Agenda
A Brief Overview of EDF-Renewable Energy
Data Reliability and the Impact on Company Culture
The Problem of Challenging the Culture
Our Solution: Projects over the last two-year project
undertaken to change that attitude.
Our Results: Where we are today after the culmination of
our work, and where we want to go.
© Copyright 2015 OSIsoft, LLC
2
Wind
9.3 GW
Installed
Capacity
Solar
EDF Renewable Energy is the U.S. subsidiary of EDF Energies
Nouvelles, the renewable arm of EDF Group (Électricité de France)
© Copyright 2015 OSIsoft, LLC
3
Teaser – The Questions Raised
How to take over the development of a PI System
infrastructure that has fallen by the wayside, that has not
met the needs of the company?
How do you monitor and manage a system that you had
no hand in building?
What happens when you are called upon to carry on
someone else’s vision (that may no longer be relevant)?
How do you transform a company’s culture with regards
to the value of data?
© Copyright 2015 OSIsoft, LLC
4
Problem Summary
Since we began using the PI System, EDF-RE experienced rapid growth.
4100 MW
[VALUE]
MW
Survivability
Inability to
Sufficiently
Monitor
Low Data
Quality
Low Data
Confidence
Low System
Utilization
515 MW
2008
2014
2015
© Copyright 2015 OSIsoft, LLC
5
Problem – System Design
Site I
Site II
Site III
PI HISTORIAN & INT
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI
HISTORIAN
& INT
PI HISTORIAN & ACE
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI
HISTORIAN
& INT
PI HISTORIAN
& ACE
PI HISTORIAN
& INT
HISTORIAN
& ACE
PI HISTORIAN
& INT
PI HISTORIAN
&PIACE
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI Administrators
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI HISTORIAN
&PIINT
HISTORIAN
& INT
PI HISTORIAN
& ACE
Asset Managers
PI HISTORIAN
& INT
PI HISTORIAN
&PIACE
HISTORIAN
& ACE
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
Engineering
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
Site IV
HISTORIAN
& INT
PI HISTORIAN
& ACE
PI HISTORIAN
&PIINT
PI
HISTORIAN
&
ACE
PI
HISTORIAN
&
INT
PI HISTORIAN & ACE
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI
HISTORIAN
& INT
PI HISTORIAN & ACE
Site V
Business Systems
San Diego
HISTORIAN
& INT
PI HISTORIAN
&PIINT
PI HISTORIAN
& ACE
PI HISTORIAN
& INT
HISTORIAN
& ACE
PI HISTORIAN
&PIACE
PI
HISTORIAN
& INT
PI HISTORIAN & ACE
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI
HISTORIAN
& INT
PI HISTORIAN & ACE
PI HISTORIAN & ACE
© Copyright 2015 OSIsoft, LLC
6
Problem – Standardization
Descriptor
Converter Grid Current
Converter Grid Frequency
Converter Grid Voltage
Yaw Angle
Active Power
Generator Bearing Temperature 1
Generator Bearing Temperature 2
Generator Current Phase A
Generator Current Phase B
Generator Current Phase C
Generator Speed
Generator Stator Temperature
Generator Stator Winding Temperature
Generator Voltage Phase A
Generator Voltage Phase B
Generator Voltage Phase C
Negative Active Energy
Negative Reactive Energy
Positive Active Energy
Positive Reactive Energy
Reactive Power
Nacelle Ambient Air Temperature
Nacelle Internal Air Temperature
Nacelle Position
Nacelle Relative Wind Direction
Nacelle Wind Direction
Nacelle Wind Speed
Power Factor
Expected APC
Operating State (Number)
Operating State (Text)
Status Code
Status Code Come Go
Status Code Index
Blade # 1 Pitch Angle
Node Class
WCNV
WCNV
WCNV
WCNV
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WGEN
WNAC
WNAC
WNAC
WNAC
WNAC
WNAC
WPRC
WREP
WREP
WREP
WREP
WREP
WROT
Site A
WCNV_WYEStaA
WCNV_MVHz
WCNV_WYEStaPhV
Site B
WCNV_MVI
WCNV_MVHz
WCNV_MVV
Site C
WCNV_WYEStaA
WCNV_MVHz
WCNV_WYEStaPhV
WGEN_WYEW
WGEN_MVGnTmpBrg1
WGEN_MVGnTmpBrg2
WGEN_WYEStaAa
