MAHARASHTRA POLLUTION CONTROL BOARD Minutes of 1st Consent Committee Meeting of 2015-2016 held on 22.04.2015 at 11:00 a.m. at 4th Floor Conference Hall, MPC Board, Kalpataru Point, Sion (E), Mumbai 22. (Booklet No. 1) 1 2 3 4 5 6 7 8 ………. The following members of the Consent Committee were present: Dr. P. Anbalagan, IAS, Member Secretary Chairman Maharashtra Pollution Control Board, Mumbai Member Shri. R. G. Pethe Retired WPAE, MPC Board Member Shri Y. B. Sontakke, Joint Director (WPC), Maharashtra Pollution Control Board, Mumbai Member Shri V. M. Motghare, Joint Director (Air Pollution Control) Maharashtra Pollution Control Board, Mumbai Shri P. K. Mirashe, Assistant Secretary (Technical) Member Maharashtra Pollution Control Board, Mumbai Sp. Invitee Shri A. R. Supate, Principal Scientific Officer Maharashtra Pollution Control Board, Mumbai Sp. Invitee Shri N. N. Gurav, Reginal Officer (HQ) Maharashtra Pollution Control Board, Mumbai Shri. Vasant B. Waghjale Co-ordinater Technical Advisor, MPCB, Mumbai Dr. B. N. Thorat, Member could not attend the meeting. Leave of absence was granted to him. Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start. The minutes of the 24th (Booklet No. 43) Consent Committee meeting of 2014-15 held on 19.03.2015 & 10.04.2015 circulated under Board’s letter No. MPCB/AS (T)/TB/B-1879 dated 17.04.2015 were confirmed. The meeting thereafter deliberated on the agenda items placed before the committee and following decisions were taken. Booklet No. 1 /2015-16 Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015 1 Sr. No. Name of Industry Decision on grant Consent granted of consent upto Section Remarks/ Discussion (1) RO(HQ) It was decided to refer case to Environment Department, GoM for clarification regarding Circular dated 17.01.2014 of violation in SRA projects. Resubmission Agenda 1 2 Reliable Construction, "Proposed SRA Scheme", CS No. 25(pt), 55(pt), 62(pt), 68(pt) to 72(pt) of Dharavi Division at matunga Labour Camp Dharavi, G/North Ward, Mumbai Sandeep Estate Development Pvt. Ltd., 1/531, 2/532, 531(pt), At Village Dharavi Sub Division, Sion-Bandra Link Road, Mumbai Not Approved Establish Not Approved Establish _____ _____ RO(HQ) Mumbai Waste Mangement Limited, MIDC Taloja, Tal - Panvel Approved Establish (Part) 3 Commissioning of the unit or 5 yrs whichever is earlier RO(HQ) It was decided to refer case to Environment Department, GoM for clarification regarding Circular dated 17.01.2014 of violation in SRA projects. It was decided to grant consent to establish (Part) for dismantling of E-waste, by imposing following conditions: (i) Industry should sub divide the plot, get proper permission from MIDC and make a separate facility of E-waste dismantling. Consent draft as placed in the agenda is approved with above conditions and corrections. 4 Allied Blenders and Distilleries Pvt. Ltd., Plot No. 6, MIDC Chikalthana, Aurangabad Approved Establish (Expansion) Commissioning of the unit or 5 yrs whichever is earlier JD(WPC) Laxmi Board and Paper Mills Ltd., Plot No. 2, Saravali, MIDC Kalyan-Bhivandi Road, Tal Bhivandi, Dist - Thane 5 Approved Establish (Expansion) Commissioning of the unit or 5 yrs whichever is earlier JD(WPC) It was decided to grant consent to establish for expansion of production. It was decided to grant consent to establish for expansion for Co-generation plant 4.80 MW., by imposing following conditions: (i) Industry shall submit Bank Guarantee of Rs. 5 lakh towards obtaining compliance of consent conditions. (ii) Consent to operate will not be granted till industry take adequate steps to improve the quality of treated effluent and air emissions to acheive consented standards. (iii) The PPM standards shall be prescribed 100 mg/nm2. Consent draft as placed in the agenda is approved with above conditions and corrections. Booklet No. 1 /2015-16 Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015 2 6 The Dharamsi Morarji Chemical Co. Ltd., Plot No. 105-A, MIDC Dhatav, Tal - Roha, Dist - Raigad Bharat Petroleum Corporation Ltd., Wadi Bunder Installation, Mallet Road, Wadi Bunder, Mumbai 7 