/4/2015
3:00 PM
El Dorado
County
3:00 PM
San Jose
1:00 PM
Sacramento NEW CRC Keying and Access Improvements
ONLINE
Highway Paint Striper
The El Dorado County Procurement & Contracts Division is requesting bids for purchase of One (1) New Highway Paint Striper
Headworks Project Consultant Services
Optional 5/14 @ 1:30PM at 700 Los Esteros Rd., San Jose
The City of San José (“CITY”) requests the submittal of Statements of Qualifications (“SOQs”) from qualified firms for the performance of planning, design,
owners’ representative and construction management services for the implementation of the Headworks Project (“PROJECT”) for the CITY’s Capital
Improvement Program (“CIP”) at the San José-Santa Clara Regional Wastewater Facility (“WASTEWATER FACILITY” or “RWF”). The PROJECT consists of
three parts: the New Headworks, Headworks Improvements and Headworks Critical Tasks. The CITY anticipates awarding a Master Consultant Agreement with
approximately a seven-year term for this PROJECT.
Recommended 5/27 @ 10AM at 8401 Center Pkwy,
Sacramento
Painting, electrical, structured cabling, intrusion & access alarm system
Page 53 of 63
$744100
ONLINE
ONLINE
Bid Date Bid Time Location
6/4/2015
10:00 AM
Contra
Costa
County
Plan Name / Scope of Work
Prebid Information
NEW RFQ-Flooring Improvements at Various Sites
MAND 5/20 @ 10AM at 1480 Gasoline Alley, Concord
Engineers # of
Plan
Estimate Addenda #
$150000
ONLINE
$950000
ONLINE
Request for Quotations from qualified entities to provide flooring improvements at various school sites
10:00 AM
Mill Valley
NEW Summit Avenue Upper Tank & Slide Gulch Pump Station
Replacement Project
This contract is for furnishing labor and equipment for the replacement of redwood tank with bolted steel tank and construction of a new pump station including
pumps, piping, controls and appurtenances
10:00 AM
10:30 AM
2:00 PM
Pinole*
Contra
Costa
County
San
Francisco
2:00 PM
Stockton
2:00 PM
Sacramento
2:00 PM
San
Francisco
2014 City Arterial Rehabilitation, San Pablo Avenue, Sunnyview Drive
to Pinole Shores Drive
Improvements include grinding & pavement rehabilitation strategy to resurface San Pablo Avenue, including asphalt concrete removals & reconstruction, PCC
improvements (curb ramps), cold planing, AC overlay, utility adjustments, pavement delineation, replacement of internally illuminated street sign panel & survey
monument restoration
$135000
NEW RFQ-Asbestos Abatement Services at Various MDUSD Sites
MAND 5/20 @ 11AM at 1480 Gasoline Alley, Concord
Request for Quotations from qualified enttties to provide asbestos abatement services at various MDUSD school sites
706 Mission Street - The Mexican Museum
5/19 @ 2PM
The project is located at Third and Mission Streets, adjacent to Jessie Square Plaza and Yerba Buena Gardens. The approximately 700,000 gross square foot
development will include the rehabilitation and integration of the approx. 120,000 square foot historic Aronson Building, a national register eligible, Article 11
Category I Significant building, construction of an adjacent new approximately 43 story, 480 foot tall residential tower (480 feet to top of roof, plus a 30 foot
elevator/mechanical penthouse) and the approximately 48,000 net square foot core and shell for the new home of The Mexican Museum on floors one through
four with basement storage areas. The existing adjacent below grade Jessie Square Garage will be partially converted to private residential parking, retain the
balance of spaces as public parking, and be connected at several basement levels to the new tower basements.
Security & Traffic Video Monitoring System Maintenance
MAND 5/11 @ 2PM at 22 E. Webber St., Stockton
Security Traffic Video Monitoring System Maintenance
$800000
Cottage Way Modifications-Cortez Lane to Watt Avenue Project
5/6 @ 1:30PM
The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for, clearing and grubbing, the construction of
sidewalk ramps, drainage facilities, pavement removal, roadway excavation, placement of asphalt concrete, slurry seal, roadway striping, signal modifications,
and other incidental work, and doing all other work specified on the plans and in the specifications
Hunters Point East West
Voluntary 6/4 @ 2PM at 425 California St., Suite 2200, San
Francisco
Project is located in the Bayview Hunters Point East West neighborhood in San Francisco. Project consists of (27) two and three story affordable multi-family
apartments wood framed buildings with total 213 residential units and (2) community rooms. Scope of work includes but is not limited to renovation of existing
buildings and ADA compliant sitework. Existing buildings were originally built on 1954 as temporary workforce housing and some enovations were completed
back in 1980s. The project is broken into several phases. The East site and West site are geographically separated with their work running in parallel phases
(see the phasing plan). These will be occupied rehab sites
Page 54 of 63
E427B/0
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
6/4/2015
2:00 PM
2:00 PM
2:00 PM
2:00 PM
2:00 PM
2:00 PM
2:00 PM
2:15 PM
3:00 PM
3:30 PM
6/5/2015
10:00 AM
Tiburon
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$400000
2015 Various Streets Overlay
Asphaltic concrete pavement repairs, resurfacing, minor concrete work & traffic striping & markings
DVC Tennis Courts Resurfacing Project (Informal Bid)
MAND 5/19 @ 10AM at 321 Golf Club Rd., Pleasant Hill
Pleasant Hill
Fill and overlay cracks, re-surface, and re-stripe all eight (8) college tennis courts
$500000 NEW Shoreline Maintenance Storage Plan
5/20 @ 10AM at 2612 N. Shoreline Blvd., Mountain View
Mountain
$550000
View
This project includes 10 concrete material storage bins, including grading, asphalt paving, and berms, and a design-build pre-engineered storage building,
including an under-slab landfill gas mitigation system and a fire sprinkler system. The project also includes minor irrigation and landscaping and relocation of five
metal storage containers.
