As-Submitted Results Report v1 Letting Of March 06, 2015 Letting Call: 1503 001 Low Bid: Project: ST 79081-109334-2 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: October 16, 2015 Description: 3.87 mi of hot mix asphalt cold milling, two-course overlay, concrete curb, gutter, sidewalk and ramps, drainage, and pavement marking on M-25 and M-24 from Bay Park Road to the Tuscola/Huron county line in the village of Unionville, Tuscola County. 4.00 % DBE participation required This proposal has been withdrawn. Letting Of March 06, 2015 Letting Call: 1503 002 Low Bid: Project: STUL 77475-126767 Engineers Estimate: Local Agreement: 15-5006 Pct Over/Under Estimate: Start Date: June 22, 2015 Completion Date: October 16, 2015 $341,012.11 $324,505.00 5.09 % Description: 0.18 mi of hot mix asphalt cold milling and resurfacing, pavement repairs, concrete curb and gutter, sidewalk, ramps, and watermain on Stone Street from Pine Grove Avenue to McPherson Street in the city of Port Huron, St. Clair County. No DBE participation required Bidder As-Submittted James P Contracting, Inc. $341,012.11 Warren Contractors & Development, Inc. $387,754.74 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 003 Low Bid: Project: MCS 79018-122775 Engineers Estimate: Local Agreement: 15-5008 Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: May 20, 2016 $1,330,113.06 $1,235,560.25 7.65 % Description: Bridge replacement with 27-inch, prestressed concrete box beams, hot mix asphalt paving, concrete pavement, curb and gutter, aggregate base, guardrail, and pavement markings on Cemetery Road over the Cass River, Tuscola County. 4.00 % DBE participation required Bidder As-Submittted Milbocker and Sons, Inc. $1,330,113.06 Anlaan Corporation $1,363,990.58 Z Contractors, Inc. $1,865,821.13 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 004 Low Bid: Project: STL 39111-120237 Engineers Estimate: Local Agreement: 14-5676 Pct Over/Under Estimate: -21.24 % Start Date: 10 Days After Award Completion Date: April 25, 2016 $784,733.00 $996,392.50 Description: 0.90 mi of hot mix asphalt cold milling and resurfacing, aggregate base, culvert replacement, drainage, traffic signal flasher replacement, and pavement markings on D Avenue from Adobe Road easterly to Rolling Meadow Drive, Kalamazoo County. 5.00 % DBE participation required Bidder As-Submittted Michigan Paving and Materials Company $784,733.00 Rieth-Riley Construction Co., Inc. $813,807.50 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 005 Low Bid: Project: STL 48555-113011 Engineers Estimate: $436,447.00 Local Agreement: 14-5592 Pct Over/Under Estimate: -4.47 % Start Date: 10 Days After Award Completion Date: August 28, 2015 $416,951.50 Description: 2.01 mi of hot mix asphalt surfacing, shoulders, approaches, and pavement markings on County Road 405 North from M-28 northerly to the Newberry village limits, Luce County. No DBE participation required Bidder As-Submittted Payne & Dolan Inc. $416,951.50 Bacco Construction Company $422,879.50 Rieth-Riley Construction Co., Inc. $475,305.50 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 006 Low Bid: Project: STL 79555-109518 Engineers Estimate: $198,953.31 Local Agreement: 14-5661 Pct Over/Under Estimate: -4.11 % Start Date: April 6, 2015 Completion Date: June 26, 2015 $190,776.84 Description: 0.30 mi of hot mix asphalt resurfacing, concrete curb, gutter and sidewalk ramps, and pavement markings on Main Street from Trend Street easterly to M-24 in the village of Mayville, Tuscola County. No DBE participation required Bidder As-Submittted Astec Asphalt, Inc. $190,776.84 Eastern Asphalt Company, Inc. $196,255.66 Pyramid Paving and Contracting Co. $198,331.35 Ace-Saginaw Paving Company $224,081.31 Total Number of Bidders: 4 Letting Of March 06, 2015 Letting Call: 1503 007 Low Bid: Project: STL 75555-124278 Engineers Estimate: $185,946.60 Local Agreement: 14-5670 Pct Over/Under Estimate: -0.74 % Start Date: 10 Days After Award Completion Date: August 28, 2015 $184,561.32 Description: Application of permanent pavement markings on various routes countywide, Schoolcraft County. No DBE participation required Bidder As-Submittted P.K. Contracting, Inc. $184,561.32 Total Number of Bidders: 1 Letting Of March 06, 2015 Letting Call: 1503 008 Low Bid: Project: HSIP 81609-123797 Engineers Estimate: Local Agreement: 15-5002 Pct Over/Under Estimate: Start Date: April 20, 2015 Completion Date: June 12, 2015 $1,190,849.65 $1,191,414.12 -0.05 % Description: 2.02 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, driveway, sidewalk and ramps, drainage, traffic signals, and pavement markings on West Huron River Drive from Hewitt Road easterly to Cornell Road and on Hewitt Road from north of Michigan Avenue northerly to Packard Road, Washtenaw County. 3.00 % DBE participation required Bidder As-Submittted Cadillac Asphalt, L.L.C. $1,190,849.65 Ajax Paving Industries, Inc. $1,269,716.91 Barrett Paving Materials Inc. $1,313,313.00 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 009 Low Bid: Project: HSIP 83609-123806 Engineers Estimate: $801,771.96 Local Agreement: 14-5671 Pct Over/Under Estimate: -6.68 % Start Date: May 26, 2015 Completion Date: June 19, 2015 $748,185.21 Description: 8.86 mi of hot mix asphalt overlay, shoulder paving with safety edge, trenching, guardrail installation, permanent signing, and pavement markings on 16 Road from M-37 east to 31 Road, Wexford County. 4.00 % DBE participation required Bidder As-Submittted Elmer's Crane and Dozer, Inc. $748,185.21 Rieth-Riley Construction Co., Inc. $823,722.20 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 010 Low Bid: Project: MCS 33005-118675 Engineers Estimate: Local Agreement: 15-5001 Pct Over/Under Estimate: 24.37 % Start Date: 10 Days After Award Completion Date: November 30, 2015 $717,632.32 $577,000.00 Description: Deck replacement, shallow overlay, hot mix asphalt cold milling and resurfacing, concrete curb, gutter and bridge railing replacement, cleaning and coating structural steel, placing scour countermeasures, and pavement markings on Columbia Road over Doan Creek, on Meech Road over Doan Creek, and on Clark Road over Deer Creek, Ingham County. No DBE participation required Bidder As-Submittted Nashville Construction Company $717,632.32 C. A. Hull Co., Inc. $844,607.38 Atsalis Brothers Painting Co. $1,026,155.24 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 011 Low Bid: Project: HSIP 34609-120517 Engineers Estimate: Local Agreement: 15-5021 Pct Over/Under Estimate: -27.94 % Start Date: April 1, 2015 Completion Date: July 17, 2015 $365,527.09 $507,255.24 Description: 1.77 mi of hot mix asphalt removal and resurfacing, concrete curb and gutter, aggregate base, trenching, drainage, guardrail, and pavement markings on Keefer Highway from the Lyons village limits south to Lyons Road, Ionia County. 