P.O. Box 422 ▪ Mapleton, OR 97453 Community Economy Environment www.siuslaw.org 541-268-3044 [email protected] Invitation to Provide Proposal and Bid Culvert Removal and Replacement with a Railroad Bridge – including Driven Piling, Precast Concrete End Bents and Wing-walls, Pre-stressed Concrete Double Cell Spans and associated track work on Coos Bay Rail Link at Cleveland Creek in Tide, Oregon Project Description The Siuslaw Watershed Council is advertising for bids for a complete replacement of the existing Cleveland Creek Culvert at milepost 699.3 of the Coos Bay Rail Link railroad in Lane County, Oregon. The existing 5.5'-diameter by 92'-long corrugated metal pipe culvert carries Cleveland Creek under the railroad tracks and an unnamed paved roadway. The existing culvert is a barrier to fish passage. The culvert will be removed and replaced with a railroad bridge consisting of pre-cast concrete end bent caps and wing-walls, supported on driven steel H-piles, with pre-stressed concrete double cell ballast deck spans. The Siuslaw Watershed Council (also listed as the SWC, Council, or Agency within the bid documents and specifications) invites qualified and experienced construction companies to review the drawings and specifications for the following tasks. See drawings and specifications for detailed description. 1. Provide plan for dewatering and spill prevention and containment prior to excavation. ODFW will provide fish removal and block nets at construction area. 2. Construct Railroad Bridge within 12-hour daily work windows and one 60-hour track closure window per-week: 2a. Shift ties as necessary to install driven steel H-piles and cut-off below bottom of rail if driven before the 60-hour work window. 2b. Remove rail and track ties from track in bridge area. 2c. Excavate as needed, being careful to not damage H-pile if driven earlier, remove and dispose of the existing Cleveland Creek Railroad Culvert and install, concrete end bent caps, pre-stressed concrete double cell spans, and pre-cast wing walls according to drawings and specifications. 2d. Install ballast, rail and ties on completed bridge and end bent backfill and surface track in work area per drawings and specifications. 3. After bridge construction: 3a. Work within railroad right-of-way and any work that will be within 20-feet of the track centerline needs to be coordinated with Coos Bay Rail Link and allowable train free work windows. 3b. Install waterway enhancement materials, provide temporary bank stabilization to disturbed areas, and take measures to limit the introduction of invasive plant species. 3c. Complete work per the drawings and specifications and in the established timelines. 1 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 General Information All bids shall be submitted using the Bid Packet provided. No bid for a construction contract shall be received or considered unless the bidder is registered with the Construction Contractors Board as required by ORS Chapter 701. The Siuslaw Watershed Council (Council) reserves the right to in whole or in part, to waive irregularities not affecting substantial rights, and award a contract to a responsible and qualified bidder; to postpone the acceptance of the proposal and the award of the contract for a period not to exceed thirty (30) days; or to reject any and all bids received and further advertise the project for bids. The SWC shall enter into a contract with the firm whose proposal/bid appears to best serve the interest of the SWC in terms of qualifications, services to be provided, timeliness and cost. The work proposed is subject to Oregon’s prevailing wage rate law. ORS 279C.800-279C.870. This law requires that entities using public funds for public works must pay not less than the prevailing rate of wage for an hour’s work, including fringe benefits, in the same trade in the locality where the work is performed. Prevailing wage rates are provided by BOLI at no cost at www.oregon.gov/boli. When the project is awarded, the successful bidder shall promptly execute a contract for the proposed work with the Council. All bidders agree to comply with the project schedule listed in Table 1 below. Qualified firms are expected to review the drawings and specifications and provide a bid for the project. Scope of Work The scope of work includes working within daily and weekend track closure windows. Work within the active channel is subject to in-water-work window provisions. Tasks include, but are not limited to: tree removal, initial removal of rail and ties to allow bridge construction; removal and disposal of the existing Cleveland Creek Railroad Culvert; providing a plan for dewatering and spill prevention and containment prior to excavation; driving steel H-pile; furnishing and installing pre-cast concrete bridge components; installation of ballast, rail and ties on railroad over the new bridge and end bent approaches; removal of existing culvert; channel grading; streambed enhancement; installation of riprap; providing temporary bank stabilization to disturbed areas; and taking measures to limit the introduction of invasive plant species according to the drawings and specifications. Complete work to specifications within established timelines. Keep permit copies on-site. The Contractor will not be responsible for the following tasks associated with the project: · The Council will secure all fill and removal permits related to the project. Contractor is responsible for notifying Oregon Department of Forestry of the operation. · Oregon Department of Fish and Wildlife will provide fish removal and aquatic block nets. · Coos Bay Railway will provide rail, ties, joint bars, track bolts, spikes, tie plates and Other Track Material for contractor’s use in replacing track. 