Click here for Blog update PROJECT: HEATHERFIELD LANE IMPROVEMENTS PROJECT AREA: Heatherfield Lane between Sherwood Road and Ferndale Road PROJECT NUMBER: E 12-41 PROJECT MANAGER: Chris Gray (847) 904-4325 [email protected] BUDGET: $1,660,399.00 CONTRACTOR: DiMeo Brothers PROJECT SCOPE: The improvements consist of the replacement of existing storm sewer structures, pipes, and increased inlet capacity. Approximately 1,800 feet of new PVC pipe with diameter ranging from 12” to 48” will be installed to improve the storm water conveyance capacity and increase inline storage. The improvements also consist of the replacement of approximately 1,600 feet of 8” PVC water main and lining of the existing sanitary sewer main. Additionally, the existing roadway within the project limits will be reconstructed with a new asphalt pavement and curbs/gutter. TARGET DATES: Start of Construction: May 18, 2015 Underground Utility Completion: TBD Roadway Paving: TBD Final Restoration: TBD PROJECT WORK HOURS: M-F: 7:00 a.m. to 7:00 p.m. Sat: 9:00 a.m. to 5:00 p.m. (7:00 a.m. start with Village approval only) CORRESPONDENCE: Attached documents are in pdf format and require Adobe Reader to view. Pre-construction meeting invitation 5/12/15 Construction start letter 5/18/15
© Copyright 2024