Name of Work:- Providing Separate WSS to village Tang and

Schedule of Quantity
Name of Work:- Providing Separate WSS to village Tang and Uthragram in Tang Panchyat in Tehsil D/Sala Distt. Kangra (H.P.).
Estimated Cost. Rs.
Earnest Money:Time Limit:-
Sub Head:- Construction of Over Head reservoir of 77,500 Ltrs capacity, 12 Mtr stagging height at Point No. 3.
S.No. Description of Items
Qty.
Unit
1 Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick Work,
jumper work, blasting hard or softs rock by chiselling where the blasting work is provided
slushy daldal and saturated soil including pumping or bailing out water within all
heights,stacking the excavated soil within all leads clear from the edge of excavation and then
returning the stacked soil in 15Cm (fifteen Centimetres) layer when required into plinths, sides
of foundation consolidating each depossited layer by ramming and watering and then
disposing of all surplus excavated earth as per the direction of Engineer-In-Charge with in all
leads and Lifts.
31.38
Cum
P/Cum
2 Providing and Laying cement concrete 1:3:6 (1 Cement:3 Sand:6 graded stone aggregate
2.08
Cum
P/Cum
38.63
Sqmt.
225.28
Sqmt.
P/Sqmt
18.42
Sqmt.
P/Sqmt
100.27
Sqmt.
100.27
Sqmt.
P/Sqmt
25.15
Sqmt.
P/Sqmt
44.57
Sqmt.
P/Sqmt
4.97
Cum
225.28
Cum
P/Cum
20mm nominal size) and curing complete excluding cost of form work in foundation and
plinth i/c carriage of material complete in all respect including all leads and lifts.
5 Providing form work with steel plates 3.15 mm thick welded with angle iron in frame
30x30x5mm so as to give a fair finish including centring,shuttering , strutting and
proping etc. with battens and ballies height of propping and centring below supporting
floor to ceiling not exceedng 4 mtrs and removal of the same for in-situ reinforced
concrete and plain concrete work in :-Foundation and Plinth.
i)
Foundation, footing, bases of columns and mass concrete complete in all srespect.
ii)
Vertical surfaces such as walls (any thickness partition buttresses plinth and string
courses and the like).complete in all respect.
iii)
Sides & soffits of beams, beam haunchings, centilever girders, bressumers and lintles not
exceeding 1 metres in depth in all heights from floor as per the direction of Engineer-in-Charge with in all
P/Sqmt
leads and lifts.
v)
Column pillars, posts and struts Circular or curved in plain complete in all respect.
Suspended floor roofs landing and shelves and their support balconies beams girders
bressusmers and cantilevers upto floor two level complete in all respect.
vi)
Stair cases with slopping or stepped soffits. Complete in all respect.
P/Sqmt
6 Providing form work of ordinary timber planking so as togive a rough finish including
centering ,shuttering and propping etc. with wooden batten and ballies height of
propping and centering below supporting floor to ceiling not exceeding 4.00 mtrs and
removal of the same for in-situ reinforced concrete and plain concrete in:a) Arches exceeding 6 mtrs span complete in all respect.
3 Providing and Laying cement concrete 1:1.50:3 (1 Cement:1.50 Sand:3 graded stone
aggregate 20mm nominal size) and curing complete excluding the cost of form work
inand reinforcement for reinfsorced concrete work in:-.
a) In foundation and plinth complete in all respect.
b)
Vertical surfaces such as walls (any thickness partition buttresses plinth and string
courses and the like).complete in all respect.
P/Cum
Rate
In Fig.
4,66,710/9,335/-
6 months.
Amount
In Word
c)
Suspended floor roofs landing and shelves and their support balconies beams girders
bressusmers and cantilevers upto floor two level complete in all respect.
d)
Columns, pillars, posts and struts square, rect angular, polygonal in plain complete in all
respect.
10.27
Cum
P/Cum
7 Providing Mild steel/Tor steel reinforcement for R.C.C. work including bendiong binding
and Placing in position complete upto floor two level in mild steel complete in all respect
including all leads and lifts.
3631.00
Kgs.
P/Kgs.
8 Providing steel work welded in built up sections trusses and framed work including
cutting, hosting fixing in position and applying a priming coat of red lead paint in
gratings framed guard bars, ladders, railling brackets and similar works in all respect
complete in all respect including all leads and lifts.
2.91
Qtl
P/Qtl.
9 Providing and Fixing CI cover with frame for manhole cover (Medium duty) of 580mm internal dia
meters .Total weight of frame and cover & frame not less than 58 Kgs. Complete in all respect
including all leads and lifts.
1.00
Nos.
Each
1.00
Nos.
1.00
Nos.
1.00
Nos.
Each
27.30
Rmt.
P/Rmt.
10 Providing and Fixing of sluice valve (Class PN-I) as per BIS 780-1984 with hand wheel
of approved made complete in all respect including all leads and lifts.
i) 80mm dia
ii) 65mm dia
11 Providing Fixing M.S. mosquto proof ventilator of size 400mmx300mm in height with frame of
M.S. angle iron 40x40x6mm complete in all respect including all leads and lifts.
Each
Each
Laying, Jointing and testing in trenches galvanised mild steel tubes of following dia metres light
grade) including tubes fittings (earth work tobe measured and paid for separately) complete in all
respect including all leads and lifts.(Light Class).
i) 80mm dia
TERMS AND CONDITIONS:-
Total:- Rs.
1 The work shall be carried out as per IPH Specification.
2 10% Security, 2% Income Tax, 15% surcharge on Income Tax and 2% Sales Tax will
be deducted from each bill of the contractor.
3 Nothing shall be paid for rejected work.
4 Any loss or theft of Govt. material will be responsibility of the contractor.
5 The final payment will be made after satisfaction of the Engineer-in-Charge
6 Cement will be issued to contractor from Divisional Store at Bhuter @ Rs. 266/- per Bag.
7 Steel will be issued to contractor from Divisional Stora at Bhuter @ Rs.55000/- P/M/Tonne
8 The final payment will be made after satisfaction of the Engineer-in-Charge.
9
Executive Engineer,
I&PH. Division,
Dharamshala.