Heatherfield Lane - Village of Glenview

Click here for Blog update
PROJECT: HEATHERFIELD LANE IMPROVEMENTS
PROJECT AREA:
Heatherfield Lane between Sherwood Road and Ferndale Road
PROJECT NUMBER:
E 12-41
PROJECT MANAGER:
Chris Gray
(847) 904-4325
[email protected]
BUDGET:
$1,660,399.00
CONTRACTOR:
DiMeo Brothers
PROJECT SCOPE: The improvements consist of the replacement of existing storm
sewer structures, pipes, and increased inlet capacity. Approximately 1,800 feet of new
PVC pipe with diameter ranging from 12” to 48” will be installed to improve the storm
water conveyance capacity and increase inline storage.
The improvements also consist of the replacement of approximately 1,600 feet of 8” PVC
water main and lining of the existing sanitary sewer main.
Additionally, the existing roadway within the project limits will be reconstructed with a
new asphalt pavement and curbs/gutter.
TARGET DATES:
Start of Construction: May 18, 2015
Underground Utility Completion: TBD
Roadway Paving: TBD
Final Restoration: TBD
PROJECT WORK HOURS:
M-F: 7:00 a.m. to 7:00 p.m.
Sat: 9:00 a.m. to 5:00 p.m. (7:00 a.m. start with Village approval only)
CORRESPONDENCE:
Attached documents are in pdf format and require Adobe Reader to view.
Pre-construction meeting invitation 5/12/15
Construction start letter 5/18/15