3.00 % DBE participation required Bidder As-Submittted C L Trucking & Excavating, LLC $365,527.09 Hoffman Bros., Inc. $378,268.95 Crawford Contracting, Inc. $386,651.45 Rieth-Riley Construction Co., Inc. $389,529.02 Wonsey Tree Service, Inc. $396,353.71 Nashville Construction Company $407,047.57 Total Number of Bidders: 6 Letting Of March 06, 2015 Letting Call: 1503 012 Low Bid: Project: STL 08015-120204 Engineers Estimate: Local Agreement: 15-5003 Pct Over/Under Estimate: 17.08 % Start Date: 10 Days After Award Completion Date: June 19, 2015 $285,871.73 Description: Application of permanent pavement markings on various routes countywide, Barry County. No DBE participation required Bidder As-Submittted Michigan Pavement Markings. LLC $285,871.73 P.K. Contracting, Inc. $295,211.45 R. S. Contracting, Inc. $327,837.83 Total Number of Bidders: 3 $244,169.16 Letting Of March 06, 2015 Letting Call: 1503 013 Low Bid: Project: MCS 38017-118681 Engineers Estimate: $777,124.10 Local Agreement: 15-5007 Pct Over/Under Estimate: -7.34 % Start Date: 10 Days After Award Completion Date: July 31, 2015 $720,083.32 Description: Bridge removal and replacement with 27-inch, prestressed concrete box beams, hot mix asphalt surfacing, concrete curb and gutter, aggregate base, and pavement markings on Hague Road over the Grand River, Jackson County. No DBE participation required Bidder As-Submittted Nashville Construction Company $720,083.32 J. E. Kloote Contracting, Inc. $866,294.90 Milbocker and Sons, Inc. $871,204.72 E.T. MacKenzie Company $906,506.07 Total Number of Bidders: 4 Letting Of March 06, 2015 Letting Call: 1503 014 Low Bid: Project: STUL 73404-120662 Engineers Estimate: Local Agreement: 15-5011 Pct Over/Under Estimate: Start Date: June 15, 2015 Completion Date: September 30, 2015 Description: 0.49 mi of hot mix asphalt removal and resurfacing, concrete pavement repairs, joints, driveway, curb, gutter, sidewalk and ramps, sanitary, drainage, water service leads, and pavement markings on Mackinaw Street from State Street (M-58) northerly to Weiss Street in the city of Saginaw, Saginaw County. 4.00 % DBE participation required All Bids Rejected 3/26/2015 Letting Of March 06, 2015 Letting Call: 1503 015 Low Bid: Project: HSIP 63609-123785 Engineers Estimate: Local Agreement: 15-5020 Pct Over/Under Estimate: 27.05 % Start Date: 10 Days After Award Completion Date: August 29, 2015 $356,608.01 $280,686.00 Description: 0.21 mi of hot mix asphalt cold milling and resurfacing, miscellaneous concrete pavement, concrete driveway, curb, gutter, sidewalk and ramps, earthwork, aggregate base, traffic signals, permanent signs, and pavement markings on East Walton Boulevard at Giddings Road in the city of Pontiac, Oakland County. No DBE participation required Bidder As-Submittted Florence Cement Company $356,608.01 Pavex Corporation $368,903.34 Diversified Power Inc. $369,796.65 Warren Contractors & Development, Inc. $430,312.06 Dan's Excavating, Inc. $472,595.73 Total Number of Bidders: 5 Letting Of March 06, 2015 Letting Call: 1503 016 Low Bid: Project: IM 58152-110616 , ETC Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: September 19, 2018 $118,190,104.57 $104,100,426.77 n/a Description: 5.60 mi of concrete reconstruction, grading, drainage and geometric improvements, traffic signals, ITS, signing, pavement markings, lighting, landscaping, bridge reconstruction and widening on 5 structures, riprap, and slope protection on I-75 from Dixie Highway to I-275, Monroe County. This project includes a 5 year materials and workmanship pavement warranty. 6.00 % DBE participation required Bidder Cal Days As-Submittted Dan's Excavating, Inc. 328 $118,190,104.57 Interstate Highway Construction, Inc. 419 $123,101,743.34 Toebe Construction LLC 388 $123,218,934.07 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 017 Low Bid: Project: ST 49025-113189 , ETC Engineers Estimate: Local Agreement: Pct Over/Under Estimate: 26.07 % Start Date: 10 Days After Award Completion Date: October 30, 2015 $1,824,812.37 $1,447,409.40 Description: 0.77 mi of hot mix asphalt cold milling and resurfacing, pavement removal, drainage, guardrail, concrete curb and gutter, deep concrete overlay, railing, substructure repair, and pavement marking on I-75BL from south of Mackinac Trail northerly to north of the Castle Rock interchange, Mackinac County. This project includes a 5 year materials and workmanship pavement warranty. 3.00 % DBE participation required Bidder As-Submittted Bacco Construction Company $1,824,812.37 M & M Excavating Company $1,853,136.70 Elmer's Crane and Dozer, Inc. $1,876,557.71 Payne & Dolan Inc. $1,971,729.45 Hebert Construction Co. $2,177,673.92 Total Number of Bidders: 5 Letting Of March 06, 2015 Letting Call: 1503 018 Low Bid: Project: BHI 38101-109145 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: 19.65 % Start Date: 10 Days After Award Completion Date: October 2, 2015 $578,147.00 $483,213.86 Description: Bridge rehabilitation, cleaning and coating of structural steel, beam end repairs, bearing replacement, substructure patching, and concrete surface coating on I-94 over US-127/M-50, Jackson County. This project includes a 2 year bridge painting warranty. No DBE participation required Bidder As-Submittted Civil Coatings and Construction Inc. $578,147.00 Atsalis Brothers Painting Co. $623,206.85 C. A. Hull Co., Inc. $667,176.34 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 019 Low Bid: Project: IM 09034-120595 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: -19.66 % Start Date: April 20, 2015 Completion Date: May 15, 2015 $58,259.40 $72,514.53 Description: 0.04 mi of concrete removal and replacement of Portable Intermittent Truck Weigh Station trench, Bay County. No DBE participation required Bidder As-Submittted J. Ranck Electric, Inc. $58,259.40 Hunt Bros. Concrete Contractors, Inc. $71,903.70 A. J. Rehmus & Son, Inc. $77,777.77 Kamminga & Roodvoets, Inc. $78,711.50 Grand River Construction, Inc. $104,469.06 Total Number of Bidders: 5 Letting Of March 06, 2015 Letting Call: 1503 020 Low Bid: Project: ST 21024-118804 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: October 16, 2015 $2,028,915.78 $2,086,616.42 -2.77 % Description: Bridge removal and replacement with a concrete, precast, three-sided culvert, hot mix asphalt approach work, guardrail, and pavement marking on US-2 over Ogontz River, Delta County. This project includes a 5 year materials and workmanship pavement warranty. 