Document 116521

GRATEFUL APPRECIATION TO PARTNERS
The U.S. Department of Energy would like to acknowledge the in-depth analysis and
extensive research conducted by the National Renewable Energy Laboratory and
the major contributions and manuscript reviews by the American Wind Energy
Association and many wind industry organizations that contributed to the production
of this report. The costs curves for energy supply options and the WinDS modeling
assumptions were developed in cooperation with Black & Veatch. The preparation of
this technical report was coordinated by Energetics Incorporated of Washington, DC
and Renewable Energy Consulting Services, Inc. of Palo Alto, CA. All authors and
reviewers who contributed to the preparation of the report are listed in Appendix D.
NOTICE
This report is being disseminated by the Department of Energy. As such, the
document was prepared in compliance with Section 515 of the Treasury and
General Government Appropriations Act for Fiscal Year 2001 (Public Law 106-554)
and information quality guidelines issued by the Department of Energy. Further, this
report could be "influential scientific information" as that term is defined in the Office
of Management and Budget's Information Quality Bulletin for Peer Review (Bulletin).
This report has been peer reviewed pursuant to section II.2 of the Bulletin.
Neither the United States government nor any agency thereof, nor any of their
employees, makes any warranty, express or implied, or assumes any legal liability
or responsibility for the accuracy, completeness, or usefulness of any information,
apparatus, product, or process disclosed, or represents that its use would not
infringe privately owned rights. Reference herein to any specific commercial product,
process, or service by trade name, trademark, manufacturer, or otherwise does not
necessarily constitute or imply its endorsement, recommendation, or favoring by the
United States government or any agency thereof.
Available electronically at http://www.osti.gov/bridge
Available for a processing fee to U.S. Department of Energy
and its contractors, in paper, from:
U.S. Department of Energy
Office of Scientific and Technical Information
P.O. Box 62
Oak Ridge, TN 37831-0062
phone: 865.576.8401
fax: 865.576.5728
email: mailto:[email protected]
Available for sale to the public, in paper, from:
U.S. Department of Commerce
National Technical Information Service
5285 Port Royal Road
Springfield, VA 22161
phone: 800.553.6847
fax: 703.605.6900
email: [email protected]
online ordering: http://www.ntis.gov/ordering.htm
Printed on paper containing at least 50% wastepaper, including 20% postconsumer waste
20% Wind Energy by 2030
Increasing Wind Energy’s Contribution to
U.S. Electricity Supply
DOE/GO-102008-2567 • July 2008
More information is available on the web at:
www.eere.energy.gov/windandhydro
http://www.nrel.gov/docs/fy08osti/41869.pdf
July 2008
Table of Contents
Acronyms ..................................................................................... xi
Chapter 1. Executive Summary & Overview ...........................1
1.1
Introduction and Collaborative Approach......................................... 1
1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.2
Scenario Description............................................................................. 7
1.2.1
1.2.2
1.2.3
1.2.4
1.3
Scope.................................................................................................... 2
Contributors ......................................................................................... 3
Assumptions and Process..................................................................... 3
Report Structure ................................................................................... 4
Setting the Context: Today’s U.S. Wind Industry ............................... 5
Wind Geography .................................................................................. 8
Wind Power Transmission and Integration........................................ 11
Electrical Energy Mix ........................................................................ 12
Pace of New Wind Installations......................................................... 12
Impacts................................................................................................. 13
1.3.1
1.3.2
1.3.3
1.3.4
Greenhouse Gas Reductions .............................................................. 13
Water Conservation............................................................................ 16
Energy Security and Stability............................................................. 17
Cost of the 20% Wind Scenario ......................................................... 18
1.4
Conclusion ........................................................................................... 20
1.5
References and Other Suggested Reading........................................ 20
Chapter 2. Wind Turbine Technology.....................................23
2.1
Introduction......................................................................................... 23
2.2
Today’s Commercial Wind Technology ........................................... 24
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.2.6
2.3
Technology Improvements on the Horizon ...................................... 34
2.3.1
2.3.2
2.3.3
2.3.4
2.4
Future Improvements to Turbine Components .................................. 35
Learning-Curve Effect ....................................................................... 39
The System Benefits of Advanced Technology................................. 40
Targeted RD&D ................................................................................. 42
Addressing Technical and Financial Risks....................................... 43
2.4.1
2.4.2
2.4.3
2.5
Wind Resources ................................................................................. 24
Today’s Modern Wind Turbine ......................................................... 25
Wind Plant Performance and Price .................................................... 26
Wind Technology Development ........................................................ 28
Current Turbine Size .......................................................................... 29
Current Status of Turbine Components.............................................. 30
Direct Impacts .................................................................................... 44
Indirect Impacts.................................................................................. 45
Risk Mitigation Through Certification, Validation, and
Performance Monitoring .................................................................... 46
Offshore Wind Technology ................................................................ 48
2.5.1
2.5.2
Cost of Energy ................................................................................... 49
Current Technology ........................................................................... 49
20% Wind Energy by 2030
i
2.5.3
2.6
Technology Needs and Potential Improvements................................50
Distributed Wind Technology ........................................................... 54
2.6.1
2.6.2
Small Turbine Technology.................................................................54
Technology Trends.............................................................................55
2.7
Summary of Wind Technology Development Needs ....................... 56
2.8
References and Other Suggested Reading........................................ 58
Chapter 3. Manufacturing, Materials, and Resources.......... 61
3.1
Raw Materials Requirements ............................................................ 62
3.2
Manufacturing Capability ................................................................. 65
3.2.1
3.2.2
3.3
Labor Requirements........................................................................... 70
3.3.1
3.4
Maintaining and Expanding Relevant Technical Strength.................70
Challenges to 20% Wind Energy by 2030 ........................................ 72
3.4.1
3.5
Current Manufacturing Facilities .......................................................66
Ramping Up Energy Industries ..........................................................69
Challenges ..........................................................................................72
References and Other Suggested Reading........................................ 73
Chapter 4. Transmission and Integration into the U.S.
Electric System....................................................... 75
4.1
Lessons Learned.................................................................................. 76
4.1.1
4.1.2
Wind Penetration Experiences and Studies........................................76
Power System Studies Conclude that 20% Wind Energy
Penetration Can Be Reliably Accommodated....................................77
4.1.3 Wind Turbine Technology Advancements Improve System
Integration .......................................................................................... 83
4.1.4 Wind Forecasting Enhances System Operation .................................86
4.1.5 Flexible, Dispatchable Generators Facilitate Wind Integration .........86
4.1.6 Integrating an Energy Resource in a Capacity World ........................ 87
4.1.7 Aggregation Reduces Variability .......................................................89
4.1.8 Geographic Dispersion Reduces Operational Impacts ....................... 90
4.1.9 Large Balancing Areas Reduce Impacts ............................................ 91
4.1.10 Balancing Markets Ease Wind Integration.........................................92
4.1.11 Changing Load Patterns Can Complement Wind Generation............93
4.2
Feasibility and Cost of the New Transmission Infrastructure
Required For the 20% Wind Scenario ............................................. 93
4.2.1
4.2.2
4.2.3
4.3
U.S. Power System Operations and Market Structure
Evolution............................................................................................ 100
4.3.1
4.3.2
ii
A New Transmission Superhighway System Would Be
Required ............................................................................................. 95
Overcoming Barriers to Transmission Investment.............................98
Making a National Investment in Transmission...............................100
Expanding Market Flexibility ..........................................................100
Enhancing Wind Forecasting and System Flexibility ......................100
20% Wind Energy by 2030
4.4
References and Other Suggested Reading...................................... 101
Chapter 5. Wind Power Siting and Environmental
Effects ....................................................................105
5.1
Wind Energy Today.......................................................................... 105
5.1.1
5.2
Environmental Benefits .................................................................... 107
5.2.1
5.2.2
5.2.3
5.3
Public Attitudes................................................................................ 116
Visual Impacts.................................................................................. 116
Sound ............................................................................................... 117
Land Value....................................................................................... 118
Siting/Regulatory Framework ......................................................... 118
5.5.1
5.5.2
5.6
Habitat Disturbance and Land Use .................................................. 110
Wildlife Risks .................................................................................. 111
Managing Environmental Risk and Adaptive Management
Principles.......................................................................................... 114
Public Perception and Engagement ................................................ 116
5.4.1
5.4.2
5.4.3
5.4.4
5.5
Global Climate Change and Carbon Reductions.............................. 107
Improving Human Health through Reduced Air Emissions ............ 108
Saving Water.................................................................................... 109
Potential Environmental Impacts.................................................... 110
5.3.1
5.3.2
5.3.3
5.4
Site-Specific and Cumulative Concerns........................................... 106
Local................................................................................................. 119
State and Federal .............................................................................. 119
Addressing Environmental and Siting Challenges ........................ 121
5.6.1
5.6.2
5.6.3
Expand Public-Private Partnerships ................................................. 121
Expand Outreach and Education ...................................................... 122
Coordinate Land-Use Planning ........................................................ 123
5.7
Prospects for Offshore Wind Energy Projects in the United
States and Insights from Europe ..................................................... 124
5.8
Findings and Conclusions ................................................................ 126
5.9
References and Suggested Further Reading................................... 128
Chapter 6. Wind Power Markets ...........................................133
6.1
U.S. Market Evolution Background................................................ 133
6.2
U.S. Electricity Market..................................................................... 134
6.2.1
6.2.2
6.2.3
6.2.4
6.3
Electric Utilities ............................................................................... 135
Federal Agencies.............................................................................. 135
Power Marketing Administrations ................................................... 136
Compliance, Voluntary, and Emissions Markets ............................. 136
Wind Power Applications................................................................. 137
6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
Large-Scale Wind Power Plants....................................................... 138
Offshore Wind.................................................................................. 138
Community Wind............................................................................. 139
Small Wind ...................................................................................... 139
Native American Wind Projects....................................................... 140
20% Wind Energy by 2030
iii
6.4
Stakeholder Involvement and Public Engagement........................ 140
6.5
Conclusions........................................................................................ 141
6.6
References.......................................................................................... 142
Appendix A. 20% Wind Scenario Impacts........................... 143
A.1 Introduction ...................................................................................... 143
A.2 Methodology...................................................................................... 146
A.2.1
A.2.2
A.2.3
Energy Generation Technologies..................................................... 146
Transmission and Integration...........................................................148
Quantification of Impacts.................................................................149
A.3 Wind Capacity Supply Curves ........................................................ 149
A.4 Impacts .............................................................................................. 151
A.4.1
A.4.2
A.4.3
A.4.4
A.4.5
Generation Mix ................................................................................151
Carbon Emission Reduction.............................................................154
Reduced Natural Gas Demand .........................................................154
Land Use ..........................................................................................155
Transmission ....................................................................................158
A.5 Direct Electricity Sector Cost .......................................................... 161
A.5.1
Water Consumption Savings............................................................164
A.6 Other Effects ..................................................................................... 166
A.7 References & Suggested Further Reading ..................................... 166
Appendix B. Assumptions Used for Wind Deployment
System Model.................................................... 169
B.1 Financial Parameters ....................................................................... 169
B.2 Power System Characteristics ......................................................... 170
B.2.1
B.2.2
B.2.3
B.2.4
WinDS Regions................................................................................170
Electric System Loads......................................................................172
Growth Rate .....................................................................................174
Capacity Requirements ....................................................................174
B.3 Wind................................................................................................... 175
B.3.1
B.3.2
B.3.3
B.3.4
Wind Resource Definition................................................................175
Wind Resource Data ........................................................................176
WinDS Seasonal and Diurnal Capacity Factor Calculations ...........179
Wind Technology Cost and Performance ........................................181
B.4 Conventional Generation ................................................................. 183
B.4.1
B.4.2
Conventional Generation Cost and Performance .............................185
Fuel Prices........................................................................................185
B.5 Transmission ..................................................................................... 187
B.6 Treatment of Resource Variability ................................................. 189
B.7 Federal and State Energy Policy ..................................................... 191
B.7.1
B.7.2
B.7.3
B.7.4
iv
Federal Emission Standards .............................................................191
Federal Energy Incentives................................................................ 192
State Energy Incentives....................................................................192
State Renewable Portfolio Standards ............................................... 193
20% Wind Energy by 2030
B.8 Electricity Sector Direct Cost Calculation...................................... 194
B.9 References & Suggested Further Reading...................................... 195
Appendix C. Wind-Related Jobs and Economic
Development ......................................................199
C.1 The JEDI Model................................................................................ 200
C.1.1
C.1.2
Model Description ........................................................................... 200
Caveats............................................................................................. 202
C.2 Wind Scenario Inputs....................................................................... 203
C.3 Findings ............................................................................................. 204
C.4 Manufacturing Sector....................................................................... 207
C.5 Construction Sector .......................................................................... 208
C.6 Operations Sector ............................................................................. 209
C.7 Conclusion ......................................................................................... 211
C.8 References.......................................................................................... 211
Appendix D. Lead Authors, Reviewers and Other
Contributors ......................................................213
Appendix E. Glossary ..............................................................221
List of Figures
Figure 1-1. Report chapters.......................................................................................4
Figure 1-2. Cumulative U.S. wind capacity, by year ................................................5
Figure 1-3. Required growth in U.S. capacity (GW) to implement the
20% Wind Scenario......................................................................7
Figure 1-4. Annual and cumulative wind installations by 2030 ...............................7
Figure 1-5. Supply curve for wind energy—current bus-bar energy costs ...............8
Figure 1-6. Supply curve for wind energy—energy costs including
connection to 10% of existing transmission grid capacity ...........9
Figure 1-7. 20% cumulative installed wind power capacity required to
produce 20% of projected electricity by 2030............................10
Figure 1-8. 46 states would have substantial wind development by 2030..............10
Figure 1-9. All new electricity generation including wind energy would
require expansion of U.S. transmission by 2030........................11
Figure 1-10. Conceptual transmission plan to accommodate 400 GW of
wind energy (AEP 2007)............................................................12
Figure 1-11. U.S. electrical energy mix ..................................................................12
Figure 1-12. Annual CO2 emissions avoided (vertical bars) would reach 825
million metric tons by 2030 .......................................................15
Figure 1-13. CO2 emissions from the electricity sector ..........................................15
Figure 1-14. National water savings from the 20% Wind Scenario........................17
Figure 1-15. Incremental investment cost of 20% wind is modest; a
difference of 2% .........................................................................19
20% Wind Energy by 2030
v
Figure 2-1. The wind resource potential at 50 m above ground on land and
offshore.......................................................................................24
Figure 2-2. Comparison of the wind energy resource at 50 m, 70 m, and 100
m for Indiana ..............................................................................25
Figure 2-3. A modern 1.5-MW wind turbine installed in a wind power plant........26
Figure 2-4. Turbine capacity factor by commercial operation date (COD)
using 2006 data...........................................................................27
Figure 2-5. Wind energy price by commercial operation date (COD)
using 2006 data...........................................................................27
Figure 2-6. The development path and growth of wind turbines ............................29
Figure 2-7. Growth in blade weight ........................................................................30
Figure 2-8. Typical power output versus wind speed curve ...................................31
Figure 2-9. Operation and maintenance costs for large-scale wind plants
installed within the last 10 years for the early years of
operation (Wiser and Bolinger 2007).........................................34
Figure 2-10. Curvature-based twist coupling..........................................................36
Figure 2-11. Twist-flap coupled blade design (material-based twist
coupling).....................................................................................36
Figure 2-12. Clipper Windpower multiple-drive-path gearbox ..............................39
Figure 2-13. Cost of wind turbines delivered from Spain between 1984 and
2000............................................................................................40
Figure 2-14. Unplanned repair cost, likely sources, and risk of
failure with wind plant age.........................................................44
Figure 2-15. Average O&M costs of wind farms in the United States ...................45
Figure 2-16. Blade growth and startup dates for U.S. blade test facilities..............47
Figure 2-17. Types of repairs on wind turbines from 2.5 kW to 1.5 MW ..............57
Figure 3-1. a. Annual installed wind energy capacity to meet 20% of energy
demand. b. Cumulative installed wind energy capacity to
meet 20% of energy demand. .....................................................65
Figure 3-2. Annual and cumulative installed wind energy capacity
represented in the 20% Wind Scenario ......................................66
Figure 3-3. Examples of manufacturers supplying wind equipment across
the United States.........................................................................68
Figure 3-4. Projected percentage of 22-year-olds with a bachelor’s degree in
science and engineering through 2050 .......................................72
Figure 4-1. Hourly load shapes with and without wind generation ........................79
Figure 4-2. Time scales for grid operations ............................................................80
Figure 4-3. Impact of wind on load-following requirements ..................................81
Figure 4-4. GE turbine frequency response ............................................................83
Figure 4-5. Vestas wind turbine control capability .................................................84
Figure 4-6. GE wind plant controls.........................................................................84
Figure 4-7. Impact of wind generation on system dynamic performance...............85
Figure 4-8. Annual hourly capacity factor ..............................................................91
Figure 4-9. Annual transmission investments from 1975 through 1999 and
projections through 2005............................................................94
Figure 4-10. Conceptual new transmission line scenario by WinDS region...........96
vi
20% Wind Energy by 2030
Figure 4-11. Cumulative savings versus total transmission cost for
renewable energy zone (worst case)...........................................97
Figure 5-1. Electricity production is responsible for 39% of CO2 emissions
in the United States ..................................................................108
Figure 5-2. Anthropogenic causes of bird mortality .............................................112
Figure 5-3. Linear decision strategy (command and control) and interactive
model with adaptive management principles ...........................115
Figure 5-4. Decibel levels of various situations....................................................117
Figure 5-5. Actions to support 20% wind energy by 2030 ...................................126
Figure 6-1. U.S. wind energy capacity growth (shown in megawatts [MW])
slowed during years when the PTC expired .............................134
Figure A-1. Prescribed annual wind technology generation as a percent of
national electricity demand from Laxson, Hand, and Blair
(2006) and corresponding annual wind capacity
installation for 20% Wind Scenario from WinDS model.........145
Figure A-2. Supply curve for wind energy—current bus-bar energy costs ..........150
Figure A-3. Supply curve for wind energy: energy costs including
connection to 10% of existing transmission grid capacity .......150
Figure A-4. Cumulative installed wind power capacity required to produce
20% of projected electricity by 2030 .......................................151
Figure A-5. 20% Wind Scenario electricity generation mix 2000–2030..............152
Figure A-6. Generation by technology in 2030 ....................................................153
Figure A-7. Capacity by technology in 2030........................................................153
Figure A-8. Cumulative carbon emission reductions attributed to wind
energy (compared to expanding the generation mix
without wind energy) ...............................................................154
Figure A-9. Fuel usage and savings resulting from 20% Wind Scenario ............155
Figure A-10. Projected wind capacity installations in 2012 .................................156
Figure A-11. Projected wind capacity installations in 2018 .................................157
Figure A-12. Projected wind capacity installations in 2024 .................................157
Figure A-13. Projected wind capacity installations in 2030 .................................158
Figure A-14. Transport of wind energy over existing and new transmission
lines projected for 2012............................................................159
Figure A-15. Transport of wind energy over existing and new transmission
lines projected for 2018............................................................159
Figure A-16. Transport of wind energy over existing and new transmission
lines projected for 2024............................................................160
Figure A-17. Transport of wind energy over existing and new transmission
lines projected for 2030............................................................160
Figure A-18. Direct electricity sector costs for 20% Wind Scenario and no­
new-Wind Scenario ..................................................................162
Figure A-19. Annual water consumption savings due to deployment
of wind energy..........................................................................165
Figure B-1. WinDS regions ..................................................................................170
Figure B-2. Wind region and Balancing Areas in WinDS base case....................172
Figure B-3. National load duration curve for base year in WinDS.......................173
Figure B-4. Projected coal and natural gas prices in WinDS to 2030...................187
20% Wind Energy by 2030
vii
Figure B-5. Distance between wind sites and correlation with power output.......190
Figure C-1. Prescribed annual wind technology generation as a percentage
of national electricity demand from Laxson, Hand, and
Blair (2006) and corresponding annual wind capacity
installation for 20% Wind Scenario from WinDS model.........200
Figure C-2. Wind's economic ripple effect ...........................................................202
Figure C-3. Annual direct, indirect and induced economic impacts from
20% scenario ............................................................................206
Figure C-4. Total economic impacts of 20% wind energy by 2030 on a
relative basis .............................................................................207
Figure C-5. Potential manufacturing jobs created by 2030...................................208
Figure C-6. Direct manufacturing, construction, and operations jobs
supported by the 20% Wind Scenario ......................................209
Figure C-7. Jobs per year from direct, indirect, and induced categories...............209
Figure C-8. Jobs and economic impacts by NERC region....................................210
List of Tables
Table 2-1. Areas of potential technology improvement..........................................41
Table 3-1. Main components and materials used in a wind turbine (%).................63
Table 3-2. Yearly raw materials estimate (thousands of metric tons).....................63
Table 3-3. Locations of U.S. wind turbine component manufacturers ...................67
Table 3-4. U.S. Manufacturing firms with technical potential to enter wind
turbine component market..........................................................67
Table 3-5. Toyota North America vehicle production and sales............................70
Table 3-6. Wind technology-related educational programs around the United
States today ................................................................................71
Table 4-1. Wind integration costs in the U.S. .........................................................82
Table 4-2. Methods to estimate wind capacity value in the United States..............88
Table 4-3. Midwest ISO plant capacity factor by fuel type (June 2005–May
2006)...........................................................................................89
Table 4-4. Wind generation variability as a function of the number of
generators and time interval .......................................................90
Table 5-1. Estimated water savings from wind energy in the interior West
(Baum et al. 2003)....................................................................110
Table 5-2. Estimated avian fatalities per megawatt per year ................................113
Table 5-3. Status of offshore wind energy applications in state and federal
waters .......................................................................................125
Table A-1. Assumptions used for scenario analysis .............................................147
Table A-2. Distribution of wind capacity on existing and new transmission
lines ..........................................................................................161
Table A-3. Direct electricity sector costs for 20% Wind Scenario and No
New Wind Scenario (US$2006)...............................................162
Table A-4. Incremental direct cost of achieving 20% wind, excluding certain
benefits (US$2006) ..................................................................163
Table A-5. Water consumption rates for power plants .........................................165
viii
20% Wind Energy by 2030
Table A-6. U.S. states, by region ..........................................................................166
Table B-1. Baseline financial assumptions ...........................................................169
Table B-2. NERC regions used in WinDS............................................................171
Table B-3. WinDS demand time-slice definitions ................................................173
Table B-4. Base load and load growth in the WinDS scenario.............................174
Table B-5. National capacity requirements in the WinDS base case....................175
Table B-6. Peak reserve margin............................................................................175
Table B-7. Classes of wind power density............................................................175
Table B-8. Data sources for land-based wind resource and environmental
exclusions.................................................................................177
Table B-9. Data sources for offshore wind resource and environmental
exclusions.................................................................................178
Table B-10. Land-based wind technology cost and performance projections
(US$2006) ................................................................................182
Table B-11. Shallow offshore wind technology cost and performance
projections (US$2006) .............................................................183
Table B-12. General assumptions for conventional generation technologies.......184
Table B-13. Cost and performance characteristics for conventional
generation (US$2006) ..............................................................186
Table B-14. National SO2 emission limit schedule in WinDS..............................192
Table B-15. Federal renewable energy incentives ................................................192
Table B-16. State renewable energy incentives ....................................................193
Table B-17. State RPS requirements as of August 2005 ......................................193
Table C-1. JEDI wind modeling assumptions ......................................................203
Table C-2. Wind plant expenditure data summary (in millions) ..........................204
Table C-3. U.S. construction-related economic impacts from 20% wind.............205
Table C-4. U.S. operations-related economic impacts from 20% wind................205
20% Wind Energy by 2030
ix
x
20% Wind Energy by 2030
Abbreviations and Acronyms
ACE
AEO
AEP
AGATE
AGC
ALA
AMA
API
APPA
ATTU
AWEA
AWST
area control error
Annual Energy Outlook
American Electric Power
Advanced General Aviation Transport Experiments
automatic generation control
American Lung Association
American Medical Association
American Petroleum Institute
American Public Power Association
Annual Turbine Technology Update
American Wind Energy Association
AWS Truewind
BACI
Berkeley Lab
BLM
BPA
BSH
BTM
Btu
BWEC
before-and-after-control impact
Lawrence Berkeley National Laboratory
Bureau of Land Management
Bonneville Power Administration
Bundesamt für Seeschiffahrt und Hydrographie
BTM Consult ApS
British thermal unit
Bat and Wind Energy Cooperative
CAA
CAIR
CAISO
CAMR
CapX 2020
CBO
CDEAC
CEC
CEQA
CESA
CF
CFRP
CNV
CO2
Coal-IGCC
Coal-new
COD
COE
CREZ
CT
Clean Air Act
Clean Air Interstate Rule
California Independent System Operator
Clean Air Mercury Rule
Capacity Expansion Plan for 2020
Congressional Budget Office
Clean and Diversified Energy Advisory Committee
California Energy Commission
California Environmental Quality Act
Clean Energy States Alliance
capacity factor
carbon filament-reinforced plastic
California/Nevada
carbon dioxide
integrated gasification combined cycle coal plants
new pulverized coal plants
commercial operation date
cost of energy
Competitive Renewable Energy Zones
combustion turbine
dB
DEA
DEIS
DOD
DOE
DOI
DWT
decibels
Danish Energy Authority
draft environmental impact statement
U.S. Department of Defense
U.S. Department of Energy
U.S. Department of Interior
distributed wind technology
20% Wind Energy by 2030
xi
ECAR
EEI
EERE
EFTA
EIA
EIR
EIS
ELCC
EPA
EPAct
EPC
EPRI
ERCOT
ERO
EU
EUI
EWEA
East Central Area Reliability Coordinating Agreement
Edison Electric Institute
Office of Energy Efficiency and Renewable Energy
European Free Trade Agreement
Energy Information Administration
environmental impact review
environmental impact statement
effective load-carrying capability
U.S. Environmental Protection Agency
Energy Policy Act
engineering, procurement, and construction
Electric Power Research Institute
Electric Reliability Council of Texas
Electric Reliability Organization
European Union
Energy Unlimited Inc.
European Wind Energy Association
FAA
FACTS
FEIR
FERC
FL
FRCC
FTE
Federal Aviation Administration
flexible AC transmission system
final environmental impact report
Federal Energy Regulatory Commission
Florida
Florida Reliability Coordinating Council
full-time equivalent
GaAs
Gas-CC
Gas-CT
GE
GHG
GIS
GRP
GS3C
GVW
GW
GWh
gallium arsenide
combined cycle natural gas plants
gas combustion turbine
General Electric International
greenhouse gas
geographic information system
glass fiber-reinforced-plastic
Grassland/Shrub-Steppe Species Collaborative
gross vehicle weight
gigawatt
gigawatt-hour
Hg
HSIL
HVDC
Hz
mercury
high-surge impedance-loading (transmission line)
high-voltage direct current
hertz
IEA
IEC
IEEE
IGCC
IOU
IPCC
IRP
ISET
International Energy Agency
International Electrotechnical Commission
Institute of Electrical and Electronics Engineers
integrated gasification combined cycle
investor-owned utility
Intergovernmental Panel on Climate Change
integrated resource planning
Institute for Solar Energy Technology (Institut für Solare
Energieversorgungstechnik)
independent system operator
ISO
xii
20% Wind Energy by 2030
ISO-NE
ITC
ISO New England
investment tax credit
JEDI
Jobs and Economic Development Impact (model)
kg
km2
kV
kW
kWh
kilogram
square kilometers
kilovolt
kilowatt
kilowatt-hour
lb
LC
LDC
LIDAR
LLC
LNG
LOLP
pound
levelized cost
load duration curve
light detection and ranging
Limited Liability Company
liquefied natural gas
loss of load probability
m
m2
MAAC
MACRS
MAIN
MAPP
Midwest ISO
MMBtu
MMS
MMTCE
MNDOC
MOU
MRO
MTEP
MVA
MW
MWh
MW-mile
meter
square meter
Mid-Atlantic Area Council
Modified Accelerated Cost Recovery System
Mid-American Interconnected Network
Mid-Continent Area Power Pool
Midwest Independent System Operator
million British thermal units
Minerals Management Service
million metric tons of carbon equivalent
Minnesota Department of Commerce
Memorandum of Understanding
Midwest Reliability Organization
MISO Transmission Expansion Plan
megavolt amperes
megawatt
megawatt-hour
megawatt-mile
NAICS
NAS
NCAR
NCEP
NE
NEMS
NEPA
NERC
NESCAUM
NGOs
nm
NOAA
NOI
NOx
NPCC
NPV
North American Industrial Classification System
National Academy of Sciences
National Center for Atmospheric Research
National Commission on Energy Policy
New England
National Energy Modeling System
National Environmental Policy Act
North American Electric Reliability Corporation
Northeast States for Coordinated Air Use Management
nongovernmental organizations
nautical mile
National Oceanic and Atmospheric Administration
notice of intent
nitrogen oxides
Northeast Power Coordinating Council
net present value
20% Wind Energy by 2030
xiii
NRC
NRECA
NREL
NSTC
NWCC
NWF
NWS
NY
NYISO
NYSERDA
National Research Council
National Rural Electric Cooperative Association
National Renewable Energy Laboratory
National Science and Technology Council
National Wind Coordinating Collaborative
National Wildlife Federation
National Weather Service
New York
New York Independent System Operator
New York State Energy Research and Development Authority
O3
O&M
OE
OCS
OMB
ozone
operations and maintenance
Office of Electricity Delivery and Energy Reliability
Outer Continental Shelf
Office of Management and Budget
PBF
PGE
PJM
PMA
PNM
POI
PPA
PSE
PTC
PUC
PURPA
Public Benefits Fund
Portland General Electric
Pennsylvania-New Jersey-Maryland Interconnection
Power Marketing Administration
Public Service Company of New Mexico
point of interconnection
power purchase agreement
Puget Sound Energy
production tax credit
Public Utility Commission
Public Utility Regulatory Policies Act
QF
qualifying or qualified facility
R&D
RMA
RD&D
REC
REPI
REPP
RFC
RGGI
RMATS
RPS
RTO
research and development
Rocky Mountain Area
research, development & demonstration
renewable energy credit
Renewable Energy Production Incentive
Renewable Energy Policy Project
ReliabilityFirst Corporation
Regional Greenhouse Gas Initiative
Rocky Mountain Area Transmission Study
Renewable Portfolio Standards
Regional Transmission Organization
s
Sandia
SCADA
SEAC
SEPA
SERC
SF6
second
Sandia National Laboratories
supervisory control and data acquisition
Strategic Energy Analysis Center
Southeastern Power Administration
Southeastern Electric Reliability Council
sulfur hexafluoride (one of six greenhouse gases identified in the
Kyoto Protocol)
silicon carbide
sulfur dioxide
sonic detection and ranging
SiC
SO2
SODAR
xiv
20% Wind Energy by 2030
SOx
SPP
ST
Std. Dev.
SWPA
sulfur oxides
Southwest Power Pool
steam turbine
standard deviation
Southwestern Power Administration
TRE
TVA
TWh
Texas Regional Entity
Tennessee Valley Authority
terawatt-hours
UCTE
UKERC
USACE
USCAP
USDA
USFS
USFWS
USGS
UWIG
Union for the Co-ordination of Transmission of Electricity
UK Energy Research Centre
U.S. Army Corps of Engineers
U.S. Climate Action Partnership
U.S. Department of Agriculture
U.S. Department of Agriculture Forest Service
U.S. Fish & Wildlife Service
U.S. Geological Survey
Utility Wind Integration Group
V
VAR
volt
volt-ampere-reactive
W
WEST
Western
WCI
WECC
WGA
Wh
WinDS
WindPACT
WPA
WRA
WRCAI
WWG
watt
Western EcoSystems Technology
Western Area Power Administration (formerly WAPA)
Western Climate Initiative
Western Electricity Coordinating Council
Western Governors’ Association
watt-hour
Wind Energy Deployment System Model
Wind Partnerships for Advanced Component Technology
Wind Powering America
Western Resource Advocates
Western Regional Climate Action Initiative
Wildlife Workgroup
20% Wind Energy by 2030
xv
xvi
20% Wind Energy by 2030
Chapter 1.
1.1
1
Executive Summary
& Overview
INTRODUCTION AND COLLABORATIVE APPROACH
Energy prices, supply uncertainties, and
environmental concerns are driving the
United States to rethink its energy mix
and develop diverse sources of clean,
renewable energy. The nation is
working toward generating more energy
from domestic resources—energy that
can be cost-effective and replaced or
“renewed” without contributing to
climate change or major adverse
environmental impacts.
In 2006, President Bush emphasized the
nation’s need for greater energy
efficiency and a more diversified energy
portfolio. This led to a collaborative
effort to explore a modeled energy
scenario in which wind provides 20% of
U.S. electricity by 2030. Members of
this 20% Wind collaborative (see 20%
Wind Scenario sidebar) produced this
report to start the discussion about
issues, costs, and potential outcomes
associated with the 20% Wind Scenario.
A 20% Wind Scenario in 2030, while
ambitious, could be feasible if the
significant challenges identified in this
report are overcome.
20% Wind Scenario:
Wind Energy Provides 20% of
U.S. Electricity Needs by 2030
Key Issues to Examine:
•
Does the nation have sufficient wind energy
resources?
•
What are the wind technology requirements?
•
Does sufficient manufacturing capability exist?
•
What are some of the key impacts?
•
Can the electric network accommodate 20% wind?
•
What are the environmental impacts?
•
Is the scenario feasible?
Assessment Participants:
•
U.S. Department of Energy (DOE)
− Office of Energy Efficiency and Renewable Energy
(EERE), Office of Electricity Delivery and Energy
Reliability (OE), and Power Marketing
Administrations (PMAs)
− National Renewable Energy Laboratory (NREL)
− Lawrence Berkeley National Laboratory (Berkeley
Lab)
− Sandia National Laboratories (SNL)
This report was prepared by DOE in a
• Black & Veatch engineering and consulting firm
joint effort with industry, government,
• American Wind Energy Association (AWEA)
and the nation’s national laboratories
− Leading wind manufacturers and suppliers
(primarily the National Renewable
− Developers and electric utilities
Energy Laboratory and Lawrence
− Others in the wind industry
Berkeley National Laboratory). The
report considers some associated
challenges, estimates the impacts, and discusses specific needs and outcomes in the
areas of technology, manufacturing and employment, transmission and grid
integration, markets, siting strategies, and potential environmental effects associated
with a 20% Wind Scenario.
In its Annual Energy Outlook 2007, the U.S. Energy Information Administration
(EIA) estimates that U.S. electricity demand will grow by 39% from 2005 to 2030,
20% Wind Energy by 2030
1
1
reaching 5.8 billion megawatt-hours (MWh) by 2030. To meet 20% of that demand,
U.S. wind power capacity would have to reach more than 300 gigawatts (GW) or
more than 300,000 megawatts (MW). This growth represents an increase of more
than 290 GW within 23 years. 1
The data analysis and model runs for this report were concluded in mid-2007. All
data and information in the report are based on wind data available through the end
of 2006. At that time, the U.S. wind power fleet numbered 11.6 GW and spanned 34
states. In 2007, 5,244 MW of new wind generation were installed. 2 With these
additions, American wind plants are expected to generate an estimated 48 billion
kilowatt-hours (kWh) of wind energy in 2008, more than 1% of U.S. electricity
supply. This capacity addition of 5,244 MW in 2007 exceeds the more conservative
growth trajectory developed for the 20% Wind Scenario of about 4,000 MW/year in
2007 and 2008. The wind industry is on track to grow to a size capable of installing
16,000 MW/year, consistent with the latter years in the 20% Wind Scenario, more
quickly than the trajectory used for this analysis.
1.1.1
SCOPE
This report examines some of the costs, challenges, and key impacts of generating
20% of the nation’s electricity from wind energy in 2030. Specifically, it
investigates requirements and outcomes in the areas of technology, manufacturing,
transmission and integration, markets, environment, and siting.
The modeling done for this report estimates that wind power installations with
capacities of more than 300 gigawatts (GW) would be needed for the 20% Wind
Scenario. Increasing U.S. wind power to this level from 11.6 GW in 2006 would
require significant changes in transmission, manufacturing, and markets. This report
presents an analysis of one specific scenario for reaching the 20% level and contrasts
it to a scenario of no wind growth beyond the level reached in 2006. Major
assumptions in the analysis have been highlighted throughout the document and
have been summarized in the appendices. These assumptions may be considered
optimistic. In this report, no sensitivity analyses have been done to estimate the
impact that changes in the assumptions would have on the information presented
here. As summarized at the end of this chapter, the analysis provides an overview of
some potential impacts of these two scenarios by 2030. This report does not
compare the Wind Scenario to other energy portfolio options, nor does it outline an
action plan.
To successfully address energy security and environmental issues, the nation needs
to pursue a portfolio of energy options. None of these options by itself can fully
address these issues; there is no “silver bullet.” This technical report examines one
potential scenario in which wind power serves as a significant element in the
portfolio. However, the 20% Wind Scenario is not a prediction of the future. Instead,
it paints a picture of what a particular 20% Wind Scenario could mean for the
nation.
1
AEO data from 2007 were used in this report. AEO released new data in March of 2008, which were
not incorporated into this report. While the new EIA data could change specific numbers in the report,
it would not change the overall message of the report.
2
According to AWEA’s 2007 Market Report of January 2008, the U.S. wind energy industry installed
5,244 MW in 2007, expanding the nation's total wind power generating capacity by 45% in a single
calendar year and more than doubling the 2006 installation of 2,454 MW. Government sources for
validation of 2007 installations were not available at the time this report was written.
2
20% Wind Energy by 2030
1.1.2
CONTRIBUTORS
Report contributors include a broad
cross section of key stakeholders,
including leaders from the nation’s
utility sector, environmental
communities, wildlife advocacy
groups, energy industries, the
government and policy sectors,
investors, and public and private
businesses. In all, the report reflects
input from more than 50 key energy
stakeholder organizations and
corporations. Appendix D contains a
list of contributors. Research and
modeling was conducted by experts
within the electric industry,
government, and other organizations.
This report is not an authoritative
expression of policy perspectives or
opinions held by representatives of
DOE.
1.1.3
ASSUMPTIONS AND
PROCESS
To establish the groundwork for this
report, the engineering company
Black & Veatch (Overland Park,
Kansas) analyzed the market
potential for significant wind energy
growth, quantified the potential U.S.
wind supply, and developed cost
supply curves for the wind resource.
In consultation with DOE, NREL,
AWEA, and wind industry partners,
future wind energy cost and
performance projections were
developed. Similar projections for
conventional generation technologies
were developed based on Black &
Veatch experience with power plant
design and construction (Black &
Veatch 2007).
To identify a range of challenges,
possible solutions, and key impacts
of providing 20% of the nation’s
electricity from wind, the
stakeholders in the 20% Wind
Scenario effort convened expert task
forces to examine specific areas
20% Wind Energy by 2030
1
Wind Energy Deployment System Model
Assumptions (See Appendices A and B)
• The assumptions used for the WinDS model were obtained from a
number of sources, including technical experts (see Appendix D), the
WinDS base case (Denholm and Short 2006), AEO 2007 (EIA
2007), and a study performed by Black & Veatch (2007). These
assumptions include projections of future costs and performance for
all generation technologies, transmission system expansion costs,
wind resources as a function of geographic location within the
continental United States, and projected growth rates for wind
generation.
• Wind energy generation is prescribed annually on a national level in
order to reach 20% wind energy by 2030:
− A stable policy environment supports accelerated wind
deployment.
− Balance of generation is economically optimized with no policy
changes from those in place today (e.g., no production tax credit
[PTC] beyond 12/31/08).
− Technology cost and performance assumptions as well as electric
grid expansion and operation assumptions that affect the direct
electric system cost.
• Land-based and offshore wind energy technology cost reductions
and performance improvements are expected by 2030 (see tables A­
1, B-10, and B-11). Assumes that capital costs would be reduced by
10% over the next two decades and capacity factors would be
increased by about 15% (corresponding to a 15% increase in annual
energy generation by a wind plant)
• Future environmental study and permit requirements do not add
significant costs to wind technology.
• Fossil fuel technology costs and performance are generally flat
between 2005 and 2030 (see tables A-1 and B-13).
• Nuclear technology cost reductions are expected by 2030 (see tables
A-1 and B-13).
• Reserve and capacity margins are calculated at the North American
Electric Reliability Corporation (NERC) region level, and new
transmission capacity is added as needed (see sections A.2.2 and
B.3).
• Wind resource as a function of geographic location from various
sources (see Table B-8).
• Projected electricity demand, financing assumptions, and fuel prices
are based on Annual Energy Outlook (EIA 2007; see sections B.1,
B.2, and B.4.2).
• Cost of new transmission is generally split between the originating
project, be it wind or conventional generation, and the ratepayers
within the region.
• Ten percent of existing grid capacity is available for wind energy.
• Existing long-term power purchase agreements are not implemented
in WinDS. The model assumes that local load is met by the
generation technologies in a given region.
• Assumes that the contributions to U.S. electricity supplies from other
renewable sources of energy would remain at 2006 levels in both
scenarios.
3
1
critical to this endeavor: Technology and Applications, Manufacturing and
Materials, Environmental and Siting Impacts, Electricity Markets, Transmission and
Integration, and Supporting Analysis. These teams conducted in-depth analyses of
potential impacts, using related studies and various analytic tools to examine the
benefits and costs. (See Appendix D for the task force participants.)
NREL’s Wind Deployment System (WinDS) model 3 was employed to create a
scenario that paints a “picture” of this level of wind energy generation and evaluates
some impacts associated with wind. Assumptions about the future of the U.S.
electric generation and transmission sector were developed in consultation with the
task forces and other parties. Some assumptions in this analysis could be considered
optimistic. Examples of assumptions used in this analysis are listed in the “Wind
Energy Deployment System Model Assumptions” text box and are presented in
detail in Appendices A and B. For comparison, the modeling team contrasted the
20% Wind Scenario impacts to a reference case characterized by no growth in U.S.
wind capacity or other renewable energy sources after 2006.
In the course of the 20% Wind Scenario process, two workshops were held to define
and refine the work plan, present and discuss preliminary results, and obtain relevant
input from key stakeholders external to the report preparation effort.
1.1.4
REPORT STRUCTURE
The 20% Wind Scenario in 2030 would require improved turbine technology to
generate wind power, significant changes in transmission systems to deliver it
through the electric grid, and large expanded markets to purchase and use it. In turn,
these essential changes in the power generation and delivery process would involve
supporting changes and capabilities in manufacturing, policy development, and
environmental regulation. As shown in Figure 1-1, the chapters of this report address
some of the requirements and impacts in each of these areas. Detailed discussions of
the modeling process, assumptions, and results can be found in Appendices A
through C.
Figure 1-1. Report chapters
3
The model, developed by NREL’s Strategic Energy Analysis Center (SEAC), is designed to address
the principal market issues related to the penetration of wind energy technologies into the electric
sector. For additional information and documentation, see text box entitled “Wind Energy Deployment
System Model Assumptions,” Appendices A and B, and http://www.nrel.gov/analysis/winds/.
4
20% Wind Energy by 2030
1.1.5
1
SETTING THE CONTEXT: TODAY’S U.S. WIND INDUSTRY
After experiencing strong growth in the mid-1980s, the U.S. wind industry hit a
plateau during the electricity restructuring period in the 1990s and then regained
momentum in 1999. Industry growth has since responded positively to policy
incentives when they are in effect (see Figure 1-2). Today, the U.S. wind industry is
growing rapidly, driven by sustained production tax credits (PTCs), rising concerns
about climate change, and renewable portfolio standards (RPS) or goals in roughly
50% of the states.
Figure 1-2. Cumulative U.S. wind capacity, by year
U.S. turbine technology has
advanced steadily to offer
(in megawatts [MW])
improved performance, and
these efforts are expected to
continue (see “Initiatives to
Improve Wind Turbine
Performance” sidebar). In 2006
alone, average turbine size
increased by more than 11%
over the 2005 level to an
average size of 1.6 MW. In
addition, average capacity
factors have improved 11%
over the past two years. To
meet the growing demand for
wind energy, U.S.
manufacturers have expanded their capacity to produce and assemble the essential
components. Despite this growth, U.S. components continue to represent a relatively
small share of total turbine and tower materials, and U.S. manufacturers are
struggling to keep pace with rising demand (Wiser & Bolinger 2007).
Initiatives to Improve Wind Turbine Performance
Avoid problems before installation
• Improve reliability of turbines and components
• Full-scale testing prior to commercial introduction
• Development of appropriate design criteria, specifications, and standards
• Validation of design tools
Monitor performance
• Monitor and evaluate turbine and wind-plant performance
• Performance tracking by independent parties
• Early identification of problems
Rapid deployment of problem resolution
• Develop and communicate problem solutions
• Focused activities with stakeholders to address critical issues (e.g., Gearbox
Reliability Collaborative)
20% Wind Energy by 2030
5
1
In 2005 and 2006, the United States led the world in new wind installations. By
early 2007, global wind power capacity exceeded 74 GW, and U.S. wind power
capacity totaled 11.6 GW. This domestic wind power has been installed across 35
states and delivers roughly 0.8% of the electricity consumed in the nation (Wiser
and Bolinger 2007).
A Brief History of the U.S. Wind Industry
The U.S. wind industry got its start in California during the 1970s, when the oil shortage
increased the price of electricity generated from oil. The California wind industry benefited
from federal and state ITCs as well as state-mandated standard utility contracts that
guaranteed a satisfactory market price for wind power. By 1986, California had installed
more than 1.2 GW of wind power, representing nearly 90% of global installations at that time.
Expiration of the federal ITC in 1985 and the California incentive in 1986 brought the growth
of the U.S. wind energy industry to an abrupt halt in the mid-1980s. Europe took the lead in
wind energy, propelled by aggressive renewable energy policies enacted between 1974 and
1985. As the global industry continued to grow into the 1990s, technological advances led to
significant increases in turbine power and productivity. Turbines installed in 1998 had an
average capacity 7 to 10 times greater than that of the 1980s turbines, and the price of windgenerated electricity dropped by nearly 80% (AWEA 2007). By 2000, Europe had more than
12,000 MW of installed wind power, versus only 2,500 MW in the United States, and
Germany became the new international leader.
With low natural gas prices and U.S. utilities preoccupied
by industry restructuring during the 1990s, the federal
production tax credit (PTC) enacted in 1992 (as part of the
Energy Policy Act [EPAct]) did little to foster new wind
installations until just before its expiration in June 1999.
Nearly 700 MW of new wind generation were installed in the
last year before the credit expired—more than in any previous
12-month period since 1985. After the PTC expired in 1999,
it was extended for two brief periods, ending in 2003.
It was then reinstated in late 2004. Although this
intermittent policy support led to sporadic growth, business
inefficiencies inherent in serving this choppy market
inhibited investment and restrained market growth.
Energy Policy Act of
1992
The PTC gave power
producers 1.5 cents
(increased annually with
inflation) for every
kilowatt-hour (kWh) of
electricity produced
from wind during the
first 10 years of
operation.
To promote renewable energy systems, many states began requiring electricity suppliers to
obtain a small percentage of their supply from renewable energy sources, with percentages
typically increasing over time. With Iowa and Texas leading the way, more than 20 states
have followed suit with RPSs, creating an environment for stable growth.
After a decade of trailing Germany and Spain, the United States reestablished itself as the
world leader in new wind energy in 2005. This resurgence is attributed to increasingly
supportive policies, growing interest in renewable energy, and continued improvements in
wind technology and performance. The United States retained its leadership of wind
development in 2006 and, because of its very large wind resources, is likely to remain a major
force in the highly competitive wind markets of the future.
6
20% Wind Energy by 2030
1.2
1
SCENARIO DESCRIPTION
The 20% Wind Scenario presented here would require U.S. wind power capacity to
grow from 11.6 GW in 2006 to more than 300 GW over the next 23 years (see
Figure 1-3). This ambitious growth could be achieved in many different ways, with
varying challenges, impacts, and
levels of success. The 20% Wind
Figure 1-3. Required growth in
Scenario would require an installation
U.S. capacity (GW) to implement the
rate of 16 GW per year after 2018
20% Wind Scenario
(see Figure 1-4). This report
examines one particular scenario for
achieving this dramatic growth and
contrasts it to another scenario that—
for analytic simplicity—assumes no
wind growth after 2006. The authors
recognize that U.S. wind capacity is
currently growing rapidly (although
from a very small base) and that wind
energy technology will be a part of
any future electricity generation
scenario for the United States. At the
same time, a great deal of uncertainty
remains about the level of contribution that wind could or is likely to make. In the
2007 Annual Energy Outlook (EIA 2007), an additional 7 GW beyond the 2006
installed capacity of 11.6 GW is forecast by 2030. 4 Other organizations are
projecting higher capacity additions, and it would be difficult to develop a “most
likely” forecast given today’s uncertainties. The analysis presented here sidesteps
these uncertainties and contrasts some of the challenges and impacts of producing
20% of the nation’s electricity from wind with a scenario in which no additional
wind is added after 2006. This results in an estimate, expressed in terms of
parameters, of the impacts associated with increased reliance on wind energy
generation under
given assumptions.
Figure 1-4. Annual and cumulative wind installations by 2030
The analysis was
also simplified by
assuming that the
contributions to U.S.
electricity supplies
from other
renewable sources of
energy would remain
at 2006 levels in
both scenarios (see
Figure A-6 for
resource mix).
The 20% Wind
Scenario has been
carefully defined to
provide a base of
4
AEO data from 2007 were used in this report. AEO released new data in March 2008, which were not
incorporated into this report. While new EIA data could change specific numbers in this report, it
would not change the overall message of the report.
20% Wind Energy by 2030
7
1
common assumptions for detailed analysis of all impact areas. Broadly stated, this
20% scenario is designed to consider incremental costs while recognizing realistic
constraints and considerations (see the “Considerations in the 20% Wind Scenario”
sidebar in Appendix A). Specifically, the scenario describes the mix of wind
resources that would need to be captured, the geographic distribution of wind power
installations, estimated land needs, the required utility and transmission
infrastructure, manufacturing requirements, and the pace of growth that would be
necessary.
1.2.1
WIND GEOGRAPHY
The United States possesses abundant wind resources. As shown in Figure 1-5,
current “bus-bar” energy costs for wind (based on costs of the wind plant only,
excluding transmission and integration costs and the PTC) vary by type of location
(land-based or offshore) and by class of wind power density (higher classes offer
greater productivity). Transmission and integration will add additional costs, which
are discussed in Chapter 4. The nation has more than 8,000 GW of available landbased wind resources (Black & Veatch 2007) that industry estimates can be captured
economically. NREL periodically classifies wind resources by wind speed, which
forms the basis of the Black & Veatch study. See Appendix B for further details.
Electricity must be transmitted from where it is generated to areas of high electricity
demand, using the existing transmission system or new transmission lines where
necessary. As shown in Figure 1-6, the delivered cost of wind power increases when
costs associated with connecting to the existing electric grid are included. The
assumptions used in this report are different than EIA’s assumptions and are
documented in Appendices A and B. The cost and performance assumptions of the
20% Wind Scenario are based on real market data from 2007. Cost and performance
for all technologies either decrease or remain flat over time. The data suggest that as
Figure 1-5. Supply curve for wind energy—current bus-bar energy costs
Note: See Appendix B for wind technology cost and performance projections; PTC and transmission and integration
costs are excluded.
8
20% Wind Energy by 2030
1
Figure 1-6. Supply curve for wind energy—energy costs including
connection to 10% of existing transmission grid capacity
Note: See Appendix B for wind technology cost and performance projections. Excludes PTC, includes transmission
costs to access existing electric transmission within 500 miles of wind resource.
much as 600 GW of wind resources could be available for $60 to $100 per
megawatt-hour (MWh), including the cost of connecting to the existing transmission
system. Including the PTC reduces the cost by about $20/MWh, and costs are further
reduced if technology improvements in cost and performance are projected. In some
cases, new transmission lines connecting high-wind resource areas to load centers
could be cost-effective, and in other cases, high transmission costs could offset the
advantage of land-based generation, as in the case of large demand centers along
wind-rich coastlines.
NREL’s WinDS model estimated the overall U.S. generation capacity expansion
that is required to meet projected electricity demand growth through 2030. Both
wind technology and conventional generation technology (i.e., coal, nuclear) were
included in the modeling, but other renewables were not included. Readers should
refer to Appendices A and B to see a more complete list of the modeling
assumptions. Wind energy development for the 20% Wind Scenario optimized the
total delivered costs, including future reductions in cost per kilowatt-hour for wind
sites both near to and remote from demand sites from 2000 through 2030. 5 Chapter 2
presents additional discussion of wind technology potential. Of the 293 GW that
would be added, the model specifies more than 50 GW of offshore wind energy (see
Figure 1-7), mostly along the northeastern and southeastern seaboards.
5
The modeling assumptions prescribed annual wind energy generation levels that reached 20% of
projected demand by 2030 so as to demonstrate technical feasibility and quantify costs and impacts.
Policy options that would help induce this growth trajectory were not included. It is assumed that a
stable policy environment that recognizes wind’s benefits could lead to growth rates that would result
in the 20% Wind Scenario.
20% Wind Energy by 2030
9
1
Based on this least-cost
optimization algorithm
(which incorporates
future cost per kilowatthour of wind and cost of
transmission), the
WinDS model estimated
the wind capacity needed
by state by 2030. As
shown in Figure 1-8,
most states would have
the opportunity to
develop their wind
resources. Total land
requirements are
extensive, but only about
2% to 5% of the total
would be dedicated
entirely to the wind
installation. In addition,
the visual impacts and other siting concerns of wind energy projects must be taken
into account in assessing land requirements. Chapter 5 contains additional discussion
of land use and visual impacts. Again, the 20% Wind Scenario presented here is not
a prediction. Figure 1-8 simply shows one way in which a 20% wind future could
evolve.
Figure 1-7. 20% cumulative installed wind power capacity required to
produce 20% of projected electricity by 2030
Figure 1-8. 46 states would have substantial wind development by 2030
Land Requirements
Altogether, new landbased installations
would require
approximately 50,000
2
square kilometers (km )
of land, yet the actual
footprint of land-based
turbines and related
infrastructure would
require only about 1,000
2
to 2,500 km of
dedicated land—slightly
less than the area of
Rhode Island.
The 20% Wind Scenario
envisions 251 GW of
land-based and 54 GW
of shallow offshore wind
capacity to optimize
delivered costs, which
include both generation
and transmission.
Wind capacity levels in each state depend on a variety of assumptions and the national optimization of electricity generation expansion.
Based on the perspectives of industry experts and near-term wind development plans, wind capacity in Ohio was modified and offshore
wind development in Texas was included. In reality, each state’s wind capacity level will vary significantly as electricity markets evolve
and state policies promote or restrict the energy production of electricity from wind and other renewable and conventional energy sources.
10
20% Wind Energy by 2030
1.2.2
1
WIND POWER TRANSMISSION AND INTEGRATION
Development of 293 GW of new wind capacity would require expanding the U.S.
transmission grid in a manner that not only accesses the best wind resource regions
of the country but also relieves current congestion on the grid, including new
transmission lines to deliver wind power to electricity consumers. Figure 1-9
conceptually illustrates the optimized use of wind resources within the local areas as
well as the transmission of wind-generated electricity from high-resource areas to
high-demand centers. This data was generated by the WinDS model (given
prescribed constraints). The figure does not represent proposals for specific
transmission lines.
Figure 1-9. All new electricity generation including wind energy would require
expansion of U.S. transmission by 2030
Figure 1-10 displays transmission needs in the form of one technically feasible
transmission grid as a 765 kV overlay. A complete discussion of transmission issues
can be found in Chapter 4.
Until recently, concerns had been prevalent in the electric utility sector about the
difficulty and cost of dealing with the variability and uncertainty of energy
production from wind plants and other weather-driven renewable technologies. But
utility engineers in some parts of the United States now have extensive experience
with wind plant impacts, and their analyses of these impacts have helped to reduce
these concerns. As discussed in detail in Chapter 4, wind’s variability is being
accommodated, and given optimistic assumptions, studies suggest the cost impact
could be as little as the current level—10% or less of the value of the wind energy
generated.
20% Wind Energy by 2030
11
1
Figure 1-10. Conceptual transmission plan to
accommodate 400 GW of wind energy (AEP 2007)
1.2.3
ELECTRICAL ENERGY MIX
The U.S. Energy Information Administration (EIA) estimates that U.S. electricity
demand will grow by 39% from 2005 to 2030, reaching 5.8 billion MWh by 2030.
The 20% Wind Scenario would require delivery of nearly 1.16 billion MWh of wind
energy in 2030, altering U.S. electricity generation as shown in Figure 1-11. In this
scenario, wind would supply enough energy to displace about 50% of electric utility
natural gas consumption and 18% of coal consumption by 2030. This amounts to an
11% reduction in natural gas across all industries. (Gas-fired generation would
probably be displaced first, because it typically has a higher cost.)
Figure 1-11. U.S. electrical energy mix
The increased wind development in this scenario
could reduce the need for new coal and combined
cycle natural gas capacity, but would increase the
need for additional combustion turbine natural gas
capacity to maintain electric system reliability.
These units, though, would be run only as
needed. 6
1.2.4
PACE OF NEW WIND
INSTALLATIONS
Manufacturing capacity would require time to
ramp up enough to support rapid growth in new
U.S. wind installations. The 20% Wind Scenario
estimates that the installation rate would need to
6
Appendix A presents a full analysis of changes in the capacity mix and energy generation under the
20% Wind Scenario.
12
20% Wind Energy by 2030
increase from installing 3 GW per year
in 2006 to more than 16 GW per year
by 2018 and to continue at roughly that
rate through 2030, as seen in
Figure 1-4. This increase in installation
rate, although quite large, is
comparable to the recent annual
installation rate of natural gas units,
which totaled more than 16 GW in
2005 alone (EIA 2005).
The assumptions of the 20% Wind
Scenario form the foundation for the
technical analyses presented in the
remaining chapters. This overview is
provided as context for the potential
impacts and technical challenges
discussed in the next sections.
1.3
IMPACTS
The 20% Wind Scenario presented
here offers potentially positive impacts
in terms of greenhouse gas (GHG)
reductions, water conservation, and
energy security, as compared to the
base case of no wind growth in this
analysis. However, tapping this
resource at this level would entail large
front-end capital investments to install
wind capacity and expanded
transmission systems. The impacts
described in this section are based
largely on the analytical tools and
methodology discussed in detail in
Appendices A, B, and C.
1
Wind vs. Traditional Electricity Generation
Wind power avoids several of the negative effects of
traditional electricity generation from fossil fuels:
•
Emissions of mercury or other heavy metals into the air
•
Emissions associated with extracting and transporting
fuels
•
Lake and streambed acidification from acid rain or
mining
•
Water consumption associated with mining or electricity
generation
•
Production of toxic solid wastes, ash, or slurry
•
Greenhouse gas (GHG) emissions
20% Wind Scenario: Projected Impacts
•
Environment: Avoids air pollution and reduces GHG
emissions; reduces electric sector CO2 emissions by
825 million metric tons annually
•
Water savings: Reduces cumulative water use in the
electric sector by 8% (4 trillion gallons)
•
U.S. energy security: Diversifies electricity portfolio
and represents an indigenous energy source with stable
prices not subject to fuel volatility
•
Energy consumers: Potentially reduces demand for
fossil fuels, in turn reducing fuel prices and stabilizing
electricity rates
•
Local economics: Creates new income source for rural
landowners and tax revenues for local communities in
wind development areas
Wind power would be a critical part of
• American workers: Generates well-paying jobs in
a broad and near-term strategy to
sectors that support wind development, such as
substantially reduce air pollution, water
manufacturing, engineering, construction, transportation,
pollution, and global climate change
and financial services; new manufacturing will cause
associated with traditional generation
significant growth in wind industry supply chain (see
technologies (see “Wind vs.
Appendix C)
Traditional Electricity Generation”
sidebar). As a domestic energy
resource, wind power would also
stabilize and diversify national energy supplies.
1.3.1
GREENHOUSE GAS REDUCTIONS
Supplying 20% of U.S. electricity from wind could reduce annual electric sector
carbon dioxide (CO2) emissions by 825 million metric tons by 2030.
20% Wind Energy by 2030
13
1
20% Wind Scenario: Major Challenges
•
Investment in the nation’s transmission system, so that
the power generated is delivered to urban centers that
need the increased supply;
•
Larger electric load balancing areas, in tandem with
better regional planning, so that regions can depend on a
diversity of generation sources, including wind power;
•
Continued reduction in wind capital costs and
improvement in turbine performance through technology
advancement and improved manufacturing capabilities;
and
•
Addressing potential concerns about local siting,
wildlife, and environmental issues within the context of
generating electricity.
The threat of climate change and the
growing attention paid to it are helping
to position wind power as an
increasingly attractive option for new
power generation. U.S. electricity
demand is growing rapidly, and cleaner
power sources (e.g., renewable energy)
and energy-saving practices (i.e., energy
efficiency) could help meet much of the
new demand while reducing GHG
emissions. Today, wind energy
represents approximately 35% of new
capacity additions (AWEA 2008).
Greater use of wind energy, therefore,
presents an opportunity for reducing
emissions today as the nation develops
additional clean power options for
tomorrow.
Concerns about climate change have spurred many industries, policy makers,
environmentalists, and utilities to call for reductions in GHG emissions. Although
the cost of reducing emissions is uncertain, the most affordable near-term strategy
likely involves wider deployment of currently available energy efficiency and clean
energy technologies. Wind power is one of the potential
supply-side solutions to the climate change problem
(Socolow and Pacala 2006).
GHG Reduction
Under the 20% Wind Scenario, a
cumulative total of 7,600 million
metric tons of CO2 emissions would
be avoided by 2030, and more than
15,000 million metric tons of CO2
emissions would be avoided through
2050.
Governments at many levels have enacted policies to
actively support clean electricity generation, including the
renewable energy PTC and state RPS. A growing number
of energy and environmental organizations are calling for
expanded wind and other renewable power deployment to
try to reduce society’s carbon footprint.
According to EIA, The United States annually emits
approximately 6,000 million metric tons of CO2. These
emissions are expected to increase to nearly 7,900 million
metric tons by 2030, with the electric power sector accounting for approximately
40% of the total (EIA 2007). As shown in Figure 1-12, based on the analysis
completed for this report, generating 20% of U.S. electricity from wind could avoid
approximately 825 million metric tons of CO2 emissions in the electric sector in
2030. The 20% Wind Scenario would also reduce cumulative emissions from the
electric sector through that same year by more than 7,600 million metric tons of CO2
(2,100 million metric tons of carbon equivalent). 7 See Figures 1-12 and 1-13 . In
general, CO2 emission reductions are not only a wind energy benefit but could be
achieved under other energy-mix scenarios.
The Fourth Assessment Report of the United Nations Environment Program and
World Meteorological Organization’s Intergovernmental Panel on Climate Change
(IPCC) notes that “Renewable energy generally has a positive effect on energy
7
CO2 can be converted to carbon equivalent by multiplying by 12/44. Appendix A presents results in
carbon equivalent, not CO2. Because it assumes a higher share of coal-fired generation, the WinDS
model projects higher CO2 emissions than the EIA model.
14
20% Wind Energy by 2030
1
Figure 1-12. Annual CO2 emissions avoided (vertical bars)
would reach 825 million metric tons by 2030
The cumulative
avoided
emissions by
2030 would
total 7,600
million metric
tons.
Figure 1-13. CO2 emissions from the electricity sector
security, employment, and air quality. Given costs relative to other supply options,
renewable electricity can have a 30% to 35% share of the total electricity supply in
2030. Deployment of low-GHG (greenhouse gas) emission technologies would be
required for achieving stabilization and cost reductions” (IPCC 2007).
More than 30 U.S. states have created climate action plans. In addition, the Regional
Greenhouse Gas Initiative (RGGI) is a 10-state collaborative in the Northeast to
address CO2 emissions. All of these state and regional efforts include wind energy as
part of a portfolio strategy to reduce overall emissions from energy production
(RGGI 2006).
20% Wind Energy by 2030
15
1
Because wind turbines typically have a service life of at least 20 years and
transmission lines can last more than 50 years, investments in achieving 20% wind
power by 2030 could continue to supply clean energy through at least 2050. As a
result, the cumulative climate change impact of achieving 20% wind power could
grow to more than 15,000 million metric tons of CO2 emissions avoided by midcentury (4,182 million metric tons of carbon equivalent).
The 20% Wind Scenario constructed here would displace a significant amount of
fossil fuel generation. According to the WinDS model, by 2030, wind generation is
projected to displace 50% of electricity generated from natural gas and 18% of that
generated from coal. The displacement of coal is of particular interest because it
provides a comparatively higher carbon emissions reduction opportunity.
