Water supply and Sanitary Installations for Tower

Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
(Established by the Govt. of Kerala)
Regd. & Corp. Office: INKEL Centre,
Off Vallathol Junction, Seaport-Airport Road,
Thrikkakara, Cochin-682021
TENDER DOCUMENT
FOR
Plumbing and Sanitary works
INKEL Greens-Ladies Hostel , Malappuram
(This document, in original, to be submitted as Financial Bid in Envelope 2)
INKEL Limited
Contractor
Page 1
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
I N D E X
Sl. No
Details
Page No
1.
Notification of Tender
4
2.
Notice Inviting Tender
8
3.
Annexure
21
4.
Scope of Work
33
5.
Technical specifications
35
6.
Format for submitting Financial Bid (Format for
Schedule of Quantities)
7.
Drawings
48
Enclosed separately
Note: Intending tenderer(s) need not submit “General Conditions of Contract” along with the
tender. However, General Conditions of Contract (GCC) will also form part of the agreement
with the successful tender. As such, it is deemed that the tenderer(s) have made reference to
the GCC in the website www.inkel.in or otherwise, and have full knowledge of its contents,
although it is not signed and attached with the tender.
INKEL Limited
Contractor
Page 2
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
ISSUE OF TENDER DOCUMENT
Tender No.
: NIT/INKEL/2015-16/153 dated 21st May 2015
This tender is issued to
:
Tenderer‟s Name
:
Tenderer‟s Address
:
Telephone No.
:
The cost of this tender document is Rs. 5250/- (Rupees Five thousand two hundred fifty only
including ST).
Sale of this tender document is against Demand Draft No. ________________ dated
______________ drawn on _____________________________________ Bank or Official Cash
Receipt No. _________________________
Issued by:
Authorised Signatory
INKEL Limited
INKEL Limited
Contractor
Page 3
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
NOTIFICATION OF TENDER (NOT)
INKEL Limited
Contractor
Page 4
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
Dated _21st May, 2015
No. NIT/INKEL/2015-16/153
NOTIFICATION OF TENDER (NOT)
1. Sealed item rate tenders are invited by Authorised Signatory, INKEL Limited having its registered office
at INKEL Centre, Off Vallathol Junction, Sea port Airport Road, Thrikkakara, Cochin-682021 from
Contractors for the work of :
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel, Malappuram
a)
The Earnest Money to
be deposited
b)
Time allowed for
Carrying out the Work
Rs. 20,000/- (Rupees Twenty Thousand only)
:
(DD in favour of INKEL Limited payable at Cochin or Bank
Guarantee from a scheduled bank for a period not less
than SIX months )
1.1
:
90 days
2. Eligibility Criteria
Criteria of eligibility for participating in the tender are detailed in the Notice Inviting Tender.
3. Issue of Tender Forms
a) The Intending Tenderer(s) can download the Tender Documents and General Conditions of
Contract from the website www.inkel.in.
b) The tender cost (non refundable) of Rs. 1050/- ( Rupees One Thousand fifty only ) per set, in the
form of DD drawn from any scheduled bank in favour of INKEL Limited payable at Cochin, shall be
kept in Envelope marked “1”.
c) The tenderer shall submit the list of works completed as in Form B & C to substantiate eligibility
criteria in Clause 1.2 of Notice Inviting Tender from the establishments concerned. The certificates/
testimonials shall be obtained from an authorised signatory officer not below the rank of Executive
Engineer/ Project manager or equivalent.
INKEL Limited
Contractor
Page 5
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
4. The Earnest money of Rs 20,000/-shall be furnished as Demand Draft in favour of INKEL Limited
payable at Cochin or Bank Guarantee from a scheduled bank for a period not less than SIX months.
5. Submission of Tenders
The tender documents shall not be sent by post / courier by the contractors
6. All tender papers should be duly quoted and signed. The unopened tenders shall be returned to
the tenderer(s) after a final decision on the tender is taken.
7. Milestones and Compensation for delay – INKEL is very keen to ensure that projects are
executed within the stipulated time frame. Hence, provision for milestones and
compensation for delay shall associate with every contract. Contractors are advised to
take extra care in understanding the details from the relevant clauses and bring into
application during the execution stage. (Refer clause 1.33 of Notice Inviting Tender (NIT)
8. It may be noted that conditional tenders shall be summarily rejected.
Authorised Signatory
INKEL Limited
INKEL Limited
Contractor
Page 6
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
BID SYNOPSIS
1.
Tender No.
NIT/INKEL/2015-16/153
2.
Name of Work
Plumbing and Sanitary works : INKEL Greens
-Ladies Hostel, Malappuram
3.
Name & Address of the
Organisation, Venue of receipt
of Tender
INKEL Limited, INKEL Centre
Off Vallathol Junction, Seaport-Airport Road,
Thrikkakara,Cochin-682021
4.
Project Location
Nearest Railway Station
Accessibility
5.
Scope of Work
Panakkad, Malappuram
Tirur
By Road
Scope of work under this contract shall include
plumbing and sanitary pipe installation for toilets
inside the building excluding sanitary and CP
fittings. In common area toilets, the contractor is
responsible
for
supply,
installation
and
commissioning the system.
6.
Earnest Money Deposit
Rs. 20,000/-
7.
Cost of Tender Document
Rs 1050/-
8.
Type of Tender
Item rate tender
9.
Pre-bid Meeting
12 June 2015; 11:00 am
10. Time of Completion
90 days
11. Last Date of Receipt of Tender
19 June 2015; 3.00 pm
Date & Time of Technical Bid
19 June 2015; 3.30 pm
opening
Date & Time of Financial Bid
13.
19 June 2015; 3.30 pm
opening
12.
14. Performance Guarantee
5% of Contract Value
15. Retention Money
5% of gross amount of each running bill, limited
to maximum of 5% of the Contract Value.
16. Validity Period of Tender
90 days
17. Defects Liability Period
One year
18. Interim Bills
Vide Clause 1.32.1 of Notice Inviting Tender
19. Escalation
Nil
20. Arbitration
Nil
INKEL Limited
Contractor
Page 7
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
NOTICE INVITING TENDER (NIT)
INKEL Limited
Contractor
Page 8
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
NOTICE INVITING TENDER (NIT)
1. 1
TENDER INVITATION
Sealed item rate tenders are invited by The Authorised Signatory, INKEL Limited having its
registered office at INKEL Centre, Off Vallathol Junction, Sea port Airport Road, Thrikkakara, Cochin682021 for the work of Plumbing and Sanitary works : INKEL Greens -Ladies Hostel, Malappuram
from Contractors for executing this work who fulfil the eligibility criteria prescribed in Clause 1.2.
The tender will be in the prescribed form.
1.2
ELIGIBILITY CRITERIA
Contractors who fulfill the following criteria may apply:
a)
The Contractor should be a registered contractor in Public Works Organisation in India like CPWD,
State PWD (B& R), DOP, MES, Railways, BSNL etc. or in established private sector.
b)
The Contractor may be either a registered partnership firm or a company limited by shares having
experience in similar construction.
c)
Minimum 3 (Three) years of experience in construction activities. Experience of having successfully
completed similar work(s) in last three years ending 31st March, 2015 shall be submitted in
enclosed format (Form B &C)
d)
The Bidder should have executed work of similar nature in a single contract of value not less than
Rs 10 lakhs.
e)
Necessarily completed plumbing and sanitary works for one building having area not less than 1000
Sq. M during the last three years.
f)
The contractor should have enough resources capacity in terms of Personnel, Labour force both
skilled and unskilled, Equipments, etc.
g)
Contractor shall obtain a Labour License from the office of the Labour commissioner exclusively to
run this contract (if awarded) and submit a copy of the same before commencement of the
contract.
1.3
ISSUE OF TENDER DOCUMENT
The general information on the project may be found from the tender document. The intending
bidders may download the tender document from the website www.inkel.in. No tender document
shall be issued from the office of INKEL Limited. The information is only indicative. The tenderer(s)
are required to visit the site and familiarize themselves with the site conditions, nature of substrata,
availability of construction materials, etc., before quoting. The drawings, conditions of contract,
schedule of quantities and the specifications may be carefully studied before offering the prices. No
claims for extra compensation over and above the quoted rates will be entertained by INKEL on the
INKEL Limited
Contractor
Page 9
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
ground that the tenderer have misjudged site conditions, nature of substrata, tender conditions or
any item of tender.
The cost of this tender document is to be remitted as indicated in Clause 3 (b) of Notification of
Tender.
1.4
RECEIPT OF TENDER DOCUMENTS
The priced tender documents signed and complete in all respects shall be submitted at the office of
INKEL Limited, INKEL Centre, Off Vallathol Junction, Sea port Airport Road, Thrikkakara, Cochin682021 on or before 3.00 PM on 19 June 2015. Any tender received after the due time on this date
will be rejected.
1.5
MANDATORY ENCLOSURES FOR THE TENDER
Tenderer shall enclose the following in sealed envelopes as per Clause 1.6 of Notice Inviting Tender.
1.
2.
3.
4.
5.
6.
7.
8.
9.
1.6
Earnest Money Deposit and Unconditional Acceptance Letter
Proof for eligibility criteria including contractor‟s registration.
Tender cost in the form of DD
Brief Work Methodology
Weekly Time schedule in form of Gantt chart
List of Equipments proposed to be used
Signed Tender documents
Preliminary agreement duly executed on non-judicial stamp paper of value not less than Rs. 500/as per Performa attached.
Price Bid
SUBMISSION OF TENDER
1.6.1 Tender shall be submitted in the following manner:
Tender shall be submitted to the address given in Bid Synopsis in sealed Envelopes as
given below, super-scribing the Name of work, Tender No. & address of the tenderer and
Last Date & Time of receipt of tender.
Envelope 1: Technical Bid
This shall contain:
i) Cost of tender documents as per clause 3(b) of NOT
ii) Proof for Contractor‟s Registration
iii) Earnest Money Deposit (EMD)
iv) Credentials (as in Forms B & C attached) along with copies of partnership deeds in case of
partnership firms
v) Unconditional acceptance of tender in the given format
vi) Preliminary Agreement in the given format and
vii) Declaration in the given format with regard to download of tenders from website.
viii) Programme of work in Bar chart
ix) Methodology
INKEL Limited
Contractor
Page 10
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
x) List of Resources
a. Equipments with details of make, nos etc
b. Manpower summary
c. Senior personnel with credentials
xi) Works-in-hand
xii)Safety Plan
xiii) QA/QC Policy
Envelope 2: Price Bid
This Envelope shall contain the Financial Offer for the mentioned work in the format specified.