2.00 % DBE participation required Bidder As-Submittted Hebert Construction Co. $2,028,915.78 Anlaan Corporation $2,146,193.03 Bacco Construction Company $2,235,639.00 A. Lindberg & Sons, Inc. $2,525,630.92 Total Number of Bidders: 4 Letting Of March 06, 2015 Letting Call: 1503 021 Low Bid: Project: RRRF 50092-116508-2 Engineers Estimate: Local Agreement: 14-5453 14-5452 Pct Over/Under Estimate: 14.03 % Start Date: 10 Days After Award Completion Date: August 30, 2015 $1,797,453.77 $1,576,324.37 Description: 0.83 mi of hot mix asphalt cold milling, widening and resurfacing, slip ramp removal and shared-use path, modernize traffic signal, pedestrian crossing, and drainage on M-19 at New Haven Road, Gratiot Avenue, and Main Street in the village of New Haven, Macomb County. This project includes a 5 year materials and workmanship pavement warranty. No DBE participation required Bidder As-Submittted Cadillac Asphalt, L.L.C. $1,797,453.77 Ajax Paving Industries, Inc. $1,864,299.77 Ace-Saginaw Paving Company $1,915,078.16 Pamar Enterprises, Inc. $1,942,711.05 Pavex Corporation $2,325,101.60 Total Number of Bidders: 5 Letting Of March 06, 2015 Letting Call: 1503 022 Low Bid: Project: TAUL 34445-123243 Engineers Estimate: Local Agreement: 14-5656 Pct Over/Under Estimate: 19.93 % Start Date: 10 Days After Award Completion Date: October 1, 2017 $2,257,111.10 $1,881,946.96 Description: 2.30 mi of hot mix asphalt shared-use path, concrete block retaining wall, concrete curb, gutter, sidewalk and ramps, grading, drainage, pavement marking, and prefabricated pedestrian bridge on Fred Meijer Grand River Valley Rail Trail from Adams Court east to Prairie Creek in the city of Ionia, Ionia County. 5.00 % DBE participation required Bidder As-Submittted Anlaan Corporation $2,257,111.10 Kamminga & Roodvoets, Inc. $2,287,555.35 C L Trucking & Excavating, LLC $2,387,815.38 Hoffman Bros., Inc. $2,436,812.52 D. J. McQuestion & Sons, Inc. $2,592,239.75 Total Number of Bidders: 5 Letting Of March 06, 2015 Letting Call: 1503 023 Low Bid: Project: TAU 82457-118189-2 Engineers Estimate: $682,905.52 Local Agreement: 14-5499 Pct Over/Under Estimate: 57.80 % Start Date: April 20, 2015 Completion Date: November 14, 2015 $1,077,657.47 Description: 0.33 mi of hot mix asphalt shared-use path including boardwalk, concrete substructure, curb, gutter, sidewalk and ramps, piles, and slope restoration on River Rouge Gateway Trail from Brady Street easterly to Elm Street in the city of Dearborn, Wayne County. 5.00 % DBE participation required Bidder As-Submittted Dan's Excavating, Inc. $1,077,657.47 Total Number of Bidders: 1 Letting Of March 06, 2015 Letting Call: 1503 024 Low Bid: Project: SRSI 23155-124128 Engineers Estimate: $273,984.00 Local Agreement: 15-5022 Pct Over/Under Estimate: -8.57 % Start Date: 10 Days After Award Completion Date: July 31, 2015 $250,510.06 Description: 0.57 mi of concrete curb, gutter, sidewalks and ramps, pavement removal, hot mix asphalt resurfacing, drainage, and pavement markings along Center Street from State Street north to Knight Street and along Knight Street from Center Street east to Kerry Street for service to Lockwood Elementary and Greyhound Intermediate School in the city of Eaton Rapids, Eaton County. No DBE participation required Bidder As-Submittted Nashville Construction Company $250,510.06 C & D Hughes, Inc. $262,742.52 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 025 Low Bid: Project: STL 72555-116213 Engineers Estimate: Local Agreement: 14-5607 Pct Over/Under Estimate: -19.54 % Start Date: July 13, 2015 Completion Date: August 31, 2015 $185,060.82 $230,015.00 Description: 1.70 mi of hot mix asphalt cold milling and ultra-thin overlay, trenching, aggregate shoulders, and pavement marking on County Road 100 from Burdell Road northerly to Sunset Drive then easterly to I-75, Roscommon County. No DBE participation required Bidder As-Submittted Rieth-Riley Construction Co., Inc. $185,060.82 Pyramid Paving and Contracting Co. $203,056.26 Bolen Asphalt Paving, Inc. $235,800.82 Payne & Dolan Inc. $299,524.72 Total Number of Bidders: 4 Letting Of March 06, 2015 Letting Call: 1503 026 Low Bid: Project: STL 72143-119932 Engineers Estimate: $218,983.87 Local Agreement: 14-5606 Pct Over/Under Estimate: -1.21 % Start Date: June 1, 2015 Completion Date: July 1, 2015 $216,334.23 Description: 7.16 mi of single chip sealing, fog sealing, and pavement markings on County Road 103 from M-18 easterly to Airport Drive then northerly to Old 76, on County Road 303 from M-55 northwesterly to Aqua Road, on County Road 602 from St. Helen Road easterly and from Au Sable Road northerly to Sunset Drive, Roscommon County. No DBE participation required Bidder As-Submittted Highway Maintenance and Construction Company $216,334.23 Pavement Maintenance Systems, LLC $223,629.57 Fahrner Asphalt Sealers, L.L.C. $259,799.97 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 027 Low Bid: Project: MCS 31003-118664 Engineers Estimate: Local Agreement: 15-5029 Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: August 14, 2015 $143,833.75 $139,973.00 2.76 % Description: Bridge rehabilitation with hot mix asphalt base crushing, shaping and resurfacing, approaches, and bridge deck joint replacement on Strugeon River Road over the Strugeon River, Houghton County. No DBE participation required Bidder As-Submittted Payne & Dolan Inc. $143,833.75 Superior Paving, Inc. $149,902.78 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 028 Low Bid: Project: CMG 61400-118971 Engineers Estimate: $131,009.04 Local Agreement: 15-5042 Pct Over/Under Estimate: -7.74 % Start Date: 10 Days After Award Completion Date: June 30, 2015 $120,872.36 Description: Traffic signal improvement on Sherman Boulevard at Glenside Boulevard in the city of Muskegon, Muskegon County. No DBE participation required Bidder As-Submittted County Line Power, LLC $120,872.36 D V T Electric, Inc. $123,572.50 Strain Electric Company $126,461.80 Diversified Power Inc. $133,659.00 Rauhorn Electric, Inc. $134,963.25 Severance Electric Co., Inc. $143,727.62 J. Ranck Electric, Inc. $145,136.51 Total Number of Bidders: 7 Letting Of March 06, 2015 Letting Call: 1503 029 Low Bid: Project: TAU 14410-123212 Engineers Estimate: Local Agreement: 15-5012 Pct Over/Under Estimate: 20.53 % Start Date: August 3, 2015 Completion Date: 30 CD $71,241.00 $59,107.00 Description: 0.25 mi of concrete and aggregate shared-use path on Gumwood Road from the Michigan/Indiana state line to north of the state line, Cass County. No DBE participation required Bidder As-Submittted Selge Construction Co., Inc. $71,241.00 Northern Construction Services, Corp. $72,577.35 Kamminga & Roodvoets, Inc. $78,215.00 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 030 Low Bid: Project: EDC 41544-124396 Engineers Estimate: Local Agreement: 15-5043 Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: October 16, 2015 $1,437,183.17 $1,401,488.25 2.55 % Description: 0.93 mi of hot mix asphalt cold milling and resurfacing, concrete pavement, storm sewer, concrete curb and gutter, and pavement markings on 52nd Street from Patterson Avenue