Recognizing that coal power will continue to play a major role in future electricity
generation, a large increase in total wind capacity could potentially defer the need to
build some new coal capacity, avoiding or postponing the associated increases in
carbon emissions. Current DOE projections anticipate construction of approximately
140 GW of new coal plant capacity by 2030 (EIA 2007); the 20% Wind Scenario
could avoid construction of more than 80 GW of new coal capacity. 8
Wind energy that displaces fossil fuel generation can also help meet existing
regulations for emissions of conventional pollutants, including sulfur dioxide,
nitrogen oxides, and mercury.
1.3.2
WATER CONSERVATION
The 20% scenario would potentially reduce cumulative water consumption in the
electric sector by 8% (or 4 trillion gallons) from 2007 through 2030—significantly
reducing water consumption in the arid states of the interior West. In 2030, annual
water consumption in the electric sector would be reduced by 17%.
Wind Reduces Vulnerability
Continued reliance on natural gas for
new power generation is likely to put
the United States in growing
competition in world markets for
liquefied natural gas (LNG)—some of
which will come from Russia, Qatar,
Iran, and other nations in less-thanstable regions.
Water scarcity is a significant problem in many parts of the
United States. Even so, few U.S. citizens realize that
electricity generation accounts for nearly 50% of all water
withdrawals in the nation, with irrigation withdrawals
coming in second at 34% (USGS 2005). Water is used for
the cooling of natural gas, coal, and nuclear power plants
and is an increasing part of the challenge in developing those
resources.
Although a significant portion of the water withdrawn for
electricity production is recycled back through the system,
approximately 2% to 3% of the water withdrawn is
consumed through evaporative losses. Even this small fraction adds up to
approximately 1.6 to 1.7 trillion gallons of water consumed for power generation
each year.
As additional wind generation displaces fossil fuel generation, each megawatt-hour
generated by wind could save as much as 600 gallons of water that would otherwise
8
Carbon mitigation policies were not modeled in either the 20% Wind or No New Wind Scenarios,
which results in conventional generation mixes typical of current generation capacity. Under carbon
mitigation scenarios, additional technologies could be implemented to reduce the need for conventional
generation technology (see Appendix A).
16
20% Wind Energy by 2030
1
Figure 1-14. National water savings from the 20% Wind Scenario
be lost to fossil plant cooling. 9 Because wind energy generation uses a negligible
amount of water, the 20% Wind Scenario would avoid the consumption of 4 trillion
gallons of water through 2030, a cumulative reduction of 8%, with annual reductions
through 2030 shown in Figure 1-14. The annual savings in 2030 is approximately
450 billion gallons. This savings would reduce the expected annual water
consumption for electricity generation in 2030 by 17%. The projected water savings
are dependent on a future generation mix, which is discussed further in Appendix A.
Based on the WinDS modeling results, nearly 30% of the projected water savings
from the 20% Wind Scenario would occur in western states, where water resources
are particularly scarce. The Western Governors Association (WGA) highlights this
concern in its Clean and Diversified Energy Initiative, which recognizes increased
water consumption as a key challenge in accommodating rapid growth in electricity
demand. In its 2006 report on water needs, the WGA states that “difficult political
choices will be necessary regarding future economic and environmental uses of
water and the best way to encourage the orderly transition to a new equilibrium”
(WGA 2006).
1.3.3
ENERGY SECURITY AND STABILITY
There is broad and growing recognition that the nation should diversify its energy
portfolio so that a supply disruption affecting a single energy source will not
significantly disrupt the national economy. Developing domestic energy sources
with known and stable costs would significantly improve U.S. energy stability and
security.
When electric utilities have a Power Purchase Agreement or own wind turbines, the
price of energy is expected to remain relatively flat and predictable for the life of the
wind project, given that there are no fuel costs and assuming that the machines are
well maintained. In contrast, a large part of the cost of coal- and gas-fired electricity
is in the fuel, for which prices are often volatile and unpredictable. Fuel price risks
reduce security and stability for U.S. manufacturers and consumers, as well as for
the U.S. economy as a whole. Even small reductions in the amount of energy
available or changes in the price of fuel can cause large economic disruptions across
the nation. This capacity to disrupt was clearly illustrated by the 1973 embargo
imposed by the Organization of Arab Petroleum Exporting Countries (the “Arab oil
embargo”); the 2000–2001 California electricity market problems; and the gasoline
9
See Appendix A for specific assumptions.
20% Wind Energy by 2030
17
1
and natural gas shortages and price spikes that followed the 2005 hurricane damage
to oil refinery and natural gas processing facilities along the Gulf Coast.
Using wind energy increases security and stability by diversifying the national
electricity portfolio. Just as those investing for retirement are advised to diversify
investments across companies, sectors, and stocks and bonds, diversification of
electricity supplies helps distribute the risks and stabilize rates for electricity
consumers.
Wind energy reduces reliance on foreign energy sources from politically unstable
regions. As a domestic energy source, wind requires no imported fuel, and the
turbine components can be either produced on U.S. soil or imported from any
friendly nation with production capabilities.
Energy security concerns for the electric industry will likely increase in the
foreseeable future as natural gas continues to be a leading source of new generation
supply. With declining domestic natural gas sources, future natural gas supplies are
expected to come in the form of liquefied natural gas (LNG) imported on tanker
ships. U.S. imports of LNG could quadruple by 2030 (EIA 2007). Almost 60% of
uncommitted natural gas reserves are in Iran, Qatar, and Russia. These countries,
along with others in the Middle East, are expected to be major suppliers to the global
LNG market. Actions by those sources can disrupt international energy markets and
thus have indirect adverse effects on our economy. Additional risks arise from
competition for these resources caused by the growing energy demands of China,
India, and other developing nations. According to the WinDS model results, under
the 20% Wind Scenario, wind energy could displace approximately 11% of natural
gas consumption, which is equivalent to 60% of expected LNG imports in 2030. 10
This displacement would reduce the nation’s energy vulnerability to uncertain
natural gas supplies. See Appendix A for gas demand reduction assumptions and
calculations.
Continued reliance on fossil energy sources exposes the nation to price risks and
supply uncertainties. Although the electric sector does not rely heavily on petroleum,
which represents one of the nation’s biggest energy security threats, diversifying the
electric generation mix with increased domestic renewable energy would still
enhance national energy security by increasing energy diversity and price stability.
1.3.4
COST OF THE 20% WIND SCENARIO
The overall economic cost of the 20% Wind Scenario accrues mainly from the
incremental costs of wind energy relative to other generation sources. This is
impacted by the assumptions behind the scenario, listed in Table A-1. Also, some
incremental transmission would be required to connect wind to the electric power
system. This transmission investment would be in addition to the significant
investment in the electric grid that will be needed to serve continuing load growth,
whatever the mix of new generation. The market cost of wind energy remains higher
than that of conventional energy sources in many areas across the country. In
addition, the transmission grid would have to be expanded and upgraded in windrich areas and across the existing system to deliver wind energy to many demand
centers. An integrated approach to expanding the transmission system would need to
include furnishing access to wind resources as well as meeting other system needs.
10
18
Compared to consumption of the high price scenario of EIA (2007), used in this report.
20% Wind Energy by 2030
1
Compared to other generation sources, the 20% Wind Scenario entails higher initial
capital costs (to install wind capacity and associated transmission infrastructure) in
many areas, yet offers lower ongoing energy costs for operations, maintenance, and
fuel. Given the optimistic cost and performance assumptions of wind and
Figure 1-15. Incremental investment cost of 20% wind is modest;
a difference of 2%
conventional energy sources (detailed in Appendix B), the 20% Wind Scenario
could require an incremental investment of as little as $43 billion net present value
(NPV) more than the base-case scenario involving no new wind power generation
(No New Wind Scenario). This would represent less than 0.06 cents (6 onehundredths of 1 cent) per kilowatt-hour of total generation by 2030, or roughly 50
cents per month per household. Figure 1-15 shows this cost comparison. The basecase costs are calculated under the assumption of no major changes in fuel
availability or environmental restrictions. In this scenario, the cost differential would
be about 2% of a total NPV expenditure exceeding $2 trillion.
This analysis is intended to identify the incremental cost of pursuing the 20% Wind
Scenario. In regions where the capital costs of the 20% Wind Scenario exceed those
of building little or no additional wind capacity, the differential could be offset by
the operating costs and benefits discussed earlier. For example, even though
Figure 1-15 shows that under optimistic assumptions, the 20% Wind Scenario could
increase total capital costs by nearly $197 billion, most of those costs would be
offset by the nearly $155 billion in decreased fuel expenditures, resulting in a net
incremental cost of approximately $43 billion in NPV. These monetary costs do not
reflect other potential offsetting positive impacts.
As estimated by the NREL WinDS model, given optimistic assumptions, the specific
cost of the proposed transmission expansion for the 20% Wind Scenario is $20
billion in NPV. The actual required grid investment could also involve significant
costs for permitting delays, construction of grid extensions to remote areas with
wind resources, and investments in advanced grid controls, integration, and training
to enable regional load balancing of wind resources.
The total installed costs for wind plants include costs associated with siting and
permitting of these plants. It has become clear that wind power expansion would
20% Wind Energy by 2030
19
1
require careful, logical, and fact-based consideration of local and environmental
concerns, allowing siting issues to be addressed within a broad risk framework.
Experience in many regions has shown that this can be done, but efficient,
streamlined procedures will likely be needed to enable installation rates in the range
of 16 GW per year. Chapter 5 covers these issues in more detail.
1.4
CONCLUSION
There are significant costs, challenges, and impacts associated with the 20% Wind
Scenario presented in this report. There are also substantial positive impacts from
wind power expansion on the scale and pace described in this chapter that are not
likely to be realized in a business-as-usual future. Achieving the 20% Wind Scenario
would involve a major national commitment to clean, domestic energy sources with
minimal emissions of GHGs and other environmental pollutants.
1.5
REFERENCES AND OTHER SUGGESTED READING
AEP 2007. Interstate Transmission Vision for Wind Integration. American Electric
Power Transmission.
http://www.aep.com/about/i765project/technicalpapers.asp.
AWEA 2007. American Wind Energy Association Web site, Oct.1, 2007:
http://www.awea.org/faq/cost.html.
AWEA 2008. 2007 Market Report. January 2008
http://www.awea.org/projects/pdf/Market_Report_Jan08.pdf.
Black & Veatch 2007. Twenty Percent Wind Energy Penetration in the United
State: A Technical Analysis of the Energy Resource. Walnut Creek, CA.
BTM Consult. 2007. International Wind Energy Development, World Market
Update 2006. Ringkøbing, Denmark: BTM.
Denholm, P., and W. Short. 2006. Documentation of WinDS Base Case. Version
AEO 2006 (1). Golden, CO: National Renewable Energy Laboratory
(NREL). http://www.nrel.gov/analysis/winds/pdfs/winds_data.pdf.
Edmonds, J.A., M.A. Wise, J.J. Dooley, S.H. Kim, S.J. Smith, P.J. Runci, L.E.
Clarke, E.L. Malone, and G.M. Stokes. 2007. Global Energy Technology
Strategy: Addressing Climate Change. Richland, WA: Global Energy
Strategy Technology Project.
http://www.pnl.gov/gtsp/docs/gtsp_2007_final.pdf
EIA (Energy Information Administration). 2005. Electric Power Annual.
Washington, DC: EIA. Table 2.6.
http://www.eia.doe.gov/cneaf/electricity/epa/epat2p6.html.
EIA. 2007. Annual Energy Outlook. Washington, DC: EIA.
http://www.eia.doe.gov/oiaf/aeo/index.html.
IPCC (Intergovernmental Panel on Climate Change). 2007. Climate Change 2007:
Impacts, Adaptation and Vulnerability: Working Group II Contribution to
the Fourth Assessment Report of the Intergovernmental Panel on Climate
change. PCC Report presented at 8th session of Working Group II of the
IPCC, April 2007, Brussels, Belgium. http://www.ipcc.ch/ipccreports/ar4­
wg2.htm
20
20% Wind Energy by 2030
1
Johnston, L., E. Hausman, A. Sommer, B. Biewald, T. Woolf, D. Schlissel, A.
Roschelle, and D. White. 2006. Climate Change and Power: Carbon
Dioxide Emissions Costs and Electricity Resource Planning. Cambridge,
MA: Synapse Energy Economics, Inc.
RGGI (Regional Greenhouse Gas Initiative). 2006. “About RGGI.”
http://www.rggi.org/about.htm.
Socolow, R.H., and S.W. Pacala. 2006. “A Plan to Keep Carbon in Check,”
Scientific American, September.
Teske, S., A. Zervos, and O. Schafer. 2007. Energy [R]evolution: A Blueprint for
Solving Global Warming, USA National Energy Scenario. Amsterdam:
Greenpeace International. http://www.greenpeace.org/raw/content/usa/press­
center/reports4/energy-r-evolution-introduc.pdf
USCAP (U.S. Climate Action Partnership). 2007. A Call for Action. http://www.us­
cap.org/USCAPCallForAction.pdf
USGS (U.S. Geological Survey). 2005. Estimated Use of Water in the United States
in 2000. http://pubs.usgs.gov/circ/2004/circ1268/htdocs/figure01.html
WGA (Western Governors’ Association). 2006. Water Needs and Strategies for a
Sustainable Future, p. 4. http://www.westgov.org/wga/publicat/Water06.pdf
Wiser, R. and M. Bolinger. 2007. Annual Report on U.S. Wind Power Installation,
Cost, and Performance Trends: 2006. DOE/GO - 102007-2433. Golden,
CO: NREL.
http://www.osti.gov/bridge/product.biblio.jsp?query_id=0&page=0&osti_id
=908214
Wiser, R., M. Bolinger, and M. St. Clair. 2005. Easing the Natural Gas Crisis:
Reducing Natural Gas Prices through Increased Deployment of Renewable
Energy and Energy Efficiency. Berkeley, CA: Berkeley Lab. Report No.
LBNL-56756. http://eetd.lbl.gov/EA/EMP/reports/56756.pdf
Wood Mackenzie. 2007. Impact of a Federal Renewable Portfolio Standard.
Edinburgh, Scotland: Wood Mackenzie.
20% Wind Energy by 2030
21
1
22
20% Wind Energy by 2030
Chapter 2.
Wind Turbine
Technology
2
Today’s wind technology has enabled wind to enter
the electric power mainstream. Continued
technological advancement would be required
under the 20% Wind Scenario.
2.1
INTRODUCTION
Current turbine technology has enabled wind energy to become a viable power
source in today’s energy market. Even so, wind energy provides approximately 1%
of total U.S. electricity generation. Advancements in turbine technology that have
the potential to increase wind energy’s presence are currently being explored. These
areas of study include reducing capital costs, increasing capacity factors, and
mitigating risk through enhanced system reliability. With sufficient research,
development, and demonstration (RD&D), these new advances could potentially
have a significant impact on commercial product lines in the next 10 years.
A good parallel to wind energy evolution can be derived from the history of the
automotive industry in the United States. The large-scale production of cars began
with the first Model T production run in 1910. By 1940, after 30 years of making
cars and trucks in large numbers, manufacturers had produced vehicles that could
reliably move people and goods across the country. Not only had the technology of
the vehicle improved, but the infrastructure investment in roads and service stations
made their use practical. Yet 30 years later, in 1970, one would hardly recognize the
vehicles or infrastructure as the same as those in 1940. Looking at the changes in
automobiles produced over that 30-year span, we see how RD&D led to the
continuous infusion of modern electronics; improved combustion and manufacturing
processes; and ultimately, safer, more reliable cars with higher fuel efficiency. In a
functional sense, wind turbines now stand roughly where the U.S. automotive fleet
stood in 1940. Gradual improvements have been made in the past 30 years over
several generations of wind energy products. These technology advances enable
today’s turbines to reliably deliver electricity to the grid at a reasonable cost.
Through continued RD&D and infrastructure development, great strides will be
made to produce even more advanced machines supporting future deployment of
wind power technology. This chapter describes the status of wind technology today
and provides a brief history of technology development over the past three decades.
Prospective improvements to utility-scale land-based wind turbines as well as
offshore wind technology are discussed. Distributed wind technology [100 kilowatts
(kW) or less] is also addressed in this chapter.
20% Wind Energy by 2030
23
2.2
2
TODAY’S COMMERCIAL WIND TECHNOLOGY
Beginning with the birth of modern wind-driven electricity generators in the late
1970s, wind energy technology has improved dramatically up to the present. Capital
costs have decreased, efficiency has increased, and reliability has improved. Highquality products are now routinely delivered by major suppliers of turbines around
the world, and complete wind generation plants are being engineered into the grid
infrastructure to meet utility needs. In the 20% Wind Scenario outlined in this report,
it is assumed that capital costs would be reduced by 10% over the next two decades,
and capacity factors would be increased by about 15% (corresponding to a 15%
increase in annual energy generation by a wind plant).
2.2.1
WIND RESOURCES
Wind technology is driven by the nature of the resource to be harvested. The United
States, particularly the Midwestern region from Texas to North Dakota, is rich in
wind energy resources as shown in Figure 2-1, which illustrates the wind resources
measured at a 50-meter (m) elevation. Measuring potential wind energy generation
at a 100-m elevation (the projected operating hub height of the next generation of
modern turbines) greatly increases the U.S. land area that could be used for wind
deployment, as shown in Figure 2-2 for the state of Indiana. Taking these
measurements into account, current U.S. land-based and offshore wind resources are
estimated to be sufficient to supply the electrical energy needs of the entire country
several times over. For a description of U.S. wind resources, see Appendix B.
Figure 2-1. The wind resource potential at 50 m above ground on
land and offshore
Identifying the good wind potential at high elevations in states such as Indiana and
off the shore of both coasts is important because it drives developers to find ways to
harvest this energy. Many of the opportunities being pursued through advanced
24
20% Wind Energy by 2030
Figure 2-2. Comparison of the wind energy resource at
50 m, 70 m, and 100 m for Indiana
2
technology are intended to achieve higher elevations, where the resource is much
greater, or to access extensive offshore wind resources.
2.2.2
TODAY’S MODERN WIND TURBINE
Modern wind turbines, which are currently being deployed around the world, have
three-bladed rotors with diameters of 70 m to 80 m mounted atop 60-m to 80-m
towers, as illustrated in Figure 2-3. Typically installed in arrays of 30 to 150
machines, the average turbine installed in the United States in 2006 can produce
approximately 1.6 megawatts (MW) of electrical power. Turbine power output is
controlled by rotating the blades around their long axis to change the angle of attack
with respect to the relative wind as the blades spin around the rotor hub. This is
called controlling the blade pitch. The turbine is pointed into the wind by rotating
the nacelle around the tower. This is called controlling the yaw. Wind sensors on the
nacelle tell the yaw controller where to point the turbine. These wind sensors, along
with sensors on the generator and drivetrain, also tell the blade pitch controller how
to regulate the power output and rotor speed to prevent overloading the structural
components. Generally, a turbine will start producing power in winds of about
5.36 m/s and reach maximum power output at about 12.52 m/s–13.41 m/s. The
turbine will pitch or feather the blades to stop power production and rotation at
about 22.35 m/s. Most utility-scale turbines are upwind machines, meaning that they
operate with the blades upwind of the tower to avoid the blockage created by the
tower.
The amount of energy in the wind available for extraction by the turbine increases
with the cube (the third power) of wind speed; thus, a 10% increase in wind speed
creates a 33% increase in available energy. A turbine can capture only a portion of
this cubic increase in energy, though, because power above the level for which the
electrical system has been designed, referred to as the rated power, is allowed to
pass through the rotor.
20% Wind Energy by 2030
25
Figure 2-3. A modern 1.5-MW wind turbine installed in a wind power plant
2
Rotor Blades:
• Shown Feathered
• Length, 37 m
Nacelle Enclosing:
Rotor Hub
• Low-Speed Shaft
• Gearbox
• Generator, 1.5 MW
• Electrical Controls
Tower, 80 m
Minivan
In general, the speed of the wind increases with the height above the ground, which
is why engineers have found ways to increase the height and the size of wind
turbines while minimizing the costs of materials. But land-based turbine size is not
expected to grow as dramatically in the future as it has in the past. Larger sizes are
physically possible; however, the logistical constraints of transporting the
components via highways and of obtaining cranes large enough to lift the
components present a major economic barrier that is difficult to overcome. Many
turbine designers do not expect the rotors of land-based turbines to become much
larger than about 100 m in diameter, with corresponding power outputs of about
3 MW to 5 MW.
2.2.3
WIND PLANT PERFORMANCE AND PRICE
The performance of commercial turbines has improved over time, and as a result,
their capacity factors have slowly increased. Figure 2-4 shows the capacity factors at
commercial operation dates (CODs) ranging from 1998 to 2005. The data show that
turbines in the Lawrence Berkeley National Laboratory (Berkeley Lab) database
(Wiser and Bolinger 2007) that began operating commercially before 1998 have an
average capacity factor of about 22%. The turbines that began commercial operation
after 1998, however, show an increasing capacity factor trend, reaching 36% in 2004
and 2005.
The cost of wind-generated electricity has dropped dramatically since 1980, when
the first commercial wind plants began operating in California. Since 2003,
however, wind energy prices have increased. Figure 2-5 (Wiser and Bolinger 2007)
26
20% Wind Energy by 2030
Figure 2-4. Turbine capacity factor by commercial operation date (COD)
using 2006 data
2
Figure 2-5. Wind energy price by commercial operation date (COD)
using 2006 data
shows that in 2006 the price paid for electricity generated in large wind farms was
between 3.0 and 6.5 cents/kilowatt-hour (kWh), with an average near 5 cents/kWh
(1 cent/kWh = $10/megawatt-hour [MWh]). This price includes the benefit of the
federal production tax credit (PTC), state incentives, and revenue from the sale of
any renewable energy credits.
Wind energy prices have increased since 2002 for the following reasons (Wiser and
Bolinger 2007):
z
z
Shortages of turbines and components, resulting from the dramatic
recent growth of the wind industry in the United States and Europe
The weakening U.S. dollar relative to the euro (many major turbine
components are imported from Europe, and there are relatively few
wind turbine component manufacturers in the United States)
20% Wind Energy by 2030
27
z
2
z
A significant rise in material costs, such as steel and copper, as well
as transportation fuels over the last three years
The on-again, off-again cycle of the wind energy PTC (uncertainty
hinders investment in new turbine production facilities and
encourages hurried and expensive production, transportation, and
installation of projects when the tax credit is available).
Expected future reductions in wind energy costs would come partly from expected
investment in the expansion of manufacturing volume in the wind industry. In
addition, a stable U.S. policy for renewable energy and a heightened RD&D effort
could also lower costs.
2.2.4
WIND TECHNOLOGY DEVELOPMENT
Until the early 1970s, wind energy filled a small niche market, supplying
mechanical power for grinding grain and pumping water, as well as electricity for
rural battery charging. With the exception of battery chargers and rare experiments
with larger electricity-producing machines, the windmills of 1850 and even 1950
differed very little from the primitive devices from which they were derived.
Increased RD&D in the latter half of the twentieth century, however, greatly
improved the technology.
In the 1980s, the practical approach of using low-cost parts from agricultural and
boat-building industries produced machinery that usually worked, but was heavy,
high-maintenance, and grid-unfriendly. Little was known about structural loads
caused by turbulence, which led to the frequent and early failure of critical parts,
such as yaw drives. Additionally, the small-diameter machines were deployed in the
California wind corridors, mostly in densely packed arrays that were not
aesthetically pleasing in such a rural setting. These densely packed arrays also often
blocked the wind from neighboring turbines, producing a great deal of turbulence for
the downwind machines. Reliability and availability suffered as a result.
Recognizing these issues, wind operators and manufacturers have worked to develop
better machines with each new generation of designs. Drag-based devices and
simple lift-based designs gave way to experimentally designed and tested high-lift
rotors, many with full-span pitch control. Blades that had once been made of sail or
sheet metal progressed through wood to advanced fiberglass composites. The direct
current (DC) alternator gave way to the grid-synchronized induction generator,
which has now been replaced by variable-speed designs employing high-speed
solid-state switches of advanced power electronics. Designs moved from mechanical
cams and linkages that feathered or furled a machine to high-speed digital controls.
A 50 kW machine, considered large in 1980, is now dwarfed by the 1.5 MW to 2.5
MW machines being routinely installed today.
Many RD&D advances have contributed to these changes. Airfoils, which are now
tested in wind tunnels, are designed for insensitivity to surface roughness and dirt.
Increased understanding of aeroelastic loads and the ability to incorporate this
knowledge into finite element models and structural dynamics codes make the
machines of today more robust but also more flexible and lighter on a relative basis
than those of a decade ago.
As with any maturing technology, however, many of the simpler and easier
improvements have already been incorporated into today’s turbines. Increased
28
20% Wind Energy by 2030
RD&D efforts and innovation will be required to continue to expand the wind
energy industry.
2.2.5
2
CURRENT TURBINE SIZE
Throughout the past 20 years, average wind turbine ratings have grown almost
linearly, as illustrated by Figure 2-6. Each group of wind turbine designers has
predicted that its latest machine is the largest that a wind turbine will ever be. But
with each new generation of wind turbines (roughly every five years), the size has
grown along the linear curve and has achieved reductions in life-cycle cost of energy
(COE).
Figure 2-6. The development path and growth of wind turbines
As discussed in Section 2.2.2, this long-term drive to develop larger turbines is a
direct result of the desire to improve energy capture by accessing the stronger winds
at higher elevations. (The increase in wind speed with elevation is referred to as
wind shear.) Although the increase in turbine height is a major reason for the
increase in capacity factor over time, there are economic and logistical constraints to
this continued growth to larger sizes.
The primary argument for limiting the size of wind turbines is based on the squarecube law. This law roughly states that as a wind turbine rotor grows in size, its
energy output increases as the rotor swept area (the diameter squared), while the
volume of material, and therefore its mass and cost, increases as the cube of the
diameter. In other words, at some size, the cost for a larger turbine will grow faster
than the resulting energy output revenue, making scaling a losing economic game.
Engineers have successfully skirted this law by either removing material or using it
more efficiently as they increase size. Turbine performance has clearly improved,
and cost per unit of output has been reduced, as illustrated in Figures 2-4 and 2-5. A
Wind Partnerships for Advanced Component Technology (WindPACT) study has
also shown that in recent years, blade mass has been scaling at an exponent of about
2.3 as opposed to the expected 3.0 (Ashwill 2004), demonstrating how successive
20% Wind Energy by 2030
29
Figure 2-7. Growth in blade weight
2
generations of blade design have moved off the cubic weight growth curve to keep
weight down (see Figure 2-7). The latest designs continue to fall below the cubic
line of the previous generation, indicating the continued infusion of new technology
into blade design. If advanced RD&D were to result in even better design methods,
as well as new materials and manufacturing methods that allow the entire turbine to
scale as the diameter squared, continuing to innovate around this size limit would be
possible.
Land transportation constraints can also limit wind turbine growth for turbines
installed on land. Cost-effective road transportation is achieved by remaining within
standard over-the-road trailer dimensions of 4.1 m high by 2.6 m wide and a gross
vehicle weight (GVW) under 80,000 pounds (lb.; which translates to a cargo weight
of about 42,000 lb.). Loads that exceed 4.83 m in height trigger expensive rerouting
(to avoid obstructions) and often require utility and law enforcement assistance
along the roadways. These dimension limits have the most impact on the base
diameter of wind turbine towers. Rail transportation is even more dimensionally
limited by tunnel and overpass widths and heights. Overall widths should remain
within 3.4 m, and heights are limited to 4.0 m. Transportation weights are less of an
issue in rail transportation, with GVW limits of up to 360,000 lb. (Ashwill 2004).
Once turbines arrive at their destination, their physical installation poses other
practical constraints that limit their size. Typically, 1.5 MW turbines are installed on
80-m towers to maximize energy capture. Crane requirements are quite stringent
because of the large nacelle mass in combination with the height of the lift and the
required boom extension. As the height of the lift to install the rotor and nacelle on
the tower increases, the number of available cranes with the capability to make this
lift is fairly limited. In addition, cranes with large lifting capacities are difficult to
transport and require large crews, leading to high operation, mobilization, and
demobilization costs. Operating large cranes in rough or complex, hilly terrain can
also require repeated disassembly to travel between turbine sites (NREL 2002).
2.2.6
CURRENT STATUS OF TURBINE COMPONENTS
The Rotor
Typically, a modern turbine will cut in and begin to produce power at a wind speed
of about 5 m/s (see Figure 2-8). It will reach its rated power at about 12 m/s to 14
30
20% Wind Energy by 2030
Figure 2-8. Typical power output versus wind speed curve
2
m/s, where the pitch control system begins to limit power output and prevent
generator and drivetrain overload. At around 22 m/s to 25 m/s, the control system
pitches the blades to stop rotation, feathering the blades to prevent overloads and
damage to the turbine’s components. The job of the rotor is to operate at the absolute
highest efficiency possible between cut-in and rated wind speeds, to hold the power
transmitted to the drivetrain at the rated power when the winds go higher, and to
stop the machine in extreme winds. Modern utility-scale wind turbines generally
extract about 50% of the energy in this stream below
the rated wind speed, compared to the maximum
The Betz Limit
energy that a device can theoretically extract, which
is 59% of the energy stream (see “The Betz Limit”
Not all of the energy present in a stream of
sidebar).
moving air can be extracted; some air must
remain in motion after extraction.
Most of the rotors on today’s large-scale machines
Otherwise, no new, more energetic air can
have an individual mechanism for pitch control; that
enter the device. Building a wall would
is, the mechanism rotates the blade around its long
stop the air at the wall, but the free stream
axis to control the power in high winds. This device
of energetic air would just flow around the
is a significant improvement over the first generation
wall. On the other end of the spectrum, a
of fixed-pitch or collective-pitch linkages, because
device that does not slow the air is not
the blades can now be rotated in high winds to
extracting any energy, either. The
feather them out of the wind. This reduces the
maximum energy that can be extracted
maximum loads on the system when the machine is
from a fluid stream by a device with the
parked. Pitching the blades out of high winds also
same working area as the stream cross
reduces operating loads, and the combination of
section is 59% of the energy in the stream.
pitchable blades with a variable-speed generator
Because it was first derived by wind
allows the turbine to maintain generation at a
turbine pioneer Albert Betz, this maximum
constant rated-power output. The older generation of
is known as the Betz Limit.
constant-speed rotors sometimes had instantaneous
20% Wind Energy by 2030
31
power spikes up to twice the rated power. Additionally, this pitch system operates as
the primary safety system because any one of the three independent actuators is
capable of stopping the machine in an emergency.
2
Blades
As wind turbines grow in size, so do their blades—from about 8 m long in 1980 to
more than 40 m for many land-based commercial systems and more than 60 m for
offshore applications today. Rigorous evaluation using the latest computer analysis
tools has improved blade designs, enabling weight growth to be kept to a much
lower rate than simple geometric scaling (see Figure 2-7). Designers are also starting
to work with lighter and stronger carbon fiber in highly stressed locations to stiffen
blades and improve fatigue resistance while reducing weight. (Carbon fiber,
however, costs about 10 times as much as fiberglass.) Using lighter blades reduces
the load-carrying requirements for the entire supporting structure and saves total
costs far beyond the material savings of the blades alone.
By designing custom airfoils for wind turbines, developers have improved blades
over the past 20 years. Although these airfoils were primarily developed to help
optimize low-speed wind aerodynamics to maximize energy production while
limiting loads, they also help prevent sensitivity to blade fouling that is caused by
dirt and bug accumulation on the leading edge. This sensitivity reduction greatly
improves blade efficiency (Cohen et al. 2008).
Current turbine blade designs are also being customized for specific wind classes. In
lower energy sites, the winds are lighter, so design loads can be relaxed and longer
blades can be used to harvest more energy in lower winds. Even though blade design
methods have improved significantly, there is still much room for improvement,
particularly in the area of dynamic load control and cost reduction.
Controls
Today’s controllers integrate signals from dozens of sensors to control rotor speed,
blade pitch angle, generator torque, and power conversion voltage and phase. The
controller is also responsible for critical safety decisions, such as shutting down the
turbine when extreme conditions are encountered. Most turbines currently operate in
variable-speed mode, and the control system regulates the rotor speed to obtain peak
efficiency in fluctuating winds. It does this by continuously updating the rotor speed
and generator loading to maximize power and reduce drivetrain transient torque
loads. Operating in variable-speed mode requires the use of power converters, which
offer additional benefits (which are discussed in the next subsection). Research into
the use of advanced control methods to reduce turbulence-induced loads and
increase energy capture is an active area of work.
Electrical controls with power electronics enable machines to deliver fault-ride­
through control, voltage control, and volt-ampere-reactive (VAR) support to the
grid. In the early days of grid-connected wind generators, the grid rules required that
wind turbines go offline when any grid event was in progress. Now, with penetration
of wind energy approaching 10% in some regions of the United States, more than
8% nationally in Germany, and more than 20% of the average generation in
Denmark, the rules are being changed (Wiser and Bolinger 2007). Grid rules on both
continents are requiring more support and fault-ride-through protection from the
wind generation component. Current electrical control systems are filling this need
with wind plants carefully engineered for local grid conditions
32
20% Wind Energy by 2030
The Drivetrain (Gearbox, Generator, and Power Converter)
2
Generating electricity from the wind places an unusual set of requirements on
electrical systems. Most applications for electrical drives are aimed at using
electricity to produce torque, instead of using torque to produce electricity. The
applications that generate electricity from torque usually operate at a constant rated
power. Wind turbines, on the other hand, must generate at all power levels and
spend a substantial amount of time at low power levels. Unlike most electrical
machines, wind generators must operate at the highest possible aerodynamic and
electrical efficiencies in the low-power/low-wind region to squeeze every kilowatthour out of the available energy. For wind systems, it is simply not critical for the
generation system to be efficient in above-rated winds in which the rotor is letting
energy flow through to keep the power down to the rated level. Therefore, wind
systems can afford inefficiencies at high power, but they require maximum
efficiency at low power—just the opposite of almost all other electrical applications
in existence.
Torque has historically been converted to electrical power by using a speedincreasing gearbox and an induction generator. Many current megawatt-scale
turbines use a three-stage gearbox consisting of varying arrangements of planetary
gears and parallel shafts. Generators are either squirrel-cage induction or woundrotor induction, with some newer machines using the doubly fed induction design
for variable speed, in which the rotor’s variable frequency electrical output is fed
into the collection system through a solid-state power converter. Full power
conversion and synchronous machines are drawing interest because of their fault­
ride-through and other grid support capacities.
As a result of fleet-wide gearbox maintenance issues and related failures with some
designs in the past, it has become standard practice to perform extensive
dynamometer testing of new gearbox configurations to prove durability and
reliability before they are introduced into serial production. The long-term reliability
of the current generation of megawatt-scale drivetrains has not yet been fully
verified with long-term, real-world operating experience. There is a broad consensus
that wind turbine drivetrain technology will evolve significantly in the next several
years to reduce weight and cost and improve reliability.
The Tower
The tower configuration used almost exclusively in turbines today is a steel
monopole on a concrete foundation that is custom designed for the local site
conditions. The major tower variable is height. Depending on the wind
characteristics at the site, the tower height is selected to optimize energy capture
with respect to the cost of the tower. Generally, a turbine will be placed on a 60-m to
80-m tower, but 100-m towers are being used more frequently. Efforts to develop
advanced tower configurations that are less costly and more easily transported and
installed are ongoing.
Balance of Station
The balance of the wind farm station consists of turbine foundations, the electrical
collection system, power-conditioning equipment, supervisory control and data
acquisition (SCADA) systems, access and service roads, maintenance buildings,
service equipment, and engineering permits. Balance-of-station components
contribute about 20% to the installed cost of a wind plant.
20% Wind Energy by 2030
33
Operations and Availability
2
Operation and maintenance (O&M) costs have also dropped significantly since the
1980s as a result of improved designs and increased quality. O&M data from the
technology installed well before 2000 show relatively high annual costs that increase
with the age of the equipment. Annual O&M costs are reported to be as high as
$30-$50/MWh for wind power plants with 1980s technology, whereas the latest
generation of turbines has reported annual O&M costs below $10/MWh (Wiser and
Bolinger 2007). Figure 2-9 shows annual O&M expenses by wind project age and
equipment installation year. Relative to wind power prices shown in Figure 2-5, the
O&M costs can be a significant portion of the price paid for wind-generated
electricity. Since the late 1990s, modern equipment operation costs have been
reduced for the initial operating years. Whether annual operation costs grow as these
modern turbines age is yet to be determined and will depend greatly on the quality of
these new machines.
Figure 2-9. Operation and maintenance costs for large-scale wind plants
installed within the last 10 years for the early years of operation (Wiser and
Bolinger 2007)
SCADA systems are being used to monitor very large wind farms and dispatch
maintenance personnel rapidly and efficiently. This is one area where experience in
managing large numbers of very large machines has paid off. Availability, defined
as the fraction of time during which the equipment is ready to operate, is now more
than 95% and often reported to exceed 98%. These data indicate the potential for
improving reliability and reducing maintenance costs (Walford 2006).
2.3
TECHNOLOGY IMPROVEMENTS ON THE HORIZON
Technology improvements can help meet the cost and performance challenges
embedded in this 20% Wind Scenario. The required technological improvements are
relatively straightforward: taller towers, larger rotors, and continuing progress
through the design and manufacturing learning curve. No single component or
design innovation can fulfill the need for technology improvement. By combining a
number of specific technological innovations, however, the industry can introduce
new advanced architectures necessary for success. The 20% Wind Scenario does not
require success in all areas; progress can be made even if only some of the
technology innovations are achieved.
34
20% Wind Energy by 2030
2.3.1
FUTURE IMPROVEMENTS TO TURBINE COMPONENTS
2
Many necessary technological advances are already in the active development
stages. Substantial research progress has been documented, and individual
companies are beginning the development process for these technologies. The risk
of introducing new technology at the same time that manufacturing production is
scaling up and accelerating to unprecedented levels is not trivial. Innovation always
carries risk. Before turbine manufacturers can stake the next product on a new
feature, the performance of that innovation needs to be firmly established and the
durability needs to be characterized as well as possible. These risks are mitigated by
RD&D investment, including extensive component and prototype testing before
deployment.
The following are brief summaries of key wind energy technologies that are
expected to increase productivity through better efficiency, enhanced energy
capture, and improved reliability.
The Rotor
The number one target for advancement is the means by which the energy is initially
captured—the rotor. No indicators currently suggest that rotor design novelties are
on their way, but there are considerable incentives to use better materials and
innovative controls to build enlarged rotors that sweep a greater area for the same or
lower loads. Two approaches are being developed and tested to either reduce load
levels or create load-resistant designs. The first approach is to use the blades
themselves to attenuate both gravity- and turbulence-driven loads (see the following
subsection). The second approach lies in an active control that senses rotor loads and
actively suppresses the loads transferred from the rotor to the rest of the turbine
structure. These improvements will allow the rotor to grow larger and capture more
energy without changing the balance of the system. They will also improve energy
capture for a given capacity, thereby increasing the capacity factor (Ashwill 2004).
Another innovation already being evaluated at a smaller scale by Energy Unlimited
Inc. (EUI; Boise, Idaho) is a variable-diameter rotor that could significantly increase
capacity factor. Such a rotor has a large area to capture more energy in low winds
and a system to reduce the size of the rotor to protect the system in high winds.
Although this is still considered a very high-risk option because of the difficulty of
building such a blade without excessive weight, it does provide a completely
different path to a very high capacity factor (EUI 2003).
Blades
Larger rotors with longer blades sweep a greater area, increasing energy capture.
Simply lengthening a blade without changing the fundamental design, however,
would make the blade much heavier. In addition, the blade would incur greater
structural loads because of its weight and longer moment arm. Blade weight and
resultant gravity-induced loads can be controlled by using advanced materials with
higher strength-to-weight ratios. Because high-performance materials such as carbon
fibers are more expensive, they would be included in the design only when the
payoff is maximized. These innovative airfoil shapes hold the promise of
maintaining excellent power performance, but have yet to be demonstrated in fullscale operation.
20% Wind Energy by 2030
35
Figure 2-10. Curvature-based twist coupling
2
One elegant concept is to build directly into the blade structure a passive means of
reducing loads. By carefully tailoring the structural properties of the blade using the
unique attributes of composite materials, the internal structure of the blade can be
built in a way that allows the outer portion of the blade to twist as it bends (Griffin
2001). “Flap-pitch” or “bend-twist” coupling, illustrated in Figure 2-10, is
accomplished by orienting the fiberglass and carbon plies within the composite
layers of the blade. If properly designed, the resulting twisting changes the angle of
attack over much of the blade, reducing the lift as wind gusts begin to load the blade
and therefore passively reducing the fatigue loads. Yet another approach to
achieving flap-pitch coupling is to build the blade in a curved shape (see
Figure 2-11) so that the aerodynamic loads apply a twisting action to the blade,
which varies the angle of attack as the aerodynamic loads fluctuate.
Figure 2-11. Twist-flap coupled blade design (material-based twist coupling)
To reduce transportation costs, concepts such as on-site manufacturing and
segmented blades are also being explored. It might also be possible to segment
molds and move them into temporary buildings close to the site of a major wind
installation so that the blades can be made close to, or actually at, the wind site.
36
20% Wind Energy by 2030
Active Controls
Active controls using independent blade pitch and generator torque can be used to
reduce tower-top motion, power fluctuations, asymmetric rotor loads, and even
individual blade loads. Actuators and controllers already exist that can achieve most
of the promised load reductions to enable larger rotors and taller towers. In addition,
some researchers have published control algorithms that could achieve the load
reductions (Bossanyi 2003). Sensors capable of acting as the eyes and ears of the
control system will need to have sufficient longevity to monitor a high-reliability,
low-maintenance system. There is also concern that the increased control activity
will accelerate wear on the pitch mechanism. Thus, the technical innovation that is
essential to enabling some of the most dramatic improvements in performance is not
a matter of exploring the unknown, but rather of doing the hard work of mitigating
the innovation risk by demonstrating reliable application through prototype testing
and demonstration.
2
Towers
To date, there has been little innovation in the tower, which is one of the more
mundane components of a wind installation. But because placing the rotor at a
higher elevation is beneficial and because the cost of steel continues to rise rapidly,
it is highly likely that this component will be examined more closely in the future,
especially for regions of higher than average wind shear.
Because power is related to the cube (the third power) of wind speed, mining
upward into these rich veins of higher wind speed potentially has a high payoff—for
example, a 10% increase in wind speed produces about a 33% increase in available
power. Turbines could sit on even taller towers than those in current use if engineers
can figure out how to make them with less steel. Options for using materials other
than steel (e.g., carbon fiber) in the tower are being investigated. Such investigations
could bear fruit if there are significant adjustments in material costs. Active controls
that damp out tower motion might be another enabling technology. Some tower
motion controls are already in the research pipeline. New tower erection
technologies might play a role in O&M that could also help drive down the system
cost of energy (COE) (NREL 2002).
Tower diameters greater than approximately 4 m would incur severe overland
transportation cost penalties. Unfortunately, tower diameter and material
requirements conflict directly with tower design goals—a larger diameter is
beneficial because it spreads out the load and actually requires less material because
its walls are thinner. On-site assembly allows for larger diameters but also increases
the number of joints and fasteners, raising labor costs as well as concerns about
fastener reliability and corrosion. Additionally, tower wall thickness cannot be
decreased without limit; engineers must adhere to certain minima to avoid buckling.
New tower wall topologies, such as corrugation, can be employed to alleviate the
buckling constraint, but taller towers will inevitably cost more.
The main design impact of taller towers is not on the tower itself, but on the
dynamics of a system with the bulk of its mass atop a longer, more slender structure.
Reducing tower-top weight improves the dynamics of such a flexible system. The
tall tower dilemma can be further mitigated with smarter controls that attenuate
tower motion by using blade pitch and generator torque control. Although both
approaches have been demonstrated, they are still rarely seen in commercial
applications.
20% Wind Energy by 2030
37
The Drivetrain (Gearbox, Generator, and Power Conversion)
2
Parasitic losses in generator windings, power electronics, gears and bearings, and
other electrical devices are individually quite small. When summed over the entire
system, however, these losses add up to significant numbers. Improvements that
remove or reduce the fixed losses during low power generation are likely to have an
important impact on raising the capacity factor and reducing cost. These
improvements could include innovative power-electronic architectures and largescale use of permanent-magnet generators. Direct-drive systems also meet this goal
by eliminating gear losses. Modular (transportable) versions of these large
generation systems that are easier to maintain will go a long way toward increasing
the productivity of the low-wind portion of the power curve.
Currently, gearbox reliability is a major issue, and gearbox replacement is quite
expensive. One solution is a direct-drive power train that entirely eliminates the
gearbox. This approach, which was successfully adopted in the 1990s by EnerconGmbH (Aurich, Germany), is being examined by other turbine manufacturers. A less
radical alternative reduces the number of stages in the gearbox from three to two or
even one, which enhances reliability by reducing the parts count. The fundamental
gearbox topology can also be improved, as Clipper Windpower (Carpinteria,
California) did with its highly innovative multiple-drive-path gearbox, which divides
mechanical power among four generators (see Figure 2-12). The multiple-drive-path
design radically decreases individual gearbox component loads, which reduces
gearbox weight and size, eases erection and maintenance demands, and improves
reliability by employing inherent redundancies.
The use of rare-earth permanent magnets in generator rotors instead of wound rotors
also has several advantages. High energy density eliminates much of the weight
associated with copper windings, eliminates problems associated with insulation
degradation and shorting, and reduces electrical losses. Rare-earth magnets cannot
be subjected to elevated temperatures, however, without permanently degrading
magnetic field strength, which imposes corresponding demands on generator cooling
reliability. The availability of rare-earth permanent magnets is a potential concern
because key raw materials are not available in significant quantities within the
United States (see Chapter 3).
Power electronics have already achieved elevated performance and reliability levels,
but opportunities for significant improvement remain. New silicon carbide (SiC)
devices entering the market could allow operation at higher temperature and higher
frequency, while improving reliability, lowering cost, or both. New circuit
topologies could furnish better control of power quality, enable higher voltages to be
used, and increase overall converter efficiency.
Distributed Energy Systems (Wallingford, Connecticut; formerly Northern Power
Systems) has built an advanced prototype power electronics system that will deliver
lower losses and conversion costs for permanent-magnet generators (Northern
Power Systems 2006). Peregrine Power (Wilsonville, Oregon) has concluded that
using SiC devices would reduce power losses, improve reliability, and shrink
components by orders of magnitude (Peregrine Power 2006). A study completed by
BEW Engineering (San Ramon, California; Behnke, Erdman, and Whitaker
Engineering 2006) shows that using medium-voltage power systems for
multimegawatt turbines could reduce the cost, weight, and volume of turbine
electrical components as well as reduce electrical losses.
38
20% Wind Energy by 2030
Figure 2-12. Clipper Windpower multiple-drive-path gearbox
2
The most dramatic change in the long-term application of wind generation may
come from the grid support provided by the wind plant. Future plants will not only
support the grid by delivering fault-ride-through capability as well as frequency,
voltage, and VAR control, but will also carry a share of power control capability for
the grid. Plants can be designed so that they furnish a measure of dispatch capability,
carrying out some of the traditional duties of conventional power plants. These
plants would be operated below their maximum power rating most of the time and
would trade some energy capture for grid ancillary services. Paying for this trade-off
will require either a lower capital cost for the hardware, contractual arrangements
that will pay for grid services at a high enough rate to offset the energy loss, or
optimally, a combination of the two. Wind plants might transition, then, from a
simple energy source to a power plant that delivers significant grid support.
2.3.2
LEARNING-CURVE EFFECT
Progressing along the design and manufacturing learning curve allows engineers to
develop technology improvements (such as those listed in Section 2.3.1) and reduce
capital costs. The more engineers and manufacturers learn by conducting effective
RD&D and producing greater volumes of wind energy equipment, the more
proficient and efficient the industry becomes. The learning curve is often measured
by calculating the progress ratio, defined as the ratio of the cost after doubling
cumulative production to the cost before doubling.
The progress ratio for wind energy from 1984 to 2000 was calculated for the high
volume of machines installed in several European countries that experienced a
20% Wind Energy by 2030
39
healthy combination of steadily growing manufacturing output, external factors, and
research investment during that time. Results show that progress ratio estimates
were approximately the same for Denmark (91%), Germany (94%), and Spain
(91%) (ISET 2003). At the time this report was written, there was not enough
reliable data on U.S.-based manufacturing of wind turbines to determine a U.S.
progress ratio. Figure 2-13 shows the data for Spain.
2
Figure 2-13. Cost of wind turbines delivered from Spain between
1984 and 2000
Note: The Y axis represents cost and is presented in logarithmic units. The data points shown fit the
downward-sloping straight line with a correlation coefficient, r2 , of 0.85.
Moving from the current level of installed wind capacity of roughly 12 gigawatts
(GW) to the 20% Wind Scenario total of 305 GW will require between four and five
doublings of capacity. If the progress ratio of 91% shown in Figure 2-13 continues,
prices could drop to about 65% of current costs, a 35% reduction. The low-hanging
fruit of cost reduction, however, has already been harvested. The industry has
progressed from machines based on designs created without any design tools and
built almost entirely by hand to the current state of advanced engineering capability.
The assumption in the 20% Wind Scenario is that a 10% reduction in capital cost
could accelerate large-scale deployment. In order to achieve this reduction, a
progress ratio of only 97.8% is required to produce a learning curve effect of 10%
with 4.6 doublings of capacity. With sustained manufacturing growth and
technological advancement, there is no technical barrier to achieving 10% capital
cost reduction. See Appendix B for further discussion.
2.3.3
THE SYSTEM BENEFITS OF ADVANCED TECHNOLOGY
A cost study conducted by the U.S. Department of Energy (DOE) Wind Program
identified numerous opportunities for technology advancement to reduce the lifecycle COE (Cohen and Schweizer et al. 2008). Based on machine performance and
cost, this study used advanced concepts to suggest pathways that integrate the
individual contributions from component-level improvements into system-level
estimates of the capital cost, annual energy production, reliability, O&M, and
balance of station. The results, summarized in Table 2-1, indicate significant
potential impacts on annual energy production and capital cost. Changes in annual
energy production are equivalent to changes in capacity factor because the turbine
40
20% Wind Energy by 2030
rating was fixed. A range of values represents the best, most likely, and least
beneficial outcomes.
2
The Table 2-1 capacity factor improvement of 11% that results from taller towers
reflects the increase in wind resources at a hub height of 120 m, conservatively
assuming the standard wind shear distribution meteorologists use for open country.
Uncertainty in these capacity factor improvements are reflected in the table below.
Depending on the success of new tower technology, the added costs could range
from 8% to 20%, but there will definitely be an added cost if the tower is the only
component in the system that is modified to take the rotor to higher elevations. An
advantage would come from a system design in which the tower head mass is
significantly reduced with the integration of a rotor and drivetrain that are
significantly lighter.
Table 2-1. Areas of potential technology improvement
Performance and Cost
Increments
(Best/Expected/Least
Percentages)
Potential Advances
Annual Energy
Production
Turbine
Capital Cost
Advanced Tower Concepts
•
•
•
•
Taller towers in difficult locations
New materials and/or processes
Advanced structures/foundations
Self-erecting, initial, or for service
+11/+11/+11
+8/+12/+20
Advanced (Enlarged) Rotors
•
•
•
•
•
Advanced materials
Improved structural-aero design
Active controls
Passive controls
Higher tip speed/lower acoustics
+35/+25/+10
-6/-3/+3
Reduced Energy Losses
and Improved Availability
•
•
•
•
Reduced blade soiling losses
Damage-tolerant sensors
Robust control systems
Prognostic maintenance
+7/+5/0
0/0/0
•
•
•
•
•
•
•
•
•
Fewer gear stages or direct-drive
Medium/low speed generators
Distributed gearbox topologies
Permanent-magnet generators
Medium-voltage equipment
Advanced gear tooth profiles
New circuit topologies
New semiconductor devices
New materials (gallium arsenide
[GaAs], SiC)
+8/+4/0
-11/-6/+1
• Sustained, incremental design and
process improvements
• Large-scale manufacturing
• Reduced design loads
0/0/0
-27/-13/-3
+61/+45/+21
-36/-10/+21
Technical Area
Drivetrain
(Gearboxes and Generators
and Power Electronics)
Manufacturing and Learning
Curve*
Totals
*The learning curve results from the NREL report (Cohen and Schweizer et al. 2008) are adjusted from 3.0
doublings in the reference to the 4.6 doublings in the 20% Wind Scenario.
20% Wind Energy by 2030
41
The capital cost reduction shown for the drivetrain components is mainly attributed
to the reduced requirements on the structure when lighter components are placed on
the tower top. Performance increases as parasitic losses in mechanical and electrical
components are reduced. Such components are designed specifically to optimize the
performance for wind turbine characteristics. The improvements shown in Table 2-1
are in the single digits, but are not trivial.
2
Without changing the location of the rotor, energy capture can also be increased by
using longer blades to sweep more area. A 10% to 35% increase in capacity factor is
produced by 5% to 16% longer blades for the same rated power output. Building
these longer blades at an equal or lower cost is a challenge, because blade weight
must be capped while turbulence-driven loads remain no greater than what the
smaller rotor can handle. With the potential of new structurally efficient airfoils,
new materials, passive load attenuation, and active controls, it is estimated that this
magnitude of blade growth can be achieved in combination with a modest system
cost reduction.
Technology advances can also reduce energy losses in the field. Improved O&M
techniques and monitoring capabilities can reduce downtime for repairs and
scheduled maintenance. It is also possible to mitigate losses resulting from
degradation of performance caused by wear and dirt over time. These improvements
are expected to be in the single digits at best, with an approximate 5% improvement
in lifetime energy capture.
Doubling the number of manufactured turbines several times over the years will
produce a manufacturing learning-curve effect that can also help reduce costs. The
learning-curve effects shown in Table 2-1 are limited to manufacturing-related
technology improvements and do not reflect issues of component selection and
design. As discussed in Section 2.3.2, the learning curve reflects efficiencies driven
by volume production and manufacturing experience as well as the infusion of
manufacturing technology and practices that encourage more manufacturing-friendly
design in the future. Although these changes do not target any added energy capture,
they are expected to result in continuous cost reductions. The only adjustment from
the NREL reference (Cohen and Schweizer et al. 2008) is that the 20% Wind
Scenario by 2030 requires 4.6 doublings of cumulative capacity rather than the 3.0
doublings used in the reference targeted at the year 2012. The most likely 13% cost
reduction assumes a conservative progress ratio of 97% per doubling of capacity.
However, there are a range of possible outcomes.
The potential technological advances outlined here support the technical feasibility
of the 20% Wind Scenario by outlining several possible pathways to a substantial
increase in capacity factor accompanied by a modest but double-digit reduction in
capital cost.
2.3.4
TARGETED RD&D
While there is an expected value to potential technology improvements, the risk of
implementing them has not yet been reduced to the level that allows those
improvements to be used in commercial hardware. The issues are well known and
offer an opportunity for focused RD&D efforts. In the past, government and industry
collaboration has been successful in moving high-risk, high-potential technologies
into the marketplace.
42
20% Wind Energy by 2030
One example of such collaboration is the advanced natural gas turbine, which
improved the industry efficiency standard—which had been capped at 50%—to
almost 60%. DOE invested $100 million in the H-system turbine and General
Electric (GE) invested $500 million. Although it was known that higher operating
temperatures would lead to higher efficiency, there were no materials for the turbine
blades that could withstand the environment. The research program focused on
advanced cooling techniques and new alloys to handle combustion that was nearly
300°F hotter. The project produced the world’s largest single crystal turbine blades
capable of resisting high-temperature cracking. The resulting “H system” gas turbine
is 11.89 m long, 4.89 m in diameter, and weighs more than 811,000 lb. Each turbine
is expected to save more than $200 million in operating costs over its lifetime (DOE
2000).
2
A similar example comes from the aviation world. The use of composite materials
was known to provide excellent benefits for light-jet airframes, but the certification
process to characterize the materials was onerous and expensive. NASA started a
program to “reduce the cost of using composites and develop standardized
procedures for certifying composite materials” (Brown 2007). The Advanced
General Aviation Transport Experiments (AGATE), which began in 1994, solved
those problems and opened the door for new composite material technology to be
applied to the light-jet application. A technology that would have been too high-risk
for the individual companies to develop was bridged into the marketplace through a
cooperative RD&D effort by NASA, the Federal Aviation Administration (FAA),
industry, and universities. The Adam aircraft A500 turboprop and the A700 very
light jet are examples of new products based on this composite technology.
Some might claim that wind technology is a finished product that no longer needs
additional RD&D, or that all possible improvements have already been made. The
reality is that the technology is substantially less developed than fossil energy
technology, which is still being improved after a century of generating electricity. A
GE manager who spent a career in the gas turbine business and then transferred to
manage the wind turbine business noted the complexity of wind energy technology:
“Our respect for wind turbine technology has grown tremendously. The practical
side is so complex and forces are so dramatic. We would never have imagined how
complex turbines are” (Knight and Harrison 2005).
Already, there is a clear understanding of the materials, controls, and aerodynamics
issues that must be resolved to make progress toward greater capacity factors. The
combination of reduced capital cost and increased capacity factor will lead to
reduced COE. Industry feels the risk of bringing new technology into the
marketplace without a full-scale development program is too great and believes
sustained RD&D would help reduce risk and help enable the transfer of new
technology to the marketplace.
2.4
ADDRESSING TECHNICAL AND FINANCIAL RISKS
Risks tend to lessen industry’s desire to invest in wind technology. The wind plant
performance track record, in terms of generated revenues and operating costs
compared with the estimated revenues used in plant financing, will drive the risk
level of future installations. The consequences of these risks directly affect the
revenues of owners of wind manufacturing and operating capabilities.
20% Wind Energy by 2030
43
2.4.1
DIRECT IMPACTS
When owners of wind manufacturing and operating capabilities directly bear the
costs of failure, the impacts are said to be direct. This direct impact on revenue is
often caused by:
2
z
z
z
Increasing O&M costs: As discussed previously and illustrated in
Figure 2-9, there is mounting evidence that O&M costs are
increasing as wind farms age. Most of these costs are associated
with unplanned maintenance or components wearing out before the
end of their intended design lives. Some failures can be traced to
poor manufacturing or installation quality. Others are caused by
design errors, many of which are caused by weaknesses in the
technology’s state of the art, generally codified by the design
process. Figures 2-14 and 2-15 both show steadily rising O&M
costs for wind farms installed in the United States in the two
decades before the turn of the century, and Figure 2-14 shows the
components that have caused these increasing costs. The numbers
and costs of component failures increase with time, and the risk to
the operators grows accordingly. In Figure 2-14, the solid lines
represent expected repairs that may not be completely avoidable,
and the dashed lines show potential early failures that can
significantly increase risk.
Poor availability driven by low reliability: Energy is not
generated while components are being repaired or replaced.
Although a single failure of a critical component stops production
from only one turbine, such losses can mount up to significant sums
of lost revenue.
Poor wind plant array efficiency: If turbines are placed too close
together, their wakes interact, which can cause the downwind
turbines to perform poorly. But if they are placed too far apart, land
and plant maintenance costs increase.
Figure 2-14. Unplanned repair cost, likely sources, and risk of
failure with wind plant age
44
20% Wind Energy by 2030
Figure 2-15. Average O&M costs of wind farms in the United States
0.025
2
Lemming & Morthorst - 600 kW (1999)
Vachon - 600-740 kW (2002)
Annual O&M Cost, $/kWh
0.020
Vachon - 2 MW (2002)
WindPACT 1.5 MW - GEC (2003)
WindPACT 1.5 MW - Northern Power (2004)
0.015
0.010
0.005
0.000
0
2
4
6
8
10
12
14
16
18
20
Year of Operation
2.4.2
INDIRECT IMPACTS
Although the wind industry has achieved high levels of wind plant availability and
reliability, unpredictable or unreliable performance would threaten the credibility of
this emerging technology in the eyes of financial institutions. The consequences of
real or perceived reliability problems would extend beyond the direct cost to the
plant owners. These consequences on the continued growth of investment in wind
could include:
z
z
z
Increased cost of insurance and financing: Low interest rates and
long-term loans are critical to financing power plants that are loaded
with upfront capital costs. Each financial institution will assess the
risk of investing in wind energy and charge according to those risks.
If wind power loses credibility, these insurance and financing costs
could increase.
Slowing or stopping development: Lost confidence contributed to
the halt of development in the United States in the late 1980s
through the early 1990s. Development did not start again until the
robust European market supported the technology improvements
necessary to reestablish confidence in reliable European turbines.
As a result, the current industry is dominated by European wind
turbine companies. Active technical supporters of RD&D must
anticipate and resolve problems before they threaten industry
development.
Loss of public support: If wind power installations do not operate
continuously and reliably, the public might be easily convinced that
20% Wind Energy by 2030
45
renewable energy is not a viable source of energy. The public’s
confidence in the technology is crucial. Without public support,
partnerships working toward a new wind industry future cannot be
successful.
2
2.4.3
RISK MITIGATION THROUGH CERTIFICATION, VALIDATION, AND
PERFORMANCE MONITORING
To reduce risk, the wind industry requires turbines to adhere to international
standards. These standards, which represent the collective experience of the
industry’s leading experts, imply a well-developed design process that relies on the
most advanced design tools, testing for verification, and disciplined quality control.
Certification
Certification involves high-level, third-party technical audits of a manufacturer’s
design development. It includes a detailed review of design analyses, material
selections, dynamic modeling, and
component test results. The wind industry
Industry Standards
recognizes that analytical reviews are not
The American National Standards Institute (ANSI) has
sufficient to capture weaknesses in the
designated the American Wind Energy Association
design process. Therefore, consensus
(AWEA) as the lead organization for the development
standard developers also require full-scale
and publication of industry consensus standards for
testing of blades, gearboxes, and the
wind energy equipment and services in the United
complete system prototype (see “Industry
States. AWEA also participates in the development of
Standards” sidebar).
international wind energy standards through its
representation on the International Electrotechnical
Actively complying with these standards
Commission (IEC) TC-88 Subcommittee. Information
encourages investment in wind energy by
on these standards can be accessed on AWEA’s Web
ensuring that turbines reliably achieve the
site (http://www.awea.org/standards).
maximum energy extraction needed to
expand the industry.
Full-Scale Testing
Testing standards were drafted to ensure that accredited third-party laboratories are
conducting tests consistently. These tests reveal many design and manufacturing
deficiencies that are beyond detection by analytical tools. They also provide the final
verification that the design process has worked and give the financial community the
confidence needed to invest in a turbine model.
Full-scale test facilities and trained test engineers capable of conducting full-scale
tests are rare. The facilities must have equipment capable of applying tremendous
loads that mimic the turbulence loading that wind applies over the entire life of the
blade or gearbox. Full-scale prototype tests are conducted in the field at locations
with severe wind conditions. Extensive instrumentation is applied to the machine,
according to a test plan prescribed by international standards, and comprehensive
data are recorded over a specified range of operating conditions. These data give the
certification agent a means for verifying the accuracy of the design’s analytical
basis. The industry and financial communities depend on these facilities and skilled
test engineers to support all new turbine component development.
As turbines grow larger and more products come on the market, test facilities must
also grow and become more efficient. New blades are reaching 50 m in length, and
46
20% Wind Energy by 2030
the United States has no facilities that can test blades longer than 50 m. Furthermore,
domestic dynamometer facilities capable of testing gearboxes or new drivetrains are
limited in capacity to 1.5 MW. The limited availability of facilities and qualified test
engineers increases the deployment risk of new machines that are not subjected to
the rigors of current performance validation in accredited facilities.
2
At full-scale facilities, it is also difficult to conduct tests accurately and capture the
operating conditions that are important to verify the machine's reliability. These tests
are expensive to conduct and accreditation is expensive to maintain for several
reasons. First, the scale of the components is one of the largest of any commercial
industry. Because blades are approaching sizes of half the length of a football field
and can weigh more than a 12.2 m yacht, they are very difficult and expensive to
transport on major highways. The magnitude of torque applied to the drivetrains for
testing is among the largest of any piece of rotating equipment ever constructed.
Figure 2-16 shows the largest blades being built and the approximate dates when
U.S. blade test facilities were built to accommodate their testing.
Although it is very expensive for each manufacturer to develop and maintain
Figure 2-16. Blade growth and startup dates for U.S. blade test facilities
facilities of this scale for its own certification testing needs, without these facilities,
rapid technological progress will be accompanied by high innovation risk. Wind
energy history has proven that these kinds of tests are crucial for the industry’s
success and the financial community’s confidence. These tests, then, are an essential
element of any risk mitigation strategy.
Performance Monitoring and O&M
One of the main elements of power plant management is strategic monitoring of
reliability. Other industries have established anonymous databases that serve to
benchmark their reliability and performance, giving operators both the ability to
recognize a drop in reliability and the data they need to determine the source of low
reliability. The wind industry needs such a strategically designed database, which
would give O&M managers the tools to recognize and pinpoint drops in reliability,
20% Wind Energy by 2030
47
along with a way to collectively resolve technical problems. Reliability databases
are an integral part of more sophisticated O&M management tools. Stiesdal and
Madsen (2005) describe how databases can be used for managing O&M and
improving future designs.