Envelope 3:
The sealed Envelopes No. 1 & 2 as above shall be placed in another ENVELOPE 3 and sealed
properly. The Envelope 3 shall also be superscribed with Name of work, Tender no. & address of
the tenderer and Last Date & Time of receipt of tender.
1.6.2 Submission of tender by a tenderer implies that he has read this notice and all other contract
documents and has made himself aware of the scope and specifications of the work to be done and
of conditions and rates at which stores, tools and plant, etc. will be issued to him by INKEL and local
conditions and other factors bearing on the execution of the works.
1. 7
OPENING OF THE TENDER
ENVELOPE 3 & Technical Bids(Envelope I) will be opened in the presence of tenderer(s) or their
authorized representatives who are present at 3.30 pm on 19 June 2015 at the office of INKEL
Limited, INKEL Centre, Cochin.
The Envelope 2 of the tender will be opened only for those tenderer(s) who qualify in the technical
evaluation. The outcome of technical evaluation shall be intimated to all participants separately.
The Financial Bids will be will be opened in the presence of tenderer(s) or their authorized
representatives who are present at 3.30 pm on 19 June 2015 at the office of INKEL Limited, INKEL
Centre, Cochin.
1.8
INFORMATION REGARDING TENDER
1.8.1
After opening of the tenders, the information relating to the examination, clarification, evaluation
and comparison of tenders and recommendations concerning the award of contract shall not be
disclosed to the tenderer(s) and other persons not officially concerned with such process.
1.8.2
Subject to INKEL‟s right to accept any tender and reject any or all tenders; the work will be
awarded to the tenderer whose bid has been determined to be substantially responsive to the
tender documents and who has offered the lowest Evaluated Tender Price provided further that the
tenderer has the capability and resources to carry out the contract effectively.
INKEL Limited
Contractor
Page 11
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
1.8.3. Prior to the expiry period of validity of the Tender, INKEL will notify the successful tenderer in
writing by registered letter that his tender has been accepted. This letter of acceptance will constitute
the formation of a contract between INKEL and the tenderer.
1.8.4 Before commencing the work and within 7 days after the letter of acceptance of the tender has been
issued to him, the tenderer shall make performance guarantee as given in clause 1.13 of this notice
and furnish the same for the proper fulfilment of the contract and shall execute an agreement for the
work in required non-judicial stamp paper in the format given as “Articles of Agreement” in GCC.
1.8.5 If the tenderer fails to execute the agreement as stated above within the specified period, the
Earnest Money Deposit shall be forfeited to INKEL and fresh tenders called for or the matter
otherwise disposed off.
1.9
REJECTION OF TENDER
1.9.1 A tenderer shall submit a responsive bid, which satisfies each and every condition laid down in this
notice, accepting all terms and conditions of the specifications and contract documents without any
modifications, failing which, the tender will be liable to be rejected.
1.9.2 Tenders not properly filled, mutilated with incorrect calculations or generally not complying with the
conditions are susceptible to be rejected.
1.9.3 Canvassing is strictly prohibited and the tenders submitted by the tenderer(s), who resort to
canvassing will be liable for rejection.
1.9.4 The tender for the Works shall not be witnessed by a contractor or contractors who
himself/themselves has/have tendered for the same works. Failure to observe this condition shall
render the tender of the contractor tendering as well as of those witnessing the tender liable to
rejection.
1.10
ITEM RATE TENDER
In the case of item rate tender, only rates quoted will be considered. Rates quoted by the contractor
in figures and words shall be accurately filled in so that there is no discrepancy in rates written in
words and figures. If at all any discrepancy is noted, the lower of the two shall prevail. The rate thus
quoted will be deemed to include the cost of all materials, labour, hire charges for all machinery,
cost of fuel, power, all leads and lifts, taxes, levies, royalties, all over heads, contingencies, profits,
etc. and the quoted price is all inclusive. The total contract price shall also be worked out and
entered in.
1. 11
SIGNATURE OF THE TENDERER
If the tender is made by an individual, it shall be signed with his full name and his complete address
shall be given. If it is made by partnership firm, it shall be signed with the co-partnership name by a
member of the firm who shall sign his own name and give the name and address of each partner of
the firm and attach a copy of „Power of Attorney‟ with the tender authorizing him to sign on behalf of
INKEL Limited
Contractor
Page 12
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
the other partners. A certified copy of the „Registered Partnership Deed‟ shall also be submitted
along with the tender.
1.12
EMD
1.12.1
The Earnest money of Rs 20,000/-shall be furnished as Demand Draft in favour of INKEL
Limited payable at Cochin or Bank Guarantee from a scheduled bank for a period not less
than SIX months.
1.12.2
EMD of the unsuccessful tenders will be refunded without any interest on finalization of the
contract with the successful Tenderer or on the expiry of the validity period whichever is earlier.
1.12.3 EMD deposited with INKEL will be forfeited,
i) If a bidder withdraws his bid during the period of validity specified.
ii) If the successful bidder fails within the time limit to sign the contract document or fails to
furnish the required security deposit.
1.12.4
On acceptance of the tender, the EMD will be refunded after remittance of the performance
guarantee and execution of the agreement.
1.13
PERFORMANCE GUARANTEE
1.13.1
The successful tenderer on receipt of the letter of acceptance will deposit an amount equal to 5%
of the probable value of contract in the form of a Bank guarantee from a scheduled public sector
Bank in the format prescribed by INKEL and valid for the entire period of construction within
seven days after the issue of letter of acceptance.
1.13.2
EMD will be refundable to the contractor after remittance of the performance guarantee and
execution of the agreement.
1.13.3
The Performance Guarantee will be refunded to the contractor after recording of the
completion certificate of the work by the Engineer-in-charge.
1.14
RETENTION AMOUNT
1.14.1
Retention Money at the rate of 5% of the value of work for each running bill will be deducted
from first and following part bills until such time as the cumulative total of such deductions
(herein referred to as the Retention Money) shall amount to 5% of the executed value of the
work. On expiry of the defects liability period or on payment of the amount of the Final Bill
whichever is later, the Engineer-in-charge, shall on demand from the contractor refund to him the
retention amount provided that the Engineer-in-charge is satisfied that there is no demand
outstanding against the Contractor.
1.14.2
Provided that when the Retention amount reaches a limit of 5% of the contract value or on
completion of the work, if the Contractor so demand may convert the amount into one of the
Government securities, or Bank guarantee from any nationalized bank; the bank guarantee being
valid till the completion of the defect liability period.
INKEL Limited
Contractor
Page 13
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
1.14.3
All the deposits of EMD, PERFORMANCE GUARANTEE and RETENTION MONEY will not
bear any interest whatsoever.
1.15
INCOME –TAX
Income-tax at the rate prevailing at the time of payment will be deducted from each running bill
and final bill as per the provisions of the act.
1.16
STATUTORY PAYMENTS
1.16.1
All statutory payments in connection with the employment of the workmen for this work will be
borne by the Contractor.
1.16.2
The contractor is the employer of all the worker‟s engaged for this work and should therefore
take all required registrations and pay premium correctly to labour welfare funds constituted by
the Union Government and Government of Kerala from time to time.
1.16.3
All statutory deductions shall be made from the amount eligible to the contractor in each part bill
at current rates. The deduction towards the work contract tax shall be as per the prevailing rates
of Kerala Government Sales Tax rules, Any tax omitted, to be deducted in any part bill shall be
deducted in the subsequent bills/final bill.
1.16.4
Sale Tax, Work Contract Tax, Excise/Customs duty or any other taxes or statutory levies
applicable to this contract shall be payable by the Contractor and INKEL will not entertain any
claim whatsoever in this respect.
1.17
PERIOD OF VALIDITY
The tender shall remain valid for acceptance for a period of 4 months (120 days) from
the date of submission of the tenders. If any tenderer withdraws his tender before the said
period or makes any modifications in terms and conditions of the tender, then INKEL has the
liberty to forfeit the said Earnest Money Deposit.
1.18
INSPECTION OF SITE
Every tenderer is expected to inspect the site of the proposed work and acquaint himself with the
site conditions of substrata, approaches, availability of raw materials, geological and weather
conditions, etc., before quoting his rates. He must go through all the drawings, specifications and
other tender documents. Any further clarification in the drawings and documents can be had from
INKEL at the above mentioned address.
1.19
QUANTUM OF WORK
1.19.1
A format for the schedule of quantities for various items accompanies this tender. The tenderer
will only be responsible for the correctness or completeness of this schedule in respect of items
and quantities and this schedule is liable to modification by deletions, deductions or additions at
the discretion of INKEL without affecting the terms of the contract.
INKEL Limited
Contractor
Page 14
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
1.19.2
INKEL reserves the right to increase or decrease the quantum of work at site without assigning
any reason.
1.19.3
Variations in the quantities put to tender will not be the basis of any claim or disputes. The rates
agreed by the contractor shall hold good for any amount of variation in the quantities and no
claims whatsoever will be entertained on this amount. The contractor shall carryout all works as
directed by INKEL at the same agreed rates.
1.20
ALL INCLUSIVE RATES
The contractor‟s rate must be firm and include the cost of transportation of materials to the site,
all taxes such all taxes such as Sales Tax, Excise, etc. and the fixing or placing in position for
which the item of work is intended to be operated. The rates quoted by the contractor shall
be firm throughout the contract period and there shall be no upward revision of the
rates quoted by the contractor for any reasons whatsoever. It should be clearly
understood that any claims for extra Sales Tax, Excise duty, Construction tax or any additional
tax, etc., shall not be entertained in any case whatsoever once the tenders are opened.
1.21
INTERPRETING SPECIFICATIONS
1.21.1
In interpreting the specifications, the following order of decreasing importance shall be
followed:
a.
b.
c.
Specifications mentioned in Schedule of Quantities
Particular specifications of contract
Drawings.
1.21.2
Matters not covered by the specifications given in the contract, as a whole shall be covered by
the relevant Indian Standard Codes. If such codes on a particular subject have not been framed,
the decision of INKEL shall be final.
1.22
REJECTION OF THE TENDER ON ACCOUNT OF MODIFICATIONS
No modifications shall be made by the tenderer in the Notice Inviting Tender, Instructions
to the contractors, Tender form, General conditions of contract (GCC), Special
conditions of contract, drawings, technical specifications and schedule of quantities.
A modification is one which affects in any way, the quality, quantity and period of completion of
the work or which limits in any way the responsibilities or liabilities of the Tenderer or any right of
INKEL as required in the specifications and contract documents. Any modification in the terms
and conditions of the tender which are not acceptable to INKEL shall also be treated as a major
modification. If any such modifications are made or any conditions attached, the tender is liable
to be rejected.
