IWHR, Beijing, China Flood Prevention System and Flood Management in China Yicheng Wang China Institute of Water Resources and Hydropower Research (IWHR) May 12, 2015 Contents 2. From Flood Control to Flood Management 3. Structural Measures 4. Non-structural Measures 5. Issues and Countermeasures Topographic Characteristics The second level with an elevation of 1,000 to 2,000m The first level (Qinghai-Tibetan Plateau) with a mean elevation of over 4,000m The third level with a mean elevation of below 500m River Basins in China 7 Major River Basins: Northwestern Rivers Yangtze River Songhua River Liao River Hai River Yellow River Hai River Huai River Songhua River Liao River Huai River Yangtze River Southwestern Rivers Yellow River Pearl River Other River Basins: Southeastern Rivers Pearl River Southeastern Rivers Southwestern Rivers Northwestern Rivers Spatial Distribution of Precipitaion Average annual precipitation in China: 643mm. World’s average: 800mm 降水深(mm) Precipitation (mm) 161 537 1200 Temporal Distribution of Precipitaion Precipitation is concentrated in the summer, especially in the northern part 8% 4% 18% 18% 9% 18% Winter 47% 62% 41% Fall Summer Spring 27% Nationwide 16% North 32% South Distribution of Flood Disasters Area seriously threatened with flood disasters Area threatened with flood disasters Areas with flood disasters The developed region in eastern and southern China threatened seriously with flood disasters Enormous economic loss 4 3,5 3 2,5 2 1,5 1 0,5 0 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 In the period from 1990 to 2011, the average annual direct economic loss exceeded RMB120 billion, accounting for about 1.37% of the same period’s GDP. Death toll 10000 Unit: persons 9000 8000 8976 7000 6000 5000 5308 4000 4338 3000 3744 2000 1000 1507 0 50年代 1950s 70年代 1970s 80年代 1980s 90年代 1990s 21st21世纪 century Contents 1. Background Information 3. Structural Measures 4. Non-structural Measures 5. Issues and Countermeasures Turning point: 1998 floods in the Yangtze River and the Songhua River Before 1998: Attempts made to control floods After 1998: Policy shift from flood control to an integrated flood management Risk-based flood management: Flood Risk = hazard × exposure × vulnerability Non-structural measures Land use management Structural measures General Framework of Flood Management Contents 1. Background Information 2. From flood control to flood management 4. Non-structural Measures 5. Issues and Countermeasures Structural measures: Levees, dams, flood detention basins flood diversion channels, river course training, etc. Levees with a total length of 410,000km Levee in the Yangtze River Levee in the Songhua River Levee in the Yellow River Levee in Wuhan 98,000 reservoirs dams with a total storage capacity of 932.3 billion m3 Xiaolangdi Dam in the Yellow River Three Gorges Dam in the Yangtze River 98 flood detention basins with a total surface area of 33,700km2 and a total storage capacity of 107.4 billion m3 Jingjiang Detention Basin in the Middle Reach of the Yangtze River Mengwa Detention Basin in the Yellow River 97,000 Sluices constructed Jingshanhu Sluice Sanhe Sluice Contents 1. Background Information 2. From flood control to flood management 3. Structural Measures 5. Issues and Countermeasures Institutional Framework State Flood Control and Drought Relief Headquarters (State FCDRH) General Commander: Vice Premier Vice General Commanders: Minister of Water Resources, Deputy Chief of the General Staff of PLA, and Deputy Secretary of the State Council Institutional Framework Laws and regulations Water Law Flood Fighting Law Flood Control Law Temporary Regulations for Compensation of Flood Retention Areas Flood warning and forecast Typhoon disaster warning Monitoring of rainfall and river situation Flood forecast Emergency management Rescue effort Flood fighting Flood risk mapping Flood control and drought relief commanding system General Framework River basin water resources commission State FCDRH Sub-center at a prefecture FCDRH of a province Information collection Forecast Alternatives Information Collection Consultation and decision making Contents 1. Background Information 2. From flood control to flood management 3. Structural Measures 4. Non-structural Measures Issues • Incomplete flood prevention engineering system • Aging flood prevention works • Increasing economic loss caused by floods • Inadequate security facilities in flood detention areas Countermeasures • Improving the structural system • Improving the emergency management system • Reinforcing the security system • Enhancing the legal framework • Building up an efficient supporting system Email: [email protected] Telephone: +86-13911812336 - End Thank you
© Copyright 2024