2
In mature industries, O&M management tools are available to help maximize
maintenance efficiency. Achieving this efficiency is a key factor in minimizing the
COE and maximizing the life of wind plants, thereby increasing investor confidence.
Unlike central generation facilities, wind plants require maintenance strategies that
minimize human attention and maximize remote health monitoring and automated
fault data diagnosis. This requires intimate knowledge of healthy plant operating
characteristics and an ability to recognize the characteristics of very complex faults
that might be unique to a specific wind plant. Such tools do not currently exist for
the wind industry, and their development will require RD&D to study wind plant
systems interacting with complex atmospheric conditions and to model the
interactions. The resultant deeper understanding will allow expert systems to be
developed, systems that will aid operators in their quest to maximize plant
performance and minimize operating costs through risk mitigation. These systems
will also produce valuable data for improving the next generation of turbine designs.
2.5
OFFSHORE WIND TECHNOLOGY
Offshore wind energy installations have a broadly dispersed, abundant resource and
the economic potential for cost competitiveness that would allow them to make a
large impact in meeting the future energy needs of the United States (Musial 2007).
Of the contiguous 48 states, 28 have a coastal boundary. U.S. electric use data show
that these same states use 78% of the nation’s electricity (EIA 2006). Of these 28
states, only 6 have a sufficient land-based wind energy resource to meet more than
20% of their electric requirements through wind power. If shallow water offshore
potential (less than 30 m in depth) is included in the wind resource mix, though, 26
of the 28 states would have the wind resources to meet at least 20% of their electric
needs, with many states having sufficient offshore wind resources to meet 100% of
their electric needs (Musial 2007). For most coastal states, offshore wind resources
are the only indigenous energy source capable of making a significant energy
contribution. In many congested energy-constrained regions, offshore wind plants
might be necessary to supplement growing demand and dwindling fossil supplies.
Twenty-six offshore wind projects with an installed capacity of roughly 1,200 MW
now operate in Europe. Most of these projects were installed in water less than 22 m
deep. One demonstration project in Scotland is installed in water at a depth of 45 m.
Although some projects have been hampered by construction overruns and higher­
than-expected maintenance requirements, projections show strong growth in many
European Union (EU) markets. For example, it is estimated that offshore wind
capacity in the United Kingdom will grow by 8,000 MW by 2015. Similarly,
German offshore development is expected to reach 5,600 MW by 2014 (BSH;
BWEA).
In the United States, nine offshore project proposals in state and federal waters are in
various stages of development. Proposed projects on the Outer Continental Shelf are
under the jurisdiction of the Minerals Management Service (MMS) with their
authority established by the Energy Policy Act (EPAct) of 2005 (MMS). Several
states are pursuing competitive solicitations for offshore wind projects approval.
48
20% Wind Energy by 2030
2.5.1
COST OF ENERGY
The current installed capital cost of offshore projects is estimated in the range of
$2,400 to $5,000 per kW (Black & Veatch 2007; Pace Global 2007). Because
offshore wind energy tends to take advantage of extensive land-based experience
and mature offshore oil and gas practices, offshore cost reductions are not expected
to be as great as land-based reductions spanning the past two decades. However,
offshore wind technology is considerably less mature than land-based wind energy,
so it does have significant potential for future cost reduction. These cost reductions
are achievable through technology development and innovation, implementation and
customization of offshore oil and gas practices, and learning-curve reductions that
take advantage of more efficient manufacturing and deployment processes and
procedures.
2.5.2
2
CURRENT TECHNOLOGY
Today’s baseline technology for offshore wind turbines is essentially a version of
the standard land-based turbine adapted to the marine environment. Although
turbines of up to 5 MW have been installed, most recent orders from Vestas
(Randers, Denmark) and Siemens (Munich, Germany), the two leading suppliers of
offshore wind turbines, range from 2.0 MW to 3.6 MW.
The architecture of the baseline offshore turbine and drivetrain comprises a threebladed upwind rotor, typically 90 m to 107 m in diameter. Tip speeds of offshore
turbines are slightly higher than those of land-based turbines, which have speeds of
80 m/s or more. The drivetrain consists of a gearbox generally run with variablespeed torque control that can achieve generator speeds between 1,000 and
1,800 rpm. The offshore tower height is generally 80 m, which is lower than that of
land-based towers, because wind shear profiles are less steep, tempering the
advantage of tower height.
The offshore foundation system baseline technology uses monopiles at nominal
water depths of 20 m. Monopiles are large steel tubes with a wall thickness of up to
60 mm and diameters of 6 m. The embedment depth varies with soil type, but a
typical North Sea installation must be embedded 25 m to 30 m below the mud line.
The monopile extends above the surface where a transition piece with a flange to
fasten the tower is leveled and grouted. Its foundation requires a specific class of
installation equipment for driving the pile into the seabed and lifting the turbine and
tower into place. Mobilization of the infrastructure and logistical support for a large
offshore wind plant accounts for a significant portion of the system cost.
Turbines in offshore applications are arranged in arrays that take advantage of the
prevailing wind conditions measured at the site. Turbines are spaced to minimize
aggregate power plant energy losses, interior plant turbulence, and the cost of
cabling between turbines.
The power grid connects the output from each turbine, where turbine transformers
step up the generator and the power electronics voltage to a distribution voltage of
about 34 kilovolts (kV). The distribution system collects the power from each
turbine at a central substation where the voltage is stepped up and transmitted to
shore through a number of buried, high-voltage subsea cables. A shore-based
interconnection point might be used to step up the voltage again before connecting
to the power grid.
20% Wind Energy by 2030
49
Shallow water wind turbine projects have been proposed and could be followed by
transitional and finally deepwater turbines. These paths should not be considered as
mutually exclusive choices. Because there is a high degree of interdependence
among them, they should be considered a sequence of development that builds from
a shallow water foundation of experience and knowledge to the complexities of
deeper water.
2
2.5.3
TECHNOLOGY NEEDS AND POTENTIAL IMPROVEMENTS
Offshore, wind turbine cost represents only one-third of the total installed cost of the
wind project, whereas on land, the turbine cost represents more than half of the total
installed cost. To lower costs for offshore wind, the focus must be on lowering the
balance-of-station costs. These costs, which include those for foundations, electrical
grids, O&M, and installation and staging costs, dominate the system COE. Turbine
improvements that make turbines more reliable, more maintainable, more rugged,
and larger, will still be needed to achieve cost goals. Although none of these
improvements are likely to lower turbine costs, the net result will lower overall
system costs.
Commercialization of offshore wind energy faces many technical, regulatory,
socioeconomic, and political barriers, some of which may be mitigated through
targeted short- and long-range RD&D efforts. Short-term research addresses
impediments that prevent initial industry projects from proceeding and helps sharpen
the focus for long-term research. Long-term research involves a more complex
development process resulting in improvements that can help lower offshore lifecycle system costs.
Short-Term RD&D Options
Conducting research that will lead to more rapid deployment of offshore turbines
should be an upfront priority for industry. This research should address obstacles to
today’s projects, and could include the following tasks:
z
z
z
50
Define offshore resource exclusion zones: A geographically based
exclusion study using geographic information system (GIS) land use
overlays would more accurately account for all existing and future
marine uses and sensitive areas. This type of exclusion study could
be part of a regional programmatic environmental impact statement
and is necessary for a full assessment of the offshore resource
(Dhanju, Whitaker, and Kempton 2006). Currently, developers bear
the burden of siting during a pre-permitting phase with very little
official guidance. This activity should be a jointly funded industry
project conducted on a regional basis.
Develop certification methods and standards: MMS has been
authorized to define the structural safety standards for offshore wind
turbines on the OCS. Technical research, analysis, and testing are
needed to build confidence that safety will be adequate, and to
prevent overcautiousness that will increase costs unnecessarily.
Developing these standards will require a complete evaluation and
harmonization of the existing offshore wind standards and the
American Petroleum Institute (API) offshore oil and gas standards.
MMS is currently determining the most relevant standards.
Develop design codes, tools, and methods: The design tools that
the wind industry uses today have been developed and validated for
20% Wind Energy by 2030
land-based utility-scale turbines, and the maturity and reliability of
the tools have led to significantly higher confidence in today’s wind
turbines. By comparison, offshore design tools are relatively
immature. The development of accurate offshore computer codes to
predict the dynamic forces and motions acting on turbines deployed
at sea is essential for moving into deeper water. One major
challenge is predicting loads and the resulting dynamic responses of
the wind turbine’s support structure when it is subjected to
combined wave and wind loading. These offshore design tools must
be validated to ensure that they can deal with the combined
dominance of simultaneous wind and wave load spectra, which is a
unique problem for offshore wind installations. Floating system
analysis must be able to account for additional turbine motions as
well as the dynamic characterization of mooring lines.
z
z
2
Site turbines and configure arrays: The configuration and spacing
of wind turbines within an array have a marked effect on power
production from the aggregate wind plant, as well as for each
individual turbine. Uncertainties in power production represent a
large economic risk factor for offshore development. Offshore wind
plants can lose more than 10% of their energy to array losses, but
improvements in array layout and array optimization models could
deliver substantial recovery (SEAWIND 2003). Atmospheric
boundary layer interaction with the turbine wakes can affect both
energy capture and plant-generated turbulence. Accurate
characterization of the atmospheric boundary layer behavior and
more accurate wake models will be essential for designing turbines
that can withstand offshore wind plant turbulence. Wind plant
design tools that are able to characterize turbulence generated by
wind plants under a wide range of conditions are likely necessary.
Develop hybrid wind-speed databases: Wind, sea-surface
temperatures, and other weather data are housed in numerous
satellite databases available from the National Oceanic and
Atmospheric Administration (NOAA), NASA, the National
Weather Service (NWS), and other government agencies. These
data can be combined to supplement the characterization of coastal
and offshore wind regimes (Hasager et al. 2005). The limitations
and availability of existing offshore data must be understood.
Application of these data to improve the accuracy of offshore wind
maps will also be important.
Long-Term R&D Options
Long-term research generally requires hardware development and capital
investment, and it must take a complex development path that begins early enough
for mature technology to be ready when needed. Most long-term research areas
relate to lowering offshore life-cycle system costs. These areas are subdivided into
infrastructure and turbine-specific needs. Infrastructure to support offshore wind
development represents a major cost element. Because this is a relatively new
technology path, there are major opportunities for reducing the cost impacts.
Although land-based wind turbine designs can generally be used for offshore
deployment, the offshore environment will impose special requirements on turbines.
These requirements must be taken into account to optimize offshore deployment.
Areas where industry should focus efforts include:
20% Wind Energy by 2030
51
z
2
z
z
z
z
52
Minimize work at sea: There are many opportunities to lower
project costs by reallocating the balance between work done on land
and at sea. The portion of labor devoted to project O&M, land-based
installation and assembly, and remote inspections and diagnostics
can be rebalanced with upfront capital enhancements, such as higher
quality assurance, more qualification testing, and reliable designs.
This rebalancing might enable a significant life-cycle cost reduction
by shifting the way wind projects are designed, planned, and
managed.
Enhance manufacturing, installation and deployment strategies:
New manufacturing processes and improvements in existing
processes that reduce labor and material usage and improve part
quality have high potential for reducing costs in offshore
installations. Offshore wind turbines and components could be
constructed and assembled in or near seaport facilities that allow
easy access from the production area to the installation site,
eliminating the necessity of shipping large components over inland
roadways. Fabrication facilities must be strategically located for
mass-production, land-based assembly, and for rapid deployment
with minimal dependence on large vessels. Offshore system designs
that can be floated out and installed without large cranes can reduce
costs significantly. New strategies should be integrated into the
turbine design process at an early stage (Lindvig 2005; Poulsen and
Skjærbæk 2005).
Incorporate offshore service and accessibility features: To
manage O&M, predict weather windows, minimize downtime, and
reduce the equipment needed for up-tower repairs, operators should
be equipped with remote, intelligent, turbine condition monitoring
and self-diagnostic systems. These systems can alert operators to the
need for operational changes, or enable them to schedule
maintenance at the most opportune times. A warning about an
incipient failure can alert the operators to replace or repair a
component before it does significant damage to the system or leaves
the machine inoperable for an extended period of time. More
accurate weather forecasting will also become a major contributor in
optimizing service schedules for lower cost.
Develop low-cost foundations, anchors, and moorings: Current
shallow-water foundations have already reached a practical depth
limit of 30 m, and anchor systems beyond that are derived from
conservative and expensive oil and gas design practices. Costsaving opportunities arise for wind power plants in deeper water
with both fixed-bottom and floating turbine foundations, as well as
for existing shallow-water designs in which value-engineering cost
reductions can be achieved. Fixed-bottom systems comprising rigid
lightweight substructures, automated mass-production fabrication
facilities, and integrated mooring and piling deployment systems
that minimize dependence on large sea vessels are possible low-cost
options. Floating platforms will require a new generation of
mooring designs that can be mass produced and easily installed.
Use resource modeling and remote profiling systems: Offshore
winds are much more difficult to characterize than winds over land.
Analytical models are essential for managing risk during the initial
20% Wind Energy by 2030
siting of offshore projects, but are not very useful by themselves for
micrositing (Jimenez et al. 2005). Alternative methods are needed to
measure wind speed and wind shear profiles up to elevations where
wind turbines operate. This will require new equipment such as
sonic detection and ranging (SODAR), light detection and ranging
(LIDAR), and coastal RADAR-based systems that must be adapted
to measure offshore wind from more stable buoy systems or from
fixed bases. Some systems are currently under development but
have not yet been proven (Antoniou et al. 2006). The results of an
RD&D measurement program on commercial offshore projects
could generate enough confidence in these systems to eliminate the
requirement for a meteorological tower.
z
z
2
Increase offshore turbine reliability: The current offshore service
record is mixed, and as such, is a large contributor to high risk. A
new balance between initial capital investment and long-term
operating costs must be established for offshore systems. This new
balance will have a significant impact on COE. Offshore turbine
designs must place a higher premium on reliability and anticipation
of on-site repairs than their land-based counterparts. Emphasis
should be placed on avoiding large maintenance events that require
expensive and specialized equipment. This can be done by
identifying the root causes of component failures, understanding the
frequency and cost of each event, and appropriately implementing
design improvements (Stiesdal and Madsen 2005). Design tools,
quality control, testing, and inspection will need heightened
emphasis. Blade designers must consider strategies to offset the
impacts of marine moisture, corrosion, and extreme weather. In
higher latitudes, designers must also account for ice flows and ice
accretion on the blades. Research that improves land-based wind
turbine reliability now will have a direct impact on the reliability of
future offshore machines.
Assess the potential of ultra-large offshore turbines: Land-based
turbines may have reached a size plateau because of transportation
and erection limits. Further size growth in wind turbines will largely
be pushed by requirements unique to offshore turbine development.
According to a report on the EU-funded UpWind project, “Within a
few years, wind turbines will have a rotor diameter of more than
150 m and a typical size of 8 MW–10 MW” (Risø National
Laboratory 2005). The UpWind project plans to develop design
tools to optimize large wind turbine components, including rotor
blades, gearboxes, and other systems that must perform in large
offshore wind plants. New size-enabling technologies will be
required to push wind turbines beyond the scaling limits that
constrain the current fleet. These technologies include lightweight
composite materials and composite manufacturing, lightweight
drivetrains, modular pole direct-drive generators, hybrid space
frame towers, and large gearbox and bearing designs that are
tolerant of slower speeds and larger scales. All of the weightreducing features of the taller land-based tower systems will have an
even greater value for very large offshore machines (Risø National
Laboratory 2005).
20% Wind Energy by 2030
53
RD&D Summary
The advancement of offshore technology will require the development of
infrastructure and technologies that are substantially different from those employed
in land-based installations. In addition, these advances would need to be tailored to
U.S. offshore requirements, which differ from those in the European North Sea
environment. Government leadership could accelerate baseline research and
technology development to demonstrate feasibility, mitigate risk, and reduce
regulatory and environmental barriers. Private U.S. energy companies need to take
the technical and financial steps to initiate near-term development of offshore wind
power technologies and bring them to sufficient maturity for large-scale deployment.
Musial and Ram (2007) and Bywaters and colleagues (2005) present more detailed
analyses of actions for offshore development.
2
2.6
DISTRIBUTED WIND TECHNOLOGY
Distributed wind technology (DWT) applications refer to turbine installations on the
customer side of the utility meter. These machines range in size from less than 1 kW
to multimegawatt, utility-scale machines, and are used to offset electricity
consumption at the retail rate. Because the WinDS deployment analysis does not
currently segregate DWT from utility deployment, DWT applications are part of the
land-based deployment estimates in the 20% Wind Energy Scenario.
Historically, DWT has been synonymous with small machines. The DWT market in
the 1990s focused on battery charging for off-grid homes, remote
telecommunications sites, and international village power applications. In 2000, the
industry found a growing domestic market for behind-the-meter wind power,
including small machines for residential and small farm applications and
multimegawatt-scale machines for larger agricultural, commercial, industrial, and
public facility applications. Although utility-scale DWT requirements are not
distinguishable from those for other large-scale turbines, small machines have
unique operating requirements that warrant further discussion.
2.6.1
SMALL TURBINE TECHNOLOGY
Until recently, three-bladed upwind designs using tail vanes for passive yaw control
dominated small wind turbine technology (turbines rated at less than 10 kW).
Furling, or turning the machine sideways to the wind with a mechanical linkage, was
almost universally used for rotor overspeed control. Drivetrains were direct-drive,
permanent-magnet alternators with variable-speed operation. Many of these
installations were isolated from the grid. Today, there is an emerging technology
trend toward grid-connected applications and nonfurling designs. U.S.
manufacturers are world leaders in small wind systems rated at 100 kW or less, in
terms of both market and technology.
Turbine technology begins the transition from small to large systems between 20
kW and 100 kW. Bergey Windpower (Norman, Oklahoma) offers a 50 kW turbine
that uses technology commonly found in smaller machines, including furling,
pultruded blades, a direct-drive, permanent-magnet alternator, and a tail vane for
yaw control. Distributed Energy Systems offers a 100 kW turbine that uses a directdrive, variable-speed synchronous generator. Although most wind turbines in the
100 kW range have features common to utility-scale turbines, including gearboxes,
mechanical brakes, induction generators, and upwind rotors with active yaw control,
54
20% Wind Energy by 2030
Endurance Windpower (Spanish Fork, Utah) offers a 5 kW turbine with such
characteristics.
2
For small DWT applications, reliability and acoustic emissions are the prominent
issues. Installations usually consist of a single turbine. Installations may also be
widely scattered. So simplicity in design, ease of repair, and long maintenance and
inspection intervals are important. Because DWT applications are usually close to
workplaces or residences, limiting sound emissions is critical for market acceptance
and zoning approvals. DWT applications are also usually located in areas with low
wind speeds that are unsuitable for utility-scale applications, so DWT places a
premium on low-wind-speed technologies.
The cost per kW of DWT turbines is inversely proportionate with turbine size.
Small-scale DWT installation costs are always higher than those for utility-scale
installations because the construction effort cannot be amortized over a large number
of turbines. For a 1 kW system, hardware costs alone can be as high as $5,000 to
$7,000/kW. Installation costs vary widely because of site-specific factors such as
zoning and/or permitting costs, interconnection fees, balance-of-station costs,
shipping, and the extent of do-it-yourself participation. Five-year warranties are now
the industry standard for small wind turbines, although it is not yet known how this
contributes to turbine cost. The higher costs of this technology are partially offset by
the ability to compete with retail electricity rates. In addition, small turbines can be
connected directly to the electric distribution system, eliminating the need for an
expensive interconnection between the substation and the transmission.
Tower and foundation costs make up a larger portion of DWT installed cost,
especially for wind turbines of less than 20 kW. Utility-scale turbines commonly use
tapered tubular steel towers. However, for small wind turbines, multiple types,
sources, and heights of towers are available.
2.6.2
TECHNOLOGY TRENDS
Recent significant developments in DWT systems less than 20 kW include the
following:
z
z
Alternative power and load control strategies: Furling inherently
increases sound levels because the cross-wind operation creates a
helicopter-type chopping noise. Aerodynamic models available
today cannot accurately predict the rotor loads in the highly skewed
and unsteady flows that occur during the furling process,
complicating design and analysis. Alternative development
approaches include soft-stall rotor-speed control, constant-speed
operation, variable-pitch blades, hinged blades, mechanical brakes,
and centrifugally actuated blade tips. These concepts offer safer,
quieter turbines that respond more predictably to high winds, gusts,
and sudden wind direction changes.
Advanced blade manufacturing methods: Blades for small
turbines have been made primarily of fiberglass by hand lay-up
manufacturing or pultrusion. The industry is now pursuing
alternative manufacturing techniques, including injection,
compression, and reaction injection molding. These methods often
provide shorter fabrication time, lower parts costs, and increased
repeatability and uniformity, although the tooling costs are typically
higher.
20% Wind Energy by 2030
55
z
2
z
z
z
z
z
2.7
Rare-earth permanent magnets: Ferrite magnets have long been
the staple in permanent-magnet generators for small wind turbines.
Rare-earth permanent magnets are now taking over the market with
Asian suppliers offering superior magnetic properties and a steady
decline in price. This enables more compact and lighter weight
generator designs.
Reduced generator cogging: Concepts for generators with reduced
cogging torque (the force needed to initiate generator rotation) are
showing promise to reduce cut-in wind speeds. This is an important
advancement to improve low-wind-speed turbine performance and
increase the number of sites where installation is economical.
Induction generators: Small turbine designs that use induction
generators are under development. This approach, common in the
early 1980s, avoids the use of power electronics that increase cost
and complexity, and reduce reliability.
Grid-connected inverters: Inverters used in the photovoltaics
market are being adapted for use with wind turbines. Turbinespecific inverters are also appearing in both single- and three-phase
configurations. Another new trend is obtaining certification of most
inverters by Underwriters Laboratories and others for compliance
with national interconnection standards.
Reduced rotor speeds: To reduce sound emissions, turbine designs
with lower tip-speed ratios and lower peak-rotor speeds are being
pursued.
Design standards and certification: The industry is increasing the
use of consensus standards in its turbine design efforts for machines
with rotor swept areas under 200 m2 (about 65 kW rated power). In
particular, IEC Standard 61400-2 Wind Turbines – Part 2: Design
Requirements of Small Wind Turbines. Currently, however, a
limited number of wind turbines have been certified in compliance
with this standard because of the high cost of the certification
process. To address this barrier, a Small Wind Certification Council
has been formed in North America to certify that small wind
turbines meet the requirements of the draft AWEA standard that is
based on the IEC standard (AWEA 1996–2007).
SUMMARY OF WIND TECHNOLOGY DEVELOPMENT
NEEDS
Wind technology must continue to evolve if wind power is to contribute more than a
few percentage points of total U.S. electrical demand. Fortunately, no major
technology breakthroughs in land-based wind technology are needed to enable a
broad geographic penetration of wind power into the electric grid. However, there
are other substantial challenges (such as transmission and siting) and significant
costs associated with increased penetration, which are discussed in other chapters of
this report. No improvement in cost or efficiency for a single component can
achieve the cost reductions or improved capacity factor that system-level advances
can achieve.
56
20% Wind Energy by 2030
The wind capacity factor can be increased by enlarging rotors and installing them on
taller towers. This would require advanced materials, controls, and power systems
that can significantly reduce the weight of major components. Capital costs would
also be brought down by the manufacturing learning curve that is associated with
continued technology advancement and by a nearly fivefold doubling of installed
capacity.
2
The technology development required to make offshore wind a viable option poses a
substantial potential risk. Offshore wind deployment represents a significant fraction
of the total wind deployment necessary for 20% wind energy by 2030. Today’s
European shallow-water technology is still too expensive and too difficult to site in
U.S. waters. Deepwater deployment would eliminate visual esthetics concerns, but
the necessary
Figure 2-17. Types of repairs on wind turbines from 2.5 kW to 1.5 MW
technologies have yet to
be developed, and the
potential environmental
impacts have yet to be
evaluated. To establish
the offshore option,
work is needed to
develop analysis
methods, evaluate
technology pathways,
and field offshore
prototypes.
Today’s market success
is the product of a
combination of
technology achievement
and supportive public
policy. A 20% Wind
Scenario would require
additional land-based
technology
improvements and a
substantial development
of offshore technology. The needed cost and performance improvements could be
achieved with innovative changes in existing architectures that incorporate novel
advances in materials, design approaches, control strategies, and manufacturing
processes. Risks are mitigated with standards that produce reliable equipment and
full-scale testing that ensures the machinery meets the design requirements.
The 20% Wind Scenario assumes a robust technology that will produce costcompetitive generation with continued R&D investment leading to capital cost
reduction and performance improvement. Areas where industry can focus RD&D
efforts include those which require the most frequent repairs (see Figure 2-17). Such
industry efforts, along with government-supported RD&D efforts, will support
progress toward achieving two primary wind technology objectives:
z
Increasing capacity factors by placing larger rotors on taller towers
(this can be achieved economically only by using lighter
components and load-mitigating rotors that reduce the integrated
tower-top mass and structural loads; reducing parasitic losses
20% Wind Energy by 2030
57
throughout the system can also make gains possible), developing
advanced controls, and improving power systems.
2
z
2.8
Reducing the capital cost with steady learning-curve improvements
driven by innovative manufacturing improvements and a nearly
fivefold doubling of installed capacity
REFERENCES AND OTHER SUGGESTED READING
Antoniou, I., H.E. Jørgensen, T. Mikkelsen, S. Frandsen, R. Barthelmie, C. Perstrup,
and M. Hurtig. 2006. “Offshore Wind Profile Measurements from Remote
Sensing Instruments.” Presented at the European Wind Energy Conference,
February 27–March 2, Athens, Greece.
Ashwill, T. 2004. Innovative Design Approaches for Large Wind Turbine Blades:
Final Report. Report No. SAND2004-0074. Albuquerque, NM: Sandia
National Laboratories.
AWEA (American Wind Energy Association). 1996–2007. IEC Wind Turbine
Standards. http://www.awea.org/standards/iec_stds.html#WG4.
Behnke, Erdman, and Whitaker Engineering (BEW Engineering). 2006. Low Wind
Speed Technology Phase II: Investigation of the Application of MediumVoltage Variable-Speed Drive Technology to Improve the Cost of Energy
from Low Wind Speed Turbines. Report No. FS-500-37950, DOE/GO­
102006-2208. Golden, CO: National Renewable Energy Laboratory
(NREL). http://www.nrel.gov/docs/fy06osti/37950.pdf.
Black & Veatch. 2007. 20% Wind Energy Penetration in the United States: A
Technical Analysis of the Energy Resource. Walnut Creek, CA.
Bossanyi, E.A. 2003. “Individual Blade Pitch Control for Load Reduction,” Wind
Energy, 6(2): 119–128.
Brown, A. 2007. “Very Light and Fast.” Mechanical Engineering, January.
http://www.memagazine.org/jan07/features/verylight/verylight.html.
BSH (Bundesamt für Seeschifffahrt und Hydrographie.). Wind Farms.
http://www.bsh.de/en/Marine%20uses/Industry/Wind%20farms/index.jsp.
BTM Consult. 2005. World Market Update 2005. Ringkøbing, Denmark: BTM
Consult ApS. http://www.btm.dk/Pages/wmu.htm.
BWEA (British Wind Energy Association). “Offshore Wind.”
http://www.bwea.com/offshore/info.html.
Bywaters, G., V. John, J. Lynch, P. Mattila, G. Norton, J. Stowell, M. Salata, O.
Labath, A. Chertok, and D. Hablanian. 2005. Northern Power Systems
WindPACT Drive Train Alternative Design Study Report; Period of
Performance: April 12, 2001 to January 31, 2005. Report No. SR-500­
35524. Golden, CO: NREL. http://www.nrel.gov/publications/
Cohen, J., T. Schweizer, A. Laxson, S. Butterfield, S. Schreck, L. Fingersh, P.
Veers, and T. Ashwill. 2008. Technology Improvement Opportunities for
Low Wind Speed Turbines and Implications for Cost of Energy Reduction.
Report No. NREL/SR-500-41036. Golden, CO: NREL.
58
20% Wind Energy by 2030
Cotrell, J., W.D. Musial, and S. Hughes. 2006. The Necessity and Requirements of a
Collaborative Effort to Develop a Large Wind Turbine Blade Test Facility
in North America. Report No. TP-500-38044. Golden, CO: NREL
2
Dhanju A., P. Whitaker, and W. Kempton. 2006. “Assessing Offshore Wind
Resources: A Methodology Applied to Delaware.” Presented at the AWEA
Conference & Exhibition, June 4–7, Pittsburgh, PA.
DOE (U.S. Department of Energy). 2000. World’s Most Advanced Gas Turbine
Ready to Cross Commercial Threshold. Washington, DC: DOE.
http://www.fossil.energy.gov/news/techlines/2000/tl_ats_ge1.html.
EIA (Energy Information Administration). 2006. “State Electricity Sales
Spreadsheet.” http://www.eia.doe.gov/cneaf/electricity/epa/sales_state.xls.
EUI (Energy Unlimited Inc.). 2003. Variable Length Wind Turbine Blade. Report
No. DE-FG36-03GO13171. Boise, ID: EUI.
http://www.osti.gov/bridge/servlets/purl/841190-OF8Frc/
Griffin, D.A. 2001. WindPACT Turbine Design Scaling Studies Technical Area 1 –
Composite Blades for 80- to 120-Meter Rotor. Report No. SR-500­
29492.Golden, CO: NREL.
Hasager, C.B., M.B. Christiansen, M. Nielsen, and R. Barthelmie. 2005. “Using
Satellite Data for Mapping Offshore Wind Resources and Wakes.”
Presented at the Copenhagen Offshore Wind Proceedings, October 26–28,
Copenhagen, Denmark.
IEC (International Electrotechnical Commission). 2007. “Technical Committee 88:
Wind turbines, Standards 61400-x.”
http://nettedautomation.com/standardization/IEC_TC88/index.html
ISET (Institut fuer Solare Energieversorgungstechnik). 2003. Experience Curves: A
Tool for Energy Policy Programmes Assessment (EXTOOL). Lund, Sweden:
ISET. http://www.iset.uni-kassel.de/extool/Extoolframe.htm.
Jimenez, B., F. Durante, B. Lange, T. Kreutzer, and L. Claveri. 2005. “Offshore
Wind Resource Assessment: Comparative Study between MM5 and
WAsP.” Presented at the Copenhagen Offshore Wind Proceedings, October
26–28, Copenhagen, Denmark.
Knight, S., and L. Harrison. 2005. “A More Conservative Approach.” Windpower
Monthly, November.
Kühn, P. 2006. “Big Experience with Small Wind Turbines (SWT).” Presented at
the 49th IEA Topical Expert Meeting, September, Stockholm, Sweden.
Lindvig, K. 2005. “Future Challenges for a Marine Installation Company.”
Presented at the Copenhagen Offshore Wind Proceedings, October 26–28,
Copenhagen, Denmark.
MMS (Minerals Management Service). Alternative Energy and Alternate Use
Program.
http://www.mms.gov/offshore/RenewableEnergy/RenewableEnergyMain.ht
m.
Musial, W. 2007. “Offshore Wind Electricity: A Viable Energy Option for the
Coastal United States.” Marine Technology Society Journal, 42 (3), 32-43.
20% Wind Energy by 2030
59
Musial, W. and B. Ram. 2007. Large Scale Offshore Wind Deployments: Barriers
and Opportunities, NREL Technical Report No. NREL/TP-500-40745,.
Golden, CO: Draft.
2
Northern Power Systems. 2006. Low Wind Speed Technology Phase I: Advanced
Power Electronics for Low Wind Speed Turbine Applications. Report No.
FS-500-37945, DOE/GO-102006-2205. Golden, CO: NREL.
http://www.nrel.gov/docs/fy06osti/37945.pdf.
NREL. 2002. Addendum to WindPACT Turbine Design Scaling Studies Technical
Area 3 – Self-Erecting Tower and Nacelle Feasibility: Report No. SR-500­
29493-A. Golden, CO: NREL.
Pace Global Energy Services, Aug. 2007, Assessment of Offshore Wind Power
Resources, http://www.lipower.org/newscenter/pr/2007/pace_wind.pdf
Peregrine Power. 2006. Low Wind Speed Technology Phase II: Breakthrough in
Power Electronics from Silicon Carbide. Report No. FS-500-37943,
DOE/GO-102006-2203. Golden, CO: NREL.
http://www.nrel.gov/docs/fy06osti/37943.pdf
Poulsen, S.F., and P.S. Skjærbæk. 2005. “Efficient Installation of Offshore Wind
Turbines: Lessons Learned from Nysted Offshore Wind Farm.” Presented at
the Copenhagen Offshore Wind Proceedings, October 26–28, Copenhagen,
Denmark.
Risø National Laboratory. 2005. Association Euratom - Risø National Laboratory
Annual Progress Report 2005. Report No. Risø-R-1579(EN). Roskilde,
Denmark: Risø National Laboratory.
http://www.risoe.dk/rispubl/ofd/ofdpdf/ris-r-1579.pdf.
SEAWIND, Altener Project, 2003. (Per Nielsen) “Offshore Wind Energy Projects
Feasibility Study Guidelines,” Denmark.
Stiesdal, H., and P.H. Madsen. 2005. “Design for Reliability.” Presented at the
Copenhagen Offshore Wind Proceedings, October 26–28, Copenhagen,
Denmark.
Walford, C.A. 2006. Wind Turbine Reliability: Understanding and Minimizing Wind
Turbine Operation and Maintenance Costs. Report No. SAND2006-1100.
Albuquerque, NM: Sandia National Laboratories.
Wiser, R., and M. Bolinger. 2007. Annual Report on U.S. Wind Power Installation,
Cost, and Performance Trends: 2006. DOE/GO–102007-2433. Golden, CO:
NREL.
http://www.osti.gov/bridge/product.biblio.jsp?query_id=0&page=0&osti_id
=908214
60
20% Wind Energy by 2030
Chapter 3.
Manufacturing,
Materials, and
Resources
3
A 20% Wind Energy Scenario would support
expansion of domestic manufacturing and related
employment. Production of several key materials
for wind turbines would require substantial but
achievable growth.
Stakeholders and decision makers need to know whether the effort to achieve a
generation mix with 20% wind energy by 2030 might be constrained by raw
materials availability, manufacturing capability, or labor availability. This chapter
examines the adequacy of these critical resources.
Over the past five years, the wind industry in the United States has grown by an
average of 22% annually. In 2006 alone, America’s wind power generating capacity
increased by 27%.
The U.S. wind energy industry invested approximately $4 billion to build 2,454 MW
of new generating capacity in 2006, making wind the second largest source of new
power generation in the nation—surpassed only by natural gas—for the second year
in a row. Recently installed wind farms increased cumulative installed U.S. wind
energy capacity to 13,884 MW—well above the 10,000 MW milestone reached in
August 2006 (AWEA 2007). On average, 1 MW of wind power produces enough
electricity to power 250 to 300 U.S. homes.
Based on estimates released by the U.S. Department of Energy (DOE) Energy
Information Administration (EIA 2006), annual electricity consumption in the
United States is expected to grow at a rate of 1.3% annually—from 3.899 billion
megawatt-hours (MWh) in 2006 to about 5.368 billion MWh in 2030. Although
wind energy supplied approximately 0.8% of the total electricity in 2006, more and
larger wind turbines can help to meet a growing demand for electricity. (See the
Glossary in Appendix E for explanations of wind energy capacity and measurement
units.)
The most common large turbines currently in use have a rated capacity of between 1
MW and 3 MW, with rotor diameters between 60 m and 90 m, tower heights
between 60 m and 100 m, and capacity factors between 30% and 40% (capacity
factor is an indicator of annual energy production). Although currently installed
machines are expected to operate through 2030, larger turbines (with capacity
factors that increase over time, as discussed in Chapter 2) are expected to become
more common as offshore technology advances are transferred to land-based
turbines. These larger turbines could reach rated power between 4 MW and 6 MW
with capacity factors between 40% and 50%.
20% Wind Energy by 2030
61
To estimate the raw materials and investments needed to support the 20% Wind
Scenario, industry leaders have assumed that most of the wind turbines used in the
next two to three decades will be in the 1 MW to 3 MW class, with a modest
contribution of the larger-sized machines (see Chapter 2). Today, approximately
2,000 turbines are installed each year, but that figure is expected to rise and to level
out at about 7,000 turbines per year by 2017.
3
3.1
RAW MATERIALS REQUIREMENTS
Wind turbines are built in many sizes and configurations, with the larger sizes
utilizing a wide range of materials. Reducing the weight and cost of the turbines is
key to making wind energy competitive with other power sources. Throughout the
next few decades, business opportunities are expected to expand in wind turbine
components and materials manufacturing. To reach the high levels of wind energy
associated with the 20% Wind Scenario, materials usage will also need to increase
considerably, even as new technologies that improve component performance are
introduced.
To estimate the raw materials required for the 20% Wind Scenario, this analysis
focuses on the most important materials used in building a wind turbine today (such
as steel and aluminum) and on main turbine components. Table 3-1 shows the
percentage of different materials used in each component and each component’s
percentage of total turbine weight. The table applies to 1.5 MW turbines MW and
larger.
Table 3-2 uses the materials consumption model in Table 3-1 to further describe the
raw materials required to reach manufacturing levels of about 7,000 turbines per
year. This analysis assumes that turbines will become lighter, annual installation
rates will level off to roughly 7,000 turbines per year by 2017, and installation will
continue at that rate through 2030. Approximately 100,000 turbines will be required
to produce 20% of the nation’s electricity in 2030.
No single component dominates a wind turbine’s total cost, which is generally split
evenly among the rotor, electrical system, drivetrain, and tower. The technological
progress described in Chapter 2, however, could significantly reduce costs (e.g.,
through the use of lighter weight components for blades and towers).
The availability of critical resources is crucial for large-scale manufacturing of wind
turbines. The most important resources are steel, fiberglass, resins (for composites
and adhesives), blade core materials, permanent magnets, and copper. The
production status of these materials is reviewed in the following list:
z
62
Steel: The steel needed for additional wind turbines is not expected
to have a significant impact on total steel production. (In 2005, the
United States produced 93.9 million metric tons of steel, or 8% of
the worldwide total.) Although steel will be required for any
electricity generation technology installed over the next several
decades, it can be recycled. As a result, replacing a turbine after 20+
years of service would not significantly affect the national steel
demand because recycled steel can be used in other applications
where high-quality steel is not required (Laxson, Hand, and Blair
2006).
20% Wind Energy by 2030
Table 3-1. Main components and materials used in a wind turbine (%)
1.5 MW
Weight %
Rotor
Hub
Blades
Nacelle
Gearbox
Generator
Frame
Tower
Steel
6.0
7.2
100
2
10.1
3.4
6.6
66.7
100.0
96
65
85
98
89.1
2
1.3
0.0
Permanent
Concrete
Magnet
4 MW
Rotor
Hub
Blades
Nacelle
Gearbox
Generator
Frame
Tower
Permanent
Concrete
Magnet
6.00
7.6
Aluminum Copper
3
0.08
2
1.34
CRP
Adhesive
Core
TOTAL
15
5
100.0
100.0
78
2
Steel
9
2
35
3
3
0.8
1.6
5.8
0.0
1.1
0.4
GRP
CRP
Adhesive
Core
68
10
15
5
Aluminum Copper
100
2
10.10
2.7
6.60
67.00
100.0
GRP
96
93
85
98
89.63
2
9
2
4
3
3
0.80
0.51
5.37
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
100.0
0.76
1.14
0.38
100.0
Notes: Tower includes foundation. GRP = glass-fiber-reinforced plastic. CRP = carbon fiber reinforced plastic
Source: Sterzinger and Svrcek (2004)
Table 3-2. Yearly raw materials estimate (thousands of metric tons)
Year
kWh/kg
Permanent
Magnet
2006
65
0.03
1,614
110
1.2
2010
70
0.07
6,798
464
4.6
2015
75
0.96
16,150
1,188
2020
80
2.20
37,468
Concrete
Steel
Aluminum
Copper
GRP
CRP
Adhesive
Core
1.6
7.1
0.2
1.4
0.4
7.4
29.8
2.2
5.6
1.8
15.4
10.2
73.8
9.0
15.0
5.0
2,644
29.6
20.2
162.2
20.4
33.6
11.2
2025
85
2.10
35,180
2,544
27.8
19.4
156.2
19.2
31.4
10.4
2030
90
2.00
33,800
2,308
26.4
18.4
152.4
18.4
30.2
9.6
Notes: kg = kilograms; GRP = glass-fiber-reinforced plastic. CRP = carbon fiber reinforced plastic
Source: Sterzinger and Svrcek (2004)
z
z
z
Fiberglass: Additional fiberglass furnaces would be needed to build
more wind turbines. Primary raw materials for fiberglass (sand) are
in ample supply, but availability and costs are expected to fluctuate
for resins, adhesives, and cores made from the petroleum-based
chemicals that are used to impregnate the fiberglass (Laxson, Hand,
and Blair 2006).
Core: End-grain balsa wood is an alternative core material that can
replace the low-density polymer foam used in blade construction.
Availability of this wood might be an issue based on the growth rate
of balsa trees relative to the projected high demand.
Carbon fiber: Current global production of commercial-grade
carbon fiber is approximately 50 million pounds (lb) per year. The
use of carbon fiber in turbine blades in 2030 alone would nearly
double this demand. To achieve such drastic industry scale-up,
changes to carbon fiber production technologies, production
facilities, packaging, and emissions-control procedures will be
required.
20% Wind Energy by 2030
63
3
z
3
z
Permanent magnets: By eliminating copper from the generator
rotor and using permanent magnets, which are becoming more
economically feasible, it is possible to build smaller and lighter
generators. World magnet production in 2005 was about 40,000
metric tons, with about 35,000 metric tons produced in China.
Although supply is not expected to be restricted, significant
additions to the manufacturing capability would be required to meet
the demand for wind turbines and other products (Trout 2002;
Laxson, Hand, and Blair 2006).
Copper: Although wind turbines use significant amounts of copper,
the associated level of demand still equates to less than 4% of the
available copper. This demand level, would not have a significant
impact on national demand (U.S. refined copper consumption was
2.27 million metric tons in 2005). Although copper ranks third after
steel and aluminum in world metals consumption, global copper
production is adequate to satisfy growing demands from the wind
industry. However, in recent years copper prices have escalated
more quickly than inflation, which could affect turbine costs.
Despite the demand and supply status of these materials, new component
developments are expected to significantly change material requirements. Generally,
trends are toward using lighter-weight materials, as
long as the life-cycle costs are low. In addition to
Material Usage Analysis
the findings of Ancona and McVeigh (2001;
(Ancona and McVeigh 2001)
described in the Materials Usage Analysis sidebar),
other trends in turbine components are outlined in
• Turbine material usage is, and will continue
the subsections that follow.
to be, dominated by steel.
•
64
Opportunities exist for introducing
aluminum or other lightweight composites,
provided that cost, strength, and fatigue
requirements can be met.
Evolution of Rotors
•
GRP is expected to continue to be used for
blades.
•
The use of carbon fiber might help reduce
weight and cost.
•
Low costs and high reliability remain the
primary drivers.
Most rotor blades in use today are built from glass­
fiber-reinforced plastic (GRP). Steel and various
composites such as carbon filament-reinforced
plastic (CFRP) are also used. As the rotor size
increases for larger machines, the trend will be
toward high-strength, fatigue-resistant materials.
Composites involving steel, GRP, CFRP, and
possibly other new materials will likely come into
use as turbine designs evolve.
•
Variable-speed generators will become more
common.
Changes to Machine Heads
•
Permanent-magnet generators on larger
turbines will increase the need for magnetic
materials.
•
Simplification of the nacelle machinery
might reduce raw material costs and also
increase reliability.
The machine head contains an array of complex
machinery including yaw drives, blade-pitch­
change mechanisms, drive brakes, shafts, bearings,
oil pumps and coolers, controllers, a bedplate, the
drivetrain, the gearbox, and an enclosure. Design
simplifications and innovations are anticipated in
each element of the machine head.
20% Wind Energy by 2030
3.2
MANUFACTURING CAPABILITY
In principle, a sustainable level of annual wind
turbine installation would be best supported by a
substantial domestic manufacturing base.
However, if installation rates fluctuate greatly
from one year to the next, manufacturing
capability may not be able to grow or shrink as
necessary. The National Renewable Energy
Laboratory (NREL) created a simple model to
explore sustainable installation rates that would
maintain wind energy production at specific
levels spanning several decades (Laxson, Hand,
and Blair 2006).
Figure 3-1. a. Annual installed wind energy
capacity to meet 20% of energy demand.
b. Cumulative installed wind energy
capacity to meet 20% of energy demand.
3
NREL’s study explored a number of alternative
scenarios for annual wind power capacity
expansion to understand their potential impact on
wind energy installation and manufacturing rates.
The results indicate that achieving the 20% Wind
Scenario by 2030 would not overwhelm U.S.
industry (Laxson, Hand, and Blair 2006).
NREL’s study assessed potential barriers that
would prohibit near-term high wind penetration
levels, such as manufacturing rates or resource
limitations. To reach 20% electric generation
from wind by 2030 in the United States, the
authors noted, an annual installed capacity
increase of about 20% would need to be
sustained for a decade (Laxson, Hand, and Blair
2006). Figure 3-1 compares the installation rates
required to meet three energy supply goals of
10%, 20%, and 30% of total national electrical
energy production from wind by 2030.
Figure 3-1(a) shows the annual rates and
Figure 3-1(b) shows the cumulative capacity
attained in each case. A manufacturing
production level of 20 gigawatts (GW) per year
by 2017—and maintained at this value
thereafter—would reach levels close to 400 GW of wind energy capacity by 2030.
NREL’s study assumed that the wind plant capacity factor would not change from
year to year or from location to location. This assumption provided an upper bound
on the annual installation rate and cumulative capacity required to produce 20% of
electricity demand. Alternatively, the 20% Wind Scenario evaluation assumes that
plant capacity factors will increase modestly with experience and technology
improvements (see Chapter 2). The 20% Scenario also accounts for regional
variations in wind resources, as explained in Appendix A’s detailed description of
the analytic modeling approach employed. Note that when these refinements are
included, the 20% curve in Figure 3-1(a) shifts downward, somewhat similar to that
shown in Figure 3-2 on the next page.
20% Wind Energy by 2030
65
Figure 3-2. Annual and cumulative installed wind
energy capacity represented in the 20% Wind Scenario
3
This chapter discusses the materials and manufacturing needed to pursue the 20%
Wind Scenario from 2007 through 2030 to meet the annual and cumulative installed
capacity shown in Figure 3-2. This figure shows the forecasts for annual and
cumulative installed wind energy capacity, which also forms the basis for estimates
of new wind turbines and the raw materials required to produce them. In this
scenario, annual installations climb more than 16 GW per year, and the total
installed wind capacity increases to 305 GW by 2030. Between 2007 and 2030, 293
GW are installed. (For more details on the modeling approach used, see
Appendix A.)
3.2.1
CURRENT MANUFACTURING FACILITIES
A growing number of states and companies in the United States are ramping up
capacity to manufacture wind turbines, or have the ability to do so. Jobs are
expected to remain in the United States, but only if investments are made in certain
components and in advanced manufacturing technologies. Appendix C describes the
jobs and economic impacts associated with wind energy, including manufacturing,
construction, and operational sectors of the wind industry.
A useful perspective on growing manufacturing requirements is provided by a non­
government organization study released in 2004 called Wind Turbine Development:
Location of Manufacturing Activity (Sterzinger and Svrcek 2004). This study
investigated the current and future U.S. wind manufacturing industry, both to
determine the location of companies involved in wind turbine production and to
examine limitations to a rapidly expanding wind business. The report covered four
census regions (the Midwest, Northeast, South, and West) and divided turbine
manufacturing into 20 separate components. These components were grouped into
five categories, as shown in Table 3-3. The table also shows the locations of U.S.
wind turbine component manufacturers in 2004, broken down by region. Among the
106 companies surveyed, about 90 companies directly manufacture components for
utility-scale wind turbines, with utility scale being roughly defined as 1 MW or
greater.
66
20% Wind Energy by 2030
Table 3-3. Locations of U.S. wind turbine component manufacturers
Region
Midwest
Northeast
South
West
Division
Rotor
East North Central
West North Central
Middle Atlantic
New England
East South Central
South Atlantic
West South Central
Mountain
Pacific
Component Total:
6
1
3
0
0
3
4
1
5
23
Nacelle
and
Controls
5
0
4
6
0
2
5
0
4
26
Gearbox & Generator &
Drivetrain
Power
Electronics
8
1
1
1
4
5
0
2
0
0
1
1
0
1
0
1
2
4
16
16
Tower
Division
Total
2
8
1
0
2
2
6
0
4
25
22
11
17
8
2
9
16
2
19
106
3
(Sterzinger and Svrcek 2004)
Figure 3-3 on the next page shows the locations of a number of the current
manufacturers of wind turbines and components. These firms are widely distributed
around the country and some are located in regions with, as yet, little wind power
development.
A large national investment in wind would likely spread beyond these active
companies. To identify this potential, the North American Industrial Classification
System (NAICS; http://www.census.gov/epcd/www/naics.html) was searched to
identify companies operating under relevant industry codes. The manufacturing
activity related to wind power development is substantial and widely dispersed
(Sterzinger and Svrcek 2004). As Table 3-4 shows, more than 16,000 firms are
currently producing products under one or more of the NAICS codes that include
Table 3-4. U.S. Manufacturing firms with technical potential to
enter wind turbine component market
NAICS Code Description
Code
326199 All Other Plastics Products
331511 Iron Foundries
332312 Fabricated Structural Metal
332991 Ball and Roller Bearings
333412 Industrial and Commercial Fans and Blowers
333611 Turbines, and Turbine Generators, and
Turbine Generator Sets
333612 Speed Changer, Industrial
333613 Power Transmission Equip.
334418 Printed Circuits and Electronics Assemblies
334519 Measuring and Controlling Devices
335312 Motors and Generators
335999 Electronic Equipment and Components, NEC
Total
20% Wind Energy by 2030
Total
Annual Payroll Number of
Employees
($1000s)
Companies
501,009
15,219,355
8,174
75,053
3,099,509
747
106,161
3,975,751
3,033
33,416
1,353,832
198
11,854
411,979
177
17,721
1,080,891
110
13,991
21,103
105,810
34,499
62,164
42,546
539,514
779,730
4,005,786
1,638,072
2,005,414
1,780,246
248
292
716
830
659
979
1,025,327
35,890,079
16,163
67
Figure 3-3. Examples of manufacturers supplying wind equipment
across the United States
3
manufacture of wind components. These firms are spread across all 50 states. They
are concentrated, however, in the most populous states and the states that have
suffered the most from loss of manufacturing jobs. The 20 states that would likely
receive the most investment and the most new manufacturing jobs from wind power
expansion account for 75% of the total U.S. population, and 76% of the
manufacturing jobs lost in the last 3.5 years.
A 2006 NGO report entitled “Renewable Energy Potential: A Case Study of
Pennsylvania (Sterzinger and Stevens 2006) identified the bottlenecks in the
component supply chain. Bottlenecks were identified for various components, but
obtaining gearbox components was particularly problematic. Currently, only a few
manufacturers in the world deliver gearboxes for large wind turbines. Additional
68
20% Wind Energy by 2030
investments will be required to support the development of a gearbox industry
specifically for large wind applications. Investments will also be needed to expand
the manufacture of large bearings and large castings.
The wind equipment manufacturing sector also faces trade-offs between using
domestic or foreign manufacturing facilities. An advantage to domestic operations is
a reduction reducing the significant transportation costs of moving large components
such as blades and towers. Manufacturing many significant wind turbine
components is also a labor-intensive process. With U.S. labor wage rates at higher
levels than those paid in many other countries, manufacturers have naturally been
drawn to setting up their factories outside the United States (e.g., in Mexico and
China). One wind blade manufacturer with significant international manufacturing
experience estimates that, to make a U.S. factory competitive, the labor hours per
blade would need to be reduced by a factor of 30%–35%. To ensure that the bulk of
these manufacturing jobs stay in the United States, automation and productivity
gains through the development of advanced manufacturing technology are needed.
These gains will allow the higher U.S. wage rates to be competitive.
3
To attract these jobs, a number of U.S. states have set aside funds for RD&D, with
plans to collaborate with industry and the federal government on a cost-shared basis.
Collaboration among state, industry, and federal programs on advanced
manufacturing technology can create competitive U.S. factories and provide better
job security for U.S. employees.
3.2.2
RAMPING UP ENERGY INDUSTRIES
In the United States, several industries have experienced large rates of growth over a
short period of time. The power plants most commonly used to produce electricity
around the world—such as thermal power stations fired with coal, gas or oil, or
nuclear reactors—are large in scale. Nuclear power stations, developed mainly since
the middle of the twentieth century, have now reached a penetration of 17.1% in the
world’s power supply. Worldwide, nuclear power plant installations saw a 17%
annual growth rate between 1960 and 1997 (BTM 1999). Despite a halt in new
nuclear plant licensing in the early 1980s, U.S. nuclear plants generate about 20% of
the nation’s electrical energy, and have done so for the last decade or more. The
history of nuclear power shows that it is possible to achieve substantial levels of
penetration over two to three decades with a new technology.
Even though the time horizon of the 20% Wind Scenario is consistent with the
historical development of nuclear power, it is nonetheless difficult to directly
compare penetration patterns for nuclear power that is typically about 1,000 MW
and wind power technology. A wind turbine is a smaller-scale technology that has a
current typical commercial unit size of 2 MW–3 MW. Despite the smaller scales of
wind power, its modularity makes it ideal for all sizes of installations—from a single
unit (2 MW–3 MW) to a large utility-scale wind farm (1,000 MW). On the supply
side, serial production of large numbers of similar units can reduce manufacturing
costs. These factors suggest that manufacturing ramp-up for wind turbines should be
less daunting than ramp-up for nuclear power plant equipment.
Experiences with natural-gas-fired power plants over the past decade also provide
important perspectives on the ability to rapidly expand manufacturing capability for
wind power. From the early 1990s through the first half of the current decade, the
U.S. electric sector experienced a rush toward new gas combined-cycle and
combustion-turbine generation. This growth was driven by the expectation—now
20% Wind Energy by 2030
69
discounted—of continuing low natural gas prices. From 1999 through 2005, tens of
gigawatts of natural gas power plants were manufactured and installed in the United
States each year, with installations peaking in 2002 at more than 60 GW (Black &
Veatch 2007). The experience with natural gas demonstrates that huge amounts of
power generation equipment can be manufactured in the United States if sufficient
market demand exists.
3
As Table 3-5 shows, Toyota North America exemplifies the manufacturing scale-up
of a modular technology and capability that is possible in the United States.
Toyota has continued to establish U.S. manufacturing capability since the mid­
1980s, and automobiles, like wind turbines, require large quantities of steel, plastics,
and electronic components. There is no indication that Toyota’s domestic expansion
caused any strain on the nation’s manufacturing or materials-supply sectors. Today,
the majority of vehicles Toyota sells in the U.S. are produced in this country.
Table 3-5. Toyota North America vehicle
production and sales
Direct U.S. Employment (2005)
32,003 employees
2005 Payroll
Cumulative U.S. Production
$2,244,946,444
12,374,062 vehicles
Cumulative Sales
$272,390,226,806
U.S. Vehicle Sales (2005)
2,269,296 vehicles
U.S. Vehicle Production (2005)
1,393,100 vehicles
Average Engine Power 2004-2005
227 horsepower or 0.17 MW
2005 U.S. Production in Power
Output Terms
275 million horsepower
236 million kW or 236 GW
2005 U.S. Sales in Power Output
Terms
448 million horsepower
384 million kW or 384 GW
Source: Adapted from Toyota website data
http://www.toyota.com/about/operations/manufacturing/
Table 3-5 shows that Toyota’s annual U.S. production, when expressed in terms of
engine power output, increased to 236 GW by 2005. This annual production begins
to approach in power capability the total amount of wind generation installed
between 2007 and 2030 through realization of the 20% Wind Scenario.
3.3
LABOR REQUIREMENTS
Beyond the raw material and manufacturing facilities required to create wind
turbines and components, a skilled labor force would be required. This staff would
need a range of skills and experience to fill many new employment opportunities.
The likely outcome from developing new capabilities and capacity would be
expansion of manufacturing in areas currently capable of competing or development
in locations where logistic advantages exist.
3.3.1
MAINTAINING AND EXPANDING RELEVANT TECHNICAL
STRENGTH
Major expansion of wind power in the United States would require substantial
numbers of skilled personnel available to design, build, operate, maintain, and
70
20% Wind Energy by 2030
advance wind power equipment and technology. Toward this end, a number of
educational programs are already offered around the nation, including those shown
in Table 3-6.
Table 3-6. Wind technology-related educational programs around the United States today
School
Location
Degree or Program
Wind Energy Applications Training
Symposium
Boulder, Colorado
Workshops for industry
Colorado State University
Fort Collins, Colorado
65 MW turbine on campus for research
(engineering, environmental, etc.)
Advanced Technology Environmental
Education Center: Sustainable Energy
Education and Training
Bettencourt, Iowa
Workshops for upper level high school
and community college technology
instructors
Iowa Lakes Community College
Estherville, Iowa
One-year diploma for wind technician;
two-year associate in applied science
degree for wind technician
University of Massachusetts at Amherst:
College of Engineering, and Renewable
Energy Research Laboratory (becoming
University of Massachusetts Wind
Energy Center in late 2008)
Amherst, Massachusetts
MS and Ph.D. level engineering
programs specializing in wind energy
Canby, Maine
Associate of applied science degree
program in wind energy technology;
diploma for wind energy mechanic;
online certificate program for ”windsmith”
Southwestern Indian Polytechnic Institute
Albuquerque, New Mexico
Under development: Integration of
renewable energy technology
experiential learning into the electronics
technology, environmental science,
agricultural science, and natural
resources certificate and degree
programs
Mesalands Community College: North
American Wind Research and Training
Center
Tucumcari,
New Mexico
Under development: Curriculum for
operations and maintenance technician;
two-year associate degree in wind farm
management
Wayne Technical and Career Center
Williamson, New York
New Vision Renewable Energy Program
for high school seniors
Columbia Gorge Community College
Hood River, Oregon
One-year certificate and two-year degree
for renewable energy technician
Lane Community College
Eugene, Oregon
Two-year associate of applied science
degree for energy management
technician; two-year associate of applied
science option for renewable energy
technician
Texas Tech and other American
universities: Wind Science & Engineering
Research Center
Lubbock, Texas
Integrative graduate education and
research traineeship
Lakeshore Technical College
Cleveland, Wisconsin
Associate degree in applied science;
electromechanical technology with a
wind system Technician track
Fond du Lac Tribal and Community
College
Fond du Lac, Wisconsin
Clean Energy Technician Certificate
Program
Minnesota West Community and
Technical College
3
Although this is an excellent beginning, many more programs of a similar nature
will be needed nationwide to satisfy the needs stemming from the 20% Wind
Scenario. One concern is that the number of students in power engineering programs
has been dropping in recent years. Currently, U.S. graduate power engineering
programs produce about 500 engineers per year; in the 1980s, this number
approached 2,000. In addition, the number of wind engineering programs in U.S.
graduate schools is significantly lower than in Europe. This concern is echoed in
Figure 3-4 below, which shows that the number of college graduates receiving
20% Wind Energy by 2030
71
Figure 3-4. Projected percentage of 22-year-olds with a bachelor’s degree in
science and engineering through 2050
3
degrees in science and engineering has been declining, and that this trend is
projected to continue for the foreseeable future (NSTC 2000).
Even the level of U.S. graduate programs is well below similar graduate programs in
Europe (Denmark, Germany, etc). At this rate, the United States will be unable to
provide the necessary trained talent and manufacturing expertise. Unless this trend is
reversed, even with major new wind installations in the United States, most of the
technology will be imported, and a significant portion of the economic gains will be
foreign rather than domestic.
3.4
CHALLENGES TO 20% WIND ENERGY BY 2030
3.4.1
CHALLENGES
Materials
Several key materials are crucial to the production of a wind turbine. The
availability of some key raw materials—including fiberglass (about 9 metric tons
required per megawatt of wind turbine capacity), resins, and permanent magnets—
might potentially constrain the ability to develop an infrastructure producing high
levels of wind power. To give perspective, the glass fiber requirements would be
about half the level used domestically for roofing shingles (which is currently the
largest consumer of fiberglass) and about double the amount now used in boat
building.
Manufacturing
The 20% Wind Scenario would demand installations at a sustained growth rate of
20% annually for nearly a decade and then require maintaining that level of annual
installations through 2030. For turbine companies, it is no longer simply a matter of
where to establish new manufacturing capacity. Investment decisions must now
address strategies for building out and securing supply lines on a global basis; a
72
20% Wind Energy by 2030
proactive stance is essential to operate successfully in an environment of rapidly
growing and shifting demand for wind turbines (Hays, Robledo, and Ambrose
2006). Fortunately, the 20% Wind Scenario could be feasible even with the potential
challenges related to the availability of raw material or increased manufacturing
demands. For rapid growth of manufacturing capacity to be achieved, stable and
consistent policies that encourage investment in these new sectors of activity are
needed.
3
Labor
One potential gap in achieving high rates of wind energy development is the
availability of a qualified work force. In a report published by the National Science
and Technology Council (NSTC), as noted above, the percentage of 22-year-olds
earning degrees in science and engineering will continue to drop in the next 40 years
(NSTC 2000). More support from industry, trade organizations, and various levels
of government could foster university programs in wind and renewable energy
technology, preparing the work force to support the industry’s efforts.
3.5
REFERENCES AND OTHER SUGGESTED READING
Ancona and McVeigh. 2001. Princeton Energy Resources International, LLC.
Rockville, MD
http://www.generalplastics.com/uploads/technology/WindTurbine­
MaterialsandManufacturing_FactSheet.pdf
AWEA (American Wind Energy Association). 2007. Wind Power Capacity In U.S.
Increased 27% in 2006 and Is Expected To Grow an Additional 26% in
2007. Washington, DC: AWEA.
http://www.awea.org/newsroom/releases/Wind_Power_Capacity_012307.ht
ml
BTM Consult. 1999. Wind Force 10: A Blueprint to Achieve 10% of the World’s
Electricity from Wind Power by 2010. Ringkøbing, Denmark: BTM Consult
ApS. http://www.inforse.dk/doc/Windforce10.pdf
EIA (Energy Information Administration). February 2006. Annual Energy Outlook
2006. Report No. DOE/EIA-0383.Washington, DC: EIA.
Hays, K., C. Robledo, and W. Ambrose. 2006. Wind Power at a Crossroads, Supply
Shortages Spark Industry Restructuring, Strategy White Paper. Cambridge,
MA: Emerging Energy Research.
Laxson, A., M.M. Hand, and N. Blair. 2006. High Wind Penetration Impact on W.S.
Wind Manufacturing Capacity and Critical Resources. Report No.
NREL/TP-500-40482. Golden, CO: National Renewable Energy Laboratory
(NREL).
NSTC (National Science and Technology Council). 2000. Ensuring a Strong U.S.
Scientific, Technical and Engineering Workforce in the 21st Century.
Washington, DC:NSTC.
Black & Veatch. 2007 20 % Wind Energy Penetration in the United States: A
Technical Analysis of the Energy Resource. Walnut Creek, CA
Sterzinger, G., and M. Svrcek. September 2004. Wind Turbine Development:
Location of Manufacturing Activity. Washington, DC: Renewable Energy
Policy Project (REPP).
20% Wind Energy by 2030
73
Sterzinger, G., and M. Svrcek. 2005. Component Manufacturing: Ohio’s Future in
the Renewable Energy Industry. Washington, DC: REPP.
Sterzinger, G., and J. Stevens. October 2006. Renewable Energy Potential: A Case
Study of Pennsylvania. Washington, DC: REPP.
Trout, S.R. 2002. “Rare Earth Magnet Industry in the USA: Current Status and
Future Trends.” Presented at the XVII Rare Earth Magnet Workshop,
August 18–22, Newark, New Jersey.
3
74
20% Wind Energy by 2030
Chapter 4.
Transmission and
Integration into the
U.S. Electric System
The ever-increasing sophistication of the operation
of the U.S. electric power system—if it continues on
its current path—would allow the 20% Wind
Scenario to be realized by 2030. The 20% Wind
Scenario would require the continuing evolution of
transmission planning and system operations, in
addition to expanded electricity markets.
4
There are two separate and distinct power system challenges to obtaining 20% of
U.S. electric energy from wind. One challenge lies in the need to reliably balance
electrical generation and load over time when a large portion of energy is coming
from a variable power source such as wind, which, unlike many traditional power
sources, cannot be accessed on demand or is “nondispatchable.” The other challenge
is to plan, build, and pay for the new transmission facilities that will be required to
access remote wind resources. Substantial work already done in this field has
outlined scenarios in which barriers to achieving the 20% Wind Scenario could be
removed while maintaining reliable service and reasonable electricity rates.