INKEL Limited
Contractor
Page 15
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
1.23
ACCEPTANCE OF THE TENDER
1.23.1
The acceptance of a tender rests with INKEL who does not bind themselves to accept the lowest
tender and reserves the authority to reject any or all the tenders received without assigning any
reason(s) whatsoever.
1.23.2
INKEL reserves the right of accepting the whole or any of the tenders received and the tenderer
shall be bound to perform the same at the rates quoted.
1.23.3
The work shall be carried out under the direction and supervision of INKEL or its authorised
representatives at site. On acceptance of the tender, the contractor shall intimate the name of
his accredited representative(s) who would be supervising the construction and would be
responsible for taking instructions for carrying out the work.
1.24
LETTER OF ACCEPTANCE
The Letter of Acceptance will be issued in writing to the successful tenderer by INKEL. The
contract will normally be awarded to the qualified and responsive Bidder offering the lowest
evaluated bid in conformity with the requirements of the specifications and contract documents
and INKEL shall be the sole judge in this regard. INKEL does not bind itself to accept the lowest
or any tender or to give any reason for its decision.
1.25
QUALITY OF MATERIAL AND WORKMANSHIP
INKEL‟s decision with regard to the quality of the material and workmanship will be final and
binding on the contractor. Any material rejected thus shall be immediately removed by the
contractor and replaced by materials as per specifications and standards.
1.26
SUB-LETTING
No part of the contract shall be sub-let without the written permission of INKEL nor shall transfers
be made by the Power of Attorney authorizing others to carry out the work, or receive
payment on behalf of the tenderer.
1.27
DEFECTS LIABILITY PERIOD
Any defect developed within the „Defect Liability Period‟ of Twelve months will have to be
rectified by the contractor at their own cost and in case the defects are not rectified by the
contractor, INKEL or its authorised representative shall get the work done at the risk and cost of
the contractor.
1.28
DELAYS IN COMMENCEMENT
The contractor shall not be entitled to any compensation for any loss suffered by him on account
of delays in commencing or executing the work, whatever be the cause for such delays including
delays in procuring Government Controlled or other materials.
INKEL Limited
Contractor
Page 16
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
1.29
INSPECTION BY THE CONTRACTOR
The contractor should inspect the source of materials, their quality, quantity and availability.
All materials must strictly comply with the relevant B.I.S specifications.
1.30
CO-ORDINATION OF WORK
The contractor must co-ordinate with other contractors involved in other works within the site
to minimize the disruption of works.
1.31
NA
1.32
PERIOD OF CONSTRUCTION
Time is the essence of this contract. The construction period shall be Ninety days.
Commencement of the work shall be considered from the 7th day of receipt of letter of
acceptance. The contractor shall draw a detailed schedule of programme in the form of a BAR
CHART on whole work, within one week of award of work and submit to INKEL for their
approval.
1.33 MILESTONES, COMPENSATION FOR DELAY AND BONUS FOR EARLY COMPLETION
1.33.1 The Milestones to be achieved during the execution of the work and compensation for delay shall
be levied for non performance as detailed below:
Milestone
1
2
Cumulative time in
allowed from start
date of contract
Physical progress
Installation
and
commissioning
the
plumbing and sanitary work of GF.
Installation
and
commissioning
the
plumbing and sanitary work of FF, SF and
TF
Compensation
for delay
30
INR 5000/day
90
INR 5000/day
1.33.2
However, the total compensation for delay deductable against Liquidated Damages (LD) whether
for non achievement of milestone or for final completion shall not exceed 10% of the contract
value.
1.33.3
In case the contractor completes the work ahead of the scheduled completion time, a bonus @
0.5% per week computed on per day basis shall be payable to the contractor subject to a
maximum limit of 2% (two percent) of the actual contract value. However, bonus is applicable
only for final completion of the project.
1.33.4
In case the Contractor does not achieve a particular milestone/the rescheduled milestone(s), the
amount shown against that milestone and withheld shall be adjusted against compensation levied
at the final grant of Extension of Time, to be decided on completion of work. Withholding of this
amount on failure to achieve a milestone shall be automatic without any notice to the contractor.
INKEL Limited
Contractor
Page 17
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
1.33.5 However, if the contractor catches up the subsequent milestone(s), the withheld compensation for
delay shall be released. In case the contractor fails to make up for the delay in subsequent
milestone(s), compensation for delay mentioned against milestones missed subsequently shall
also be withheld. However, no interest, whatsoever, shall be payable on such withheld amount.
1.33.6 Upon completion of each milestone within two days, the contractor shall intimate INKEL the exact
date of completion of the milestone in writing. INKEL shall verify the claim based on the site
reports / physical inspection and confirm acceptance of the same within a week of notification
from the contractor.
1.33.7 The contractor should issue notice to INKEL regarding any event / events that may cause delay in
completion of milestones within two days from the date of occurrence of such an event. The
contractor should also substantiate the claim notice with evidence and the impact of such an
event on the milestone / request for EOT. Notice by the contractor requesting EOT for achieving
any particular milestone after the contractual completion date of that milestone shall be
summarily rejected.
1.33.8 Upon receipt of notice and further substantiation of claim / request for EOT, INKEL shall in
consultation with site representative take a view and intimate the contractor of the outcome of
request placed. However, the contractor shall put all efforts from his end to mitigate delays and
try to achieve the completion target during the period of such evaluation.
1.33.9 Also, the contractor can issue notice / request for EOT only in such reasons which are beyond his
control and foreseen during the contract period.
1.33.10 The contractor is expected to foresee material requirement for the project in advance and
procure accordingly. Sufficient stock of materials needed for daily consumption should be stocked
and no claims whatsoever on account of quarry strike, equipment strike, hartals etc shall be
accepted for delay of the project.
1.33.11 The contractor shall indicate in the project schedule the actual date for each milestone based on
the calendar year in accordance with the clause 1.33.1.
1.34
OCCUPATION IN PART
If INKEL wants to occupy areas in part, the contractor shall complete the work of these areas in
conjunction with INKEL and hand over the same to INKEL without affecting any of the clauses of
contract agreement.
1.35
LIQUIDATED DAMAGES
1.35.1 INKEL, if satisfied, that the works can be completed by the contractor within a reasonable time
after the specified time for completion, may allow further extension of time at its discretion with
or without the levy of L.D. In the event of extension granted being with Liquidated Damages,
INKEL will be entitled without prejudice to any other right or remedy available in that behalf, to
recover from the contractor as agreed.
INKEL Limited
Contractor
Page 18
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
1.35.2
INKEL, if not satisfied with the progress of the contract and in the event of failure of the
contractor to recoup the delays in the mutually agreed time frame, shall be entitled to terminate
the contract.
1.35.3
In the event of such termination of the contract as described in 1.35.2 the owner shall be
entitled to recover Liquidated damages up to Ten per cent (10%) of the contract value and
forfeit the performance guarantee made by the contractor besides getting the work completed
by other means at the risk and cost of the contractor.
1.36
CONTRACTOR‟S STORE AND SITE OFFICE
Suitable area in the site of work shall be allowed to the contractor free of cost for constructing
temporary structures for storing his tools and plants, materials, site office and cement godown.
However, the structure will be provided by him at his own expense and he will be solely
responsible for guarding his property with requisite insurance against theft, fire etc. The
contractor however will have to dismantle the sheds and vacate the land of all debris, etc. at his
own expense after completion of work.
1.37
MEASUREMENT AND BILLING
1.37.1
Wherever mode of measurement is not specified, the measurement will be taken at site as per
the latest BIS code of practice for measurement. All measurable works shall be approved by the
Engineer in charge in the approved format. At least 4 hour notice has to be given prior to such
measurements.
1.37.2
The contractor or his representative shall accompany INKEL or its authorised representative in
taking measurement and shall agree to the measurement taken on spot. All necessary tapes shall
be of steel and shall be supplied by the contractor. Request for Approval (RFA) shall be duly filled
up and certified. The contractor shall then present his bill based upon the agreed and recorded
measurements and as per the directions of INKEL. If the contractor fails to accompany INKEL‟s
representatives for measurements, then he shall be bound by the measurement taken by INKEL
or their representative.
The contractor shall raise bills once a month or for a minimum payment of 15% of contract value.
All bills shall be accompanied by the signed Request for Approval (RFA) as in enclosed format.
Payment towards 50% of the interim bills shall be released within 15 days and balance within 30
days of presentation by the contractor.
Period of final measurement shall be one month from the time of completion of the project.
Payment Certificate shall be in the enclosed format.
1.37.3
1.37.4
1.37.5
1.38
EXTRA ITEMS
1.38.1
Any item of work that do not find a place in the schedule of quantities, in the original tender or in
the accepted tender which has been directed by INKEL to execute is deemed as an extra item of
work. All such works that are necessary to be carried out under the direction of INKEL shall be
carried out by the contractor. No such variation will violate the Contract.
1.38.2
Extra items of work thus carried out by the contractor will be paid at the rates worked out by
INKEL.
INKEL Limited
Contractor
Page 19
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
1.39
WATER AND ELECTRICITY
The contractor shall make his own arrangement for water and electricity required for the
work. INKEL shall take no responsibility for the supply of either electricity or water.
1.40
INSURANCE
The successful tenderer shall take out Contractor‟s All Risk (CAR) insurance policy, jointly in the
name of INKEL and the contractor, and the original policy shall be deposited with INKEL.
This Notice Inviting Tender (NIT) will form part of the tender document and the agreement
executed by the successful tenderer.
Date:
INKEL Limited
INKEL Centre, Vallathol Junction
Sea port Airport Road,
Place:
Thrikkakara, Cochin-682021.
INKEL Limited
Contractor
Page 20
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
ANNEXURES
INKEL Limited
Contractor
Page 21
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
1.0
1.01
INSTRUCTIONS FOR FILLING THE TENDER FORM
In this tender, the item specifications are given in the following sections:
PARTICULAR SPECIFICATIONS OF CONTRACT
SCHEDULE OF QUANTITIES (With Unit Rate Specifications)
Particular specifications are the general instructions for carrying out the works.
Unit rate specifications are the descriptions of items for which unit rates are to be worked out by
the tenderer by considering all tender information.
1.02
In the case of percentage rate tenders, Contractor has to work out his rate as an overall percentage
above or below or at the rate given in the schedule and for item rate tenders, the rate has to be
entered by a single entry in front of the schedule both in words and in figures.
1.03
The contractor should certify that he has studied the works at site and has acquainted himself with
the position with regard to the construction, materials and labour required for the work.
