RSC 5&6 Fact Sheet RIVER SUPPLY CONDUIT IMPROVEMENT - UPPER REACH UNITS 5 & 6 (RSC 5&6) Project Map Project Background The existing River Supply Conduit (RSC) is a major transmission pipeline built in the 1940’s and is responsible for transporting large amounts of water from the Northeast Valley area to the Central City area. Approximately 30,000 linear feet of the RSC that runs between North Hollywood Pump Station and the Headworks Spreading Grounds site, located near Forest Lawn Drive just west of Victory Boulevard, will be replaced with a larger diameter steel pipe. The new pipe is referred to as the RSC Upper Reach and will be constructed under two separate projects: RSC Improvement Upper Reach – Units 5 & 6 (RSC 5 & 6) and RSCIUR – Unit 7 (RSC 7). The improvements that will be completed under these two projects are necessary for the following reasons: Safety and Improved System Reliability: New pipe replaces an aging concrete pipe built in the 1940’s. Improve Water Pressure: Pipeline will provide higher water pressures as required by California Department of Public Health regulations. Comply with Water Quality Regulations: Pipeline will allow for greater operational flexibility to compensate for loss of water storage within the distribution system. It also Update: April 10, 2015 Page | 1 RSC 5&6 Fact Sheet assists in facilitating planned changes to method of disinfection. These actions are required to meet stricter federal/state water quality regulations. Increased Water Capacity: Pipeline requires upsizing to accommodate future demands Mitigate Air Entrainment: The new pipe will minimize air entrainment and improve flow Scope of Project The RSCIUR – Units 5 & 6 Project consists of installing approximately 15,800 feet of 78-inch diameter welded steel pipe and appurtenances utilizing tunneling and open-cut, also known as cut and cover, methods. The new pipe will be installed within the following streets: Morella Ave (North Hollywood Pump Station to Archwood St), Archwood St (Morella Ave to Lankershim Blvd), Lankershim Blvd (Archwood St to Burbank Blvd), and Burbank Blvd (Lankershim Blvd to Biloxi Ave) to where it will join with the future RSC 7 Project. Two construction methods will be used for construction: 1. Open-Cut: 5,411 ft. 2. Tunnel Boring Machine (TBM) Tunneling: 10,357 ft. Status Groundbreaking: March 2015 Construction Completion: Early 2018 Environmental Impact Report (EIR) The Environmental Impact Report (EIR) for the RSC Upper Reach Program was finalized on October 16, 2008. LADWP Contact Information To contact on-site staff, please contact the Project Office at (818)771-3122 For additional information regarding this project, please contact the following: Project Manager: Johan Torroledo • (213) 367-2296 • [email protected] Assistant Project Manager: Fidencio Madero • (213) 367-9013• [email protected] Construction Manager: Ali Sabouni • (213) 367-2637• [email protected] LADWP Public Affairs-Community Relations Office Stephanie Spicer • (213) 367-1314 • [email protected] David Rahimian • (213) 367-0361• [email protected] Project Website Project information and presentations available at: www.LADWP.com/RSC5and6 Update: April 10, 2015 Page | 2
© Copyright 2024