$158000
NEW Walnut Park Restroom
Davis
Mobilization & demobilization, clearing/grubbing/demolition, earthwork, water system, sewer system, concrete paving pedestrian, grouted cobble, irrigation,
electrical, restroom, sodding
$1350000
NEW Modernization Group I Restroom Renovations at Various Sites
MAND 5/21 @ 9:30AM at 333 Ronald Way, Concord
Concord
Selective demolition, concrete, rough carpentry, laminated plastic work, wood paneling, building insulation, vapor control membrane, sheet metal flashing & tril,
joint sealants, gypsum board, tiling, painting & coating, plumbing, electrical
Sacramento State Garage Accessibility Upgrades
MAND 5/13 @ 9:30AM at 1416-10th St., Sacramento
Sacramento
Div_02-selective demolition; Div_03-concrete; Div_05-metal stairs, pipe & tube railings, steel pipe bollards; Div_10-signs, telephone specialties, toilet
accessories; Div_22-plumbing; Div_26-interrior lighting; Div_32-surface applied tactile warning, parking bumpers, chain-link fences & gates
$250000 District Wide Road Slurry Seal
San
MAND 5/7 @ 10AM
$300000
Ramon/Marti
nez/Fremont
Apply hot crack fill, Type II and III Slurry seal to three entrance roads in three parks: Las Trampas, (San Ramon) Coyote Hills, (Fremont) and Briones.
NEW Photo-Voltaic (PV) System Maintenance and Repair Services
MAND 5/26 @ 9:30AM
Satewide
The Contractor agrees to provide to the California Department of Transportation (Caltrans) all labor, tools, materials, equipment, travel, and incidentals
necessary to test, inspect, troubleshoot, and repair the photo-voltaic (PV) systems electrical equipment and communication on an on-call, as-needed basis (via a
Service Request). The services shall be performed at 71 Caltrans photo-voltaic stations located throughout the State of California. Please refer to Attachment A
of the Proposed Form of Agreement for the facility name and address location.
NEW Terrazzo for the Moscone Convention Center Facilities Expansion
San
Project
Francisco
The City seeks Trade Subcontractors with significant experience in major urban, multi-story civic, institutional or convention center projects which included
TERRAZZO on existing and new structures. Furnish and install all TERRAZZO work in accordance with requirements of the Contract Documents. This shall
include, but is not limited to, substrate preparation, moisture protection, waterproofing and crack isolation. Qualified Trade Subcontractors shall have
successfully completed projects that are LEED® Gold certified or better
$1859633
NEW Napa River Oakville to Oak Knoll Restoration Project, Group A
MAND 5/13 @ 10AM & 5/22 @ 10AM
Napa
Mobilization, clearing & grubbing, earthwork, rock sturctures, log structures, bioctechnical structures, seeding, erosion control, irrigation
MAND 5/22 @ 10AM at 4000 Pinelli St., Sacramento
Sacramento NEW Community Day School Parking Lot Project
Earthwork, trenching & backfilling, asphalt paving, chain link fences & gates, site concrete
Page 55 of 63
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
E428B
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
6/5/2015
11:00 AM
Sonoma
2:00 PM
Martinez
2:00 PM
Monterey
County
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Napa Road Rehabilitation Project
In general, the work consists of street rehabilitation and improvements, including edgegrinding existing asphalt pavement, repairing localized pavement failures,
crack sealing, placing asphalt pavement leveling course and overlay, placement of geosynethic pavement interlayer, reconfiguring of roadway for installation of
Class II bike lanes and Class III shared lanes, installation of pavement striping/markings and signing, adjusting utility structures to grade, upgrading existing curb
ramps for ADA compliance, miscellaneous
concrete sidewalk and curb and gutter construction, replacement of existing detector loops,
temporary traffic control, storm water pollution control and other related work, as set forth on
the project Plans and Specifications
$1100000
Treatment Plant Piping Renovations Phase 8
5/15 @ 10AM at 5019 Imhoff Pl, Martinez
The work generally consists of replacement of piping and equipment in various areas of the treatment plant.
