Document Number: EOP 03-0072 Date: 10/03/2015 ENGINEERING OPERATING PROCEDURE EOP 03-0072 PUP BUSBAR FOR WT HENLEY CUT-OUTS Network(s): EPN, LPN, SPN Summary: This operating procedure details the installation instructions and limitations of use for the WT Henley Pup busbar. Owner: Jesse Garcia Date: 10/03/2015 Approved By: Steve Mockford Approved Date: 31/03/2018 This document forms part of the Company’s Integrated Business System and its requirements are mandatory throughout UK Power Networks. Departure from these requirements may only be taken with the written approval of the Director of Asset Management. If you have any queries about this document please contact the author or owner of the current issue. Applicable To UK Power Networks External All UK Power Networks G81 Website Asset Management Contractors Capital Programme ICPs/IDNOs Connections Meter Operators HSS&TT Network Operations UK Power Networks Services Other THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Version: 4.1 Pup Busbar for WT Henley Cut-Outs Document Number: EOP 03-0072 Version: 4.1 Date: 10/03/2015 Revision Record Version 4.1 Review Date 31/03/2018 Date 13/03/2015 Author Lee Strachan Why has the document been updated – Minor update What has changed – Document number corrected Version 4.0 Review Date 31/03/2018 Date 10/03/2015 Author Jesse Garcia Why has the document been updated – Periodic review What has changed – Document re-numbered from EBP 03-0034 to EOP 03-0072 Version 3.1 Review Date 22/03/2015 Date 28/07/2012 Author Lee Strachan Document reviewed for publishing on G81 website Version 3.0 Review Date Date 19/01/2012 Author J Garcia Reviewed for Series-8 Version 2.0 Review Date Date 02/03/2011 Author J Garcia Reviewed and Rebranded Version 1.0 Review Date Date 22/08/2005 Author D J Collis Original (Review date extended by DJC) © UK Power Networks 2015 All rights reserved 2 of 9 Pup Busbar for WT Henley Cut-Outs Document Number: EOP 03-0072 Version: 4.1 Date: 10/03/2015 Contents 1 Introduction ............................................................................................................. 4 2 Scope ....................................................................................................................... 4 3 Description............................................................................................................... 5 3.1 Existing Services ....................................................................................................... 5 3.2 New Services ............................................................................................................ 5 4 Actions Required ..................................................................................................... 5 4.1 Existing Services ....................................................................................................... 5 4.2 New Services ............................................................................................................ 5 5 Installation Instructions .......................................................................................... 5 © UK Power Networks 2015 All rights reserved 3 of 9 Pup Busbar for WT Henley Cut-Outs Document Number: EOP 03-0072 Version: 4.1 Date: 10/03/2015 1 Introduction The WT Henley Pup busbar has been used on the UKPN network for some years. The busbar is currently only suitable for use on WT Henley, Series 7, 8. The Pup busbar from WT Henley has previously been used to supply a second service from an existing 100A supply with the two fuses fed from the service restricted to 60A. This practice will not be allowed for new services. In future, for new services, the fuse rating of the second fuse will be restricted to 30A and the main fuse to 60A (see drawing below). Landlords Supply Pup fuse 30A 30A Landlords Supply Service Pup fuse 30A 30A Main Fuse 60A 60A A A Neutral Pup bar PupBus Busbar Cable cover Service Service Main Fuse Main Fuse 60A 60A 60A 100A Service Main Fuse 60A 100A A A Neutral Pup bar PupBus Busbar Cable cover Incoming Cable In coming Cable Incoming Cable Cable In coming The original pup busbar was designed with only a single screw termination and service failures have occurred on existing services. The new design of busbar provides full contact with both screws in the terminal. The new design is shown Section 5 and should be used to replace any existing Pup busbars found on the UK Power Network. 