2015 CONSTRUCTION UPDATE 2014 CONSTRUCTION ACCOMPLISHMENTS 2014 ACCOMPLISHMENTS • • • • • Start of Construction, July 2014 Partial I-94 Bridge Demolition, August 2014 Rail Delivery, August 2014 Rail Welding, September 2014 Install first track on Woodward Ave., September 2014 • Partial I-75 Bridge Demolition, October 2014 Rail Delivery Rail Transport 2014 ACCOMPLISHMENTS • Substantial completion of track installation on Woodward Ave. in Downtown, November 2014 • Start of Penske Tech Center Construction, February 2015 • Installation of steel beams for the I-94 Woodward Ave. Overpass Bridge, March 2015 Rail Welding Concrete Pour 2015 CONSTRUCTION CLEAN & SAFE WORK ZONES • Clean and safe construction zones are important to M-1 RAIL • Filled potholes • Painted new temporary striping on Woodward Ave. to keep drivers and pedestrians safe • Power washed every sign and orange barrel to help keep the construction area presentable for residents, businesses and visitors 2014 TRACK & ROAD REBUILD CONSTRUCTION SEQUENCE EARTH AGG. SEWER/ EARTH AGG. SEWER/ FLATWORK FLATWORK SYSTEMS SYSTEMS TRACK ROADWAY TRACK DEMO DEMO DTE DTE WATER WATER WORK BASE WORK BASE EARTH AGG. SEWER/ SYSTEMS TRACK DEMO DTE WATER WORK BASE EARTH SEWER/ SYSTEMS TRACK DEMO DTE WATER WORK SEWER/ EARTH SYSTEMS DEMO DTE WORK WATER SEWER/ SYSTEMS DEMO DTE WATER SEWER/ DEMO DTE WATER DEMO DTE DEMO 2015 GEOGRAPHICAL CONSTRUCTION SCHEDULE NOW IT’S TIME FOR THE INTERACTIVE PART OF OUR PRESENTATION! PENSKE TECH CENTER PENSKE TECH CENTER Completed Activities: • Mobilization • Site clearing and staking • Utility investigation/relocation Balance of year timeline: • Spring-Summer: • Site utilities • External Structure • Summer-Fall: • External Structure • Internal Structure • Exterior lot • Fall-Winter: • Internal structure • 2016: Final completion MDOT I-94 & I-75 OVERPASS RECONSTRUCTION MDOT I-94 & I-75 OVERPASS RECONSTRUCTION I-94 • West side I-94 Bridge Replacement • Fall 2014 – Spring 2015 • East side I-94 Bridge Replacement • Spring – Winter 2015 I-75 • West side I-75 Bridge Replacement: • Fall 2014 – Spring 2015 • East side I-75 Bridge Replacement: • Spring – Winter 2015 OVERPASS TRAFFIC SHIFTS MDOT ROAD RECONSTRUCTION • Reconstruct Woodward Ave. from Sibley St. to Chandler St. • Complete Streets Improvements • Streetscape Improvements • Drainage Improvements • Signal Upgrades 2015 NORTH END/NEW CENTER DISTRICT 2015 NORTH END/ NEW CENTER DISTRICT Work in Progress: • Grand Blvd. & Woodward Ave. Intersection: Winter 2014 to Summer(DWSD) • SB Woodward Ave. from Harper to Bethune: Spring – Summer (DTE) • SB Woodward Ave. from I-94 to Piquette/Amsterdam: Spring – Summer (M-1 RAIL/MDOT) 2015 NORTH END/ NEW CENTER DISTRICT *Upcoming Work: • SB Woodward Ave. from Grand Blvd. to Chandler: Spring – Fall (M-1 RAIL/MDOT) • NB Woodward Ave. from I-94 to Milwaukee: August – November (M-1 RAIL) • NB Woodward Ave. from Grand Blvd. to Chandler: Fall – Winter 2016 (MDOT) *Schedule subject to change 2015 MIDTOWN DISTRICT 2015 MIDTOWN DISTRICT Work in Progress: • SB Woodward Ave. from Sibley to Temple: Spring - Summer (MDOT) • NB/SB Woodward Ave. from Temple to Watson: Spring (DTE) • NB Woodward Ave. from Watson to Canfield: Winter – Spring (MDOT/M-1RAIL) 2015 MIDTOWN DISTRICT *Upcoming Work: • NB Woodward Ave. from I-75 to Watson: Summer to Fall(M-1 RAIL/MDOT) • NB Woodward Ave. from Canfield to I-94: Spring –Summer (M-1 RAIL / MDOT) • SB Woodward Ave. from MLK/Mack to Canfield: Summer - Fall (M-1 RAIL/MDOT) • SB Woodward Ave. from Canfield to Warren: Summer - Fall (M-1 RAIL) *Schedule subject to change 2015 DOWNTOWN DISTRICT 2015 DOWNTOWN DISTRICT Work in