25 MARCH 2015 26 MARCH 2015

25 MARCH 2015
Optional
Programme
Option 1 (13:00-17:30)
ITER Site visit (Departure from Palais du
Pharo and back)
18:30-19:30
Option 2 (09:00-19:00)
Option 3 (08:30-19:00)
ITER Site visit
ITER Site visit + Visit of Comex
+ Visit of Airbus Helicopters
Nucléaire/ONET Group
(Departure from Palais du Pharo and back) (Departure from Palais du Pharo and back)
Pre-registration from 18:30 at the Venue
WELCOME RECEPTION AT THE VENUE (EXTENSION - ESPACE VIEUX PORT)
19:30-22:00
-
Welcome addresses by representatives of Local Authorities:
Mayor of Marseille
Provence-Alpes-Côte-d’Azur Regional Council
President of the Chamber of Commerce and Industry of Marseille
26 MARCH 2015
07:30-08:30
Registration
PLENARY SESSION - Chairman: Jérôme PAMELA, Director of Agence ITER France
08:30-09:00
Welcome addresses:
Jacques PFISTER, President, Chamber of Commerce and Industry of Marseille Provence
Jérôme PAMELA, on behalf of the High Representative for the implementation of the ITER project in France (5’)
Jean-Marc FILHOL, Fusion for Energy (F4E), Head of the ITER Department, on behalf of F4E Director (5’)
Bernard BIGOT, Director General of ITER Organization (5’)
09:00-09:30
General overview of status of progress of the ITER project, ITER and Industry involvement, by Sergio ORLANDI, ITER
Organization, Chief Engineer, Director for Plant & Support Engineering Directorate
09:30-10:00
ITER and nuclear safety issues, by Carlos ALEJALDRE, ITER Organization, Head of Safety, Quality & Security Department
10:00-10:30
Coffee break
10:30-11:00
Status of progress of European procurement for ITER, F4E industrial policy, business opportunities for 2015‐2016, by JeanMarc FILHOL, Fusion for Energy (F4E), Head of the ITER Department
11:00-11:30
General overview of the China Domestic Agency procurement activities by LUO Delong, Director General of ITER China
11:30-12:00
General overview of the Indian Domestic Agency procurement activities, by Arun CHAKRABORTY, DA Head representative,
ITER India, Institute for Plasma Research
12:00-12:30
General overview of the Korean Domestic Agency procurement activities, by Ki-Jung JUNG, Director General of ITER Korea,
National Fusion Research institute (NFRI)
12:30-13:00
General overview of the Japanese Domestic Agency procurement activities, by Dr. Takashi INOUE, Senior Principal
Researcher, JAEA (Japan Atomic Energy Agency)
13:00-14:30
Lunch
14:30-15:00
General overview of the Russian Domestic Agency procurement activities, by Anatoly KRASILNIKOV, Doctor of Physics &
Mathematics, Director of Institution "Project Center ITER" (Russian Federation Domestic Agency)
15:00-15:30
Main ITER Organization’s future opportunities for 2015-2016, by Françoise FLAMENT, ITER Organization, Head of
Procurement and Contracts
15:30-15:45
Local support (lodging, transport, subcontracting, partnerships, qualified workforce) for companies that want to set up and
work on the ITER site, by Jérôme PAMELA, Director of Agence ITER France for “Welcome around ITER” network (W@I)
15:45-16:00
How to involve SMEs on the ITER project? Illustration by Michel SESQUÈS, Executive Vice-President, Chamber of Commerce
and Industry of Marseille Provence
16:00-17:30
Refreshments
16:00-19:00
THEMATIC WORKSHOPS
1-1 MEETINGS
VACUUM VESSEL, THERMAL SHIELDS
& IN-VESSEL COILS (15:30-17:30)




BUILDINGS
Chairperson: Kurt EBBINGHAUS
Deutsches ITER Industrie Forum (DIIF), ILO Germany
Overall status of the design and manufacture of the
ITER Vacuum Vessel, by Carlo SBORCHIA, ITER