east to Kraft Avenue, Kent County. No DBE participation required Bidder As-Submittted Dykema Excavators, Inc. $1,437,183.17 Kamminga & Roodvoets, Inc. $1,542,791.19 Dean's Landscaping & Excavating, Inc. $1,602,791.63 Michigan Paving and Materials Company $1,628,549.87 Al's Excavating, Inc. $1,791,118.00 Diversco Construction Company, Inc. $1,838,268.83 Total Number of Bidders: 6 Letting Of March 06, 2015 Letting Call: 1503 031 Low Bid: Project: MCS 77023-118576 Engineers Estimate: Local Agreement: 15-5033 Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: August 31, 2015 $756,273.96 $752,550.32 0.49 % Description: Bridge removal and replacement with a three-sided concrete precast culvert, hot mix asphalt pavement removal and paving, aggregate base, guardrail, and pavement markings on Wales Center Road over Apply Drain, St. Clair County. No DBE participation required Bidder As-Submittted Nashville Construction Company $756,273.96 Dan's Excavating, Inc. $888,122.75 Milbocker and Sons, Inc. $892,526.71 Z Contractors, Inc. $1,038,717.58 Total Number of Bidders: 4 Letting Of March 06, 2015 Letting Call: 1503 032 Low Bid: Project: TAU 41401-122963-3 Engineers Estimate: Local Agreement: 14-5445 Pct Over/Under Estimate: 15.15 % Start Date: 10 Days After Award Completion Date: October 1, 2017 $777,777.77 $675,426.00 Description: 0.39 mi of hot mix asphalt shared-use path, concrete curb, gutter, sidewalk and ramps, pedestrian bridge, retaining wall, signing, and fencing on Joyce Street from Cannonsburg Road north to Townsend Park, Kent County. 3.00 % DBE participation required Bidder As-Submittted J. E. Kloote Contracting, Inc. $777,777.77 Anlaan Corporation $779,834.12 Dean's Landscaping & Excavating, Inc. $806,515.12 John Henry Excavating Inc. $819,515.00 Al's Excavating, Inc. $848,053.70 Kamminga & Roodvoets, Inc. $896,701.50 Total Number of Bidders: 6 Letting Of March 06, 2015 Letting Call: 1503 033 Low Bid: Project: TAUL 78434-124259 Engineers Estimate: $667,302.00 Local Agreement: 15-5023 Pct Over/Under Estimate: -9.84 % Start Date: April 13, 2015 Completion Date: July 10, 2015 $601,612.95 Description: 0.12 mi of brick street reconstruction, hot mix asphalt surfacing, concrete base course, header, curb and gutter, sidewalk and ramps, sewer, drainage, watermain, and pavement markings on South Nottawa Street from Mechanic Street north to Congress Street in the city of Sturgis, St. Joseph County. 4.00 % DBE participation required Bidder As-Submittted Nashville Construction Company $601,612.95 Northern Construction Services, Corp. $655,928.32 Peters Construction Co. $678,910.11 Hoffman Bros., Inc. $817,235.26 Total Number of Bidders: 4 Letting Of March 06, 2015 Letting Call: 1503 034 Low Bid: Project: FLH 21012-124258-2 Engineers Estimate: Local Agreement: 14-5531 Pct Over/Under Estimate: 20.15 % Start Date: 10 Days After Award Completion Date: September 30, 2015 $746,946.42 $621,680.10 Description: 0.71 mi of hot mix asphalt crushing, shaping and resurfacing, aggregate base, bridge rehabilitation with hydrodemolition, concrete deck overlay, concrete patching, bridge railing, joints, guardrail, and pavement markings on Federal Forest Highway 13 over the Sturgeon River, Delta County. 2.00 % DBE participation required Bidder As-Submittted Hebert Construction Co. $746,946.42 Anlaan Corporation $1,190,375.75 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 035 Low Bid: Project: STUL 73404-125408 Engineers Estimate: Local Agreement: 15-5017 Pct Over/Under Estimate: -11.88 % Start Date: May 4, 2015 Completion Date: September 4, 2015 $444,422.45 $504,348.50 Description: 0.25 mi of pavement removal, hot mix asphalt surfacing, machine grading, aggregate base, drainage, and concrete driveway, curb, gutter, sidewalk and ramps on Lapeer Avenue from Veterans Parkway east to 19th Street and on 19th Street from Lapeer Avenue south to Janes Avenue in the city of Saginaw, Saginaw County. 3.00 % DBE participation required Bidder As-Submittted Geiersbach Construction, Inc. $444,422.45 Malley Construction, Inc. $451,168.47 Lois Kay Contracting Co. $453,932.29 Bourdow Contracting, L.L.C. $458,663.87 Rohde Bros. Excavating, Inc. $464,131.00 Crawford Contracting, Inc. $499,746.10 Champagne and Marx Excavating, Inc. $501,246.83 Tri-City Groundbreakers, Inc. $534,624.00 Fisher Contracting Company $559,139.55 Total Number of Bidders: 9 Letting Of March 06, 2015 Letting Call: 1503 036 Low Bid: Project: BHO 79020-118521 , ETC Engineers Estimate: Local Agreement: 15-5013 Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: October 31, 2015 Description: Hot mix asphalt removal, bridge deck waterproofing and repaving, removal of expansion joint, pin and hanger removal and replacement, patching, and repaving approaches on Caine Road over the Cass River, on East Dayton Road over the Cass River, and on Dodge Road over the Cass River, Tuscola County. 4.00 % DBE participation required This proposal has been withdrawn. Letting Of March 06, 2015 Letting Call: 1503 037 Low Bid: Project: NH 82102-118749 , ETC Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: August 1, 2015 $5,444,468.74 $5,763,821.34 -5.54 % Description: 4.70 mi of hot mix asphalt cold milling and resurfacing, pavement markings, drainage structure cleaning, bridge approach patching and healer sealer, abutment repairs, and substructure repairs on M-14/I-96 from Sheldon Road easterly to Newburgh Road in the city of Livonia, Wayne County. This project includes two 3 year materials and workmanship pavement warranties. 6.00 % DBE participation required Bidder As-Submittted Cadillac Asphalt, L.L.C. $5,444,468.74 Ajax Paving Industries, Inc. $5,798,260.39 Barrett Paving Materials Inc. $6,529,333.51 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 038 Low Bid: Project: HSIP 82081-116524 , ETC Engineers Estimate: Local Agreement: 14-5625 Pct Over/Under Estimate: 29.51 % Start Date: 10 Days After Award Completion Date: August 1, 2015 $4,805,725.95 $3,710,565.67 Description: 2.97 mi of hot mix asphalt cold milling and resurfacing, full-depth concrete patches, extension of turn lanes and sidewalk, lane additions, single-face barrier, permanent pavement markings, and signing on M-153 from west of Haggerty Road to west of Lotz Road, on the I-275 southbound exit ramp to M-153, on M-153 from Marlowe Street to Lotz Road, and on the M-153/I-275 interchange ramps, Wayne County. This project includes a 3 year materials and workmanship pavement warranty and a 5 year materials and workmanship pavement warranty. 