Application for Fire Sprinkler Permit Address of Job site Building Permit # Contractor Name Plumbing Permit # Contractor Address SF/TQ# Email Phone number TO BE INCLUDED IN PERMIT APPLICATION: 3 copies of drawings if more than 12 sprinkler heads Schedule B from Professional Engineer required prior to issuance of permit if more than 12 sprinkler heads OR if related Building Permit is for an Engineered Project (regardless of number of heads) – if unsure, please call 604-946-3330 to confirm requirements TO BE SUBMITTED WHEN JOB IS COMPLETED: Schedule C-B from Professional Engineer (for more than 12 sprinkler heads OR if related Building Permit is for an Engineered Project (regardless of number of heads) – if unsure, please call 604-946-3330 to confirm requirements). Letter of Compliance from Certified Installer (for 12 or less sprinkler heads). Test Report of Backflow Preventer from Installer. TOTAL NUMBER OF SPRINKLER HEADS REQUIRED.......................................................... Fee Calculation First 2 sprinkler heads.......................................................................................................................................$ 35.50 Each additional sprinkler head @ $ 2.00 each Each siamese connection @ $31.00 each Each hose connection @ $31.00 each Each hose cabinet @ $31.00 each Each backflow prevention assembly @ $20.25 each TOTAL AMOUNT OF PERMIT: Minimum Permit Fee............................................................................$ 61.00 The Application Centre, Community Planning and Development Contact Us: 604-946-3380 or [email protected] last updated April 2015
© Copyright 2024