ONLINE
ONLINE
Brad Leidecker @ 925-229-7119
RFP Environmental Compliance For The Interlake Tunnel And
Spillway Modification
MAND 4/16 @ 10AM
ONLINE
Monterey County Water Resources Agency (MCWRA) hereinafter referred to as the “MCWRA” is soliciting proposals from qualified firms to provide
Environmental Compliance services for the Interlake Tunnel and Spillway Modification Project, (Projects) located in southern Monterey County and northern San
Luis Obispo counties, California. The Projects involve the environmental and regulatory approvals of a gravity flow water conveyance tunnel from the Nacimiento
Reservoir to the San Antonio Reservoir and the modification of the spillway at San Antonio Reservoir to affect an increase of storage in the San Antonio
Reservoir. The goal of the Projects is to maximize flood control and water storage benefits of the reservoirs.
2:00 PM
Fair Oaks
NEW RFQ-Lease-Leaseback Construction Services for Bella Vista High
MAND 5/21 @ 3PM at 8301 Madison Ave, Fair Oaks
ONLINE
School Science Wing
The San Juan Unified School Dist is seeking qualified providers of lease-leaseback construction services to provide preconstruction & construction related
services for the Bella Vista HS Science Wing Project
2:00 PM
2:30 PM
Patterson
Hayward
ONLINE
Patterson Public Safety Center
The City invites proposals that include architectural services by an appropriately licensed team to work under the direction of City Staff. The selected proposal
will 1) exhibit experience in planning, design, and construction of public safety facilities, 2) provide a full range of architectural, engineering, and other
professional services (i.e. renderings, drawings, specifications, scopes of work, testing, contracts and estimates) in the form of City Council reports, town hall
meetings, and ultimately a bid package, and 3) project administration
NEW HVAC Duct Cleaning at Hayward DMV Field Office
MAND 5/26 @ 11AM at 150 jackson St., Hayward
HVAC duct cleaning services at the Hayward DMV Field Office
ONLINE
Anne Mearlon @ 916-657-0997
3:00 PM
Monterey
County
RFP Preliminary Engineering and Design Services for Interlake
Tunnel and Spillway Modification
MAND 4/16 @ 10AM
Monterey County Water Resources Agency (MCWRA) hereinafter referred to as the “MCWRA” is soliciting proposals from qualified firms to provide preliminary
engineering and design consulting services for the Interlake Tunnel and Spillway Modification Project, (Projects) located in southern Monterey County and
northern San Luis Obispo counties, California. The Projects involve the preliminary engineering of a gravity flow water conveyance tunnel from the Nacimiento
Reservoir to the San Antonio Reservoir and the modification of the spillway at San Antonio Reservoir to affect an increase of storage in the San Antonio
Reservoir. The goal of the Projects is to maximize flood control and water storage benefits of the reservoir
Page 56 of 63
ONLINE
Bid Date Bid Time Location
6/5/2015
4:00 PM
5:00 PM
Alameda/Co
ntra Costa
Counties
Herald
Plan Name / Scope of Work
Prebid Information
I-680 Express Lane Project in Alameda and Contra Costa Counties
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 5/20 @ 10AM
The Bay Area Infrastructure Financing Authority (BAIFA) will be soliciting bids for the construction of BAIFA I-680 Express Lanes in Alameda and Contra Costa
Counties, including the communities of Dublin, San Ramon, Danville, Alamo and Walnut Creek. The work will include installation of overhead sign structures and
gantries for dynamic messaging, cameras and FasTrak toll readers. The project also includes reconstructing median barriers to protect motorists from the
possibility of colliding with toll equipment, close circuit television (CCTV) camera poles and other toll system elements. Conduit and subsurface vault construction
for providing connections to power and communication sources are also included. A total of 31 overhead sign structures are also planned in the northbound and
southbound medians as part of this project. Additionally, the overhead static sign (OSS) structure and the variable toll message sign (VTMS) structure cast-indrilled hole (CIDH) foundations will be included. Close coordination with BAIFA’s Toll System Integrator and Backhaul Communications Contractors will be
required. Please register as a vendor and add your firm as a Plan Holder for this upcoming opportunity to receive future notifications and additional updates.
$208000
Operations and Maintenance Services for the Cosumnes Power
MAND 5/8 @ 8AM at 14295 E. Clay Rd., Herald
ONLINE
Plant, SPA Cogen III
The Proposer shall optionally provide the Authorities with full scope Operation and Maintenance Services for: Option 1: All SFA, SPA, SCA and CVFA facilities.
Full scope Operation and Maintenance services for SFA, SPA, SCA and CVFA shall be inclusive of the entire SFA, SPA, SCA and CVFA Projects, as defined in
the Sample Contracts and shall be inclusive of any portion of the existing Projects that may be inadvertently omitted from the Project descriptions. Option 2: All
SFA and SPA facilities. Full scope Operation and Maintenance services for SFA and SPA shall be inclusive of the entire SFA and SPA Projects, as defined in
the Sample Contracts and shall be inclusive of any portion of the existing Projects that may be inadvertently omitted from the Project descriptions. Option 3: All
SCA and CVFA facilities. Full scope Operation and Maintenance services for SCA and CVFA shall be inclusive of the entire SCA and CVFA Projects, as defined
in the Sample Contracts and shall be inclusive of any portion of the existing Projects that may be inadvertently omitted from the Project descriptions. Payment
considerations are given in Section 12 of the Sample Agreements. Details are found in the Sample Agreements. PURPOSE OF RFP The purpose of this RFP is
to solicit proposals from qualified (by experience) firms to provide full-scope Operation and Maintenance services. These services include providing qualified
managerial, professional, technical, operating and maintenance personnel for the operation and maintenance of applicable SFA, SPA, SCA and/or CVFA assets.