Not Approved Establish (Expansion) _____ AS(T) Approved Operate (Amedment) 31.08.2017 AS(T) It was decided to issue refusal of consent to establish as industry has already started expansion without C to E and EC. It was decided to grant consent to operate with amendment for change in generation of HW quantity, by imposing following conditions: (i) Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M of pollution control system. (ii) Industry shall obtain membership of CHWTSDF with in 1 month and submit Bank Guarantee of Rs. 5 lakh towards compliance of same. Consent draft as placed in the agenda is approved with above conditions and corrections. Ruby Mill Ltd., Khursundi Village, Khalapur, Dist - Raigad Not Approved 1st Operate 8 Appasaheb Nalawade Gadhinglaj Taluka SSK Ltd. (Distillery), Harali, Dist - Kolhapur 9 Ninaidevi Sakhar Karkhana Ltd., (A Unit of Dalmia Bharat Sugar & Industries Ltd.), A/p10 Krangali-Arala, Tal - Shirala, Dist - Sangli. Not Approved Renewal Approved Renewal _____ _____ 31.07.2015 JD(WPC) JD(WPC) JD(WPC) Booklet No. 1 /2015-16 It was decided to keep case in abeyance and put up in next CC after getting detail report regarding compliance of Proposed Direction issued on 29.12.2014 for CREP non compliance. It was decided to grant renewal of consent with standard conditions and Bank Guarantee regime for sugar unit. It was decided to grant consent to renewal with increase in C.I., by imposing following conditions: (i) Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M of pollution control system. A. B. Mauri India Pvt. Ltd., Plot No. - D-7/2, A MIDC Lote Parshuram, Tal - Khed, Dist Ratnagiri 11 JD(WPC) informed committee that C.I. of the industry as per CA certficate submited for financial year 2013-14 (March 2014) is 132.32 Crs. Hence the case is in purview of CAC. It was decided to refer case to CAC cell. CAC Cell get the detail report from RO regarding present status of the industry and place before next CAC meeting. Approved Renewal 30.11.2017 JD(WPC) Consent draft as placed in the agenda is approved with above conditions and corrections. Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015 3 Fresh Agenda Sahajanand Developers, CTS No. 26(PT), Teachers Colony, MHADA Layout Siddharth Nagar, Goregaon (W), Mumbai Commissioning of the unit or 5 yrs Approved Establish whichever is earlier 1 RO(HQ) It was decided to grant consent to establish for construction of residential project on total plot area of 8,659.44 sq. mtrs. & total construction BUA of 75,420.61 sq. mtrs., by imposing following conditions: (i) PP shall submit Bank Guarantee of Rs. 10 lakhs towards compliance consent conditions. (ii) PP shall submit an affidavit in Board’s prescribed format within 15 days regarding the compliance of conditions of EC/CRZ clearance and C to E. (iii) PP shall submit Board Resolution from company Board, towards starting of construction work without obtaining consent to establish from the MPC Board thus violated the provisions of Environmental Laws and in future, they will not do such violations and BG of Rs. 2 lakh towards submission of Board resolution by 31.05.2015. Consent draft as placed in the agenda is approved with above conditions and corrections. GGLB Estate, "Ganga Rosewood", S. No. 23/4/1, Undri, Haveli, Pune 2 Commissioning of the unit or 5 yrs Approved Establish whichever is earlier RO(HQ) It was decided to grant consent to establish for construction of residential project on total plot area of 17,500 sq. mtrs. & total construction BUA of 32,320.06 sq. mtrs., by imposing following conditions: (i) PP shall not take any effective steps prior to obtaining Environment Clearance and submit Bank Guarantee of Rs. 5 lakhs towards compliance of same and consent conditions. (ii) PP shall submit an affidavit in Board’s prescribed format within 15 days regarding the compliance of conditions of EC and C to E. Consent draft as placed in the agenda is approved with above conditions and corrections. Booklet No. 1 /2015-16 Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015 4 3 4 Premier City, "Wisdom Park", S. no. 23/1 & 