Service Construction Requirements Single Phase Residential Installation: Overhead Mast Pipe Once all of the following requirements have been met, you can anticipate our crews beginning the construction of your service within two weeks. However, inclement weather, power outages, and customer-requested design changes can cause delays. Service Application Date completed Complete and return the service application including a sketch of your building site. Show all existing and proposed underground facilities such as water lines, septic tanks, drain fields along with phone, electric, gas and cable TV lines. Electrical Permit Date completed An electrical permit is required. If you will be doing the work yourself, you must apply for the permit. If you are planning to hire an electrical contractor, the contractor will apply for the permit. Permit applications may take two or more weeks for processing. Easements Date completed We require a signed easement before a service is installed. Easements may also be required from adjoining property owner(s). This process can take a number of months. Construction Fees Date completed Construction fees must be paid in full before we will proceed with construction of your service. Cost estimates for the work performed will be based on rough grade restoration. Service Equipment Date completed Before we can make the service connection, the meter socket, disconnect panel and related items must be installed per Cloverland specifications and applicable electrical codes. Electrical Inspection Date completed An electrical inspector must approve the service. If you are completing the work yourself, it is up to you to schedule the inspection; otherwise, the electrical contractor will do it for you. Once your service is approved, the electrical inspector will notify our member services department and provide us with an official release. Service Route Date completed The service route from the transformer to the service location must be cleared per Cloverland specifications. Electrical Inspectors STATE INSPECTORS LOCAL INSPECTORS Alger, Delta, Schoolcraft, Luce & West Mackinac Counties Pat Debone (906) 786-2063 Clark Township, DeTour Village and DeTour Township Duke Masse (906) 297-3964 Fred Bryner (906) 484-1220 Chippewa & East Mackinac Counties Jon Merihugh (906) 495-1390 Hendricks Township Currently covered by state inspectors. Schoolcraft County Mike Rozeck (906) 249-5106 Garfield, Newton and Hudson Townships James Zdebski (906) 477-6207
© Copyright 2024