WGEN_WYEStaAb
WGEN_WYEStaAc
WGEN_MvSpd
WGEN_WYEW
A1_MVTrmTmpgbxbrg1
A1_MVTrmTmpgbxbrg2
WGEN_WYEStaAa
WGEN_WYEStaAb
WGEN_WYEStaAc
WGEN_MvSpd
WGEN_WYEW
WGEN_MVGnTmpBrg1
WGEN_MVGnTmpBrg2
WGEN_WYEStaAa
WGEN_WYEStaAb
WGEN_WYEStaAc
WGEN_MvSpd
WGEN_MVGnTmpRtr
WGEN_WYEStaPhVa
WGEN_WYEStaPhVb
WGEN_WYEStaPhVc
WGEN_WYEWNeg
WGEN_WYEVArNeg
WGEN_WYEWh
WGEN_WYEVArh
WGEN_WYEVAr
WNAC_MVExTmp
WNAC_MVIntlTmp
WNAC_MVDir
WNAC_MVRelWdDir
WNAC_MVWdDir
WNAC_MVWdSpd
WGEN_MVGnTmpRtr
WGEN_WYEStaPhVa
WGEN_WYEStaPhVb
WGEN_WYEStaPhVc
WGEN_WYENegativeActiveEnergy
WGEN_WYENegativeReactiveEnergy
WGEN_WYEPositiveActiveEnergy
WGEN_WYEPositiveReactiveEnergy
WGEN_WYEVAr
WNAC_MVExTmp
WNAC_MVIntlTmp
WNAC_MVPos
WNAC_MVWdDir_rel
WNAC_MVWdDir
WNAC_MVWdSpd
WGEN_MVGnTmpRtr
WGEN_WYEStaPhVa
WGEN_WYEStaPhVb
WGEN_WYEStaPhVc
WGEN_WYEWNeg
WGEN_WYEVArNeg
WGEN_WYEWh
WGEN_WYEVArh
WGEN_WYEVAr
WNAC_MVExTmp
WNAC_MVIntlTmp
WNAC_MVDir
WNAC_MVRelWdDir
WNAC_MVWdDir
WNAC_MVWdSpd
WREP_INGWYEWExpAPC10s
WREP_StvOpSt
WREP_STVOpSt
WREP_StvOpSt
WREP_EventRawStatuscode
WREP_EventRawComeGo
WREP_EventRawIndex
WTUR_STVRawStatusCode
WTUR_STVComeGo
WTUR_STVIndex
WREP_EventRawStatuscode
WREP_EventRawComeGo
WREP_EventRawIndex
Site D
WCNV_WYEStaA
WCNV_MVHz
WCNV_WYEStaPhV
WCNV_MvYawAngle
WGEN_WYEW
WGEN_MVGnTmpBrg1
WGEN_MVGnTmpBrg2
WCNV_WYEStaAa
WCNV_WYEStaAb
WCNV_WYEStaAc
WGEN_MvSpd
WGEN_MVGnTmpSta
Site E
WCNV_MVStaA
WCNV_MVHz
WCNV_WYEStaPhV
WCNV_MvYawAngle
WGEN_WYEW
WGEN_MVGnTmpBrg1
WGEN_MVGnTmpBrg2
WCNV_WYEStaAa
WCNV_WYEStaAb
WCNV_WYEStaAc
WGEN_MVSpd
WGEN_MVGnTmpSta
WGEN_WYEStaPhVa
WGEN_WYEStaPhVb
WGEN_WYEStaPhVc
WGEN_wyewNeg
WGEN_WYEStaPhVa
WGEN_WYEStaPhVb
WGEN_WYEStaPhVc
WGEN_WyeWhNeg
WGEN_WyeWh
WGEN_WyeWh
WGEN_MVVAR
WNAC_MVExTmp
WNAC_MVIntlTmp
WNAC_MVDir
WNAC_MVRelWdDir
WNAC_MVWdDir
WNAC_MVWdSpd
WRPC_MVPIPF
WGEN_MVVAR
WNAC_MVExTmp
WNAC_MVIntlTmp
WNAC_MVDir
WNAC_MVRelWdDir
WNAC_MVWdDir
WNAC_MVWdSpd
WRPC_MVPIPF
WTUR_STVOpSt
WTUR_STVOpStDigit
WREP_EventRawstvaltemp
WREP_EventRawcomegotemp
WREP_EventRawidxtemp
WROT_MVPtAngValBl1
WTUR_Stvopst
WTUR_Stvopstdigit
WREP_EventRawstvaltemp
WREP_EventRawcomegotemp
WREP_EventRawidxtemp
WROT_MVPtAngValBl1
© Copyright 2015 OSIsoft, LLC
7
Problem – Standardization
• Exception and Compression Settings
• Engineering Units
© Copyright 2015 OSIsoft, LLC
8
Problem – Monitoring
• Performance of a wind project could not be gauged
− Data loss for whole weeks out of the year
− Every calculation had to be crafted to accommodate
these data gaps
• Changes were executed without a firm understanding
of the effects in profitability
• Data no longer held any value
• Failed Operational Infrastructure
© Copyright 2015 OSIsoft, LLC
9
Solution Slides
Creation of a data quality metric
Fundamental system redesign
New and updated technologies in the PI System
Better ways of monitoring
Accessibility – opening the data to all employees of
EDF-Renewable Energy
• The Impact on Culture
•
•
•
•
•
© Copyright 2015 OSIsoft, LLC
10
Solution - Creation of the Data Quality Metric
• Quantify your progress for yourself and for the business
• Important to have global acceptance amongst the
departments
• Tracking a high resolution data tag that is based on a
physical phenomena that can assumed to always be live
− Wind Speed
− Power generated
• Can be used to illustrate the cost in the lack of data
© Copyright 2015 OSIsoft, LLC
11
Solution - Creation of the Data Quality Metric
1
1
0
2/3 = 66.66%
© Copyright 2015 OSIsoft, LLC
12
Solution - Creation of the metric
120/144 = 83.3%
© Copyright 2015 OSIsoft, LLC
13
Problem – System Design
Site I
Site II
Site III
PI HISTORIAN & INT
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI
HISTORIAN
& INT
PI HISTORIAN & ACE