Organization, Head of Vessel Division (25’)
Overview of the Procurement of the Vacuum Vessel
components, by Chang Ho CHOI, ITER Organization,
Vacuum Vessel/Ports & Thermal Shield Section Leader
(15’)
Nuclear safety requirements: application of RCCM
requirements for the Vacuum Vessel and ANB role, by
Benoit GIRAUD, ITER Organization, Vacuum
Vessel/Ports & Thermal Shield Section (15’)
Overview of the design and procurement of the
Thermal Shields, by Nam Il HER, ITER Organization,
Vacuum Vessel/Ports & Thermal Shield Section (15’)
 Status of European Vacuum Vessel sectors
procurement, by Francesco ZACCHIA, F4E, Vacuum
Vessel Project Team Manager (15’)
 Status of Korean Vacuum Vessel Sectors
procurement, by Ki-Jung JUNG, Director General of
ITER Korea (10’)
 Overview of the design and procurement of the InVessel Coils, by Anna ENCHEVA, ITER Organization,
Vacuum Vessel/Ports & Thermal Shield Section (15’)
POWER SUPPLY SYSTEMS



17:30-19:00



19:30-22:00
Chairperson: Sue O'NEILL (16:00-17:30)
Dublin City University (DCU), ILO Ireland
 Status of ITER Buildings construction and next
procurement steps, by Timothy WATSON, ITER
Organization, Director for Buildings & Site
Infrastructure and Laurent SCHMIEDER, F4E,
Site, Buildings and Power Supplies Project Team
Manager (40’)
 Civil engineering and finishing works for
Tokamak complex, assembly hall and
surrounding buildings (TB03): scope of works,
potential needs in subcontracting or local
support, by Frédéric SCIBLO, Project Director
for VINCI FERROVIAL RAZEL BEC (VFR)
Consortium (10’)
 HVAC, mechanical and electrical equipment for
the Tokamak complex (TB04): scope of work,
potential needs in subcontracting or local
support, by Patrick BERTRAND, Project
Manager, for OMEGA Consortium (10’)
 Conventional buildings construction contracts
and electrical power distribution (TB05, TB06,
TB07): scope of work, potential needs in
subcontracting or local support, by Antonio
MARTINEZ LEON, TB05&TB07 Project Director,
FERROVIAL AGROMAN (10’)
 presentation of facilities that may be made
available to Contractors on the ITER site, by
Timothy WATSON, ITER Organization, Director
for BSI Directorate (20’)
One to One
FUEL CYCLE & WASTE MANAGEMENT
Chairperson: Paolo ACUNZO
ENEA, ILO Italy
Present status of design and manufacturing of the
ITER power supply systems and cable engineering ; IO
strategy for on-site installation and assembly of the
ITER power supply systems, potential needs of local
support by Ivone BENFATTO, Head of Electrical
Engineering Division, ITER Organization (40’)
State of progress and plan for AC/DC converters, by
Kwang Cheol HWANG, Project Manager, DAWONSYS
(10’)
Overview of Cable Engineering Support Services for
ITER Plant, by Sung-Hoon KIM, Senior Engineer,
Contractor Technical Responsible Officer for CESS
(Cable Engineering Support Services), KEPCO E&C (10’)
Construction design on PF Converter system for ITER,
by Li JIANG, Engineer, Institute of Plasma Physics,
Chinese Academy of Sciences (ASIPP) (10’)
Status of the Ion Source and Extraction Power
Supplies and Overview of OCEM's Activities, by
Giuseppe TADDIA, Power Electronics Manager, OCEM
(10’)
Inabensa at ITER: current projects and opportunities
by Juan PÉREZ-TINAO DOMINGUEZ, Business
Development Manager, INSTALACIONES INABENSA
S.A (10’)
Chairperson: Eric BOOM, Industrial coordinator of
the Dutch Big Science ILO-Net
 Fuel Cycle: status of design, required
technologies and schedule, next steps of
procurement by Manfred GLUGLA, ITER