1.04
The contractors are to pay the Earnest money as specified in the Notice inviting Tender separately
along with the tender. Tenders for which Earnest Money Deposit has not been received separately,
shall be rejected.
1.05
Certified copies of Registration Certificate, Partnership Deed and Power of Attorney or
Articles of Agreement in case of Limited Companies will have to be furnished for considering the
acceptance of the tender.
1.06
Should the contractor notice any discrepancy or error in the statement made, or quantities or units
shown against items, he shall immediately bring it to the notice of INKEL and obtain the clarification
before submitting the tender. The tender shall be based on such clarifications received and shall be
recorded as such in the covering letter to the contractor to execute the work according to the
statement made for quantities or units shown in the tender, without any compensation.
1.07
The tenderer shall execute a preliminary agreement on non-judicial stamp paper of value
not less than Rs.500/- and enclose the same with the tender documents. The Performa of the
preliminary agreement can be found in Forms for different deeds.
1.08
The tender of the Contractor not complying with the above instructions may be rejected.
1.09
The tenderer should put the signature on all pages of the tender documents.
I/We have carefully read the above said instructions and shall comply with the same.
Signature of Tenderer:
Date:
INKEL Limited
Place:
Contractor
Page 22
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
TENDER FORM
To
The Authorised Signatory
INKEL Limited
INKEL Centre,
Off Vallathol Junction,
Sea port Airport Road,
Thrikkakara, Cochin -682021.
Dear Sir,
Sub: Plumbing and Sanitary works : INKEL Greens -Ladies Hostel, Malappuram
With reference to the tender invited by you for the above proposal, I/We do hereby tender for this after
having:
a) Examined the Designs, Drawings, Details, Specifications, Schedule of Quantities, Instructions to
Tender, Agreement and the Conditions of Contract annexed thereto (hereinafter called the Tender
Documents) relating to Construction.
b) Visited the site of work, studied the site conditions, nature of substrata, availability of
construction materials and
c) Acquired the requisite information on all prevailing factors affecting the tender.
d) Read and understood the General Conditions of Contract
I/We undersigned hereby offer to construct the proposed work in strict accordance with the Tender
document for the consideration to be calculated in terms of the priced schedule of quantities.
I/We have noted that Time is the essence of the contract and undertake to complete the whole of
the works as per the attached schedule from the date of issue of intimation (Letter of Acceptance) by you
that our tender has been accepted and upon receiving possession of site.
I/We further undertake that on failure subject to the conditions of the contract relating to extension of
time, I/We are willing to pay the agreed Liquidated Damages/Compensation for delay for the period
during which the work remains incomplete beyond the due date of completion.
I/We further agree to the deduction of retention money amounting to a total of 5 percent of value of work
which will be returned to me/us as per the relevant clauses in the agreement .The deduction will be as
explained in clause 1.14 of Notice Inviting Tender.
INKEL Limited
Contractor
Page 23
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
I/We undertake to execute the work of electrification of various facilities though a licensed electrical
contractor of appropriate class as given in the tender condition. All the requirements of supervision,
testing, commissioning and energizing will be fulfilled by us.
I/We have also executed the preliminary agreement as is enclosed.
Further we undertake to execute the works which will be entrusted to us in the most work man like
manner within the stipulated completion period. If our Tender is found accepted, we agree to enter into a
contract as specified by you within fifteen days of this receipt of Letter of Acceptance of our tender.
Our Bankers are:
1.
…………………………………………………….
2.
…………………………………………………….
Place:
Date:
Signature of tenderer
Name of the partners of the firm
OR
Name of the Contractor
INKEL Limited
Contractor
Page 24
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
FORMAT OF UNCONDITIONAL ACCEPTANCE LETTER
(TO BE SUBMITTED IN ENVELOPE 1)
The Authorised Signatory
INKEL Limited,
INKEL Centre, Off Vallathol Junction,
Sea port Airport Road,
Thrikkakara,
Cochin -682021
Sir,
ACCEPTANCE OF INKEL‟s TENDER CONDITIONS
1.
Tender Document for the work of -------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------has been sold
to me/us by INKEL Limited, and I/We hereby unconditionally accept the tender condition of
INKEL‟s Tender documents in its entirety for the above work.
2.
The contents of the clauses of Notice Inviting Tender of the Tender Documents have been noted
wherein it is clarified that the unconditional acceptance of the tender conditions in its entirety is a
pre-condition for acceptance of the tender. It is further noted that it is not permissible to put any
remarks/conditions (except unconditional rebate on quoted rates if any) in the tender enclosed in
“Envelope 3”. I/We agree that the tender shall be rejected and INKEL shall, without prejudice to
any other right or remedy is at liberty to forfeit the Earnest Money Deposit.
3.
The required Earnest Money for this work is enclosed herewith.
Yours faithfully,
NAME AND ADDRESS OF
THE TENDERER WITH SEAL
Date: ______________
INKEL Limited
Contractor
Page 25
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
FORM – B
Details of experience for similar nature and complexity of work in last 3 (Three) years:
Please fill in information about the relevant projects completed over the last five years
Name of
Completion
Engineer
Contract
Name of
Scope of
certificate
Location
responsible
price & Date
Employer
works
enclosed
for
(Rs. In lakhs)
(Yes/No)
supervision
Signature of Contractor with seal:
INKEL Limited
Contractor
Page 26
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
FORM - C
PERFORMANCE REPORT FOR WORKS REFERRED TO IN FORM „B‟
Name of the work: ......................................................................
Project & Location: ......................................................................
1.
Scope of work:
a.
Number of floors in basement:
b.
Number of floors in superstructure:
2.
Agreement No. & date:
3.
Contract Role: Sole contractor/ Sub contractor/ Partner in Joint Venture
4.
Estimated Cost:
5.
Tendered Cost:
6.
Value of work done:
7.
Date of Start:
8.
a. Due date of completion:
b. Actual date of completion:
9.
Amount of compensation levied for delayed completion if any.
10. Performance report based on Quality of work, Time
Management and Resourcefulness
: Very Good / Good / Fair
11. Mobile No:
12. Email:
EXECUTIVE ENGINEER/
AUTHORISED SIGNATORY
Place:
Date:
INKEL Limited
Contractor
Page 27
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
PROFORMA OF PRELIMINARY AGREEMENT
(To be executed on stamp paper of value Rs.500/- & submitted along with tender in Envelope1)
Preliminary agreement entered into on this the …………. (Day) of................................
(Month)................... (Year) between INKEL Limited, Cochin-21 (hereinafter called INKEL on one part and
Shri...................... ……………… (Name and Address of the Contractor) (Hereinafter called the Contractor)
on the other part for the execution of the agreement as well as the execution of the work.
And whereas in the Notice Inviting Tender it is stated as follows:
Before commencing the work within seven days of the date when the letter of acceptance of
tender has been issued to him, the tenderer shall deposit an additional sum of
`…………………
(Performance Guarantee AS BANK GUARANTEE) which together with the amount of earnest money
deposited shall be treated as guarantee for the proper fulfilment of the same and he shall execute an
agreement for the work in the scheduled form of agreement. If he fails to do this or fails to maintain a
specified rate of progress, the performance guarantee shall be forfeited to INKEL and fresh tenders shall
be called for or the matter otherwise disposed. If as a result of such measures due to the default of the
tenderer to pay the requisite deposit, sign the contract, to take possession of the work, cause any loss to
INKEL, the same will be recovered from him as arrears of revenue. Recoveries to this or any other account
will be made from the sum that may be due to contractor on this or any other contracts or under the
Revenue Recovery Act or otherwise as INKEL may decide.
Now therefore those present witness and it is mutually agreed as follows:
1.
The terms and conditions for the said contract having been stipulated in the said tender
form to which the contractor has agreed, a copy of which is appended, and which forms part of this
agreement, it is agreed that the terms and conditions stipulated there in shall bind the parties to this
agreement, except to the extent to which they are abrogated or altered by express terms and conditions
herein, agreed to and in which respect the express provisions herein shall supersede those in the said
tender form.
2.
The Contractor hereby agrees and under take to perform and fulfil all the operations and
obligations connected with the execution of the said contract work.
3.
If the Contractor does not come forward to execute the original agreement after the said
work is awarded and letter of acceptance issued in his favour or commits breach of any of the conditions
of the contract as stipulated in the concerned clause of the Notice Inviting Tender as quoted above within
the period stipulated, INKEL may rearrange the works otherwise or get it done otherwise at the risk and
cost of the contractor and the loss so sustained by INKEL can be realized from the Contractor under the
Revenue Recovery Act as if arrears of land revenue as assessed, quantified and fixed by an adjudicating
authority consisting of INKEL or any other officer or officers authorized by INKEL taking into consideration
the prevailing rates and after giving due notice to the Contractor. The decision taken by such authorized
officer or officers shall be final and conclusive and shall be binding on the contractor.
INKEL Limited
Contractor
Page 28
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
4.
The contractor further agrees that any amount found due to INKEL under or by virtue of
this agreement shall be recoverable from the Contractor from his EMD and his properties, movable and
immovable as arrears of land revenue under the provision of the Revenue Recovery Act for the time being
in force or in any other manner as INKEL may deem fit in this regard.
In witness where of Sri………………………………… Authorised Signatory, INKEL Limited and
Sri…………………………., the Contractor, have set their hands on the day and year first above
written,
Signed by Sri ………………………………..…, Authorised Signatory, INKEL Limited.
In the presence of witnesses
1. ………………………….
2. ………………………….
Signed and delivered by Sri. …………………………………………….. , The Contractor,
In the presence of witnesses
1. …………………………..
2…………………………..
INKEL Limited
Contractor
Page 29
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
DECLARATION
It is to certify that
(TO BE GIVEN BY THE TENDERER(S) WHO HAVE DOWNLOADED
THE TENDER DOCUMENT FROM THE WEB)
1. I/We have submitted the tenders in the Proforma as downloaded directly from the website.
2. I/We have submitted tender documents which are same / identical as available in the website.
3. I/We have not made any modification/corrections/additions etc. in the tender documents
downloaded from web by me/us.
4. I/We have checked that no page is missing and all pages as per the index are available & that all
pages of tender document submitted by us are clear and legible.
5. I/We have signed (with stamp) all the pages of the tender document before submitting the same.
6. I/We have sealed the tender documents properly before submitting the same.
7. I/We have submitted the cost of tender along with the EMD.
8. I have read carefully and understood the important instructions to the all tenderer(s) & to
tenderer(s) who have down loaded the tenders from the web.
9. In case at any stage later, it is found there is difference in our downloaded tender documents from
the original, INKEL shall have the absolute right to take any action as deemed fit without any prior
intimation to me / us.
