Master Plan 2015 State Board of Education Presentation

BOISE STATE UNIVERSITY
2015 MASTER PLAN UPDATE
Presented to the
Idaho State Board of Education
April 16, 2015
© 2012 Boise State University
1
2005 MASTER PLAN
© 2015 Boise State University
2
2008 MASTER PLAN UPDATE
© 2015 Boise State University
3
© 2015 Boise State University
4
2015 MASTER PLAN UPDATE
• Goals based on 2012 Boise State University Strategic
Plan
• Build on principals in past plans
• Integrate current projects / plans
• Plan for expansion
• Strategic
• Flexible
• Implementable
© 2015 Boise State University
5
BOISE STATE UNIVERSITY – 2012 STRATEGIC PLAN
Goal 1: Create a signature, high-quality educational experience for all
students.
Goal 2: Facilitate the timely attainment of educational goals of our
diverse student population.
Goal 3: Gain distinction as a doctoral research university.
Goal 4: Align university programs and activities with community
needs.
Goal 5: Transform our operations to serve the contemporary mission
of the university.
© 2015 Boise State University
6
MASTER PLAN STEERING COMMITTEE
Campus stakeholders
•
•
•
•
•
•
•
•
•
University Leadership
Academic-Research Colleges
Athletics
Residence Life
Student Health + Recreation
Parking + Transportation-Transit
Taco Bell Arena, Morrison Center
Faculty + Staff
Students
Community stakeholders
•
•
•
•
Planning, City of Boise
ADA County Highway District
Valley Regional Transit
Community and Neighborhood Associations
© 2015 Boise State University
7
Existing Campus
Circulation Network
Access + Gateways
Parking
Pedestrian Network
Building Use
© 2015 Boise State University
8
© 2015 Boise State University
9
MASTER PLAN GOALS
Framework for Plan Update:
A. Flexibility to meet changing twenty-first century demands
B. Integrate Boise River Greenbelt into campus
C. Reinforce a Pedestrian Campus Environment
D. Urban University and a good neighbor
© 2015 Boise State University
10
© 2015 Boise State University
11
FINAL PLAN
PRECINCTS
© 2015 Boise State University
12
Rivers-Edge Precinct
Expansion Area Precinct
EXISTING CAMPUS BUILDINGS
EXISTING CAMPUS GARAGES
STEM +
Athletics Precinct
PROPOSED CAMPUS BUILDINGS
PROPOSED CAMPUS GARAGES
OFF CAMPUS BUILDINGS
Final Draft Plan
© 2015 Boise State University
13
Improved
Pedestrian Fine Arts, Music-Theater Academic Open Quad to Library Expansion
the river
+River Terrace
+Performance Facilities
Crossing
Improved Pedestrian
Connections + New
Pedestrian Bridge
River’s Edge Precinct
Final Draft Plan
© 2015 Boise State University
14
New General Academic, Student
Services + STEM buildings
New Engineering Resources building
New Materials Sciences building
Health Sciences
STEM + Athletics Precinct
© 2015 Boise State University
15
Stadium improvements
New entry plaza-addition for TB Arena
+ expanded celebration space
(demo Bronco gym + pool/annex)
Kinesiology + studio w/shared use of
Student Recreation expansion
New Natatorium
New Olympic Sports Field House
STEM + Athletics Precinct
© 2015 Boise State University
16
Capitol Boulevard Gateway
Academic Building
University Ave traffic shifted to
new perimeter + internal
street network
Campus core expands w/new
University Mall lined by
Administration, Academic +
Live+Learn Communities
Significant central parking
resources
Expansion Precinct
© 2015 Boise State University
Options for expanding,
engaging + integrating
student life on campus
17
Broadway
University Mall
University Drive