24, Behind Finolex Cable, Morwadi Chowk, Pimpri, Pune Star City, Gat No. 336/A, Opp. Pandharpur Crossing, Adj. to NH-4 Highway, Shirwal, Taluka - Haveli Not Approved Establish Not Approved Establish Trans Thane Creek Waste Management Association, Plot No. P-128, TTC MIDC Indusrial Area, Near L & T Infotech Ltd., Shil Mahape Road, Mahape, Navi Mumbai Approved Establish 5 _____ _____ Commissioning of the unit or 5 yrs whichever is earlier RO(HQ) RO(HQ) RO(HQ) Industry has not obtained EC yet and Board has already filled complaint against the PP in Hon'ble CJM Court, Pune. Hence it was decided to return the application and inform PP to resubmit along with copy of the Environment Clearance. It was decided to issue SCN for refusal of consent to establish and stop work, for starting of construction work without obtaining C to E and EC. It was decided to grant consent to establish (Part) for dismantling of E-waste, by imposing following conditions: (i) Industry should sub divide the plot, get proper permission from MIDC and make a separate facility of E-waste dismantling. Consent draft as placed in the agenda is approved with above conditions and corrections. Shrinivas Pride Purple Properties Pvt. Ltd., "Park Express", S. no. 5, 18, 19 at Balewadi, Dist - Pune 6 Approved Establish (Revalidation) Commissioning of the unit or 5 yrs whichever is earlier RO(HQ) It was decided to grant revalidation for consent to establish for construction of residential project on total plot area of 57,920.25 sq. mtrs. & total construction BUA of 1,15,546.68 sq. mtrs., by imposing following conditions: (i) PP shall not take any further effective steps prior to obtaining revalidated Environment Clearance and submit Bank Guarantee of Rs. 10 lakhs towards compliance of same and consent conditions. (ii) PP shall submit an affidavit in Board’s prescribed format within 15 days regarding the compliance of conditions of EC and C to E. Consent draft as placed in the agenda is approved with above conditions and corrections. Booklet No. 1 /2015-16 Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015 5 Sukumar Township Development Pvt. Ltd., "Prithvi", S. no. 45/1+2(2P)+46/134a/2, Kondhwa Khurd, Pune Approved 1st Operate (Part) 7 31.01.2017 RO(HQ) It was decided to grant consent to 1st operate (Part) for residential on total plot area of 47,700 sq. mtrs. & total construction BUA of 31,675.06 sq. mtrs. put of 35,539 sq. mtrs., subject to submission of occupancy certificate or architect certificate, by imposing following conditions: (i) PP shall submit Bank Guarantee of Rs. 3 lakh towards O & M of STP and OWC. (ii) PP shall submit an affidavit in Board’s prescribed format within 15 days regarding the compliance of conditions of EC and C to E. (iii) PP shall install OWC within 3 months and submit Bank Guarantee of Rs. 5 lakh towards compliance of the same. Consent draft as placed in the agenda is approved with above conditions and corrections 8 Sumitomo Chemical India Pvt. Ltd., (Formerly known as M/s S.C. Agro India Pvt. Ltd.) Plot No. T-113, 137, 138 & 251, MIDC Tarapur, Tal. & Dist. Palghar Approved Operate (Amendment) It was decided to grant amedment in consent to operate for increase in generation of HW quantity from 22 MT/A to 922 MT/A 31.08.2016 AS(T) Rama Petrochemicals Ltd., Vill. Vashivali, Patalganga, Savroli-Kharpada Road, Tal Panvel, Dist - Raigad 9 Approved Renewal 31.03.2016 AS(T) Consent draft as placed in the agenda is approved with above conditions and corrections. It was decided to grant consent to renewal, by imposing following conditions: (i) Industry shall intimate 15 days in advance prior to resuming production activity and get verified the operation conditions of pollution control systems from Regional Officer, Raigad. (ii) During non-operation of the plant all liability arising due to storage of ram amterial etc lies with the industry including compliance of consent conditions by extending Bank Guarantee of Rs. 1 lakh. Consent draft as placed in the agenda is approved with above conditions and corrections. Booklet No. 1 /2015-16 Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015 