10. In case at any stage later, it is found that there is difference in our downloaded tender documents
from the original, the tender/work will be cancelled and Earnest Money/
Performance Guarantee
will be forfeited at any stage whenever it is so noticed. INKEL will not pay any damages to me / us
on this account.
11. In case at any stage later, it is found that there is difference in our downloaded tender documents
from the original, I/We may also be debarred from further participation in the tenders of INKEL
Limited.
Date ………………..
INKEL Limited
CONTRACTOR
(Sign with seal)
Contractor
Page 30
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
2.0
FORMAT FOR REQUEST FOR APPROVAL
Project
Date
Employer
Contractor
Description of activity to be inspected
Submitted
by
Designation
RFA no
BOQ Ref
Date & Time
Inspection notes
Commented
by
Designation
Date & Time
APPROVALS
Approved /
Rejected
Designation
Date & Time
Details of Attachments
1
2
3
INKEL Limited
Contractor
Page 31
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
10. 10.0
Format
for for
Payment
Format
Paymentcertificate
Certificate
Project
Payment no
Employer
Date
Consultant
For the month
Contractor
Contract value
Start date
Contract period
Completion
date
Time elapsed in
%
Cumulative value of work done till date RB -
Value of
work done
Cumulative value of work done till last bill RB Value of work done for this bill RB -
Deductions in this bill
Recovery of adhoc/advance Payments
Other recoveries
Recovery of Liqidated damages
Total deductions
Net amount certified before taxes
Prepared by
Approved by
Signature
Signature &
stamp
Designation
Designation
Taxes, retention & recoveries for this bill RB Recovery off retention @ 5%
Recovery of mobilisation advance from this bill
TDS
WCT
Reverse ST
Labour Cess
Interest on Mobilisation advance
Total recoveries
Net amount payable
Finance
Signature
Designation
INKEL Limited
Management
Signature &
stamp
Designation
Contractor
Page 32
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
SCOPE OF WORK
INKEL Limited
Contractor
Page 33
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
SCOPE OF WORK
1. INKEL ladies hostel is a G+3 RCC building.
2. The scope of work under this contract is to supply, install and commission plumbing and
sanitary fittings and associated pipelines as per the drawing provided.
3. The contractor shall follow the time schedule of the main contractor and shall liaison with
the various sub contractors for easy coordination of the work.
4. The milestone-1 : completion of GF and commissioning the facility is a critical activity and
should be completed within 30 days of commencing the contract.
5. In the absence of overhead water tank, GF shall be fed with water from academic block.
6. INKEL shall supply wash basin for the project. Contractor should take this into account while
estimating the price.
INKEL Limited
Contractor
Page 34
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
TECHNICAL SPECIFICATIONS OF CONTRACT
INKEL Limited
Contractor
Page 35
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
TECHNICAL SPECIFICATIONS
TECHNICAL CONDITIONS FOR PLUMBING INSTALLATION WORKS
PIPING – PREPARATION
Pipes and tubes shall be cut perpendicular to the axis , with approved cutting tools , the ends reamed
and burrs removed.
Scale and dirt, on inside and outside and weld splatter shall be removed before assembly.
Piping connections to equipment shall be made with flanges or unions.
PIPING – SPACING AND LOCATION
Piping shall be installed in such a way that conserves building space and not interfering with the use
of space .
Exposed piping shall be installed parallel or at right angles to the building walls , except where
otherwise shown on the Contract drawings .
Minimum clearances shall be provided between piping covered by this section and those of other trades.
Adequate clearance shall be provided around piping for installation of insulation and access to valves and
fittings.
Piping shall be grouped at common elevations wherever possible.
Piping shall be installed in such a way that allows for expansion and contraction without stressing pipe
joints or connected equipment.
Access doors shall be provided where valves and fittings are not exposed. Size and location of access
doors shall be coordinated with the Civil Work .
PIPE FITTINGS
Tapered reducer fittings shall be installed where changes in pipe sizes occur. Use of site fabricated fittings
or bushings shall not be permitted.
Tapered , factory manufactured reducer fittings (eccentric type at suction and concentric type at
discharge ) shall be installed at pump connections . Eccentric reducer fittings shall be installed with
level crown.
Factory manufactured fittings shall be installed where changes in pipe direction occur. Bending or forming
of piping shall not be permitted without the written permission of the Engineer .
Test – tees shall be installed in soil , waste , vent and rainwater pipe risers at minimum 450 mm (18
inch) above the ground floor level , at every alternate level and at other locations as shown on the
Contract Drawings .
Connections shall not be made between piping of different services, under any circumstance. The
existence of any one such connection in the project , whether temporary or permanent , shall make
the Contractor liable for an anti – confusion test for all of the concerned services .
SLOPES AND INVERTS
Invert elevations shall be established and drainage pipes sloped to one percent minimum unless otherwise
stated. The minimum gradients that are shown on the Contract Drawings shall be maintained.
Water supply piping shall be sloped to facilitate complete drainage of the piping for maintenance
purposes .
Elevations of buried piping , outside the building , shall be established to ensure not less than
900mm(3ft) of cover , especially in areas subject to traffic loading .
INKEL Limited
Contractor
Page 36
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
The crown (or suffix ) levels of the pipes shall be matched when joining horizontal drainage pipes of
differing sizes , as far as possible . This shall apply to stepped reducers in drainage piping and
connections in manholes ( saddle joints in drainage mains excluded )
PROTECTION DURING CONSTRUCTION
Ends of piping shall kept closed with factory manufactured plugs or blind flanges with integral
indicating flange , to prevent entry of foreign matter , during the progress of the work such plugs
or flanges shall be removed on completion of the work .
Water supply piping outlets in wet areas shall be kept closed with threaded (PVC) pipe stub with
one end crimped or closed otherwise until the time of installing the out let fittings .
The piping surface shall be protected from splashes of cement , plaster , paint and similar
construction materials .
The piping shall be blown out using dry compressed air , prior to testing .
SPECIALITY CONNECTORS
Chrome plated brass extension pieces shall be installed at the water supply piping outlets for
sanitary fittings in wet areas . these shall be of variable length for making the outlet flush with the
wall finished and shall have internal hexagonal water way for fixation by Allen keys.
Fixture waste adapters of rubber or neoprene shall be used to connect tail pipes of sanitary fixtures
/drains to the waste piping .
SETTING OUT FOR EXTERNAL SERVICES
The existing ground shall be cleared along the line of piping , particularly at all manholes building
connections and other appurtenances.
Sight rails shall be set in position , using a surveyor ,s level and properly established temporary
bench marks alongside the work . The practice of transferring level by means of a straight edge and
spirit level shall not be allowed .
Where long lengths of slightly sloping sewers are to be laid in trenches , sight rails should be fixed
across the trench at intervals of at least 20m at a height equal to the length of the boning rod to
be used above the required invert level of the drain or sewer at the point where sight rail is fixed
.there shall at no time be less than three sight rails in position on each length of sewer or drain
under construction at any one gradient .
Deviations from given levels may not be greater that +2cm and in gradients not greater than 1/20
of given gradient .
LAYING OF EXTERNAL PIPING
Pipes shall be laid and connected at the required depth in straight line and true to the gradient on
an even foundation , over the full length of the barrel , with the sockets facing up the gradient .
When jointing pipes , a mark shall be made to check the position of the end of the barrel in view of
the flexibility of the joint , a gap 5 to 10 mm shall be left between the end of the pipes . When
pipes are laid in curves , the pipes may not be bent sideways unit the connection has been made
.
Piping shall be kept free of earth , dirt and extraneous matter and every pipe shall be cleaned
after installation by special cleaning tools approved by the Engineer to inspect the pipelines at any
time during construction .
No pipe shall be laid when , in the opinion of the Engineer , conditions are unsuitable
INKEL Limited
Contractor
Page 37
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
ENCASEMENT FOR EXTERNAL PIPING
Foundation of cement concrete shall be provided under the pipes , hunching with similar concrete
up to half the diameter of the barrel ; in weak soils ,as required .
Pipes laid in areas subject to t4raffic loading shall be encased with concrete , as stated below .
pipes with 1000 to 4000mm earth cover need not be encased . hunching and encasing of pipes
shall be done in two stages , after completion of tests .
1.
Concrete bed of 50mm thickness shall be cast to scheduled slopes and levels.
2.
Blocks of concrete (100mm thick and length equal to the external diameter of
the pipe) shall be fixed on the bed with cement and sand mortar (1:3).
3.
Hunching or encasing concrete shall be cast from one side of the pipe only ,
vibrating until it is raised on the opposite side by 50mm over the bottom of the pipe .
4.
Expansion joints shall be made in the protective concrete with fiber board or
other suitable filling material .
BACKDROPS TO MANHOLES
Drop connections shall be executed at the inlet to sewage manhole , when the drop exceeds
600mm and benching shall be provided at the bottom .
These shall be constructed vertically adjacent to the external face of the external face of the
manhole shaft in order to reach the level inside the manhole .
VALVES
Valves shall be installed with stem upright or horizontal , not inverted ; except with the written
permission of the Engineer for each location .
Valves shall be same size as pipeline , except where shown otherwise on the Contract Drawings .
Valves with flanged ends shall be used in valve pits and when directly buried , irrespective of size .
Ball and gate valves shall be used for shutoff and to isolate equipment part of systems or risers
.full bore ball valves shall be used for water storage tank , drain and for isolation purposes in
gravity fed systems (which are not subjected to shock conditions)
Globe valves shall be used for throttling , bypass or manual flow control services .
Drain valves shall be installed at system low points and at the foot of risers .
Appropriate valves gland packing , sealing and gasket materials shall be selected for the
temperature and pressure encountered .
SUPPORTS AND HANGERS FOR PIPING
Horizontal cast iron piping shall be supported independently of other piping.
Sports shall be provided for fittings grouped together in horizontal runs, as appropriate.
Piping shall be anchored at horizontal changes in direction, at clean outs and at start or horizontal lines.
Floor clamps shall be provided at every floor and offset clamps below the branch take off joint in
vertical risers.
SUPPORTS AND HANGERS FOR PLASTIC PIPING.
Horizontal piping shall be supported as scheduled below:
Pipe size
Diaz.
UP to 25mm nomadic
32 to 50mm nom .dial
INKEL Limited
Maximum spacing
1.2m
1.5m
Hanger Rod
8mm(5/16”)
10mm(3/8”)
Contractor
Page 38
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
65 to 75 mm nom. dial
100 to 150mm nom .dial.