Organization, Head of Fuel Cycle Engineering
Division (40’)
 Fuel Cycle: update on technical and
procurement status, by Alain TEISSIER, F4E,
Cryoplant & Fuel Cycle Project Team Manager,
and Giovanni PIAZZA, F4E, Cryoplant & Fuel
Cycle Project Team (20’)
 Presentation of the ITER waste storage facility
(INTERMED), by Daniel CANAS, CEA/DEN (10’)
 Lessons learned from tritiated water holding
tanks manufacturing for the Water Detritiation
System, by David de FRANCISCO VILLA, Tritium
Tanks Project Manager, ENSA (10’)
 Engineering approach to the design of cryogenic
cold valve boxes for use as Safety Important
Components in the ITER Tokamak building by
Gemma GODIA and Javier SORAVILLA,
Mechanical Engineers, IDOM Ingeniería y
Consultoría SAU (10’)
CONGRESS DINNER
One to One
27 MARCH 2015
IN VESSEL COMPONENTS
Chairperson: Karel CERVENKA, Centrum vyzkumu Rez s.r.o.,
Research Reactors Section, ILO Czech Republic (08:00-09:45)
 Overview on design, required technologies and schedule,
by Mario MEROLA, ITER Organization, Head of Internal
Components Division (20’)
 EU procurement of In-Vessel Components: state of
progress and next steps, by Patrick LORENZETTO, F4E, In
Vessel Project Team Manager (15’)
 Contribution to the procurement of ITER First Wall by
Patrice NOGUÉ, Project Manager, AREVA NP Technical
Center (10’)
 Contribution to the procurement of ITER First Wall by
Leticia RUIZ, Project Manager, IBERDROLA Ingeniería y
Construcción, for the Consortium formed by IBERDROLA,
AMEC Foster Wheeler and Mecánica Industrial Buelna
(MIB) (10’)
 Contribution to the procurement of ITER First Wall by
Philippe BUCCI, Director of technological developments,
ATMOSTAT/ALCEN Group (10’)
 Overview of ITER Shielding Blanket and First Wall in China
by Jiming CHEN, Division Head, South Western Institute
of Physics (SWIP) (10’)
 Contribution to the procurement of the ITER Divertor
Inner Vertical Target by Gian Paolo SANGUINETTI, Nuclear
Fusion Business Leader, ANSALDO NUCLEARE S.p.A (10’)
 WEST in support of the ITER Divertor, by André
GROSMAN, Deputy Head of the CEA/IRFM (10’)
 ITER Divertor Activities in MHI, by Katsusuke SHIMIZU,
Project Promotion Team of Fusion Engineering Office,
MITSUBISHI Heavy Industries Ltd (MHI) (10’)
MAGNETS










Chairperson: Staffan LORIN (08:00-10:00)
Research Match Sweden AB, ILO Sweden
ITER Magnet construction status, by Alexander ALEKSEEV,
Director of the Tokamak Directorate, ITER Organization
(25’)
Status of EU Toroïdal Field coils procurement, by
Alessandro BONITO OLIVA, F4E, Magnets Project Team
Manager (10’)
Status of EU Poloïdal Field coils procurement, by Kevin
SMITH, F4E, PF Coils Group leader (10’)
Current status of Japanese TF Coils manufacturing by Ikuo
SENDA, Nuclear Energy Systems & Services Division,
TOSHIBA Corporation, Power Systems Company (10’)
ITER TF Coil Activities in MHI Ltd, by Naoki SAWA, Project
Manager of TF Coils, MITSUBISHI Heavy Industries (MHI)
(10’)
Status of TF Coils Winding, by Tsuneaki MINATO, Project
Manager, MITSUBISHI Electric Corporation (10’)
Current Status of Correction Coils manufacturing in China,
by Jing WEI, Director, Institute of Plasma Physics, Chinese
Academy of Sciences (ASIPP) (10’)
European TF Coils Radial plates manufacturing and TF
Coils Winding Packs Cold Test and Insertion into the Coil
Cases by Marianna GINOLA, Commercial Manager, SIMIC
S.p.A (10’)
Toroïdal Field Coils winding packs or Poloïdal Field Coils
engineering and integration: state of play by Antonio
PELLECCHIA, Sales Manager, ASG Superconductors S.p.A.