This chapter begins with an examination of several detailed studies that have looked
at the technical and economic impacts of integrating high levels of wind energy into
electric systems. Next, this chapter examines how wind can be reliably
accommodated into power system operations and planning. Transmission system
operators must ensure that enough generation capacity is operating on the grid at all
times, and that supply meets demand, even through the daily and seasonal load
cycles within the system. To accommodate a nondispatchable variable source such
as wind, operators must ensure that sufficient reserves from other power sources are
available to keep the system in balance. However, overall it is the net system load
that must be balanced, not an individual load or generation source in isolation. When
seen in this more systemic way, wind energy can play a vital role in diversifying the
power system’s energy portfolio.
As the research discussed in this chapter demonstrates, wind’s variability need not
be a technical barrier to incorporating it into the broader portfolio of available
options. Although some market structures, generation portfolios, and transmission
rules accommodate much more wind energy than others, reforms already under
consideration in this sector can better accommodate wind energy. Experience and
studies suggest that with these reforms, wind generation could reliably supply 20%
of U.S. electricity demand.
20% Wind Energy by 2030
75
Finally, this chapter assesses the feasibility and cost of building new transmission
lines and facilities to tap the remote wind resources that would be needed for the
20% Wind Scenario. Many challenges are inherent in building transmission systems
to accommodate wind energy. If electric loads keep growing as expected, however,
extensive new transmission will be required to connect new generation to loads.
Over the coming decades, this will be true regardless of the power sources that
dominate, whether they are fossil fuels, wind, hydropower, or others. The U.S.
power industry has renewed its commitment to a robust transmission system, and
support continues to grow for cleaner generation options. In this environment,
designers and engineers must find ways to build transmission at a reasonable cost
and take a closer look at the alternatives to conventional power generation in a
carbon-constrained future.
4
Wind Penetration Levels
At least three different measures are used to describe wind penetration levels:
energy penetration, capacity penetration, and instantaneous penetration. They
are defined and related as follows:
Energy penetration is the ratio of the amount of energy delivered from the
wind generation to the total energy delivered. For example, if 200 megawatthours (MWh) of wind energy are supplied and 1,000 MWh are consumed
during the same period, wind’s energy penetration is 20%.
Capacity penetration is the ratio of the nameplate rating of the wind plant
capacity to the peak load. For example, if a 300 MW wind plant is operating in
a zone with a 1,000 MW peak load, the capacity penetration is 30%. The
capacity penetration is related to the energy penetration by the ratio of the
system load factor to the wind plant capacity factor. Say that the system load
factor is 60% and the wind plant capacity factor is 40%. In this case, and with
an energy penetration of 20%, the capacity penetration would be 20% ×
0.6/0.4, or 30%.
Instantaneous penetration is the ratio of the wind plant output to load at a
specific point in time, or over a short period of time.
4.1
LESSONS LEARNED
4.1.1
WIND PENETRATION EXPERIENCES AND STUDIES
The needs of system operators—reflected in grid codes—ensure that wind power
will continue to be integrated in ways that guarantee the continued reliable operation
of the power system. Grid codes are regulations that govern the performance
characteristics of different aspects of the power system, including the behavior of
wind plants during steady-state and dynamic conditions. Grid codes around the
world are also changing to incorporate wind plants; the Federal Energy Regulatory
Commission (FERC) Order 661-A in the United States is an example.
Several U.S. utilities are approaching 10% wind capacity as a percentage of their
peak load, including the Public Service Company of New Mexico (PNM) and Xcel
76
20% Wind Energy by 2030
Energy (which serves parts of Colorado, Michigan, Minnesota, New Mexico, North
Dakota, South Dakota, Texas, and Wisconsin). Xcel Energy could actually exceed
13% by the end of 2007. MidAmerican Energy in Iowa has already exceeded 10%,
and Puget Sound Energy (PSE) in Washington expects to reach 10% capacity
penetration shortly after 2010.
4.1.2
POWER SYSTEM STUDIES CONCLUDE THAT 20% WIND ENERGY
PENETRATION CAN BE RELIABLY ACCOMMODATED
Rapid growth in wind power has led a number of utilities in the United States to
undertake studies of the technical and economic impacts of incorporating wind
plants, or high levels of wind energy, into their electric systems. These studies are
yielding a wealth of information on the expected impacts of wind plants on power
system operations.
4
General Electric International (GE), for example, has conducted a comprehensive
study for New York state that examines the impact of 10% capacity penetration of
wind by 2008 (Piwko et al. 2005). The state of California has set the ambitious goal
of achieving 20% of its electrical energy from renewable sources by 2010 and 30%
by 2020 (CEC 2007). The state of Minnesota has studied wind energy penetration of
up to 25%, to be implemented statewide by 2020 (EnerNex Corporation 2006). The
Midwest ISO (independent system operator) has examined the impact of achieving a
wind energy penetration of 10% in the region by 2020, with 20% in Minnesota
(Midwest ISO 2006).
U.S. experience with studies on wind were reviewed in a special issue of the
Institute of Electrical and Electronics Engineers (IEEE) Power & Energy Magazine
(IEEE 2005). The Utility Wind Integration Group (UWIG) also summarized these
studies in cooperation with the three large utility trade associations—the Edison
Electric Institute (EEI), the American Public Power Association (APPA), and the
National Rural Electric Cooperative Association (NRECA). The UWIG (2006)
summary came to the following conclusions:
z
z
z
“Wind resources have impacts that can be managed through proper
plant interconnection, integration, transmission planning, and
system and market operations.”
“On the cost side, at wind penetrations of up to 20% of system peak
demand, system operating cost increases arising from wind
variability and uncertainty amounted to about 10% or less of the
wholesale value of the wind energy. These conclusions will need to
be reexamined as results of higher-wind-penetration studies—in the
range of 25%–30% of peak balancing-area load—become available.
However, achieving such penetrations is likely to require one or two
decades.”
“During that time, other significant changes are likely to occur in
both the makeup and the operating strategies of the nation’s power
system. Depending on the evolution of public policies,
technological capabilities, and utility strategic plans, these changes
can be either more or less accommodating to the natural
characteristics of wind power plants.”
20% Wind Energy by 2030
77
z
z
z
4
z
“A variety of means—such as commercially available wind
forecasting and others discussed below—can be employed to reduce
these costs.”
“There is evidence that with new equipment designs and proper
plant engineering, system stability in response to a major plant or
line outage can actually be improved by the addition of wind
generation.”
“Since wind is primarily an energy—not a capacity—source, no
additional generation needs to be added to provide back-up
capability provided that wind capacity is properly discounted in the
determination of generation capacity adequacy. However, wind
generation penetration may affect the mix and dispatch of other
generation on the system over time, since non-wind generation is
needed to maintain system reliability when winds are low.”
“Wind generation will also provide some additional load carrying
capability to meet forecasted increases in system demand. This
contribution is likely to be up to 40% of a typical project’s
nameplate rating, depending on local wind characteristics and
coincidence with the system load profile. Wind generation may
require system operators to carry additional operating reserves.
Given the existing uncertainties in load forecasts, the studies
indicate that the requirement for additional reserves will likely be
modest for broadly distributed wind plants. The actual impact of
adding wind generation in different balancing areas can vary
depending on local factors. For instance, dealing with large wind
output variations and steep ramps over a short period of time could
be challenging for smaller balancing areas, depending on the
specific situation.”
Load, Wind Generation, and Reserves
The first phase in determining how to integrate wind energy into the power grid is to
conduct a wind integration study, which begins with an analysis of the impact of the
wind plant profiles relative to the utility load curve. By way of illustration,
Figure 4-1 shows a two-week period of system loads in the spring of 2010 for the
Xcel system in Minnesota. This system has 1,500 MW of wind capacity on a 10,000
MW peak-load system (Zavadil et. al. 2004). Because both load and wind generation
vary, it is the resulting variability—load net of wind generation—that system
operators must manage, and to which the non-wind generation must respond.
Although wind plants exhibit significant variability and uncertainty in their output,
electric system operators already deal with these factors on similar time scales with
current power system loads. It is critical to understand that output variability and
uncertainty are not dealt with in isolation, but rather as one component of a large,
complex system. The system must be operated with balance and reliability, taking
into account the aggregate behavior of all of its loads and generation operating
together.
To maintain system balance and security, the electric system operator analyzes the
regulation and load-following requirements of wind relative to other resources.
Wind energy contributes some net increase in variability above that already imposed
by cumulative customer loads. This increase, however, is less than the isolated
variability of the wind alone on all time scales of interest. Although specific details
78
20% Wind Energy by 2030
Figure 4-1. Hourly load shapes with and without wind generation
4
vary, distribution of changes in the load net flattens and broadens when large-scale
wind is added to the system. The resulting reserve requirements can be predicted
with statistical analysis. It is not necessary, or economically feasible, to counter each
movement of wind with a corresponding movement in a traditional energy source.
As a result, the load net of wind requires fewer reserves than would be required to
balance the output of individual wind plants, or all the wind plants aggregated
together, in isolation from the load. In the very short time frame, the additional
regulation burden has been found to be quite small, typically adding less than
$0.50/MWh to the cost of the wind energy (Zavadil, et. al. 2004).
Operational impacts of nondispatchable variable resources can occur in each of the
time scales managed by power system operators. Figure 4-2 below illustrates these
time scales, which range from seconds to days. “Regulation” is a service that rapidresponse maneuverable generators deliver on short time scales, allowing operators to
maintain system balance. This typically occurs over a few minutes, and is provided
by generators using automatic generation control (AGC). “Load following” includes
both capacity and energy services, and generally varies from 10 minutes up to
several hours. This time scale incorporates the morning load pick-up and evening
load drop-off. The “scheduling” and “unit-commitment” processes ensure that
sufficient generation will be available when needed over several hours or days ahead
of the real time schedule.
A statistical analysis of the load net of wind indicates the amount of reserves needed
to cope with the combination of wind and load variability. The reserve determination
starts with the assumption that wind generation and load levels are independent
variables. The resultant variability is the square root of the sum of the squares of the
individual variables (rather than the arithmetic sum). This means that the system
operator, who must balance the total system, needs a much smaller amount of
reserves to balance the load net of wind. Higher reserves would be needed if that
operator were to try to balance the output of individual wind plants, or all the wind
plants aggregated together in isolation from the load.
20% Wind Energy by 2030
79
Figure 4-2. Time scales for grid operations
4
Source: Milligan et al. (2006)
Some suggest that hydropower capacity, or energy storage in the form of pumped
hydro or compressed air, should be dedicated to supply backup or firming and
shaping services to wind plants. Given an ideally integrated grid, this capacity would
not be necessary because the pooling of resources across an electric system
eliminates the need to provide costly backup capacity for individual resources.
Again, it is the net system load that needs to be balanced, not an individual load or
generation source in isolation. Attempting to balance an individual load or
generation source is a suboptimal solution to the power system operations problem
Reserve Requirements Calculation
A hypothetical example is offered to calculate reserve requirements. Say that system peak
load for tomorrow is projected at 1,000 MW with a 2% forecast error, which makes the
forecast error (i.e., expected variability of peak load) equal to 20 MW. Wind generation for a
200 MW wind plant in that balancing area is predicted at a peak hour output of 100 MW
with an error band of 20%. The expected variability of peak wind generation, then, is 20
MW. Assuming that these are independent variables, the total error is calculated as the
square root of the sum of the squares of the individual variables (which is the square root of
(2 × 20) squared, or 1.41 × 20, which equals 28 MW). Adding the two variables to estimate
reserve requirements would result in an incorrect value of 40 MW.
80
20% Wind Energy by 2030
because it introduces unnecessary extra capacity and an associated increase in cost.
Hydro capacity and energy storage are valuable resources that should be used to
balance the system, not just the wind capacity.
Figure 4-3 illustrates the incremental load-following impact of wind on an electrical
system, as determined in the work of Zavadil and colleagues (2004). The histograms
show more high-ramp requirements with wind than without wind, and a general
reduction in small-ramp requirements compared to the no wind case. For these
illustrative summer and winter hours, following load alone entails relatively fewer
large-megawatt changes in generation (ramps). Following load net of wind
generation, however, creates a wider variability in the magnitude of load change
between two adjacent hours. A system with wind generation needs more active loadfollowing generation capability than one without wind, or more load-management
capability to offset the combined variability of load net of wind.
4
Figure 4-3. Impact of wind on load-following requirements
Wind Integration Cost
One impact of the variability that wind imposes on the system is an increase in the
uncertainty introduced into the day-ahead unit-commitment process. Specifically,
despite improvements in wind generation forecasting, greater uncertainty remains
about what the next day’s load net of wind and resulting generation requirements
20% Wind Energy by 2030
81
will be. The impact of these effects has been shown to increase system operating
cost by up to $5.00/MWh of wind generation at wind capacity penetrations up to
20%. These figures are shown in the Unit-Commitment Cost column of Table 4-1.
These day-ahead cost impacts are significantly higher than the others, reflecting the
high cost of starting up generating units on a daily basis—even when they might not
be needed.
The impact of wind’s variability depends on the nature of the dispatchable
generation sources, their fuel cost, the market and regulatory environment, and the
characteristics of the wind generation resources. The most recent study conducted
for Minnesota, for example, examined up to 25% energy penetration in the Midwest
ISO market context (EnerNex 2006). The study found that the cost of wind
integration is similar to that found in a study done two years earlier for a 15% wind
capacity penetration in a vertically integrated market (Zavadil et al. 2004). A
comparison of these results illustrates the beneficial effect of regional energy
markets, namely that large operational structures reduce variability, contain more
load-following resources, and offer more useful financial mechanisms for managing
the costs of wind integration. Handling large output variations and steep ramps over
short time periods (e.g., within the hour), though, can be challenging for smaller
balancing areas.
4
Table 4-1 shows the integration cost results from recent U.S. studies. The wind
integration issue is primarily a matter of cost, but the costs in the 20% Wind
Scenario are expected to be less than 10% of the wholesale cost of energy (COE).
Table 4-1. Wind integration costs in the U.S.
Date
Study
May 03
Sep 04
Nov 06
Xcel-UWIG
Xcel-MNDOC
MN/MISO
July 04
CA RPS Multiyear Analysis
We Energies
We Energies
PacifiCorp
Xcel-PSCo
Xcel-PSCo
June 03
June 03
2005
April 06
April 06
Wind
Capacity
Penetration
(%)
Regulati
Load
on Cost Following
($/MWh)
Cost
($/MWh)
Unit
Commitment Cost
($/MWh)
Gas
Supply
Cost
($/MWh)
Total
Operating
Cost
Impact
($/MWh)
3.5
15
35
(25% energy)
4
0
0.23
0.15
0.41
na
na
1.44
4.37
4.26
na
na
na
1.85
4.60
4.41
0.45
na
na
na
na
4
29
20
10
15
1.12
1.02
0
0.20
0.20
0.09
0.15
1.6
na
na
0.69
1.75
3.0
2.26
3.32
na
na
na
1.26
1.45
1.90
2.92
4.6
3.72
4.97
Source: Adapted from IEEE (2005)
Wind Penetration Impacts
U.S. studies for capacity penetrations in the range between 20% and 35% have
found that the additional reserves required to meet the intrahour variability are
within the capabilities of the existing stack of units expected to be committed. In the
high-penetration Minnesota study (EnerNex 2006), changes in total reserve
requirements amounted to 7% of the wind generation needed to reach 25% wind
energy penetration (5,700 MW). These reserves included 20 MW of additional
regulating reserve, 24 MW of additional load-following reserve, and 386 MW
82
20% Wind Energy by 2030
maximum of additional operating reserve to cover next-hour errors in the wind
forecast. Existing capacity is expected to cover these reserve needs, although over
time, load growth could reduce this spare capacity if new dispatchable power plants
are not constructed. Because wind and load are generally uncorrelated over short
time scales, the regulation impact of wind is modest. The system operator will
schedule sufficient spinning and nonspinning reserves so that unforeseen events do
not endanger system balance, and so that control performance standards prescribed
by the North American Electric Reliability Corporation (NERC) are met.
4.1.3
WIND TURBINE TECHNOLOGY ADVANCEMENTS IMPROVE
SYSTEM INTEGRATION
4
As described in more detail in the Wind Turbine Technology chapter, wind turbine
technology has advanced dramatically in the last 20 years. From a performance point
of view, modern wind power plants have much in common with conventional utility
power plants, with the exception of variability in plant output. In the early days of
wind power applications, wind plants were often thought of as a curiosity or a
nuisance. Operators were often asked to disconnect from the system during a
disturbance and reconnect once the system was restored to stable operation. With the
increasing penetration of wind power, most system operators recognize that wind
plants can and should contribute to stable system operation during a disturbance, as
do conventional power plants.
As grid codes are increasingly incorporating wind energy, new plants are now
capable of riding through a serious fault at the point of interconnection and are able
to contribute to the supply of reactive power and voltage control, just like a
conventional power plant. The supply of reactive power is a critical aspect of the
design and operation of an interconnected power system. Modern wind plants can
perform this function and supply voltage support for secure grid operations.
In addition, modern wind plants can be integrated into a utility’s supervisory control
and data acquisition (SCADA) system. They can provide frequency response similar
to that of other conventional machines and participate in plant output control
functions and ancillary service markets. Figure 4-4 illustrates the ability of a wind
power plant to increase its output (grey line) in response to a drop in system
frequency (red line). Figure 4-5 illustrates various control modes possible via
Figure 4-4. GE turbine frequency response
20% Wind Energy by 2030
83
Figure 4-5. Vestas wind turbine control capability
4
SCADA participation, including the ability to limit plant output power at any given
time, control ramp rate in moving up or down, and carry spinning reserves as
ordered (Saylors 2006). These plants also have the ability to tap frequencyresponsive reserves. These control features come at a cost, however, which is that of
“spilling” wind, a free energy resource. In any given geographic area, the cost of
operating wind units in this manner so as to provide ancillary services would have to
be compared with the cost of furnishing such services by other means.
Wind plant control systems offer another mechanism for dealing with the variability
of the wind resource. Controllers can hold system voltage constant at a remote bus,
even under widely varying wind speed conditions. Figure 4-6 shows an example of
Figure 4-6. GE wind plant controls
84
20% Wind Energy by 2030
the voltage control features on a GE wind plant built recently in Colorado. In this
system, voltage can be controlled across a broad range of wind conditions and power
plant output. Voltage disturbances at the point of interconnection (POI) on the
remote bus trigger offsetting changes in the wind plant voltage, controlling
variations in the bus voltage.
Modern wind plants can be added to a power grid without degrading system
performance. In fact, they can contribute to improvements in system performance. A
severe test of the reliability of a system is its ability to recover from a three-phase
fault at a critical point in the system. (For definitions of faults, see the Glossary in
Appendix E.) System stability studies have shown that modern wind plants—
equipped with power electronic controls and dynamic voltage support capabilities—
can improve system performance by supporting postfault voltage recovery and
damping power swings.
4
This performance is illustrated in Figure 4-7, which simulates a normally cleared
three-phase fault on a critical 345 kV bus in the Marcy substation in central New
York state (Piwko et al. 2005). The simulation assumed a 10% wind penetration
(3,300 MW on a 33,000 MW system) of wind turbines with doubly fed induction
Figure 4-7. Impact of wind generation on system dynamic performance
20% Wind Energy by 2030
85
generators. It incorporated power electronics that allowed for independent control of
real and reactive power. The top half of the figure shows the quicker recovery and
increased damping in the system voltage transient at the Marcy 345 kV bus. The
bottom half of the figure similarly shows that the flow on the east interface has less
overshoot and is more highly damped with wind. And because the power electronics
capabilities of these wind turbines remain connected to the grid and respond to grid
conditions with or without real power generation, they manage voltage on the grid
even when the turbine is not generating power.
Utility planners use models to understand and represent the capabilities and
performance of generators and transmission system assets. Detailed wind plant
models that incorporate today’s sophisticated wind turbine and plant control features
are being used to study future system configurations, as well as to improve the
power system performance of conventional technology. Wind turbine manufacturers
and developers are giving a high priority to the development of improved models in
response to the leadership of utility organizations such as the Western Electricity
Coordinating Council (WECC). The models are critical tools that enable planners to
understand wind plant capabilities and accurately determine the impact of wind
plants on power system behavior.
4
Improved performance features are likely to be incorporated into wind models as the
utility interface and control characteristics of wind turbines and wind plants continue
to evolve. Variable-speed designs with power electronic controls are improving real
and reactive power control within wind turbines under both transient and steadystate conditions.
4.1.4
WIND FORECASTING ENHANCES SYSTEM OPERATION
System operators can significantly reduce the uncertainty of wind output by using
wind forecasts that incorporate meteorological data to predict wind production. Such
systems yield both hour-ahead and day-ahead forecasts to support real-time
operations. They also inform the scheduling and market decisions necessary for dayahead planning.
Forecasting allows operators to anticipate wind generation levels and adjust the
remainder of generation units accordingly. Piwko and colleagues (2005) found that a
perfect wind forecast reduced annual variable production costs by $125 million. And
a state-of-the-art forecast delivered 80% of the benefit of a perfect forecast.
Improved short-term wind production forecasts let operators make better day-ahead
market operation and unit-commitment decisions, help real-time operations in the
hour ahead, and warn operators about severe weather events. Advanced forecasting
systems can also help warn the system operator if extreme wind events are likely so
that the operator can implement a defensive system posture if needed. The operating
impact with the largest cost is found in the unit-commitment time frame. The
seamless integration of wind plant output forecasting—into both power market
operations and utility control room operations—is a critical next step in
accommodating large penetrations of wind energy in power systems.
4.1.5
FLEXIBLE, DISPATCHABLE GENERATORS FACILITATE WIND
INTEGRATION
Studies and actual operating experience indicate that it is easier to integrate wind
energy into a power system where other generators are available to provide
86
20% Wind Energy by 2030
balancing energy and precise load-following capabilities. In 2005, Energinet.dk
published the preliminary results of a study of the impact of meeting 100% of
western Denmark’s annual electrical energy requirement from wind energy
(Pedersen 2005). The study showed that the system could absorb about 30% energy
from wind without any excess (wasted) wind production, assuming no transmission
ties to outside power systems. Surplus wind energy starts to grow substantially after
the wind share reaches 50%. And if wind generates 100% of the total energy
demand of 26 terawatt-hours (TWh), 8 TWh of the wind generation would be
surplus because it would be produced during times that do not match customer
energy-use patterns. Other energy sources, such as thermal plants, would supply the
deficit, including the balancing energy. In the Pedersen study, the cost of electricity
doubled when wind production reached 100% of the load. The study made very
conservative assumptions, however, of no external ties or market opportunities for
the excess wind energy.
4.1.6
4
INTEGRATING AN ENERGY RESOURCE IN A CAPACITY WORLD
Wind energy has characteristics that differ from those of conventional energy
sources. Wind is an energy resource, not a capacity resource. Capacity resources are
those that can be available on demand, particularly to meet system peak loads.
Because only a fraction of total wind capacity has a high probability of running
consistently, wind generators have limited capacity value. Traditional planning
methods, however, focus on reliability and capacity planning. Incorporating wind
energy into power system planning and operation, then, will require new ways of
thinking about energy resources.
Traditional system planning techniques use tools that are oriented toward ensuring
adequate capacity. Most transmission systems, however, can make room for
additional energy resources if they allow some flexibility for interconnection and
operation. This flexibility includes choice of interconnection voltage, operation as a
price-taker in a spot market, and limited curtailment. Economic planning tools and
probabilistic analytical methods must also be used to ensure that a bulk power
system has adequate generation and transmission capacity while optimizing its use
of energy resources such as wind and hydropower.
Many hydropower generators produce low-cost variable energy. Unlike wind
energy, most hydropower energy can be scheduled and delivered at peak times, so it
contributes greater capacity value to the system. But because the reality of droughts
Effective Load Carrying Capability (ELCC)
The ELCC is the amount of additional load that can be served at the target reliability level with the
addition of a given amount of generation (wind in this case). For example, if the addition of 100 MW
of wind could meet an increase of 20 MW of system load at the target reliability level, it would have
an ELCC of 20 MW, or a capacity value of 20% of its nameplate value.
Consider the following example: There are 1,000 MW of wind capacity in a concentrated geographic
area, with an ELCC of 200 MW or a capacity value of 20%. The peak load of the system is 5,000
MW. On the peak-load day of the year, there is a dead calm over the area, and the output of the wind
plant is 0. The lost capacity is 200 MW (20% of 1,000 MW). If this system were planned with a
nominal 15% reserve margin, it would have a planning reserve of 750 MW that would well exceed
the reserves needed to replace the loss of the wind capacity at system peak load.
20% Wind Energy by 2030
87
causes hydropower capacity to vary from year to year, the capacity value of this
energy resource (effective load-carrying capacity [ELCC]) must be calculated using
industry-standard reliability models. The capacity value is used for system planning
purposes on an annual basis, not on a daily operating basis. Some combination of
existing market mechanisms and utility unit-commitment processes must be used to
plan capacity for day-to-day reliability.
Planning techniques for a conventional power system focus on the reliable capacity
offered by the units that make up the generation system. This is essential for meeting
the system planning reliability criterion, such as the loss of load probability (LOLP)
of 1 day in 10 years. The ELCC of a generation unit is the metric used to determine
its contribution to system reliability. It is important to recognize that wind does offer
some additional planning reserves to the system, which can be calculated with a
standard reliability model. The ELCC of wind generation, which can vary
significantly, depends primarily on the timing of the wind energy delivery relative to
times of high system risk. The capacity value of wind has been shown to range from
approximately 5% to 40% of the wind plant rated capacity, as shown in Table 4-2. In
some cases, simplified methods are used to approximate the rigorous reliability
analysis.
4
Table 4-2. Methods to estimate wind capacity value in the United States
Region/Utility
Method
CA/CEC
PJM
ELCC
Peak Period
ERCOT
MN/DOC/Xcel
GE/NYSERDA
CO PUC/Xcel
10%
ELCC
ELCC
ELCC
RMATS
PacifiCorp
MAPP
PGE
Idaho Power
PSE and Avista
SPP
Rule of thumb
ELCC
Peak Period
Peak Period
Peak Period
Peak Period
Note
Rank bid evaluations for RPS (20%-25%)
Jun-Aug HE 3 -7 p.m., capacity factor using 3-year rolling average (20%, fold
in actual data when available)
May change to capacity factor for the hours between 4 -6 p.m. in July (2.8%)
Sequential Monte Carlo (26%-34%)
Offshore/land-based (40%/10%)
PUC decision (10%), Full ELCC study using 10-year data gave average
value of 12.5%
20% for all sites in RMATS
Sequential Monte Carlo (20%). New Z-method 2006
Monthly 4-hour window, median
33% (method not stated)
4 p.m. -8 p.m. capacity factor during July (5%)
The lesser of 20% or 2/3 of January Capacity Factor
Top 10% loads/month; 85th percentile
Reliability planning entails determining how much generation capacity of what type
is needed to meet specified goals. Because wind is not a capacity resource, it does
not require 100% backup to ensure replacement capacity when the wind is not
blowing. Although 12,000 MW of wind capacity have been installed in the United
States, little or no backup capacity for wind energy has been added to date. Capacity
in the form of combustion turbines or combined cycle units has been added to meet
system reliability requirements for serving load. It is not appropriate to think in
terms of “backing up” the wind because the wind capacity was installed to generate,
low-emissions energy, but not to meet load growth requirements. Wind power
cannot replace the need for many “capacity resources,” which are generators and
dispatchable load that are available to be used when needed to meet peak load. If
wind has some capacity value for reliability planning purposes, that should be
viewed as a bonus, but not a necessity. Wind is used when it is available, and system
reliability planning is then conducted with knowledge of the ELCC of the wind
88
20% Wind Energy by 2030
plant. Nevertheless, in some areas of the nation where access to generation and
markets that span wide regions has not developed, the wind integration process
could be more challenging. (For more information on capacity terminology, see the
Glossary in Appendix E.)
Plant capacity factors illustrate the roles that different power technologies play in a
bulk power system. The capacity factor (CF) of a unit measures its actual energy
production relative to its potential production at full utilization over a given time
period. Table 4-3 shows the capacity factors of different power plant types within
the Midwest ISO for a year. The units with the highest capacity factors—nuclear
(75% CF) and coal (62% and 71% CF)—are the workhorses of the system because
they produce relatively low-cost baseload energy and are fully dispatchable. Wind
(30% CF) and hydro (27% CF) generate essentially free energy, so the wind is taken
whenever it is available (subject to transmission availability) and the hydro is
scheduled to deliver maximum value to the system (to the extent possible). The
plants with the lowest capacity factors (combined cycle, combustion turbines, and
oil- and gas-fired steam boilers) are operated as peaking and load-following plants
and essential capacity resources. As illustrated in Table 4-3, many resources in the
system operate at far less than their rated capacity for much of the year, but all are
necessary components of an economic and reliable system.
4
Table 4-3. Midwest ISO plant capacity factor by fuel type (June 2005–May 2006)
Fuel Type
Combined Cycle
Number of Max Capacity
(MW)
Units
Possible
Energy
(MWh)
Actual
Energy
(MWh)
Capacity
Factor
(%)
50
12,130
106,257,048
11,436,775
11
Gas Combustion Turbine
(CT)
Oil CT
275
21,224
185,924,868
14,749,450
8
187
7,488
65,595,756
2,292,288
3
Hydro
113
2,412
21,129,120
5,696,734
27
17
11,895
104,200,200
77,764,757
75
230
25,432
222,786,948
137,771,172
62
113
51,155
448,116,048
320,014,108
71
Gas ST
20
1,673
14,651,976
1,256,756
9
Oil ST
12
1,790
15,676,896
560,910
4
Other ST
10
345
3,021,324
1,722,434
57
Wind
28
1,103
9,658,776
2,882,459
30
Total
1055
136,646
1,197,018,960
576,147,844
Nuclear
Coal Steam Turbine
(ST; <300 MW)
Coal ST Coal (≥300 MW)
4.1.7
AGGREGATION REDUCES VARIABILITY
The greater the number of wind turbines operating in a given area, the less their
aggregate production variability. This is shown in Table 4-4, which gives an analysis
of wind production variability as a function of an increasing number of aggregated
wind turbines in a large wind plant in the Midwest (Wan 2005). Table 4-4 shows the
average and standard deviation of step changes in wind plant output for different
numbers of turbines over different time periods. These results indicate that wind
production changes very little over short time periods. As the time period increases
from seconds to minutes to hours, the output variability increases because it is
driven by changes in weather patterns. In addition, as a general trend, the more wind
20% Wind Energy by 2030
89
Table 4-4. Wind generation variability as a function of the
number of generators and time interval
14 Turbines
(%)
61 Turbines
(%)
138 Turbines
(%)
250+Turbines
(%)
Average
0.4
0.2
0.1
0.1
Std. Dev.
0.5
0.3
0.2
0.1
Average
1.2
0.8
0.5
0.3
Std. Dev.
2.1
1.3
0.8
0.6
Average
3.1
2.1
2.2
1.5
Std. Dev.
5.2
3.5
3.7
2.7
Average
7.0
4.7
6.4
5.3
Std. Dev.
10.7
7.5
9.7
7.9
1-Second Interval
1-Minute Interval
4
10-Minute Interval
1-Hour Interval
Note: This table compares output at the start and end of the indicated time period in terms of the percentage of total
generation from each turbine group. Std. Dev. is the abbreviation for standard deviation.
turbines that are operating in a given period, the lower the production variability
during that period. Simply put, system operators in the United States have found that
as more wind generating capacity is installed, the combined output becomes less
variable.
A careful evaluation of integrating wind into current operations should include a
determination of the magnitude and frequency of occurrence of changes in the net
load on the system during the time frames of interest (seconds, minutes, and hours).
This analysis, which should be conducted both before and after the wind generation
is added, will help determine the additional requirements on the balance of the
generation mix.
Similarly, as more wind turbines are installed across larger geographic areas, the
aggregated wind generation becomes more predictable and less variable. The
benefits of geographical diversity can be seen in Figure 4-8, which shows the change
in wind plant hourly capacity factor over one year for four different levels of wind
plant aggregation. This figure shows the operational capacity factor of wind turbines
aggregated over successively larger areas—first over southwest Minnesota, then
across southwest and southeast Minnesota, then across the entire state, and finally
across both Minnesota and central North Dakota. There is a decrease in the number
of occurrences of very high and very low hourly capacity factors in the tails of the
distribution as the degree of aggregation increases. A considerable benefit is also
realized across a broad mid-range of capacity factors from 20% to 80% (EnerNex
2006).
4.1.8
GEOGRAPHIC DISPERSION REDUCES OPERATIONAL IMPACTS
Actual wind production data and sophisticated mesoscale weather modeling
techniques have shown that a sudden and simultaneous loss of all wind power on a
system is not a credible event. This scenario would be prevented by spatial
variations of wind from turbine to turbine in a wind plant, and to a greater degree,
from plant to plant. Because of the higher capacities of existing thermal plants and
90
20% Wind Energy by 2030
Figure 4-8. Annual hourly capacity factor
4
transmission lines, the loss of a wind plant will seldom be the single largest first
contingency event for planning purposes. Severe weather events can lead to the loss
of wind plant output as individual turbines trip off-line and/or restart as a storm front
passes through. This kind of event happens on the time scale of tens of minutes to
hours, however, rather than seconds.
4.1.9
LARGE BALANCING AREAS REDUCE IMPACTS
To maintain the stable operation of the electric system, the system must
instantaneously balance the amount of generation supplied and the load. If the
generation and load are not in balance, the system could potentially suffer a loss of
either, or lose stability and collapse. The system-balancing function is performed by
authorities who operate a portion of the system called a “balancing area.” (For more
information on balancing areas, see the Glossary in Appendix E.) Today there are
about 130 balancing areas in the U.S. grid. The largest balancing area is the PJM
grid, which is part of the Eastern Interconnection, with a peak load of 145,000 MW.
A small balancing area, in contrast, might be a small utility with a peak load of a few
hundred MW. Balancing areas are an outgrowth of the evolution of power systems.
In some areas, the current patchwork nature of the grid resulted when a number of
small, isolated systems were combined into a single balancing area such as PJM.
Systems became interconnected for a number of reasons, mostly having to do with
reliability and economics. Consider this example: If three adjacent systems, each
with a peak load of 3,000 MW, had a single largest contingency (loss of a line or
generator) of 300 MW, each would carry 300 MW of reserves. If the three systems
were interconnected, and the single largest contingency was still 300 MW, each
system would need only 100 MW of reserves to cover contingency reserve
requirements. In this example, and as another advantage, the peak load of the
combined system would be less than 9,000 MW because of diversity in the load of
the three systems. Finally, operators can call on the most efficient and lowest-cost
producers available across the combined system and shift production away from
more-expensive units. This approach ensures that the generation mix used to meet
the aggregated system’s changing load is always relatively more efficient. Overall,
the three interconnected systems are able to operate more efficiently at a reduced
operating cost.
20% Wind Energy by 2030
91
Wind units operate in a parallel situation across multiple balancing areas. As
indicated previously, geographically dispersed wind units produce electricity more
consistently and predictably. Similarly, when a system is operating across a larger
area, more wind generators are available to offset customer demands, making the
resulting load net of wind less variable and more predictable.
The Energy Policy Act (EPAct) of 2005 created an Electricity Reliability
Organization (ERO), overseen by FERC, to enforce mandatory reliability standards,
with fines for rule violations. The resulting reliability standards, implemented by
NERC, include the following:
4
z
Operator training
z
Balancing authority performance criteria
z
Control room situational awareness capability
z
Control center hardware and software capability
These reliability requirements are likely to increase pressure on small balancing
areas to consolidate. In addition to providing reliability benefits, consolidation of
balancing areas would offer economic advantages because it would reduce operating
costs and lower the cost of increased penetration of wind power. Virtual balancingarea consolidation can deliver the benefits of large-area aggregation without
physically merging balancing areas under a single operator. Virtual consolidation
can be accomplished through reserve sharing or pooling across a group of utilities,
sharing of area control error (ACE) data among several balancing areas, and
dynamic scheduling of wind plants from a smaller to a larger balancing area. All of
these methods can help deal with the challenges of high penetrations of wind power.
(For further explanation of ACE, see Appendix E.)
4.1.10 BALANCING MARKETS EASE WIND INTEGRATION
Experience has shown that the use of well-functioning hour-ahead and day-ahead
markets and the expansion of access to those markets are effective tools for dealing
with wind’s variability. A deep, liquid real-time market is the most economical
approach to providing the balancing energy required by wind plants with variable
outputs (IEA 2005). The absence of a wind production forecast introduces
significant costs into the day-ahead market. As a result, wind plant participation in
day-ahead markets is important for minimizing total system cost. Price-responsive
load markets and associated technologies are helpful components of a wellfunctioning electricity market, which allows the power system to better deal with
increased variability. In some regions of the United States that lack centralized
markets, access to balancing and related services is being pursued through
instruments such as bilateral contracts and reserve-sharing agreements.
The electricity market allows energy from all generators across the area to be
dispatched based on real-time prices. When wind blows strongly, the real-time price
falls, signaling more controllable generators to reduce their output and save costly
fuel. Conversely, when wind drops off, real-time prices rise and dispatchable
generators increase their output. As an example, the Midwest ISO covers a footprint
of 15 states, so there is a deep pool of generators that can ramp up and down in
response to wind output. The EnerNex (2006) study in Minnesota examined up to
25% energy penetration in the Midwest ISO market context (33% capacity
penetration). The integration costs were similar to the results of a study done two
92
20% Wind Energy by 2030
years earlier (Zavadil et al. 2004) for a 15% wind capacity penetration in a structure
without the regional Midwest ISO balancing market.
4.1.11 CHANGING LOAD PATTERNS CAN COMPLEMENT WIND
GENERATION
To date, the electric system has been planned and operated under the fundamental
assumption that the supply system must perfectly meet every customer’s energy use,
and that demand is relatively uncontrolled. But this assumption is starting to change
as policy makers work to create opportunities for customers to manage their energy
use in response to price signals. Wider use of price-responsive demand is expected
to boost the competitiveness of wholesale electricity markets, enhance grid
reliability, and improve the efficiency of resource use. Technology and regulatory
options that enable customer energy management are gaining momentum because of
increasing support from electricity regulators, regional transmission organizations
(RTOs), and retail electricity providers.
4
Several customer-driven energy trends could have a significant impact on wind
development. Much wind generation occurs in hours when energy use is low. Two
proposed off-peak electricity uses—the deployment of plug-in hybrid vehicles with
off-peak charging and the production of hydrogen to power vehicles—could absorb
much of this off-peak, low-cost wind generation. In addition, as more customers
gain the ability to practice automated price-responsive demand or to automatically
receive and respond to directions to increase or decrease their electricity use, system
loads will be able to respond to, or manage, variability from wind and other energy
sources.
4.2
FEASIBILITY AND COST OF THE NEW TRANSMISSION
INFRASTRUCTURE REQUIRED FOR THE 20% WIND
SCENARIO
If the considerable wind resources of the United States are to be utilized, a
significant amount of new transmission will be required. Transmission must be
recognized as a critical infrastructure element needed to enable regional delivery and
trade of energy resources, much like the interstate highway system supports the
nation’s transportation needs. Every era of new generation construction in the
United States has been accompanied by new transmission construction. Federal
hydropower developments of the 1930s, 1940s, and 1950s, for example, included the
installation of integral long-distance transmission owned by the federal government.
Construction and grid integration of large-scale nuclear and coal plants in the 1960s
and 1970s entailed installing companion high-voltage interstate transmission lines,
which were needed to deliver the new generation to loads. Even the natural gas
plants of the 1990s, although requiring less new electric transmission, relied on
expansion of the interstate gas transportation network. Significant expansion of the
transmission grid will be required under any future electric industry scenario.
Expanded transmission will increase reliability, reduce costly congestion and line
losses, and supply access to low-cost remote resources, including renewables.
Much of the current electric grid was built to deliver power from remote areas to
load centers. During the past two decades, however, investment in gas-fired
generation units located closer to load centers allowed the power system to grow
20% Wind Energy by 2030
93
without investment in major new transmission (Hirst and Kirby 2001). Transmission
investment lagged substantially behind that of previous decades because of
uncertainty about the outcome of electricity restructuring. The average level of
investment for the last half of the 1990s was under $3 billion per year, as illustrated
in Figure 4-9. This amount was down from investments of approximately $5.5
billion per year in the mid 1970s (adjusted for inflation). Although transmission
investment declined for two decades, it has been steadily climbing since the late
1990s .
Figure 4-9. Annual transmission investments from 1975 through 1999 and
projections through 2005
4
Transmission investment from investor-owned utilities and independent
transmission companies climbed from $3.0 billion per year in 2000 to $6.9 billion in
2006 (Eisenbrey 2007). Nearly $8 billion of investment is expected in 2007, with the
figure growing to $8.4 billion in 2009. The steady increase in new transmission
investment reflects not only a catch-up in local transmission, but new commitments
to backbone transmission systems for major new generation, intra- and inter-regional
trade, and increased reliability.
The 20% Wind Scenario would require continued transmission investment. Many
new transmission infrastructure studies, plans, and projects are already under way.
Current or recent activities include the following:
z
z
z
z
z
z
94
Planning by the Western Governors’ Association’s (WGA) Clean
and Diversified Energy Advisory Committee (CDEAC 2006)
The collaboration of Minnesota utilities in the Capital Expansion
Plan for 2020 (CapX 2020)
The creation of Competitive Renewable Energy Zones (CREZ) by
the state legislature in Texas (ERCOT 2006)
The creation of state transmission or infrastructure authorities in
Wyoming, Kansas, South Dakota, New Mexico, and Colorado
The proliferation of large interstate transmission projects in the
West (WIEB 2007)
The SPP “X Plan” and Extra High Voltage analysis (SPP)
20% Wind Energy by 2030
z
4.2.1
The Midwest ISO Transmission Expansion Plan 2006 (Midwest
ISO 2006).
A NEW TRANSMISSION SUPERHIGHWAY SYSTEM WOULD BE
REQUIRED
Wind energy development requires two types of transmission. Trunk-line
transmission runs from areas with high-quality wind resources and often carries a
high proportion of energy from wind and other renewable sources. Backbone highvoltage transmission runs across long distances to deliver energy from production
areas to load centers. These superhighways mix power from many generating areas,
sources, and shippers—just as a highway carries all types of vehicles traveling a
range of distances.
4
To determine how much transmission would be needed for the 20% Wind Scenario,
the National Renewable Energy Laboratory’s (NREL) Wind Deployment System
(WinDS) model was used (see Appendices A and B). The approach, described in
Appendices A and B, used the WinDS model to determine distances from the point
of production to the point of consumption, as well as the cost-effectiveness of
building wind plants close to load or in remote locations and paying the transmission
cost. To account for the cost of transmission that would be required by coal and
other resources, the analysis added the typical cost of transmission needed to
interconnect those resources to the capital cost. This method, although providing
balance in the overall cost assessment, is only a first step. More work must be done
in regional transmission planning processes to evaluate the transmission required for
the desired portfolio of resources.
When determining whether it is more efficient to site wind projects close to load or
in higher quality wind resource areas that are remote from load and require
transmission, the WinDS optimization model finds that it is often more efficient to
site wind projects remotely. In fact, the model finds that it would be cost-effective to
build more than 12,000 miles of additional transmission, at a cost of approximately
$20 billion in net present value terms. Much of that transmission would be required
in later years after an initial period in which generation is able to use the limited
remaining capacity available on the existing transmission grid. The transmission
required for the 20% Wind Scenario can be seen in the red lines on the map in
Figure 4-10. The red lines represent general areas where new transmission capacity
would be needed. The existing transmission grid illustrated by green lines. As a
point of comparison, more than 200,000 miles of transmission lines are currently
operating at 230 kV and above.
This analytical approach is consistent with other recent or current studies and plans,
such as the following:
z
The CDEAC evaluated a “high renewables” case and found that it
would require an additional 3,578 line miles of transmission at a
total cost of $15.2 billion (CDEAC 2006). This transmission
investment would access 68.4 GW of renewable generation
(predominantly wind) and 84.6 GW of new fossil fuel generation.
Under the CDEAC analysis, if half of the transmission cost is
assigned to wind, the resulting cost would be approximately $120
per new kilowatt of wind developed. This represents about a 7%
increase in the capital cost of wind development (based on capital
costs for a wind energy facility of about $1,800/kW).
20% Wind Energy by 2030
95
Figure 4-10. Conceptual new transmission line scenario by WinDS region
4
z
z
z
96
The Midwest ISO compared the benefits and costs of bringing
8,640 MW of new wind energy online. Using a natural gas price of
$5 per million British thermal units (MMBtu; well below 2007
prices), the annual benefits of reduced natural gas costs from new
transmission and development of wind generation were between
$444 and $478 million (Midwest ISO 2003). The Midwest ISO
recently studied the costs of developing 16,000 MW of wind within
its system, along with 5,000 miles of new 765 kV transmission lines
to deliver the wind from the Dakotas to the New York City area.
Although the overall generation and transmission costs reached an
estimated investment of $13 billion, the project produced annual
savings of $600 million over its costs. These savings are in the form
of lower wholesale power costs and prices in the eastern part of the
Midwest ISO footprint—such as Ohio and Indiana—resulting from
greater access to lower-cost generation in western states such as
Iowa and the Dakotas.
AEP, a large utility and transmission owner/operator, produced a
conceptual transmission plan to integrate 20% electricity from wind.
The conceptual plan provides for 19,000 miles of new 765 kV
transmission line at a discounted or net present value cost of $26
billion. This estimate is close to the WinDS model estimate (AEP
2007).
ERCOT, the independent transmission operator for most of Texas,
evaluated 12 options to build transmission for additions of
1,000 MW to 4,600 MW of wind energy. ERCOT found that the
transmission addition would cost between $15 million and $1.5
billion, depending on the distance required. The transmission cost
averages $180/kW of wind energy, or about 10% of the $1,800/kW
20% Wind Energy by 2030
capital cost (ERCOT 2006). The benefits available from such
transmission are often reported in terms of annual savings to
consumers and the reduced cost of energy production. The graph in
Figure 4-11 illustrates the cumulative benefits in the Texas study,
for the weakest investment of the 12 analyzed by ERCOT. It should
be noted that wind transmission cost estimates remain highly
uncertain. For example, ERCOT recently updated their earlier study
and found that for additions of 5,150 MW to 18,000 MW of wind
energy, the transmission addition would cost between $2.95 billion
and $6.38 billion, or in the range of $350/kW to $570/kW (ERCOT
2008).
4
Figure 4-11. Cumulative savings versus total transmission cost for
renewable energy zone (worst case)
Source: ERCOT (2006)
z
In another study analyzing transmission costs, the CDEAC Wind
Task Force used NREL’s WinDS geographic information system
(GIS) database to create wind energy supply curves for many states
in the western United States. This analysis showed that the western
states can build 30 GW of wind capacity that can be delivered at a
price of $50/MWh (counting both generation and transmission
costs). Building additional transmission to reach more wind
resources and more loads would raise the marginal cost by 20% to
$60/MWh. More than 100 GW of new wind capacity could be
developed at that price, using 2005 equipment costs (CDEAC
2006).
Clearly, significant additional transmission capacity would be required to integrate
high levels of wind across the country. As the studies described here demonstrate,
however, meeting this challenge could be economically and technically feasible. In
20% Wind Energy by 2030
97
addition, sizable net reductions in the cost of delivering bulk electricity to load
centers could be achievable.
Developing any major new generation sources in remote or semiremote locations
will require new transmission to deliver the energy to loads. As long as load
continues to grow, investment in transmission will be needed as well. Most highvoltage transmission additions serve multiple generation resources, not just wind.
Once the marginal transmission cost for wind is balanced against its low energy cost
and environmental impacts, the net costs might turn out to be not much greater in the
portfolio context than the transmission costs of traditional fossil fuel resources.
An investment of approximately $60 billion (in undiscounted terms) in transmission
between now and 2030, as suggested by the NREL analysis, amounts to an
expenditure of approximately $3 billion per year over the next 22 years. Current
transmission investment level is nearly $8 billion per year and growing. Regardless
of wind’s role, most analysts believe that this figure will continue to increase as
utilities make up for decades of underinvestment in the grid. As long as electricity
demands grow, new transmission will be required to serve any new generation
developed, and incremental transmission costs will be unavoidable.
4
4.2.2
OVERCOMING BARRIERS TO TRANSMISSION INVESTMENT
Barriers to transmission investment include:
z
Transmission planning
z
Allocation of the costs of new transmission investments
z
Assurance of cost recovery
z
Siting of new transmission facilities
More details on each area are given in the following subsections.
Transmission Planning
Generation companies are currently reluctant to commit to a new generation project
unless it is clear that transmission will be available, but transmission developers are
equally reluctant to step forward until generator interconnection requests have been
filed (hence, transmission planning has its own “chicken or the egg” conundrum).
Most electric utilities planned generation and transmission in an integrated process
until the 1990s, when federal open access rules required the separation of
transmission and generation businesses. The effects of this separation on planning
can be reduced through open, transparent transmission planning processes, which
are now required by FERC’s recently enacted ruling, Order No. 890 (FERC 2007).
The 20% Wind Scenario would require a generic change in the way transmission
planning is done in many areas of the country. Numerous parties across a wide
geographic area would need to collaborate on developing a common plan, instead of
individual entities planning in isolation. This approach yields major economies of
scale in that all users would benefit by pooling solutions to their needs into a single
plan that would be more productive (in regional terms) than simply summing the
needs of individual organizations. FERC’s Order No. 890 is a large step toward this
regional joint planning approach, but success will depend on collaborative followthrough at the regional level.
98
20% Wind Energy by 2030
Cost Allocation
Transmission is often a “public good”─ meaning that its benefits are widely
dispersed and that some parties can enjoy these benefits without incurring direct
costs. In such situations, parties might have incentives to avoid paying their fair
share of the costs. Accordingly, public good status cannot be achieved unless some
government agency determines how the costs are to be allocated and is able to
enforce that allocation.
Under the Federal Power Act, FERC is responsible for
determining how transmission costs are to be
allocated. For regions with RTOs or ISOs, FERC has
typically reviewed generic cost-allocation plans
proposed by these organizations and approved the
plans with modifications. In areas without RTOs or
ISOs, prospective transmission developers propose
cost-allocation arrangements to FERC on a project-by­
project basis. FERC reviews the proposals; calls for
additional information if needed; and either approves
them, rejects them, or approves them with certain
conditions attached.
Cost Recovery
A new transmission facility, regardless of need or
merit, will not be built until the participating utilities
(and the financial community) have a very high degree
of certainty that the cost of the facility will be
recoverable in a predictable manner. FERC and state
regulatory approval of a cost-allocation plan and a rate
of return on the investment are essential.
Creating Renewable Energy
Models for New Transmission
4
A few states that have good wind resources
and RPS laws have decided to expand their
states’ transmission in advance of
generation to enable the modular
development of location-constrained, clean,
and diversified resource areas to meet state
goals. Texas, Minnesota, Colorado, and
California, for example, are leaders in
renewable energy development, and have
created renewable energy models for new
transmission. North Dakota, South Dakota,
Wyoming, Kansas, and New Mexico have
also established new authorities to spur
investment in additional transmission
infrastructure.
Transmission Siting
Local opposition to proposed transmission lines is often a major challenge to
transmission expansion. An AC transmission line typically benefits all users along
its path by increasing reliability, allowing for new generation and associated
economic development, and providing access to lower-cost resources. Local owners,
however, do not always value such benefits and frequently have other concerns that
must be addressed. Some transmission companies have been more effective than
others at obtaining local input, identifying and dealing with landowners’ concerns,
and selecting routes. Best practices in this area need to be identified and broadly
applied.
State agencies sometimes reject interstate transmission proposals if it appears that
they would not result in significant benefits for intrastate residents. This concern led
the U.S. Congress to include a provision in the 2005 EPAct that establishes a federal
“backstop” transmission siting authority, which can be invoked if the U.S.
Department of Energy (DOE) has designated the relevant geographic area as a
“national interest electric transmission corridor” (i.e., a “national corridor”), and an
affected state has withheld approval of a proposed transmission facility in the
national corridor for more than one year.
20% Wind Energy by 2030
99
4.2.3
MAKING A NATIONAL INVESTMENT IN TRANSMISSION
The 20% Wind Scenario would require widespread recognition that there is national
interest in ensuring adequate transmission. Expanding the country’s transmission
infrastructure would support the reliability of the power system; enable open, fair,
and competitive wholesale power markets; and grant owners and operators access to
low-cost resources. Although built to enable access to wind energy, the new
transmission infrastructure would also increase energy security, reduce GHG
emissions, and enhance price stability through fuel diversity.
4.3
4
U.S. POWER SYSTEM OPERATIONS AND MARKET
STRUCTURE EVOLUTION
The lessons summarized from research done to date illustrate a number of changes
that would facilitate reaching 20% wind energy penetration. Expanding from
approximately 12 GW at the time of this writing to over 300 GW will require most
or all of these changes. This section summarizes the operational and market features
that would support the 20% Wind Scenario. These features are also important to the
long-term sustainability of the electric industry.
4.3.1
EXPANDING MARKET FLEXIBILITY
The 20% Wind Scenario would be aided by the development of or access to energy
spot markets where participants who have an excess or shortfall of power could
trade at competitive prices that reflect the marginal cost of balancing load. Such
markets were recently implemented in the 15-state Midwest ISO region, the midAtlantic PJM region, New York, New England, and the Southwest Power Pool
(SPP), showing the feasibility of such reforms. It is certainly possible that other
regions could pursue such reforms by 2030.
Broad geographical markets and inter-area trading would allow the benefits of
geographic dispersion and aggregation of wind plant output to be realized. These
benefits have been shown to reduce the variability of wind plant output on a large
scale, which makes a market-based approach and trading system all the more
worthwhile. The challenge is that energy spot markets have been subject to
opposition as market prices have risen because of higher fuel costs.
4.3.2
ENHANCING WIND FORECASTING AND SYSTEM FLEXIBILITY
The 20% Wind Scenario would require highly trained power system operators,
equipped with state-of–the-art wind resource forecasting tools that would be fully
integrated with power system operations. Forecasting is spreading rapidly and
improving significantly, particularly in terms of its adoption and integration within
power system operations. Some power system dispatchers, however, still need to be
trained to operate systems with high wind penetration and to use forecasting and
operations tools that predict and respond to wind plant output fluctuations.
To achieve balance in a power system using wind energy, the 20% Wind Scenario
would require the use of the existing fleet of flexible, dispatchable, mainly gas-fired
generators designed for frequent and rapid ramping. There would need to be enough
dispatchable units to balance the system as fluctuations occur in wind plant output
and load.
100
20% Wind Energy by 2030
Transmission services vary across regions in the United States. Regions with RTOs
have “financial transmission rights” that are more flexible than capacity reservations
and allow for payment based on usage. In addition, under FERC Order 890 (FERC
2007), all regions are now required to develop “conditional firm” services, which
would allow for resources such as wind to be better integrated into the grid.
The 20% Wind Scenario would require end users to be able (via price signals and
technology) to respond to system needs by shifting or curtailing consumption. Timeshifting of demand would help reduce today’s large difference between peak and
off-peak loads and encourage more flexible loads (such as plug-in hybrid cars,
hydrogen production, and smart appliances) that take energy from the grid during
low-load periods. These practices would smooth electricity demand and open a
larger market for off-peak wind energy.
4
The 20% Wind Scenario would require a smarter, more flexible, and more robust
high-voltage transmission grid than the one in place today. Greater reliance on
flexible AC transmission system (FACTS) devices and wide-area monitoring and
control systems would be necessary. Increased flexibility would accommodate
variations in technology choices, resource mixes, market rules, and regional
characteristics. Greater robustness would help ensure future reliability. Information
technologies for distributed intelligence, sensors, smart systems, controls, and
distributed energy resources would need to be standardized and integrated with
market and customer operations.
4.4
REFERENCES AND OTHER SUGGESTED READING
Ackermann, T. 2005. Wind Power in Power Systems. Chichester, UK: Wiley Europe
Ltd.
AEP (American Electric Power). 2007. Interstate Transmission Vision for Wind
Integration.
http://www.aep.com/about/i765project/docs/windtransmissionvisionwhitepa
per.pdf
Bouillon, H., P. Fösel, J. Neubarth, and W. Winter. 2004. Wind Report 2004.
Bayreuth, Germany: E.ON Netz. http://www.wind­
watch.org/documents/wp-content/uploads/EonWindReport2004.pdf
CapX 2020. CapX 2020 Web site. http://www.capx2020.com/.
Cardinal, M., and N. Miller. 2006. “Grid Friendly Wind Plant Controls:
WindCONTROL – Field Test Results.” Presented at WindPower 2006, June
4–7, Pittsburgh, PA.
CDEAC (Clean and Diversified Energy Advisory Committee). 2006. Combined
Heat and Power White Paper. Denver, CO: CDEAC.
http://www.westgov.org/wga/initiatives/cdeac/CHP-full.pdf
CEC (California Energy Commission). 2007. Intermittency Analysis Project: Final
Report. California Energy Commission, July 2007.
http://www.energy.ca.gov/pier/final_project_reports/CEC-500-2007­
081.html
20% Wind Energy by 2030
101
Deutsche Energie-Agentur GmbH (dena). 2005. Energy Management Planning for
the Integration of Wind Energy into the Grid in Germany, Onshore and
Offshore by 2020. Cologne, Germany: Deutsche Energie-Agentur GmbH.
http://www.uwig.org/Dena-2005_English.pdf
Eisenbrey, C. 2007. EEI Energy Data Alert, Strong Upward Trend in T&D
Investment Continued in 2006. Washington, DC: Edison Electric Institute
(EEI).
EnerNex Corporation. 2006. Final Report: 2006 Minnesota Wind Integration Study.
Volumes I and II. Knoxville, TN: EnerNex.
http://www.puc.state.mn.us/docs/#electric
ERCOT (Energy Reliability Council of Texas). 2006. Analysis of Transmission
Alternatives for Competitive Renewable Energy Zones in Texas. Austin:
ERCOT.
http://www.ercot.com/news/presentations/2006/ATTCH_A_CREZ_Analysi
s_Report.pdf
4
ERCOT (Energy Reliability Council of Texas). 2008. ERCOT’s Competitive
Renewable Energy Zone Transmission Optimization Study. Austin:
ERCOT. http://www.ercot.com/news/press_releases/2008/nr04-02-08.html
Eriksen, P., A. Orths, and V. Akhmatov. 2006. “Integrating Dispersed Generation
into the Danish Power System – Present Situation and Future Prospects.”
Presented at the IEEE Power Engineering Society (PES) Meeting, June 20,
Montreal.
Erlich, I., W. Winter, and A. Dittrich. 2006. Advanced Grid Requirements for the
Integration of Wind Turbines into the German Transmission System. Invited
panel paper No. 060428. Montreal: IEEE. http://www.uni­
duisburg.de/FB9/EAUN/downloads/papers/paper_030706-02.pdf
EWEA (European Wind Energy Association). 2007. Wind Power Installed in
Europe by End of 2006 (Cumulative).
http://www.ewea.org/fileadmin/ewea_documents/documents/
publications/statistics/070129_Wind_map_2006.pdf
FERC (Federal Energy Regulatory Commission). 2007. Order No. 890 Final Rule:
Preventing Undue Discrimination and Preference in Transmission Service.
Washington, DC: FERC. http://www.ferc.gov/industries/electric/indus­
act/oatt-reform/order-890/fact-sheet.pdf
Gross, R., P. Heptonstall, D. Anderson, T. Green, M. Leach, and J. Skea. 2006.
The Costs and Impacts of Intermittency: An Assessment of the Evidence
on the Costs and Impacts of Intermittent Generation on the British
Electricity Network. ISBN 1 90314 404 3. London, UK: Energy Research
Centre.
http://www.ukerc.ac.uk/ImportedResources/PDF/06/0604_Intermittency_re
port_final.pdf
Hirst, E., and B. Kirby. 2001. Transmission Planning for a Restructuring U.S.
Electric Industry. Washington, DC: EEI.
http://www.eei.org/industry_issues/energy_infrastructure/transmission/trans
mission_hirst.pdf
102
20% Wind Energy by 2030
Holttinen, H. 2004. The Impact of Large Scale Wind Power Production on the
Nordic Electricity System. ISBN 951-38-6426-X. Espoo, Finland: VTT
Technical Research Centre of Finland.
http://www.vtt.fi/inf/pdf/publications/2004/P554.pdf
IEA (International Energy Agency). 2005. Variability of Wind Power and Other
Renewables: Management Options and Strategies. Paris: IEA.
http://www.iea.org/Textbase/Papers/2005/variability.pdf
IEEE. 2005. IEEE Power and Energy Magazine Special Issue: Working with Wind;
Integrating Wind into the Power System, November–December, (3:6).
Milligan, M. and K. Porter. 2006. “Capacity Value of Wind in the United States:
Methods and Implementation,” Electricity Journal, 19(2): 91–99.
4
Milligan, M., B. Parsons, J.C. Smith, E. DeMeo, B. Oakleaf, K. Wolf, M. Schuerger,
R. Zavadil, M. Ahlstrom, and D. Nakafuji. 2006. Grid Impacts of Wind
Variability: Recent Assessments from a Variety of Utilities in the United
States. Report No. NREL/CP-500-39955. Golden, CO: National Renewable
Energy Laboratory (NREL). http://www.uwig.org/Ewec06gridpaper.pdf.
Midwest ISO (Independent Transmission System Operator). 2006. Midwest ISO
Transmission Expansion Plan 2006. http://www.midwestmarket.org
Midwest ISO. 2003. Midwest ISO Transmission Expansion Plan 2003.
http://www.midwestmarket.org
National Grid. 2006. Transmission and Wind Energy: Capturing the Prevailing
Winds for the Benefit of Customers. Westborough, MA: National Grid.
http://www.nationalgridus.com/transmission/c3-3_documents.asp.
Northwest Power and Conservation Council. 2007. Northwest Wind Integration
Action Plan. Portland, OR: Northwest Power and Conservation Council,
Northwest Wind Integration Action Plan Steering Committee.
http://www.nwcouncil.org/energy/Wind/library/2007-1.htm
Pedersen, J. 2005. System and Market Changes in a Scenario of Increased Wind
Power Production. Report No. 238389. Fredericia, Denmark: Energinet.dk.
Pfirrmann, K. 2005. PJM Testimony Promoting Regional Transmission Planning
and Expansion to Facilitate Fuel Diversity Including Expanded Use of
Coal-Fired Resources. FERC Docket No. AD05-3-000. Washington, DC:
PJM Interconnection, L.L.C.
http://conserveland.org/pp/Transmission/testimony_mtneer.pdf
Piwko, R., B. Xinggang, K. Clark, G. Jordan, N. Miller, and J. Zimberlin. 2005. The
Effects of Integrating Wind Power on Transmission System Planning,
Reliability, and Operations. Schenectady, NY: Prepared for The New York
State Energy Research and Development Authority (NYSERDA) by Power
Systems Energy Consulting, General Electric International, Inc.
http://www.nyserda.com/publications/wind_integration_report.pdf
Saylors, S. 2006. “Wind Park Solutions to Meet Expectations of Grid System
Planners and Operators.” Presented at WindPower 2006, June 4–7,
Pittsburgh, PA.
SPP (Southwest Power Pool). Southwest Power Pool Web site. http://www.spp.org/.
20% Wind Energy by 2030
103
The Blue Ribbon Panel on Cost Allocation. 2007. A National Perspective on
Allocating the Costs of New Transmission Investment: Practice and
Principles. A white paper prepared for WIRES (Working Group for
Investment in Reliable and Economic Electric Systems).
http://www.wiresgroup.com/resources/industry_reports/1Blue%20Ribbon%
20Panel%20-%20Final%20Report.pdf
UWIG (Utility Wind Integration Group). 2006. Utility Wind Integration State of the
Art. Reston, VA: UWIG.
http://www.uwig.org/UWIGWindIntegration052006.pdf.
Van Hulle, F. 2005. Large Scale Integration of Wind Energy in the European Power
Supply: Analysis, Issues, and Recommendations. Brussels, Belgium: EWEA.
http://www.ewea.org/fileadmin/ewea_documents/documents/publications/gr
id/051215_Grid_report.pdf.
4
Wan, Y. 2005. Primer on Wind Power for Utility Applications. Report No. TP-500­
36230.Golden, CO: NREL.
http://nrelpubs.nrel.gov/Webtop/ws/nich/www/public/SearchForm
WIEB (Western Interstate Energy Board). 2007. Western Transmission Expansion.
Denver, CO: WIEB.
http://www.westgov.org/wieb/electric/Transmission%20Expansion/index.ht
m
Zavadil, R., J. King., L. Xiadon, M. Ahlstrom, B. Lee, D. Moon, C. Finley, et al.