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI
HISTORIAN
& INT
PI HISTORIAN
& ACE
PI HISTORIAN
& INT
HISTORIAN
& ACE
PI HISTORIAN
& INT
PI HISTORIAN
&PIACE
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI Administrators
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI HISTORIAN
&PIINT
HISTORIAN
& INT
PI HISTORIAN
& ACE
Asset Managers
PI HISTORIAN
& INT
PI HISTORIAN
&PIACE
HISTORIAN
& ACE
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
Engineering
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
Site IV
HISTORIAN
& INT
PI HISTORIAN
& ACE
PI HISTORIAN
&PIINT
PI
HISTORIAN
&
ACE
PI
HISTORIAN
&
INT
PI HISTORIAN & ACE
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI
HISTORIAN
& INT
PI HISTORIAN & ACE
Site V
Business Systems
San Diego
HISTORIAN
& INT
PI HISTORIAN
&PIINT
PI HISTORIAN
& ACE
PI HISTORIAN
& INT
HISTORIAN
& ACE
PI HISTORIAN
&PIACE
PI
HISTORIAN
& INT
PI HISTORIAN & ACE
PI HISTORIAN
& INT
PI HISTORIAN
& ACE
PI
HISTORIAN
& INT
PI HISTORIAN & ACE
PI HISTORIAN & ACE
© Copyright 2015 OSIsoft, LLC
14
Solution - Fundamental System Redesign
INTERFACE
PI
HISTORIAN
INTERFACE
PI
HISTORIAN
INTERFACE
PI
HISTORIAN
INTERFACE
PI
HISTORIAN
INTERFACE
PI
HISTORIAN
San Diego
PI to PI
Interface
Asset
Analytics
PI Administrators
Asset Managers
PI Server
Engineering
INTERFACE I
Business Systems
INTERFACE II
PI Coresight
INTERFACE I
INTERFACE II
INTERFACE I
INTERFACE II
Users Anywhere
© Copyright 2015 OSIsoft, LLC
15
Solution – PI System Tools: Asset Framework (AF)
Structure
Templatizing
Outside Data
© Copyright 2015 OSIsoft, LLC
16
Solution – PI System Tools
Asset Analytics
© Copyright 2015 OSIsoft, LLC
17
Solution - Monitoring
• Notifications & NOC
• Custom reports utilizing the AF SDK
© Copyright 2015 OSIsoft, LLC
18
Solution – Accessibility
• DMZ (Demilitarized Zone)
− Secured yet accessible
Centralization
• PI Coresight
− Freed from the confines
of the cubicle
• Standardization
− Legitimate comparisons
can be conducted
© Copyright 2015 OSIsoft, LLC
19
Results - Summary
•
•
•
•
•
High Data Quality
High Data Availability
Increased Data Confidence
Company-Wide Cohesiveness
A Revolution in Company Culture
© Copyright 2015 OSIsoft, LLC
20
Results – Data Availability
• Completed the centralization effort by backfilling all data onto the
central PI Collective
• Data can be accessed from anywhere in the
world (where there is an internet connection)
• High Data Quality, low data loss
− From 70% to over 99% data quality
© Copyright 2015 OSIsoft, LLC
21
Results - Cohesiveness
1950
1450
950
450
-50
0
5
10
15
20
© Copyright 2015 OSIsoft, LLC
22
Results
<insert picture of data quality visualization>
© Copyright 2015 OSIsoft, LLC
23
Transforming the Data Culture by Optimizing the PI System at
EDF-Renewable Energy
“Defining the Science of Data and exposing the Value and
possibilities that lie within” – Davidöff Mèyers
Business Challenges
•
Low confidence in data
•
The need to make
business decisions
based on information
•
Struggled to match
resources with growth
Solution(s)
•
•
•
PI System redesign to
achieve manageability and
scalability
Define a data quality metric
and measure the progress
Utilize new and improved
PI Tools
Results and Benefits
•
Unprecedented Data
Quality
•
Buy-in and utilization from
the whole company
•
The ability to grow and
adapt to ever-changing
environments
© Copyright 2015 OSIsoft, LLC
2
4
David Meyers & Jason Nunez
[email protected]
[email protected]
PI Development Engineers
EDF - Renewable Energy
© Copyright 2015 OSIsoft, LLC
25
Questions
Please wait for the microphone
before asking your questions
State your
name & company
© Copyright 2015 OSIsoft, LLC
26
© Copyright 2015 OSIsoft, LLC