(10’)
Chances of SMEs in the ITER world: Process engineering
on ITER materials, by Damir PITESA, FORGIATURA
A.VIENNA (10’)
TEST BLANKET MODULES PROGRAM
One
to
One
TECHNOLOGY TRANSFER FOR FUSION
Chairperson: Luciano GIANCARLI, TBMS Section leader,
ITER Organization (09:45-11:30)
Chairperson: Victor SÁEZ, Head of Market
Intelligence Group, Fusion for Energy (F4E)
(10:00-11:30)
 Overview on design activities, industrial supports and
schedule, by Luciano GIANCARLI, ITER Organization,
Plasma Operation Directorate, TBMs Section Leader (30’)
 EU procurement of TBMs - State of progress and next
steps, by Marco FERRARI, F4E, Senior Officer of the TBM
Team, Responsible Officer for the F4E-IO Arrangement for
the delivery of two European TBM Systems in ITER (15’)
 Status of the CN TBM Program activities and next steps by
Xiaoyu WANG, Professor, South Western Institute of
Physics (SWIP) (10’)
 TBMs Program Radwaste management by Jaap G. VAN
DER LAAN, ITER Organization, Nuclear Engineer for Test
Blanket System, Test Blanket Modules Section (10’)
 Contributions by the European TBM Consortium, by Klaus
HESCH, Head of KIT Fusion Programme and Member of
the European TBM Consortium Steering Committee (10’)
 TBM Systems Design and Technological Demonstrations,
by Ian GRAYSON - ERHA Programme Director, AMEC
FOSTER WHEELER (10’)
 Contribution to the EU TBM Program, by Noël THOMAS,
Project Manager, ATMOSTAT (10’)
 Contribution to the TBM Program and to other ITER
Project Activities by Slim CONSTANS, Fusion projects &
ITER coordinator, ONET Technologies (10’)
 A vision from F4E, by Victor SÁEZ, Head of Market
Intelligence Group, F4E (10’)
 Building on the ESA experience, by Lluc DIAZ, ESA
Technology Transfer Program Office (20’)
 Fusion and Space transfers and technologies (30’) by:

Arne JUNGSTAND, ESA Technology Transfer
Broker at CESAH GmbH (Centre for Satellite
Navigation Hesse) and

Matthew EDWARDS, ESA Technology Transfer
Broker - UK, STFC Innovations (UK)
 ENEA policy for technology transfer in the Fusion domain,
by Aldo PIZZUTO, Director of ENEA Fusion Department
(10’)
 Discussion and Q&A (20’)
One
to
One
CRYOGENICS AND COOLING SYSTEMS
CODAC AND I & C SYSTEMS
Chairperson: Christian DIERICK
Agoria vzw, ILO Belgium
Chairperson: Belén DEL CERRO GORDO, CDTI, Ministry of
Economy and Competitiveness, ILO Spain
 Cooling Water System: status of design and procurement,
required technologies and schedule, manufacturing
progress, next business opportunities by Giovanni
DELL’ORCO, ITER Organization, Cooling Water System
Section leader (25’)
 ITER CODAC and I&C Systems: design status, required
technologies and schedule, next steps of procurement by
Anders WALLANDER, Head of Control System Division,
ITER Organization (25’)
 Update on Technical and Procurement Status, by Alain
TEISSIER, F4E, Cryoplant & Fuel Cycle Project Team
Manager (15’)
11:3013:00
 Status of ITER Cryoplants design and manufacturing:
scope of work, schedule, needs in subcontracting or local
support, by Frédéric ANDRIEU, ITER Program Operations
Director, AIR LIQUIDE Advanced Business & Technologies
(10’)
 Compressors for the largest Cryoplant ever, by Eric
DELFORGE, Corporate Business & Policy Officer,
MAYEKAWA Europe (10’)
 Cryolines design & procurement status, by Rajkumar L.
PANJWANI, President (Cryo Scientific Division), INOX
INDIA LIMITED (10’)
 Dutch SME successful at ITER India, by Ronald DEKKER,
Director of DEMACO (10’)
13:0014:30
 F4E I&C-CODAC group and scope of supply, Business
opportunities by Filippo SARTORI, F4E I&C-CODAC Project
Team Manager (15’)
 Nuclear Safety Instrumentation & Control, by Maria
Teresa DOMÍNGUEZ BAUTISTA, Advanced Projects
Director, for the consortium EMPRESARIOS AGRUPADOS
- INABENSA (10’)
One
to
One
 ITER project participation, by Geug Sin BANG, Senior
Engineer, KEPCO E&C (10’)
 Application of Systems Engineering to support I&C
integration, a practical example by Hector NOVELLA,
Program Manager for Energy & Science, GTD SISTEMAS
DE INFORMACION (GTD) (10’)
 Experience on the ITER project, by Manojkumar
ANNIGERI, Program Manager, Control System and
Automation, TATA CONSULTANCY SERVICES (TCS) (10’)