6/8/2015
2:00 PM
Fremont
2:00 PM
Rohnert
Park
2:00 PM
6/9/2015
11:00 AM
NEW Controller Panel Fabrication Services
The Alameda County Water District (District) invites qualified firms to provide Programmable Logic Controller (PLC) Panel Fabrication Services (Services) for
PLC Panel assemblies
$1800000 NEW Rohnert Park Expressway Rehabilitation
MAND 5/26 @ 10AM at 5401 Snyder Ln., Rohnert Park
ONLINE
$2000000
Street sweeping/pavement preparation, cold-plane asphalt concrete, pavement reinforcement mat, digout repair, asphalt concrete, minor concrete, traffic striping
& marking, pavement markers, video imaging vehicle detection system, final clean up
BHCS
Sobering & Detox Back-up Power Central Fremont Hospital
MAND 5/21 @ 10AM at 15430 Foothill Blvd. San Leandro $125100
San Leandro NEW
Order, install, test and secure BAAQMD permit for all material associated with providing
back-up power to the BHCS Sobering Center and Detox Facility on the Fairmont Hospital
campus, San Leandro. The scope of work shall include connection to the existing new generator at the BHCS Villa Short Stay for the Sobering Center, a new
generator at the BHCS Detox Facility, trenching, conduits, pavement and landscape patching, roof mast, cabling, transfer switches, panel breakers, etc. as
specified on the Emergency Power construction documents by Interface Engineering dated 5-4-15.
Modesto
ONLINE
$1048900
NEW Collector And Arterial Rehabilitation Project
5/26 @ 11AM at 1010 Tenth St., Modesto
This project will rehabilitate the pavement and improve bicycle facilities on numerous street segments with slurry seal and restriping. The base bid is on 9th
Street, Carpenter Road, Fire Science Lane, Collegiate Lane , Tully Road (segment) and College Avenue. This project will connect MJC East with MJC West
Campus with a class IV bicycle route and install the College Avenue Road Diet.
Page 57 of 63
R014
ONLINE
Bid Date Bid Time Location
6/9/2015
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
2:00 PM
Santa Rosa
2:00 PM
Santa Cruz NEW RFP-Electronic Monitoring Services for the Sheriff's Office
The General Services Department Purchasing Division (Purchasing), on behalf of the Santa Cruz County Sheriff’s Office (Sheriff), is seeking proposals to
provide Electronic Monitoring (EM) equipment and services for correctional facilities in Santa Cruz County. Qualified Respondents must have a minimum of three
(3) years demonstrated ability to successfully provide EM equipment and services for lower-level criminal offenders
Grace
Hudson Nature Education Project
MAND 5/12 @ 1PM at 431 S, Main St., Ukiah
Ukiah
Construction of a nature education garden and sustainable museum campus, including grading, utilities, trails, boardwalk, gathering areas, exterior structures,
irrigation & plantings, water feature, rainwater harvesting, stormwater garden, parking lot renovation & museum interior renovations
Health Care Facility Improvement Project Sitewide Generator
MAND 4/21 @ 10AM
Vacaville
2:00 PM
2:00 PM
MADF Roof Replacement
MAND 5/20 @ 10AM
The Work consists of construction of County’s MADF Roof Replacement, Phase 1, at 2777 Ventura Avenue, Santa Rosa, California. The Work includes, but is
not limited to, the construction of the following: this project will remove and replace the existing roof on the north section of the MADF roof. Work consists of
removing the existing built up roofing and insulation and replacing with new insulation and a new 60 mil Sarnafil membrane. All vertical and horizontal
expansions joints within the project scope will be removed and replaced. This is a detention facility and security background checks will be required
ONLINE
ONLINE
ONLINE
ONLINE
Upgrades California Medical Facility
2:00 PM
Rohnert
Park
The California Department of Corrections and Rehabilitation (CDCR) intends to receive bids and award a contract for the construction of two new structures; the
remodel of two building areas; and infrastructure; and Sitewide emergency power upgrades at California Medical Facility (CMF) located in the City of Vacaville,
California.
$30000
NEW Stevenson Hall Provost Office Renovation
Optional 5/28 @ 2PM
ONLINE
Office renonation
2:00 PM
Napa
2:00 PM
Cupertino
2:00 PM
Vacaville
2:00 PM
San
Francisco
$627000
NEW ACP Lining Project No. 1
5/19 @ 2PM at 1515 Soscol Ferry Rd., Napa
Existing utilities & underground structres, flow bypass system, CIPP lining, sewer cleaning, CCTV inspection of existing & rehabilitation sewers.