6 Centaur Pharmaceuticals Pvt. Ltd., Plot no. 75 & 76, Chikhloli MIDC, Ambernath, Dist Thane Approved Renewal (Amendment with Amalgamtion) 10 Bazargaon Paper & Pulp Mills Pvt. Ltd., (New Boiler), Mauza-Panchnavari, Tal. & Dist 11 Nagpur Zeus International, Plot No. A-10/11, MIDC Tarapur, Tal - Palghar, Dist - Palghar 12 30.04.2018 AS(T) Consent draft as placed in the agenda is approved with above conditions and corrections. Not Approved Renewal (with increase in C.I.) _____ JD(WPC) Not Approved Renewal (with increase in C.I.) _____ JD(WPC) Approved Renewal Suditi Enterprises, Plot no. C-253/254, TTC MIDC, Navi Mumbai 14 Booklet No. 1 /2015-16 Approved Renewal (with increase in C.I.) It was decided to issue SCN for refusal of consent to renewal as JVS are exceeding prescribed consented standard, storage of fly as is not proper and non submission of B.G as per previous consented standard. It was decided to issue SCN for refusal of renewal of consent and forfeiter of B.G. of Rs. 4 lakh out of existing B.G. of Rs. 8 lakhs and top-up with Rs. 8 lakh to make total B.G. of Rs. 12 lakh as JVS are exceeding prescribed consented standard. It was decided to grant consent to renewal, by imposing following conditions: (i) Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M of pollution control system. Valsad District Co-op Milk Producers Union Ltd., E-23, MIDC Tarapur, Tal - Palghar, Dist Palghar 13 It was decided to grant consent to renewal with amendment (additions of plot no. 74) with amalgamation, by imposing following conditions: (i) Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M of pollution control system. (ii) Plot area and increase C.I. to be menctioned in conset, industry shall obtain prior C to E from Board to cary out any activity on Plot No. 74. 30.04.2018 JD(WPC) Consent draft as placed in the agenda is approved with above conditions and corrections. It was decided to grant consent to renewal with increase in C.I., imposing standard conditions and B.G. regime for textile unit. 31.01.2019 JD(WPC) Consent draft as placed in the agenda is approved with above conditions and corrections. Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015 7 Balkrishna Synthetics Ltd., H-3/1, MIDC Boisar-Tarapur, Tal- Palghar, Dist- Palghar 15 Cosma Internnational India Pvt. Ltd., Plot No. A-12, Talegaon MIDC, Tal - Maval, Dist16 Pune Not Approved Renewal _____ JD(WPC) Not Approved Operate (with change in acitivity & category) _____ JD(APC) Superfine Metal Pvt. Ltd., Plot No. E-29, E39, Supa MIDC Ahmednagar Approved Renewal (with additional product) 17 30.04.2016 JD(APC) It was decided to issue SCN for refusal of consent to renewal as JVS are exceeding consented standard also B.G. not submitted and secondary treatment system not provided inspite of directions issued by the Board. It was deccided to keep the case in abyenace and put up in next CC after obtaing clarification from industry regarding increase production quanity from 2,46,200 to 26,24,640 Nos./A and decrease in C.I. It was decided to grant consent to renewal with additional product, by imposing following conditions: (i) Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M of pollution control system. (ii) PP shall submit Board Resolution from company Board, towards carrying out expansion work without obtaining consent to establish from the MPC Board thus violated the provisions of Environmental Laws and in future, they will not do such violations and BG of Rs. 2 lakh towards submission of Board resolution by 30.04.2015. (iii) Industry shall not exceed the consented production quantity and submit Bank Guarantee of Rs. 2 lakh towards compliance of same. Consent draft as placed in the agenda is approved with above conditions and corrections. Cooper Corporation Pvt. Ltd., Plot No. M-60, Additional MIDC, Satara 18 Approved Plain Renewal 31.01.2018 JD(APC) It was decided to grant consent to plain renewal, by imposing following conditions: (i) Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M of pollution control system (ii) Industry shall not exceed the consented production