2 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 See Staging Areas Map for available staging areas. Shed staging area is behind a locked gate. Contractors are to provide their own lock. Reasonably Implied Work and Incidental Items Any part of the work that is not mentioned in the above scope of work, but is shown on the plan set or specifications package, or any part not shown on the plan set or specifications package, but described in the above scope of work, or any part not shown on the plan set or specifications nor described in the above scope of work which is necessary or normally required as a part of such work, or is necessary or required to make such installation satisfactorily and legally operable, shall be performed by the Contractor as incidental work without extra cost to the Council. Table 1. Project Timeline Task Contractor site visit and meeting Proposals due to Council Contractor selected, develop contract Begin work Finish Construction Timeframe April 28, 2015 May 14, 2015 May 28, 2015 No later than, July 1, 2015 September 15, 2015 Site Visit An optional site visit will be conducted on April 28, 2015 at 9:30 AM with all contractors interested in submitting proposals to the Council. Please contact the SWC Office (541-268-3044) by 12pm April 27 if you would like to attend the site visit. The meeting will provide an opportunity for contractors to view the site and to ask any questions they may have. Bidding Process Interested contractors will present the Council with a written bid/proposal by 3 p.m. on May 14, 2015 in accordance with these bidding provisions. The proposal should include a complete bid packet (Items I-IV). The Council will review proposals and notify bidders within 9 days of submittal. The Council may propose modifications to the selected contractor before finalizing contract. The Council will award the contract based on the qualifications, experience, and price offered by each contractor. Inspection & Quality Control The Contractor is expected to abide by the specifications outlined above, in the plan set and specifications package provided by the engineer, and by the procedures outlined within their Councilapproved proposal. The Contractor shall not make any changes to the procedures outlined within the proposal without approval from the Council. The Council Project Manager, Engineer, and Coos Bay Rail Link officials may inspect work at any time during the course of the contract. The Council will conduct a 3 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 final inspection within three business days of the Contractor’s request. This final inspection will be to ensure that all tasks have been conducted to the satisfaction of the Council. The Council shall give written notice to the Contractor stating acceptance of work and absolving contractor of further duty. Railroad and Track Safety Contractor shall, at a minimum, perform work in accordance with Coos Bay Rail Link Track and Bridge Worker Safety Rules and track standards and FRA 49 CFR Part 213, Track Safety Standards and 214, Railroad Workplace Safety. Contractor shall designate a supervisor who is qualified under FRA 49 CFR Part 213 to be in charge of the Project’s track work. Contractor shall coordinate all track outages with Coos Bay Rail Link’s designated representative and shall restore safe track condition to allow train operations within agreed upon track outage time-frames. Contractor’s Supervisor The Contractor shall provide an on-site working supervisor to be physically present whenever contract work is being performed. The supervisor shall speak fluent English in order to be able to communicate clearly with the Council, Engineer, and Coos Bay Rail Link. This individual shall be responsible for the overall management and coordination of this contract and shall act as the central point of contact with the Council. The Contractor’s Supervisor shall check-in by phone or in person with the PM each day work is performed. The Supervisor shall also attend any meetings with the Council that specifically pertains to the Supervisor’s duties and all performance evaluation meetings. Weekly Work Plan The Contractor shall provide a written schedule for the Project Manager’s and Railroad’s review and approval. The schedule shall show hours and days to be worked, what tasks will be undertaken, and the estimated crew size for each day. The Contractor will notify the PM and Railroad when there are changes to this schedule. Contractor Furnished Items The Contractor shall furnish all equipment, repair parts, and materials/supplies to perform contract work according to the required specifications. All equipment shall be in safe and good operating condition and free of weed seeds. Equipment includes but is not limited to: · Petroleum, oils, and lubricants · Trucks and trailers for transporting equipment and materials · Heavy equipment · Hand tools · Hand-operated, power-driven equipment · Equipment repair parts · Personnel clothing, safety equipment · Spill Containment Kit (see below) · Traffic signs (see below) · Submittals for materials used in project Public Safety The Contractor shall exercise due caution and care when operating to prevent undue conflict with public users of roads, trails, and project sites. The Contractor shall post signs at both ends of any roads 4 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 that are blocked by