1.8 m
2.4m
10mm(3/8”)
12mm (1/2”)
Risers of all sizes shall be supported at one quarter (1/4) points of floor to floor height support to
spacing of 2.0 m shall not be exceeded .
Manufacturer‟s recommendations (which will supersede this specification) shall be conformed to in major
PVC drainage system).
SLEEVES
Sleeves shall be set in position in form work and additional reinforcement provided around sleeves.
Where sleeves in concrete structural elements are omitted due to error , the required openings shall
be cored only after obtaining written permission of the Engineer.
Sleeves with puddle flanges resting on the concrete surface shall be placed and the sleeves fixed
in position by non –shrink grout . Cutting of hole by chiseling shall not be permitted.
All sleeves in wet areas shall be projected by at least 50mm(2inch) above the finish floor level .
Sleeves shall be erected in the from work , perpendicular to the wall face and rigidly to resist
displacement during pouring of concrete .
Sleeves shall be large enough to allow for movement of pipe due to expansion or contraction,
Provision of during of concrete .
PUDDLE FLANGES
Puddle flanges shall be erected in the form work perpendicular to the wall face and Rigidly to
resist displacement during pouring of concrete .
Verticality of the flange faces and alignment of bolt holes with connecting equipment (valves etc.) shall be
checked and ensured.
Openings in the form work , around puddle flanges , shall be sealed so as to avoid leakage (and
resultant honey combing ) and undesirable formation of concrete .
Alignment of puddle flanges shall be checked (and adjusted if necessary) immediately after
pouring of concrete
EXCAVATION TO BE TAKEN TO PROPER DEPTH
Trenches shall be excavated in all condition of soil and to such a depth that sewers shall be set as
described in the several clauses relating thereto and so that the inverts may be at the levels given
on the section . In bad ground , the Engineer may order the contractor to excavated to a greater
depth than shown in the drawings and fill up the excavation to the level of the sewer with concrete
; sand , gravel or other materials . For such work the contractor shall be paid extra at the rates
laid down such works in the schedule , if the extra work was ordered by the Engineer in writing
.But if the contractor should excavate the trench to greater depth than is required without a
specific order to that effect in writing of the Engineer , the extra depth shall have to be filled up
with concrete at the contractor‟s own cost t o the requirements and satisfaction of the Engineer.
REFILLING
After the sewer or other work has been laid and proved to be water-tight , the trench or other
excavation shall be refilled . Utmost care shall be taken in doing this ,so that no damage shall be
caused to the sewer and other permanent works . Filling in he trenches up to 50cm above the
crown of the sewer shall consist of the finest selected materials placed carefully and consolidated .
INKEL Limited
Contractor
Page 39
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
After this has been laid , the trench and other excavation, each layer being watered and
consolidated .
CONTRACTOR SHALL RESTORE SETTLEMENT AND DAMAGES
The contractor shall at his own cost make good promptly , during the whole period the work are
in hand, any settlement that may occur in the surfaces of roads , beams , footpaths, gardens open
spaces etc . whether public or private caused by his trenches or his other excavations and he shall
be liable for any accidents cased thereby .He also shall, at his own expense and charge repair and
make good any damage done to buildings and other properties.
DISPOSAL OF SURPLUS
The contractor shall at his own cost dispose within the site or as directed all surplus excavated materials
not required to be used on the work .
SHORING
The contractor shall at all times support efficiently the sides of trenches and other excavations by
suitable timbering , piling , sheeting etc . Trenches shall be close timbered in loose or sandy strata
and below the surface of the sub – soil water table .
All timbering , sheeting and piling with their wailings and supports shall be of adequate
dimensions and strength and fully braced and strutted so that there is no risk of collapse or
subsidence of the walls of trenches . The contractor shall be held accountable and responsible for
the sufficiency of all timbering , bracing , sheeting and piling used for all damages to persons and
property resulting from the improper quality , strength , placing , maintenance or removing of the
same
BAILING OUT WATER
The contractor shall at all times, during the progress of work, keep trenches and excavations free
from which shall be disposed off by him in a manner as will neither cause injury to public nor to
public or private property nor to the work completed or in progress nor to the surface of any
roads or streets nor cause any interference with the use of the same .
PROTECTION OF EXISTING SERVICES
All pipes, water mains, cables etc. met in the course of excavation shall be carefully protected and
supported.
CONCRETING
All pipes at shallow road crossings and made –up ground shall be laid on a bed of 6”(150mm)
concrete with one part of cement , four parts of sand and eight parts of stone metal of
¾‟‟(20mm) or smaller gauge properly consolidated . Concrete shall be laid to full width of trench and
also in haunches.
CONSTRUCTION ACROSS ROADS
All work across roads shall be carried out as per the directions of the Engineer.
WATER SUPPLY
UPVC PRESSURE PIPES AND FITTINGS
INKEL Limited
Contractor
Page 40
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
LAYING AND FIXING
Pipes are to be cut to size and threaded with standard GI threading die . Pipes and fittings shall be
jointed using Teflon tape as thread sealant. Pipes and fittings can be tightened by hand also to achieve
leak –proof joint. Pipes shall be fixed by means of holder bat clamps keeping them 12mm off walls for easy
maintenance. Pipes running on roof slabs shall be suitably supported blocks and to be projected
from ultra violet radiation
TESTING
Pipes shall be tested to a hydrostatic pressure of 10 kg/sq cm and pressure shall be maintained for
at least eight hours without appreciable drop in pressure . In addition to sectional testing of water
supply pipes , the contractor shall test the whole of the installation to the entire satisfaction of
the Engineer.
PVC PIPES
LAYING AND JOINTING
For PVC pipes ,pasted joints are preferred .The socket length should be 11/2 times the outer
diameter for size above 110mm diameter . The surface to be glued should be thoroughly scoured
with dry cloth and preferably chamfered to 30o.Slovent cement is to be applied evenly with a
brush outside surface of the spigot of one pipe and to the inside surface of the socket of the
other . The spigot end should then be inserted immediately into the socket should be wiped out
at once with a clean dry cloth . Jointing should be carried out quickly , taking not more than one
minute to completed joint should not be disturbed for at least 5 minutes . Gluing should be
avoided in rainy or foggy weather to avoid water contamination of the solvent cement . Pipes
should be supported at distance of 1.20 m for vertical runs with appropriate MS clips and support
blocks or wooden plugs fixed on walls , floors or ceiling . Holder bat clamps are to be used to keep
pipes 12mm clear off walls.
TESTING
Pipes should be tested to a hydrostatic test pressure of 3.5kg/sq cm in sections of lengths. Pressure should
be maintained for 8 hours without appreciable drop. In addition to sectional testing of pipes , the
contractor shall test the entire installation to the entire satisfaction of the Engineer.
CHLORINATED POLY VINYL CHLORIDE PIPES (CPVC PIPES)
The pipe may cut to the required lengths using circular tubing cutters, Ratchet type cutters or
chop saws .The cuts shall be square . Burrs and fillings shall be removed from outside and inside
the pipes using a chamfering tool
For jointing CPVC pipes special solvent cement is required. The surfaces are to be dry before solvent
cement shall not be allowed puddle in the fitting and pipe assembly . The pipe may then be
rotated to one quarter to half turn while inserting into the fitting socket. When the pipe end is
seated it may hold in place for ten second s to allow the joint to set. Teflon tape may be used as
thread sealant.
Water testing to a pressure of 10kg/cm2 may be carried out for CPVC piping system . Air testing
shall not be done
POLYPROPYLENE
INKEL Limited
PIPES (PP PIPES)
Contractor
Page 41
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
The installation of PP pipes may be carried out similar to metal pipes . The pipes may be cut to
the desired length using special cutters , the cuts being perpendicular to the axis.
Jointing of PP pipes may be done using Fusion welding by special welding machines . The pipes
can be bent by heating , but the pipes shall not put to flame . The welding Fusion joint process
involves heating , fusion and cooling .Before welding, the pipe ends may be cleaned with a cloth and
alcohol water solution . after heating the ends on the welding machine for a few second , the
pipe may be removed from the welding machine and the ends may be connected using a little
pressure without twisting . It may be allowed to cool down for a few seconds. The joints may be kept
in a tight condition during cooling.
Water testing shall be adopted for testing PP pipes. The pressure applied shall be 10kg /cm2 . The test
time is to be 2 Hours.
WATER FITTINGS (TAPS, STOP COCKS ETC.)
All water fittings shall be of approved quality and design and shall generally comply with latest I .S.
Specifications.
VALVES AND PRESSURE GAUGES.
Pressure gauges shall have not less than 115mm dia , 10mm BSP full threads , brass
body
siphon and gauge cock of 10mm size . Dial gauges shall be adequate for pressure encountered
and specified (0-15 kg/sq cm ) . Valves shall comply with IS:780 (Class I) for CI sluice valves and IS:
778 for GM valves and tested and approved by the Municipal Corporation .
BALL COCKS
Ball cocks used for storage tanks shall be high pressure
lever road and PVC floats.
brass/ gun metal ball cocks with brass
SANITARY SYSTEM
PVC SWR PIPES AND FITTING
LAYING.
PVC Pipes shall be laid under floors , in suspended ceiling , in sunk slabs or on walls either buried
or exposed as the case may be as shown on drawings . The minimum thickness of the fittings shall
be32mm. Fittings shall be injection molded type with rubber ring socket. Exposed pipes and fitting
shall be capable of with standing sun –rays without any cracks or de- colorization.
JOINTING
Jointing of pipes to fittings shall be done as per manufacture‟s instructions/ recommendation .
TESTING
PVC pipe and fittings shall be tested for three meters of water head .Openings
of pipes
shall be sealed for the section to be tested .Water pressure shall be maintained for maximum of one hour.
The Engineer shall examine carefully all the joints for leakage.
SEWER APPURTENANCES.
LOCATION AND SIZES
INKEL Limited
Contractor
Page 42
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
The sizes given on drawings shall be internal sizes of chamber, man –hole etc
Unless
otherwise specified, man – hole and inspection chambers shall be provided at all changes in direction of
drain and where branch drain meets main drain .The
Minimum internal sizes shall be taken as
per detailed drawings, standards specified and local bye- laws if any
BED CONCRETE.
Bed Concrete shall be in 1:4:8 cement concrete 150mm thick for inspection chambers, 230mm for
depths up to 2.1m and 300mm for greater depths in case of man-holes.
BRICK MASONRY
Brick work shall be with best quality table - moulded bricks in 1:6 cement mortar as per
specification for brick masonry.
PLASTER
Inside of the walls of chambers / man –holes shall be plastered with 15mm thick cement plaster
1:3 mixed with waterproofing material and finished smooth with a flushing coat of neat cement .