quantity and submit Bank Guarantee of Rs. 2 lakh towards compliance of same. Consent draft as placed in the agenda is approved with above conditions and corrections. Booklet No. 1 /2015-16 Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015 8 It was decided to grant consent to renewal, by imposing following conditions: (i) Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M of pollution control system Automobile Corporation of Goa Ltd., Plot No. F-2, MIDC Jejuri, Tal- Purandar. DistPune 19 Approved Renewal 30.09.2017 JD(APC) Consent draft as placed in the agenda is approved with above conditions and corrections. Booklet No. 1 /2015-16 Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015 9 Ambey Iron Pvt. Ltd., Plot No. E-1, MIDC Chincholi, Tal - Mahol, Dist- Solapur 20 Approved Renewal 31.05.2016 JD(APC) It was decided to grant consent to renewal, after obtaining additional requisite fee, by imposing following conditions: (i) Industry shall submit Bank Guarantee of Rs. 5 lakh towards O & M of pollution control system. (ii) Standard conditions for Sponge Iron shall be prescribed in consent. Consent draft as placed in the agenda is approved with above conditions and corrections. Review Item 1 2 3 Renewal of consent of Industries in Dhanu Area - M/s Parekh Plastic, 12 Parekh Industrial Estate, Collage Road, Vadkun Dahanu, Dist. Thane, Maharashtra Renewal of NOC for collection, reception, storage, transportation and disposal of nonhazardous solid waste to M/s V.R. Waste Mangment, S. No. 441, A/p - Moshi, Tal Haveli, Dist - Pune M/s Ishwar Reality & Technology Pvt. Ltd., to issue NOC to carry out sie remediation and disposal of contaminated soil from the premises of M/s Clarient Ltd., Thane to CHWTSDF _____ _____ _____ _____ _____ _____ RO(HQ) RO(HQ) RO(HQ) It was decided to grant consent to renewal to M/s Parekh Plastic for manufacturing of HDPE plastic containers. It was decided to form a committee comprasing of Technical HOD's in order to define the policy for such type of activity and report will be placed before Board Meeting for approval. As request by PP, it was decided to issue NOC to carry out site remediation and disposal of contaminated soil from premises of M/s Clarient Ltd, Thane to CHWTSDF, Taloja. Table Item All STP's - Aurangabad, KDMC, Nagpur, Nanded-Waghela, CIDCO Ghansoli, Sangli Miraj Kupwad, PCMC, Mumbai, Kolhapur, Pune & Bhiwandi-Nizampur 1 It was decided to grant consent to STP's with Bank Guarantee regime and Standard of 30 BOD for land lock Corporations i.e. Aurangabad, KDMC, Nagpur, Nanded-Waghela, CIDCO Ghansoli, Sangli Miraj Kupwad, PCMC, Kolhapur, Pune & BhiwandiNizampur. Mumbai corporation standards accordingly to EPA and placed before Board meeting for perusal The meeting concluded with a vote of thanks to the Chair. Booklet No. 1 /2015-16 Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015 10 Note: General Points: 1. The consents shall be disposed after obtaining requisite consent fees as per GoM, revised fee structure dtd. 25.08.2011 and according to the industry wise new validity period. The balance fees on the part of MPCB, if any, shall be considered at the time of next renewal of consent, which shall be mentioned in the consents to be issued hereafter. 2. In case of total construction is exceeding 20,000 sq. mt. built up area, and then no effective steps shall be taken till Environmental Clearance is obtained. 3. RO(HQ) to ensure aqequacy of adequate land regurding disposal of treated effleunt in non muncipal corporation area while granting consent to 1st Operate, necessary condition may also be imposind during grant of C to E. 4. All consent draft with respect to HCE shall be rectified for disposal of ash, disposal of sludge, APC for stacks & draft consent should be revised for combine consent to operate & BMW authorization. 5. In case of grant of revalidated consent to establish the consent period shall be co-terminus with obtained revalidated EC or five years whichever is earlier. Booklet No. 1 /2015-16 Minutes of 1st CC meeting (Booklet No. 1) of 2015-16 dtd. 22.04.2015 11
© Copyright 2025