Progress: • SB Woodward Ave. from Park/Witherell to I-75 SB: Spring – Summer (M-1 RAIL) *Upcoming Work: • NB Woodward Ave. from Congress to North end of Campus Martius: Spring – Summer (M-1 RAIL) • NB/SB Woodward Ave. from North end of Campus Martius to State/Gratiot: Spring – Summer (M-1 RAIL) • SB Woodward Ave. from Congress to North end of Campus Martius: Summer – Fall (M-1 RAIL) • NB/SB Woodward Ave. from Larned to South end of Campus Martius: Summer - Fall (M-1 RAIL) • NB Woodward Ave. Park/Witherell to I-75: Summer – Fall (M-1 RAIL) *Schedule subject to change LOWER WOODWARD AVENUE SPECIALTY TRACK PHASE ONE Woodward Ave. between Congress St. and Monroe Ave. • Track installation will take place in northbound Woodward Ave. lanes • One travel lane will be maintained around Campus Martius • Monroe Ave. between Woodward Ave. and Farmer St. will be open mid-block to local traffic only • Parking meters will be available • Delivery vehicle staging will be available on the east and westbound lanes of Cadillac Sq. between Bates St. and Farmer St. • Cadillac Square between Woodward Ave. and Bates St. will be inaccessible to vehicular traffic • Anticipated Construction Period: Spring – Summer* *Schedule subject to change PHASE ONE MAP PHASE TWO Woodward Ave. between the Northern terminus of Campus Martius and State St./Gratiot Ave. • Track installation will take place in north and southbound Woodward Ave. lanes • Only northbound Woodward Ave. lanes will close for the first two weeks - southbound Woodward Ave. lanes will remain open • North and southbound Woodward Ave. lanes will close for the remaining construction period - resulting in a temporary full closure • One travel lane will be maintained around Campus Martius • Delivery vehicle staging will be unavailable on Woodward Ave. between the Northern Terminus of Campus Martius and State St./Gratiot Ave. • Anticipated Construction Period: Summer* *Schedule subject to change PHASE TWO MAP PHASE THREE Woodward Ave. between the Northern terminus of Campus Martius and Congress St. • Track installation will take place in southbound Woodward Ave. lanes • One travel lane will be maintained around Campus Martius • Michigan Ave. between Woodward Ave. and Griswold St. will be available for delivery vehicles only • Fort St. between Woodward Ave. and Griswold St. will be closed - vehicles will be unable to head westbound onto Fort St. • Anticipated Construction Period: Summer – Fall* *Schedule subject to change PHASE THREE MAP PHASE FOUR Southern Terminus of Campus Martius to Congress St. • Temporary Full closure between Larned and the Southern end of Campus Martius both northbound and southbound • Track installation will take place in southbound and northbound Woodward Ave. lanes • Congress will require a temporary closure at Woodward Avenue for track installation; vehicle traffic will be temporarily detoured • Anticipated Construction Period: Summer – Fall* *Schedule subject to change PHASE FOUR MAP LOWER WOODWARD AVE. ALTERNATE ROUTES • Detour signs will be posted • Traveling northbound on Woodward Ave. (starting at Jefferson Ave.) • Turn right at Larned St., make a left onto Randolph St., continue straight across Gratiot St. onto Broadway St., turn right on Witherell St., left on Adams Ave. to arrive back at Woodward Ave. • Traveling southbound on Woodward Ave. (starting at Elizabeth St.) • Turn right at Adams Ave., make a left onto Park Ave., a right onto Washington Blvd. (continue straight for 2 blocks), turn left at Larned St. to arrive back at Woodward Ave. Q&A © 2014 M-‐1 RAIL. The streetcar image depicted is a conceptual rendering.
© Copyright 2024