work in progress and at both ends of the waste material haul route. Signs shall be of a color, size, and number of which are acceptable to the Project Manager, ODOT (if required), and Coos Bay Rail Link. Fire Precautions All State of Oregon fire laws shall be followed. Specific requirements for fire equipment may vary by local fire district. Fire restrictions may result in limited hours of equipment operation at the work site, including the use of gasoline powered vehicles and power tools. Contractor is required to obtain a work permit from the Oregon Department of Forestry and furnish any equipment required. Smoking or flaming materials are not allowed on project site or nearby areas with significant fuel loads during fire season. Environmental Protection Contractor shall adhere to all applicable Federal, State, and local environmental protection laws and regulations. Any maintenance work, equipment repairs, and refueling of equipment shall be at fueling areas located in parking lots or existing gravel roads. Equipment furnished shall be free from any leakage of petroleum products. Excessive leakage shall be a basis for issuing an immediate shutdown of the operation. Contractor shall exercise care to minimize damage (including cutting, trampling, and removal) to established native trees and shrubs. Work on the project shall be continually monitored to verify that native plants are protected in this manner. If excessive damage to native vegetation is found, work shall be stopped until Contractor can demonstrate techniques that will not result in excessive damage. Hazardous Material Containment/Cleanup The Contractor is required to develop a spill prevention, control, and countermeasure (SPCC) plan. The SPCC plan will be reviewed and accepted by the Project Manager prior to initiating project work. The SPCC plan shall, as a minimum, contain the following information: 1) Response priorities 2) Contractor representative in charge 3) Duties of Contractor personnel 4) Contractor emergency response procedures 5) Contents of spill containment kit (SCK) 6) Spill response diagram The Contractor is required to have a SCK as described in the SPCC on-site during any operation and provide training to employees on how components of the SCK are used. The SCK must be designed for use with petroleum products and must contain, as a minimum, the following items: 1) Four bales (8 booms/bale, of 8 inch x 10-foot absorbent booms) 2) Two bales (100 pads/bale, of absorbent pads, minimum of 17 inch x 19 inch x ¼ inch pads) 3) One absorbent sweep (minimum of 18 inches x 100 feet x 3/8 inches) 4) Two 30-50 gallon garbage cans In the event of a release as defined in Oregon Administrative Rules (OAR), PART 340, DIVISION 108, HAZARDOUS WASTE MANAGEMENT, the Contractor shall immediately implement the SPCC plan and 5 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 notify the project manager. The Project Manager will coordinate with Coos Bay Rail Link staff. The Contractor will be responsible for the cleanup and any liability associated with a spill. Indemnity Contractor shall indemnify, defend, save and hold harmless the Indemnified Parties (defined below) from and against any and all liability, demands, claims, losses, costs (including but not limited to attorneys' fees and, in the case of item (b) below, royalty payments) and expenses arising from or in connection with: 1) Claims for personal injury (including death) and/or property loss or damage to whomsoever or whatsoever occurring or arising in any manner out of or in connection with: (a) The Work, this Contract, or any act or omission of Contractor, its directors, officers, agents or employees, or the presence of Contractor, its directors, its officers, agents or employees upon or about the property, premises or right-of-way of the Oregon International Port of Coos Bay (hereinafter “Port”), whether or not negligence on the part of any Indemnified Party may have caused or contributed to such injury, death, loss or damage; provided, however, that if, under the law applicable to enforcement of this Contract, an agreement to indemnify against the indemnities’ own negligence is invalid, then in that event Contractor's obligation to indemnity Port under this section shall be reduced in proportion to the negligence of Port, if any, which proximately contributed to such injury, death, loss or damage; (b) Any claim of infringement of patent rights arising from the use of any of the articles, materials, equipment or designs furnished in connection with the Work or named in this Contract; and (c) Any claims, fines, penalties or other charge or loss arising from any alleged violation of any statute, code, or ordinance or regulation of the United States or of any state, county or municipal government that results in whole or in part, directly or indirectly, from the activities of Contractor's officers, agents, employees or subcontractors related in any way to this Contract, or from any act or omission of Contractor, its officers, agents, employees or subcontractors contributing to such violation, regardless of whether such activities, acts or omissions are intentional or negligent, and regardless of any specification by Port without actual knowledge that it might violate any such statute, code, ordinance or regulation (these laws, ordinances and regulations, include, without limitation, all laws, ordinances and regulations relating to air, water, noise, solid waste and other forms of environmental protection, contamination or pollution, as well as all laws, ordinances and regulations relating to discrimination on the basis of disability). As used in this Contract, the terms "Indemnified Parties" and "Indemnified Party" shall mean and include, collectively and singularly, (i) The Oregon International Port of Coos Bay and the Coos Bay Railroad Operating Company, LLC dba Coos Bay Rail Link (hereinafter CBR), (ii) any direct or indirect subsidiary of Port or CBR (iii) any officer, director, Commissioner, employee, shareholder or agent of Port or CBR or of any of their direct or indirect subsidiaries, (iv) The Siuslaw Watershed Council, Inc. (hereinafter SWC), (v) any direct or indirect subsidiary of SWC (vi) any officer, director, Commissioner, employee, shareholder or agent of SWC or of any of their direct or indirect subsidiaries. 