NEW Learning Center West-Elevator Renovation De Anza College
5/21 @ 2PM at 21250 Stevens Creek Blvd., Admin Bldg,
Cupertino
Hydraulic elevator modernization
$1133100
NEW 2015 Slurry Seal Project
Water pollution control, watering, damage repair, dust control, maintaining traffic, remove traffic striping & pavement markings, remove pavement markers,
temporary pavement delineation, pavement markers, thermoplastic pavement delineation & pavement markings, vegetation removal, tree trimming & removal,
protection of manhole covers & miscellaneous covers & lids, asphalt crack sealing, polymer emulsified asphalt, modified type II slurry seal, roadside signs, final
cleanup
TG12.1 Civil/Sitework at Grade/Ground Level Landscaping
4/14 @ 2PM at 175 Beale St., San Francisco
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with Civil/Sitework at Grade, Landscaping, Interface with Building
Control Systems/Security Platforms, and removal of Temporary Bridges on complex projects which require significant coordination with adjacent properties and
traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems in
the following trade: TG12.1 CIVIL/SITEWORK AT GRADE/GROUND LEVEL LANDSCAPING
Page 58 of 63
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
6/9/2015
3:00 PM
4:00 PM
El Dorado
Hills
Napa
Plan Name / Scope of Work
Prebid Information
NEW El Dorado Hills Wastewater Treament Plant Odor Control
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 6/1 @ 10AM at 4625 Latrobe Rd., El Dorado Hills
Div_02-demolition, earthwork, biofilter systems, excavating, backfilling & compacting for utilities, sheeting/shoring/bracing, asphalt concrete paving; Div_03concrete; Div_05-structural sluminum, metal fabrications, aluminum handrailing, engineered aluminum covers, hot-dip zinc coating; Div_07-sealants; Div_08aluminum access hatches; Div_09-painting & protective coatings; Div_11-equipment mounting; Div_13-reinforced thermoset plastic specialties, fiberglass
reinforced plastic ductwork; Div_15-piping systems
NEW RFQ/P-Design-Build Services Downtown Two-Way Street Conversion 5/26 @ 9AM at 1600 First St., Napa
ONLINE
Project Phase 2 (Third and Fourth Streets)
The City of Napa (City) is releasing this Request for Qualifications and Proposals (RFQ/P)
to select a design-build contractor team with the necessary and desirable qualifications to
be successful in a partnership with City for the design and construction of specified
improvements to convert one-way traffic operations to two-way traffic operations along
Third Street and Fourth Street from west of Coombs Street to east of Wilson Street. The
design-build team must be willing and able to collaborate with the City in a partnership to
deliver the project components in a timely and cost effective manner. The majority of the
construction will be demolition and reconstruction of sections of streets and sidewalks
including utility protection and relocation as required.
6/10/2015 2:00 PM
Martinez
NEW 2015 Seismic And Structural Upgrade Project (Prequalified Generals 5/21 @ 1:30PM at 525 Henrietta St., Martinez
$2500000
ONLINE
Only)
he project includes necessary site work and construction for seismic and structural upgrades to facilities at the City of Martinez Water Treatment Plant.The City
of Martinez Water Treatment Plant is located at 3003 Pacheco Boulevard, Martinez, CA 94553. Work includes the replacement of the existing glass
superstructure for the facility’s 1967 Filter Building with construction of partial concrete shear walls, seismic improvements for the Washwater Supply Tank and
Clearwell structures, replacement of 24-36” buried reinforced concrete piping to and from the Clearwell with steel piping, and seismic and structural
improvements for the pipe supports associated with the facility’s finished water piping.The necessary site work includes, but is not limited to, utility coordination
and relocation, off-site disposal of demolition and excavation materials, startup, pavement cutting and restoration, obtaining and complying with permits,
hazardous material disposal and removal and miscellaneous items of work as specified and required by the contract documents
2:00 PM
2:30 PM
$170800
Santa Rosa NEW LG Firing Range Upgrades
The Work consists of construction of County’s LG Firing Range Upgrades, at 343 Casa Manana Rd, Santa Rosa, California. The Work includes, but is not
limited to, the construction of installation of new firing range equipment.