2004. Wind Integration Study – Final Report. Prepared for Xcel Energy and
the Minnesota Department of Commerce. Knoxville, TN: EnerNex and
WindLogics.
104
20% Wind Energy by 2030
Chapter 5.
Wind Power Siting
and Environmental
Effects
The 20% Wind Scenario offers substantial positive
environmental impacts in today’s carbonconstrained world. Wind plant siting and approval
processes can accommodate increased rates of
installation while addressing environmental risks
and concerns of local stakeholders.
5.1
5
WIND ENERGY TODAY
Wind energy is one of the cleanest and most environmentally neutral energy sources
in the world today. Compared to conventional fossil fuel energy sources, wind
energy generation does not degrade the quality of our air and water and can make
important contributions to reducing climate-change effects and meeting national
energy security goals. In addition, it avoids environmental effects from the mining,
drilling, and hazardous waste storage associated with using fossil fuels. Wind energy
offers many ecosystem benefits, especially as compared to other forms of electricity
production. Wind energy production can also, however, negatively affect wildlife
habitat and individual species, and measures to mitigate prospective impacts may be
required. As with all responsible industrial development, wind power facilities need
to adhere to high standards for environmental protection.
Wind energy generally enjoys broad public support, but siting wind plants can raise
concerns in local communities. Successful project developers typically work closely
with communities to address these concerns and avoid or reduce risks to the extent
possible. Not all issues can be fully resolved, and not every prospective site is
appropriate for development, but engaging with local leaders and the public is
imperative. Various agencies and stakeholders must also be involved in reviewing
and approving projects. If demand increases and annual installations of wind energy
approach 10 gigawatts (GW) and more, the wind energy industry and various
government agencies would need to scale up their permitting and review
capabilities.
To date, hundreds of wind projects have been successfully permitted and sited.
Although the wind energy industry must continue to address significant
environmental and siting challenges, there is growing market acceptance of wind
energy. If challenges are resolved and institutions are adaptive, a 20% Wind
Scenario in the United States could be feasible by 2030. As noted by the
Intergovernmental Panel on Climate Change (IPCC), under certain conditions,
20% Wind Energy by 2030
105
renewable energy could contribute 30% to 35% of the world’s electricity supply by
2030 (IPCC 2007).
This chapter reviews environmental concerns associated with siting wind power
facilities, public perceptions about the industry, regulatory frameworks, and
potential approaches to addressing remaining challenges.
5.1.1
SITE-SPECIFIC AND CUMULATIVE CONCERNS
About 10% to 25% of proposed wind energy projects are not built—or are
significantly delayed—because of environmental concerns. Although public support
for wind energy is generally strong, this attitude does not always translate into early
support for local projects. Site-specific concerns often create tension surrounding
new energy facilities of any kind. Although most wind energy installations around
the United States pose only minor risks to the local ecology or communities, some
uncertainties remain. Further research and knowledge development will enable some
of these uncertainties to be mitigated and make risks more manageable.
5
Local stakeholders generally want to know how wind turbines might affect their
view of their surroundings and their property values. In addition, they might be
concerned about the impact on birds and other wildlife. Weighing these risks and
benefits raises questions about the best management approaches and strategies.
Wind energy developments usually require permits or approvals from various
authorities, such as a county board of supervisors, a public service commission, or
another political body (described in more detail in Section 5.5). These entities
request information from a project developer—usually in the form of environmental
impact studies before construction—to understand potential costs and benefits. The
results of these studies guide jurisdictional decisions. A single lead agency might
consider the entire life-cycle effects of a wind energy project. This is in contrast to
fossil fuel and nuclear projects, in which the life-cycle impacts (e.g., acid rain and
nuclear wastes) would be widely dispersed geographically. No single agency
considers all impacts.
For many government agency officials, the central issue is whether wind energy
projects pose risks to the resources or environments they are required to protect.
Officials want to know the net cumulative environmental impact (i.e., emissions
reductions versus wildlife impacts) of using 20% wind power in the United States,
whether positive or negative. Uncertainty can arise from inadequate data, modeling
limitations, incomplete scientific understanding of basic processes, and changing
societal or management contexts. Complex societal decisions about risk typically
involve some level of uncertainty, however, and very few developers make decisions
with complete information (Stern and Fineberg 1996). Because a great deal of
experience exists to inform decision making in such circumstances, residual
uncertainties about environmental risks need not unduly hinder wind energy project
development.
The wind industry may encounter difficulties entering a competitive energy
marketplace if it is subject to requirements that competing energy technologies do
not face. Risks associated with wind power facilities are relatively low because few
of the significant upstream and downstream life-cycle effects that typically
characterize other energy generation technologies are realized. Moreover, the
potential risks are not commensurate when comparing wind energy and other
sources (such as nuclear and fossil fuels), and comparative impact analyses are not
106
20% Wind Energy by 2030
readily available. These analyses would need to examine the broader context of the
potential adverse effects of wind power on human health and safety (minimal),
ecology, visibility, and aesthetics in relation to the alternatives.
The acceptability of risks will vary among communities and sites, so it is important
to understand these differences and build broad public engagement. Developing
effective approaches to gaining the public’s acceptance of risks is a necessary first
step toward siting wind energy facilities.
5.2
ENVIRONMENTAL BENEFITS
5.2.1
GLOBAL CLIMATE CHANGE AND CARBON REDUCTIONS
Publicity related to wind power developments often focuses on wind power’s impact
on birds, especially their collisions with turbines. Although this is a valid
environmental concern that needs to be addressed, the larger effects of global
climate change also pose significant and growing threats to birds and other wildlife
species. The IPCC recently concluded that global climate change
caused by human activity is likely to seriously affect terrestrial
Compared with the current U.S.
biological systems, as well as many other natural systems (IPCC
average utility fuel mix, a single
2007). A 2004 study in Nature forecast that a mid-range
1.5 MW wind turbine displaces
estimate of climate warming could cause 19% to 45% of global
2,700 tons of CO2 per year, or the
species to become extinct. Even with minimal temperature
equivalent
of planting 4 square
increases and climate changes, the study forecast that extinction
kilometers of forest every year
of species would be in the 11% to 34% range (Thomas et al.
(AWEA 2007).
2004). The future for birds in a world of global climate change is
particularly bleak. A recent article found that 950 to 1,800
terrestrial bird species are imperiled by climate changes and
habitat loss. According to the study, species in higher latitudes will experience more
effects of climate change, while birds in the tropics will decline from continued
deforestation, which exacerbates global climate change and land conversion (Jetz,
Wilcove, and Dobson 2007). Wind energy, which holds significant promise for
reducing these impacts, can be widely deployed across the United States and around
the world to begin reducing greenhouse gas emissions (GHGs) now. Although the
effects of wind energy development on wildlife should not be minimized, they must
be viewed in the larger context of the broader threats posed by climate change.
5
A primary benefit of using wind-generated electricity is that it can play an important
role in reducing the levels of carbon dioxide (CO2) emitted into the atmosphere.
Wind-generated electricity is produced without emitting CO2, the GHG that is the
major cause of global climate change.
Today, CO2 emissions in the United States approach 6 billion metric tons annually,
39% of which are produced when electricity is generated from fossil fuels (see
Figure 5-1; EIA 2006). If the United States obtained 20% of its electricity from wind
energy, the country could avoid putting 825 million metric tons of CO2 annually into
the atmosphere by 2030, or a cumulative total of 7,600 million metric tons by 2030
(see assumptions outlined in Appendices A and B).
A relatively straightforward metric used to understand the carbon benefits of wind
energy is that a single 1.5 MW wind turbine displaces 2,700 metric tons of CO2 per
year compared with the current U.S. average utility fuel mix, or the equivalent of
planting 4 square kilometers of forest every year (AWEA 2007).
20% Wind Energy by 2030
107
Figure 5-1. Electricity production is responsible for 39% of
CO2 emissions in the United States
Source: EIA (2006)
The fuel displaced by wind-generated electricity depends on the local grid and the
type of generation supply. In most places, natural gas is the primary fuel displaced.
Wind energy can displace coal on electric grids with large amounts of coal-fired
generation. In the future, wind energy is likely to offset more coal by reducing the
need to build new coal plants. Regardless of the actual fuel supplanted, more
electricity generated from wind turbines means that other nonrenewable, fossilbased fuels are not being consumed. In New York, for example, a study prepared for
the independent system operator (ISO) found that if wind energy provided 10% of
the state’s peak electricity demand, 65% of the energy displaced would be from
natural gas, followed by coal at 15%, oil at 10%, and electricity imported from out
of state at 10% (Piwko et al. 2005).
5
In addition, manufacturing wind turbines and building wind plants together generate
only minimal amounts of CO2 emissions. One university study that examined the
issue (White and Kulsinski 1998) found that when these emissions are analyzed on a
life-cycle basis, wind energy’s CO2 emissions are extremely low—about 1% of those
from coal, or 2% of those from natural gas, per unit of electricity generated. In other
words, using wind instead of coal reduces CO2 emissions by 99%; using wind
instead of gas reduces CO2 emissions by 98%.
5.2.2
IMPROVING HUMAN HEALTH THROUGH REDUCED AIR
EMISSIONS
Switching to a zero-emissions energy-generation technology like wind power
contributes to cleaner and healthier air. Moreover, wind power generation is not a
direct source of regulated pollutants such as nitrogen oxides, sulfur dioxide, and
mercury.
Coal-fired power plants are the largest industrial source of mercury emissions in the
United States (NESCAUM 2003). The U.S. Environmental Protection Agency
(EPA) (EPA 2007) and the American Medical Association (AMA) note that fetal
exposure to methylmercury has been linked to problems with neurological
development in children (AMA Council on Scientific Affairs 2004).
Furthermore, according the American Lung Association (ALA), almost half of all
Americans live in counties where unhealthy levels of smog place them at risk for
decreased lung function, respiratory infection, lung inflammation, and aggravation
108
20% Wind Energy by 2030
of respiratory illness. And more than 76.5 million Americans are exposed to
unhealthful short-term levels of particle pollution, which has been shown to increase
heart attacks, strokes, emergency room visits for asthma and cardiovascular disease,
and the risk of death. Some 58.3 million Americans suffer from chronic exposure to
particle pollution. Even when levels are low, exposure to these particles can also
increase the risk of hospitalization for asthma, damage to the lungs, and the risk of
premature death (ALA 2005).
5.2.3
SAVING WATER
The nation’s growing communities place greater demands on water supplies and
wastewater services, and more electricity is needed to power the expanding water
services infrastructure. Future population growth in the United States will heighten
competition for water resources. Especially in arid regions, communities are
increasingly facing challenges with shortages of water and electric power, resources
that are interlinked.
5
Water is a critical resource for thermoelectric power plants, which use vast
quantities. These plants were responsible for 48% of all total water withdrawals in
2000, or about 738 billion liters per day (Hutson et al. 2005). Much of the water
withdrawn from streams, lakes, or other sources is returned, but about 9%—totaling
about 68 billion liters per day—is consumed in the process. Although regulation will
require the majority of new generation plants to use recirculating, closed-loop
cooling technologies, which will lessen water withdrawals, this evolution will
actually lead to an overall increase in water consumption (DOE 2006).
Even some renewable technologies place a demand on water resources. For
example, most ethanol plants have demonstrated a reduction in water use over the
past years, but are still in the range of 13.25 to 22.7 liters of water consumed per
3.79 liters of ethanol produced (IATP 2006).
In contrast, wind energy does not require the level of water resources consumed by
many other kinds of power generation. As a result, it may
offer communities in water-stressed areas the option of
Wind energy has the potential to
economically meeting growing energy needs without
conserve billions of liters of water in the
increasing demands on valuable water resources. Wind energy
interior West, which faces declining
can also provide targeted energy production to serve critical
water reservoirs.
local water system needs such as irrigation and municipal
systems.
In a nongovernmental organization report entitled The Last Straw: Water Use by
Power Plants in the Arid West, Baum and colleagues (2003) called attention to water
quality and supply issues associated with fossil-fuel power plants in the interior
West. Faced with water shortages, the eight states in this region are seeing water for
power production compete with other uses, such as irrigation, hydropower, and
municipal water supplies. Based on this analysis, the authors estimate that
significant savings from wind energy are possible, as illustrated in Table 5-1.
As the United States seeks to lessen the use of foreign oil for fuel, water use and
consumption is high among other energy production methods. Most ethanol plants
have demonstrated a reduction in water use in recent years, but are still in the range
of 13.25 to 22.7 liters of water consumed per 3.79 liters of ethanol produced (IATP
2006). An issue brief, prepared by the World Resources Institute, stated that coal-to­
20% Wind Energy by 2030
109
Table 5-1. Estimated water savings from
wind energy in the interior West (Baum et al. 2003)
Wind
Energy (MW)
Water Savings
(billion gallons
withdrawn)
Water Savings
(billion gallons
consumed)
1,200
3.15
1.89
3,000
7.88
4.73
4,000
10.51
6.31
Adapted from The Wind/Water Nexus: Wind Powering America
(DOE 2006)
liquid fuel production is a water-intensive process, requiring about 10 gallons of
water use for every gallon of coal-to-liquid product (Logan and Venezia 2007).
5
Global climate change is also expected to impact water supplies. Mountains in the
western United States will have less snowpack, more winter flooding, and reduced
flows in the summer, all of which worsen the already fierce competition for
diminished water resources (IPCC 2007). Because of increasing demand for water
and decreasing supplies, some tough decisions will be needed about how this
valuable resource should be allocated—especially for the West and Great Plains.
Although wind energy cannot solve this dilemma, an increased reliance on wind
energy would alleviate some of the increased demand in the electricity sector,
thereby reducing water withdrawals for the other energy sources.
5.3
POTENTIAL ENVIRONMENTAL IMPACTS
5.3.1
HABITAT DISTURBANCE AND LAND USE
Fuel extraction and energy generation affect habitat and land use, regardless of the
type of fuel. Traditional electricity generation requires mining for coal or uranium
and drilling for natural gas, all of which can destroy habitat for many species and
cause irreversible ecological damage. With the global and national infrastructure
required to move fuel to generating stations—and the sites needed to store and treat
the resulting waste—processing fossil fuel and nuclear energy is also a highly landintensive endeavor.
Coal mining is estimated to disturb more than 400,000 hectares 11 of land every year
for electricity generation in the United States, and it destroys rapidly disappearing
wildlife habitat. In the next 10 years, more than 153,000 hectares of high-quality
mature deciduous forest are projected to be lost to coal mining in West Virginia,
Tennessee, Kentucky, and Virginia, according to the National Wildlife Federation
(Price and Glick 2002).
Wind development also requires large areas of land, but the land is used very
differently. The 20% Wind Scenario (305 GW) estimates that in the United States,
about 50,000 square kilometers (km2) would be required for land-based projects and
more than 11,000 km2 would be needed for offshore projects. However, the footprint
of land that will actually be disturbed for wind development projects under the 20%
Wind Scenario ranges from 2% to 5% of the total amount (representing land needed
11
110
One hectare = 2.47 acres
20% Wind Energy by 2030
for the turbines and related infrastructure). Thus the amount of land to be disturbed
by wind development under the 20% Wind Scenario is only 1,000 to 2,500 km2
(100,000 to 250,000 hectares)—an amount of dedicated land that is slightly smaller
than Rhode Island. For scale comparisons, available data for existing coal mining
activities indicate that about 1,700,000 hectares of land is permitted or covered and
about 425,000 hectares of land are disturbed (DOI 2004). An important factor to
note is that wind energy projects use the same land area each year; coal and uranium
must be mined from successive areas, with the total disturbed area increasing each
year. In agricultural areas, land used for wind generation projects has the potential to
be compatible with some land uses because only a few hectares are taken out of
production, and no mining or drilling is needed to extract the fuel.
Although wind energy may be able to coexist with land uses such as farming,
ranching, and forestry, wind energy development might not be compatible with land
uses such as housing developments, airport approaches, some radar installations, and
low-level military flight training routes. Wind turbines are tall structures that require
an otherwise undisturbed airspace around them. The need for relatively large areas
of undisturbed airspace can also directly or indirectly affect wildlife habitat.
5
In a presentation to the National Wind Collaborative Committee, wildlife biologists
describe direct construction impacts that include building wind turbines, service
roads, and other infrastructure (such as substations). Estimates of temporary
construction impacts range from 0.2 to 1.0 hectare per turbine; estimates of
permanent habitat spatial displacement range from 0.3 to 0.4 hectare per turbine
(Strickland and Johnson 2006). Indirect impacts can include trees being removed
around turbines, edges in a forest being detrimental to some species, and the
presence of turbines causing some species or individuals to avoid previously viable
habitats. For example, a grassland songbird study on Buffalo Ridge in Minnesota
found species displacement of 180 meters (m) to 250 m from the wind turbines
(Strickland and Johnson 2006).
Indirect habitat impacts on grassland species are a particular concern, especially
because extensive wind energy development could take place in grassy regions of
the country. Peer-reviewed research has concluded, however, that one species, the
Lesser Prairie Chicken, actively avoids electricity infrastructure such as transmission
lines and frequent vehicle activity by as much as 0.4 km, and fossil fuel power plants
by more than 1 km (Robel et al. 2004). Displacements of already declining local
populations are likely, but the magnitude of these effects is uncertain because data
specific to wind energy are not yet available. The extent of unknowns surrounding
this issue led the National Wind Collaborative Committee (NWCC) Wildlife
Workgroup to form the Grassland/Shrub-Steppe Species Collaborative (GS3C), a
four-year research program to study the effects of wind turbines on grassland birds
(NWCC 2006). Like the Bat and Wind Energy Cooperative (BWEC) discussed later,
the GS3C provides a vehicle for public and private funding and for third-party peerreviewed studies. Issues regarding the conservation of sensitive habitats will need to
be addressed over time. Strategic planning and siting to conserve and improve
potentially high-value habitat can be constructive and beneficial for both wind
energy and wildlife.
5.3.2
WILDLIFE RISKS
Wildlife—and birds in particular–are threatened by numerous human activities,
including effects from climate change. Relative to other human causes of avian
mortality, wind energy’s impacts are quite small. Figure 5-2 puts the wind industry’s
20% Wind Energy by 2030
111
Figure 5-2. Anthropogenic causes of bird mortality
(per 10,000 avian deaths)
5
Source: Erickson et al. (2002)
impacts into context and illustrates that many human (and some feline) activities
pose risks to birds.
As Figure 5-2 shows, anthropogenic causes of bird fatalities range from 100 million
to 1 billion annually. Currently, it is estimated that for every 10,000 birds killed by
all human activity, less than one death is caused by wind turbines. In fact, a recent
National Research Council (NRC 2007) study concluded that current wind energy
generation is responsible for 0.003% of human-caused avian mortality. Even with
20% wind energy, turbines are not expected to be responsible for a significant
percentage of avian mortality as long as proper precautions are taken in siting and
design.
Further comparative analyses are needed to better understand the trade-offs with
other energy sources. Avian mortality is also caused, for example, by oil spills, oil
platforms built on bird migration routes along the Gulf Coast, acid rain, and
mountaintop mining. Wind energy will likely continue to be responsible for a
comparatively small fraction of total avian mortality risks, although individual sites
can present more-localized risks. Some data relative to specific sites are offered in
the list that follows:
z
112
The first large-scale commercial wind resource area developed in
the world was Altamont Pass in California’s Bay Area in the 1980s.
The Altamont Pass development has seen high levels of bird kills,
specifically raptors. Although this facility has been problematic, it
remains an anomaly relative to other wind energy projects. In
January 2007, a number of the parties involved agreed to take steps
20% Wind Energy by 2030
to reduce raptor fatalities and upgrade the project area with newer
technology.
z
An NWCC fact sheet (2004) reviewed the mortality figures from 12
comparable postconstruction monitoring studies and found that the
fatality rate averaged 2.3 bird deaths per turbine per year and 3.1
birds per megawatt per year of capacity in the United States (outside
California). Fatality rates have ranged from a low of 0.63 per
turbine and 1 per megawatt at an agricultural site in Oregon to 10
per turbine and 15 per megawatt at a fragmented mountain forest
site in Tennessee (NWCC 2004). This information, which is shown
in Table 5-2, will be updated in 2008 to incorporate newly available
data.
Table 5-2. Estimated avian fatalities
per megawatt per year
Wind Project and Location
Total Fatalities
Stateline, OR/WA
2.92
Vansycle, OR
0.95
Combine Hills, OR
2.56
Klondike, OR
0.95
Nine Canyon, WA
2.76
Foote Creek Rim, WY (Phase 1)
2.50
Foote Creek Rim, WY (Phase 2)
1.99
Wisconsin
1.97
Buffalo Ridge, MN (Phase 1)
3.27
Buffalo Ridge, MN (Phase 2)
3.03
Buffalo Ridge, MN (Phase 3)
5.93
Top of Iowa
1.44
Buffalo Mountain, TN
Mountaineer, WV
5
11.67
2.69
Source: Data adapted from Strickland and Johnson (2006)
z
Before 2003, bat kills at wind farms studied were also generally
low. The frequency of bat deaths in 2003 at a newly constructed
wind farm in West Virginia, though, led researchers to estimate that
1,700 to 2,900 bats had been killed, and that additional bats had
probably died a few weeks before and after the six-week research
period (Arnett et al. 2005). According to a USGS biologist, bat
mortality has also been higher than expected at a number of sites in
the United States and Canada (Cryan 2006).
Wildlife collisions with wind turbines are a significant concern, particularly if they
affect species populations. To date, no site or cumulative impacts on bird or bat
populations have been documented in the United States or Europe. But that does not
mean that impacts are nonexistent. This is a particular worry with bats because they
are relatively long-lived mammals with low reproduction rates, according to a peer­
20% Wind Energy by 2030
113
reviewed study (Arnett et al. 2005). BWEC is currently conducting the necessary
research to understand the risks to bats.
Concerns about uncertain risks to birds and bats can lead permitting agencies and
developers to conduct lengthy and costly studies that may or may not answer the
wildlife impact questions raised. More research is necessary to more clearly
understand the link between preconstruction surveys and postconstruction
monitoring results. Well-designed research programs can, however, be costly for
many projects and require care in assessing the appropriate levels of analysis.
Addressing these uncertainties through additional, focused research would be
necessary if the United States is to increase wind development. Although many
factors influence decisions to build wind projects, wildlife and environmental
concerns can cause site exclusion because of the following:
5
z
Concerns about potential wildlife impacts
z
Costly study requirements
z
Future risk mitigation requirements
z
Conflicts with other resources
The long term viability of the wind industry will be helped by acknowledging and
addressing the challenges raised by these uncertain risks. Collaborative efforts such
as BWEC and GS3C offer constructive models for this undertaking.
5.3.3
MANAGING ENVIRONMENTAL RISK AND ADAPTIVE MANAGEMENT
PRINCIPLES
Dealing with uncertainties associated with siting wind power facilities is a challenge
for some institutions because it requires a management structure with high levels of
social trust and credibility. As a result, various stakeholders are investigating how
adaptive management principles might be applied to assess and manage wildlife and
habitat risks at wind power sites. Under these models, developers and operators of
the wind site, along with permitting agencies, could adjust the management of the
site and the level of required monitoring studies to the potential challenges that arise
over the life of the project.
Although the term is used often, “adaptive management” is not always well defined.
Here adaptive management refers to an evolutionary management approach that
purposely seeks to adapt management and decision-making processes to evolving
knowledge of the technology or environmental risks in question (Holling 1978;
Walters 1986; Lee 1993). “Social learning” is a centerpiece in this approach, with
management seeking to enhance its capability to learn from experience and from an
expanding body of knowledge. Management solutions are regarded more as
experiments than as definitive solutions to the challenges involved. Valuable
experience with this approach exists in such areas as watershed planning (Lee 1993;
NRC 2004), fisheries (Walters 1986), and forestry (Holling 1978).
An adaptive management approach contrasts with the more typical regulatory
approaches, which assume that sufficient knowledge exists at the outset to define
environmental risks and effects. The basic differences between two decision-making
approaches—a linear approach commonly called “command and control,” and the
adaptive management approach—are quite apparent in Figure 5-3. In the figure,
114
20% Wind Energy by 2030
Figure 5-3. Linear decision strategy (command and control) and interactive
model with adaptive management principles
5
Source: Morgan et al. (2007)
Model 1 assumes that sufficient research and assessment can be done before the
technology or management system is deployed, allowing an appropriate
management system and the needed regulatory requirements to be put in place at the
outset. Risk analysis plays a critical role in this process, with the assumption that
major risks can be identified and assessed and appropriate mitigation systems
instituted. In Model 2, the assumptions address different types of situations—the
risks are uncertain and unlikely to be resolved in the near future; the risks can only
be partially assessed at the outset; and surprises are likely as experience unfolds.
This model emphasizes the importance of flexible, rapid response to new knowledge
or events.
Accordingly, this risk management approach might well be suited for a technology
such as wind energy, where experience and knowledge are still growing and where
documented effects are strongly site-specific. Guiding principles and applications
for this approach are still evolving, but adaptive management seems particularly
well suited for situations of high uncertainties or conflict in the political process.
20% Wind Energy by 2030
115
5.4
PUBLIC PERCEPTION AND ENGAGEMENT
Because the environmental benefits of wind energy are significant, public support
for expanding wind energy development is widespread. The impacts of wind
projects, however, are predominately local and can concern some individuals in the
affected communities and landscapes. A primary challenge in achieving 20% of U.S.
electricity from wind is to maximize the overall benefits of this form of energy
without disrupting or alienating specific communities, especially prospective
communities that do not have experience with wind turbines.
5.4.1
5
PUBLIC ATTITUDES
Wind energy development receives considerable general support among the U.S.
population. Of those polled in a study conducted by Yale University in 2005, more
than 87% want expanded wind energy development (Global Strategy Group 2005).
Only a minority of the U.S. population appears to oppose wind energy, but that
opposition can strengthen when particular sites
are proposed. Some evidence indicates that, over
time,
opposition might decrease and support
Selected Public Opinion Surveys
might grow. Surveys commissioned in the United
Kingdom and Spain have found, for example, that
• In April 2002, RBA Research conducted a
local support for a wind project increased once it
study for the British Wind Energy Association
was installed and operating.
of people living near a small project in the
United Kingdom. It found that 74% of
Communities must be consulted about the global
participants supported the wind farm—37%
impacts of wind, and this must include addressing
strongly—and only 8% were opposed. Of
their concerns early on. Involving affected
those opposed to the project, about 25%
communities early is critical to identifying
remained opposed after the project was
concerns and addressing them proactively.
constructed. Sixty percent later supported the
Stakeholder concerns must be taken seriously, and
wind farm (RBA Research 2002).
a long-term commitment to understanding
• Although polls show broad statewide support
stakeholder interactions must be made.
for the Cape Wind offshore project in
Massachusetts, some opponents have been
very vocal. When asked, however, some
opponents say they might support the project if
it were part of a broader strategy to combat
global climate change. More information on
this topic can be found at
www.mms.gov/offshore/alternativeenergy.
5.4.2
VISUAL IMPACTS
Wind turbines can be highly visible because of
their height and locations (e.g., ridgelines and
open plains). Reactions to wind turbines are
subjective and varied. The best areas for siting
wind turbines tend to be those with lower
population densities. Although this can minimize
the number of people affected, less populated areas may also be prized for
tranquility, open space, and expansive vistas. Some people feel that turbines are
intrusive; others see them as elegant and interesting. In either case, the visual
impacts of wind energy projects may well be a factor in gauging site acceptability.
Discourse with communities about the expected impacts is important. Wind project
developers can conduct visual simulations from specific vantage points and produce
maps of theoretical visibility across an affected community (Pasqualetti 2005). With
this information, a developer can make technical adjustments to the project layout to
accommodate specific concerns, relocate wind turbines, reduce the tower height, or
even propose screening devices (such as trees) to minimize visual impact. All of
116
20% Wind Energy by 2030
these steps can, of course, affect the economic feasibility of a proposed project, so
they should be weighed carefully in siting and development decisions.
Because almost all commercial-scale wind turbines rise more than 60 m above the
ground, proposed wind projects must be reviewed by the Federal Aviation
Administration (FAA). In February 2007, the FAA updated an advisory circular
(FAA 2007) dealing with obstruction lighting and marking, including new uniform
recommendations for lighting wind energy projects. The new FAA suggestions are
designed to allow pilots flying too low to be warned of obstructions and minimize
intrusion to neighbors. The guidance recommends that wind energy projects should
be lit at night, but now the lights can be up to 0.8 km apart and be placed only
around the project perimeter, reducing the number of lights needed overall. The
guidelines recommend red lights, which are less annoying than white lights to
people nearby. No daytime lighting is necessary if the turbines and blades are
painted white or off-white.
5.4.3
SOUND
5
All machinery with moving parts make some sound, and wind turbines are no
exception, though advances in engineering and insulation ensure that modern
turbines are relatively quiet; concerns about sound are primarily associated with
older technology, such as the turbines of the 1980s, which were considerably louder.
The primary sound is aerodynamic noise from the blades moving through the air—
the “whoosh-whoosh” sound heard as the blades pass the tower. Less commonly
heard in modern turbines are the mechanical sounds from the generator, yaw drive,
and gearbox. When the wind picks up and the wind turbines begin to operate, the
sound from a turbine (when standing at or closer than 350 m) is 35 to 45 decibels
(dB; see Figure 5-4). This sound is equivalent to a running kitchen refrigerator.
Figure 5-4. Decibel levels of various situations
Source: BWEA (2007)
When proposing a wind energy project, wind developers can conduct studies to
predict sound levels in various places, including in nearby buildings or homes.
Turbines noise might be more obtrusive if, for example, they are located on a windy
ridge or if houses are located downwind in a sheltered valley. Changes can usually
20% Wind Energy by 2030
117
be made to a project if the sound levels at a particular location are deemed too high.
In general, standard setbacks from residences and other buildings appear to
reasonably ensure that sound levels from a wind project will be low and
nonintrusive.
5.4.4
LAND VALUE
The primary asset for many families is their home, so property values are a serious
concern. Residents can become particularly concerned about possible declines in
local property values when wind energy projects are proposed in their community.
To ascertain what effects they are likely to
experience, they may look to other communities
Wind Energy and Home Values
with existing wind facilities.
5
In 2003, the Renewable Energy Policy Project
(REPP) conducted a study of 24,000 home sales
surrounding 11 wind projects in the United
States. It compared the average selling price over
time of homes near the wind project with a
nearby control area that was at least 8 km from
the project. No clear evidence of adverse effects
on property values was found. In some
communities, home values near the facilities rose
faster than properties in the control group
(Sterzinger, Fredric, and Kostiuk 2003).
In April 2006 a Bard College study focused on a
20-turbine wind project in Madison County, New
York. Researchers visited each home, measured
the distance to the nearest turbine, and
ascertained to what degree the home could see
the wind facility. This study also concluded that
there was no evidence that the facility affected
home values in a measurable way, even when
concentrating on homes that sold near to the
facility or those with a prominent view of the
turbines (Hoen 2006).
5.5
Studies of the effects of wind projects on local
property values should be done with great care,
even though extensive studies have already been
conducted on other energy facilities, such as
nuclear plants. Because home values are a
composite of many factors, isolating the effects of
proximity to a wind project is important (though
only a part of the full picture). Wind projects also
tend to be located in areas of low residential
density, which further compounds the difficulties
of controlling the impact on property value. To
date, two studies (see “Wind Energy and Home
Values” sidebar) have examined these issues in
the United States. Though neither is definitive
and additional work in this area is needed, both
studies found little evidence to support the claim
that home values are negatively affected by the
presence of wind power generation facilities.
Individuals with turbines on their properties
might actually see an increase in their property
values because of the lease payments paid by the
wind project owner. Lease payments tend to be
$2,000 to $5,000 (US$2006) per turbine per year,
either through fixed payments or as a small share
of the revenue.
SITING/REGULATORY FRAMEWORK
Currently, wind energy projects are governed by a complex set of laws. Projects are
subject to the input of a diverse set of decision makers and different permitting
regulations apply in different parts of the country. Authorities at local, state, and
federal levels make siting decisions. These authorities have different responsibilities
relative to a project, and there can be inconsistencies among them and even within
the same agency. In some places, primary decisions rest with the local jurisdiction,
although federal and state requirements may still apply. A wide diversity of
requirements means that projects across the country must adhere to different
standards, and different information is often required before permits are issued.
Differing levels of public involvement also occur in these processes. A dramatic
118
20% Wind Energy by 2030
increase in development is likely to make this situation even more complex for
developers and decision makers alike. Increased uniformity of regulatory
requirements across regions would greatly facilitate the increased deployment of
wind projects necessary to reach the 20% Wind Scenario.
5.5.1
LOCAL
Locally-elected officials make siting decisions at the county level. This allows the
community to maintain control of local land use decisions, which is especially
attractive in states where local authority is highly prized. Responsibilities differ
among local bodies, but local commissions are often responsible for property
assessments, rural road maintenance, economic development, zoning, and water
quality (NACO 2003). Local commissions typically are concerned with protecting
the environment, enhancing tax revenue, and preserving the local quality of life.
In some cases, local authorities may feel ill-equipped to weigh the highly technical
information presented by a wind project developer. They can be easily influenced by
proponents or opponents armed with incomplete or inaccurate information. In
communities where wind development has a history, decision makers are more
comfortable rendering considered permit decisions.
5
Most wind energy projects go through the local conditional use permit process and
must spell out the conditions under which a project will operate. For example, a
project permit might limit the sound level or require a setback distance from roads,
houses, or property lines. Counties can also create ordinances to permit wind energy
facilities: In Pike County, Illinois, the County Board created a permitted use
ordinance that lays out standard conditions for wind projects; decision makers in
Klickitat County, Washington, designated specific areas to encourage and guide
wind energy development; and the local authorities in Kern County, California,
conducted a county-wide environmental impact review to enable development of the
Tehachapi Wind Resource Area.
5.5.2
STATE AND FEDERAL
States can control siting decisions either through specific decision-making bodies or
by virtue of rules set for projects on state-controlled land. In addition, a state
agency—such as a wildlife agency—might establish guidelines for siting wind
projects. State guidelines can require maintaining certain sound levels or conducting
environmental studies.
A few states have an energy siting board, which places the authority to review
energy facilities with the state utility commission (i.e., a public service commission).
The governor or legislature usually appoints representatives, and because they are
more accountable to the public, they tend to be generally more familiar with this
sector. The charge of these state commissions or boards often includes supplying
reliable electric service at reasonable prices. Concerned individuals or project
opponents have legal recourse to raise objections by formally challenging a
commission decision.
The federal government participates in regulating wind energy projects through
several different agencies, depending on the circumstances. Unless there is federal
involvement, such as when developers propose a project on federally-managed land
or there is a potential effect on areas of federal oversight, wind energy projects are
not usually subject to the National Environmental Policy Act (NEPA). An agency
20% Wind Energy by 2030
119
can trigger the provisions of NEPA by undertaking a major federal action, such as
allowing construction of a large energy project on or adjacent to federal lands
(NEPA 1969).
The federal agencies that follow have mandates that may be related to wind energy:
z
z
5
z
z
z
z
120
The Federal Aviation Administration (FAA) conducts
aeronautical studies on all structures taller than 60 m for potential
conflicts with navigable airspace and military radar, and ensures
proper marking and lighting. Developers are required to submit an
application for each individual turbine. From 2004 to 2006, the
FAA approved almost 18,000 wind turbine proposals, nearly half in
2006 alone, and issued only eight determinations of hazard (Swancy
2006).
The Bureau of Land Management (BLM) manages 105 million
hectares of public land, mostly in the western United States. In
2005, the BLM finalized a programmatic environmental impact
statement for wind energy development on BLM lands in the West.
This statement includes best management practices for wind energy
projects, sets standard requirements for projects, and allows for sitespecific studies. As an alternative, wind developers can rely on the
previous programmatic NEPA document and provide a development
plan without having to do a full environmental impact statement
(EIS) at each site, which can save valuable resources and time.
The U.S. Army Corps of Engineers (USACE) issues permits for
any development that will affect wetlands. Roads, project
infrastructure, and foundations at some wind project sites have the
potential to affect wetlands. Projects must also comply with the
Endangered Species Act if any threatened or endangered species
will be adversely affected.
The U.S. Fish & Wildlife Service (USFWS) can pursue
prosecution for violations of the Migratory Bird Treaty Act, which
prohibits the killing or harming of almost all migratory birds. Some
migratory birds, however, can be taken under a permit or license.
The USFWS also enforces the Bald and Golden Eagle Protection
Act, which gives additional protection to eagles. The USFWS
exercises prosecutorial discretion under these statutes. To date, no
wind energy companies have faced action under either law, but
flagrant violations without mitigation could be subject to
prosecution.
The Minerals Management Service (MMS) oversees permitting
for offshore ocean-based wind energy projects proposed for the
outer continental shelf (OCS). MMS is developing the rules and
issued a programmatic environmental impact statement for all
alternative energy development on the OCS. New regulations are
expected in 2008.
The U.S. Department of Agriculture Forest Service (USFS)
manages 78 million hectares of public land in national forests and
grasslands. Projects sited on any Forest Service lands are subject to
NEPA, and potentially to siting guidelines that the Forest Service is
currently developing.
20% Wind Energy by 2030
z
z
5.6
The U.S. Department of Defense (DOD) has no formal review
process for wind energy projects, although DOD does participate in
the FAA studies. Wind energy companies planning a project near an
Air Force base, however, generally work with base leadership to
address and avoid conflicts.
The U.S. Department of Energy (DOE) has taken the lead in
creating an interagency project siting team. The team reviews how
wind sites affect government assets such as radar installations, and
decides how to plan for and mitigate those impacts.
ADDRESSING ENVIRONMENTAL AND SITING
CHALLENGES
In order to install more than 10 GW of wind capacity per year by 2014, the United
States will need to have a consistent way to review and approve projects. Examples
below reflect what mature energy industries are doing to address concerns about
wildlife and energy facility siting issues. The approaches described outline steps that
could be adopted for a 20% Wind Scenario. The wind energy industry—in
partnership with the government and nongovernmental organizations (NGOs)—will
need to address environmental and siting issues.
5.6.1
5
EXPAND PUBLIC-PRIVATE PARTNERSHIPS
States, collaboratives, and the National Academy of Sciences (NAS) have identified
gaps in the knowledge base about wind energy and its risks. This situation is not
surprising for a relatively new energy technology. The knowledge gaps are framed
in questions such as:
z
How can large deployments of wind energy generation contribute to
national climate change goals and significantly reduce GHG
emissions?
z
Can bats be deterred from turbines?
z
How high do night-migrating songbirds fly over ridgelines?
Sometimes developers address these questions at specific sites, but broader research
is urgently needed on a few of the most significant questions.
Several research collaboratives have been formed (see sidebar entitled “Examples of
Existing Wind Energy Research Collaboratives”) to ensure that the interests of
various stakeholders are represented, that research questions are relevant, and that
research results are widely disseminated. Collaboratives can help to avoid relying on
industry-driven research, which critics often perceive as biased. Various
combinations of technical experts and informed representatives from industry,
relevant NGOs, and government agencies currently participate in ongoing
collaboratives on wind energy. For example, BWEC is exploring the effectiveness of
an acoustic deterrent device to warn bats away from the spinning blades of wind
turbines. Although the risk to bats might be greater at some sites than at others, it is
not necessarily feasible or appropriate for one company or one project to foot the
entire bill for this research. A public–private partnership is often a more effective
way to undertake and fund the research needed, and might also lead to more credible
results.
20% Wind Energy by 2030
121
Examples of Existing Wind Energy Research Collaboratives
Bats and Wind Energy Cooperative (BWEC)
After learning in 2003 that thousands of bats had been killed at a West Virginia site, the wind energy
industry collaborated with Bat Conservation International, the USFWS, and the National Renewable
Energy Laboratory (NREL) to form BWEC. This organization has developed a research program to
explore ways to reduce fatalities. Its work currently centers on two areas: (1) understanding and
quantifying what makes a site more risky for bats and (2) field-testing deterrent devices to warn bats
away from wind turbine blades.
National Wind Coordinating Collaborative (NWCC)
NWCC is a forum for defining, discussing, and addressing wind–avian interaction issues, with a
focus on public policy questions. Supported by funds from DOE, the NWCC Wildlife Workgroup
(WWG) serves as an advisory group for national research on wind–avian issues. The group released
a report, Studying Wind Energy/Bird Interactions: A Guidance Document, which is the first-ever
comprehensive guide to metrics and methods for determining and monitoring potential impacts on
birds at existing and proposed wind energy sites. Additionally, the WWG has facilitated six national
research meetings. It is subdivided into a number of groups focused on specific tasks, such as
development of a “mitigation toolbox.”
5
Grassland/Shrub-Steppe Species Collaborative (GS3C)
The GS3C is a voluntary cooperative to identify what impacts, if any, wind energy has on grassland
and shrub steppe avian species. Established in 2005 as the Grassland/Shrub Steppe Species
Subgroup, the GS3C includes representatives from state and federal agencies, academic institutions,
NGOs, and the wind industry.
As development levels ramp up, an overarching research consortium that would
combine the work of these collaboratives could focus on addressing potential risks
and ensuring that the most critical uncertainties are research priorities. As the more
focused groups come together in a region, they could examine some of the habitat
and biological sensitivity issues to understand which areas are most appropriate for
development. With the public–private nature of the consortium, the conversation
might shift from where development is inappropriate to where it is most promising.
These groups, or a larger institute, could also identify priority conservation areas and
work toward enhancing key habitat areas.
If the wind energy sector is to increase installations to more than 16 GW of capacity
per year after 2018, research consortia could be created to take part in sustainable
growth planning. A region, for example, might decide to open to development
because new transmission lines are planned. In this case, a collaborative research
body could determine what baseline wildlife and habitat studies are needed; organize
and fund researchers to begin the work; and determine what mitigation, habitat
conservation, or other activities might be appropriate for the area.
5.6.2
EXPAND OUTREACH AND EDUCATION
Public acceptance of wind projects may increase if the local community directly
shares in the benefits from a new wind energy development. In Europe, for example,
tax law allows individuals to invest directly in wind projects. Those individuals
122
20% Wind Energy by 2030
might well view their turbines as a source of income and feel more positive about
the siting of turbines nearby.
In the United States, examples of direct community impacts include:
z
z
z
Community wind: Groups of individuals join together to develop
and own a project. Although this can be risky because of the
significant complexity and capital required to successfully build a
wind project, the rewards are significant. A town or municipality
sometimes purchases a turbine to generate power and lower public
electricity bills. These groups might develop a smaller project in
conjunction with a commercial development to leverage the
economies of scale available for turbine purchases, construction,
and operations and maintenance.
Property tax payments: Wind projects are multimillion-dollar
facilities that can make a significant contribution to a community’s
tax base. Projects are usually on leased private property, with the
project owner paying any related property taxes.
5
Payment in lieu of taxes: In places where property taxes are not
required, project owners often contribute to a local community fund
in lieu of taxes.
In other energy facility siting programs, communities might protect property values.
Desired facilities are also sometimes collocated in the community as a form of
incentive. Many such options exist and any combination might be part of a siting
strategy. Wind energy developers can engage residents in a prospective host
community to explain potential impacts, share information about the project, and
learn about community concerns. This early involvement gives citizens an
opportunity to ask questions and have their concerns addressed.
5.6.3
COORDINATE LAND-USE PLANNING
Successfully addressing numerous inconsistencies in permitting and regulation will
require government and industry stakeholders to review the policies and procedures
currently being implemented across multiple jurisdictions. In the long term, it may
be necessary to create a sustainable growth planning effort as new areas of
development open. A number of NGOs already have ecoregional plans that may
yield a solid baseline of biological data. In 2006, states also completed wildlife
action plans that identify high-priority actions needed to preserve and enhance their
wildlife resources.
Numerous states and federal agencies have developed, or are in the process of
developing, siting guidelines for wind power developments. Some states have
created siting guidelines in conjunction with implementation of their state renewable
portfolio standards (RPS). Other collaborative efforts to develop guidelines are
moving forward through wildlife or energy agencies. Development of siting
guidelines gives developers and agency officials a clear pathway to what may be
required in certain jurisdictions, although time and cost considerations are involved.
20% Wind Energy by 2030
123
5.7
PROSPECTS FOR OFFSHORE WIND ENERGY
PROJECTS IN THE UNITED STATES AND INSIGHTS
FROM EUROPE
Europe’s experience with offshore wind energy projects is instructive for how the
United States might address environmental and siting challenges. European
developments are supported by ambitious national goals for wind deployment,
financial instruments and subsidies, and commitments to reduce GHGs. Direct
comparisons and lessons learned would be instructive but need to be applied with
appropriate cautions about different public policies.
5
Offshore Wind Plant Siting and
Seabed Rights in the United States
Various U.S. government agencies are
responsible for evaluating and approving the
siting, installation, and operation of wind
power plants in the ocean. Until recently,
offshore siting was notably more complex
than land-based siting because of unclear and
overlapping legal and jurisdictional
authorities.
Before the passage of the Energy Policy Act
(EPAct) of 2005, the USACE assumed
permitting authority over proposed offshore
wind energy developments. With EPAct
2005, Congress delegated authority to grant
easements, leases, or rights-of-way in coastal
waters to the MMS under the DOI.
Uncertainty about the extent of potential
impacts of offshore wind projects—in
addition to the lack of well-designed siting
strategies— and the lack of long-term
scientific information to fully evaluate the
technology can contribute to delays in
deployment (Musial and Ram, 2007).
A growing awareness of the large potential for
electricity contributions from offshore wind energy
has led to numerous proposals for siting offshore
wind plants in European seas. Currently, 26 projects
are installed in the North and the Baltic Seas in eight
nations with a combined capacity of more than 1200
MW. A major scientific effort is in progress to
support these projects. More than 280 research
studies and assessments are examining
environmental and human effects from installed
offshore wind installations (SenterNovem 2005).
Studies have also been conducted on birds, marine
ecology, and animal physiology (Gerdes et al. 2005).
Others have addressed the planning, construction,
operations, maintenance, and decommissioning of
turbines.
By contrast, the United States does not yet have any
commercial-scale offshore wind power sites, and
proposals for developing them are still limited.
Preliminary environmental analyses relating to
offshore installations are restricted to NEPA-related
requirements for specific projects in federal waters.
(Table 5-3 lists proposed projects and the
documentation relating to the permitting and NEPA
process.)
The state of knowledge and assessment of risks
surrounding offshore wind energy are still emerging,
which is characteristic of the early stages of any
energy technology. To date, Denmark has conducted the most extensive before­
after-control-impact study in the world. The most recent environmental monitoring
program from this study, spanning more than five years, concluded that none of the
potential ecological risks appear to have long-term or large-scale impacts (DEA
2006). Denmark intends to do further research, however, to assess the effects over
time of multiple projects within the same region.
124
20% Wind Energy by 2030
Table 5-3. Status of offshore wind energy applications in state and federal waters
Type of
Initiativea
Developer
Project
Location
Project
Cape Wind
Associates
Nantucket
Sound
Project
Long Island
Power
Authority and
Florida Power
& Light
Long Island
Sound
Project
Wind Energy
Systems
Technologies
Project
Bluewater
Wind LLC
November 2001
Status as of
June 2007
Received permit approval for
the met tower in 2002; USACE
issued a draft EIS in November
2004; MMS issued a notice of
intent (NOI) to prepare a new
EIS in May 2006.
Massachusetts issued a final
environmental impact report
(FEIR); draft environmental
impact statement (DEIS) in
progress by MMS.
5
Joint application submitted to
USACE April 2005; MMS
issued an NOI to prepare an
EIS in June 2006; project
cancelled in October 2007.
July 2005
Galveston,
TX
50–60
N/A
(Texas state
waters)
Signed lease with Texas
General Land Office in 2005.
Meteorological tower installed
to begin collecting data in 2007.
Delaware
70
TBD
Won competition May 22, 2007,
with Delmarva Power & Light
4
N/A
(Massachusetts
state waters)
Collecting data. Received
funding from Massachusetts
Technology Collaborative to
support permitting and siting
analyses.
90–120
N/A
(Massachusetts
state waters)
Applied for state approval with
Massachusetts Environmental
Affairs, May 2006. Conducting
feasibility studies.
No current
plans
Two-year collaborative study
with Georgia Institute of
Technology (Georgia Tech)
concluded that conditions are
favorable but current cost and
regulatory situation precludes
development.
Hull
Municipal
Boston
Harbor
Announced
Patriot
Renewables
LLC
Buzzards
Bay, MA
Southern
Company
130
Federal
Application
Filed
40
Project
Announced
Number
of
Turbines
Proposed
Off the coast
of Savannah,
GA
3–5
a
In this table, a “Project” is a planned commercial development or demonstration where complete state or federal applications
have been submitted to appropriate permitting agencies. “Announced” refers to proposals at the feasibility study and data
collection stage, with no commercial plans as yet and no permit applications completed.
To date, members of the European wind industry and other stakeholders have largely
mitigated risks related to wind energy or decided that the local siting risks are less of
a concern than other factors, such as air emissions and the larger global risks of
climate change. Precautionary principles apply during the adoption of facility siting
and design, as well as risk management principles. Because risks are highly sitespecific, well-planned siting strategies are critical to future offshore wind
20% Wind Energy by 2030
125
developments. Successful strategies in Europe have recognized the need to engage
local populations in siting decisions and development planning. This builds
community support for wind facilities by addressing local and site-specific concerns,
including:
z
Fish and benthic communities
z
Undersea sound and marine mammals
z
Electromagnetic fields and fish behaviors
z
Human intrusion on seascape environments
z
Competing commercial and recreational uses of the ocean
z
Other socioeconomic effects, including tourism and property values.
As the United States establishes a regulatory process and siting strategies for
offshore wind projects, much can be learned from Europe’s decades of experience
with offshore wind. If the United States supports a major increase of offshore wind
deployments over the next two decades, it will need to develop an ambitious and
well-managed environmental research and siting program and lay the groundwork
for collaborative approaches that engage the public and interested stakeholders.
5
5.8
FINDINGS AND CONCLUSIONS
To scale up wind energy development responsibly, benefits and risks should be
considered in context with other energy options. Remaining uncertainties associated
with overall risks, cost-effective opportunities for risk mitigation, strategic siting
approaches, enlarged community involvement, and more effective planning and
permitting regimes can also be considered. Figure 5-5 outlines activities that may be
needed over the near and longer terms. Some of the activities would begin now and
continue through 2030; more details are given in the subsections that follow. Given
the significant ramp-up of wind installations by 2018 in the 20% Wind Scenario,
these actions would need to occur within the next decade, in time to anticipate and
plan for siting strategies and potential environmental effects.
Figure 5-5. Actions to support 20% wind energy by 2030
126
20% Wind Energy by 2030
Near- and Mid-Term Actions
Comparing lifecycle effects of energy generation options: The knowledge base
for comparing wind energy with other energy options—according to their climate
change implications—is still uneven and incomplete. Such knowledge could prove
helpful to wind energy developers; electric utilities; and national, state, and local
regulators in evaluating wind energy developments. In fact, EPAct 2005 included
authorization language for an NAS study of the comparative risk and benefits of
current and prospective electricity supply options; the study has not begun.
Researching wildlife and habitat effects: The current research program on wind
energy is largely driven by the problems that have arisen at specific sites, such as
bird mortality in California and bat mortality in West Virginia. Additional research
on wildlife and habitat fragmentation, which takes a collaborative approach and
involves interested parties, affected communities, and subject matter experts, would
be informative and should be placed within the context of other energy risks.
5
Defining risks: A systematic risk research program that addresses the full range of
human, ecological, and socioeconomic effects from wind project siting is needed.
Such a study would establish a systematic knowledge base to inform research
priorities and decision makers. A comprehensive survey of risk issues that might
arise at different sites has yet to be designed and undertaken, although several state
agencies—such as the California Energy Commission—are developing these
priorities. Along with these risk research programs, the associated cost and time
implications must be demarcated.
Engaging national leadership: Evolving national and state policies and corporate
programs seek to minimize human-caused emissions of greenhouse gases. Wind
energy is an important part of the portfolio of energy technologies that can
contribute to this goal. Many positive impacts are projected from wind energy
comprising a larger share of the U.S. electricity grid, but these data must be
quantified and made publicly available. National leadership could facilitate rapid
progress toward 20% wind energy.
Develop siting strategies: The risks associated with wind energy deployment are
heavily site-specific, and public responses will vary among potential sites. Siting
strategies are needed to identify sites that are highly favored for wind energy
developments, but also to avoid potential ecological risks and minimize community
conflict. The American Wind Energy Association (AWEA) is currently developing a
siting handbook, which may be valuable as a first step in addressing this need.
Further work could continue to enhance collaborative siting processes that engage
states, NGOs, host community officials, and various other stakeholders.
Addressing public concerns: Building public support is essential if wind energy is
to supply 20% of the nation’s electricity by 2030. Although substantial national
experience exists with siting different types of energy facilities, that experience has
not yet been incorporated into wind siting strategies. The roots of public perceptions
of and concerns about wind energy are not well understood.
Long-Term Actions
Applying adaptive management principles: As with other technologies, wind
energy will continue to pose new uncertainties as existing ones are reduced. The
knowledge base is certain to evolve as new sites are developed and the scale of wind
20% Wind Energy by 2030
127
development expands in the United States, in Europe, and in other parts of the
world. Adaptive management concepts and approaches, which have been applied to
the development of numerous other technologies, should also be considered for
incorporation into wind energy development.
5.9
REFERENCES AND SUGGESTED FURTHER READING
ALA (American Lung Association). 2005. State of the Air 2005. New York: ALA.
http://lungaction.org/reports/sota05exec_summ.html.
AMA (American Medical Association) Council on Scientific Affairs. 2004. Mercury
and Fish Consumption: Medical and Public Health Issues. Report No. A-04.
Chicago, IL: AMA. http://www.ama-assn.org/ama/pub/category/
15842.html.
AMA. 2006. “AMA Adopts New Policies on Mercury Pollution, Hormone
Compounds and Smoke-Free Meetings.” American Medical Association,
November 13. http://www.ama-assn.org/ama/pub/category/17086.html.
5
Arnett, E., W. Erickson, J. Horn, and J. Kerns. 2005. Relationships between Bats
and Wind Turbines in Pennsylvania and West Virginia: An Assessment of
Fatality Search Protocols, Patterns of Fatality, and Behavioral Interactions
with Wind Turbines. Bat and Wind Energy Cooperative.
http://www.batcon.org/wind/BWEC2004Reportsummary.pdf.
AWEA (American Wind Energy Association). 2007. Wind Energy Basics.
Washington, DC: AWEA.
http://www.awea.org/newsroom/pdf/Wind_Energy_Basics.pdf.
Baum, E., J. Chaisson, B. Miller, J. Nielsen, M. Decker, D. Berry, and C. Putnam.
2003. The Last Straw: Water Use by Power Plants in the Arid West.
Boulder, CO and Boston, MA: The Land and Water Fund of the Rockies
and Clean Air Task Force.
http://www.catf.us/publications/reports/The_Last_Straw.pdf.
BLM. “BLM Facts.” U.S. Bureau of Land Management.
www.blm.gov/nhp/facts/index.htm.
BWEA (British Wind Energy Association). 2007. Noise from Wind Turbines: The
Facts. London: BWEA. http://www.britishwindenergy.co.uk/pdf/noise.pdf.
Cryan, P. 2006. “Overview of What We Know About the Bat/Wind Interaction as of
November of 2004.” Presented at the National Wind Coordinating
Collaborative (NWCC) Wildlife Research Meeting VI, November 14, San
Antonio, TX. http://www.nationalwind.org/events/wildlife/2006­
3/presentations/bats/cryan.pdf.
DEA (Danish Energy Authority). 2006. Danish Offshore Wind – Key Environmental
Issues. ISBN: 87-7844-625-2. Stockholm, Sweden: DONG Energy.
http://www.ens.dk/graphics/Publikationer/Havvindmoeller/danish_offshore_
wind.pdf.
DOE (U.S. Department of Energy). 2006. The Wind/Water Nexus. DOE/GO­
102006-2218. Golden, CO: National Renewable Energy Laboratory
(NREL). http://www.eere.energy.gov/windandhydro/windpoweringamerica/
pdfs/wpa/wpa_factsheet_water.pdf.
128
20% Wind Energy by 2030
DOE. 2007. “Federal Interagency Wind Siting Collaboration.” DOE Office of
Energy Efficiency and Renewable Energy, Wind & Hydropower
Technologies Program.
http://www1.eere.energy.gov/windandhydro/federalwindsiting/about_collab
oration.html.
DOI (U.S. Department of the Interior). 2004. State and Indian Regulatory Program
Permitting: 2004. Washington, DC: DOI Office of Surface Mining.
http://www.osmre.gov/progpermit04.htm
EIA. 2006. Emissions of Greenhouse Gases in the United States 2005. Washington,
DC: Department of Energy. Report No. DOE/EIA-0573.
www.eia.doe.gov/oiaf/1605/ggrpt/index.html.
EPA (U.S. Environmental Protection Agency). 2007. Mercury: Health Effects.
Washington, DC: EPA. http://www.epa.gov/mercury/effects.htm.
Erickson, W., G. Johnson, and D. Young. 2002. “Summary of Anthropogenic
Causes of Bird Mortality.” Presented at Third International Partners in
Flight Conference, March 20–24, Asilomar Conference Grounds,
CA.http://www.dialight.com/FAQs/pdf/Bird%20Strike%20Study.pdf.
5
FAA. 2007. (U.S. Department of Transportation, Federal Aviation Administration),
Advisory Circular, AC 70/7460-1K, Obstruction Marking and Lighting.
Washington, DC.
https://oeaaa.faa.gov/oeaaa/external/content/AC70_7460_1K.pdf
Flavin, C., and J. Sawin. 2006. American Energy: The Renewable Path to Energy
Security. Washington, DC: Worldwatch Institute Center for American
Progress. http://www.americanprogress.org/issues/2006/09/
american_energy.html/AmericanEnergy.pdf.
GAO (Government Accountability Office). 2005. Wind Power: Impacts on Wildlife
and Government Responsibilities for Regulating Development and
Protecting Wildlife. Report No. GAO-05-906. Washington, DC: GAO.
http://www.gao.gov/new.items/d05906.pdf
Gerdes, G., A. Jansen, K. Rehfeldt, and S. Teske. 2005. Offshore Wind:
Implementing a New Powerhouse for Europe; Grid Connection,
Environmental Impact Assessment & Political Framework. Amsterdam:
Greenpeace International.
http://www.greenpeace.org/raw/content/international/press/reports/offshore­
wind-implementing-a.pdf
Global Strategy Group. 2005. Survey on American Attitudes on the Environment –
Key Findings. New Haven, CT: Yale University School of Forestry &
Environmental Studies. http://www.loe.org/images/070316/yalepole.doc
Government Accountability Office. 2005. Wind Power: Impacts on Wildlife and
Government Responsibilities for Regulating Development and Protecting
Wildlife. Report No. GAO-05-906. Washington, DC: Government
Accountability Office. www.gao.gov/new.items/d05906.pdf
Hoen, B. 2006. Impacts of Windmill Visibility on Property Values in Madison
County, New York. Unpublished M.S. thesis. Annandale on Hudson, NY:
Bard College, Bard Center for Environmental Policy.
http://www.aceny.org/pdfs/misc/effects_windmill_vis_on_prop_values_hoe
n2006.pdf.
20% Wind Energy by 2030
129
Holling, C.S. 1978. Adaptive Environmental Assessment and Management. New
York: John Wiley & Sons.
Hutson, S.S., N. Barber, J. Kenny, K. Linsey, D. Lumia, and M. Maupin. 2005.
Estimated Use of Water in the United States in 2000. Circular No. 1268.
Reston, VA: U.S. Geological Survey.
http://pubs.usgs.gov/circ/2004/circ1268/index.html.
IPCC (Intergovernmental Panel on Climate Change). 2007. Climate Change 2007:
Impacts, Adaptation and Vulnerability: Contribution of Working Group II
Contribution to the Intergovernmental Panel on Climate Change [IPCC]
Fourth Assessment Report. Report presented at 8th session of Working
Group II of the IPCC, April 2007, Brussels, Belgium.
http://www.usgcrp.gov/usgcrp/links/ipcc.htm
IATP 2006. Water Use by Ethanol Plants: Potential Challenges. Institute for
Agriculture and Trade Policy (IATP). October 2006.
http://www.agobservatory.org/library.cfm?refid=89449
5
Jetz, W., D. Wilcove, and A. Dobson. 2007. “Projected Impacts of Climate and
Land-Use Change on the Global Diversity of Birds.” PLoS Biology, 5(6):
1211–1219. http://www.pubmedcentral.nih.gov/
picrender.fcgi?artid=1885834&blobtype=pdf.
Lee, K.N. 1993. Compass and Gyroscope: Integrating Science and Politics for the
Environment. Washington, DC: Island Press.
Logan, J. and J. Venezia. 2007. Coal-To-Liquids, Climate Change, and Energy
Security. World Resources Institute.
http://www.wri.org/climate/topic_content.cfm?cid=3993.
Morgan, G., et al. 2007. Best Practice Approaches for Characterizing,
Communicating, and Incorporating Scientific Uncertainty in Climate
Decision Making, Advance Copy. Washington, DC: The National
Academies Press (NAP).
Musial, W. and B. Ram. 2007. Large Scale Offshore Wind Deployments: Barriers
and Opportunities, NREL, Golden, CO: Draft.
NACO (National Association of Counties). 2003. A Brief Overview of County
Government. Washington, DC: NACO. http://www.naco.org/
NEPA 1969. The National Environmental Policy Act of 1969, as amended, 42
U.S.C. 4321–4347.
http://ceq.eh.doe.gov/nepa/regs/nepa/nepaeqia.htm
NESCAUM (Northeast States for Coordinated Air Use Management). 2003.
Mercury Emissions from Coal-Fired Power Plants: The Case for Regulatory
Action. Boston, MA:
NESCAUM.http://bronze.nescaum.org/airtopics/mercury/rpt031104mercury
.pdf.
NRC (National Research Council). 2004. Endangered and Threatened Fishes in the
Klamath River Basin: Causes of Decline and Strategies for Recovery.
Washington, DC: NAP.
http://books.nap.edu/openbook.php?isbn=0309090970.
NRC. 2007. Environmental Impacts of Wind-Energy Projects. Washington, DC:
NAP. http://dels.nas.edu/dels/reportDetail.php?link_id=4185
130
20% Wind Energy by 2030
NWCC. 1999. Studying Wind Energy/Bird Interactions: A Guidance Document.
Metrics and Methods for Determining Or Monitoring Potential Impacts On
Birds At Exisitng and Proposed Wind Energy Sites. Washington, DC:
NWCC.
NWCC. 2004. Wind Turbine Interactions with Birds and Bats: A Summary of
Research Results and Remaining Questions. Washington, DC: NWCC.
http://www.nationalwind.org/publications/wildlife/wildlife_factsheet.pdf.
NWCC. 2006. “Collaborative Study of the Effects of Wind Power on PrairieChicken Demography and Population Genetics.” Press release from
National Wind Coordinating Collaborative, May 9.
http://www.nationalwind.org/workgroups/wildlife/060509­
press_release.pdf.
Pasqueletti, M.J. 2005. “Visual Impacts.” Presented to National Wind Coordinating
Collaborative Technical Considerations in Siting Wind Developments:
Research Meeting, December 1–2, Washington, DC.
http://www.nationalwind.org/events/siting/presentations/pasqualetti­
visual_impacts.pdf.
5
Piwko, R., B. Xinggang, K. Clark, G. Jordan, N. Miller, and J. Zimberlin. 2005. The
Effects of Integrating Wind Power on Transmission System Planning,
Reliability and Operations. Schenectady, NY: GE Energy.
http://www.nyserda.org/publications/wind_integration_report.pdf.
Price, J. and P. Glick. 2002. The Birdwatchers Guide to Global Warming. Reston,
VA: National Wildlife Federation.
www.abcbirds.org/climatechange/birdwatchersguide.pdf.
RBA Research. 2002. Lambrigg Residents Survey. London: BWEA.
http://www.bwea.com/ref/lambrigg.html.
Regional Greenhouse Gas Initiative. “About RGGI.” Regional Greenhouse Gas
Initiative. www.rggi.org/about.htm.SenterNovem. 2005. Concerted Action
for Wind Energy Deployment (COD): Principal Findings 2003-2005.
Utrecth, Netherlands: SenterNovem .
http://www.offshorewindenergy.org/cod/COD-Final_Rept.pdf.
Robel, R., Harrington, J., Hagen, C., Pitman, J., and Reker, R.. 2004. Effect of
energy development and human activity of the use of sand sagebrush habitat
by Lesser Prairie-chickens in southwest Kansas. Transactions of the North
American Wildlife and Natural Resources Conference 68.
http://kec.kansas.gov/wptf/robertrobel.pdf
Stern, P.C., and H.V. Fineberg. 1996. Understanding Risk: Informing Decisions in a
Democratic Society. Washington, DC: NAP.
http://books.nap.edu/openbook.php?isbn=030905396X.