7.00 % DBE participation required Bidder As-Submittted Ajax Paving Industries, Inc. $4,805,725.95 Barrett Paving Materials Inc. $4,930,102.30 Cadillac Asphalt, L.L.C. $5,077,538.15 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 039 Low Bid: Project: HSIP 84917-125486 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: December 5, 2015 $2,638,401.00 $2,707,560.00 -2.55 % Description: Application of longitudinal pavement markings on various trunklines and parking lots, Macomb, Oakland, St. Clair, and Wayne Counties. No DBE participation required Bidder As-Submittted R. S. Contracting, Inc. $2,638,401.00 P.K. Contracting, Inc. $2,776,061.00 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 040 Low Bid: Project: HSIP 84915-125496 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: May 1, 2015 Completion Date: December 1, 2015 $2,180,350.55 $2,288,484.77 -4.73 % Description: Application of permanent pavement markings on various trunkline routes, Allegan, Barry, Berrien, Branch, Calhoun, Cass, Kalamazoo, St. Joseph, and Van Buren Counties. No DBE participation required Bidder As-Submittted R. S. Contracting, Inc. $2,180,350.55 P.K. Contracting, Inc. $2,237,613.51 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 041 Low Bid: Project: ST 31041-118767 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: 10.64 % Start Date: May 18, 2015 Completion Date: October 16, 2015 $1,940,799.44 $1,754,193.13 Description: Bridge replacement with prestressed, concrete box beam and approach work on M-38 over the Silver River, Houghton County. 3.00 % DBE participation required Bidder As-Submittted Hebert Construction Co. $1,940,799.44 A. Lindberg & Sons, Inc. $2,618,399.25 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 042 Low Bid: Project: IM 82021-113815 , ETC Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: August 31, 2015 $1,300,763.50 $1,254,836.08 3.66 % Description: 14.04 mi of corrugated shoulder rumble strips, full-depth concrete pavement repairs, and transverse and longitudinal crack and joint sealing on I-94 (Detroit Industrial Expressway) from the county line to east of I-275 eastbound, to east of Ozga Rd westbound, and to I-275 in the city of Romulus, Wayne County. No DBE participation required Bidder As-Submittted Causie Contracting, Inc. $1,300,763.50 Florence Cement Company $1,340,104.55 C & D Hughes, Inc. $1,584,803.36 Fiore Enterprises LLC $1,659,131.69 Major Cement Co. $1,728,527.21 Total Number of Bidders: 5 Letting Of March 06, 2015 Letting Call: 1503 043 Low Bid: Project: NH 29014-119184 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: -14.44 % Start Date: 10 Days After Award Completion Date: October 2, 2015 $915,078.86 $1,069,512.03 Description: Full-depth deck patching, epoxy overlay, steel beam, substructure, and pack rust repairs, heat straightening structural steel, and partial painting on US-127BR (Alger Road) over US-127, Gratiot County. 4.00 % DBE participation required Bidder As-Submittted Anlaan Corporation $915,078.86 Atsalis Brothers Painting Co. $935,350.25 C. A. Hull Co., Inc. $977,269.86 Civil Coatings and Construction Inc. $1,058,214.86 Grand River Construction, Inc. $1,396,776.77 Total Number of Bidders: 5 Letting Of March 06, 2015 Letting Call: 1503 044 Low Bid: Project: STG 84916-110093 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: August 17, 2015 Completion Date: November 13, 2015 $599,232.34 $560,879.45 6.84 % Description: 42.37 mi of non-freeway sign upgrading on various routes, Livingston, Monroe, and Washtenaw Counties. No DBE participation required Bidder As-Submittted Highway Service Company, Inc. $599,232.34 Action Traffic Maintenance, Inc. $622,359.25 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 045 Low Bid: Project: HSIP 84915-125499 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: May 1, 2015 Completion Date: November 1, 2015 $387,038.80 $472,004.02 -18 % Description: Application of permanent, special pavement markings on various trunkline routes, Allegan, Kalamazoo, and St. Joseph Counties. No DBE participation required Bidder As-Submittted P.K. Contracting, Inc. $387,038.80 R. S. Contracting, Inc. $448,466.75 Michigan Pavement Markings. LLC $477,156.60 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 046 Low Bid: Project: ST 82291-124727-2 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: 42.34 % Start Date: 10 Days After Award Completion Date: September 19, 2017 $630,960.95 $443,272.97 Description: 6.58 mi of landscaping and slope restoration on I-275 Metro Trail from the Huron River bridge to south of I-94 in the city of Romulus, Wayne County. 3.00 % DBE participation required Bidder As-Submittted W. H. Canon, Inc. $630,960.95 Anderson-Fischer & Associates, Inc. $696,786.50 Erie Construction, LLC $739,796.00 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 047 Low Bid: Project: HSIP 84912-125498 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: August 31, 2015 $327,932.00 $301,689.72 8.70 % Description: Application of special markings on various routes, Alcona, Alpena, Iosco, Kalkaska, Montmorency, Ogemaw, Oscoda, and Presque Isle Counties. No DBE participation required Bidder As-Submittted P.K. Contracting, Inc. $327,932.00 Total Number of Bidders: 1 Letting Of March 06, 2015 Letting Call: 1503 048 Low Bid: Project: ST 73051-110522 , ETC Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: April 13, 2015 Completion Date: September 19, 2018 $12,668,209.00 $13,641,213.58 -7.13 % Description: 7.46 mi of hot mix asphalt cold milling and resurfacing, concrete curb, gutter, sidewalk and ramp, bridge replacements and repairs with approach work on M-13 at various locations in the city of Saginaw, Saginaw County. This project includes a 2 year bridge painting warranty and 3 year and 5 year materials and workmanship pavement warranties. 5.00 % DBE participation required Bidder As-Submittted Anlaan Corporation $12,668,209.00 Toebe Construction LLC $12,745,894.32 C. A. Hull Co., Inc. $13,364,825.94 Z Contractors, Inc. $14,112,838.35 Dan's Excavating, Inc. $14,213,260.99 Total Number of Bidders: 5 Letting Of March 06, 2015 Letting Call: 1503 049 Low Bid: Project: ST 77091-123936 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: -11.94 % Start Date: July 6, 2015 Completion Date: August 31, 2015 $512,205.00 $581,644.92 Description: 4.01 mi of hot mix asphalt double chip sealing, fog sealing, and pavement marking on M-136 (Pine Grove and Keewahdin Road) from North Road easterly to M-25, St. Clair County. This project includes a 2 year pavement performance warranty. No DBE participation required Bidder As-Submittted Pavement Maintenance Systems, LLC $512,205.00 Highway Maintenance and Construction Company $532,003.86 Fahrner Asphalt Sealers, L.L.C. $618,214.86 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 050 Low Bid: Project: STG 23812-117701 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: -10.29 % Start Date: June 1, 2015 Completion Date: August 7, 2015 $118,924.93 $132,565.40 Description: 7.30 mi of non-freeway signing on Lansing Road from I-69 east to I-496, Eaton and Ingham Counties. No DBE