NOTICE
Ref: Continuation of offer of coal in 2015-16 on "As is where is Basis" to Power Utilities
having FSA with Central Coalfields Limited vide letter no. CIL/S&M/CMD Meet/As is where
is/200 dated 11.04.2015
t.
tt has been decided to make offer to all Power Utilities (including lPPs) having FSA in the year
2015-16 to lift the coal which is held in the stocks on "As is where is Basis" with the stipulation
that the Power utilities will make their own evacuation arrangement. This will serve the
objective of honouring the FSA up to the trigger point with normal despatches and to even
exceed it by allowing liquidation from the stocks whenever the Power Utilities come forward
to lift either by Road or Road - cum - Rail arrangement. The price applicable for Power Utilities
would be as per FSA, including incentives, as applicable'
2.
In line with prevailing practice, supply of coal through this scheme would be an integral part
of the quantity supplied gnder FSA and may be availed by both, pre & post 2009
Commissioned Power Stations having
3.
4.
FSA.
In case, where under Model FSA for new Power Stations mandatorily lifting through Roadcum-Rail mode to the extent of 5% of ACQ is already provisioned , the "As is where is Basis"
scheme would be an additional facility to the willing Power-stations and the quantity so lifted
would also be an integral part of the quantity supplied under FSA.
K.D.Old Siding, which was made available earlier for augmenting despatches under "As is
where is Basis" scheme through Road / Road-cum-Rail mode, may again be considered for
such despatches. For despatches from Amrapali Project, Tori Siding may be made available for
despatches under RCR mode.
5.
5.
7.
All concerned, who are interested in lifting of coal through the Siding mentioned above, may
offer their expression of interest for supply of coal under "As is where is Basis" scheme. In
case , certain consumers are interested in lifting coal by forming a group, they may submit
their expression of interest through consortium duly formed by such cohSUlYl€rs:
The list of pithead stocks which is offered for despatches to Power Utilities having FSA with
CCL is enclosed as Annexure L
You are requested to submit your offer for lifting of coal to the office of the undersigned within
15 days from the date of issue of this notice in accordance with the linked range of GCV/Grade
as per FSA executed
with them.
In case interest is received for more than the offered quantity, the allocation shall be made
on pro-rata basis in accordance with their respective ACQ, Other modalities shall be decided
after receipt of offer/interest from the concerned Power Utilities.
This issues with the approval of competent authority.
Encl: As above.
(l
General
Copy for kind information:
L.
2.
3.
4.
5.
CMD, CCL, Ranchi
D(F), CCL, Ranchi
DT(OP), CCL, Ranchi
CVO, CCL, Ranchi
CGM(S&M), ClL, Kolkata
Distribution:
1.
2.
3.
4.
5.
Copy
Notice Board - CCL(S&M), CSC CCL, CCL Kolkata office
GM (System), CCL, Ranchi- with a request to kindly upload the notice at
CCL
website.
General Manager, CCL All Area.
GM(S&M-FSA)/ GM(aM), ccL/cM(S&M-RS)/Dy. GM(M), CCL, Kolkata
Sr. Mgr (Finance-CSC)/Sr. Mer.(Oprn)/Sr. Mer(RS)/Mer(F- S&M)
to : ( Regd. Post)
The Director (Technical), Damodar Valley Corporation, DVC, Towers, VIP Road, Kolkata700054.
2.
3.
4.
5.
The C.E (Fuel), UPRVUNL, 14th Floor, Shakti Bhawan, Extn-14, Ashok Marg, Lucknow (UP).-
22600r.
The Executive Director, Adhunik Power & Natural Resources Limited, "Lansdowne
f owers",2f TA,Sarat Bose Road, Kolkata- 7O0O2O.
The Sr. Vice President (Operations) M/S Jhajjar Power Limited ,Village Khanpur,Tahsil,
Matenhail, Distt:J hajjar, Ha ryana -L24I42
The Project (Director), M/S Rosa Power Supply Company Limited ,Administrative Block,Hardoi
Road,P.O.Rosar Kothi ,Sadar Tehsil ,Shahjahanpur District, Uttar Pradesh,242407.
6.
The Director, Bajaj Energy Private Limited, Bajaj Bhawan, B-1-0, Sector-3, Jamnalal Bajaj Marg,
Noida (UP)-201301
7.
8.
The Managing Director,Jaiprakash Power Ventures Limited ,Sector-L28,Nodia-201304 (U.P)
The C.E.O, Maithon Power Limited, MA-5, Gogna, P.O. Maithon Dam-828 207, Dhanbad,
Jharkhand.
9.
The OSD/Coal Management, to Member Generation, Punjab State Power,Corporation
Limited (erstwhile PSEB), Patiala-147 001
10. The Director (T), HPGCL, Urja Bhawan, C- 7, Sector -6, Shakti Bhawan, Panchkula (Haryana)134 109.
11. The Managing Director, WNL, Allahabad Bank Building, Hinoo, Ranchi-834 002
12. Chief Engineer (Generation), JSEB HQ" Engineering Building, HEC, Dhurva, Ranchi-834004.
13. General Manager (FM), NTPC, A-11, C- wing, NFL Premises, Sec-24, NoidaiU.P.
\rr-
ANNEXURE -
for the vear 2015-16 under "As is where is Basis" scheme of
CIL
Stock position as on
01.04.2015 (Prov.)
(Fig. in '000 tonnes)
Area
Open Cast Colliery
Grade/GCV Range
Barka Sayal
UrimariOC
North Urimari
G4/Gs
G4
101
Argada
GidiA
Gidic
2t3
NK
D Bukbuka
KD
G5/G6
G6lG8
G9/G10
Gg/G10
308
Purnadih
G7lcs
557
Tetariakhar
Piparwar
G10/G11
Gs/G11
1.47
Ashoka
G10
594
Magadh-Amrapali
Amrapali
G10/G11
974
Kuju
Kuiu OC
G6
155
Karma
G5
25r
Kedla OC
W-IV
W-IV
178
w-rv/c9
189
G8/W-rV
W-IV
733
G8
248
G8/G10
W-IV
W-IV
W-IV
W-IV
108
Raihara
Piparwar
Hazaribagh
Kargali
Dhori
Katha ra
Tapin North
Parei East
Karo-lOC
KhasmahalOC
Kabribad
Giridih"OC
S.DhoriQry. No. 1
S.DhoriQry. No. 3
Jarangdih OC
Govindpur Phase ll
347
1.45
767
544
725
274
369
230
71.4
347
I