$8500000
NEW Glen Canyon Recreation Center Renovation
5/20 @ 11AM at 30 Van Ness Ave, 5th Fl, San Francisco
San
Francisco
The work is located at Glen Canyon Park, near the intersection of Chenery
and Elk Streets and includes building work for the renovation and seismic
retrofit of the existing recreation center and building expansion for a new multi-purpose room and at gym for new bleachers; hazmat abatement and demolition;
ADA upgrades; and all related utility work. The site work includes demolition; grading and drainage; concrete and asphalt work; metalwork; new site furnishings;
bio-retention area; stonework and planting/irrigation work
Karen Mauney-Brodek, Proj Mgr, @ 415-575-5601
Page 59 of 63
ONLINE
ONLINE
Bid Date Bid Time Location
6/10/2015 2:30 PM
San
Francisco
Plan Name / Scope of Work
Prebid Information
NEW Alamo Square Restroom and Irrigation Upgrade
5/20 @ 2PM
Engineers # of
Plan
Estimate Addenda #
$2000000
ONLINE
Div_02-earthwork, structural excavation, filling & backfilling, structural demolition, contaminated site materials removal, facility remediation; Div_03-concrete;
Div_05-structural steel framing, metal fabrication, formed metal fabrication; Div_06-rough carpentry; Div_07-fluid applied roofing membrane, sheet metal &
flashing, joint sealants; Div_09-portland cement plastering, gypsum board assemblies, tiling, painting, anti-graffiti coatings, epoxy floor coating; Div_10-signage,
toilet partitions, toilet & bath accessories; Div_22-plumbing; Div_23-HVAC; Div-26-lighting, electrical; Div_27-communications; Div_31-site clearing, rough
grading of soil, trenching & backfilling, pavement cutting & excavation; Div_32-asphalt paving, concrete paving, textured asphalt finishing, site concrete work,
irrigation systems, irrigation booster pump package, planting, planting preparation; Div_33-utilities
Mary Hobson, Project Mgr, @ 415-581-2575
3:00 PM
Hayward
3:00 PM
Los Altos
Hills
6/11/2015 2:00 PM
Concord
2:00 PM
2:00 PM
2:00 PM
3:30 PM
Council Chamber Audio/Video System
ONLINE
MAND 5/21 @ 9AM at 777 B St., Hayward
The City of Hayward (hereafter referred to as CoH) is requesting proposals from
qualified companies (Proposer) to procure, install and configure a complete Council
Chambers Audio/Video system for their existing facilities specified herein
NEW Parking & Circulation Phase 3-Lot 1 Stair
MAND 5/20 @ 10AM at 12345 El Monte Rd., Bldg D160,
Los Altos Hills
Site finish carpentry, site water repellent, site painting, exterior lighting, electrical, site preparation, earthwork & grading, trenching, backfilling & compacting,
landscape maitenance period, paving & surfacing, site concrete, site sealants, pavement marking, restoration of surfaces, soil preparation & mixes, planting
areas finish grading, grasses, plant material, site metalwork, storm drainage
Detroit Avenue Pedestrian and Bicycle Improvements
MAND 5/26 @ 10AM & 5/28 @ 10AM
$1500000 $1750000
Mobilization, traffic control, storm water pollution control, open trench construction of storm drain & fiber optic conduit & bozes, street pavement, concrete curb &
gitter construction, concrete sidewalk construction, concrete ADA ramp construction, tree removal & installation, potholing of existing utilities, traffic sigining,
striping & markings & street lighting
$80000
NEW Wastewater Treatment Plant UV Building Remodel
5/26 @ 10AM at 678 W. 18th St., Merced
Merced
The work to be done consists, in general, of the removal of the existing railing system and the installation of Granitstone wall panels, including the structural
support, metal roll-up door, metal service doors, windows, supply air intake fans, air relief vents, and electrical work. All work shall be done at the Merced
Wastewater Treatment Plant within the City of Merced
$1000000
MAND 05/22/15 @ 10:00 am
Pleasant Hill NEW DVC Exterior Painting Project
In general, the Work consists of exterior painting of selected buildings on Campus. Repair of dry rot and other damaged areas as needed.
$145000
East Shore Trail Landslide Stabilization-Lake Chabot Regional Park 5/19 @ 10AM
Castro
Valley
Stabilize landslide along the East Shore Trail by installing 124 LF of reinforced concrete grade beam with 21 cast-in-drilled-hole piers.
American
Canyon
ONLY THOSE PROSPECTIVE BIDDERS WHO HAVE PURCHASED BID DOCUMENTS DIRECTLY FROM THE DISTRICT MAY BID ON THIS CONTRACT.
$680000
NEW American Canyon Landfill Storage Tank Seismic Upgrades
MAND 5/21 @ 10AM at 1 Eucalyptus Dr., Maintenance
Shop yard, American Canyon
Earthwork, HDPE piping, cast-in-place concrete, equipment, PVC piping, electrical
Page 60 of 63
ONLINE
ONLINE
ONLINE
ONLINE
E431B
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
6/16/2015 2:00 PM
Dormitory Building Fire Alarm and Fire Sprinkler Work
Meyers
2:00 PM
Tracy
3:00 PM
Eldridge
6/17/2015 2:00 PM
Hayward
6/18/2015 11:00 AM
Lodi
2:00 PM
4:00 PM
6/23/2015 2:00 PM
San Mateo
County
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 4/21 @ 9:30AM 1949 Apache Ave, Meyers
Through & membrane penetration firestop systems, wet-pipe sprinkler & standpipe systems, fire alamr, electrical work
NEW Joe Wilson Pool Reconstruction
5/26 @ 10AM at 900 W. Lowell Ave., Tracy
Joe Wilson Swimming Pool reconstruction project generally consists of but is not limited to swimming pool demolition and reconstruction including all its
accessories, site improvements, equipment and mechanical systems, and pool pump room renovations, improvements and modifications. Site improvements
include but not limited to grading, utilities, parking areas, fencing, walkways, landscaping, lighting and other civil improvements. Pool building renovations and
improvements consist of selected demolition and renovation of finish surfaces, roofing, passive solar system, plumbing replacement and modifications, electrical
improvements, equipment replacement.