participation required Bidder As-Submittted Highway Service Company, Inc. $118,924.93 Action Traffic Maintenance, Inc. $121,411.56 Give 'em A Brake Safety, Inc. $128,987.83 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 051 Low Bid: Project: M 17034-M00232 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: June 1, 2015 Completion Date: Description: No DBE participation required Bidder Total Number of Bidders: No Bids Submitted As-Submittted Letting Of March 06, 2015 Letting Call: 1503 052 Low Bid: Project: STU 41481-124556 Engineers Estimate: Local Agreement: 15-5044 Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: July 15, 2016 Description: 0.25 mi of hot mix asphalt cold milling, removal and resurfacing, drainage, concrete pavement, curb, gutter, driveway, sidewalk and ramps, landscaping, street lighting, watermain, sanitary sewer, and pavement markings on Bostwick Avenue from Lyon Street north to Crescent Street and on State Street from Jefferson Avenue southeasterly to Lafayette Avenue in the city of Grand Rapids, Kent County. 6.00 % DBE participation required This proposal has been withdrawn. Letting Of March 06, 2015 Letting Call: 1503 053 Low Bid: Project: CMG 63400-122599-2 Engineers Estimate: $500,005.50 Local Agreement: 14-5560 Pct Over/Under Estimate: -2.27 % Start Date: 10 Days After Award Completion Date: December 10, 2015 $488,679.00 Description: Traffic signal modernization including box spans, countdown pedestrian signals, wireless video detection, and concrete ramps on Franklin Road at four locations from Walnut Lake Road north to Long Lake Road, Oakland County. 3.00 % DBE participation required Bidder As-Submittted Diversified Power Inc. $488,679.00 Rauhorn Electric, Inc. $505,565.21 J. Ranck Electric, Inc. $562,613.98 Dan's Excavating, Inc. $585,465.86 Total Number of Bidders: 4 Letting Of March 06, 2015 Letting Call: 1503 054 Low Bid: Project: STUL 73404-120658 Engineers Estimate: Local Agreement: 15-5016 Pct Over/Under Estimate: Start Date: May 11, 2015 Completion Date: September 25, 2015 $489,013.42 $456,023.00 7.23 % Description: 0.17 mi of pavement removal, hot mix asphalt surfacing, machine grading, aggregate base, concrete curb, gutter, sidewalk and ramps, drainage, and pavement markings on Niagara Street from Genesee Avenue northeasterly to Davenport Avenue in the city of Saginaw, Saginaw County. 5.00 % DBE participation required Bidder As-Submittted Champagne and Marx Excavating, Inc. $489,013.42 Geiersbach Construction, Inc. $492,271.65 Rohde Bros. Excavating, Inc. $504,115.00 Crawford Contracting, Inc. $505,601.92 Bourdow Contracting, L.L.C. $516,307.63 Tri-City Groundbreakers, Inc. $529,997.00 Total Number of Bidders: 6 Letting Of March 06, 2015 Letting Call: 1503 055 Low Bid: Project: STL 03555-119348 Engineers Estimate: Local Agreement: 15-5030 Pct Over/Under Estimate: 23.72 % Start Date: 10 Days After Award Completion Date: May 22, 2015 $433,495.38 $350,371.00 Description: 0.61 mi of hot mix asphalt cold milling and resurfacing, concrete pavement repair, driveway, curb, gutter, and sidewalk ramps, embankment, subbase, aggregate base, shoulders, and pavement markings on Blue Star Highway from the south city limits of the Village of Douglas north to north of Wiley Road, Allegan County. 2.00 % DBE participation required Bidder As-Submittted Michigan Paving and Materials Company $433,495.38 Superior Asphalt, Inc. $455,555.00 Rieth-Riley Construction Co., Inc. $500,438.58 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 056 Low Bid: Project: STL 16555-112775 Engineers Estimate: $524,976.92 Local Agreement: 15-5041 Pct Over/Under Estimate: -7.43 % Start Date: April 13, 2015 Completion Date: May 29, 2015 $485,983.80 Description: 0.74 mi of hot mix asphalt cold milling and resurfacing, aggregate base, concrete driveway, curb, gutter, sidewalk and ramps, and pavement markings on South Huron Avenue from US-23 northerly to Central Avenue in the village of Mackinaw City, Cheboygan County. 6.00 % DBE participation required Bidder As-Submittted Rieth-Riley Construction Co., Inc. $485,983.80 Payne & Dolan Inc. $536,250.05 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 057 Low Bid: Project: STL 31013-123754 Engineers Estimate: Local Agreement: 15-5031 Pct Over/Under Estimate: -10.82 % Start Date: 10 Days After Award Completion Date: June 12, 2015 $20,252.65 Description: Application of pavement markings on various routes, countywide, Houghton County. No DBE participation required Bidder As-Submittted P.K. Contracting, Inc. $20,252.65 Michigan Pavement Markings. LLC $24,048.38 Total Number of Bidders: 2 $22,709.48 Letting Of March 06, 2015 Letting Call: 1503 058 Low Bid: Project: STG 84915-109857 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: April 13, 2015 Completion Date: October 23, 2015 $1,437,879.77 Description: 128.92 mi of permanent, non-freeway signing upgrades on various routes, Berrien County. No DBE participation required Bidder As-Submittted Action Traffic Maintenance, Inc. $1,437,879.77 Highway Service Company, Inc. $1,449,934.46 Total Number of Bidders: 2 $1,321,585.55 8.80 % Letting Of March 06, 2015 Letting Call: 1503 059 Low Bid: Project: STG 84914-117048 Engineers Estimate: Local Agreement: 15-5004 Pct Over/Under Estimate: Start Date: March 2, 2015 Completion Date: November 13, 2015 $1,847,667.98 $1,858,304.82 -0.57 % Description: Traffic signal modernization and concrete curb, gutter, sidewalk, and ramps at 21 locations on various routes in the cities of Mt. Pleasant and Alma, Clare, Isabella and Gratiot Counties. No DBE participation required Bidder As-Submittted J. Ranck Electric, Inc. $1,847,667.98 Rauhorn Electric, Inc. $1,935,051.18 Strain Electric Company $2,320,599.94 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 060 Low Bid: Project: STL 32555-109508 Engineers Estimate: $920,467.25 Local Agreement: 15-5000 Pct Over/Under Estimate: -6.12 % Start Date: 10 Days After Award Completion Date: September 15, 2015 $864,096.75 Description: 8.84 mi of hot mix asphalt cold milling and resurfacing, aggregate shoulders and pavement markings on Kinde Road from M-25 north easterly to Pinnebog Road, Huron County. 