Beacon Street
Expansion Area New Circulation Network – Major Streets
© 2015 Boise State University
18
Broadway
University Drive Transformations
University Drive
University Multi-modal Mall
Beacon Ave
Beacon Street
Expansion Area New Circulation Network – Major Streets
© 2015 Boise State University
19
University Drive (Current)
© 2015 Boise State University
20
Multi-modal Mall
© 2015 Boise State University
21
Broadway
University Drive Transformations
University Drive
University Mall
Beacon Street
Expansion Area New Circulation Network – Major Streets
© 2015 Boise State University
22
PRECEDENTS:
Street Before
© 2015 Boise State University
Beacon Street
University of Georgia
23
PRECEDENTS:
Street After
© 2015 Boise State University
Beacon Street
University of Georgia
24
Phase 1
University Drive
Multi-Modal Mall
with Pedestrian
Improvements
University Mall
Phase 2
(from Juanita St to
Lincoln
University Drive Transformations
© 2015 Boise State University
25
University Drive - CURRENT
© 2015 Boise State University
26
University Drive - FUTURE
© 2015 Boise State University
27
Broadway
Existing
Academic Core
University Drive
Existing
STEM Academic
Expansion Area
Expansion Area Land Use - Academic
© 2015 Boise State University
28
FINAL PLAN
© 2015 Boise State University
29
EXISTING CAMPUS BUILDINGS
EXISTING CAMPUS GARAGES
PROPOSED CAMPUS BUILDINGS
PROPOSED CAMPUS GARAGES
OFF CAMPUS BUILDINGS
Final Plan
© 2015 Boise State University
30
Plan illustrates 24 new building sites
adding over 2 million GSF in core mission facilities
(academic, research, admin + student services).
EXISTING CAMPUS BUILDINGS
EXISTING CAMPUS GARAGES
PROPOSED CAMPUS BUILDINGS
PROPOSED CAMPUS GARAGES
OFF CAMPUS BUILDINGS
Final Plan - Academic
© 2015 Boise State University
31
Plan illustrates net additional 2000 beds,
with expanded student recreational facilities.
Final Plan – Student Housing
© 2015 Boise State University
32
Final Landscape Network Plan
© 2015 Boise State University
33
R D
A V E
B E A C O N
S T
V I S T A
A V E
A V E
D R
D E N V E R
G R A N T
M A L L
A V E
A V E
M A L L
E U C L I D
B E L M O N T
M A N I T O U
S T
L I N C O L N
H I L L
P A R K C E N T E R
B L V D
B R O A D W A Y
U N I V E R S I T Y
R O S E
Final Plan Circulation: PEDESTRIANS
© 2015 Boise State University
34
R D
A V E
B E A C O N
S T
V I S T A
A V E
A V E
D R
D E N V E R
G R A N T
M A L L
A V E
A V E
M A L L
E U C L I D
B E L M O N T
M A N I T O U
S T
L I N C O L N
H I L L
P A R K C E N T E R
B L V D
B R O A D W A Y
U N I V E R S I T Y
R O S E
Final Plan Circulation: BICYCLE ROUTES
© 2015 Boise State University
35
R D
A V E
B E A C O N
S T
V I S T A
A V E
A V E
D R
D E N V E R
G R A N T
M A L L
A V E
A V E
M A L L
E U C L I D
B E L M O N T
M A N I T O U
S T
L I N C O L N
H I L L
P A R K C E N T E R
B L V D
B R O A D W A Y
U N I V E R S I T Y
R O S E
Final Plan Circulation: VEHICLES
© 2015 Boise State University
36
Plan illustrates 3 new parking structures for a total of
+/- 10,000 spaces or a net addition of 1700 parking spaces
with a significant reduction in surface parking.
PROPOSED SURFACE PARKING LOTS
PROPOSED PARKING STRUCTURES
Final Draft Campus Plan
© 2015 Boise State University
37
IMPLEMENTATION + PHASING
© 2015 Boise State University
38
1.
2.
3.
4.
5.
1
6.
7.
2
8.
9.
10.
11.
3
4
8
7
12.
5
19
6
9
10
20
11
15.
16.
18
12
17
16
21
22
14
15
13
EXISTING CAMPUS BUILDINGS
EXISTING CAMPUS GARAGES
PROPOSED CAMPUS BUILDINGS
13.
14.