$270000
NEW Replace Pipes & Media at the Water Treatment Plant
MAND 5/29 @ 10AM at 15000 Arnold Dr., Eldridge
Contractor shall provide all materials, labor, tools, transportation, equipment, supervision and other services necessary to remove and replace existing corroded
pipe system and water filter sections as noted on specs and plans
Cherryland Fire Station
MAND 5/15 @ 1PM at 19745 Meekland Ave., Hayward
Construction of a new fire station on two parcels
$535000
NEW Shady Acres Pump Station Trash Handling Project
MAND 5/27 @ 10AM
The work consists of installing a pre-fab storm water trash-handling unit at the Shady Acres storm water pump station site. The work will require proper shoring
for the unit installation. The work also consists of installing a reinforced concrete channel and other incidental and related work, all as shown on the plans and
specifications for the above project.
$5000000
NEW Quint Street Bridge Replacement
5/14 @ 9AM
Woodside
This public works project for the Quint Street Bridge Replacement Project will remove and demolish a double track railroad bridge, reconstructing an elevated
earthen berm in its place, all while maintaining daily rail traffic. The Quint Street Bridge was constructed in 1907 and consists of one concrete span and eleven
steel spans on skewed steel bents. The elevated earthen berm will utilize lightweight cellular concrete (LCC) fill, supported by a mechanically stabilized earth
(MSE) retaining wall and topped with cement stabilized soil. Bridge removal and track reconstruction is required to be completed in a single 31 hour rail service
outage. The project will also entail installing 2000 track feet of concrete ties during weekend single track outages and remove a single span of the Jerrold
Avenue Bridge during a single seven hour rail service outage
$6000000
RFQ -Design Build Entities for Skylonda Fire Station No. 58
MAND 5/15 @ 10AM at 455 County Center, Rm 101,
Replacement Project
Redwood City
The County intends to construct an approximately 8,000 SF replacement building that will consolidate the functions and operations of two existing office and
barracks structures at the Skylonda Fire Station No. 58, 17290 Skyline Blvd, Woodside, CA
.
This project will also include demolition, site work, utilities, and septic system improvements to provide for a complete and functional Essential Services Facility.
The design-build contract is estimated to be approximately $6 million.
Castro
Valley
The Sidewalk Improvements on Orange Avenue Between Lessley Ave MAND 06/02/15 @ 10:00am at 951 Turner Ct, Room 230,
and I-580
Hayward
The project consists of, in general, providing a traffic control system; providing construction area signs; furnishing and implementing water pollution control plans;
furnishing and applying water; notifying and coordinating with local residents and utility companies; removing existing rolled curb and gutter; constructing new
concrete curb, gutter, sidewalk, driveways, driveway and walkway conforms; constructing pedestrian ramps; constructing asphalt pavement conforms; milling;
constructing base failure repair; constructing new asphalt concrete pavement on a portion of the roadway; planting new trees on both sides of the roadway; and
cleaning of the site at the end of the project.
Page 61 of 63
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
090C
Bid Date Bid Time Location
Plan Name / Scope of Work
6/30/2015 10:30 AM
Pier 94 High Mast Lighting project
San
Francisco
Prebid Information
Engineers # of
Plan
Estimate Addenda #
5/26 @ 10:30AM at 5 Thomas Mellon Circle, Ste 168, San
Francisco
$300000
ONLINE
Replacing two high mast light poles at Pier 94
Arnel Prestosa, Proj Engineer,@ 415-274-0627
12:00 PM
San
Francisco
GSA Real Estate Division, Elevator and Escalator Special Services Continuous Solicitation
ONLINE
General Services Agency, Real Estate Division is seeking specialty-licensed contractors to perform elevator and escalator inspection, maintenance and repair
work (Special Services). The work is performed on an “if-and-as-needed” basis in accordance with the San Francisco Administrative Code Section 6.65
requirements. Contractors who can demonstrate experience, expertise and quality of work may be awarded a master agreement for a term not-to-exceed five
years. All maintenance and repair services work shall conform to the City’s insurance, bonds, indemnity and prevailing wage requirements for public work.When
work is available, at least three special service contractors will be invited to submit a competitive quotation for the work. The contractor submitting the lowest
responsive quotation may be awarded the Contract Service Order (CSO) to perform the work. All special services work shall conform to the City’s insurance,
bonds, indemnity and prevailing wage requirements.
12:00 PM
2:00 PM
San
Francisco
San
Francisco
GSA Real Estate Division, Fire Protection, Fire Alarm & Security
Systems Special Services - Continuous Solicitation
General Services Agency, Real Estate Division is seeking specialty-licensed contractors to perform fire protection, fire alarm or security systems inspection,
maintenance and repair work (Special Services). The work is performed on an “if-and-as-needed” basis in accordance with the San Francisco Administrative
Code Section 6.65 requirements. Contractors who can demonstrate experience, expertise and quality of work may be awarded a master agreement for a term
not-to-exceed five years. All maintenance and repair services work shall conform to the City’s insurance, bonds, indemnity and prevailing wage requirements for
public work. When work is available, at least three special service contractors will be invited to submit a competitive quotation for the work. The contractor
submitting the lowest responsive quotation may be awarded the Contract Service Order (CSO) to perform the work. All special services work shall conform to the
City’s insurance, bonds, indemnity and prevailing wage requirements.