Sterzinger, G., B. Fredric, and D. Kostiuk. 2003. The Effect of Wind Development on
Local Property Values: Analytical Report. Washington, DC: Renewable
Energy Policy Project (REPP).
http://www.repp.org/articles/static/1/binaries/wind_online_final.pdf.
Strickland, D., and D. Johnson. 2006. “Overview of What We Know About
Avian/Wind Interaction.” Presented at the National Wind Coordinating
Collaborative Wildlife Workgroup Research Meeting VI, November 14,
San Antonio, TX. http://www.nationalwind.org/events/wildlife/2006­
3/presentations/birds/strickland.pdf.
20% Wind Energy by 2030
131
Swancy, H. 2006. “Wind Power and Aviation.” Presented at the AWEA 2006 Fall
Symposium, December 6–8, Phoenix, AZ.
Thomas, C.D., A. Cameron, R. Green, M. Bakkenes, L. Beaumont, Y. Collingham,
B. Erasmus, et al. 2004. Extinction Risk from Climate Change. Nature, 427:
145–148. http://www.gbltrends.com/doc/nature02121.pdf.
USDA. “Forest Service: About Us.” U.S. Department of Agriculture Forest Service.
www.fs.fed.us/aboutus.
USFWS (U.S. Fish & Wildlife Service). Migratory Birds & Habitat Programs.
“Migratory Bird Treaty Act.” U.S. Fish & Wildlife Service.
http://www.fws.gov/pacific/migratorybirds/mbta.htm.
Walters, C.A. 1986. Adaptive Management of Renewable Resources. New York:
MacMillan.
White, S., and G. Kulsinski. 1998. Net Energy Payback and CO2 Emissions from
Wind Generated Electricity in the Midwest. Report No. UWFDM-1092.
Madison, WI: Fusion Technology Institute, University of Wisconsin.
http://fti.neep.wisc.edu/pdf/fdm1092.pdf.
5
132
20% Wind Energy by 2030
Chapter 6.
Wind Power Markets
Wind power suppliers and consumers span a broad
range. Currently, wind power serves primarily
large-scale utility markets, and smaller scale
community-based projects are playing an
increasing role in some regions. In addition, the
eastern and Gulf Coast states are considering
offshore proposals.
If 20% wind energy by 2030 were to be reached, supply and demand markets would
need to expand to deliver wind energy to end-use customers throughout the United
States. This chapter presents a brief overview of U.S. electricity markets, major
wind power supply chain segments, market drivers, and their potential impacts on
U.S. wind power expansion.
6.1
6
U.S. MARKET EVOLUTION BACKGROUND
The U.S. Department of Energy (DOE) projects U.S. electricity demand to increase
by 39% from 2005 to 2030 (EIA 2007). Taking into account projected plant
retirements and the implementation of energy efficiency and demand reduction
programs, meeting this increased demand could require new electricity generation to
increase by more than 50% over that period. Wind power is a viable option for
meeting a substantial portion of this growing demand for electricity.
During the past seven years, the total number of wind installations worldwide has
grown at an average annual rate of 27%. Recent growth of the wind power market in
the United States has been driven by a dramatic reduction in the cost of wind energy,
public interest in renewable energy, state renewable energy standards, federal
production tax credits (PTCs), and volatile natural gas prices. Historically, however,
periodic expiration and subsequent extensions of federal PTCs have resulted in
intervals of no growth followed by explosive growth, as shown in Figure 6-1.
The U.S. wind power industry has experienced two major transformations in its
history. In 1940, more than 100,000 wind turbines—many of them Jacobs
Windmasters—were in operation across the Midwest, producing electricity for
isolated farms and ranches. Their use declined, however, as electrification connected
rural U.S. regions to electricity grids in the 1940s and 1950s. The oil price shocks of
the 1970s stimulated new interest in renewable energy and led to the establishment
of the Public Utility Regulatory Policies Act (PURPA) of 1978. By requiring utility
companies to buy electricity from independent power producers (including wind
companies), PURPA provided the foundation for the emergence of a second wind
energy market in a few states in the 1980s. A key catalyst for wind’s further
development was California’s investment tax credit and supportive state policies that
jump started the bulk power wind industry in the early 1980s. The addition of
federal tax credits also contributed to industry expansion. Several firms pioneered
20% Wind Energy by 2030
133
Figure 6-1. U.S. wind energy capacity growth (shown in
megawatts [MW]) slowed during years when the PTC expired
6
modern wind turbine technology during this period, and by 1990 more than 6,000
turbines were operating in the state.
The significantly broader and larger wind electricity supply today originated in the
late 1990s. This most recent expansion resulted from a technical revolution that is
influencing electricity markets in dozens of countries around the globe. Public and
private research and technological innovation have rapidly improved wind resource
assessment and siting, wind turbine aerodynamics and component design, and power
electronics. Turbine sizes have increased steadily, leading to improvements in wind
generation economics. Wind plant reliability has also improved—today,
manufacturers routinely guarantee the availability of their turbines at 97% or higher.
Although the wind resource is variable, wind turbines are highly reliable and operate
whenever winds are sufficient to generate electricity. The current U.S. wind energy
market is robust and expanding at unexpected rates.
6.2
U.S. ELECTRICITY MARKET
Electricity in the United States is supplied mainly by the more than 3,000 utilities
across the country, some of which are owned by shareholders, others by the
customers they serve. State public utility commissions and the Federal Energy
Regulatory Commission (FERC) oversee these utilities and specific electricity
markets. Utilities and commissions work within a regulatory framework based on
federal and state legislation and jurisdiction-specific regulations that vary throughout
the country. As a result of these regulatory differences, the roles of utilities and
commissions also differ, creating a variety of market structures at the local and
regional levels. To bring wind energy to customers nationwide, wind project
developers must accommodate these local and regional market features.
134
20% Wind Energy by 2030
6.2.1
ELECTRIC UTILITIES
Approximately 200 investor-owned utilities (IOUs), 70 large municipal and federal
or state systems, and 50 rural generation and transmission cooperatives supply
power for more than 3,000 local distribution companies across the country. The
largest of these utilities typically own power plants and generate much of the power
they supply. They purchase the rest of the electricity needed to serve their customers
from other utilities or from nonutility generators through power purchase
agreements (PPAs).
Utilities serve a variety of customers with differing needs and priorities, both retail
and wholesale. Retail customers are divided into three categories: residential,
commercial, and industrial. Residential customers use energy in a single dwelling
for personal service. Commercial customers often have multiple dwellings, offices,
or business enterprises located in a multifunction building. Industrial customers are
typically large manufacturing or assembly plants that have hundreds of workers and
multiple electricity applications. Special forms of commercial and industrial
customers include the federal, state, and local public sectors.
Retail electricity service to end-use customers is regulated by state commissions in
many states and jurisdictions. Some states have implemented restructuring or
deregulation of their electricity markets, increasing competition among electricity
providers and retailers. In states where competitive entities are vying to supply
electric generation and to serve retail customers, wind developers have the
opportunity to build projects and deliver energy directly to customers. In states that
have not restructured, wind developers can sell into wholesale markets or sell to the
incumbent utilities under a PPA. Some utilities are pursuing options for owning and
operating their own wind projects.
6
At the national level, FERC policies have been implemented to foster competitive
wholesale electricity markets and spur innovation and efficiency improvements.
FERC continues to review and modify, as appropriate, its policies concerning
competition in wholesale power markets. FERC policies cover transmission lines,
treated as a common carrier, meaning that it requires transmission providers to allow
nondiscriminatory access to their wires. The large wholesale markets enable a more
effective exchange of services and compensation for all electricity generators,
including wind power generators, helping them compete for larger shares of
generation markets.
To regulate their utilities, roughly half of states in the country have integrated
resource planning (IRP) policies in place. An IRP policy requires utilities to evaluate
opportunities to serve loads through energy efficiency and demand reduction
programs on the same basis they use to plan new generation. In addition, utilities
must compare supply alternatives—including fossil and non-fossil resources—on a
risk-adjusted basis. Some decisions made under the IRP process consider local
customer preference, which can influence decisions made by commissions in
selecting generation options. As a result, the IRP process has been an important
factor in establishing wind power markets.
6.2.2
FEDERAL AGENCIES
In aggregate, the federal government is the largest single consumer of electricity in
the world. Federal agency electricity consumption in 2005 was more than 55,000
20% Wind Energy by 2030
135
gigawatt-hours (GWh), which would equate to approximately 18 gigawatts (GW) of
wind capacity at a 35% capacity factor.
Federal agencies were encouraged to meet an executive order goal of 2.5% of site
electricity from new renewable energy sources by the end of 2005. Agencies
exceeded the goal with a final tally of about 3,800 GWh (6.9%) of electricity
consumed coming from renewable sources (DOE 2006). There was a dramatic
increase in 2004 and 2005, largely because of renewable energy certificate (REC)
purchases by the Air Force, the General Services Administration, and the
Environmental Protection Agency (EPA). Overall, 96% of federal renewable
energy—outside the Department of Defense—was purchased with RECs.
The Energy Policy Act (EPAct) of 2005 also guides federal agency energy use. It
requires the agencies to incorporate renewable energy into their electricity supply
mix at an escalating rate beginning at 3.0% in 2007 and increasing up to 7.5% by
2013, to the extent economically feasible and technically practicable. Wind energy
could play a significant role in meeting this goal, particularly through projects sited
on federal lands, and both EPAct 2005 and the executive order goal will help
advance wind power use across federal facilities.
6.2.3
6
POWER MARKETING ADMINISTRATIONS
Starting in the 1930s, the federal
government created Power Marketing
Administrations (PMAs) to market
electricity generated by governmentowned hydropower projects. The PMAs
include the Bonneville Power
Administration (BPA), the Western Area
Power Administration (Western), the
Southwestern Power Administration
(SWPA), and the Southeastern Power
Administration (SEPA). Though not
technically a PMA, the Tennessee Valley
Authority (TVA) has a similar purpose.
Each of these entities operates as a utility,
supplies power to other utilities, and often
owns extensive transmission networks that
are important to generators, including the
wind industry. Western and BPA, in
particular, have extensive transmission
grids in regions with significant wind
potential. Generally, the PMAs and the TVA are mandated by Congress to set rates
at the lowest possible levels consistent with sound business principles. The PMAs
provide access to available transmission capacity on their systems under FERCapproved transmission tariffs.
6.2.4
COMPLIANCE, VOLUNTARY, AND EMISSIONS MARKETS
Under a scenario of significant wind energy expansion, multiple revenue streams
and diverse markets for wind generation output will be increasingly important.
Compliance and voluntary markets, which have the potential to create separate and
complementary revenue streams for supporting wind energy generation, can reduce
risks. Emerging emissions reduction markets might also provide revenue streams.
136
20% Wind Energy by 2030
Policy-Driven Markets
Compliance markets, or markets where there are standards for renewable energy
contributions, play an important role in supporting the development of wind energy
resources. Today, 25 states plus the District of Columbia have established renewable
portfolio standards (RPS) requirements, which proscribe the amount of renewable
energy that must be produced within the state. These compliance markets have been
growing rapidly in recent years and hold the potential to substantially expand wind
energy capacity. Current state RPS policies call for about 55 GW of new renewable
energy capacity by 2020, and a number of states are considering increasing their
targets.
Voluntary or Green Power Markets
Voluntary markets for renewable energy also play a key role in supporting new wind
energy development. Today, more than 500,000 electricity customers across the
nation are purchasing green power products through regulated utility companies,
from green power marketers in a competitive market setting, or in the form of RECs.
These voluntary purchasers support about 2 GW of new renewable energy capacity,
mostly wind. Sales have recently grown at annual rates exceeding 60%. Large
nonresidential customers—including businesses; universities; and federal, state, and
local governments—are driving much of the growth, and this trend is likely to
continue.
6
Voluntary REC markets can also be important because they might be able to support
wind energy projects in regions that have good wind regimes but no compliance
markets (e.g., RPS). Because RECs are sold separately from commodity electricity,
they can be used to support wind energy facilities in regions with the best resources.
Some factors do limit the effectiveness of RECs, though, including the lack of a
national REC tracking system, the lack of a national REC trading system, and the
difficulty of using RECs in project financing.
Air Quality Markets
Throughout the past several decades, approaches for controlling pollution from
fossil-based power generators have moved from traditional command and control
strategies to market-oriented trading regimes that allow the most cost-effective
emission reduction techniques to be applied first. Sulfur dioxide (SO2) emissions
were the first to be controlled with cap and trade programs, and now nitrogen oxides
(NOx) and mercury (Hg) programs have been added. Others, such as carbon dioxide
(CO2) programs, are currently under serious consideration. Markets must have
accurate price information to operate efficiently, and these programs help to
incorporate the external costs of pollutants from carbon-based fuels into power
prices.
6.3
WIND POWER APPLICATIONS
There are four basic wind applications:
z
z
z
Utility-scale wind power plants, both land-based and offshore
Community-owned projects, which often produce power for local
consumption and sell bulk power under contracts
Institutional and business applications
20% Wind Energy by 2030
137
z
Off-grid home installations and behind-the-meter farm/ranch/home
systems.
The size and number of turbines vary in each of these applications. Utility-scale
wind power plants typically use turbines larger than 1,000 kW to produce large
amounts of wholesale power, accounting for more than 90% of all wind power
generated in the United States. A 1,000 kW turbine can supply electricity for about
300 homes. Off-grid and behind-the-meter projects usually employ turbines smaller
than 100 kilowatts (kW).
Wind projects range from less than 400 watts (W) to more than 400 megawatts
(MW), with much larger projects expected in the future. The utility-scale technology
that started in California in the early 1980s revolved around 50- to 100 kW
machines, while the standard size of today’s more efficient and reliable turbines
ranges from 1,500 kW to 2,500 kW.
6.3.1
LARGE-SCALE WIND POWER PLANTS
Wind power plants consist of a number of individual wind turbines that are
generally operated through a common control center. The number can range from a
few, to dozens, to hundreds of energy-producing turbines.
6
Wind projects that are 2,000 megawatts or larger have been proposed. Such largescale wind projects will bring about new challenges and benefits, requiring (and
large enough to justify) dedicated large-scale transmission infrastructure to carry
power long distances on land or shorter distances offshore to urban demand centers.
Accelerated growth of wind power in the United States would almost certainly
require developing a number of very large-scale projects, considering:
z
z
z
z
6.3.2
Siting constraints on traditional projects: Installing large
numbers of turbines in remote regions minimizes landowner
objections to dense turbine siting in populated areas.
Geographic distribution of the wind resource: Most high-quality
land-based wind resources in the nation are in mountain and plains
states. The 20% Wind Scenario would require significant amounts
of these resources to be captured.
Development pace and scale of development: A few very large
projects can add as much wind generation capacity as hundreds of
traditional 100 MW projects and can be developed and built much
more quickly.
Restrictions on land-based deployment: Some energy-constrained
coastal areas will depend on offshore wind resources that will
require large-scale project development to reduce overall
infrastructure costs.
OFFSHORE WIND
Coastal areas, especially in California and the northeastern United States, pay higher
than average prices for electricity, so offshore wind developers have an added
incentive—in the form of high market prices—to enter these markets. There are
uncertainties with permitting requirements in federal waters. However, the Minerals
Management Service (MMS) is in the process of developing proposed rules, along
with a programmatic environmental impacts statement. The MMS program is
138
20% Wind Energy by 2030
expected to be in place toward the end of 2008. Still, technical, market and policy
uncertainties are limiting the deployment of offshore wind turbines alone (see
chapters 3 and 5 for more discussion of offshore wind).
In addition, the cost of offshore wind projects is higher than land-based turbines by
about 40%, according to a study conducted by Black & Veatch, an engineering
company based in Overland, Kansas (Black & Veatch, 2007). This higher cost can
be attributed to the added complexity of siting wind turbines in a marine (and
potentially harsher) environment, higher foundation and infrastructure costs, and
higher operations and maintenance (O&M) costs because of accessibility issues and
O&M associated with offshore locations and the marine environment.
In the next 10 years, the U.S. offshore wind market could play a more significant
role in bringing new power generation online in selected regions of the country
where electricity prices are higher than average, population density restricts power
plant installations, shallow water sites are available, state governments have passed
aggressive RPS requirements, and coastal communities support this energy option.
6.3.3
COMMUNITY WIND
Community stakeholders have started to evaluate wind development as a way to
diversify and revitalize rural economies. Schools, universities, farmers, Native
American tribes, small businesses, rural electric cooperatives, municipal utilities,
and religious centers have installed their own wind projects. Although community
wind projects can be of any size, they are usually commercial in scale, with
capacities greater than 500 kW, and are connected on either side of the meter.
Community wind includes both on-site wind turbines used to offset customer’s loads
and wholesale wind generation sold to a third party.
6
Community wind is likely to advance wind power market growth because it has the
following advantages:
z
z
6.3.4
Strengthens communities: Locally-owned and -controlled wind
development substantially broadens local tax bases and generates
new income for farmers, landowners, and entire communities.
Galvanizes support: Local ownership and increased local impacts
broaden support for wind energy, engage rural and economic
development interests, and build a larger constituency with a direct
stake in the industry’s success. Local investments and local impacts
produce local advocates.
SMALL WIND
Small wind (sometimes called “distributed wind energy”) refers to wind turbines
that are generally smaller than 100 kW. Residences or businesses can install small
wind turbines on-site to meet their local electricity demands, often selling excess
electricity sold back to the grid on distribution lines. On-grid behind-the-meter
applications, where turbines are connected to distribution lines and supply electricity
to partially meet local loads, comprise the primary market for small wind. On-grid
installations are currently supported by a variety of state and utility financial
incentives, which reduce up-front capital costs to the consumer. Small wind can also
include small units for off-grid applications, such as remote homes and livestock
watering facilities as well as wind–diesel hybrid systems that are deployed in remote
village settings, such as, Alaska.
20% Wind Energy by 2030
139
Small wind has lower wind speed requirements, so more locations can accommodate
and harvest wind. The U.S. small wind manufacturing industry dominates today’s
world markets, and deploying distributed wind energy in rural or remote parts of the
United States can help to build acceptance of future wind power plants. As markets
continue to expand and manufacturers increase their volume, the result will be lower
cost turbines. An additional benefit, although small wind systems have higher perkilowatt costs than utility-scale systems, they compete with retail instead of
wholesale electricity rates, which are also higher.
Community Wind in Minnesota
6
Minnesota took major steps to encourage the
development of renewables by requiring the state’s
largest utility, Xcel Energy, to acquire a growing
amount of wind energy. The target was 425 MW in
1994, 825 MW by 1999, and 1,125 MW by 2003. This
created a reliable wind energy market in the state
which, in turn, helped wind energy find its way into
many areas of Minnesota’s economy, including
construction, O&M, and engineering. It also forged
the path for development of permitting rules that other
states and counties use as models for writing their own
regulations.
Community wind began in the United States in
Minnesota in 1997, when local advocates worked with
the legislature to create the Minnesota Renewable
Energy Production Incentive (REPI). Local ownership
was a priority for those who created this incentive,
which paid $0.01 to $0.015/kWh for the first 10 years
of production for projects smaller than 2 MW. In the
beginning, local wind developers had to individually
negotiate with utilities for interconnection and PPAs.
It was not until a special community wind tariff—
establishing a set power purchase rate of $0.033/kWh
and standard procedures for interconnection for wind
projects below 2 MW—was created in 2001 as part of
Xcel Energy’s merger settlement, that community
wind projects really became feasible. The initial
Minnesota REPI allocation was then quickly
subscribed, and a second round was fully subscribed
within 6 months. Pairing of these complementary
policies allowed the community wind market to really
take off.
Small wind energy market challenges
include turbine availability (product gaps
exist for 5-, 15-, and greater than 100 kW
turbines); economics and lack of financial
incentives across all market segments;
turbine reliability; utility interconnections;
and zoning and permitting.
6.3.5
NATIVE AMERICAN WIND
PROJECTS
Native American reservations constitute a
special community with emerging interests
in wind power development. Windgenerating potential on tribal lands, which is
conservatively estimated at more than 1.5
GW, could make an important contribution
toward the 20% Wind Scenario. At least 39
Native American reservations with
significant wind power potential (Class 4
and higher) are located in remote areas that
could support development. Self-governed
Native American tribes also have a unique
legal relationship with the U.S. federal
government and are afforded increased
opportunities under EPAct 2005.
6.4
STAKEHOLDER
INVOLVEMENT AND
PUBLIC ENGAGEMENT
As wind energy development proceeds in
the United States, site selection and
development will require well-designed and
effective stakeholder engagement. The
preceding sections outlined the markets and
supply segments that can contribute to the 20% Wind Scenario. The types of
stakeholders and their perceptions of wind energy are likely to vary markedly from
one location to another. An important part of any stakeholder initiative is to identify
the full range of interested parties and decision makers, such as public utility
commissions and their staffers, utilities and regional transportation organizations
and their customers, state and federal legislators, and financiers. Understanding
140
20% Wind Energy by 2030
stakeholder interests and how to effectively communicate with these various groups
is central to the pursuit of 20% wind energy by 2030.
Experience with past wind and other energy facility development in the United
States has brought home the critical importance of stakeholder involvement. The
energy community now generally recognizes that effectively engaging stakeholders
in siting-related decisions requires attention to a number of key factors:
z
z
z
z
z
z
State and local siting guidelines and procedures are needed to
establish a known and deliberate siting process in which local
concerns and siting issues are fully considered. Developers must
also be able to plan for and manage a predetermined and predictable
process.
The developer, state and local officials, and the host communities
should collaborate on designing stakeholder outreach
A comprehensive list of stakeholders—including those who will be
targeted in the engagement efforts—should be compiled early in the
process.
Concerns and requirements of various stakeholders should be
assessed. Needs should be identified and defined through interviews
with stakeholders.
6
The stakeholder-engagement process should begin before the site is
assessed and selected so that baseline information can be
established. Stakeholders should continue to be actively engaged
throughout facility development and operation, with an emphasis on
two-way communications.
A neutral third party should carefully evaluate effectiveness of the
engagement process along the way, to ensure that any initiatives
incorporate new stakeholders that might appear and new concerns
that might arise. This will also allow deficiencies in engagement and
communications to be forthrightly addressed.
Finally, no element in an engagement and communications effort is more important
than building trust among the developers, state and local officials, and members of
the host community. Although this is a much more difficult task than is generally
understood, experience has shown that openness, serious consideration of local
concerns, and a participatory process all contribute substantially to successful
outcomes.
6.5
CONCLUSIONS
Within the 20% Wind Scenario, multiple revenue streams and multiple markets for
wind generation output would be increasingly important. Standards for renewable
energy contributions as well as voluntary markets have the potential to create
separate and complementary revenue streams for supporting wind energy generation
while reducing risks. Today, 25 states have established RPS requirements.
Compliance markets, which have been growing rapidly in recent years, can make
substantial contributions to the expansion of wind energy capacity. Emerging
emissions markets can also be a source of revenue streams.
20% Wind Energy by 2030
141
To create the catalyst necessary to support aggressive wind energy growth, many
different market drivers must converge; and if the significant increase in wind power
development under the 20% Wind Scenario is to be realized, many stakeholders will
need to embrace a robust wind future. Stakeholder interests are as diverse as
stakeholder types; a long-term commitment to understanding and working with
stakeholders will be critical for deploying significant levels of wind power. All
segments of the market must be taken into account when planning for the wide
adoption of wind-generated electricity. Market forces need to be targeted and
utilized efficiently to leverage stakeholder interests if 20% of U.S. electricity from
wind is to be realized.
6.6
REFERENCES
DOE (U.S. Department of Energy). 2006. Annual Report to Congress on Federal
Government Energy Management and Conservation Programs Fiscal Year
2005. Washington, DC: DOE.
http://www1.eere.energy.gov/femp/pdfs/annrep05.pdf.
EIA (Energy Information Administration). 2007. Annual Energy Outlook 2007 with
Projections to 2030. Washington, DC: EIA. Report No. DOE/EIA-0383.
http://www.eia.doe.gov/oiaf/archive/aeo07/index.html
6
Black & Veatch. 2007. 20 % Wind Energy Penetration in the United States: A
Technical Analysis of the Energy Resource. Walnut Creek, CA.
142
20% Wind Energy by 2030
Appendix A. 20% Wind Scenario
Impacts
A.1
Introduction
This appendix describes the analytic tool and assumptions that were used to identify
some key components of the impacts, and technical challenges of providing 20% of
the nation’s electricity from wind in 2030. The 20% level was chosen exogenously
as the central assumption of the evaluation. The relative cost difference between a
scenario including 20% wind-generated electricity and a scenario in which no
additional wind technology is installed after 2006 is the primary metric. All
modeling assumptions contribute to this incremental cost of wind energy. Thus,
changes to the assumptions increase or decrease the incremental cost of the 20%
Wind Scenario over the scenario that does not include wind energy. No sensitivities
exploring changes to the assumptions were
performed for this analysis. Modeling
assumptions are described in this appendix (See
Table A-1) and Appendix B.
Considerations in the 20% Wind
The National Renewable Energy Laboratory’s
(NREL) Wind Deployment System (WinDS)
model was employed to simulate generation
capacity expansion of the U.S. electricity sector
through 2030. This model used a wind energy
generation rate that would result in the production
of 20% of projected electricity demand from
wind by 2030. Carbon emission reductions in this
20% Wind Scenario have also been derived from
the WinDS model outputs. Water savings
associated with significant wind energy
generation has been externally calculated as well.
The assumptions used for these analyses were
developed from a variety of sources and
experiences that span the wind and electricity
generation industries; model-specific details of
these assumptions are presented in Appendix B.
The 20% Wind Scenario requires U.S. wind
power capacity to grow from the current 16–17
gigawatts (GW) to more than 300 GW over the
next 23 years. This ambitious growth could be
reached in many different ways, with varying
challenges, benefits, costs, and levels of success.
This report examines one particular scenario for
achieving this dramatic growth and contrasts it to
another scenario called No New Wind, which
assumes no wind growth after 2006 for analytic
simplicity.
20% Wind Energy by 2030
Scenario
A
•
Wind resources of varying quality exist across
the United States and offshore.
•
Although land-based resources are less
expensive to capture, they are sometimes far
from demand centers.
•
Typically, wind power must be integrated into
the electric grid with other generation sources.
•
Technology and power market innovations
would make it easier to handle a variable
energy resource such as wind.
•
New transmission lines would be required to
connect new wind power sources to demand
centers.
•
Transmission costs add to the cost of
delivered wind energy costs, but today’s U.S.
grid requires significant upgrading and
expansion under almost any scenario.
•
Wind installations will require significant
amounts of land, although actual tower
footprints are relatively small.
•
Domestic manufacturing capacity might not
be sufficient to accommodate near-term rapid
growth in U.S. wind generation capacity; the
gap may be filled by other countries.
143
The authors recognize that U.S. wind capacity today is growing rapidly, although
from a very small base, and that wind energy technology will be a part of any future
electricity generation scenario for the United States. At the same time, there is still a
great deal of uncertainty about what level of contribution wind could or is likely to
make. In its Annual Energy Outlook 2007 with Projections to 2030 (AEO), the
Energy Information Administration (EIA) forecasts that an additional 7 GW—
beyond the 2006 installed capacity of 11.6 GW—will be installed by 2030 (EIA
2007). 12 Other organizations are projecting higher capacity additions, and given
today’s uncertainties, developing a “most likely” forecast would be difficult. The
analysis presented here sidesteps these uncertainties and contrasts the impacts of
producing 20% of the nation’s electricity from wind with No New Wind. This yields
a parameterized estimate of some of the impacts associated with increased reliance
on wind energy generation.
The analysis was also simplified by assuming that the contributions to U.S.
electricity supplies from other renewable sources of energy would remain at 2006
levels in both scenarios. In addition, no sensitivity analyses have been done to
identify how the results would differ if assumptions were changed.
Broadly stated, this 20% Wind Scenario is designed to optimize costs while
recognizing certain constraints and considerations (see sidebar above). Specifically,
the scenario describes the mix of wind resources that would have to be captured, the
geographic distribution of the wind power installations, estimated land needs, and
required utility and transmission infrastructure changes associated with 20% wind in
2030. It is not a definitive identification of the exact locations of wind turbines and
transmission lines.
A
The scenario reflects several assumptions about generation technology cost and
performance as well as electric grid system operation and expansion. For example,
wind technology development is projected to continue based on a history of
performance improvements. The national transmission system is assumed to evolve
in ways favorable to wind energy development by shifting toward large regional
markets. In addition, future environmental study and permit requirements are not
expected to add significant costs to wind technology.
The 20% Wind Scenario was constructed by specifying annual wind energy
generation in each year from 2007 to 2030, based on a trajectory proposed in a
previous NREL study (Laxson, Hand, and Blair 2006). The investigators forced the
WinDS model to reach the 20% level for wind-generated electricity by 2030 and
evaluated aggressive near-term growth rates. Next, they examined sustainable levels
of wind capacity installations that would maintain electricity generation levels at
20% and accommodate the repowering of aging wind turbine equipment in wind
installations beyond 2030. The 20% wind by 2030 trajectory from the NREL study
was implemented in WinDS by calculating the percentage of annual energy
production from wind, an increase of approximately 1% per year. Figure A-1
illustrates the energy generation trajectory proposed in the study, and the
corresponding annual wind capacity installations that the WinDS model projects will
meet these energy generation percentages.
12
AEO data from 2007 were used in this report. AEO released new data in March of 2008, which were
not incorporated into this report. While the new EIA data could change specific numbers in the report,
it would not change the overall message of the report.
144
20% Wind Energy by 2030
Figure A-1. Prescribed annual wind technology generation as a percent of
national electricity demand from Laxson, Hand, and Blair (2006) and
corresponding annual wind capacity installation for
20% Wind Scenario from WinDS model
The combined cost, technology, and operational assumptions in the WinDS model
show that reaching an annual installation rate of about 16 GW/year by 2018 could
result in generation capacity capable of supplying 20% of the nation’s electricity
demand by 2030. This annual installation rate is affected by the quality of wind
resources selected for development as well as future wind turbine performance. The
declining annual installed capacity after 2024 is an artifact of the prescribed energy
generation from the NREL study (Laxson, Hand, and Blair 2006), in which
technology improvements and wind resource variations were not considered. The
NREL study (Laxson, Hand, and Blair 2006) provides an upper level of about 20
GW/yr, because turbine performance is unchanged over time. Based on the wind
resource data and the projected wind technology improvements presented in this
report, sustaining a level of annual installations at approximately 16 GW/yr beyond
2030 would accommodate the repowering of aging wind turbine equipment and
increased electricity demand, so that the nation’s energy demand would continue to
be met at the 20% wind level.
A
The 20% Wind Scenario does not include policy incentives such as a production tax
credit (PTC) or carbon regulations, although such policies may make this growth
trajectory more likely. It is implicitly assumed that a stable policy environment that
recognizes wind’s impacts could lead to growth rates that would result in the 20%
Wind Scenario.
Some of the consequences of a 20% Wind Scenario in 2030, including carbon
emission reductions and natural gas demand reduction, were calculated based on the
results of the WinDS model. To estimate the impacts associated with incorporating
electricity from wind into the grid at this level, a comparison has been made with a
scenario in which no additional wind power would be installed after 2006. The
differences between the two cases are attributed to the incorporation of wind power.
From a planning and operational perspective, integrating wind generation into the
U.S. electricity grid at the 20% level appears to be technically feasible without
significantly and unrealistically constraining the WinDS model (e.g., assuming no
new transmission will be built). In addition to modeling the expansion of the
electricity grid to transmit power from wind-rich geographic areas to demand (load)
20% Wind Energy by 2030
145
centers, the model treats wind resource variability on time scales ranging from
multiyear capacity planning to minute-to-minute ancillary service requirements.
(WinDS does not perform minute-to-minute ancillary service calculations, but it
uses statistics to approximate these requirements; see Appendix B for a detailed
discussion of the treatment of wind variability.) The 20% Wind Scenario presented
here includes future reductions in wind technology costs and increased performance,
coupled with transmission system expansion that is favorable to wind energy. These
assumptions affect only the direct cost to the electricity sector associated with this
level of wind energy expansion. These cost and performance assumptions differ
from those used by EIA; the assumptions are based on 2006 market data developed
by Black & Veatch for all generation technologies. Explicit cost and performance
projections are used rather than learning algorithms generally used by EIA. See
Appendix B for more information.
A.2
Methodology
The WinDS model was used to identify some key components of the impacts of
producing 20% of the nation’s electricity from wind energy by 2030. WinDS is a
geographic information system (GIS) and linear programming model of electricity
capacity expansion for the U.S. wholesale market. 13 The model operates over
multiple regions and time periods. Generation capacity expansion is selected to
achieve a cost-optimal generation mix to meet 20% wind generation over a 20-year
planning horizon for each 2-year period from 2000 to 2030.
The assumptions used for the WinDS model were obtained from a number of
sources, including technical experts (see Appendix D), the WinDS base case
(Denholm and Short 2006), AEO (EIA 2007), and a study performed by Black &
Veatch (2007). These assumptions include projections of future costs and
performance for all generation technologies, transmission system expansion costs,
wind resources as a function of geographic location within the continental United
States, and projected growth rates for wind generation. Appendix B describes these
assumptions in detail.
A
A.2.1 Energy Generation Technologies
Wind-generation technologies are contained in the WinDS model, along with
conventional technologies such as coal plants (pulverized coal and integrated
gasification combined cycle [IGCC]), nuclear plants, and natural-gas-fired
combustion turbine and combined cycle plants. The model does not include
technologies installed “behind the meter,” such as cogeneration or other distributed
generation systems, nor does it include energy efficiency or demand response
technologies. Table A-1 summarizes the modeling assumptions.
Wind technology options include land-based and offshore technologies. Wind
resource classes 3 through 7 (at 50 meters [m] above ground level) are specified for
358 wind supply regions across the continental United States. Each wind supply
region in WinDS includes a mix of these wind resource classes. Offshore wind
resources are associated with coastal and Great Lakes regions. Resource maps
reference those produced by the Wind Powering America (WPA) initiative or by
individual state programs, and include environmental and land use exclusions. In
13
The model, developed by NREL’s Strategic Energy Analysis Center (SEAC), is designed to address
the principal market issues related to the penetration of wind energy technologies into the electric
sector. For additional information and documentation, see http://www.nrel.gov/analysis/winds/.
146
20% Wind Energy by 2030
Table A-1. Assumptions used for scenario analysis
Renewable Energy
Technologies (other
than wind)
Land-Based Wind
Technology Cost
•
Shallow Offshore
Wind Technology
Cost
Wind Technology
Performance
Existing
Transmission
New Transmission
•
Wheeling Charges
Conventional
Generation
Technology Cost
and Performance
•
•
•
• Capacity factor improvements about 15% on average
over all wind classes between 2005 and 2030
• 10% of existing transmission capacity available to wind
•
•
•
•
•
•
•
•
•
Fuel Prices
Scenario Assumptions
Contributions to U.S. electricity supply from renewable
energy (other than wind) are held constant at 2006 levels
through 2030
$1,730/kW in 2005 and 2010, decreasing 10% by 2030
Regional costs vary with population density, with an
additional 20% in New England
$2,520/kW in 2005, decreasing 12.5% by 2030
•
•
•
plants at point of interconnection
Transmission will be expanded
$1,600/megawatt-mile (MW-mile)
50% of cost covered by wind project
Regional cost variations prescribed as follows: 40%
higher in New England and New York, 30% higher in
Pennsylvania-New Jersey-Maryland (PJM) East
interconnection, 20% higher in PJM West, 20% higher in
California
No wheeling charges between balancing areas
Natural gas plant cost ($780/kW in 2005) and
performance flat through 2030
Coal plant capital cost ($2,120/kW in 2005) increases
about 5% through 2015 and then remains flat through
2030
Coal plant performance improvement of about 5%
between 2005 and 2030
Nuclear plant capital cost ($3,260/kW in 2005) decreases
28% between 2005 and 2030
Nuclear plant performance stays flat through 2030
Natural gas prices follow AEO high fuel price forecast
Coal prices follow AEO reference fuel price forecast
Uranium fuel price is constant
A
addition to the geographic display of wind resources, seasonal and diurnal variations
in capacity factor (CF) are computed based on wind resource data. Appendix B
contains more information about the wind resource data used for this study.
Experts at Black & Veatch Corporation developed wind technology cost and
performance projections based on their experience and market knowledge,
discussions with wind industry professionals, and review of cost and performance
trends (Black & Veatch 2007). Wind technology costs in 2005 are assumed to be
$1,730/kW 14 (kilowatt; in real US$2006), which reflects recent cost increases
attributed to current exchange rates between the euro and the dollar, increased
commodity prices, a constrained supply of wind turbines, and construction
14
All dollar values in appendices A and B are in $US2006. These capital costs include construction
financing, which adds approximately 5% to the “overnight” capital cost given in Appendix B. The
WinDS model applies financing costs in each solution period that requires overnight capital costs as
input.
20% Wind Energy by 2030
147
financing. Wind technology costs are projected to decrease to $1,550/kW by 2030
(in US$2006 including construction financing). The cost of offshore wind energy
technology is projected to decrease 12.5% over the same period, from $2,500/kW in
2005 to $2,200/kW in 2030 (real US$2006 including construction financing).
Specialists at Black & Veatch developed wind technology performance projections,
in the form of capacity factors, by extrapolating historical performance data from
2000 to 2005. Appendix B gives more details on the cost and performance estimates
for current and future years for both land-based and offshore wind technologies.
Black & Veatch experts also developed conventional generation technology cost and
performance projections based on reported engineering, procurement, and
construction costs for currently proposed plants through 2015. Fossil plant costs
were assumed to remain flat beyond 2015 with modest performance improvements
for coal plants. Cost and performance projections for nuclear plants assume
continued technology development. Appendix B presents these cost and
performance assumptions.
A.2.2 Transmission and Integration
Wind energy can be used to meet local loads (i.e., loads in the same wind supply
region), as well as those in other geographic locations. Local loads can be met either
by transmitting on the existing grid where capacity is available (10% of the capacity
of each existing line is assumed to be available for wind) or by building a short,
dedicated transmission line directly to the local load. Wind energy can also be
transmitted to another locale, either on the existing grid when capacity is available
or on a new transmission line. If the transmission line crosses between two
balancing areas, there must be enough capacity on the line in each seasonal or
diurnal time frame to take advantage of wind’s full nameplate capacity, as well as
the energy associated with other generators transmitting power over that line. If no
capacity remains on that transmission line, the model assumes that a dedicated
transmission line will be constructed for wind.
A
When integrating wind resources into the grid, the model considers both planning
and operating reserve margins for all North American Electric Reliability
Corporation (NERC) regions. For both types of reserve margin, WinDS accounts for
the variability that occurs when wind generation is used from disparate wind sites
whose output is not fully synchronized. The wind plant’s capacity value is a function
of the CF, seasonal and diurnal wind variations, and correlation with existing wind
capacity installations. In this way the variability of the wind resource is assessed in
combination with conventional generation within each NERC region.
The transmission system is assumed to expand under large, regional operation and
planning entities, which incorporate polices that favor wind energy. Operating grid
systems on large, regional bases, such as through the Midwest Independent
Transmission System Operator (Midwest ISO), mitigates the variability of wind
power. The WinDS model calculates reserve and planning margins at the NERC
regional level, which is representative of these large operating structures. A wind
energy penetration limit of 25% has been assumed at the interconnect level. Also,
based on the participant funding principle adopted by Midwest ISO, the cost of new
transmission is assumed to be split equally between the originating project, be it
wind or conventional generation, and the ratepayers within the region. This tariff
structure is assumed to apply nationwide. The exception is for new transmission
lines that are built at a project in one interconnection region to meet loads in another
148
20% Wind Energy by 2030
interconnection region. In this case, the transmission cost is borne entirely by the
project. Consistent with the large, regional planning process, this scenario assumes
that there are no wheeling charges between balancing areas. Finally, the 20% Wind
Scenario assumes that 10% of existing grid capacity is available for wind energy.
A.2.3 Quantification of Impacts
Projected electricity demand estimates, as well as financing and economic
assumptions, were obtained from the AEO reference case (EIA 2007). Total direct
costs of all generation technologies were estimated over a 20-year planning horizon
in each two-year solution period. The sum of these direct costs represents the total
cost to the electricity sector for generation choices through 2030, including costs for
capital investment, operations and maintenance (O&M), new transmission, and fuel.
To calculate the impacts of 20% wind energy, the authors of this report constructed
the aforementioned No New Wind Scenario. This scenario assumes that the
conventional generation mix expands to meet electricity demand with currently
enacted policies. Table A-1 outlines the major assumptions in the scenario and
supporting analyses. The difference between the two cases, 20% Wind and No New
Wind, represents the impact of wind energy.
A.3
Wind Capacity Supply Curves
In economic analysis, a supply curve is used to determine the quantity of a product
that is available at various prices. For this report, wind generation potential is plotted
against its calculated levelized cost (LC) of electricity in ascending order. See
Appendix B for more information. For example, the potential (in gigawatts) from
high-speed wind resources has been plotted against its levelized cost (dollars per
megawatt-hour [MWh]); lower-speed wind projects have higher costs and represent
the next step up on the supply curve. Cost and potential were estimated for each
region based on a GIS optimization strategy developed by NREL. The regions were
aggregated such that an overall supply curve for national wind potential could be
developed. The following supply curves compare the quantities and costs for wind
resources and show which products can be brought to market at the lowest cost
(resources on the left side of Figure A-2 “Supply Curve for wind energy: current
bus-bar energy costs”). See Appendix B for wind resource estimates.
A
The national supply curve for bus-bar energy costs—for the wind plant alone,
excluding transmission costs—is shown in Figure A-2. The figure illustrates that
more than 8,000 GW of wind energy is available in the United States at $85/MWh
or less. This is a huge amount of capacity, equivalent to roughly eight times the
existing nameplate generating capacity in the country, which is estimated at 983 GW
(EIA 2007). This price, however, excludes the cost of transmission or integration.
The supply curve uses today’s cost and performance figures, which are projected to
improve with future technology development.
The supply curve shows the simple relationship between wind power class and cost,
as the higher classes are the lowest cost (and least abundant resources); Classes 3
and 4 are much more prevalent. At today’s costs, offshore wind is not costcompetitive with land-based wind technologies. Finally, the national resource
potential for land-based wind technologies exceeds the existing nameplate
generating capacity in the country by a factor of eight. However, that does not mean
capturing that full potential is economically, technically, or politically viable.
20% Wind Energy by 2030
149
Figure A-2. Supply curve for wind energy—current bus-bar energy costs
The national supply curve in Figure A-3 shows the costs of connecting to the
existing transmission system, given that 10% of capacity is available for new wind
generation. This supply curve also shows the cost of connecting directly to load
centers that are in the same balancing area as the wind resource, given that a
maximum of 100% of that load can be served by wind. This curve is produced as an
input to the WinDS model. Please see Appendix B or (Black & Veatch 2007) for
more information.
A
Figure A-3. Supply curve for wind energy: energy costs including connection to
10% of existing transmission grid capacity
150
20% Wind Energy by 2030
Figure A-3 shows only the supply curve for wind projects that can enter the existing
transmission system (or that can power nearby loads), and does not include wind
projects that would require new transmission to deliver power to markets distant
from the generation system. The supply curve, however, shows more than 1,000 GW
of wind energy— approximately 600 GW of land-based and roughly 400 GW of
offshore capacity. Developing all of this resource is not economical and would
require significant modifications in the transmission system, but under certain
conditions it could produce enough energy to greatly exceed 20% of the nation’s
electricity supply in the future. The supply curve further illustrates that more than
600 GW of wind are available at or below $100/MWh at current bus-bar energy
costs and performance indicators. These supply curves do not factor in transmission
or integration costs or technology improvements.
A.4
Impacts
Based on the assumptions used to create the 20% Wind Scenario, providing 20% of
the nation’s projected electricity demand by 2030 would require the installation of
293.4 GW of wind technology (in addition to the 11.4 GW currently installed) for a
cumulative installed capacity of 304.8 GW, generating nearly 1,200 terawatt-hours
(TWh) annually. Offshore wind technology would account for about 18% (54 GW)
of total wind capacity by 2030. Figure A-4 shows the cumulative installed capacity
of land-based and offshore wind technologies required to generate 20% of projected
electricity demand by 2030.
Figure A-4. Cumulative installed wind power capacity required to produce 20%
of projected electricity by 2030
A
A.4.1 Generation Mix
This section presents impacts on the remaining generation mix and on the emissions
of carbon from producing 20% of the nation’s electricity from wind in 2030. The
geographic distribution of wind turbines and the transmission expansion required to
accommodate them are also addressed. Sophisticated routines in the WinDS model
use existing transmission or build new transmission while incorporating associated
wind integration costs. This scenario shows that with wind technology advancement
20% Wind Energy by 2030
151
associated reductions in costs and changes in the grid system, producing 20% wind
energy in the nation’s portfolio by 2030 could be technically feasible.
The generation mix produced by the WinDS model based on the requirement that
20% electricity generation will come from wind is pictured in Figure A-5. This
scenario does not assume that carbon regulation policies are in place and reflects the
assumptions listed in Table A-1 as well as others. The resulting generation mix,
excluding wind, is made up of the most cost-effective conventional technologies in
place today. Wind energy grows as a percentage of the nation’s generation mix, and
coal-generated electricity remains the major generation technology in 2030. Nuclear
power generation declines slightly as a fraction of the total generation mix. Natural
gas technologies make a greater contribution to the total mix through 2016 and then
decline to a level similar to today’s level by 2030. Changes in assumptions would
produce a different mix of conventional generation technologies.
Figure A-5. 20% Wind Scenario electricity generation mix 2000–2030
A
Figure A-6 illustrates the comparison in net generation in 2030 between
conventional energy and wind energy generation, when applied to the 20% Wind
and the No New Wind Scenarios. The 20% Wind Scenario, of course, would result
in dramatically higher levels of wind energy generation. This figure also shows a
significant reduction of energy generated from combined cycle natural gas plants
(Gas-CC) as well as reduced energy from new pulverized coal plants (Coal-New).
Figure A-7 compares generating capacity by 2030 between the 20% Wind Scenario
and the No New Wind Scenario. Again, the contribution from wind is the primary
difference. The 20% Wind Scenario requires less Coal-New and Gas-CC capacity.
The 20% Wind Scenario does require additional gas combustion turbine capacity
(Gas-CT) to maintain grid reliability when wind resources vary. As shown in
Figure A-6, relatively little electricity is generated from these plants in both
scenarios.
152
20% Wind Energy by 2030
Figure A-6. Generation by technology in 2030
Figure A-7. Capacity by technology in 2030
A
Several important assumptions could affect the resulting mix of conventional
generation in output from the WinDS model, including the following:
z
z
Fuel price forecasts: The WinDS model uses regional gas and coal
fuel price projections from the AEO (EIA 2007). The reference-case
coal fuel projections were implemented, but the natural gas price
forecast from the high-price case was deemed more probable. Other
gas and coal future price projections could be used, and modifying
these prices would affect generation from gas, coal, and other
sources.
Fuel price elasticity: For this analysis, the WinDS model does not
include fuel price elasticity. This could be important in scenarios
that differ significantly from the scenario assumed in the AEO (EIA
2007). For example, assuming wind generation at 20% of U.S.
20% Wind Energy by 2030
153
electricity, the demand for gas and coal would decrease, resulting in
a lower price for both (thereby conversely driving up demand) and
settling on a cost value lower than that currently used in the model.
z
Carbon regulation: The imposition of a carbon constraint would
also change this generation mix significantly, increasing future
Coal-IGCC and Nuclear capacity, reducing future Coal-New and
Gas-CC capacity, and leading to significantly more plant
retirements and less use of existing coal plants.
A.4.2 Carbon Emission Reduction
Comparing the 20% Wind Scenario with the No New Wind Scenario provides one
way of estimating the potential carbon emissions reductions that could be attributed
to wind energy. This scenario assumes that the conventional generation mix is
allowed to expand while optimizing total costs without any carbon regulation policy.
Figure A-8 illustrates the cumulative carbon emissions reduction of more than 2,100
million metric tons of carbon equivalent (MMTCE) attributed to producing 20% of
the nation’s electricity from wind during the significant wind energy expansion
period, 2005 to 2030. Extrapolating cumulative carbon emissions avoidance over the
20-year wind plant life through 2050 results in avoided emissions of more than
4,000 MMTCE, and avoided carbon emission in 2030 alone of 225 MMTCE.
Figure A-8. Cumulative carbon emission reductions attributed to wind energy
(compared to expanding the generation mix without wind energy)
A
A.4.3 Reduced Natural Gas Demand
Figure A-9 demonstrates the decrease in coal and gas fuel use for the 20% Wind
Scenario relative to the No New Wind Scenario. This graph indicates that a
reduction in coal use across all coal technologies and a reduction in natural gas use
comprise a significant portion of the total amount that would be used without
additional wind installations. Incorporating enough wind generation technology to
produce 20% of the nation’s electricity demand by 2030 could reduce the electricity
sector’s natural gas requirements by about 50% and its coal requirements by about
18%. This shift translates into a reduced national demand for natural gas of 11%.
154
20% Wind Energy by 2030
Figure A-9. Fuel usage and savings resulting from
20% Wind Scenario
Wind power offers the country important resource diversification benefits, including
the prospect for moderating natural gas demand. In 2006, gas-fired generation
accounted for nearly 20% of the nation’s electricity generation capacity. Because of
the way electricity markets operate, the price of gas-fired generation determines the
price of electricity. Wellhead natural gas prices, which hovered near $2/MMBtu in
the 1990s, have risen to more than $6/MMBtu, and most forecasts expect prices to
remain high relative to historical standards. Past efforts to forecast natural gas prices
have not been very successful (e.g., Wiser and Bolinger 2004 and Bolinger and
Wiser 2006).
A
A.4.4 Land Use
Under the 20% Wind Scenario, wind turbines required to supply 20% of the nation’s
electricity (over 300 GW) would be broadly distributed across the United States; at
least 100 MW would be installed in 43 of the 48 contiguous states. Hawaii and
Alaska have not been represented in this study, but both states are expected to install
more than 100 MW of wind capacity. The WinDS model uses the best available
assessment of local wind resources to expand wind technology capacity. Limitations
of wind resource input data, which could significantly affect the wind technology
capacity installed in a given state, are discussed in Appendix B. In addition to wind
resources, other factors related to the model logic can influence the amount of wind
capacity installed in a given state. For instance, current long-term power purchase
agreements are not implemented in WinDS. The model assumes that local load is
met by the generation technologies in a given region.
The lack of wind capacity installed in Ohio is assumed to be primarily a result of the
amount of existing conventional energy resources that supply the state, reducing the
need for additional generating capacity, regardless of the fact that Ohio’s wind
resources are sufficient to support wind technology development. Additionally
Ohio’s wind resources are concentrated in the western part of the state. The
transmission cost assumptions are higher in Ohio than in neighboring Indiana and
20% Wind Energy by 2030
155
Michigan, which makes Ohio’s wind resource appear less cost-effective in
comparison. Some states such as Louisiana, Mississippi, and Alabama have lower
quality wind resources than Ohio, but under the right economic circumstances some
wind energy development could occur in those states. The WinDS model optimizes
the installation of wind energy capacity within each of the three large
interconnection areas in the United States. The model shows that broad geographic
distribution of wind energy capacity serves to meet the broadly distributed national
electricity load. Figures A-10 to A-13 illustrate capacity expansion of wind energy
representing the years 2012, 2018, 2024, and 2030 (approximately 3%, 9%, 15%,
and 20% electricity generation, respectively). The specific assumptions used in this
model significantly affect each state’s projected wind capacity. See Table A-1 and
Appendix B for more information on the assumptions. In reality, these levels will
vary significantly as electricity markets evolve and state policies promote or restrict
wind energy production.
The black outline in each state in Figures A-10 to A-13 represents land area required
for a wind farm, corresponding to the capacity shown on the green scale. These
figures use standard exclusion practices, which are detailed in Appendix B. The total
land area of the United States required for 305 GW of wind energy, assuming a
turbine density of 5 MW per square kilometer (km2), would be smaller than
61,000 km2 (50,000 km2 for land-based projects and 11,000 km2 for offshore
projects). Only about 2% to 5% of the wind farm area, which is represented by the
brown square within each black outline, is occupied by towers, roads, and other
infrastructure components, and the balance of the area remains available for its
original use (such as farming or ranching).
A
Figure A-10. Projected wind capacity installations in 2012
156
20% Wind Energy by 2030
Figure A-11. Projected wind capacity installations in 2018
Figure A-12. Projected wind capacity installations in 2024
A
20% Wind Energy by 2030
157
Figure A-13. Projected wind capacity installations in 2030
A.4.5 Transmission
A
To meet the nation’s growing demand for electricity, significant transmission
expansion will be required. Meeting the 20% Wind Scenario requires transmission
expansion to accommodate such a geographically dispersed resource. Three types of
transmission systems included in the WinDS model could be used to transport wind
power around the country:
z
z
z
Existing grid: The model assumes that 10% of the existing grid
could be used for new wind capacity, either by improving the grid
or by drawing on existing unused capacity.
New lines: The WinDS model can evaluate the use of straight-line
transmission lines in the 358 wind regions. The model assumes that
appropriate planning will allow new transmission lines to be
constructed as additional capacity is needed.
In-region transmission: In any of the 358 wind regions in the
United States, the model can assess transmission lines directly from
the wind site to loads within the same region.
Figures A-14 to A-17 illustrate the expansion of the transmission system required
under the 20% Wind Scenario for the years 2012, 2018, 2024, and 2030
(approximately 3%, 9%, 15%, and 20% wind-electricity generation, respectively).
The 20% Wind Scenario assumes that transmission planning and grid operations
occur on several levels—planning at the national level, reserve margin constraint
planning at the NERC level, and load growth planning and operations at the
balancing area (BA) level. For visual clarity, these figures display wind capacity
only at the balancing area level.
158
20% Wind Energy by 2030
Figure A-14. Transport of wind energy over existing and
new transmission lines projected for 2012
A
Figure A-15. Transport of wind energy over existing and
new transmission lines projected for 2018
20% Wind Energy by 2030
159
Figure A-16. Transport of wind energy over existing and
new transmission lines projected for 2024
A
Figure A-17. Transport of wind energy over existing and
new transmission lines projected for 2030
160
20% Wind Energy by 2030
The balancing areas, shaded in purple, depict the amount of locally installed wind,
which is assumed to meet local load levels. Generally, the first wind system installed
either uses the existing grid or is accompanied by a short transmission line built to
supply local loads. In later years, as the existing grid capacity is filled, additional
transmission lines are built. New transmission lines built to support load in a
balancing area with wind resources within that same area are not pictured in these
figures; only transmission lines that cross balancing area boundaries are illustrated.
In each figure, the blue arrows represent wind energy transported on existing
transmission lines between balancing areas. The red arrows represent new
transmission lines constructed to transport wind energy between balancing areas.
The arrows originate and terminate at the centroid of a balancing area and do not
represent the physical location of demand centers or wind resources. The location
and relative number of red or blue arrows depend on the relative cost of using
existing transmission lines or building new lines.
Table A-2 summarizes the projected installed wind capacity in 2030 by transmission
type, number of megawatt-miles of transmission, and the resulting average distance
traveled by each megawatt. Transmission options are based on a variety of factors;
the cost of using existing transmission compared with new transmission can shift the
relative amounts significantly. Appendix B contains a more complete discussion of
transmission options used in the WinDS model.
Table A-2. Distribution of wind capacity on existing and
new transmission lines
Transmission
Type
Existing Transmission
Lines
New Capacity Lines
within a WinDS region
New Capacity Lines that
Cross One or More
WinDS Region
Boundaries
A.5
2030
Wind Capacity
2030
MW-Miles
71 GW
20 million
MW-miles
278 miles
67 GW
N/A
N/A (estimated at
50 miles)
166 GW
30 million
MW-miles
180 Miles
A
Average Distance
Traveled for Each
MW
Direct Electricity Sector Cost
WinDS has been used to estimate the direct costs of meeting 20% of the nation’s
electricity requirements with wind power in accordance with the 20% Wind
Scenario (see Appendix B for detailed calculations of each cost element). Direct
costs to the electricity sector for each scenario include the capital costs of wind and
conventional energy equipment, as well as transmission, O&M, and fuel costs.
External analyses based on the WinDS model have estimated water consumption
reductions. By comparing this scenario with a reference case that involves No New
Wind generation after 2006, the potential costs of future wind development were
estimated as the incremental change between these two scenarios.
Capital and transmission expansion costs are calculated for generation capacity
added through 2030. Other costs presented in this section assume a 20-year project
life for wind technology installed after 2010. Thus, the incremental differences in
20% Wind Energy by 2030
161
fuel consumption, carbon emissions, and water consumption between the two
scenarios in 2030 are reduced proportionally for wind systems that achieve a 20-year
operational history between 2030 and 2050.
Direct costs to the electricity sector for each scenario include the capital costs of
wind and conventional energy equipment, as well as transmission, O&M, and fuel
costs. Table A-3 and Figure A-18 illustrate costs for the 20% Wind Scenario as well
as the No New Wind Scenario. These costs represent the effect of investment
decisions made over 20 years. The primary difference between the two scenarios is
the higher capital investment for the 20% Wind Scenario, which is offset somewhat
by additional fuel costs for the No New Wind Scenario. Both scenarios show a
significant investment—exceeding $2 trillion—in generation capacity expansion
through 2030. The capital costs include all financing costs applied to WinDS model
investment selection, as described in Appendix B. The discounted capital costs,
excluding financing, are $717 billion for the 20% Wind Scenario and $580 billion
for the No New Wind Scenario.
Table A-3. Direct electricity sector costs for 20% Wind Scenario and
No New Wind Scenario (US$2006)
Wind Technology O&M Costs
A
Wind Technology Capital Costs
Present Value
Present Value
Direct Costs for Direct Costs for
20% Wind
No New Wind
Scenario*
after 2006*
(billion US$2006) (billion US$2006)
$51
$3
Transmission Costs
Fuel Costs
$236
$23
$813
$0
$2
$968
Conventional Generation O&M Costs
$464
$488
Conventional Generation Capital Costs
$822
$905
* 7% real discount rate is used, per Office of Management and Budget (OMB) guidance;
the time period of analysis is 2007-2030. WinDS modeling is used through 2030 and
extrapolations of fuel usage and O&M requirements are used for 2030-2050.
Figure A-18. Direct electricity sector costs for
20% Wind Scenario and no-new-Wind Scenario
162
20% Wind Energy by 2030
The WinDS model assumes that conventional generation systems, including coal
and nuclear plants, are sited near load centers (except for California, which restricts
the installation of coal and nuclear plants). Wind resources, on the other hand, tend
to be geographically distant from load centers, requiring transmission lines to move
electricity to the load. Estimated costs of transmission expansion in the No New
Wind Scenario, then, are much lower than those for the 20% Wind Scenario, which
might be overly conservative. Assuming that conventional plants are built near load
centers is a simplifying assumption for modeling purposes, but may not reflect real
siting issues that the coal and nuclear industries face today.
The WinDS model also estimates construction of a portion of a duplicate
transmission line to maintain system reliability while expanding transmission
capacity, but the model does not explicitly model system reliability conditions and
resulting transmission upgrades.
Table A-4 summarizes the key findings of this analysis, focusing on direct electricity
sector costs and ignoring the benefits of wind generation in reducing carbon
emissions, or reducing water consumption. All costs are shown in US$2006, and the
difference between the present values of the two cost streams is the total cost
difference; in effect, WinDS calculates the incremental cost of achieving 20% wind
(considering costs of capital, O&M, transmission and integration, and
decommissioning) relative to the No New Wind Scenario.
Table A-4. Incremental direct cost of achieving 20% wind,
excluding certain benefits (US$2006)
Present Value
Direct Costs
(billion US
$2006) a
Average Incremental
LC of Wind
($/MWh-Wind)b
43 billion
$8.6/MWh
A
Average Incremental Impact on Average
Levelized
Household
Rate Impact
Customer
($/MWh-Total)
($/month)c
$0.6/MWh
$0.5/month
a
Per Office of Management and Budget (OMB) guidance, a 7% real discount rate is used. The
time period of analysis is 2007–2030. WinDS modeling is used through 2030 and extrapolations
of fuel usage and O&M requirements are used for 2030–2050.
b
The levelized cost per kilowatt-hour of wind produced is found by solving the following formula:
∑ wind generation * LC /(1+d)t = PV of costs in 20% Wind Scenario–PV of costs in No New Wind
Scenario.
c
Assumes 11,000 kWh/year average consumption.
The result of this analysis suggests rather modest incremental electricity-sector
costs. 15 The direct incremental cost of 20% wind is estimated to be $43 billion in net
present value terms, increasing electricity rates by only $0.6/MWh on average over
the 2007–2050 analysis period, and raising average residential monthly electricity
bills by just $0.5/MWh over that same time period. The average incremental LC
imposed by each megawatt-hour of wind is estimated at $8.6/MWh. Because WinDS
considers not just bus-bar energy costs, but also transmission costs and the cost of
integrating the variable output pattern of wind into electricity grids, the analysis
presented here suggests that the potential direct costs of achieving 20% wind,
relative to meeting load with conventional technologies, need not be overwhelming.
15
These costs reflect the model inputs and could vary significantly with different fossil fuel
price assumptions, carbon taxes or caps, or additional breakthroughs in renewable
technologies.
20% Wind Energy by 2030
163
A.5.1 Water Consumption Savings
In the energy sector, water is used primarily for cooling in steam plants, but it is also
used in boilers and in air pollution reduction processes. Several technologies are
used to condense steam (EPRI 2002; Feeley et al. 2005):
z
z
z
Recirculating steam plant cooling: Water is reused to cool steam
in a closed-loop system using a cooling tower or cooling pond.
Once-through cooling: Water from a lake, a river, or the ocean is
used to condense steam, and the water is then returned to its source,
but at a higher temperature.
Dry cooling: Air cools steam, using far less water than the first two
“wet” cooling technologies. Although dry cooling is not widely
used, it can be the cooling technology of choice where water
supplies are limited.
Two types of water use are generally considered:
z
z
A
Water withdrawal: Water is removed from the ground or diverted
from a surface source for use.
Water consumption: Water is withdrawn from a source but not
directly returned to the source because it is evaporated, transpired,
incorporated into products and crops, or consumed by people or
livestock.
In this analysis, water consumption projections were made by applying water
consumption rates (gallons per megawatt-hour generated) to projected megawatthours of generation for each type of power plant. These calculations were made on a
yearly basis for the 20% Wind Scenario and No New Wind Scenario. Water savings
from deploying large amounts of wind-generated electricity are calculated as the
difference in water consumption between the two scenarios. Water consumption
rates were developed from several data sources, the most important of which are:
z
z
z
EIA Form 767 for 2002: This database includes water consumption
rates for each steam power plant, including the steam portion of
combined cycle plants. Because these data often contain unrealistic
values for water consumption (e.g., no water consumption or very
large amounts of water consumption per megawatt-hour),
observations with extremely high and low values have been
removed before computing average consumption rates for each type
of power plant (EIA 2002).
EPRI’s water and sustainability study: This report contains
typical water consumption values for steam and combined cycle
power plants (EPRI 2002).
A Clean Air Task Force/Western Resource Advocates study:
This report supplements the EPRI estimates with other sources of
data (Baum et al. 2003).
Because of the quality and availability of data from these sources, the authors have
assumed in this study that existing and new power plants have the same water
consumption rates. Although once-through cooling plants withdraw more water per
megawatt-hour than recirculating plants, the mix of power plant cooling types (once­
164
20% Wind Energy by 2030
through and recirculating) was assumed to stay the same over the study period. No
systematic regional variations in water consumption for coal-fired steam plants were
found, and the number of realistic observations for the other technologies was too
small to permit a useful geographic disaggregation. Therefore, only national average
water consumption rates were used. Table A-5 illustrates water consumption rates
used in the analysis, and Figure A-19 shows annual water savings resulting from the
deployment of wind resources.
Table A-5. Water consumption rates for power plants
Generation
Type
Coal-Fired Steam
Gas-Fired Combined
Cycle
Nuclear
Oil- or Gas-Fired
Steam
Combustion Turbine
Wind
Water
Consumption
Rate: Gallons
per MWh
541
180
609
662
0-100
0
Source
(see list of references for
full citation)
EIA Form 767 for 2002
EPRI; Clean Air Task Force & Western
Resource Advocates
EIA Form 767 for 2002
EIA Form 767 for 2002
See note below
Clean Air Task Force & Western
Resource Advocates
Note: Data on water consumption rates for combustion turbines are sparse. Estimated
consumption rates range from 0 to about 100 gall/MWh. For example, the U.S. Department
of Energy Environmental Assessment for the Installation and Operation of Combustion
Turbine Generators at Los Alamos National Laboratory (December 2002) estimated that
water use by planned combustion turbines would be 0 (p. 17). A California Energy
Commission study (2005) indicated that water consumption for combustion turbines is less
than 100 gal/MWh. We analyzed total water savings, assuming combustion turbine water
consumption is 0 gal/MWh and 100 gal/MWh and found that the difference in total water
savings in any year was only 0.3% or less. Therefore, water savings are not sensitive to
assumptions about water consumption rates for combustion turbines.