23
24
26
25
PROPOSED CAMPUS GARAGES
OFF CAMPUS BUILDINGS
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
Royal Street Intersection
Fine Arts Building
Arts Green, Relocate
Greenhouses
Academic Building
Academic Building – Replace
Campus School
Administration Visitor Parking
Remove Riverfront Hall –
Expand Main Quad to River
Albertson’s Library Expansion
Administration Plaza
Library Mall Pedestrian Path
SUB Green and Central
Pedestrian Path/Bikeway
Live-Learn Residential Honors
College
Student Recreation Field
University Drive Pedestrian
Improvements
Academic STEM Building
Academic Student Resources
Building
Athletics Practice Field
Academic Building
Dining Hall Satellite
Broadway Bridge
Replacement
Bronco Plaza
Improved Stadium Entrance
Plaza and Round-about
Alumni Center
Academic Stem Building
Beacon Crossing – Pedestrians
and Bicycles
Health Sciences Building and
Quad
Phase 1 – High Priority Projects + Improvements (1-10+ Yrs.)
© 2015 Boise State University
39
1.
2.
3.
4.
5.
1
6.
7.
8.
9.
10.
11.
12.
13.
14
2
13
26
14.
3
16
12
4
6
15
11
25
5
9
19
24
20.
8
21.
EXISTING CAMPUS BUILDINGS
EXISTING CAMPUS GARAGES
PROPOSED CAMPUS BUILDINGS
PROPOSED CAMPUS GARAGES
OFF CAMPUS BUILDINGS
17.
18.
19.
18
10
7
15.
16.
17
23
20
22
21
22.
23.
24.
25.
26.
Music – Theater Performing
Arts Center
Gateway Academic Building
Academic – Research Building
West Parking Garage /
Facilities Services
Student Housing Village /
Campus Ministries Option
Administration Building
Center Parking Garage
Faculty, Staff or Graduate
Townhomes
Campus Ministries Option
Live – Learn Community
University Mall
Central Plant Expansion
Improved Connection to the
Greenbelt
New Pedestrian and Bicycle
Bridge
Academic or Athletics Building
Taco Bell Arena Entrance
Improvements
Pedestrian Plaza and Crossings
to the Stadium
STEM Academic Building
Stadium East Entrance
Improvements
Kinesiology Building and Quad
Improvements
Broadway Parking Garage –
Phase 1
Olympic Sports Center
Natatorium
Recreation Center Expansion
New Center Street
Boise Avenue /Capitol
Boulevard Intersection
Improvements
Phase 2 – Medium Range Improvements
© 2015 Boise State University
40
1.
2.
3.
4.
5.
1
2
6.
7.
8.
9.
10.
11.
12.
13.
12
13
3
4
6
5
Improvements to the
Morrison Center, Relocating
and Expanding the Box Office
Drop-off and pedestrian
improvements
Student Housing and/or
Campus Ministries Option
Recreation Field and Pavilion
Student Housing Village
Expansion
Academic and Research
Buildings
Student Housing (Freshman
Communities)
Health Sciences – STEM
Academic Building
Engineering Resources
Building
Broadway Parking Garage –
Phase 2
Gateway Buildings
North Stadium Expansion
Center Street Continuation
11
9
7
EXISTING CAMPUS BUILDINGS
EXISTING CAMPUS GARAGES
PROPOSED CAMPUS BUILDINGS
8
10
PROPOSED CAMPUS GARAGES
OFF CAMPUS BUILDINGS
Full Build-out
© 2015 Boise State University
41
EXISTING CAMPUS BUILDINGS
EXISTING CAMPUS GARAGES
PROPOSED CAMPUS BUILDINGS
PROPOSED CAMPUS GARAGES
OFF CAMPUS BUILDINGS
Final Campus Plan
© 2015 Boise State University
42
MASTER PLAN VIEWS
© 2015 Boise State University
43
CAMPUS FROM CAPITOL BOULEVARD
© 2015 Boise State University
44
CAMPUS FROM CAPITOL BOULEVARD
© 2015 Boise State University
45
CAMPUS FROM BROADWAY AVENUE
© 2015 Boise State University
46
CAMPUS FROM BROADWAY AVENUE
© 2015 Boise State University
47
THANK YOU
Additional Information at:
http://operations.boisestate.edu/campus-masterplan-2014/
Special thanks to Ayers Saint Gross for providing materials for this presentation
© 2015 Boise State University
48