BENCHING
Channels and benching shall be done in cement concrete 1:3:6 rendered smooth with neat cement
. Following sizes of channels for the bench shall be adopted .
Size of Drain
100mm(4‟‟)
Depth of Centre
Depth of outside i.e. at wall
150mm(6‟‟)
150mm(6‟‟)
250mm (10‟‟)
200mm(8‟‟)
300mm(12‟‟)
CHAMBER / MAN HOLE COVER.
Covers shall be of cast iron / Ductile Iron with lifting hooks as per IS: 1726-1967, details given on
drawings and fixed on CI frame s embedded in concrete . Cover placed on the frames shall be air tight. Height of frame and cover shall be as per schedule of quantities. Covers for chambers / man –
holes coming within buildings should be Double Seal Type.
STEPS
CI /PVC steps duly painted shall be provided whenever depth
1.2m.
of man – hole / chamber is more than
DROP CONNECTIONS.
In case the difference in invert levels between the main drain and the branch line requires a drop
of more than 600mm , a drop connection should be provided with cast iron, stoneware or PVC four
-way junction, fixed at right angles to the drop pipe at the level where branch pipe enters manholes. Access for cleaning bends should be provided at finished ground level.
MODE OF MEASUREMENTS
CAST IRON, PVC (SWR) PIPES AND COPPER PIPES AND COPPER PIPES
These pipes shall be measured along the centre line of pipes including all specials in (Rm) Quoted
rate for respective items shall include. The following:
INKEL Limited
Contractor
Page 43
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
a) Cost of jointing materials.
b) Laying, fixing and jointing with necessary clamps, brackets, screws etc .and curing.
Making good all damages to the building to suit the surroundings. Painting buried surfaces of CI pipes with
bit mastic paint (no painting for AC pipes). esting and making good defects, if any.
INSPECTION CHAMBERS
Inspection chambers shall be measures in numbers and rate quoted shall also be per number only
. Quoted rate shall include cost of all the following items.
a) Bed Concrete
b) Brick work
c) Plastering
d) Concrete benching channeling
e) PCC bed for fixing the frame.
f) Providing holes and embedding pipes for all connections
g) Curing
h) Testing
i)
MAN-HOLES
Man -holes shall be measured in numbers. Depth of man – holes shall be reckoned from invert of channel
to top of man- hole cover. Quoted rates shall cover the range of +/-240mm on the depth specified
and also cost of all the following items.
a) Bed concrete
b) Brick work
c) Plastering
d) Concrete benching and channeling including drop connections
e) Fixing steps
f) Providing holes and embedding pipes for all connections.
g) Curing
h) Embedding frame in concrete bed
i) Testing
GULLY TRAP CHAMBERS
Gully trap chambers shall be measured in numbers and rate quoted shall also be
Per
number only. Quoted rate shall include cost of all following items:
a) Bed concrete
b) Brick work
c) Plastering
d) Concrete to embed gully trap
e) Chamber cover and frame
f) Providing holes and embedding pipes for all connections .
g) Excavation , refilling , necessary dewatering and disposing off extra materials to a place
as directed by the Engineer
G I PIPES AND FITTINGS
GI Pipes above ground shall be measured along the center line of pipes and fittings . Quoted rate
for respective items shall be per (rm) and shall include the following:
Laying, fixing and jointing with necessary clamps. Cutting holes and chases in walls, floors, beams etc. and
making good the same. All supporting arrangements, brackets etc. Testing and making good defects , if
any .GI pipes below ground shall be measured as stated in (a) and (b).
INKEL Limited
Contractor
Page 44
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
UPVC, PVC PRESSURE PIPES AND FITTINGS
PVC pipes and UPVC pipes shall be measured along the center line of pipes and fittings quoted
rate respective items shall be per (rm) and shall include the following.
(a) Laying, fixing and jointing with necessary clamps.
(b) Cutting holes and chases in walls, floors, beams etc. and making good the same.
(c) All supporting arrangements, brackets etc.
(d) Testing and making good defects, if any.
WATER FITTINGS (TAPS, STOP COCKS, ETC.)
These items shall be measured in numbers unless included as part of other items viz wash basins ,
inlets to cisterns etc . Cost of fittings shall include.
Cost of fixing accessories like bolts, nuts, washers.
Cost of thread or fixing taps.
VALVES AND GAUGES
Valves shall be measured in numbers and cost shall include.
a)
cost of jointing material
b)
Fixing and jointing material
c)
Testing and making good defects , if any .
BALL COCKS
Ball cocks shall be measured in numbers called for as part of other items.
INDIAN WATER CLOSETS
Indian Water Closets shall be measured in numbers and quoted rate shall include.
(a) Setting the closets in plain cement including cost of cement concrete .
(b) Painting brackets, if any.
EUROPEAN TYPE WATER CLOSETS
These items shall be measured in numbers and rate quoted shall be per number only Quoted rate
shall include .
a)
Plastic seat cover
b)
Jointing and fixing material
c)
Painting of brackets .
BIDETS
These items shall be measured in numbers and quoted rate shall include:
(a) Fixing charges on wall /floor of Bidets and mixers and waste fitting .
(b)Jointing & Fixing Materials.
URINALS
Urinals shall be measured in numbers and rate quoted per number shall include:
1) Fixing charges of urinal and partition plate with trap, waste fitting and water pipe and
connecting it to soil pipe .
2) Fixing charges of automatic flushing cistern (proportionate rate per urinal incase of a flush tank
serving more than one urinal.)
3) Cost of jointing & fixing materials.
INKEL Limited
Contractor
Page 45
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
WASH BASINS
These items shall be measured in numbers and quoted rate shall include:
1)
Fixing charges of brackets on to walls by CP screws in case of wall hung basins and fixing
charges on slab counter in case of counter top basins and fixing pedestals in case of pedestal
mounted basins .
2)
Jointing and Fixing Material
3)
Painting of Brackets .
SHOWER UNITS
This item shall be measured as whole unit and rate quoted shall include all the items stated above .
BATH TUBS
This item shall be measured in numbers and rate quoted shall be number only . Quoted rate shall
include:
a) Jointing and fixing materials.
b) Waste coupling with CP P-trap
SINKS
Sinks shall be measured in numbers including all items stated above and shall include cost of all
fixing materials and fixing in position .
TOILET ACCESSORIES (MIRROR, TOWEL RAIL, PAPER HOLDER, TOWEL RING, SOAP TRAY,
CLOTH STAND ETC.)
All the items shall be measured in numbers and quoted rate shall be per number any of which shall
include :
Fixing in position Testing where necessary / specified .
SANITARY APPLIANCES AND FIXTURES .
Apart from piping , it is essential that each and every sanitary appliance and fixture is inspected
and its performance tested prior to handling over the installation it is necessary to maintains a
check list in respect of wet rooms (toilets ,baths , kitchenette ,laundry etc.) of every apartment /
office. Main points to be looked into are enumerated below.
INSTALLATION
Check whether all installation are located as per drawing and in level .
FLUSH
Check whether flushing mechanisms for WC tanks , urinals are proper . Also no stagnation in WCs ,
baths ,bidets ,wash basins , sinks etc. when used . Fill wash basins , baths , sinks to brim and check
overflows .
FACE
Check from damages , if any in the installation such and chipped vitreous appliances, discolored or
disfigured baths , sinks , mirrors etc.
FASTENING
Check whether all appliances have been properly fixed .No rattling or loose bolts.
INKEL Limited
Contractor
Page 46
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
SLOPES
Check whether toilet floors and roofs are properly sloped towards floor drains/ roof
and there is no stagnation of water .
drains
LEAK PROOF
Check whether all joints within appliances and connection from appliances to pipes are leak proof.
Particularly check connection between WC pan and cistern , WC trap and soil pipe, all traps including
bottles traps , overflows, flexible connections to valves / taps etc. Check whether floor drains and
roof drain are leak – proof.
COLD WATER
Check functioning of all cold water valves , taps and piping .
HOT WATER
Similarly check hot water valves , taps and piping .Check functioning of thermostats of heaters .
Check whether non- return valves are functioning properly .
COMPLETION
It is desirable that sanitary works are completed in all respects at least 3 to 4 weeks prior to the
scheduled overall completion of the Project so as to enable the systems to be properly tested ,
defects rectified and the systems operated.
INKEL Limited
Contractor
Page 47
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
SCHEDULE OF QUANTITIES
INKEL Limited
Contractor
Page 48
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
INKEL GREENS-LADIES HOSTEL
DETAILED ESTIMATE FOR PLUMBING WORKS
SL
NO
A
1
a
b
c
d
e
B
2
a
b
c
d
DESCRIPTION
UNIT
INTERNAL WATER SUPPLY
TOILETS
Supplying, Installing & Testing at site in
position uPVC unthreaded pipes (As per
ASTM D - 1785 ,Sch.40) of approved make
for water supply, complete with all
necessary Fittings (elbows, unions, tees,
reducers, couplings, nipples etc.) complete
with pipes concealing through the walls /
floors including cutting and making good
the wall to line and level wherever required
as per drawings to the satisfaction of the
Enginer-in-Charge.
20mm
25mm
32mm
40mm
50mm
C/O SUMMARY OF A
INTERNAL DRAINAGE
TOILETS
Supplying, Installing & Testing at site in
position uPVC pipe(SWR) of Type B
(IS:13592) including injection moulded
fittings with bosses where required eg tees,
bends, clamps couplings and adapters &
clamping with Universal clamps, Anchor
fastners(8mm), Threaded Rod(8mm), nuts,
washers etc complete.and jointing with
adhesive approved by manufactures
including cutting and making good the walls
and floors or surface mounted with clamps
as required at site(For Soil & waste pipes Toilet Inside).
40mm
50mm
63mm
75mm
INKEL Limited
QTY
RATE
AMOUNT
Rmt
Contractor
240
40
24
24
12
56
100
24
80
Page 49
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
e
110mm
C/O SUMMARY OF B
C
SHAFT WORKS
Water supply
Supplying, Installing & Testing at site in
position uPVC unthreaded pipes (As per
ASTM D - 1785 ,Sch.40) of approved make
for water supply, complete with all
necessary Fittings (elbows, unions, tees,
reducers, couplings, nipples etc.) complete
with clamping in position with G.I. "U" bolts
(8 mm thick) on G.I. slotted rails (1.6 mm
thick) , Rail legs (2.5 mm thick) of approved
make, as per drawings to the satisfaction of
the Enginer-in-Charge.
