(9*p^,k,h{t##,r,#-BlllttT,P,,p,.rp,$I$ SALES EXEtrUTIVE HP : +62 857 77557777 Email : pt latex_marine@Yahoo co id BlttYIElt BX-Bl Undetlay EilEq= + D,'\EI{Y('P TECH CO.,LTD. Primary Deck Govering Prod uction description is a deck composition product, which is composed of silica sand, etc. lt is 2 coating system, as a standard type, which can be applied for floor'and deck in all ship types. lt also satisfies lM0 FTP code MSC.61(67) Annex 1, parts 2 BILLYTEX BX-B1 UNDERLAY ceme.nt, latex, antll-6. The final coating on the BILLYTEX BX-81 UNDERLAY can be vinyl sheet, tile, polyurethane, epoxy paint, etc. Gharacteristics Excellent adhesive component and elasticity like natural rubber No crack or no rust by water proofness Long life material Non-com bustibility Good chemical and abrasing resistances lmpact absorption from collision Special surface preparation is not required before application Application e;; Accommodation decks. 'a: Floors in building BX-B1 Coat BX-PRIMER Coat Steel deck or Concrete Certificates 0lassification 'society BILLYTEX BX-81 CE (MED) USCG DNV o a o UNDERLAY N Q : Approved, -: Notapplicable BV LR GL - - I ABS - KR I NK I RS lnstallation Steps -Srrface preparation i ' BILLYTEX BX-81 UNDERLAY may be applied on hard foundations such as concrete and steel, which should be free of dust, grease, oil, dirt, etc. Primer coal : BILLYTEX BX.PRIMER & BX-1103 It is possible to carry out Base coat iust after finishing Primer coat work. Base coat : & compound BX-1103 0nly mix with the piopcr quantity, in consideration of working timE(20-30 minutes). Pour the mixed compositon to deck and spread with a linotol trowel(steel board). 'After enough drying, next proce$s ean be for is cleaning tools beiore the cured. Shelf -life : Powder:The available period of 12 months under ordinary conditions is guaranteed. Latex:The available period of 6 months under ordinary conditions is guaranteed. applided. : 1. Primer coat BILLYTEX BX-PRIMER BILLYTEX BX-1103 10kg 3.3liter 2. Base coat ,BILLYTEX Curing may be variahle upon the th Ickness of the applied layer, temperature, relative humidity and the ventilation of the installed area. The compound should be completely dry prior to the application of dense finish materials, such as vinyl sheet, stud tile and earpet etc. Content of moisture < 6o/o. Cleaning : Use water BILLYTEX BX-81 Mixing BILLYTEX BX-81 will be cured after approx. 16-18hours, at +20C and max. 650lo relative humidity, however, the curing time BX-81 2OOKg : After application of BILLYTEX BX.B1 UNDERLAY, the compound should be protected against .direet hcat and sunligtrt as well as strong wind. Also it should not be exposed undor freezing temperature (Reeommended curing temperature is over +5C ) : Caution : The BILLYTEX BX-PRIMER, BX-81, powder should not be exposed to moisture or freezing temperature. For additionat technieal information, please contact to our technlcal deBartment. Technical data Basis Cement and synthetic latex : BX-PRIMER, BX-81, Powder Grey BX-11 03 Liquid White Color: Densid (g/cm3) Approx" 1.9 (applied) : Compressive strength (N/mmr) : Fire resistance: Th 30 Fire resistant ickness Standard I Minimum 6 Maximum 45 Curing time (hours): (20'c / 65%) x According 16 to ambient conditions and humidity, curing time would be changed. Noolication method 0uantity(m'z) Process x Materials Unit Remarks 6mm 7mm 8mm 9mm 10mm Primer BX-PRIMER KG 06 0.6 06 06 0.6 coat BX-11 03 KG 02 02 02 0.2 02 Base BX-B1 KG 10.45 12.35 14.25 16.15 18.05 coat BX-11 03 KG 1.05 1.24 1.43 1.62 181 0uantity may be changed depending on working condition.
© Copyright 2024