ttdotqfrg.gfrfttg (q7{il q|,*ft 4,1 \4 jIlltrq ) t{x.qqiF*qulrfufl.r ErrirflErsc, (+ +c+1 +qttlill I Cl, ,4%liaizataa eo*&otq ccL/HQ/c-4lAs is where is/201.s-t6/ id s34 029 CENTRAL COALFI ELDS LIM ITED (Govt. of lndia Undeftaking) Sales & Mad<eting Department DARBHANGA HOUSE, RANCHI iAiri{j-lTelefax- 0651 -2360369 {cliTl?z'Website- wrv,v.cci. gov in \ To7,-- v Ku 1 DaIe L8/04/2OL5 NOTICE Ref: Continuation of offer of coal in 2015-16 on "As is where is Basis" to Power Utilities having FSA with Central Coalfields Limited vide letter no. CIL/S&M/CMD Meet/As is where is/200 dated 11.04.2015 t. tt has been decided to make offer to all Power Utilities (including lPPs) having FSA in the year 2015-16 to lift the coal which is held in the stocks on "As is where is Basis" with the stipulation that the Power utilities will make their own evacuation arrangement. This will serve the objective of honouring the FSA up to the trigger point with normal despatches and to even exceed it by allowing liquidation from the stocks whenever the Power Utilities come forward to lift either by Road or Road - cum - Rail arrangement. The price applicable for Power Utilities would be as per FSA, including incentives, as applicable' 2. In line with prevailing practice, supply of coal through this scheme would be an integral part of the quantity supplied gnder FSA and may be availed by both, pre & post 2009 Commissioned Power Stations having 3. 4. FSA. In case, where under Model FSA for new Power Stations mandatorily lifting through Roadcum-Rail mode to the extent of 5% of ACQ is already provisioned , the "As is where is Basis" scheme would be an additional facility to the willing Power-stations and the quantity so lifted would also be an integral part of the quantity supplied under FSA. K.D.Old Siding, which was made available earlier for augmenting despatches under "As is where is Basis" scheme through Road / Road-cum-Rail mode, may again be considered for such despatches. For despatches from Amrapali Project, Tori Siding may be made available for despatches under RCR mode. 5. 5. 7. All concerned, who are interested in lifting of coal through the Siding mentioned above, may offer their expression of interest for supply of coal under "As is where is Basis" scheme. In case , certain consumers are interested in lifting coal by forming a group, they may submit their expression of interest through consortium duly formed by such cohSUlYl€rs: The list of pithead stocks which is offered for despatches to Power Utilities having FSA with CCL is enclosed as Annexure L You are requested to submit your offer for lifting of coal to the office of the undersigned within 15 days from the date of issue of this notice in accordance with the linked range of GCV/Grade as per FSA executed with them. In case interest is received for more than the offered quantity, the allocation shall be made on pro-rata basis in accordance with their respective ACQ, Other modalities shall be decided after receipt of offer/interest from the concerned Power Utilities. This issues with the approval of competent authority. Encl: As above. (l General Copy for kind information: L. 2. 3. 4. 5. CMD, CCL, Ranchi D(F), CCL, Ranchi DT(OP), CCL, Ranchi CVO, CCL, Ranchi CGM(S&M), ClL, Kolkata Distribution: 1. 2. 3. 4. 5. Copy Notice Board - CCL(S&M), CSC CCL, CCL Kolkata office GM (System), CCL, Ranchi- with a request to kindly upload the notice at CCL website. General Manager, CCL All Area. GM(S&M-FSA)/ GM(aM), ccL/cM(S&M-RS)/Dy. GM(M), CCL, Kolkata Sr. Mgr (Finance-CSC)/Sr. Mer.(Oprn)/Sr. Mer(RS)/Mer(F- S&M) to : ( Regd. Post) The Director (Technical), Damodar Valley Corporation, DVC, Towers, VIP Road, Kolkata700054. 2. 3. 4. 5. The C.E (Fuel), UPRVUNL, 14th Floor, Shakti Bhawan, Extn-14, Ashok Marg, Lucknow (UP).- 22600r. The Executive Director, Adhunik Power & Natural Resources Limited, "Lansdowne f owers",2f TA,Sarat Bose Road, Kolkata- 7O0O2O. The Sr. Vice President (Operations) M/S Jhajjar Power Limited ,Village Khanpur,Tahsil, Matenhail, Distt:J hajjar, Ha ryana -L24I42 The Project (Director), M/S Rosa Power Supply Company Limited ,Administrative Block,Hardoi Road,P.O.Rosar Kothi ,Sadar Tehsil ,Shahjahanpur District, Uttar Pradesh,242407. 6. The Director, Bajaj Energy Private Limited, Bajaj Bhawan, B-1-0, Sector-3, Jamnalal Bajaj Marg, Noida (UP)-201301 7. 8. The Managing Director,Jaiprakash Power Ventures Limited ,Sector-L28,Nodia-201304 (U.P) The C.E.O, Maithon Power Limited, MA-5, Gogna, P.O. Maithon Dam-828 207, Dhanbad, Jharkhand. 9. The OSD/Coal Management, to Member Generation, Punjab State Power,Corporation Limited (erstwhile PSEB), Patiala-147 001 10. The Director (T), HPGCL, Urja Bhawan, C- 7, Sector -6, Shakti Bhawan, Panchkula (Haryana)134 109. 11. The Managing Director, WNL, Allahabad Bank Building, Hinoo, Ranchi-834 002 12. Chief Engineer (Generation), JSEB HQ" Engineering Building, HEC, Dhurva, Ranchi-834004. 13. General Manager (FM), NTPC, A-11, C- wing, NFL Premises, Sec-24, NoidaiU.P. \rr- ANNEXURE - for the vear 2015-16 under "As is where is Basis" scheme of CIL Stock position as on 01.04.2015 (Prov.) (Fig. in '000 tonnes) Area Open Cast Colliery Grade/GCV Range Barka Sayal UrimariOC North Urimari G4/Gs G4 101 Argada GidiA Gidic 2t3 NK D Bukbuka KD G5/G6 G6lG8 G9/G10 Gg/G10 308 Purnadih G7lcs 557 Tetariakhar Piparwar G10/G11 Gs/G11 1.47 Ashoka G10 594 Magadh-Amrapali Amrapali G10/G11 974 Kuju Kuiu OC G6 155 Karma G5 25r Kedla OC W-IV W-IV 178 w-rv/c9 189 G8/W-rV W-IV 733 G8 248 G8/G10 W-IV W-IV W-IV W-IV 108 Raihara Piparwar Hazaribagh Kargali Dhori Katha ra Tapin North Parei East Karo-lOC KhasmahalOC Kabribad Giridih"OC S.DhoriQry. No. 1 S.DhoriQry. No. 3 Jarangdih OC Govindpur Phase ll 347 1.45 767 544 725 274 369 230 71.4 347 I
© Copyright 2024