3.00 % DBE participation required Bidder As-Submittted Ace-Saginaw Paving Company $864,096.75 Pyramid Paving and Contracting Co. $891,376.51 Albrecht Sand & Gravel Co. $928,818.60 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 061 Low Bid: Project: STL 31061-116609 Engineers Estimate: Local Agreement: 15-5032 Pct Over/Under Estimate: -12.50 % Start Date: 10 Days After Award Completion Date: August 28, 2015 $631,518.66 $721,727.25 Description: 3.13 mi of hot mix asphalt base crushing, shaping and resurfacing, aggregate base, drainage, guardrail and pavement markings on Pike River Road from Lower Worham Road then southerly, Houghton County. No DBE participation required Bidder As-Submittted Payne & Dolan Inc. $631,518.66 Bacco Construction Company $638,632.03 M.J.O. Contracting, Inc. $681,016.06 A. Lindberg & Sons, Inc. $872,169.30 Total Number of Bidders: 4 Letting Of March 06, 2015 Letting Call: 1503 062 Low Bid: Project: NH 39405-121017 Engineers Estimate: Local Agreement: 15-5048 Pct Over/Under Estimate: 14.73 % Start Date: April 27, 2015 Completion Date: August 21, 2015 $2,803,081.62 $2,443,287.25 Description: 0.74 mi of hot mix asphalt removal, cold milling and resurfacing, concrete curb, gutter, sidewalk and ramps, aggregate base, drainage, traffic signal and pavement markings on South Westnedge Avenue from Mall Drive north to Dawnlee Avenue in the city of Portage, Kalamazoo County. 5.00 % DBE participation required Bidder As-Submittted Hoffman Bros., Inc. $2,803,081.62 Peters Construction Co. $3,032,625.14 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 063 Low Bid: Project: STU 81001-123008 Engineers Estimate: Local Agreement: 15-5009 Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: October 30, 2015 $1,681,308.48 $1,718,666.55 -2.17 % Description: Bridge overlay, replacing expansion joints, structural steel repairs, cleaning and coating structural steel, substructure repairs and pavement markings on Fuller Road over Amtrak Railroad and Maiden Lane over Huron River in the city of Ann Arbor, Washtenaw County. 3.00 % DBE participation required Bidder As-Submittted C. A. Hull Co., Inc. $1,681,308.48 Z Contractors, Inc. $1,924,011.81 Anlaan Corporation $2,120,325.69 E. C. Korneffel Co. $2,263,501.60 Total Number of Bidders: 4 Letting Of March 06, 2015 Letting Call: 1503 064 Low Bid: Project: STL 64555-114118 Engineers Estimate: Local Agreement: 15-5038 Pct Over/Under Estimate: -15.38 % Start Date: June 8, 2015 Completion Date: August 21, 2015 $797,971.17 $943,053.00 Description: 0.40 mi of hot mix asphalt surface removal and resurfacing, earth excavation, sanitary sewer, water main, storm sewer, lighting, concrete driveway, curb, gutter, sidewalk and ramps, guardrail, and pavement markings on Johnson Street from Peach Street easterly to State Street in the city of Hart, Oceana County. 5.00 % DBE participation required Bidder As-Submittted Hallack Contracting, Inc. $797,971.17 McCormick Sand, Inc. $926,632.32 D. J. McQuestion & Sons, Inc. $1,008,178.42 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 065 Low Bid: Project: STL 35069-116201 Engineers Estimate: Local Agreement: 14-5663 Pct Over/Under Estimate: -10.27 % Start Date: July 7, 2015 Completion Date: August 7, 2015 $235,844.42 $262,840.00 Description: 0.99 mi of hot mix asphalt overlay, aggregate base, aggregate shoulders, trenching and pavement markings on Lorenz Road from Townline Road northerly to Meadow Road, Iosco County. No DBE participation required Bidder As-Submittted Bolen Asphalt Paving, Inc. $235,844.42 Rieth-Riley Construction Co., Inc. $238,182.92 Pyramid Paving and Contracting Co. $241,993.99 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 066 Low Bid: Project: STG 84914-119962 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: April 1, 2015 Completion Date: November 13, 2015 $699,739.46 $728,933.00 -4 % Description: 58.18 mi of non-freeway signing on various trunkline routes, Clare, Gratiot, Isabella and Midland Counties. No DBE participation required Bidder As-Submittted J & J Contracting, Inc. $699,739.46 Action Traffic Maintenance, Inc. $720,044.68 J. Ranck Electric, Inc. $802,096.47 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 067 Low Bid: Project: MER 63174-126507 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: 42.61 % Start Date: 10 Days After Award Completion Date: May 30, 2015 $299,810.86 $210,234.55 Description: Substructure patching, replacement of beam 1-W (Span 2), repair of beams 2-W and 3-W (Span 2), partial deck/railing/thrie beam replacement, and bridge sign replacement in the city of Madison Heights, Oakland County. No DBE participation required Bidder As-Submittted Z Contractors, Inc. $299,810.86 C. A. Hull Co., Inc. $317,983.28 Anlaan Corporation $359,837.68 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 068 Low Bid: Project: IM 63172-123144-2 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: April 15, 2015 Completion Date: October 15, 2015 $4,642,169.43 $4,873,823.18 -4.75 % Description: 4.10 mi of hot mix asphalt overlay, concrete pavement patching, detail 7 joint and crack repair and pavement markings on I-75 from Clintonville Road to M-15, Oakland County. This project includes a 3 year material and workmanship pavement warranty. 5.00 % DBE participation required Bidder As-Submittted Cadillac Asphalt, L.L.C. $4,642,169.43 Ajax Paving Industries, Inc. $5,298,721.65 Ace-Saginaw Paving Company $5,649,997.41 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 069 Low Bid: Project: PRIP 58034-124033-2 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: -12.45 % Start Date: 10 Days After Award Completion Date: August 1, 2015 $963,315.67 $1,100,301.91 Description: 3.97 mi of concrete pavement repairs and diamond grinding concrete on US-23 from School Road northerly to Ida Center Road, Monroe County. No DBE participation required Bidder As-Submittted Scodeller Construction, Inc. $963,315.67 Causie Contracting, Inc. $1,088,391.42 Diamond Coring Company, Inc. $1,203,471.40 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 070 Low Bid: Project: STG 84911-109837 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: -10.14 % Start Date: 10 Days After Award Completion Date: September 25, 2015 $479,224.17 $533,283.39 Description: 93.88 mil of non-freeway signing on M-35 from the Delta County Line to US-41 and M-95 from the Wisconsin State Line to US-41, Dickinson and Marquette Counties. No DBE participation required Bidder As-Submittted Action Traffic Maintenance, Inc. $479,224.17 Give 'em A Brake Safety, Inc. $516,304.00 J.C.S., Incorporated $520,688.24 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 071 Low Bid: Project: ST 14062-124018 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: 12.09 % Start Date: August 17, 2015 Completion Date: October 19, 2015 $515,457.38 $459,858.19 Description: 1.38 miles of hot mix asphalt cold milling and resurfacing with sidewalk ramp upgrades in Berrien and Cass Counties. This project includes a 3 year material and workmanship pavement warranty. 