Knight/Crown/Linneman

Click here for Blog update
PROJECT: Knight/Crown/Linneman Water Main Improvements
PROJECT AREA:
Knight Street, from Pfingsten Road to west end
Crown Lane, from Knight Street to south end
Crown Drive, from Knight Street to Crown Lane
Linneman Street, from Wedel Lane to Meadowlark Lane
PROJECT NUMBER:
E12-33 & E14-36
PROJECT MANAGER:
Robert Steele
(847) 904-4423
[email protected]
BUDGET:
$1,321,762.00
CONTRACTOR:
A Lamp Concrete Contractors, Inc.
PROJECT SCOPE:
•
•
•
•
Replacement of the existing water main with a new, larger water main
Upgrading of the water services to the shut-off (b-box) valve located in the
parkway
Pavement, parkway and driveway restoration for areas affected during
construction
Removing and repaving 2” of the existing roadway
TARGET DATES:
Start of Construction: June 18, 2015
Water Main Completion: May 29, 2015
Driveway & Parkway Restoration: August 7, 2015
Roadway Paving: August 20, 2015
PROJECT WORK HOURS:
M-F: 7:00 a.m. to 7:00 p.m.
Sat: 9:00 a.m. to 5:00 p.m. (7:00 a.m. start with Village approval only)
CORRESPONDENCE:
Attached documents are in pdf format and require Adobe Reader to view.
Construction start notice 6/9/15