2 Scope This bulletin applies to all three networks within UK Power Networks and should be applied to all new and existing services supplied using the WT Henley Pup busbar. © UK Power Networks 2015 All rights reserved 4 of 9 Pup Busbar for WT Henley Cut-Outs Document Number: EOP 03-0072 Version: 4.1 Date: 10/03/2015 3 Description 3.1 Existing Services Where existing services are discovered with the old style of Pup busbar they should be replaced with the new style. When changing the Pup, a check must be made to ensure that the main fuse in the existing service is reduced to a maximum of 60A. If a higher rated fuse is discovered, then it must be replaced with a 60A fuse. If this is not done the cut-out could be subjected to an overload and may fail. The principle of reducing both fuses to 60A must also be applied to all existing looped services using cables. Looped services must not be fused above 60A. 3.2 New Services When used for a new service, the maximum size of fuse in the service supplied by the Pup will be 30A. A 30A wide bodied fuse to fit the standard 100A WT Henley fuse carriers will be supplied with each Pup busbar. 4 Actions Required 4.1 Existing Services Replace older style Pup busbars with the new style and ensure that the main service is down-rated to a maximum of 60A and the pup is fused at 30A. The fuse carriers must be appropriately labelled. 4.2 New Services The WT Henley Pup busbar is only permitted for use on new services up to 30A and the main fuse may only be rated up to 60A 5 Installation Instructions To install a WT Henley Pup busbar onto an existing or new service, follow the instructions below: 1. The old style Pup busbar. Note: The original Pup busbar was designed with only a single screw termination and service failures have occurred on existing services. © UK Power Networks 2015 All rights reserved 5 of 9 Pup Busbar for WT Henley Cut-Outs Document Number: EOP 03-0072 Version: 4.1 Date: 10/03/2015 2. New WT Henley Pup busbar kit. UKPN Commodity Code 12027V includes 30A fuse link and label. 3. Add 60A label. UKPN Commodity Code 12028F. 4. On arrival check the condition of cut-out and fuse ratings. Remove fuse carrier and neutral cover from the SP&N cut-out. This will allow the removal of the cable cover. © UK Power Networks 2015 All rights reserved 6 of 9 Pup Busbar for WT Henley Cut-Outs Document Number: EOP 03-0072 Version: 4.1 Date: 10/03/2015 5. Remove the plastic plug. By pushing inwards towards were the plug is located with a screwdriver the plug should fall out; alternatively you may use a pair of pliers to pull the plug out. 6. Undo terminal screws. Undo the terminals on the bottom left hand of the single pole and neutral cutout and also the single-phase unit. The busbar will only fit in these terminals and if it is being used on an existing service the incoming service cable may need to be moved to the right hand side terminal. 7. Insert Pup fuse on the left hand terminal. Ensure pup is fully inserted into the carrier. 8. Install the second fuse way and secure to the meter board. Ensure the Pup is fully inserted into both carriers so that no gaps are left or exposed to foreign object ingress. Note: That the cable termination on second fuse way is blocked. Secure carrier to the back board. © UK Power Networks 2015 All rights reserved 7 of 9 Pup Busbar for WT Henley Cut-Outs Document Number: EOP 03-0072 Version: 4.1 Date: 10/03/2015 9. Check tightness. Tighten the terminal screws on the two fuse ways, and check the tightness of all existing terminals. 10. Ensure correct fusing and labels are utilised. Install a 30A fuse in the additional fuse carrier and down-rate the main fuse to a maximum of 60A. 11. Preparing the cable chamber. Using a pair of pliers remove chamber’s pup access from the side cover. © UK Power Networks 2015 All rights reserved 8 of 9 Pup Busbar for WT Henley Cut-Outs Document Number: EOP 03-0072 Version: 4.1 Date: 10/03/2015 12. Install cable covers. Complete visual checks and replace cable cover and neutral cover and install fuse carriers into fuse ways. © UK Power Networks 2015 All rights reserved 9 of 9
© Copyright 2024