A
Figure A-19. Annual water consumption savings due to
deployment of wind energy
Displacing large amounts of fossil-fueled power generation with wind energy
reduces water consumption. Based on the authors’ estimates, if the current
conventional generation mix is expanded to meet electricity needs, approximately
51 trillion gallons of water will be consumed for electricity production from 2007 to
20% Wind Energy by 2030
165
2030. If wind energy deployment gradually increases to 20% of the nation’s
electricity over the same time period, however, 47 trillion gallons of water will be
consumed. This is a saving of 4 trillion gallons; an 8% reduction in water
consumption. Of the 4 trillion gallons of water saved nationally, 29% will be in the
West, 41% will be in the Midwest/Great Plains, 14% will be in the Northeast, and
16% will be in the Southeast (see Table A-6). Extrapolating the savings beyond
2030 to account for the 20-year investment benefit from installing wind energy
yields cumulative water consumption savings of 6 trillion gallons by 2050.
Table A-6. U.S. states, by region
Region
West
Midwest/Great Plains
Northeast
Southeast
A
A.6
States
Alaska, Arizona, California, Colorado, Hawaii, Idaho,
Montana, Nevada, New Mexico, Oregon, Washington,
Wyoming, Utah
Illinois, Indiana, Iowa, Kansas, Michigan, Minnesota,
Missouri, Nebraska, North Dakota, Ohio, Oklahoma,
South Dakota, Texas, Wisconsin
Connecticut, Delaware, Maine, Maryland,
Massachusetts, New Hampshire, New Jersey, New York,
Pennsylvania, Rhode Island, Vermont
Alabama, Arkansas, Florida, Georgia, Louisiana,
Kentucky, North Carolina, South Carolina, Tennessee,
Mississippi, Virginia, West Virginia
Other Effects
Appendix C describes the jobs and economic impacts directly associated with the
manufacturing, construction, and operational sectors of the wind industry.
Other benefits associated with wind energy include an improved environment and
better health resulting from reduced particulate or other chemical emissions such as
acid rain or mercury, and market benefits including diversification of the electricity
sector. These benefits, and others, have not been quantified in this study.
A.7
References & Suggested Further Reading
Awerbuch, S. 1993. “The Surprising Role of Risk in Utility Integrated Resource
Planning.” The Electricity Journal 6(3): 20–33.
Awerbuch, S. 2003. “Determining the Real Cost: Why Renewable Power is More
Cost-Competitive than Previously Believed.” Renewable Energy World
6(2), March-April 2003.
Baum, E., J. Chaisson, B. Miller, J. Nielsen, M. Decker, D. Berry, and C. Putnam.
2003. The Last Straw: Water Use by Power Plants in the Arid West.
Boulder, CO and Boston, MA: The Land and Water Fund of the Rockies
and Clean Air Task Force.
http://www.catf.us/publications/reports/The_Last_Straw.pdf.
Black & Veatch Corporation. 2007. Wind Supply Curves. September. Overland, KS:
Black & Veatch.
166
20% Wind Energy by 2030
Bokenkamp, K., H. LaFlash, V. Singh, and D.B. Wang. 2005. “Hedging Carbon
Risk: Protecting Customers and Shareholders from the Financial Risk
Associated with Carbon Dioxide Emissions.” The Electricity Journal 18(6):
11–24.
Bolinger, M., and R. Wiser. 2005. Balancing Cost and Risk: The Treatment of
Renewable Energy in Western Utility Resource Plans. LBNL-58450.
Berkeley, CA: Lawrence Berkeley National Laboratory (Berkeley Lab).
Bolinger, M., and R. Wiser. 2006. Comparison of AEO 2007 Natural Gas Price
Forecast to NYMEX Futures Prices. LBNL-62056. Berkeley, CA: Berkeley
Lab..
Bolinger, M., R. Wiser, and W. Golove. 2006. “Accounting for Fuel Price Risk
When Comparing Renewable to Gas-Fired Generation: The Role of Forward
Natural Gas Prices.” Energy Policy 34(6): 706–720.
CEC (California Energy Commission). 2005. Page 43 in A Preliminary
Environmental Profile of California’s Imported Electricity. CEC-700-2005­
017. Sacramento: CEC.
http://www.energy.ca.gov/2005_energypolicy/documents/2005-06­
27+28_workshop/presentations/2005-06­
27_CECSTAFF+ASPEN_PRESENTATION.PDF
Cavanagh, R., A. Gupta, D. Lashof, and M. Tatsutani. 1993. “Utilities and CO2
Emissions: Who Bears the Risks of Future Regulation?” The Electricity
Journal, 6(2): 64–75.
Denholm, P., and W. Short. 2006. Documentation of WinDS Base Case. Version
AEO 2006 (1). Golden, CO: National Renewable Energy Laboratory
(NREL). http://www.nrel.gov/analysis/winds/pdfs/winds_data.pdf.
A
DOE (U.S. Department of Energy), NNSA (National Nuclear Security
Administration), and Los Alamos Site Office (US). 2002. Environmental
Assessment for the Installation and Operation of Combustion Turbine
Generators at Los Alamos National Laboratory. DOE/EA-1430. Los
Alamos, NM: DOE, NNSA, and Los Alamos Site Office.
EIA (Energy Information Administration). 2002. A Steam-Electric Plant Operation
and Design Report, Schedule 6, Cooling System Information. Form EIA­
767. Washington, DC: EIA.
http://www.eia.doe.gov/cneaf/electricity/forms/eia767/eia767.pdf
EIA (Energy Information Administration). 2007. Annual Energy Outlook 2007 with
Projections to 2030. Washington, DC: EIA. Report No. DOE/EIA-0383.
http://www.eia.doe.gov/oiaf/archive/aeo07/index.html.
EPRI (Electric Power Research Institute). 2002. Water and Sustainability (Volume
3): U.S. Water Consumption for Power Production – The Next Half
Century. Report 1006786. Prepared by Bevilacqua-Knight, Inc. Palo Alto,
CA: EPRI.
Feeley, T. III, L. Green, J. Murphy, J. Hoffman, and B. Carney. 2005. Department of
Energy/Office of Fossil Energy’s Power Plant Water Management R&D
Program. Washington, DC: U.S. Department of Energy (DOE), National
Energy Technology Laboratory (NETL), Science Applications International
Corporation (SAIC).
20% Wind Energy by 2030
167
Hoff, T.E. 1997. Integrating Renewable Energy Technologies in the Electric Supply
Industry: A Risk Management Approach. NREL/SR-520-23089. Golden,
CO: NREL. Hutson, S., N. Barber, J. Kenny, K. Linsey, D. Lumia, and M.
Maupin. 2004. Estimated Use of Water in the United States in 2000.
Circular 1268. Denver, CO: U.S. Geological Survey.
http://pubs.usgs.gov/circ/2004/circ1268/.
Johnston, L., E. Hausman, A. Sommer, B. Biewald, T. Woolf, D. Schlissel, A.
Roschelle, and D. White. 2006. Climate Change and Power: Carbon
Dioxide Emissions Costs and Electricity Resource Planning. Cambridge,
MA: Synapse Energy Economics, Inc.
Laxson, A., M. Hand, and N. Blair. 2006. High Wind Penetration Impact on U.S.
Wind Manufacturing Capacity and Critical Resources. NREL/TP-500­
40482. Golden, CO: NREL. http://www.nrel.gov/docs/fy07osti/40482.pdf.
NREL. 2006. Projected Benefits of Federal Energy Efficiency and Renewable
Energy Programs-FY2007 Budget Request. NREL/TP-320-39684. Golden,
Colorado: NREL. http://www1.eere.energy.gov/ba/pdfs/39684_00.pdf.
Rabe, B. 2002. Greenhouse & Statehouse: The Evolving State Government Role in
Climate Change. Arlington, Virginia: Pew Center on Global Climate
Change. http://www.pewclimate.org/docUploads/states_greenhouse.pdf.
Repetto, R., and J. Henderson. 2003. Environmental Exposures in the US Electric
Utility Industry. New Haven, CT: Yale School of Forestry & Environmental
Studies.
http://environment.yale.edu/doc/969/environmental_exposures_in_the_us_el
ectric/.
A
Wiser, R., and M. Bolinger. 2004. An Overview of Alternative Fossil Fuel Price and
Carbon Regulation Scenarios. LBNL-56403. Berkeley, CA: Berkeley Lab.
eetd.lbl.gov/EA/EMP/reports/56403.pdf.
Wiser, R., M. Bolinger, and M. St. Clair. 2005. Easing the Natural Gas Crisis:
Reducing Natural Gas Prices through Increased Deployment of Renewable
Energy and Energy Efficiency. LBNL-56756. Berkeley, CA: Berkeley Lab.
http://www.lbl.gov/Science­
Articles/Archive/sabl/2005/February/assets/Natural-Gas.pdf
168
20% Wind Energy by 2030
Appendix B. Assumptions Used
for Wind Deployment
System Model
To define the 20% Wind Scenario, a number of modifications were made to the
National Renewable Energy Laboratory’s (NREL) Wind Deployment System
(WinDS) base-case assumptions (which are described in the WinDS documentation;
see Denholm and Short 2006). These changes include updating wind resource maps,
accounting for seasonal and diurnal capacity factor (CF) variations, and including
offshore wind resources from South Carolina to Texas. Black & Veatch developed
the wind and conventional generation technology cost and performance projections
in consultation with American Wind Energy Association (AWEA) industry experts.
The assumptions about the large regional planning and operation structure of the
transmission system were developed through collaboration with the experts who
contributed to Chapter 4. The financial assumptions and the region definitions are
unchanged from the WinDS base case. This appendix outlines the assumptions used
in constructing the 20% Wind Scenario.
B.1
Financial Parameters
WinDS optimizes the electric power system “build” based on projected life-cycle
costs, which include capital costs and cumulative discounted operating costs over a
fixed evaluation period. The “overnight” capital costs supplied as inputs to the
model are adjusted to reflect the actual total cost of construction, including tax
effects, interest during construction, and financing mechanisms. Table B-1
summarizes the financial values used to produce net capital and operating costs.
These assumptions are unchanged from the WinDS base case (Denholm and Short
2006) and correspond to assumptions made by the Energy Information
Administration (EIA) in the Annual Energy Outlook 2007 with Projections to 2030
(AEO); (EIA 2007a).
B
Table B-1. Baseline financial assumptions
Name
Inflation Rate
Real Discount Rate
Marginal Income Tax
Rate
Evaluation Period
Depreciation
Schedule
Conventional
Wind
Nominal Interest Rate
during Construction
Dollar Year
20% Wind Energy by 2030
Value
3%
8.5%
40%
20 Years
15 Year
5 Year
10%
2004
Notes and Source
Based on recent historical inflation rates
Equivalent to weighted cost of capital.
Based on EIA assumptions (EIA 2006)
Combined federal/state corporate income
tax rates
Base Case Assumption
MACRS (Modified Accelerated Cost
Recovery Schedule)
MACRS (Modified Accelerated Cost
Recovery Schedule)
Base Case Assumption
All costs are expressed in year 2004
dollars.
169
B.2
Power System Characteristics
B.2.1 WinDS Regions
Four types of regions are included in the WinDS model (see Figure B-1):
z
z
z
z
Interconnect regions: There are three major interconnects in the
United States (all are electrically isolated): the Eastern Interconnect,
Western Interconnect, and the ERCOT (Electric Reliability Council
of Texas) Interconnect.
National Electric Reliability Council (NERC) 16 subregions:
WinDS uses 13 NERC regions, which are listed in Table B-2.
Balancing areas: WinDS uses 136 balancing areas.
Wind resource regions: There are 358 wind resource regions in
WinDS.
Interconnect regions, NERC regions, and balancing areas are defined and operated
by various regulatory agencies.
Figure B-1. WinDS regions
B
16
For more information on NERC, see http://www.nerc.com/regional/.
170
20% Wind Energy by 2030
Table B-2. NERC regions used in WinDS
NERC Region/
Subregion
Abbreviation
Region
Name
1
ECAR
2
ERCOT
3
MAAC
Mid-Atlantic Area Council
4
MAIN
Mid-America Interconnected
Network
5
MAPP
Mid-Continent Area Power Pool
6
NY
New York
7
NE
New England
8
FRCC
Florida Reliability Coordinating
Council
9
SERC
Southeast Reliability Council
10
SPP
Southwest Power Pool
11
NWP
Northwest
12
RA
13
CNV
East Central Area Reliability
Coordination Agreement
Electric Reliability Council of Texas
Rocky Mountain Area
California/Nevada
Note: NERC regions in WinDS are based on the pre-2006 regional definitions
defined by the EIA (2000). In January 2006, NERC regions were redefined;
however, the EIA has not incorporated these changes through publication of an
AEO. Therefore, the WinDS will continue to use pre-2006 definitions until the EIA
modifies its data. Similarly, some of the recent changes to balancing-area
boundaries (now referred to as balancing authorities) are not yet reflected in
WinDS (e.g., the formation of the Texas Regional Transmission Organization).
B
Wind resource regions were created specifically for the WinDS model. These
regions were selected using the following rules and criteria:
z
z
z
z
z
Incorporate buildup from counties (so the electricity load can be
determined for each wind supply/demand region based on county
population)
Avoid crossing state boundaries (so that state-level policies can be
modeled)
Conform to balancing areas as much as possible (to better capture
the competition between wind and other generators)
Separate major windy areas from load centers (so that the distance
from a wind resource to a load center can be well approximated)
Conform to NERC region/subregion boundaries (so that the results
are appropriate for use by integrating models that use the NERC
regions and subregions).
Figure B-2 illustrates all wind regions and balancing areas in the United States.
20% Wind Energy by 2030
171
Figure B-2. Wind region and Balancing Areas in WinDS base case
B
Several components of the WinDS model necessitate using four levels of geographic
resolution. For example, electricity demand is modeled at the NERC region level,
and wind-generator performance is modeled at the wind-resource region level.
B.2.2 Electric System Loads
Loads are defined by region and by time. WinDS meets the energy and power
requirements for each of 136 balancing areas. Energy is met for each balancing area
in each of 16 time slices, and within each year modeled. Table B-3 defines these
slices.
The electricity load in 2000 for each balancing area and time slice is derived from an
RDI/Platts database (Platts Energy Market Data; see http://www.platts.com).
Figure B-3 illustrates the WinDS load duration curve (LDC) for the entire United
States for the base year, showing the 16 load time slices. For reference, the actual
U.S. coincident LDC—also derived from the Platts database—is depicted in the
figure as well. The aggregated data for the United States that are shown in
Figure B-3 are not used directly in WinDS because the energy requirement is met in
each balancing area. This curve does, however, give a general idea of the WinDS
172
20% Wind Energy by 2030
Table B-3. WinDS demand time-slice definitions
Slice
Name
Number of
Hours Per
Year
Season
H1
1,152
Summer
Weekends, plus 11:00 p.m. to 6:00 a.m.
weekdays
H2
462
Summer
Weekdays, 7:00 a.m. to 1:00 p.m.
H3
264
Summer
Weekdays, 2:00 p.m. to 5:00 p.m.
H4
330
Summer
Weekdays, 6:00 p.m. to 10:00 p.m.
H5
792
Fall
Weekends, plus 11:00 p.m. to 6:00 a.m.
weekdays
H6
315
Fall
Weekdays, 7:00 a.m. to 1:00 p.m.
H7
180
Fall
Weekdays, 2:00 p.m. to 5:00 p.m.
H8
225
Fall
Weekdays, 6:00 p.m. to 10:00 p.m.
H9
1,496
Winter
Weekends, plus 11:00 p.m. to 6:00 a.m.
weekdays
H10
595
Winter
Weekdays, 7:00 a.m. to 1:00 p.m.
H11
340
Winter
Weekdays, 2:00 p.m. to 5:00 p.m.
H12
425
Winter
Weekdays, 6:00 p.m. to 10:00 p.m.
H13
1,144
Spring
Weekends, plus 11:00 p.m. to 6:00 a.m.
weekdays
H14
455
Spring
Weekdays, 7:00 a.m. to 1:00 p.m.
H15
260
Spring
Weekdays, 2:00 p.m. to 5:00 p.m.
H16
325
Spring
Weekdays, 6:00 p.m. 10:00 p.m.
Time Period
B
Figure B-3. National load duration curve for base year in WinDS
20% Wind Energy by 2030
173
energy requirement. The LDC does not include the “super peak,” which occurs in
most systems for a few hours per year. These peak requirements are discussed in
Section B.2.4.
B.2.3 Growth Rate
Load growth is defined at the NERC region level. Loads in all balancing areas
within each NERC region are assumed to grow at the same rate to 2050. Table B-4
contains the 2000 load and annual growth rates for each NERC region.
Table B-4. Base load and load growth in the
WinDS scenario
B
NERC
Region/SubRegion
Abbreviation
2000 Load
TWh/year
Annual Load
Growth
1
ECAR
370
1.010
2
ERCOT
205
1.016
3
MAAC
197
1.009
4
MAIN
184
1.010
5
MAPP
110
1.011
6
NY
109
1.006
7
NE
96
1.010
8
FL
141
1.022
9
SERC
589
1.015
10
SPP
132
1.013
11
NWP
176
1.017
12
RA
97
1.022
13
CNV
202
1.017
Source: EIA (2007b)
WinDS assumes that the growth rate in each time slice is also constant (i.e., the load
shape remains the same over time).
B.2.4 Capacity Requirements
In each balancing area, WinDS requires that firm capacity be available to meet the
demand in each time slice (see the national example of time-slice demand in
Figure B-3). In addition, for every NERC and interconnect region, WinDS requires
sufficient capacity to meet the peak instantaneous demand throughout the course of
the year, plus a peak reserve margin. The instantaneous annual peak load is higher
than the load in each of the 16 time slices, because the load in each time slice is the
average load over the hours included in that time slice. The reserve margin
requirement can be met by any generator type, although the generator must have the
appropriate capacity value. In the case of wind power, the actual capacity value is a
minority fraction of the nameplate capacity. Section B.6 discusses the treatment of
resource variability within the model.
Although these capacity requirements are implemented regionally, Table B-5
illustrates their national impact.
174
20% Wind Energy by 2030
Table B-5. National capacity requirements in the WinDS base case
Total (GW)
Capacity Requirement
Annual
Growth Rate
%
2000
2050
Average load in the summer peak time slice
571
1,249
1.6
Annual peak instantaneous load
702
1,531
1.6
Peak capacity value (not nameplate) to
meet reserve margin
875
1,730
1.4
Table B-6 gives the peak reserve margin for each region. Reserve margin is ramped
from its initial value in 2000 to the 2010 requirement, and maintained thereafter. It is
assumed that energy growth and peak demand grow at the same rate, and that the
load shape stays constant from one period to the next.
Table B-6. Peak reserve margin
NERC Region
Abbreviation
1
2
3
4
5
6
7
8
9
10
11
12
13
ECAR
ERCOT
MAAC
MAIN
MAPP
NY
NE
FL
SERC
SPP
NWP
RA
CNV
2010 Required
Reserve Margin
0.12
0.15
0.15
0.12
0.12
0.18
0.15
0.15
0.13
0.12
0.08
0.14
0.13
B
Source: PA Consulting Group (2004)
B.3
Wind
B.3.1 Wind Resource Definition
Table B-7 defines wind power classes.
Table B-7. Classes of wind power density
Wind Power
Class
3
4
5
6
7
Wind Power
Density, W/m2
300–400
400–500
500–600
600–800
>800
Speed,
m/s
6.4–7.0
7.0–7.5
7.5–8.0
8.0–8.8
>8.8
Notes: W/m2 = watts per square meter; m/s = meters per second. Wind speed
measured at 50 m above ground level.
Source: Elliott and Schwartz (1993)
20% Wind Energy by 2030
175
Wind power density and speed are not explicitly calculated in WinDS. Different
classes of wind power are identified by resource level, CF, turbine cost, and so forth,
which are discussed in the subsections that follow.
B.3.2 Wind Resource Data
The basic wind resource input for the WinDS model is the amount of available
windy land area (in square kilometers [km2]) by wind power class (Class 3 and
higher). The amount of available windy land is derived from state wind resource
maps and modified for environmental and land-use exclusions (as outlined in
Tables B-8 and B-9). These maps are the most recent available from the Wind
Powering America (WPA) initiative (EERE) and individual state programs. The
maps depict estimates of the wind resource at 50 m above the ground.
The WinDS base case (Denholm and Short 2006) used only two data sources, the
WPA maps validated by NREL and the Wind Energy Resource Atlas of the United
States (PNL 1987). For this report, however, the WinDS model uses recent wind
maps from individual state programs where available (instead of maps from the
1987 PNL atlas) and new WPA state maps.
Using the recent maps offers an advantage in that modern mapping techniques and
recent measurement data are incorporated into the mapping process, resulting in a
finer horizontal resolution (1 km or smaller size grid cells) of the wind resource. The
disadvantage is that not all updated maps were created using the same technique.
The difference in techniques leads to a “patchwork quilt” pattern in some regions.
The differences also result in notable resource discontinuities at state borders. For
this project, several 50 m state maps were adjusted to produce more interstate
compatibility. Table B-8 summarizes the state sources and land-use exclusions for
the land-based wind resource data used in WinDS, and Table B-9 presents the same
information for offshore wind.
B
Most state maps were completed with direct support from WPA and cost-sharing
from individual states and regional partners. Under the WPA initiative, state wind
resource maps were produced as described here. The preliminary resource map was
produced by AWS Truewind (AWST; Albany, New York). NREL validated this
map in cooperation with private consultants who had access to proprietary data,
special data, and knowledge of wind resources in each state, or both. The validation
results were used to modify the preliminary map and to create a final wind map.
NREL mapped three states—Illinois, North Dakota, and South Dakota—before
AWST became involved. An important difference between the NREL and AWST
maps is that the NREL mapping technique assumed low surface roughness
(equivalent to short grasslands); AWST used digital land cover data sets for surface
roughness values. Increases in surface roughness generally decreases the estimated
50 m wind resource, so the NREL maps might overestimate the wind resource in
areas that do not have low surface roughness. The 50 m wind power classes for
individual grid cells on the WPA maps were used to determine available windy land
for the WinDS model.
Individual state programs have updated other (non-WPA) maps, which were created
using a variety of mapping techniques. NREL has not, however, validated these
176
20% Wind Energy by 2030
Table B-8. Data sources for land-based wind resource and
environmental exclusions
Onshore Wind Resource Data Used in WinDS (10/23/2006)
Resource Data (50 m height):
State
Data Source*
2003, N/AWST
Arizona
Alabama
1987, PNL
Arkansas
2006, N/AWST**
2003, N/AWST
California
Colorado
2003, N/AWST
Connecticut
2002, N/AWST
2003, N/AWST
Delaware
Florida
1987, PNL
Georgia
2006, AWST
Idaho
2002, N/AWST
Illinois
2001, NREL
a
Indiana
2004, N/AWST
Iowa
1997, OTH
2004, OTH
Kansas
Kentucky
1987, PNL
Louisiana
1987, PNL
State
Maine
Maryland
Massachusetts
a
Michigan
Minnesota
Mississippi
a
Missouri
Montana
a
Nebraska
Nevada
New Hampshire
New Jersey
New Mexico
a
New York
North Carolina
North Dakota
Data Source*
2002, N/AWST
2003, N/AWST
2002, N/AWST
2005, N/AWST
2006, OTH
1987, PNL
2004, N/AWST
2002, N/AWST
2005, N/AWST
2003, N/AWST
2002, N/AWST
2003, N/AWST
2003, N/AWST
2004, AWST
2003, N/AWST
2000 NREL
State
a
Ohio
a
Oklahoma
Oregon
a
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Vermont
Virginia
Washington
West Virginia
Wisconsin
Wyoming
Data Source*
2004, N/AWST
2002, OTH
2002, N/AWST
2003, N/AWST
2002, N/AWST
2005, AWST
2000 NREL
1987, PNL
2004, OTH/2000, NREL
2003, N/AWST
2002, N/AWST
2003, N/AWST
2002, N/AWST
2003, N/AWST
2003, OTH
2002, N/AWST
* YrSource
Yr = Year produced (1987 to present); Source = PNL, NREL, N/AWST (NREL with AWS TrueWind), AWST (AWS TrueWind alone
not validated by NREL) or OTH (data from other sources)
PNL data resolution is 1/4 degree of latitude by 1/3 degree of longitude, each cell has a terrain exposure percent (5% for
ridgecrest to 90% for plains) to define base resource area in each cell. Ridgecrest areas have 10% of the area assigned to
the next higher power class.
NREL data was generated with the WRAMS model, and does not account for surface roughness. Resolution is 1 km.
Texas includes the Texas mesas study area updated by NREL using WRAMS.
N/AWST data was generated by AWS TrueWind and validated by NREL. Resolution is 400 m for the northwest states (WA, OR,
ID, MT, and WY) and 200 m everywhere else. These data consider surface roughness in their estimates.
N/AWST** data was generated by AWS TrueWind, and will be validated by NREL. Data used is preliminary.
OTH data from other sources. The methods, resolution, and assumptions vary. These results have not been validated by NREL
For most states, the data was taken at face value. However, some datasets were not available as 50 m power density. In those
cases, assumptions were made to adjust the data to 50 m power density.
a
In these states, the class 2, 3 and 4 wind power class estimates were adjusted upwards by 1/2 power class to better represent the
likely wind resource at wind turbine height. For Nebraska, only the portion of the state east of 102 degrees longitude was adjusted.
Wind Resource Onshore Exclusions (last revised Jan 2004)
Criteria for Defining Available Windy Land (numbered in the order they are applied):
Environmental Criteria
2) 100% exclusion of National Park Service and Fish and Wildlife
Service managed lands
3) 100% exclusion of federal lands designated as park,
wilderness, wilderness study area, national monument, national
battlefield, recreation area, national conservation area, wildlife
refuge, wildlife area, wild and scenic river or inventoried roadless
area.
Data/Comments:
USGS Federal and Indian Lands shapefile, Jan 2005
4) 100% exclusion of state and private lands equivalent to criteria
2 and 3, where GIS data is available.
State/GAP land stewardship data management status 1, from
Conservation Biology Institute Protected Lands database, 2004
8) 50% exclusion of remaining USDA Forest Service (FS) lands
(incl. National Grasslands)***
USGS Federal and Indian Lands shapefile, Jan 2005
9) 50% exclusion of remaining Dept. of Defense lands***
10) 50% exclusion of state forest land, where GIS data is
available***
USGS Federal and Indian Lands shapefile, Jan 2005
State/GAP land stewardship data management status 2, from
Conservation Biology Institute Protected Lands database, 2004
Land Use Criteria
5) 100% exclusion of airfields, urban, wetland and water areas.
B
USGS Federal and Indian Lands shapefile, Jan 2005
USGS North America Land Use Land Cover (LULC), version 2.0, 1993;
ESRI airports and airfields (2003)
Ridge-crest areas defined using a terrain definition script, overlaid with
USGS LULC data screened for the forest categories.
11) 50% exclusion of non-ridgecrest forest***
Other Criteria
1) Exclude areas of slope > 20%
6) 100% exclude 3 km surrounding criteria 2-5 (except water)
2
7) Exclude resource areas that do not meet a density of 5 km of
2
class 3 or better resource within the surrounding 100 km area.
Derived from elevation data used in the wind resource model.
Merged datasets and buffer 3 km
Focalsum function of class 3+ areas (not applied to 1987 PNL resource
data)
***50% exclusions are not cumulative. If an area is non-ridgecrest forest on FS land, it is just excluded at the 50% level one time.
20% Wind Energy by 2030
177
Table B-9. Data sources for offshore wind resource and
environmental exclusions
Offshore Wind Resource Data Used in WinDS (10/23/2006)
Resource Data (50 m height):
State
Data Source*
Alabama
2006, NREL3
California
2003, NREL1
Connecticut
2002, NREL1
Delaware
2003, NREL1
Florida
2006, NREL3
Georgia
2006, NREL3
Illinois
2006, NREL2
Indiana
2006, NREL2
Louisiana
2006, NREL3
State
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
New Hampshire
New Jersey
New York
Data Source*
2002, NREL1
2003, NREL1
2003, NREL1
2006, NREL2
2006, NREL2
2006, NREL3
2002, NREL1
2003, NREL1
2003, NREL1
State
North Carolina
Ohio
Oregon
Pennsylvania
Rhode Island
South Carolina
Texas
Virginia
Washington
Wisconsin
Data Source*
2003, NREL1
2006, NREL2
2002, NREL1
2006, NREL2
2002, NREL1
2006, NREL3
2006, NREL3
2003, NREL1
2002, NREL1
2006, NREL2
* YrSource
Yr = Year produced (2002 to present); Source = NREL with different methods enumerated below
NREL1: Validated near-shore data was supplemented with offshore resource data from earlier, preliminary runs which extended
further from shore. In most cases, this still did not fill the modeling area of interest of 50 nm from shore. The resource estimates
were extended linearly to obtain full coverage at 50 nm with little or no change in spatial pattern.
NREL2: Similar to NREL1, but available resource data estimates and areas not covered by validated and preliminary data were
evaluated by NREL meteorologist to establish a best estimate of resource distribution based on expert knowledge and available
measured/modeled data sources.
NREL3: No validated resource estimates existed to provide a baseline. NREL meteorologists generated an initial best estimate
of resource distribution to be used in the model, based on expert knowledge and available measured/modeled data sources.
Wind Resource Offshore Exclusions
No exclusions were applied to the offshore resource data. It is
characterized by power class and depth (0-30 m and >30m)
maps, which do not necessarily show the 50 m wind power classes on the maps or
the 50 m classes in geographic information system (GIS) format. For two states
(Minnesota and Wisconsin) where the 50 m power classes for individual grid cells
were unavailable, a methodology that applies basic assumptions to calculate wind
power classes for each grid cell was used. This methodology calculates a
combination of wind speed at the grid cells (direct or interpolated), extrapolates to
adjust the wind speeds from map height(s) to 50 m, plots common wind speed
frequency distribution, and takes air density into consideration. Next, environmental
and land-use exclusions were applied to arrive at the final windy land area totals.
B
Updated wind resource maps were unavailable for six southeastern states—
Alabama, Florida, Kentucky, Louisiana, Mississippi, and Tennessee. The underlying
50 m wind power class data from the maps contained in the 1987 atlas (PNL 1987)
were used to calculate windy land area for these states. The horizontal resolution of
the atlas maps is quite a bit larger (approximately 25 km grid cells) than that of the
updated state maps, which feature 1 km or smaller grid cells. To compensate for the
low resolution, landform classifications and environmental and land use exclusions
were used to calculate the available windy land for these states.
As mentioned previously, several state maps were adjusted to produce more
interstate compatibility. The Texas map was adjusted to include wind resources
currently being developed on the mesas in western Texas. Because the mesas are
relatively small terrain features, adequately depicting the available resources on
these features is difficult. As a result, the Texas map underestimates the power class
on the mesas where considerable wind energy development has taken place. In
adjusting the maps, the power class values for the mesas were increased based on
anemometer measurements, leading to a more realistic representation of the wind
energy available. The maps for eight states—Oklahoma, Missouri, Nebraska (the
178
20% Wind Energy by 2030
eastern two-thirds of the state), Indiana, Michigan, Ohio, Pennsylvania, and New
York—were adjusted because their 50 m wind power class maps underestimate the
potential resource at modern turbine hub heights. The available resource increase
results from the high wind speed shear that is present in these states. The available
windy land in these states was increased based on the wind power density values of
individual grid cells. Grid cells in classes 2, 3, and 4 that had 50 m power density
values greater than the midpoint of the associated wind power class were adjusted to
the next highest class. The these adjustments increased the estimated amount of land
with class 3, 4, and 5 wind resources.
For each of the 358 WinDS regions, the total available land area corresponding to a
particular wind resource power class was multiplied by an assumed turbine density
of 5 megawatts per square kilometer (MW/km2). This calculation yields the total
wind-generation capacity available within each WinDS region for each wind power
class.
The patchwork quilt effect that results from the varied resource input data affects the
selection of wind energy capacity in the WinDS model. If a state’s resource is
underestimated, the WinDS model may select less wind energy capacity than is
currently being developed in a given state. Similarly, if a state’s resource is
overestimated, the actual wind energy capacity could be significantly less than that
calculated by the model.
All these resource maps were based on wind power estimates at 50 m above ground
level. Today’s wind turbines, however, have hub heights as high as 80 m to 100 m.
As turbine technology improves and hub heights increase, wind resources could be
significantly different. Many states that show poor wind capability for electricity
generation at the 50 m level may have significantly improved wind speeds at heights
of 80 m to 100 m. As an example, even though Missouri is currently developing
several hundred megawatts of wind energy, WinDS does not specify significant
wind energy capacity for the state.
B
B.3.3 WinDS Seasonal and Diurnal Capacity Factor Calculations
For each region and wind power class (classes 3 to 7), 16 time slices represent four
seasons and four time periods (see Table B-3). The diurnal and seasonal variations
of the wind are portrayed as the ratio of the average wind turbine output during the
time slice with the annual average wind turbine output. Average CFs are calculated
for each of the 358 WinDS regions for each power class.
Monthly and hourly wind variations were obtained from two databases:
z
z
AWST text supplemental database files
National Commission on Energy Policy/National Center for
Atmospheric Research (NCEP/NCAR) global reanalysis mean
values (Kalnay et al. 1996).
For states with AWST data, annual and monthly average wind speeds and power
were selected from the fine map grid (400 m resolution in Washington, Oregon,
Idaho, Montana, and Wyoming; 200 m resolution in all other states), and hourly
wind speed profiles by season from the coarse map grid (10 km in Washington,
Oregon, Idaho, Montana, and Wyoming; 2 km in all other states). States with AWST
data are identified in Table B-8.
20% Wind Energy by 2030
179
For monthly input data, only one 3 × 3 km cell for each region and power class was
used. This cell was chosen because it has the lowest cost, based on the existing grid
usage optimization that is normally done as an input to WinDS (Sabeff et al. 2004).
The resulting monthly pattern is the average of the monthly values within the
3 × 3 km cell for all map points in the desired power class (plus or minus one class).
For hourly input data, the closest grid point from the coarse grid for each 3 × 3 km
cell was used. The hourly pattern is the average of hourly values for up to twenty
3 × 3 km cells for each region/power class combination. There are four patterns, one
for each season. Seasons are three-month periods (March–May, June–August,
September–November, and December–February).
For states without AWST data and for certain offshore regions, NCEP/NCAR
reanalysis data were used. Reanalysis uses a dynamic data assimilation model to
create worldwide data sets of wind, temperature, and other variables on a 208 km
resolution grid, four times daily, throughout the depth of the atmosphere. Average
values of wind speed, wind power, and air density were used, by month and by day
(four times daily), over a 46-year period of record. Reanalysis wind characteristics
from 120 m above ground level have been found to have the best correlation with
measured wind data and wind maps. Reanalysis data, however, is suitable for use
only over fairly level terrain at lower elevations. Fortunately, AWST data is
available for most states that are not suitable for reanalysis.
For regions that use reanalysis, the reanalysis grid point closest to the geographic
center of the region was chosen. For some offshore locations, the center of the
offshore region was computed and the closest reanalysis grid point was used.
Using the AWST and NCEP/NCAR databases, input data sources were used to
populate matrices of average wind speed, wind power, and air density by month and
hour of day (24 hours × 12 months). The 24 × 12 array of wind speed, wind power,
and air density was then divided into desired seasonal and diurnal time slices (see
Table B-3). For each time slice, the power output of the General Electric
International (GE) 1.5 MW wind turbine as a function of air density was estimated,
and a histogram of wind speed probability as a function of wind speed and Weibull k
factor was calculated.
B
The data was then combined to calculate the wind turbine CF for each time slice. In
the AWST data, wind power is available only by month, so the Weibull k factor was
calculated only once for each season. All times of day use the same Weibull k for
calculating CF. Finally, a weighted average of CFs from the four time slices was
used to revise nighttime values into a “nights and weekends” capacity factor. Timeslice CFs were then normalized by the total annual CF, resulting in values
representing the ratio of power produced in the current time slice to annual average
power produced. This is the desired input into the WinDS model.
This process creates a desired array of CF ratios only for regions and wind power
classes with data. With reanalysis, each region has data from only one power class.
A final data processing step is to populate the entire array of 358 regions × 5 power
classes with results. If a power class is missing, data from the next-lower power
class are chosen. If there are no available data from a lower power class, the nexthigher power class is chosen. For reanalysis regions, all five power classes are given
the same array of CF ratios.
180
20% Wind Energy by 2030
B.3.4 Wind Technology Cost and Performance
Black & Veatch analysts (in consultation with AWEA industry experts) developed
wind technology cost and performance projections for this report (Black & Veatch,
forthcoming 2008). Costs for turbines, towers, foundations, installation, profit, and
interconnection fees are included. Capital costs are based on an average installed
capital cost of $1,775 per kilowatt (kW) in 2007. After adjusting for inflation and
removing the construction financing charge, this reduces to $1,650/kW for 2006.
Additional costs reflecting terrain slope and regional population density are
described later in this subsection.
Technology development is projected to reduce future capital costs by 10%.Black &
Veatch used historical capacity factor data to create a logarithmic best-fit line, which
is then applied to each wind power class to project future performance
improvements. 17 Black & Veatch’s experience indicate that variable and fixed
operations and maintenance (O&M) costs represent an average of recent project
costs. Approximately 50% of variable O&M cost is the turbine warranty. These
costs are expected to decline as turbine reliability improves and the scale of wind
turbines increases. Other variable O&M expenses are tied to labor rates, royalties,
and other costs that are expected to be stable. Fixed O&M costs, including
insurance, property taxes, site maintenance, and legal fees, are projected to stay the
same because they are not affected by technology improvements. Table B-10 lists
cost and performance projections for land-based wind systems (Black & Veatch
2007).
Table B-11 lists cost and performance projections prepared by Black & Veatch for
shallow offshore wind technology (in water shallower than 30 m). Capital costs for
2005 were based on publicly available cost data for European offshore wind farms.
Capital costs are assumed to decline 12.5% as a result of technology development
and a maturing market. The capacity factor projection, which is based on the
logarithmic best-fit lines generated for land-based turbines, we increased 15% to
account for larger rotor diameters and reduced wind turbulence over the ocean. By
2030 this adjustment factor is reduced to 5% as land-based development allows
larger turbines to be used in turbulent environments. O&M costs are assumed to be
three times those of land-based turbines (Musial and Butterfield 2004) with a
learning rate commensurate to that projected by the U.S. Department of Energy
(DOE; NREL 2006).
B
A number of adjustments, including financing, interest during construction, terrain
slope, population density, and rapid growth were applied to the capital cost.
Although financing has not been treated explicitly, it is assumed to be captured by
the weighted cost of capital (real discount rate) of 8.5%.
A slope penalty that increases one-fourth of the capital cost by 2.5% per degree of
terrain slope was used to represent expected costs associated with installations on
mesas or ridge crests. Costs associated with installation represent 25% of the capital
cost. Wiser and Bolinger (2007) present regional variations in installed capital cost
for projects constructed in 2006. Applying a multiplier related to population density
within each of the WinDS regions results in regional variations similar to the
observed data. An additional 20% must be applied to the base capital cost in New
17
Capacity factors for 2000 and 2005 fit to actual data. For the higher wind power classes (6 and 7),
however, limited data are available for operating plants, so capacity factors were extrapolated from the
linear relationships between wind classes.
20% Wind Energy by 2030
181
Table B-10. Land-based wind technology cost and performance projections
(US$2006)
Wind Resource
Power Class at
50 m
3
3
3
3
3
3
4
4
4
4
4
4
5
5
5
5
5
5
6
6
6
6
6
6
7
7
7
7
7
7
B
Year
Installed
2005
2010
2015
2020
2025
2030
2005
2010
2015
2020
2025
2030
2005
2010
2015
2020
2025
2030
2005
2010
2015
2020
2025
2030
2005
2010
2015
2020
2025
2030
Capacity
Factor
(%)
32
35
36
38
38
38
36
39
41
42
43
43
40
43
44
45
46
46
44
46
47
48
49
49
47
50
51
52
52
53
Cost
($/kW)
Fixed O&M
($/kW-yr)
1,650
1,650
1,610
1,570
1,530
1,480
1,650
1,650
1,610
1,570
1,530
1,480
1,650
1,650
1,610
1,570
1,530
1,480
1,650
1,650
1,610
1,570
1,530
1,480
1,650
1,650
1,610
1,570
1,530
1,480
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
Variable
O&M
($/MWh)
7.0
5.5
5.0
4.6
4.5
4.4
7.0
5.5
5.0
4.6
4.5
4.4
7.0
5.5
5.0
4.6
4.5
4.4
7.0
5.5
5.0
4.6
4.5
4.4
7.0
5.5
5.0
4.6
4.5
4.4
Note: MWh = megawatt-hour
Source: Black & Veatch (2007)
England to reflect observed capital cost variations. Slope and population density
penalties have been applied to the capital cost listed in Tables B-10 and B-11 within
the model to represent topographical and regional variations across the United
States.
If the demand for new wind capacity significantly exceeds the amount supplied in
the previous year, WinDS assumes that the price paid per unit of wind capacity can
rise above the capital costs of Tables B-10 and B-11 as well as the multiplier
factors.. In particular, installing more than 20% new wind generation over the
preceding year, will increase capital costs by 1% for each 1% growth above 20% per
year (EIA 2004).
182
20% Wind Energy by 2030
Table B-11. Shallow offshore wind technology cost and performance
projections (US$2006)
Wind
Resource
Power Class
at 50 m
3
3
3
3
3
3
4
4
4
4
4
4
5
5
5
5
5
5
6
6
6
6
6
6
7
7
7
7
7
7
Year
Installed
Capacity
Factor
(%)
Capital
Cost
($/kW)
Fixed
O&M
($/kW-yr)
Variable
O&M
($/MWh)
2005
2010
2015
2020
2025
2030
2005
2010
2015
2020
2025
2030
2005
2010
2015
2020
2025
2030
2005
2010
2015
2020
2025
2030
2005
2010
2015
2020
2025
2030
34
37
38
39
40
40
38
41
43
44
45
45
42
45
46
47
48
48
46
48
50
51
51
51
50
52
54
55
55
55
2,400
2,300
2,200
2,150
2,130
2,100
2,400
2,300
2,200
2,150
2,130
2,100
2,400
2,300
2,200
2,150
2,130
2,100
2,400
2,300
2,200
2,150
2,130
2,100
2,400
2,300
2,200
2,150
2,130
2,100
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
21
18
16
14
13
11
21
18
16
14
13
11
21
18
16
14
13
11
21
18
16
14
13
11
21
18
16
14
13
11
B
Source: Black & Veatch (2007)
B.4
Conventional Generation
U.S. conventional energy generation included in the WinDS model, and most likely
to be built in the United States, has been included in EIA’s data reports (2007).
Table B-12 illustrates expected construction time and schedules for conventional
energy technologies.
WinDS considers outage rates when determining the net capacity available for
energy (as described in Section 2), and also when determining the capacity value of
each technology. Planned outages are assumed to occur in all seasons except
summer. Table B-12 shows outage rates for each conventional technology.
20% Wind Energy by 2030
183
Table B-12. General assumptions for conventional generation technologies
Technology
Modeled
Conventional
Hydropower Hydraulic Turbine
Natural Gas
Combustion Turbine
Combined Cycle
Natural Gas Turbine
Conventional
Pulverized Coal
Steam Plant
(No SO2 Scrubber)
Conventional
Pulverized Coal
Steam Plant
(With SO2 scrubber)
B
Advanced
Supercritical Coal
Steam Plant (with
SO2 and Nox
Controls)
Integrated Coal
Gasification
Combined Cycle
Turbine
Oil/Gas Steam
Turbine
Capability for
new builds in
WinDS
No
Construction
Time (years)
(1)
NA
Forced
Outage
Rate (%)
(3)
Construction Schedule (2)
Fraction of Cost in Each Year
Planned
Outage
Rate (%)
(3)
Emissions Rates (4)
(lbs/MMBTU fuel input)
SO2
Lifetime
(years)
1
2
3
4
5
6
-
-
-
-
-
-
2.0%
5.0%
0
0
0
0
100
NOx
Hg
CO2
Yes
3
0.8
0.1
0.1
-
-
-
10.7%
6.4%
0.0006
0.08
0
33.2877
30
Yes
No-Scrubbers
may be added to
meet SO2
constraints.
Existing plants
may also switch
to low-sulfur coal.
3
0.5
0.4
0.1
-
-
-
5.0%
7.0%
0.0006
0.02
0
33.2877
30
6
0.1
0.2
0.2
0.2
0.2
0.1
7.9%
9.8%
0.2355
0.448
4.6E-06
55.77131
60
No-see above
6
0.1
0.2
0.2
0.2
0.2
0.1
7.9%
9.8%
1.57
0.448
4.6E-06
55.77131
60
Yes
4
0.4
0.3
0.2
0.1
-
-
7.9%
9.8%
0.157
0.02
4.6E-06
55.77131
60
Yes
No -Assumes
Gas-CT or GasCC will be built
instead.
4
0.4
0.3
0.2
0.1
-
-
7.9%
9.8%
0.0184
0.02
4.6E-06
55.77131
60
-
-
-
-
-
-
7.9%
9.8%
0.026
0.1
0
33.2877
50
6
0.1
0.2
0.2
0.2
0.2
0.1
5.0%
5.0%
0
0
0
0
30
NA
Nuclear
Yes
Geothermal
No
NA
-
-
-
-
-
-
5.0%
5.0%
0
0
0
0
20
No
NA
-
-
-
-
-
-
5.0%
5.0%
0
0
0
0
45
0.5
0.4
0.1
-
-
-
35.0%
5.0%
0.00015
0.02
0
8.321926
30
-
-
-
-
-
-
5.0%
5.0%
0
0
0
0
30
Biomass (as Thermal
Steam Generator)
Concentrating Solar
Power with Storage
Municipal Solid Waste
/ Landfill Gas
184
Yes
No
3
NA
20% Wind Energy by 2030
Emission rates are estimated in Table B-12 for SO2, NOx, mercury, and CO2 and
provides input-specific emission rates (in pounds per million British thermal units)
for plants that use combustible fuel. Output emission rates (in pounds per megawatthour) are calculated by multiplying input emission rate by heat rate.
B.4.1 Conventional Generation Cost and Performance
Table B-13 also gives capital cost values, heat rates (efficiency), and fixed and
variable O&M costs for conventional technologies that might be added to the
electric system. Cost and performance values for natural gas, nuclear, and coal
technologies are based on recent project costs according to Black & Veatch
experience. Pulverized coal plants continue to operate in WinDS, and SO2 scrubbers
can be added to unscrubbed coal plants for $200/kW. Oil, gas, steam, and
unscrubbed coal plants cannot be added to the electric system, but those currently in
operation are maintained until retired. WinDS sites conventional generation
technology where it is least expensive (generally adjacent to load centers) and does
not require new transmission. California is the exception because its legislative
requirements prohibit siting new coal plants.
Capital costs for 2005, 2010, and 2015 are based on proposed engineering,
procurement, and construction (EPC) estimates for plants that will be commissioned
in 2010, 2015, and 2020. A wet scrubber is included in the EPC costs for new
pulverized coal plants. Owners’ costs of 20% for coal, nuclear, and combined-cycle
gas plants and 10% for simple-cycle gas plants provide an “all-in” cost. These
owners’ costs are based on national averages and include transmission and
interconnection, land, permitting, and other costs. As with wind systems, an
additional 20% of the capital costs listed in Table B-13 is applied to coal and nuclear
generation technology in New England, representing siting difficulties.
B.4.2 Fuel Prices
B
Fuel prices for natural gas and coal are derived from reference projections from the
AEO (EIA 2007b). These tables provide the prices in each census region, which are
then assigned to a NERC subregion in WinDS. Prices in the AEO are projected to
2030. Beyond 2030, WinDS projects that fuel prices will increase at the same
national annual average rate as the AEO’s 2030 projection.
Figure B-4 illustrates the projected fossil fuel prices in constant $US2005. The 20%
Wind Scenario uses the reference AEO fuel price forecast for coal because
government agencies and the private sector regularly use that forecast to make
planning and investment decisions. The New York Mercantile Exchange futures
prices for natural gas for May 2007 through 2012 exceed the AEO’s high fuel price
forecast over that period. Also, under the current set of technology cost and
performance assumptions, the WinDS model tends to select natural gas-fueled
technology over coal-fueled technology. To provide a conservative estimate while
representing a more traditional mix of conventional generation technology, the AEO
high natural gas price forecast has been implemented.
The price of uranium fuel in WinDS is constant at $0.5/MMBtu (Denholm and Short
2006).
20% Wind Energy by 2030
185
Table B-13. Cost and performance characteristics for
conventional generation (US$2006)
Gas CT
Gas-CC
New Coal (SC)
Coal - IGCC
B
Nuclear
Install
Date
Capital
Cost
($/kW)
Fixed
O&M
($/MW/yr)
Variable
O&M
($/MWh)
Heat Rate
(Btu/kWh)
2005
625
7,700
12.0
11,560
2010
750
6,600
2.8
8,900
2015
750
6,600
2.8
8,900
2020
750
6,600
2.8
8,900
2030
750
6,600
2.8
8,900
2005
780
14,400
3.0
6,870
2010
780
14,400
3.0
6,870
2015
780
14,400
3.0
6,870
2020
780
14,400
3.0
6,870
2030
780
14,400
3.0
6,870
2005
2,120
35,300
1.7
9,470
2010
2,180
35,300
1.7
9,200
2015
2,240
35,300
1.7
9,100
2020
2,240
35,300
1.7
9,000
2030
2,240
35,300
1.7
9,000
2005
2,750
38,100
3.9
9,000
2010
2,840
38,100
3.9
9,000
2015
2,840
38,100
3.9
8,900
2020
2,840
38,100
3.9
8,800
2030
2,840
38,100
3.9
8,580
2005
3,260
90,000
0.5
10,400
2010
3,170
90,000
0.5
10,400
2015
3,020
90,000
0.5
10,400
2020
2,940
90,000
0.5
10,400
2030
2,350
90,000
0.5
10,400
Notes: New nuclear plants may not be constructed before 2010. O&M costs do not
include fuel. Heat rate is net heat rate (including internal plant loads).
Source: Black & Veatch 2007
186
20% Wind Energy by 2030
Figure B-4. Projected coal and natural gas prices in WinDS to 2030
B.5
Transmission
Three types of transmission systems can be used to transport wind power around the
country:
z
B
Existing grid: It is assumed that 10% of the existing grid can be
used for new wind capacity, either by improving the grid or by
tapping existing unused capacity. A GIS optimization determines
the distance at which a particular wind farm will have to be built to
connect to the grid (based on the assumption that the closest wind
installation will access the grid first at the least cost). In this way, a
supply curve of costs to access the grid is created for each class of
wind in each region. Additionally, the model assumes a pancaketype fee may be charged for crossing between balancing areas . The
supply curves described earlier are based on this type of
transmission and the GIS optimization described here. In the near
term, one can expect that most wind will be built and will use the
existing grid without needing to build excessive amounts of new
transmission lines, but as higher penetration levels are reached, the
existing grid will be insufficient.
Existing transmission capacity is estimated using a database of
existing lines (length and voltage) from RDI/Platts (Platts Energy
Market Data; see http://www.platts.com). This database is translated
into a megawatt capacity as a function of kilovolt (kV) rating and
length (Weiss and Spiewak 1998).
20% Wind Energy by 2030
187
z
New lines: The model has the ability to build straight-line
transmission lines between any of the 358 wind regions. The line is
built exactly to the size necessary to transmit the desired megawatts
and the cost of building that transmission line is accounted for in the
model.
AWEA experts indicate that new transmission line capacity might
be constructed for any generation technology for an average cost of
$1,600/MW-mile. Based on input from the AWEA expert panel,
regional transmission cost variations include an additional 40% in
New England and New York; 30% in PJM East (New Jersey and
Delaware); 20% in PJM West (Maryland, West Virginia,
Pennsylvania, Ohio, parts of Illinois, Indiana, and Virginia); and
20% in California.
The WinDS model assumes that 50% of the cost of new
transmission is borne by the generation technology for which the
new transmission is being built (wind or conventional); the other
half is borne by the ratepayers within a region (because of the
reliability benefits to all users associated with new transmission).
This 50–50 allocation, which is common in the industry, was
recently adopted for the 15-state Midwest Independent
Transmission System Operator (Midwest ISO) region. New wind
transmission lines that carry power across the main interconnects
are not cost-shared with other technology. In the WinDS model, this
sharing of costs is implied by reducing the cost of new transmission
associated with a particular capacity by 50%. This means that the
relative costs of transmission and capacity capital are in line with
the model’s assumption. The remaining 50% of transmission costs
are integrated into the final cost value outputs from the model,
resulting in accurate total transmission costs.
B
z
In-region transmission: Within any of the 358 wind regions, the
model can build directly from a wind resource location to a load
within the same region. A second GIS-generated supply curve is
used within the model to assign a cost for this transmission.
A fourth type of transmission, used predominantly by conventional capacity and
called general transmission, can be built as well. This is limited because
conventional capacity can generally be built in the region where it is needed, thereby
obviating the need for new transmission.
WinDS uses a transmission loss rate of 0.236 kW/MW-mile. This value is based on
the loss estimates for a typical transmission circuit (Weiss and Spiewak 1998). The
assumed typical line is a 200-mile, 230-kV line rated at 170 megavolt amperes
(MVA; line characteristics derived from EPRI [1983]).
To emulate large regional planning structures based on that of the Midwest ISO,
there is essentially no wheeling fee between balancing areas used in this analysis
(although the model has the capability to model such a fee). The wind penetration is
limited to 25% energy in each of the three interconnects: Western, Eastern, and
ERCOT.
188
20% Wind Energy by 2030
B.6
Treatment of Resource Variability
The variability of wind resources can impact the electrical grid in several ways. One
useful way to examine these impacts is to categorize them in terms of time, ranging
from multiyear planning issues to small instantaneous fluctuations in output.
At the longest time interval, a utility’s capacity expansion plans might call for the
construction of more nameplate generation capacity. To meet this need, planners can
plan to build conventional dispatchable capacity or wind. The variability of wind
output precludes the planners from considering 1 MW of nameplate wind capacity to
be the same as 1 MW of nameplate dispatchable capacity. The wind capacity cannot
be counted on to be available when electricity demand is at its peak. Actually,
conventional capacity cannot be considered 100% available, either. The difference is
in the degree of availability. Conventional generators are available 80% to 98% of
the time. However, wind energy is available at varying levels that average about
30% to 45% of the time, depending on the quality of the wind site. For planning
purposes, this lack of availability can be handled in the same way—a statistical
treatment that calculates how much more load can be added to the system for each
megawatt of additional nameplate wind or conventional capacity or effective load
carrying capability (ELCC).
Wind’s ELCC is less than that of conventional capacity because (1) the wind
availability is less conventional fuel availability and (2) at any given instant, energy
output from a new wind farm can be heavily correlated with the output from existing
wind farms. In other words, if the wind is not blowing at one wind site, there is a
reasonable chance that it is not blowing at another nearby site. On the other hand,
there is essentially no correlation between the outputs of any two conventional
generation plants.
Fortunately, there are ways to partly mitigate both the low availability of the wind
resource and its correlation between sites. In the past 20 years, the capacity factors
of new wind installations have improved considerably. This is attributable to better
site exploration and characterization and to improvements in the wind turbines
(largely higher towers).
B
The correlation in wind output between sites can also be reduced. Increasing the
distance between sites and the terrain features that separate them reduces the chance
that two sites will experience the same wind at the same time. Figure B-5 shows this
correlation as a function of distance between sites in an east–west direction and in a
north–south direction (Simonsen and Stevens 2004). With its multiple regions,
WinDS is able to approximate the distance between sites and, therefore, the
correlation between their outputs. WinDS uses the correlation between sites to
estimate the variation in wind output from the total set of wind farms supplying
power to a particular region.
Between each two-year optimization period and for each demand region, WinDS
updates its estimate of the marginal ELCC associated with adding wind of each
resource class in each wind supply region to meet demand within a NERC region.
This marginal ELCC is a strong function of the wind capacity factor and the distance
from the existing wind systems to the new wind site. It is also a weak function of the
demand region’s LDC and the size and forced outage rates of conventional capacity.
This marginal ELCC is assumed to be the capacity value of each megawatt of that
20% Wind Energy by 2030
189
Figure B-5. Distance between wind sites and correlation with power output
wind class added in the next period in that wind supply region to serve the NERC
region’s demand.
All other factors being equal, when expanding wind capacity, WinDS will select the
next site in a region that is as far from the existing sites as possible to ensure the
lowest correlation and the highest ELCC for the next wind site. (From a practical
standpoint, all factors are never “equal,” and WinDS considers the trade-offs
between ELCC and wind site quality, transmission availability and cost, and local
siting costs.)
B
Generally, for the first wind site supplying a demand region, these capacity values
(ELCCs) are almost equal to the peak season capacity factor. As the wind penetrates
to higher levels, though, the ELCC can decline to almost zero in an individual wind
supply region.
The next time frame of major interest is the day ahead. Utilities generally make
decisions on which generating units to commit to generation the day before they are
actually committed. To comply with these unit-commitment procedures,
independent power plant owners can be expected to bid for firm capacity a day
ahead. This can be problematic for wind generator owners. For example, if the wind
owner bids to provide firm capacity and the wind does not blow as forecast, the
owner may have to make up the difference by purchasing power on the real-time
market. If the purchased power costs more per kilowatt-hour than the owner is being
paid for the day-ahead bid, the owner will lose money.
Not all of today’s electric grid systems operate day-ahead and real-time markets.
California, for example, allows a monthly balancing of bid and actual wind
generation that is much more tolerant of the inaccuracies in forecasting wind a day
ahead of time. In all cases, however, the imbalances can be offset with adequate
operating reserves. To capture the essence of the unit-commitment issue, WinDS
estimates the impact of wind variability on the need for operating reserves (which
include quick-start and spinning reserves) that can rapidly respond to changes in
wind output. The operating reserves are assumed to be a linear function of the
variance in the sum of generation (both wind and conventional) minus load. Because
190
20% Wind Energy by 2030
the variability of wind is statistically independent of load variability and forced
outages, the total variance can be calculated as the sum of the variance associated
with the normal (i.e., no wind) operating reserve and the total variance (over all the
wind supply regions) in the wind output over the reconciliation period.
Before each two-year optimization, WinDS calculates the marginal operating
reserve additions required by the next unit of wind added in a particular wind supply
region from a particular wind class. The resulting value is the difference between the
operating reserve required by the total system with the new wind and the operating
reserve required by the total system if there were no new wind installations in that
region. This value is then used throughout the next two-year linear program
optimization as the marginal operating reserve requirement induced by the next
megawatt of wind addition in that region of that wind resource class.
In the shortest time interval, regulation reserves must compensate for instantaneous
changes in wind output. Regulation reserves are normally provided by automatic
generation control of conventional generators whose output can be automatically
adjusted to compensate for small voltage changes on the grid. Fortunately, these
instantaneous changes in wind output do not all occur at the same time, even from
wind turbines within the same wind farm. This lack of correlation over time and the
ease with which conventional generators can respond allows this second-order cost
to be reasonably ignored.
WinDS assumes that the wind generated energy delivered to a specific demand
region in a specific time slice in excess of the total load for that region/time slice
will be lost. In addition, WinDS also statistically accounts for surplus wind lost
within a time slice because of variations in load and wind within the time slice.
WinDS includes three options for mitigating the impact of resource variability. The
first option is to add conventional generators that can provide spinning reserve (e.g.,
gas-CC) and quick-start capabilities (combustion turbines). The second, and usually
least costly, option is to allow the dispersion of new wind installations to reduce the
correlation of the outputs from different wind sites. Finally, the model can allow for
storage of electricity at the wind site, which is usually the most costly option. The
storage option was not available within this analysis and is currently being
developed for the model.
B.7
B
Federal and State Energy Policy
The WinDS accounts for all currently enacted federal and state emission standards,
renewable portfolio standards (RPS), and tax credits.
B.7.1
Federal Emission Standards
WinDS provides the ability to add a national cap on CO2 emissions from electricity
production. WinDS can also account for a tax for CO2 emissions. However, neither a
carbon cap nor a tax is implemented in the 20% Wind Scenario.
Emissions of SO2 are capped at the national level. WinDS uses a cap that
corresponds roughly to the 2005 Clean Air Interstate Rule (CAIR), replacing the
previous limits established by the 1990 Clean Air Act Amendments (CAAA). The
CAIR rule divides the United States into two regions. WinDS uses the U.S.
Environmental Protection Agency’s (EPA) estimate of the effective national cap on
20% Wind Energy by 2030
191
SO2 resulting from the CAIR rule (EPA 2005). Table B-14 shows the SO2 cap used
in WinDS.
Table B-14. National SO2 emission limit schedule in WinDS
Year
2003
2010
2015
2020
2030
National SO2 Emissions
(Million Tons)
10.6
6.1
5.0
4.3
3.5
(EPA 2005)
WinDS currently allows unrestrained NOx emissions. . The NOx cap from CAIR can
be added, but the net effect on the overall competitiveness of coal is expected to be
relatively small (EIA 2003).
WinDS currently allows unrestrained Mercury emissions. The Clean Air Mercury
Rule (see http://www.epa.gov/camr/index.htm) is a cap and trade regulation, which
is expected to be met largely by the CAIR requirements. Control technologies for
SO2 and NOx that are required for CAIR are expected to capture enough mercury to
largely meet the cap goals. As a result, the incremental cost of mercury regulations
is very low and is not modeled in WinDS (EIA 2003).
B.7.2 Federal Energy Incentives
Several classes of incentives have been applied to wind systems at the federal level.
These incentives generally have the effect of reducing the cost of producing energy
from renewable sources. A production tax credit (PTC) offsets the tax liability of
companies based on the amount of energy produced. This analysis assumes that the
current PTC will be available for wind through 2008 (see Table B-15).
B
Table B-15. Federal renewable energy incentives
Name
Value
Renewable Energy PTC
$19/MWh
Notes and Source
Applies to wind. No limit to the aggregated
amount of incentive. Value is adjusted for
inflation to US$2006. Expires end of 2008.
(U.S. Congress 2005)
B.7.3 State Energy Incentives
Several states also offer production and investment incentives for renewable energy
resource development. Table B-16 lists the values used in WinDS. However, in the
20% Wind Scenario these incentives are overwhelmed by the specification of wind
energy generation in each year through 2030.
192
20% Wind Energy by 2030
Table B-16. State renewable energy incentives
State
PTC $/
MWh
Iowa
Idaho
Minnesota
New Jersey
New Mexico
Oklahoma
Utah
Washington
Wyoming
ITC
Assumed State
Corporate Tax Rate
5.00%
5.00%
6.50%
6.00%
10.0%
7.60%
9.8%
9.0%
7.0%
6.0%
5.0%
0.0%
0.0%
10
2.5
4.75%
6.50%
4.00%
Investment and production tax credit data from IREC 2006
Tax rates from: www.taxadmin.org/fta/rate/corp_inc.html
B.7.4 State Renewable Portfolio Standards
A number of states have developed Renewable Portfolio Standards (RPS), and states
can put capacity mandates in place as an alternative or supplement to an RPS (see
Table B-17). A capacity mandate requires a utility to install a certain fixed capacity
of renewable energy generation. Unless prohibited by law, a state might also meet
requirements by importing electricity.
Table B-17. State RPS requirements as of August 2005
State
RPS
Start
Year2
RPS Full
Implementation3
Penalty
in
$/MWh
Arizona
California
Colorado
Connecticut
Delaware
Illinois
Massachusetts
Maryland
Minnesota
Montana
New Jersey
New Mexico
Nevada
New York
Oklahoma
Oregon
Pennsylvania
Rhode Island
Texas
Vermont
Wisconsin
2001
2003
2007
2004
2007
2004
2003
2006
2002
2008
2005
2006
2003
2006
2005
2002
2007
2007
2003
2005
2001
2025
2017
2015
2010
2019
2013
2009
2019
2015
2015
2008
2011
2015
2013
2016
2020
2020
2019
2015
2012
2011
50
5
50
55
25
10
50
20
10
10
50
10
10
5
50
5
45
55
50
10
10
20% Wind Energy by 2030
WinDS
Assumed
RPS
Fraction4
0.0079
0.034
0.044
0.013
0.056
0.062
0.026
0.045
0.072
0.075
0.029
0.026
0.133
0.035
0.05
0.078
0.014
0.069
0.01
0.05
0.006
Legislated
Load
RPS
Fraction5
Fraction
(%)
1.1
1
20
0.63
10
0.69
10
0.94
10
0.75
15
0.92
4
0.85
7.5
0.8
1,125 MW
1
15
0.9
6.5
1
10
0.53
20
0.89
25
0.84
See Note 6
1
See Note 6
1
8
0.98
15
0.99
5,880 MW
1
See Note 6
1
2.2
0.75
B
193
Notes:
1) RPS data as of 8/16/05. Source: IREC 2006.
