Application for Fire Sprinkler Permit The Application Centre

Application for Fire Sprinkler Permit
Address of Job site
Building Permit #
Contractor Name
Plumbing Permit #
Contractor Address
SF/TQ#
Email
Phone number
TO BE INCLUDED IN PERMIT APPLICATION:


3 copies of drawings if more than 12 sprinkler heads
Schedule B from Professional Engineer required prior to issuance of permit if more than 12 sprinkler
heads OR if related Building Permit is for an Engineered Project (regardless of number of heads) – if
unsure, please call 604-946-3330 to confirm requirements
TO BE SUBMITTED WHEN JOB IS COMPLETED:



Schedule C-B from Professional Engineer (for more than 12 sprinkler heads OR if related Building Permit
is for an Engineered Project (regardless of number of heads) – if unsure, please call 604-946-3330 to
confirm requirements).
Letter of Compliance from Certified Installer (for 12 or less sprinkler heads).
Test Report of Backflow Preventer from Installer.
TOTAL NUMBER OF SPRINKLER HEADS REQUIRED..........................................................
Fee Calculation
First 2 sprinkler heads.......................................................................................................................................$ 35.50
Each additional sprinkler head
@ $ 2.00 each
Each siamese connection
@ $31.00 each
Each hose connection
@ $31.00 each
Each hose cabinet
@ $31.00 each
Each backflow prevention assembly
@ $20.25 each
TOTAL AMOUNT OF PERMIT:
Minimum Permit Fee............................................................................$ 61.00
The Application Centre, Community Planning and Development
Contact Us: 604-946-3380 or [email protected]
last updated April 2015