65mm
50mm
32mm
Drainage
Supplying, Installing & Testing at site in
position uPVC pipe(SWR) of Type
B(IS:13592) including SWR fittings with
bosses where required eg.tees, bends,
clamps, couplings and adapters and cowls
with sealing grooves and clamping with
Position & jointing with 'O' rings including
cutting and making good the walls and
floors as required at site(For Vertical &
Horizontal Shaft piping).
3
a
b
c
4
a
b
98
Rmt
23
27
33
Rmt
Clamping details - For Vertical Shafts
G.I. "U" bolts (8 mm thick) on G.I. slotted
rails (1.6 / 2.5 mm thick) , Rail legs (2.5 mm
thick)
Clamping details - For Suspended lines
G.I. "U" bolts (8 mm thick) on Heavy Duty
G.I.slotted rails(2.5 mm thick) or Clamping
with Universal clamps, Anchor
fastners(10mm), Threaded Rod(10mm),
nuts, washers etc complete.
110MM
63MM
INKEL Limited
Contractor
200
40
Page 50
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
C/O SUMMARY OF C
D
5
a
b
c
d
6
a
b
7
EXTERNAL PLUMBING WORKS
Drainage
Supplying, Installing & Testing of pipes and
conveying to position; and jointing to true
lines and gradients, PVC pipe of IS
4985(6kg/cm2), jointing the pipe line as per
specification, testing the pipe line after
installation to the specified hydrostatic test
pressure including Supplying, Supplying,
Installing specials like bends, couplers,
sockets, connections etc. as per provisions
of IS: 1742-1983 (Code of practice for
building drainage) complete.
160mm
110mm
75mm
63mm
Water supply
Supply and fixing of ASTM-SCH-40 pipe
with fittings for water supply, with all
necessary fasteners, brackets etc including
testing and commissioning.
65mm
50mm
Earth work excavation
Excavation of earth up to a depth of 1.5m in
all classes of soil including medium rock soil
for pipe laying trenches, shoring,
dewatering, etc., wherever necessary
including supply of all materials.
INKEL Limited
Rmt
23
52
14
16
Rmt
23
32
Cubic
meter
Contractor
18
Page 51
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
8
a
b
Manholes
Supplying, Installing & Testing at site in
position brick masonry manholes with 75
class designation bricks in cement mortar
1:5 (1cement :5coarse sand )inside and
outside cement plaster 12mm thick with
cement mortar 1:3 (1cement : 3 coarse
sand) inside with a floating coat of neat
cement, 15cm thick R.C.C top slab 1:2:4 mix
(1 cement: 2 coarse sand: 4 graded stone
aggregate 20mm nominal size) for fixing
manhole frame; foundation concrete 1:4:8
mix (1 cement: 4 coarse sand: 8 graded
stone aggregate 40mm nominal size) and
making channels in cement concrete 1:2:4
mize (1 cement: 2 coarse Sand: 4 graded
stoneaggregate 20mm nominal size)
including excavation, back filling and
disposal of surplus earth finished as per
CPWD standard design etc.
60 X 60 cms (inside) and 1. 2m (Max) deep
using ISI marked hinge type Ductile Iron
manhole cover and frame ( 65kg)
conforming to the latest relevant IS
specifications, of the brand as approved by
the Enginer-in-Charge.
45X45 cms (inside) and 0.6 m (average)
deep using ISI marked hinge type Ductile
Iron manhole cover and frame ( 45kg)
conforming to the latest relevant IS
specifications, of the brand as approved by
the Enginer-in-Charge.
INKEL Limited
Nos
6
Nos
2
Contractor
Page 52
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
9
10
Gully chambers
Supplying, Installing & Testing at site in
position best quality PVC gully trap of size
160 X110mm outlet embedded in plain
cement concrete 1:4:8 (20mm metal), all
the above encased in a chamber of 300 X
300mm built with 115mm thick brick
masonry using first class country bricks in
CM 1:3 over a bed of CC 1:4:8 using 40mm
size metal 100mm thick ,plastering with
CM1:3,13mm thick inside, outside, exposed
top surfaces and internal and top exposed
surface finished smooth with a floating coat
of neat cement, providing and fixing Ductile
Iron(Hinged type) frame and cover of size
450 X 450mm weighing not less than 45 kgs
fixing the frame in PCC 1:2:4 using 20mm
stone metal including painting the frame
and cover with 2 coats of anticorrosive
black bitumastic painting etc. complete all
as specified and directed.
Making holes in slabs floors using core
cutting machine, for laying pipes with
standard clearance and rendering the same
in RCC , including nominal reinforcement
wherever required, complete.The quoted
rate shall also include water proofing
compound (Conbextra GP-2 / GP-10) for
complete sealing the same joints around
the pipes for full depth etc to the
satisfaction of the Enginer-in-Charge
including supply of all materials.
RCC slabs (For Wash Basin, EWC & Floor
Trap etc.)
i) 110mm dia
ii) 75mm dia
iii)63mm dia
iv) 50mm dia
v)32 mm dia
C/O SUMMARY OF D
INKEL Limited
Nos
2
Each
Each
Each
Each
Each
63
RO
27
RO
RO
Contractor
Page 53
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
E
11
12
13
SANITARY FIXTURES
Supply & fixing at site in position white
glazed vitreous china wall mounted type
(European style) water closet with C.P.
bolts, nuts, solid white plastic seat and lid,
angle cock, CP tube, PVC brass hinges and
rubber buffers with PVC flushing cistern
complete include cutting and making good
the walls wherever required.
Cat No: Cera CORDO-3162 ( EWC Wall Hung
P
535x 360x 335mm, 3355 Soft close Seat
Cover, 2603Twin Flush Cistern, CC 108 AQuarter turn angle cock with wall flange )
Supplying & Fixing water closet squatting
pan (Indian type W.C pan) with P trap
,angle cock 10 litre high level white PVC
flushing cistern with all fittings and
fixtures complete including cutting and
making good the walls and floors
wherever required.
Cat No: Cera-2073(white vitreous china
Orissa pattern W.C pan of size 580X440 mm
with integral type foot rests,2603Twin Flush
Cistern,9002 Trap P, CC 108 A-Quarter turn
angle cock
Fixing at site in position white vitreous china
wash basin with C.P brass waste coupling of
standard pattern, 32mm dia C.P , cast brass
bottle trap , angle cock , pillar cock, CP tube
and union , CP tube connector including
cutting & making good the walls wherever
required complete.
a. Under/Oval wash basin below counter
type
set
8
set
15
set
20
CERA WASH BASIN OVAL 550 X 40 – SNOW
WHITE (WASH BASIN WILL BE SUPPLIED BY
CLIENT)
INKEL Limited
Contractor
Page 54
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
14
15
16
17
Cera- make CM 203Waste coupling (half
thread) 40 mm, CM 104 B Bottle trap 228
mm (9”), CC 108 A- Quarter turn angle cock
with wall flange,CQ 801-Pillar cock with
aerator - Crayo, Viking make cp tube &
union
Supply & fixing at site in position 18mm
thick black galaxy colour granite slab and
facia for wash basin counter with 12mm
thick marine plywood , tubular section (2”)
frame work with provision for removal of
wash basin whenever required as per
approved drawing and as per direction of
Engineer in charge. Edges of granite shall be
moulded and polished. The rate shall
include cost for oval cutting the plywood
and granite including polishing the edge of
granite etc, complete.
Supply,fixing & testing of overhead
shower,rose & arm,spout with all necessary
accessories with consealed stopcock
control.Concealed stop cock CERA CL
127/128 with adjustable wall flange ,spout
CERA-CL 104. CERA-CG 301 Overhead
shower with single flow and shower arm
Supply & fixing at site in positions shower
assembly units comprising of wall mixer
lever divertor , spout with fixing flange ,
shower arm heavy casted with wall flange
and over head shower, complete including
cutting and making good the walls wherever
required.
Cat No: Cera-CP 112 Wall mixer with 220
max long bend pipe for overhead shower
and CERA CG 301 overhead shower with
single flow and shower arm.CERA- CL 104
spout
Supply & fixing at site in position C.P.
ablution spray health faucet with eye hook
,one metre long flexible tube, angle cock
with wall flange all complete including
cutting and making good the walls wherever
required.
INKEL Limited
sqm
17
set
13
set
4
set
8
Contractor
Page 55
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
Cat No: Cera- CG 205 - Health faucet with
wall hook and 1 mtr. Chrome plated PVC
hose pipe. & CC 108 A Quarter turn angle
cock with wall flange (small)
18
19
20
21
22
23
Supply & fixing at site in position coat hook
by means of screws and rawl plug complete
including drilling and making good the
surfaces wherever required.
Cera CA-408 Robe hook
Supply & fixing at site in position towel rail
of approved make /quality . C.P brass
towel rail 600 mm size with concealed
screws.
Cera : CA 403 Towel Rail 600 mm
Supply , fixing and testing of 25 mm
consealed stop cock for with all necessary
accessories
Supply , fixing and testing of 20 mm
consealed stop cock for with all necessary
accessories CERA CL 128
Supply and fixing of SS Floor trap with
grating SS 316 grade of size 5" x 5 "
Supply & fixing at site in position 15mm dia
C.P brass bib cocks long body with wall
flange including cutting and making good
the walls wherever required.
set
23
set
17
Nos
4
Nos
16
Nos
44
Nos
23
Nos
Nos
Nos
1
5
1
Nos
1
Cat No: CQ 804 Bib cock Long nose with
wall flange and aerator
24
25
Supply , fixing and testing of PN-10 ball
valves of make ITAP,italy
32mm
50mm
65mm
fixing and commisioning of 32mm float
with SS body pvc ball
C/O SUMMARY OF E
INKEL Limited
Contractor
Page 56
Plumbing and Sanitary works : INKEL Greens -Ladies Hostel,
Malappuram
F
MISCELLANIOUS EXPENCES
LS
GRAND TOTAL AMOUNT
SL
No
DESCRIPTION
A
INTERNAL WATER SUPPLY
B
INTERNAL DRAINAGE
C
SHAFT WORKS
D
EXTERNAL PLUMBING WORKS
E
SANITARY FIXTURES
F
MISCELLANEOUS EXPENCES
GRAND TOTAL AMOUNT
NOTE: CERA BRAND CERAMIC AND CP FITTINGS ARE MENTIONED TO BE USED FOR THE
SANITARY AND WATER SUPPLY FITTINGS.EQUIVALENT QUALITY OF PARRYWARE OR
HINDWARE CERAMIC FITTINGS AND EQUIVALENT QUALITY OF JAQUAR CP FITTINGS
APPROVED BY INKEL ALSO CAN BE USED.
INKEL Limited
Contractor
Page 57