TG13.1 Roof Park Landscaping and Irrigation
Optional 3/18 @ 2PM at 175 Beale St., San Francisco
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with roof park substructure, hardscape, contract grow and
acclimatization, landscaping, maintenance, utility corridor, drainage and irrigation, site furnishings, miscellaneous metals, fountain hardscape, and playground
structure on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the
engineering, coordination, procurement and complete installation of their respective systems in the following trade: TG13.1 Roof Park Landscaping and Irrigation
Page 62 of 63
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
6/30/2015 6:00 PM
Various Public Works Projects-Sonoma State University
Rohnert
Park
Prebid Information
Engineers # of
Plan
Estimate Addenda #
Sonoma State University is seeking qualified contractors and service providers to perform various projects and services beginning July 1, 2014 through June 30,
2015. The University shall establish a shortlist of qualified contractors for possible future minor capital projects ranging in value from $5,000.00 up to
$634,000.00.
Carolyn Faulconer of the Sonoma State University says that from July 1, 2014 through June 30, 2015 the university will be accepting contractors who wish to be
added to its list to perform various projects & services for the university. Right now there are no projects yet out to bid. The bid date, June 30, 2015, is the last
day the University will be accepting qualified contractors to its list.
REMOVE, REPLACE, REPAIR REMODEL, RENOVATE, CONSTRUCT AND/OR MAINTAIN:
Includes, but not limited to, demolition, miscellaneous site improvements, flooring, walls, doors,
windows, roofing, mechanical and plumbing systems; electrical and telecommunication systems, audio and video systems, radio and communications systems,
security and surveillance systems, fire alarm systems and signage; HVAC equipment; water heaters; automatic doors; ADA; pathways; wall coverings
Page 63 of 63
ONLINE
INVITATION TO BID / PARTICIPATE TO BE ON SUBCONTRACTOR’S LIST
(Return Reply Requested)
Bid Information:
Alameda County Project #R15008 / Master Contract ID #901333
SANTA RITA JAIL (SRJ) CONDENSER WATER SYSTEM UPGRADE
5325 Broder Blvd.
Dublin, CA 94568
Bid Value:
$369,000.00 Budgetary estimate for the scope of work
Bid Date & Time:
June 2, 2015 at 2:00 PM (Please respond by 1:00 PM)
Project Duration:
The time to complete this entire project is 225 calendar days. The time to complete
the cooling tower installation portion of this project is 60 calendar days with construction
anticipated to start on 11/01/2015 or upon receipt of a Notice To Commence Construction.
Dear Estimator: It is the express purpose of the Enhanced Construction Outreach Program (ECOP) to
encourage the participation in the Alameda County projects of the MWBE/MBE/WBE/SBE/SLBE/LBEs.
TRADE
Seeking all qualified MWBE/MBE/WBE/SBE/SLBE/LBEs Subcontractors, Suppliers, Manufacturers, and
Truckers. LOCAL Subcontractors are Strongly Encouraged.
Where applicable effort will be made to assist interested MWBE/MBE/WBE/SBE/SLBE/LBEs in obtaining
Bonds, Lines of Credit, Insurance required by either the GSA or General Contractor.
PROJECT DESCRIPTION: The work of this Contract consists of replacing all condenser water system
equipment that serves a chilled water plant located in the Santa Rita Jail chiller refrigeration room #322 at 5325
Broder Boulevard. The scope of work includes the demolition and installation of two 800-ton cooling towers,
two condenser water pumps variable frequency drives, central plant water softener, the installation of a new
water filtration system, the installation of a chemical treatment system, and all ancillary equipment and
controls.
Ensure all required licenses are listed: A, B2, C-20
These are all prevailing wage rated projects. MWBE/MBE/WBE/SBE/SLBE/LBEs enterprises are strongly
encouraged to submit.
Plans, Specs, & Requirements are available for viewing in our Plan Room. In order to receive them on time please
contact our office. In order to be placed in the subcontractor list/date base for the Alameda County projects,
please respond by marking the appropriate boxes below and fax it back to 213-487-6131, calling 213-487-6130,
or email at [email protected].
Thank you!
Jenny Park
-----------------------------------------------------------------------------------------------------------------------------------------------------------------Subcontractor’s Name:
Trade:
Contact Name:
Telephone:
Address:
Fax #:
E-Mail:
(
) MWBE/MBE/WBE/SBE/SLBE/LBEs
(please circle one)
(
(
) NO, I will not participate
) YES, I would like to participate
3325 Wilshire Blvd., Suite 305 Los Angeles, CA 90010
Tel: 213.487.6130
Fax 213.487.6131