2) RPS Start Year is the “beginning” of the RPS program. The RPS is ramped linearly to the full
implementation year.
3) RPS Full Implementation is the year that the full RPS fraction must be met. WinDS assumes
the fraction met is ramped up linearly between the start year and the full implementation year.
4) WinDS Assumed RPS Fraction is the fraction of state demand that must be met by wind by
the full implementation year. This value is based on the total state RPS requirement and
adjusted to estimate the fraction actually provided by wind since WinDS does not currently
include other renewables such as biomass cofiring and certain hydro projects.
5) Load fraction is the fraction of the total state load that must meet the RPS. In certain locations,
municipal or cooperative power systems may be exempt from the RPS.
6) Several states have special funds set aside to promote renewables. The net increase in wind
due to these funds was estimated and applied as an effective RPS.
B.8
Electricity Sector Direct Cost Calculation
The objective of the electricity sector direct cost calculation is to determine the
difference in system-wide costs where 20% wind penetration is required compared
to the case where no new wind generation is installed after 2006. The goal was to
estimate the cost per kilowatt-hour of wind produced and the cost per kilowatt-hour
of the total load met. The resulting numbers for both scenarios are reported in
Appendix A.
To gather necessary costs from the WinDS model, it was programmed to calculate
costs incurred in each year of the simulation from 2008 through 2030 for both cases
(with and without wind). These costs are then broken into subgroups, including wind
capital costs; conventional energy capital costs; wind and conventional transmission
build costs (including the full transmission cost, not just the portion shared by each
generator); and conventional fuel costs.
Because the impacts of reduced fuel demand and wind turbines installed in the years
immediately preceding 2030 are not evident until after 2030, the cost impacts
beyond 2030 are estimated. To arrive at the estimate, the model assumes that wind
generation would linearly decay from 2030 to 2050 and that the conventional fuel
and O&M savings would also linearly decay to 0 from 2030 to 2050. This is a
conservative approach because it assumes that the wind farms are retired linearly.
B
Finally, all costs (including the approximated costs after 2030) are discounted back
to 2006. The WinDS model is run with an 8.5% real weighted cost of capital to
represent a typical utility perspective. In evaluating a policy such as an RPS, a social
discount rate of 7% should be used in accordance with Office of Management and
Budget guidelines (OMB 1992). This lower rate effectively places higher (higher
than a utility’s 8.5% discount rate) value on benefits and costs encountered further in
the future. The total cost difference then becomes the difference in the present value
of the two cost streams. To find the cost per kilowatt-hour (levelized cost) of wind
produced, the total cost difference is levelized to satisfy the following formula:
∑ wind generationt * LC /(1+d)t = PV of costs in 20% case – PV of costs in no wind
case
194
20% Wind Energy by 2030
As a second result, to find the cost per kilowatt-hour of total generation, replace
wind generation with total generation in the preceding formula. The complete
equation to calculate the present value of costs used in the preceding equation is as
follows:
PVCosts = a + b + c
2030
a =
Σ
( ( CapCostNewCapacityt + CapCostNewTransmission t + O&MCost t + FuelCost t ) / ( 1 + d ) ( t – 2006 ) )
t=2006
2050
b =
Σ
( WindO&MCostsCapBuiltBy2030 t / ( 1 + d ) ( t – 2006 ) )
t=2031
2050
c =
Σ
( ( ( ConvO&M2030 + Fuel Cost,2030 ) FractionNotRetiredWind ) / ( 1 + d ( t – 2006 ) ))
t=2031
where
FractionNotRetiredWind = Fraction of wind generation remaining from wind capacity installed prior to 2031
in the 20% wind case
B.9
References & Suggested Further Reading
Black & Veatch. 2007. 20 % Wind Energy Penetration in the United States: A
Technical Analysis of the Energy Resource. Walnut Creek, CA.
B
Denholm, P., and W. Short. 2006. Documentation of WinDS Base Case. Version
AEO 2006 (1). Golden, CO: National Renewable Energy Laboratory
(NREL). http://www.nrel.gov/analysis/winds/pdfs/winds_data.pdf.
EERE (U.S. DOE Office of Energy Efficiency and Renewable Energy). Wind and
Hydropower Technologies Program: Wind Powering America Web site.
http://www.eere.energy.gov/windandhydro/windpoweringamerica/.
EIA (Energy Information Administration). 2000. Cross Reference of States to
Federal Regions, NERC Regions, and Census Divisions. Washington, DC:
EIA. http://www.eia.doe.gov/cneaf/electricity/ipp/html1/tb5p01.html.
EIA. 2002. Upgrading Transmission Capacity for Wholesale Electric Power Trade.
Washington, DC: EIA.
http://www.eia.doe.gov/cneaf/pubs_html/feat_trans_capacity/w_sale.html.
EIA. 2003. Analysis of S. 485, the Clear Skies Act of 2003, and S. 843, the Clean
Air Planning Act of 2003. SR/OIAF2003-03(2003). Washington, DC: EIA.
EIA. 2004a. The Electricity Market Module of the National Energy Modeling
System; Model Documentation Report. DOE/EIA-M068(2004).
Washington, DC: EIA.
EIA. 2004b. Analysis of Senate Amendment 2028, the Climate Stewardship Act of
2003. SR/OIAF/2004-06. Washington, DC: EIA.
20% Wind Energy by 2030
195
EIA. 2006a. Assumptions to the Annual Energy Outlook 2006 with Projections to
2030. . Washington, DC: EIA.
http://www.eia.doe.gov/oiaf/archive/aeo06/assumption/index.html
EIA. 2006b. Supplemental Tables to the Annual Energy Outlook 2006. Washington,
DC: EIA.
http://www.eia.doe.gov/oiaf/archive/aeo06/supplement/index.html.
EIA. 2006c. Energy and Economic Impacts of H.R.5049, the Keep America
Competitive Global Warming Policy Act. SR/OIAF/2006-03.Washington,
DC: EIA.
EIA. 2007a. Annual Energy Outlook 2007 with Projections to 2030. Washington,
DC: EIA. Report No. DOE/EIA-0383.
http://www.eia.doe.gov/oiaf/archive/aeo07/index.html
EIA. 2007b. Supplemental Tables to the Annual Energy Outlook. Tables 60 through
72. Washington, DC: EIA.
http://www.eia.doe.gov/oiaf/aeo/supplement/index.html.
EIA. 2007c. Assumptions to the Annual Energy Outlook 2007 with Projections to
2030. Washington, DC: EIA.
http://www.eia.doe.gov/oiaf/aeo/assumption/index.html
EIA. 2007d. Energy Market and Economic Impacts of a Proposal to Reduce
Greenhouse Gas Intensity with a Cap and Trade System. SR/OIAF/2007-01.
Washington, DC: EIA. http://www.epa.gov/cleanenergy/egrid/index.htm.
Elliott, D.L., and M.N. Schwartz. 1993. Wind Energy Potential in the United States.
PNL-SA-23109. NTIS No. DE94001667. Richland, WA: Pacific Northwest
Laboratory (PNL).
EPA (U.S. Environmental Protection Agency). 1996. “Compilation of Air Pollutant
Emission Factors, AP-42.” In Volume I: Stationary Point and Area Sources.
Fifth edition. Washington, DC: EPA. http://www.epa.gov/ttn/chief/ap42/.
B
EPA. 2005a. Clean Air Interstate Rule, Charts and Tables. Washington, DC: EPA.
http://www.epa.gov/cair/charts_files/cair_emissions_costs.pdf.
EPA. 2005b. eGRID Emissions & Generation Resource Integrated Database.
Washington, DC: EPA Office of Atmospheric Programs.
EPRI (Electric Power Research Institute). 1983. Transmission Line Reference Book,
345-kV and Above. Second edition. Palo Alto, CA: EPRI.
IREC (Interstate Renewable Energy Council). 2006. Database of State Incentives for
Renewable & Efficiency (DSIRE). http://www.dsireusa.org/.
Kalnay, E., M. Kanamitsu, R. Kistler, W. Collins, D. Deaven, L. Gandin, M. Iredell,
et al. 1996. “The NCEP/NCAR 40-Year Reanalysis Project.” Bulletin of the
American Meteorological Society. 77, 437–471.
http://ams.allenpress.com/perlserv/?request=res­
loc&uri=urn%3Aap%3Apdf%3Adoi%3A10.1175%2F1520­
0477%281996%29077%3C0437%3ATNYRP%3E2.0.CO%3B2.
McDonald, A., and L. Schrattenholzer. 2001. “Learning Rates for Energy
Technologies.” Energy Policy 29, 255–261.
Musial, W., and S. Butterfield. 2004. Future for Offshore Wind Energy in the United
States. NREL/CP-500-36313. Golden, CO: NREL.
196
20% Wind Energy by 2030
NREL. 2006. National Wind Technology Center Website, “About the Program,”
http://www.nrel.gov/wind/uppermidwestanalysis.html.
NREL. 2006. Projected Benefits of Federal Energy Efficiency and Renewable
Energy Programs-FY2007 Budget Request. NREL/TP-320-39684. Golden,
CO: NREL. http://www1.eere.energy.gov/ba/pdfs/39684_00.pdf.
OMB (Office of Management and Budget). 1992. Guidelines and Discount Rates for
Benefit-Cost Analysis of Federal Programs. Circular A-94.Washington, DC:
OMB. http://www.whitehouse.gov/OMB/circulars/index.html.
PA Consulting Group. 2004. “Reserve Margin Data.” Energy Observer 2, July.
PNL. 1987. Wind Energy Resource Atlas of the United States. DOE/CH 10093-4.
Richland, WA: PNL.
Sabeff, L., R. George, D. Heimiller, and A. Milbrandt. 2004. Regional Data and GIS
Representation: Methods, Approaches & Issues. Presentation to Scoping
Workshop for GIS Regionalization for EERE Models.
http://www.nrel.gov/analysis/workshops/pdfs/brady_gis_workshop.pdf.
Simonsen, T., and B. Stevens. 2004. Regional Wind Energy Analysis for the Central
United States. Grand Forks, ND: Energy and Environmental Research
Center.
http://www.undeerc.org/wind/literature/Regional_Wind.pdf.
U.S. Congress. 2005. Domenici-Barton Energy Policy Act of 2005. Washington,
DC: 109th Congress.
Weiss, L., and S. Spiewak. 1998. The Wheeling and Transmission Manual.
Lilburn,GA: The Fairmont Press Inc.
Wiser, R., and M. Bolinger. 2007. Annual Report on U.S. Wind Power Installation,
Cost, and Performance Trends: 2006. DOE/GO-102007-2433. Golden, CO:
NREL. http://www.osti.gov/bridge.
B
Notes: Many of the assumptions about conventional generation and fuel prices are
drawn from the EIA’s National Energy Modeling System. This information is
published in the AEO, which consists of three documents: the main AEO (which
focuses on results); the supplemental tables (which contain additional details on
results at the regional level); and the assumptions (which presents input details).
Several sources for emissions data are available from the EPA, including the AP-42
series of documents. Detailed emissions estimates for different combustion
technologies and emissions controls can be found in the AP-42 series. The eGRID
database estimates emissions rates from existing plants, based on measured fuel use
and continuous emissions monitoring system data measurement.
20% Wind Energy by 2030
197
B
198
20% Wind Energy by 2030
Appendix C. Wind-Related Jobs
and Economic
Development
This appendix details the economic model used to project the employment and
economic development impacts of the 20% Wind Scenario described in Appendix
A. Ramping up wind capacity and electricity output from wind would displace jobs
and economic activity elsewhere. However, identifying such transfers accurately
would be very difficult. Therefore, the impacts cited here do not constitute impacts
to the U.S. economy overall but are specific to the wind industry and related
industries. The impacts were calculated using the Jobs and Economic Development
Impacts (JEDI) model, based in part on data from the Wind Deployment System
(WinDS) model (developed by the National Renewable Energy Laboratory
[NREL]). Appendix A summarizes the WinDS modeled scenario, and specific
assumptions are described in Appendix B. Cost and performance projections for this
analysis were supplied by Black & Veatch (Black & Veatch 2007) and are detailed
in Appendix B.
The 20% Wind Scenario was constructed by specifying annual wind energy
generation for every year from 2007 to 2030. The specifications were based on a
trajectory proposed in an NREL study (Laxson, Hand, and Blair 2006). The NREL
study forced the WinDS model to reach the 20% level for wind-generated electricity
by 2030. The investigators evaluated aggressive near-term growth rates followed by
sustainable levels of wind capacity installations that would maintain electricity
generation levels at 20% and accommodate the repowering of aging wind
installations beyond 2030. The 20% wind by 2030 trajectory was implemented in
WinDS by calculating the percentage of annual energy production from wind at an
increase of approximately 1% per year. Figure C-1 illustrates the energy generation
trajectory proposed by the NREL study with the corresponding annual wind capacity
installations that the WinDS model projects will meet these energy-generation
percentages.
C
The combined cost, technology, and operational assumptions in the WinDS model
show that an annual installation rate of about 16 gigawatts per year (GW/year)
reached by 2018 could result in generation capacity capable of supplying 20% of the
nation’s electricity demand by 2030. This annual installation rate is affected by the
quality of wind resources selected for development as well as future wind turbine
performance. The declining annual installed capacity after 2024 is an artifact of the
prescribed energy generation from the NREL study, which did not consider
technology improvement and wind resource variation. The NREL study provides an
upper level of about 20 GW/year, because turbine performance is unchanged over
time and only one wind resource power class was assumed. Based on the wind
resource data and the projected wind technology improvements presented in this
report, sustaining a level of annual installations at approximately 16 GW/year
beyond 2030 would accommodate the repowering of aging wind turbine equipment
along with increased electricity demand, so that the nation’s energy demand would
20% Wind Energy by 2030
199
Figure C-1. Prescribed annual wind technology generation as a percentage of
national electricity demand from Laxson, Hand, and Blair (2006) and
corresponding annual wind capacity installation for 20% Wind Scenario from
WinDS model.
continue to be met by 20% wind. This installation level could maintain energy
production of 20% of the nation’s demand. Additionally, this scenario shows that
this level of wind development could accommodate the repowering of aging wind
turbine equipment. Specific policy incentives necessary for this growth, such as a
production tax credit (PTC) or carbon regulation policy, are not modeled.
To obtain 20% of U.S. electricity from wind by 2030, changes in the wind power
and electricity industries would need to be made. These changes, which are
discussed in the body of this report, include advances in domestic manufacturing of
wind turbine components; training, labor, and materials for installation of wind
farms and operations and maintenance (O&M) functions; and improvements in wind
technology and electric power system infrastructure. This appendix covers the
output from the JEDI model, which shows the potential employment impacts from
this scenario along with other impacts to the United States associated with new wind
installations.
C
C.1
The JEDI Model
C.1.1 Model Description
The JEDI model was developed in 2002 for NREL to demonstrate the state and local
economic development impacts associated with developing wind power plants in the
United States. These impacts include employment numbers created in the wind
power sector, and the increase in overall economic activity associated with the
construction and operating phases of new wind power. The JEDI spreadsheet-based
model for wind is free and available to the public. It can be downloaded from the
Wind Powering America website: www.windpoweringamerica.gov. Documentation
is listed on the same site. For questions, please contact Marshall Goldberg at
[email protected] or Suzanne Tegen at [email protected].
JEDI was initially designed to estimate economic impacts to state economies.
Subsequent enhancements made the model capable of performing county, regional,
and national analyses as well. This particular analysis focuses primarily on
200
20% Wind Energy by 2030
economic impacts for the United States as a whole, although some state and regional
results are presented.
To calculate economic impacts, the model relies on investment and expenditure data
from the 20% Wind Scenario for the period between 2007 and 2030. The model also
uses industry multipliers that trace supply linkages in the economy. For example, the
analysis shows how wind turbine purchases benefit not only turbine manufacturers,
but also the fabricated metal industries and other businesses that supply inputs
(goods and services) to those manufacturers.
The model evaluates three separate impacts for each expenditure: direct, indirect,
and induced.
z
z
z
Direct impacts are the on-site or immediate effects created by
spending money for a new wind project. In the JEDI model, the
construction phase includes the on-site jobs of the contractors and
crews hired to construct the plant as well as their managers and
staffs. Direct impacts also include jobs at the manufacturing plants
that build the turbines as well as the jobs at the factories that
produce the towers and blades. 18
Indirect impacts refer to the increase in economic activity that
occurs, for example, when a contractor, vendor, or manufacturer
receives payment for goods or services and in turn is able to pay
others who support their business. This includes the banker who
finances the contractor and the accountant who keeps the
contractor’s books, as well as the steel mills, electrical part
manufacturers, and suppliers of other necessary materials and
services.
Induced impacts are the changes in wealth that result from
spending by people directly and indirectly employed by the project.
For example, when plant workers and other local workers receive
income from expenditures related to the plant, they in turn purchase
food, clothing, and other goods and services from local business.
C
The sum of these three impacts is the total impact from the turbine’s construction.
Figure C-2 illustrates this ripple effect, from direct impacts to induced impacts. This
figure excludes the impacts on other energy sectors as wind power displaces other
sources of energy.
JEDI relies on U.S.-specific multipliers and personal expenditure patterns. These
multipliers—for patterns of employment, wage and salary income, output (economic
activity), and personal spending (expenditure)—are adapted from the IMPLAN
Professional Software model (Minnesota IMPLAN Group, Inc., Stillwater,
Minnesota; see http://www.implan.com). The IMPLAN® model is based on U.S.
industry and census data. Spending from new investments (e.g., purchases of
equipment and services) to construct and operate wind plants is matched with the
appropriate multipliers for each industry sector (e.g., construction, electrical
18
When an impact analysis is conducted in this manner, the definitions of direct and indirect are
changed somewhat. Typically, the change in final demand to an industry (in this instance the wind
industry) is seen as the direct effect. In the JEDI model, the direct effect includes what are usually
called first-round indirect effects (e.g., demand to manufacturers and other goods and service
suppliers). The JEDI indirect effects are all subsequent rounds of the industry indirect effects.
20% Wind Energy by 2030
201
Figure C-2. Wind's economic ripple effect
equipment, machinery, professional services, and others) affected by the change in
expenditure.
Outputs from the JEDI model are reported for two distinct phases: the construction
phase and the annual operations phase. The construction period outputs represent the
entire construction period (typically one year for a utility-scale wind project,
although this can vary depending on the size of the project). The outputs for the
operating period represent the jobs and economic impacts created for one year of
operation.
C.1.2 Caveats
Before noting the specific economic impacts from the 20% Wind Scenario, it is
important to underscore several caveats about the JEDI model.
First, the model is considered static. As such, it relies on inter-industry relationships
and personal consumption patterns at the time of the analysis. The model does not
account for feedback through demand, increases, or reductions that could result from
price changes. Similarly, the model does not account for feedback from inflationary
pressures or potential constraints on local labor and money supplies. In addition, the
model assumes that adequate local resources and production and service capabilities
are available to meet the level of local demand identified in the model’s
assumptions. For new power plants, the model does not automatically take into
account improvements in industry productivity over time, changes during
construction, or changes in O&M processes (e.g., production recipe for labor,
materials, and service cost ratios). To adjust for advancements in technology or
changes in wages and salaries, the model is run with new cost assumptions (e.g.,
once with a construction cost of $1,650/kW and again with a construction cost –
excluding construction financing - of $1,610/kW).
C
Second, the intent of using the JEDI model is to construct a reasonable profile of
investments (e.g., wind power plant construction and operating costs) to demonstrate
the economic impacts that will likely result during the construction and operating
periods. Given the potential for future changes in wind power plant costs beyond
those identified, and potential changes in industry and personal consumption
patterns in the economy noted earlier, the analysis is not intended to provide a
202
20% Wind Energy by 2030
precise forecast, but rather an estimate of overall economic impacts in the wind
energy sector from specific scenarios.
Third, because the analysis and results are specific to developing new land-based
and offshore wind power plants only, this is considered a gross analysis. The results
do not reflect the net impacts of construction or operation of other types of
electricity-generating power plants or replacement of existing power generation
resources to meet growing needs.
Fourth, the analysis assumes that the output from the wind power plants and the
specific terms of the power purchase agreements generate sufficient revenues to
accommodate the equity and debt repayment and annual operating expenditures.
And finally, the analysis period is 2007 through 2030; additional impacts beyond
these years are not considered.
C.2
Wind Scenario Inputs
To assess the economic development from the addition of 293 GW of wind
technology in the United States, the authors relied on inputs from the WinDS model.
The detailed cost and performance projections can be found in Appendix B of this
report.
Table C-1 summarizes the wind data assumptions used in the JEDI model. The cost
data are allocated into expenditure categories. Each category includes the portion of
the expenditure that goes to the local area, which in this case is the entire United
States.
Table C-1. JEDI wind modeling assumptions
Category
Period of Analysis
Nameplate Capacity
Number of Turbines
Turbine Size
Technology Cost1 per kW
2007
2010
2015
2020
2025
2030
O&M Costs
Fixed2
Variable3
2004
2010
2015
2020
2025
20% Wind Energy by 2030
2007-2030
Shallow
Offshore
2007-2030
239.5 GW
79,130
1500–5000 kW
53.9 GW
17,976
3000 kW
$1650
$1650
$1610
$1570
$1530
$1480
$2400
$2300
$2200
$2150
$2130
$2100
$11.50/kW
$15.00/kW
$7.00/MWh
$5.50/MWh
$5.00/MWh
$4.60/MWh
$4.50/MWh
$21.00/MWh
$18.00/MWh
$16.00/MWh
$14.00/MWh
$13.00/MWh
Land-Based
Total
293.4 GW
97,106
C
203
Category
2030
U.S. Spending
Labor
Materials and Services
Major Components
Blades
Towers
Machine Heads
Sub-Components
Land-Based
$4.40/MWh
Shallow
Offshore
$11.00/MWh
Total
100%
100%
100%
100%
Equipment (Manufacturing
Transition)4
50% in 2007 to 80% in 2030
26% in 2007 to 50% in 2030
20% in 2007 to 42% in 2030
10% in 2007 to 30% in 2030
Notes: 1. All dollar values are 2006 dollars. Technology costs exclude construction
financing costs and regional cost variations that result from increased population density,
elevation, or other considerations that are included in the WinDS model. Thus, the
cumulative investment costs presented in this study are lower than those presented in
Appendix A. 2. Fixed costs include land lease cost. 3. Variable costs include property taxes.
4. Refers to U.S. manufacturing/assembly for turbines, blades and towers. For purposes of
this modeling, the transition (percentage of U.S. manufacturing/assembly) is assumed to
occur at an average annual rate over the 24-year period.
As explained earlier, the JEDI model uses project expenditures—or spending—for
salaries, services, and materials to calculate the total economic impacts. Table C-2
summarizes the expenditure data used in the analysis.
Table C-2. Wind plant expenditure data summary (in millions)
Category
Offshore
All Wind
Total Cumulative Construction Cost
(2007-2030)
$379,343
$115,790
$495,133
Domestic Spending
$200,192
$94,690
$294,882
$63,618
$20,765
$84,383
$4,394
$2,861
$7,255
$59,224
$17,904
$77,128
$1,533
$345
$1,877
$639
$144
$783
Total Annual Operational Expenses in
2030 (300 GW)
C
Onshore
Direct O&M Costs
Other Annual Costs
Property Taxes
Land Lease
Notes: All dollar values are 2006 dollars. All dollars represent millions of dollars. Though
some of the money spent during construction leaves the country, all O&M spending is
domestic.
C.3
Findings
As Table C-3 indicates, developing 293 GW of new land-based and offshore wind
technologies from 2007 to 2030 could have significant economic impacts for the
entire United States. Cumulative economic activity from the construction phase
alone will reach more than $944 billion for direct, indirect, and induced activity in
the nation. This level of economic activity stimulates an annual average of more
than 250,000 workers required for employment in the wind power and related
204
20% Wind Energy by 2030
sectors from 2007 forward. Of these average annual positions, the wind industry
supports 70,000 full-time workers in construction-related sectors, including more
than 47,000 full-time workers directly in construction and 22,000 workers in
manufacturing. As noted earlier, this estimate does not take into account the
offsetting effects on employment in other energy sectors.
Table C-3. U.S. construction-related economic impacts from 20% wind
Average Annual Impacts
Jobs
Earnings
Output
$12,217
Direct Impacts
72,946
$5,221
Construction Sector Only
47,020
$3,547
Manufacturing Sector Only
22,346
$1,446
Other Industry Sectors
3,580
$228
Indirect Impacts
66,035
$3,008
$11,377
Induced Impacts
Total Impacts (Direct, Indirect,
Induced)
Total Construction Impacts
2007-2030
119,774
$4,483
$15,749
258,755
$12,712
$39,343
Jobs
Earnings
Output
NPV of
Output
Direct Impacts
1,750,706
$125,305
$293,197
$111,153
Construction Sector Only
1,128,479
$85,129
Manufacturing Sector Only
536,305
$34,706
Other Industry Sectors
85,922
$5,471
Indirect Impacts
1,584,842
$72,197
$273,057
$103,541
Induced Impacts
Total Impacts (Direct, Indirect,
Induced)
2,874,582
$107,591
$377,984
$143,367
6,210,129
$305,093
$944,238
$358,061
Note: All dollar values are millions of 2006 dollars. Average annual Jobs are full-time equivalent for
each year of the construction period. Cumulative jobs are total full-time equivalent for the 24-year
construction period from 2007 through 2030. The NPV column shows the net present value of the
output column with a discount rate of 7%, per guidance from the Office of Management and
Budget.
C
Under this scenario, the wind industry would produce 305 GW/year. By 2020, the
economic activity generated from annual operations of the wind turbines would
exceed $27 billion/year. The number of wind plant workers alone would grow to
more than 28,000/year, and total wind-related employment would exceed 215,000
workers (see Table C-4).
Table C-4. U.S. operations-related economic impacts from 20% wind
Operation of 300 GW
in 2030
Jobs
Earnings
Output
Direct Impacts
76,667
$3,643
$8,356
Plant Workers Only
28,557
$1,617
Nonplant Workers
48,110
$2,026
Indirect Impacts
37,785
$1,624
$5,642
Induced Impacts
Total Impacts (Direct, Indirect,
Induced)
102,126
$3,822
$13,429
216,578
$9,090
$27,427
20% Wind Energy by 2030
205
Total Operation Impacts 20072030
Jobs
Earnings
Output
NPV of
Output
1,163,297
$55,907
$122,463
$26,072
Property Tax
$1,877
$760
Land Lease
$783
$317
$119,804
$24,996
Direct Impacts
Other Direct Impacts
Plant Workers Only
482,578
$27,458
Nonplant Workers
680,719
$28,449
Indirect Impacts
561,107
$24,118
$84,008
$17,674
1,591,623
$59,572
$209,286
$42,569
3,316,027
$139,596
$415,757
$86,315
Induced Impacts
Total Impacts (Direct, Indirect,
Induced)
Note: All dollar values are millions of 2006 dollars. Operation jobs in 2030 are full-time equivalent
for operation of the 305 GW fleet existing in 2030. Cumulative jobs are total full-time equivalent for
the 24-year construction period from 2007 through 2030. The NPV column shows the net present
value of the output column with a discount rate of 7%, per guidance from the Office of Management
and Budget.
Figure C-3 shows the economic impacts from direct, indirect, and induced impacts .
Figure C-3. Annual direct, indirect and induced economic
impacts from 20% scenario
C
Figure C-4 displays the total economic impacts on a relative basis. The impacts of
both the construction and the operation phases are included for the entire period
from 2007 through 2030.
The 20% Wind Scenario shows the U.S. wind industry growing from its current
3 GW/year in 2007 to a sustained 16 GW/year by around 2018. In the following
sections, employment impacts in the wind industry are divided into three major
industry sectors: manufacturing, construction, and operations. Each sector is
206
20% Wind Energy by 2030
Figure C-4. Total economic impacts of 20% wind energy by 2030
on a relative basis
described during the year of its maximum employment supported by the wind
industry.
The JEDI model estimates the number of jobs supported by one project throughout
the economy, as well as the total economic output from the project. Results from the
JEDI model do not include macroeconomic effects. Instead, the model focuses on
jobs and impacts supported by specific wind projects. In other words, the
employment estimates from the JEDI model look only at gross economic impacts
from this 20% Wind Scenario.
C.4
Manufacturing Sector
The 20% Wind Scenario includes the prospect of significantly expanding wind
power manufacturing capabilities in the United States. In 2026, this level of wind
development supports more than 32,000 U.S. manufacturing full-time workers,
including land-based and offshore wind projects. These employment impacts are
directly related to producing the major components and subcomponents for the
turbines, towers, and blades installed in the United States. Although the level of
domestic wind installations declines after 2021 in the scenario modeled, the
manufacturing and construction industries have the potential to maintain a high level
of employment and expand further to meet increasing global demand.
C
To estimate the potential location for manufacturing jobs, data from a non­
governmental organization, Renewable Energy Policy Project (REPP), report were
used (Sterzinger and Svrcek 2004). The REPP report identified existing U.S.
companies with the technical potential to enter the wind turbine market. The map in
Figure C-5 was created using the percentages of manufacturing capability in each
state and JEDI’s manufacturing jobs output. Again, these potential manufacturing
jobs from the REPP report are based on technical potential existing in 2004, without
assuming increased productivity or expansion over time. The data also assumes that
existing facilities that manufacture components similar to wind turbine components
are modified. Most of the manufacturing jobs in this scenario are located in the
Great Lakes region, where manufacturing jobs are currently being lost. Even states
20% Wind Energy by 2030
207
Figure C-5. Potential manufacturing jobs created by 2030
without a significant wind resource can be impacted economically from new
manufacturing jobs (e.g., southeastern US).
C.5
Construction Sector
The year 2021 represents the height of the wind plant construction period, with
16.7 GW of wind having been brought online. In that year, more than 65,000
construction industry workers are assumed to be employed and $54.5 billion is
generated in the U.S. economy from direct, indirect, and induced construction
spending.
C
To reach the 20% Wind Scenario, today’s wind power industry would have to grow
from 9,000 annual construction jobs in 2007 to 65,000 new annual construction jobs
in 2021. Construction jobs could be dispersed throughout the United States.
Assuming the 16 GW/year capacity can be maintained into the future, including the
replacement of outdated wind plants, the industry could maintain 20% electricity
from wind as demand grows. In this scenario, the construction sector would
experience the largest increase in jobs, followed by the operations sector, and then
by the manufacturing sector. Figure C-6 shows the direct employment impact on the
construction sector, the manufacturing sector and the operations sector (plant
workers only).
Figure C-7 shows employment impacts during the same years, but adds the indirect
and induced jobs. The bottom three bars (manufacturing, construction, and
operations—including plant workers and other direct jobs) are direct jobs only. This
chart depicts the large impact from the indirect and induced job categories,
compared to the initial direct expenditures in the direct categories.
208
20% Wind Energy by 2030
Figure C-6. Direct manufacturing, construction, and operations
jobs supported by the 20% Wind Scenario
Figure C-7. Jobs per year from direct, indirect, and induced categories
In the last ten years of the scenario, the wind industry could support 500,000 jobs, including
over 150,000 direct jobs.
C
C.6
Operations Sector
JEDI predicts that in 2030, employment of more than 215,000 total operations
workers (direct, indirect, and induced) will exist to maintain 293 GW of wind
capacity. This includes more than 28,000 direct O&M jobs and 48,000 other direct
jobs related to operating a wind plant (e.g., utility services and subcontractors). JEDI
predicts that in 2030, land-based and offshore wind project operations will have a
total economic impact of $27 billion. Operations employment would be dispersed
20% Wind Energy by 2030
209
across the country and is likely to be near wind installations. Rural Americans, in
particular, could realize significant positive impacts from this scenario in the form of
landowner payments and property taxes. Counties use property taxes to improve
roads and schools, along with other vital infrastructure. More than $8.8 billion is
estimated in property taxes and land lease payments between 2007 and 2030, which
could be an important boost for rural communities.
Figure C-8 shows the results of JEDI analysis, performed on a state-by-state basis, in
the form of impacts to each North American Electric Reliability Corporation
(NERC) region. The individual state impacts were summed to calculate the NERC
region impacts. These total impacts are lower than those from the JEDI analysis for
the entire country because any job or dollar flowing out of state is considered
monetary leakage (in the U.S. analysis, the model considers the whole country to be
“local”).
Figure C-8 shows jobs in job-years, which are FTE jobs counted in each year in
which they exist. For example, if a maintenance worker holds one job for 20 years,
this is shown as 20 job-years. For this figure, jobs during construction are assumed
to last for one year. Jobs during the operations period are assumed to last for 20
years. Economic impacts are direct, indirect, and induced. Because it represents
impacts from 305 GW of new wind starting in 2004 and ending in 2030, Figure C-8
shows three additional years when compared to other results.
Figure C-8. Jobs and economic impacts by NERC region
C
210
20% Wind Energy by 2030
C.7
Conclusion
As a nation, the United States has made much progress recently in developing its
wind resources. However, advancements in wind technologies and the projected
increasing demand for electricity, will provide significant opportunities to further
develop this domestic renewable resource. Actions toward this goal, as identified in
the 20% Wind Scenario, offer residents and businesses in the rural and urban United
States potential for economic development opportunities and potential for
employment.
The United States is a prime location for developing wind resources and new wind
manufacturing facilities. At the same time, relocating or expanding existing
industries can give businesses opportunities to meet many of the material needs
associated with wind technology manufacturing, installation, and facility operation.
In many areas of the country, renewable resources provide an opportunity to boost
the local economy significantly. Wind plants offer employment during construction
and continue to support permanent jobs during operation. Today, tax revenues from
wind plants help to fund local schools, hospitals, and government services.
Based on the scenario presented in this report, a new and expanding wind
manufacturing industry can meet 20% of our domestic electricity needs through
2030.
C.8
References
Laxson, A., M. Hand, and N. Blair. 2006. High Wind Penetration Impact on U.S.
Wind Manufacturing Capacity and Critical Resources. NREL/TP-500­
40482. Golden, CO: National Renewable Energy Laboratory.
MIG IMPLAN. “IMPLAN Professional Software.” Stillwater, MN: Minnesota
IMPLAN Group, Inc. (MIG) www.implan.com/software.html.
Black & Veatch. 2007 20 % Wind Energy Penetration in the United States: A
Technical Analysis of the Energy Resource. Walnut Creek, CA
C
Sterzinger, G., and M. Svrcek. 2004. Wind Turbine Development: Location of
Manufacturing Activity. Washington, DC: Renewable Energy Policy Project
(REPP).
20% Wind Energy by 2030
211
C
212
20% Wind Energy by 2030
Appendix D. Lead Authors,
Reviewers and Other
Contributors
The U.S. Department of Energy would like to acknowledge the authors and
reviewers listed below. This technical report is the culmination of contributions
from more than 90 individuals and more than 50 organizations since June 2006.
Their contributions and support were important throughout the development
of this report. The final version of this document was prepared by the U.S.
Department of Energy. Overall report reviewers included the U.S. Department
of Energy, National Renewable Energy Laboratory, American Wind Energy
Association, and other selected National Laboratory staff.
Report Lead Editors and Coordinators
Steve Lindenberg, U.S. Department of Energy, Brian Smith and Kathy O’Dell,
National Renewable Energy Laboratory (NREL), Ed DeMeo, Renewable Energy
Consulting Services *, (Team co-manager) and Bonnie Ram, Energetics
Incorporated* (Team co-manager)
Report Production, Editing, and Graphic Images
Donna Heimiller
NREL, WinDS maps and graphics
Cliff Scher
Energetics Incorporated, Document Version Control
Russell Raymond
Energetics Incorporated, Document Version Control
Wendy Wallace
Energetics Incorporated, Document Version Control
Julie Chappell
Energetics Incorporated, Graphics Lead
Tommy Finamore
Energetics Incorporated, Cover Graphic Design
Susan Kaczmarek
Energetics Incorporated, Document Layout Coordinator
GE Energy
Cover graphic photographs
Members of the following advisory group supplied strategic guidance:
Rashid Abdul
Mitsubishi Power Systems
Stan Calvert
U.S. Department of Energy
*
Edgar DeMeo
Renewable Energy Consulting Services, Inc.
Robert Gates
Clipper Windpower
Robert Gramlich
American Wind Energy Association
Thomas O. Gray
American Wind Energy Association
Steven Lindenberg
U.S. Department of Energy
James Lyons
GE Global Research
Brian McNiff
McNiff Light Industries
Bentham Paulos
Energy Foundation
Bonnie Ram*
Energetics Incorporated
Janet Sawin
Worldwatch Institute
Brian Smith
National Renewable Energy Laboratory
J. Charles Smith
Utility Wind Integration Group
Randall Swisher
American Wind Energy Association
Robert Thresher
National Renewable Energy Laboratory
James Walker
enXco
*
D
Support provided under subcontract to the National Renewable Energy Laboratory
20% Wind Energy by 2030
213
Chapter 1. Executive Summary and Overview of the 20% Wind Scenario
Elizabeth Salerno
Robert Gramlich
Alison Silverstein
Paget Donnelly
Edgar DeMeo
Larry Flowers
Thomas O. Gray
Maureen Hand
Bonnie Ram
Brian Smith
American Wind Energy Association
American Wind Energy Association
Consultant
Energetics Incorporated
Renewable Energy Consulting Services, Inc.
National Renewable Energy Laboratory
American Wind Energy Association
National Renewable Energy Laboratory
Energetics Incorporated
National Renewable Energy Laboratory
Chapter 2. Wind Turbine Technology
Michael Robinson *
Paul Veers
Sandy Butterfield
Jim Greene
Walter Musial
Robert Thresher
Edgar DeMeo
Robert Gramlich
Robert Poore
Scott Schreck
Alison Silverstein
Brian Smith
James Walker
Lawrence Willey
Jose Zayas
Rashid Abdul
Jim Ahlgrimm
James Lyons
Amir Mikhail
National Renewable Energy Laboratory
Sandia National Laboratories
National Renewable Energy Laboratory
National Renewable Energy Laboratory
National Renewable Energy Laboratory
National Renewable Energy Laboratory
Renewable Energy Consulting Services, Inc.
American Wind Energy Association
Global Energy Concepts, LLC
National Renewable Energy Laboratory
Consultant
National Renewable Energy Laboratory
enXco
GE Energy
Sandia National Laboratories
Mitsubishi
U.S. Department of Energy
GE Global Research
Clipper Windpower
Chapter 3. Manufacturing, Material and Resources
Lawrence Willey*
Corneliu Barbu
Maureen Hand
Edgar DeMeo
Kate Gordon
Steve Lockard
Brian O’Hanlon
Elizabeth Salerno
Brian Siu
Brian Smith
Paul Veers
James Walker
D
GE Energy
GE Energy (formerly)
National Renewable Energy Laboratory
Renewable Energy Consulting Services, Inc.
Apollo Alliance
TPI Composites
U.S. Department of Commerce
American Wind Energy Association
Apollo Alliance
National Renewable Energy Laboratory
Sandia National Laboratories
enXco
*
Lead authors and advisors for each chapter are shown in bold. The final versions of the chapters are
the sole responsibility of the U.S. Department of Energy. Task force members are underlined, and Task
Force chairpersons are identified with an asterisk. Reviewers are shown in italics. Reviewers did not
help to draft the chapters they reviewed. Their participation is not meant to imply that they or their
respective organizations either agree or disagree with the findings of the effort.
214
20% Wind Energy by 2030
Stephen Connors
Brian McNiff
Massachusetts Institute of Technology
McNiff Light Industries
Chapter 4. Transmission and Integration into the U.S. Electric System
J. Charles Smith *
Robert Gramlich
Mark Ahlstrom
Jeff Anthony
Jack Cadogan
James Caldwell
Henri Daher
Edgar DeMeo
Ken Donohoo
Abraham Ellis
Douglas Faulkner
Robert Fullerton
Stephen Gehl
Jay Godfrey
John Holt
Karen Hyde
Mike Jacobs
Brendan Kirby
Ronald L. Lehr
Charles Linderman
Michael Milligan
Dale Osborn
Philip Overholt
Brian Parsons
Richard Piwko
Steve Ponder
Craig Quist
Kristine Schmidt
Matthew Schuerger
Alison Silverstein
Beth Soholt
John Stough
Robert Thomas
Gary Thompson
Robert Zavadil
Ellen Lutz
Utility Wind Integration Group
American Wind Energy Association
WindLogics
American Wind Energy Association
U.S. DOE Retired
Los Angeles Department of Water and Power
National Grid USA
Renewable Energy Consulting Services, Inc.
Electric Reliability Council of Texas
Public Service Company of New Mexico
Puget Sound Energy
Western Area Power Administration
Electric Power Research Institute
American Electric Power
National Rural Electric Cooperative Association
Xcel Energy
American Wind Energy Association
Oak Ridge National Laboratory
American Wind Energy Association
Edison Electric Institute
National Renewable Energy Laboratory
Midwest Independent System Operator
U.S. Department of Energy
National Renewable Energy Laboratory
GE Energy
Sierra Pacific Resources
PacifiCorp
Xcel Energy
Energy Systems Consulting Services, LLC
Consultant
Wind on the Wires
AEP
Cornell University
Nebraska Public Power District
EnerNex
U.S. Department of Energy (formerly)
D
Chapter 5. Wind Power Siting and Environmental Effects
Laurie Jodziewicz*
Bonnie Ram
James Walker
Wayne Walker
Abby Arnold
John Coequyt
Edgar DeMeo
Nathanael Greene
American Wind Energy Association
Energetics Inc.
enXco
Horizon Wind Energy
Resolve
Greenpeace
Renewable Energy Consulting Services, Inc.
Natural Resources Defense Council
*
Lead authors and advisors for each chapter are shown in bold. Task force members are underlined and
Task Force chairpersons are identified with an asterisk. Reviewers are shown in italics.
20% Wind Energy by 2030
215
Alan Nogee
Janet Sawin
Alison Silverstein
Tom Weis
Katherine Kennedy
Jim Lindsay
Laura Miner
Robert Thresher
Union of Concerned Scientists
Worldwatch Institute
Consultant
enXco Consultant
Natural Resources Defense Council (formerly)
Florida Power & Light Company
U.S. Department of Energy (formerly)
National Renewable Energy Laboratory
Chapter 6. Wind Power Markets
The contributions of this Task Force (Markets and Stakeholders) spanned a broad
spectrum of issues, and are reflected in many of the chapters in this report.
Larry Flowers *
Ronald L. Lehr
David Olsen
Brent Alderfer
Jeff Anthony
Lori Bird
Lisa Daniels
Trudy Forsyth
Robert Gough
Steven Lindenberg
Walter Musial
Kevin Rackstraw
Roby Robichaud
Susan Sloan
Tom Wind
Bob Anderson
Ruth Baranowski
Edgar DeMeo
Robert Fullerton
Robert Gramlich
Karen Hyde
Bonnie Ram
Kristine Schmidt
Michael Skelley
Brian Smith
Dennis Lin
Roby Roberts
Wayne Walker
D
National Renewable Energy Laboratory
American Wind Energy Association
Center for Energy Efficiency and Renewable
Technologies
Community Energy
American Wind Energy Association
National Renewable Energy Laboratory
Windustry
National Renewable Energy Laboratory
Intertribal Council on Utility Policy
U.S. Department of Energy
National Renewable Energy Laboratory
Clipper Windpower
U.S. Department of Energy
American Wind Energy Association
Wind Utility Consulting
Bob Anderson Consulting
National Renewable Energy Laboratory
Renewable Energy Consulting Services, Inc.
Western Area Power Administration
American Wind Energy Association
Xcel Energy
Energetics Incorporated
Xcel Energy
Horizon Wind Energy
National Renewable Energy Laboratory
U.S. Department of Energy
Goldman Sachs
Horizon Wind Energy
*
Lead authors and advisors for each chapter are shown in bold. Task force members are underlined and
Task Force chairpersons are identified with an asterisk. Reviewers are shown in italics.
216
20% Wind Energy by 2030
Appendices A, B, and C and Supporting Analysis Task Force
Maureen Hand * (A, B, C)
Nate Blair (A, B)
Suzanne Tegen (C)
Mark Bolinger (A)
Dennis Elliott (B)
Ray George (B)
Marshall Goldberg (C)
Donna Heimiller (B)
Tracy Hern (A)
Bart Miller (A)
Ric O’Connell (A, B)
Marc Schwartz (B)
Ryan Wiser (A)
Jeff Anthony
Steven Clemmer
Edgar DeMeo
Robert Gramlich
Christopher Namovicz
Elizabeth Salerno
Alison Silverstein
Brian Smith
Ian Baring-Gould
Jack Cadogan
Eric Gebhardt
Gary Jordan
Brian Parsons
Ryan Pletka
Walter Short
Martin Tabbita
Hanson Wood
Michael DeAngelis
Alejandro Moreno
National Renewable Energy Laboratory
National Renewable Energy Laboratory
National Renewable Energy Laboratory
Lawrence Berkeley National Laboratory
National Renewable Energy Laboratory
National Renewable Energy Laboratory
MRG Associates
National Renewable Energy Laboratory
Western Resource Advocates
Western Resource Advocates
Black & Veatch
National Renewable Energy Laboratory
Lawrence Berkeley National Laboratory
American Wind Energy Association
Union of Concerned Scientists
Renewable Energy Consulting Services, Inc.
American Wind Energy Association
U.S. DOE Energy Information Administration
American Wind Energy Association
Consultant
National Renewable Energy Laboratory
National Renewable Energy Laboratory
U.S. DOE Retired
GE Energy
GE Energy
National Renewable Energy Laboratory
Black & Veatch
National Renewable Energy Laboratory
GE Energy
enXco
Sacramento Municipal Utility District
U.S. Department of Energy
The Communications and Outreach Task Force advised on outreach strategy and
facilitated engagement of key stakeholders. Members of this task force include:
Mary McCann-Gates*
Jill Pollyniak*
Thomas O. Gray
Susan Williams Sloan
Peggy Welsh
Clipper Windpower
Clipper Windpower
American Wind Energy Association
American Wind Energy Association
Energetics Incorporated
D
Workshops and Outreach
Two strategic workshops took place during the course of this work. At the first of
these, held August 17–18, 2006, attendees developed the initial statement of the 20%
Wind Scenario and defined work plans. At the second, held November 9–10, 2006,
participants shared and discussed preliminary results and obtained input from a
group of invited individuals from key stakeholder sectors. Previously, these
*
Lead authors and advisors for each chapter are shown in bold. Task force members are underlined and
Task Force chairpersons are identified with an asterisk. Reviewers are shown in italics.
20% Wind Energy by 2030
217
individuals had been external to the effort. Many of the authors, reviewers, and task
force members listed in this appendix attended one or both of these workshops.
The invited participants at the November workshop brought along important
feedback and perspectives from their respective sectors that have helped to shape
this report. Some also reviewed sections of the report. Their participation is not
meant to imply that they or their respective organizations either agree or disagree
with the findings of the effort. These participants are listed below:
Aaron Brickman
Jennifer DeCesaro
Michael Fry
Matt Gadow
Stephen Gehl
David Hamilton
John Holt
Robert Hornung
Karen Hyde
Ed Ing
Debra Jacobson
Miles Keogh
Charles Linderman
Steve Lockard
Craig Mataczynski
Christopher Namovicz
Alan Nogee
Jim Presswood
Kristine Schmidt
Linda Silverman
Brian Siu
Kate Watson
U.S. Department of Commerce
Clean Energy Group
American Bird Conservancy
DMI Industries
Electric Power Research Institute
Sierra Club
National Rural Electric Cooperative Association
Canadian Wind Energy Association
Xcel Energy
Law Office of Edwin T. C. Ing
DJ Consulting
National Association of Regulatory Utility
Commissioners
Edison Electric Institute
TPI Composites
Renewable Energy Systems Americas
U.S. Department of Energy, Energy Information
Administration
Union of Concerned Scientists
Natural Resources Defense Council
Xcel Energy
U.S. Department of Energy
Apollo Project
Horizon Wind Energy
On November 28, 2006, a topical outreach workshop was held with representatives
from nongovernmental organizations concerned about wildlife conservation and the
environment. Participants discussed the early findings of the Environment and Siting
Task Force and offered insights into issues important to their organizations.
Workshop attendees are listed below. Their participation is not meant to imply that
they or their respective organizations either agree or disagree with the findings of the
effort.
D
Matthew Banks
Laura Bies
Brent Blackwelder
John Coequyt
Amy Delach
Tom Franklin
Michael Fry
Robert Gramlich
Tony Iallonardo
Laurie Jodziewicz
Katie Kalinowski
Katherine Kennedy
218
World Wildlife Fund
The Wildlife Society
Friends of the Earth
Greenpeace
Defenders of Wildlife
Izaak Walton League
American Bird Conservancy
American Wind Energy Association
National Audubon Society
American Wind Energy Association
Resolve/National Wind Coordinating Collaborative
Natural Resources Defense Council
20% Wind Energy by 2030
Betsy Loyless
Laura Miner
Amber Pairis
Cliff Scher
Kate Smolski
Robert Thresher
James Walker
Wayne Walker
Tim Warman
Tom Weis
Peggy Welsh
Marchant Wentworth
National Audubon Society
U.S. Department of Energy
Association of Fish and Wildlife Agencies
Energetics Incorporated
Greenpeace
National Renewable Energy Laboratory
enXco
Horizon Wind Energy
National Wildlife Federation
enXco
Energetics Incorporated
Union of Concerned Scientists
D
20% Wind Energy by 2030
219
D
220
20% Wind Energy by 2030
Appendix E. Glossary
Area control error (ACE): The instantaneous difference between net actual and
scheduled interchange, taking into account the effects of frequency deviations.
Balancing area (balancing authority area): The collection of generation,
transmission, and loads within the metered boundaries of the balancing authority.
The balancing authority maintains load-resource balance within this area.
Before-and-after control impact (BACI): A schematic method used to trace
environmental effects from substantial anthropogenic changes to the environment.
The overall aim of the method is to estimate the state of the environment before and
after any change and the specific objectives is to compare changes at reference sites
(or control sites) with the actual area of impact.
Bus: An electrical conductor that serves as a common connection for two or more
electrical circuits.
Bus-bar: The point at which power is available for transmission.
Cap and trade: An established policy tool that creates a marketplace for emissions.
Under a cap and trade program, the government regulates the aggregate amount of a
type of emissions by setting a ceiling or cap. Participants in the program receive
allocated allowances that represent a certain amount of pollutant and must purchase
allowances from other businesses to emit more than their given allotment.
Capability: The maximum load that a generating unit, generating station, or other
electrical apparatus can carry under specified conditions for a given period of time
without exceeding approved limits of temperature and stress.
Capacity: The amount of electrical power delivered or required for which
manufacturers rate a generator, turbine, transformer, transmission circuit, station, or
system.
Capacity factor (CF): A measure of the productivity of a power plant, calculated as
the amount of energy that the power plant produces over a set time period, divided
by the amount of energy that would have been produced if the plant had been
running at full capacity during that same time interval. Most wind power plants
operate at a capacity factor of 25% to 40%.
Capacity penetration: The ratio of the nameplate rating of the wind plant capacity
to the peak load. For example, if a 300-megawatt (MW) wind plant is operating in a
zone with a 1,000 MW peak load, the capacity penetration is 30%. The capacity
penetration is related to the energy penetration by the ratio of the system load factor
to the wind plant capacity factor. For example, say that the system load factor is
60% and the wind plant capacity factor is 40%. In this case, and with an energy
penetration of 20%, the capacity penetration would be 20% × 0.6/0.4, or 30%.
20% Wind Energy by 2030
E
221
Capital costs: The total investment cost for a power plant, including auxiliary costs.
Carbon dioxide (CO2): A colorless, odorless, noncombustible gas present in the
atmosphere. It is formed by the combustion of carbon and carbon compounds (such
as fossil fuels and biomass); by respiration, which is a slow form of combustion in
animals and plants; and by the gradual oxidation of organic matter in the soil. CO2 is
a greenhouse gas that contributes to global climate change.
Carbon monoxide (CO): A colorless, odorless, but poisonous combustible gas.
Carbon monoxide is produced during the incomplete combustion of carbon and
carbon compounds, such as the fossil fuels coal and petroleum.
Circuit: An interconnected system of devices through which electrical current can
flow in a closed loop.
Competitive Renewable Energy Zones (CREZ): A mechanism of the renewable
portfolio standard in Texas designed to ensure that the electricity grid is extended to
prime wind energy areas. The designation of these areas directs the Electric
Reliability Council of Texas to develop plans for transmission lines to these areas
that will connect them with the grid. See also “Electric Reliability Council of Texas”
and “renewable portfolio standard.”
Conductor: The material through which electricity is transmitted, such as an
electrical wire.
Conventional fuel: Coal, oil, and natural gas (fossil fuels); also nuclear fuel.
Cycle: In AC electricity, the current flows in one direction from zero to a maximum
voltage, then back down to zero, then to a maximum voltage in the opposite
direction. This comprises one cycle. The number of complete cycles per second
determines the frequency of the current. The standard frequency for AC electricity in
the United States is 60 cycles.
Dispatch: The physical inclusion of a generator’s output onto the transmission grid
by an authorized scheduling utility.
Distribution: The process of distributing electricity. Distribution usually refers to
the series of power poles, wires, and transformers that run between a high-voltage
transmission substation and a customer’s point of connection.
Effective load-carrying capability (ELCC): The amount of additional load that
can be served at the target reliability level by adding a given amount of generation.
For example, if adding 100 MW of wind could meet an increase of 20 MW of
system load at the target reliability level, the turbine would have an ELCC of 20
MW, or a capacity value of 20% of its nameplate value.
E
Electricity generation: The process of producing electricity by transforming other
forms or sources of energy into electrical energy. Electricity is measured in kilowatthours.
222
20% Wind Energy by 2030
Electric Reliability Council of Texas (ERCOT): One of the 10 regional reliability
councils of the North American Electric Reliability Council. ERCOT is a
membership-based 501(c)(6) nonprofit corporation, governed by a board of directors
and subject to oversight by the Public Utility Commission of Texas and the Texas
Legislature. ERCOT manages the flow of electric power to approximately 20
million customers in Texas, representing 85% of the state’s electric load and 75% of
the Texas land area. See also “North American Electric Reliability Council.”
Energy: The capacity for work. Energy can be converted into different forms, but
the total amount of energy remains the same.
Energy penetration: The ratio of the amount of energy delivered from one type of
resource to the total energy delivered. For example, if 200 megawatt-hours (MWh)
of wind energy supplies 1,000 MWh of energy consumed, wind’s energy penetration
is 20%.
Externality: A consequence that accompanies an economic transaction, where that
consequence affects others beyond the immediate economic actors and cannot be
limited to those actors.
Feed-in law: A legal obligation on utilities to purchase electricity from renewable
sources. Feed-in laws can also dictate the price that renewable facilities receive for
their electricity.
Frequency: The number of cycles through which an alternating current passes per
second, measured in hertz.
Gearbox: A system of gears in a protective casing used to increase or decrease shaft
rotational speed.
Generator: A device for converting mechanical energy to electrical energy.
Gigawatt (GW): A unit of power, which is instantaneous capability, equal to one
million kilowatts.
Gigawatt-hour (GWh): A unit or measure of electricity supply or consumption of
one million kilowatts over a period of one hour.
Global warming: A term used to describe the increase in average global
temperatures caused by the greenhouse effect.
Green power: A popular term for energy produced from renewable energy
resources.
E
Greenhouse effect: The heating effect that results when long-wave radiation from
the sun is trapped by greenhouse gases produced by natural and human activities.
Greenhouse gases (GHGs): Gases such as water vapor, CO2, methane, and lowlevel ozone that are transparent to solar radiation, but opaque to long-wave radiation.
These gases contribute to the greenhouse effect.
20% Wind Energy by 2030
223
Grid: A common term that refers to an electricity transmission and distribution
system. See also “power grid” and “utility grid.”
Grid codes: Regulations that govern the performance characteristics of different
aspects of the power system, including the behavior of wind plants during steadystate and dynamic conditions. These fundamentally technical documents contain the
rules governing the operations, maintenance, and development of the transmission
system and the coordination of the actions of all users of the transmission system.
Heat rate: A measure of the thermal efficiency of a generating station. Commonly
stated as British thermal units (Btu) per kilowatt-hour. Note: Heat rates can be
expressed as either gross or net heat rates, depending whether the electricity output
is gross or net generation. Heat rates are typically expressed as net heat rates.
Instantaneous penetration: The ratio of the wind plant output to load at a specific
point in time, or over a short period of time.
Investment tax credit (ITC): A tax credit that can be applied for the purchase of
equipment such as renewable energy systems.
Kilowatt (kW): A standard unit of electrical power, which is instantaneous
capability equal to 1,000 watts.
Kilowatt-hour (kWh): A unit or measure of electricity supply or consumption of
1,000 watts over a period of one hour.
Leading edge: The surface part of a wind turbine blade that first comes into contact
with the wind.
Lift: The force that pulls a wind turbine blade.
Load (electricity): The amount of electrical power delivered or required at any
specific point or points on a system. The requirement originates at the consumer’s
energy-consuming equipment.
Load factor: The ratio of the average load to peak load during a specified time
interval.
Load following: A utility’s practice in which more generation is added to available
energy supplies to meet moment-to-moment demand in the utility’s distribution
system, or in which generating facilities are kept informed of load requirements. The
goal of the practice is to ensure that generators are producing neither too little nor
too much energy to supply the utility's customers.
E
Megawatt (MW): The standard measure of electricity power plant generating
capacity. One megawatt is equal to 1,000 kilowatts or 1 million watts.
Megawatt-hour (MWh): A unit or energy or work equal to1,000 kilowatt-hours or
1 million watt-hours.
Met tower: A meteorological tower erected to verify the wind resource found
within a certain area of land.
224
20% Wind Energy by 2030
Modified Accelerated Cost Recovery System (MACRS): A U.S. federal system
through which businesses can recover investments in certain property through
depreciation deductions over an abbreviated asset lifetime. For solar, wind, and
geothermal property placed in service after 1986, the current MACRS property class
is five years. With the passage of the Energy Policy Act of 2005, fuel cells,
microturbines, and solar hybrid lighting technologies became classified as five-year
property as well.
Nacelle: The cover for the gearbox, drivetrain, and generator of a wind turbine.
Nameplate rating: The maximum continuous output or consumption in MW of an
item of equipment as specified by the manufacturer.
Nondispatchable: The timing and level of power plant output generally cannot
be closely controlled by the power system operator. Other factors beyond
human control, such as weather variations, play a strong role in determining
plant output.
Nitrogen oxides (NOx): The products of all combustion processes formed by the
combination of nitrogen and oxygen. NOx and sulfur dioxide (SO2) are the two
primary causes of acid rain.
Power: The rate of production or consumption of energy.
Power grid: A common term that refers to an electricity transmission and
distribution system. See also “utility grid.”
Power marketers: Business entities engaged in buying and selling electricity.
Power marketers do not usually own generating or transmission facilities, but take
ownership of the electricity and are involved in interstate trade. These entities file
with the Federal Energy Regulatory Commission (FERC) for status as a power
marketer.
Power Purchase Agreement (PPA): A long-term agreement to buy power from a
company that produces electricity.
Power quality: Stability of frequency and voltage and lack of electrical noise on the
power grid.
Public Utility Commission: A governing body that regulates the rates and services
of a utility.
Public Utility Regulatory Policies Act (PURPA) of 1978: As part of the National
Energy Act, PURPA contains measures designed to encourage the conservation of
energy, more efficient use of resources, and equitable rates. These measures
included suggested retail rate reforms and new incentives for production of
electricity by cogenerators and users of renewable resources.
E
Production tax credit (PTC): A U.S. federal, per-kilowatt-hour tax credit for
electricity generated by qualified energy resources. Originally enacted as part of the
Energy Policy Act of 1992, the credit expired at the end of 2001, was extended in
March 2002, expired at the end of 2003, was renewed on October 4, 2004 and was
then extended through December 31, 2008.
20% Wind Energy by 2030
225
Radioactive waste: Materials remaining after producing electricity from nuclear
fuel. Radioactive waste can damage or destroy living organisms if it is not stored
safely.
Ramp rate: The rate at which load on a power plant is increased or decreased. The
rate of change in output from a power plant.
Renewable energy: Energy derived from resources that are regenerative or that
cannot be depleted. Types of renewable energy resources include wind, solar,
biomass, geothermal, and moving water.
Regional Greenhouse Gas Initiative (RGGI): An agreement among 10
northeastern and mid-Atlantic states to reduce CO2 emissions. Through the initiative,
the states will develop a regional strategy to control GHGs. Fundamental to the
agreement is the implementation of a multistate cap and trade program to induce a
market-based emissions controlling mechanism.
Renewable energy credit (REC) or certificate: A mechanism created by a state
statute or regulatory action to make it easier to track and trade renewable energy. A
single REC represents a tradable credit for each unit of energy produced from
qualified renewable energy facilities, thus separating the renewable energy’s
environmental attributes from its value as a commodity unit of energy. Under a REC
regime, each qualified renewable energy producer has two income streams—one
from the sale of the energy produced, and one from the sale of the RECs. The RECs
can be sold and traded and their owners can legally claim to have purchased
renewable energy.
Renewable portfolio standard (RPS): Under such a standard, a certain percentage
of a utility’s overall or new generating capacity or energy sales must be derived
from renewable resources (e.g., 1% of electric sales must be from renewable energy
in the year 200x). An RPS most commonly refers to electricity sales measured in
megawatt-hours, as opposed to electrical capacity measured in megawatts.
Restructuring: The process of changing the structure of the electric power industry
from a regulated guaranteed monopoly to an open competition among power
suppliers.
Rotor: The blades and other rotating components of a wind turbine.
Solar energy: Electromagnetic energy transmitted from the sun (solar radiation).
Sulfur dioxide (SO2): A colorless gas released as a by-product of combusted fossil
fuels containing sulfur. The two primary sources of acid rain are SO2 and NOx.
E
Trade wind: The consistent system of prevailing winds occupying most of the
tropics. Trade winds, which constitute the major component of the general
circulation of the atmosphere, blow northeasterly in the northern hemisphere and
southeasterly in the southern hemisphere. The trades, as they are sometimes called,
are the most persistent wind system on Earth.
Turbine: A term used for a wind energy conversion device that produces electricity.
See also “wind turbine.”
226
20% Wind Energy by 2030
Turbulence: A swirling motion of the atmosphere that interrupts the flow of wind.
Utility grid: A common term that refers to an electricity transmission and
distribution system. See also “power grid.”
Variable-speed wind turbines: Turbines in which the rotor speed increases and
decreases with changing wind speeds. Sophisticated power control systems are
required on variable-speed turbines to ensure that their power maintains a constant
frequency compatible with the grid.
Volt (V): A unit of electrical force.
Voltage: The amount of electromotive force, measured in volts, between two points.
Watt (W): A unit of power.
Watt-hour (Wh): A unit of electricity consumption of one watt over the period of
one hour.
Wind: Moving air. The wind’s movement is caused by the sun’s heat, the earth, and
the oceans, which force air to rise and fall in cycles.
Wind energy: Energy generated by using a wind turbine to convert the mechanical
energy of the wind into electrical energy. See also “wind power.”
Wind generator: A wind energy conversion system designed to produce electricity.
Wind power: Power generated by using a wind turbine to convert the mechanical
power of the wind into electrical power. See also “wind energy.”
Wind power density: A useful way to evaluate the wind resource available at a
potential site. The wind power density, measured in watts per square meter, indicates
the amount of energy available at the site for conversion by a wind turbine.
Wind power class: A scale for classifying wind power density. There are seven
wind power classes, ranging from 1 (lowest wind power density) to 7 (highest wind
power density). In general, sites with a wind power class rating of 4 or higher are
now preferred for large-scale wind plants.
Wind power plant: A group of wind turbines interconnected to a common utility
system.
Wind resource assessment: The process of characterizing the wind resource and its
energy potential for a specific site or geographical area.
E
Wind speed: The rate of flow of wind when it blows undisturbed by obstacles.
Wind speed profile: A profile of how the wind speed changes at different heights
above the surface of the ground or water.
Wind turbine: A term used for a device that converts wind energy to electricity.
20% Wind Energy by 2030
227
Wind turbine rated capacity: The amount of power a wind turbine can produce at
its rated wind speed.
Windmill: A wind energy conversion system that is used primarily to grind grain.
Windmill is commonly used to refer to all types of wind energy conversion systems.
E
228
20% Wind Energy by 2030
E
230
20% Wind Energy by 2030