Click here for Blog update PROJECT: Knight/Crown/Linneman Water Main Improvements PROJECT AREA: Knight Street, from Pfingsten Road to west end Crown Lane, from Knight Street to south end Crown Drive, from Knight Street to Crown Lane Linneman Street, from Wedel Lane to Meadowlark Lane PROJECT NUMBER: E12-33 & E14-36 PROJECT MANAGER: Robert Steele (847) 904-4423 [email protected] BUDGET: $1,321,762.00 CONTRACTOR: A Lamp Concrete Contractors, Inc. PROJECT SCOPE: • • • • Replacement of the existing water main with a new, larger water main Upgrading of the water services to the shut-off (b-box) valve located in the parkway Pavement, parkway and driveway restoration for areas affected during construction Removing and repaving 2” of the existing roadway TARGET DATES: Start of Construction: June 18, 2015 Water Main Completion: May 29, 2015 Driveway & Parkway Restoration: August 7, 2015 Roadway Paving: August 20, 2015 PROJECT WORK HOURS: M-F: 7:00 a.m. to 7:00 p.m. Sat: 9:00 a.m. to 5:00 p.m. (7:00 a.m. start with Village approval only) CORRESPONDENCE: Attached documents are in pdf format and require Adobe Reader to view. Construction start notice 6/9/15
© Copyright 2024