3.00 % DBE participation required Bidder As-Submittted Rieth-Riley Construction Co., Inc. $515,457.38 Michigan Paving and Materials Company $515,858.45 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 072 Low Bid: Project: NH 17033-124087 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: -19.78 % Start Date: July 6, 2015 Completion Date: October 2, 2015 $3,181,391.02 $3,965,927.70 Description: 9.68 mi of hot mix asphalt cold milling and single course resurfacing with fiber reinforced membrane interlayer on I-75 from north of the Mackinac/Chippewa County Line northerly to north of M-80, Chippewa County. This project includes a 3 year materials and workmanship pavement warranty. No DBE participation required Bidder As-Submittted Payne & Dolan Inc. $3,181,391.02 Bacco Construction Company $3,368,599.74 Rieth-Riley Construction Co., Inc. $3,830,006.57 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 073 Low Bid: Project: HSIP 84911-125497 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: 10 Days After Award Completion Date: December 1, 2015 $1,816,229.35 $1,674,502.56 8.46 % Description: Application of longitudinal markings on trunkline routes, Alger, Baraga, Chippewa, Delta, Dickinson, Gogebic, Houghton, Iron, Keweenaw, Luce, Mackinac, Marquette, Menominee, Ontonagon, and Schoolcraft Counties. No DBE participation required Bidder As-Submittted P.K. Contracting, Inc. $1,816,229.35 R. S. Contracting, Inc. $1,842,886.30 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 074 Low Bid: Project: ST 30033-124023 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: -15.11 % Start Date: August 3, 2015 Completion Date: September 11, 2015 $260,393.35 $306,756.94 Description: 1.716 mi of fiber reinforced bituminous membrane, Type B with micro-surface, single course, warranty with shoulder gravel and pavement markings on M-99 from the west village limit of Litchfield northwesterly to the Calhoun/Hillsdale County Line, Hillsdale County. This project includes a 2 year pavement performance warranty. No DBE participation required Bidder As-Submittted Strawser Construction Inc. $260,393.35 Total Number of Bidders: 1 Letting Of March 06, 2015 Letting Call: 1503 075 Low Bid: Project: ST 83021-109681 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: -10.54 % Start Date: June 15, 2015 Completion Date: 25 AD $595,599.71 $665,764.12 Description: 2.75 mi of hot in place recycling, hot mix asphalt cold milling and ultra-thin resurfacing, concrete joint repairs and sidewalk ramp on Old 55 in the City of Cadillac, Wexford County. This project includes a 2 year pavement performance warranty. No DBE participation required Bidder As-Submittted Pyramid Paving and Contracting Co. $595,599.71 Elmer's Crane and Dozer, Inc. $692,660.96 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 076 Low Bid: Project: PRIP 63132-123947 , ETC Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: May 15, 2015 Completion Date: September 15, 2015 $2,605,535.24 $2,422,918.02 7.54 % Description: 4.10 mi of hot mix asphalt cold milling and resurfacing, catch basin, curb, gutter, sidewalk and ramp, and pavement markings on M-150 from M-59 to Avon Road and from Paint Creek to Tienken Road in the cities of Rochester and Rochester Hills, Oakland County. This project includes a 3 year materials and workmanship pavement warranty. 7.00 % DBE participation required Bidder As-Submittted Cadillac Asphalt, L.L.C. $2,605,535.24 Ajax Paving Industries, Inc. $3,078,362.46 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 077 Low Bid: Project: ST 62022-118174 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: June 15, 2015 Completion Date: June 6, 2016 $2,193,964.86 $2,017,912.39 8.72 % Description: 10.02 mi of hot mix asphalt cold milling and resurfacing, ADA ramps, and shoulder resurfacing on M-82 from Main Street to M-37 in the cities of Fremont and Newaygo, Newaygo County. This project includes a 3 year materials and workmanship pavement warranty. 4.00 % DBE participation required Bidder As-Submittted Michigan Paving and Materials Company $2,193,964.86 Rieth-Riley Construction Co., Inc. $2,319,650.35 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 078 Low Bid: Project: PRIP 70081-122636-2 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: September 8, 2015 Completion Date: June 6, 2016 $1,145,554.35 $1,169,213.09 -2.02 % Description: 4.43 mi of hot mix asphalt cold milling and resurfacing, detail 8 joint and crack repairs, centerline and shoulder corrugations, traffic loop, concrete curb, gutter, sidewalk and ramps, and permanent pavement markings on M-104 from west of Lake Street to west of 124th Avenue in the village of Spring Lake, Ottawa County. This project includes a 3 year materials and workmanship pavement warranty. No DBE participation required Bidder As-Submittted Rieth-Riley Construction Co., Inc. $1,145,554.35 Michigan Paving and Materials Company $1,229,925.43 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 079 Low Bid: Project: IM 82194-123927 Engineers Estimate: Local Agreement: Pct Over/Under Estimate: 12.09 % Start Date: April 15, 2015 Completion Date: November 1, 2015 $1,975,479.78 $1,762,404.37 Description: 2.00 mi of full depth concrete pavement repairs, centerline repairs, crack sealing, joint re-sealing and permanent pavement markings on I-75 from Springwells Street to Clark Street in the city of Detroit, Wayne County. 5.00 % DBE participation required Bidder As-Submittted Major Cement Co. $1,975,479.78 C & D Hughes, Inc. $2,122,003.07 Florence Cement Company $2,303,007.66 Total Number of Bidders: 3 Letting Of March 06, 2015 Letting Call: 1503 080 Low Bid: Project: NH 41061-112069 , ETC Engineers Estimate: Local Agreement: 15-5035 Pct Over/Under Estimate: 15.69 % Start Date: 10 Days After Award Completion Date: August 8, 2017 $5,464,997.99 $4,723,730.16 Description: 2.43 mi of mix asphalt cold milling and resurfacing, detail 8 joint repairs and construct roundabouts on M-11 from west of Hayes Street east to Wilson Avenue and M-11 at Remembrance Road and Wilson Avenue in the city of Walker, Ottawa and Kent Counties. This project includes a 5 year materials and workmanship pavement warranty. 5.00 % DBE participation required Bidder As-Submittted Michigan Paving and Materials Company $5,464,997.99 Rieth-Riley Construction Co., Inc. $6,040,735.13 Total Number of Bidders: 2 Letting Of March 06, 2015 Letting Call: 1503 081 Low Bid: Project: STR 62032-115082 , ETC Engineers Estimate: Local Agreement: Pct Over/Under Estimate: Start Date: July 6, 2015 Completion Date: June 6, 2016 $1,224,837.11 $1,121,100.63 9.25 % Description: 4.38 mi of hot mix asphalt cold milling and single course resurfacing, concrete curb, gutter, sidewalk and ramps and railroad crossing replacement on M-37 from the south city limits of White Cloud northerly to Three Mile Road and M-20 from M-37 easterly to Swain Street in the village of Kent City, city of White Cloud, Kent, Newaygo, and Muskegon Counties. This project includes a 3 year materials and workmanship pavement warranty. 4.00 % DBE participation required Bidder As-Submittted Rieth-Riley Construction Co., Inc. $1,224,837.11 Michigan Paving and Materials Company $1,439,321.27 Total Number of Bidders: 2
© Copyright 2025