 Co-developing ITER control system, by Robert
REINHARDT, Project Leader, COSYLAB (10’)
Lunch
ITER MACHINE ASSEMBLY
REMOTE HANDLING SYSTEMS
Chairperson: Søren Bang KORSHOLM, Technical University
of Denmark DTU, ILO Denmark (14:00-16:00)
Chairperson: Timo MÄÄTTÄ, VTT Technical Research Centre
of Finland, EFLO Finland (14:30-16:00)
 ITER machine assembly status, procurement strategy,
challenges and opportunities for industry, focus on ITER
Construction Management by Ken BLACKLER, ITER
Organization, Head of Assembly and Operations Division
(45’)
 Design status, required technologies and schedule, next
steps of procurement by Jim PALMER, ITER Organization,
Remote Handling Section (30’)
 Lessons learned from K-STAR assembly and status of ITER
assembly tools by Dr. Hyung-Yeol YANG, Advanced
Technology Research Center acting Director, National
Fusion Research Institute (NFRI) (20’)
 Assembly of EAST Tokamak by Yuntao SONG, Deputy
Director General, Institute of Plasma Physics, Chinese
Academy of Sciences (ASIPP) (15’)
 Current status of the Cryostat manufacturing and
assembly (scope of work, schedule, needs of
subcontracting or local support) by Philippe TOLLINI,
Director Europe - Business Development, LARSEN &
TOUBRO LTD (20’)
 ITER Supply chain, by François GENEVEY, ITER logistics
provider, Director, DAHER (10’)
 Chances of SME’s in the ITER world, by Stephan GUERIN,
President, ARKADIA for the consortium ARKADIAG2Metric (10’)
 Update on technical and procurement status, by Carlo
DAMIANI, F4E, Remote Handling Project Team Manager
(20’)
 Plan of manufacturing ITER Blanket Remote Handling
System, by Ikuo SENDA, Nuclear Energy Systems &
Services Division, TOSHIBA Corporation, Power Systems
Company (10’)
 Divertor Remote Handling System - Project status and
challenges, by Bryn THOMAS, Head of Civil Nuclear
Power and Sebastian DIMMOCK, Chartered Senior
Engineer, ASSYSTEM UK Ltd (10’)
 Neutral Beam Remote Handling System - Project status
and Challenges, by Ian GRAYSON, Operations Director,
AMEC Foster Wheeler (10’)
 Chances of SME’s in the ITER world: TELEROBOT LABS and
the ITER Vacuum Vessel Pressure Suppression System
(VVPSS) remote handling strategy, by Francesco BECCHI,
General Manager, TELEROBOT LABS (10’)
One
to
One
DIAGNOSTICS
HEATING SYSTEMS & CURRENT DRIVE
Chairperson: Kurt EBBINGHAUS
Deutsches ITER Industrie Forum (DIIF)
ILO Germany
16:0017:30
Chairperson: Michel HÜBNER
CRPP EPFL, ILO Switzerland
 Design status, required technologies and schedule,
next Procurement steps, by Michael WALSH, ITER
Organization, Head of Diagnostics Division (30’)
 Overview on design, required technologies and schedule,
by Deirdre BOILSON, ITER Organization, Head of Heating
and Current Drive Division (30’)
 EU contribution to ITER Diagnostics, by Glenn
COUNSELL, F4E, Diagnostics Project Team Manager
(20’)
 Update on technical and procurement Status, by Gilbert
AGARICI, F4E, Neutral Beam and EC Power Supplies and
Sources Project Team (20’)
 Design Activities for the ITER Radial Neutron Camera, by
Basilio ESPOSITO, ENEA, Coordinator of the FPA-327
Consortium (10’)
 Gyrotron Research and Development for Fusion
Applications in Europe by John JELONNEK, Director,
Institute for Pulsed Power and Microwave Technology
(IHM), Karlsruhe Institute of Technology (KIT) (10’)
 Status of design activities for the ITER Plasma Position
Reflectometer, by Paulo VARELA, Researcher, Instituto
Superior Técnico (IST) on behalf of the PPR Consortium
(IST, CIEMAT and IFP-CNR) (10’)
 Diagnostic design development by Jean-Baptiste
HAUMONTÉ, Sales Manager, BERTIN Technologies (10’)
One
to
One
 Current Status of the ECRH Power Supply design works by
Josef TROXLER, CEO, AMPEGON (10’)
 Plasma heating solutions and THALES activities for ITER
and satellites projects by Franck POMPON, RF Sources
development Engineer, THALES Electron Devices (10’)
 Development status of the ITER bolometers and neutral
pressure gauges by Hans MEISTER, Project leader "ITER
Contributions", Group leader ITER diagnostics, Max
Planck Institut Für Plasmaphysik (IPP) (10’)
10:0016:00
Refreshments
13 March 2015