6 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 Insurance Contractor shall, at its expense, obtain and maintain during the period of this Contract, in a form and with companies satisfactory to Siuslaw Watershed Council (hereinafter SWC), the following insurance coverage: 1. The Contractor, its sub-contractors, if any, and all employers working under this Contract are subject employers under the Oregon Worker's Compensation Law and shall comply with ORS 656.017 which requires them to provide workers' compensation coverage for all their subject workers, applicable in connection with the death, disability or injury of Contractor's officers, agents, servants or employees arising directly or indirectly out of the performance of this contract; or shall provide documentation to SWC establishing to their satisfaction that Contractor is exempt from Workers’ Compensation coverage pursuant to ORS Chapter 656. Each policy required by this section shall be endorsed to provide a waiver of subrogation in favor of SWC, the Oregon International Port of Coos Bay, Oregon and the Coos Bay Railroad Operating Company, LLC, dba Coos Bay Rail Link. 2. Employers' Liability Insurance with Limits of not less than One Million Dollars ($1,000,000) each accident, One Million Dollars ($1,000,000) policy limit for disease, and One Million Dollars ($1,000,000) each employee for disease per occurrence. Each policy required by this section shall be endorsed to provide a waiver of subrogation in favor of, SWC, the Port and the Coos Bay Railroad Operating Company, LLC, dba Coos Bay Rail Link. 3. Commercial General Liability Insurance with a limit of not less than One Million Dollars ($1,000,000) per occurrence and an aggregate limit of Two Million Dollars ($2,000,000) for injury to or death of persons and damage to or loss or destruction of property. Such policy shall be endorsed to provide products and completed operations coverage and contractual liability coverage for liability assumed under this Contract and Per Project Aggregate coverage shall apply. The contractual liability coverage shall be of a form that does not deny coverage for operations conducted within fifty (50) feet of any railroad hazard (CG 2417 10 01 Contractual Liability – Railroads Endorsement). In addition, said policies shall be endorsed (by CG 2010 11 85, or its equivalent) to name SWC, Davidson Industries, Inc., the Port of Coos Bay, and the Coos Bay Railroad Operating Company, LLC, dba Coos Bay Rail Link, and their divisions, directors, officers and employees as an additional insured and shall include a “severability of interests” provision. All coverage shall be on an occurrence basis and not on a claim made basis. Each policy required by this section shall be endorsed to provide a waiver of subrogation in favor of SWC, Davidson’s Industries, Port, and the Coos Bay Railroad Operating Company, LLC, dba Coos Bay Rail Link. 4. Automobile Liability Insurance with a combined single limit of not less than One Million Dollars ($1,000,000) each occurrence for injury to or death of persons and damage to or loss or destruction of property. Said policy or policies shall be endorsed to name SWC, the Port and the Coos Bay Railroad Operating Company, LLC, dba Coos Bay Rail Link and their divisions, directors, officers and employees as additional insured’s and shall include a “severability of interests” provision. Each policy required by this section shall be endorsed to provide a waiver of subrogation in favor of SWC, Port, and the Coos Bay Railroad Operating Company, LLC, dba Coos Bay Rail Link. 5. A separate umbrella policy with a limit of Four Million Dollars ($4,000,000). This policy shall be 7 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 endorsed to name SWC, the Port, and the Coos Bay Railroad Operating Company, LLC, dba Coos Bay Rail Link and their divisions, directors, officers, Commissioners, employees, shareholders, as an additional insured and shall include a severability of interest provision. Each policy required by this section shall be endorsed to provide a waiver of subrogation in favor of SWC, the Port, and the Coos Bay Railroad Operating Company, LLC, dba Coos Bay Rail Link. 6. If Contractor cannot obtain a Commercial General Liability policy that does not deny coverage for operations conducted within fifty (50) feet of any railroad hazard, the Contractor shall obtain Railroad Protective Liability insurance naming only Railroad as the insured with coverage of at least Two Million Dollars ($2,000,000) per occurrence and an aggregate limit of Six Million Dollars ($6,000,000). The policy must be issued on a standard ISO form CG 00 35 12 07 and include the following: 1. Endorsed to include the Limited Seepage and Pollution Endorsement 2. Endorsed to remove any exclusion for punitive damages 3. No other endorsements restricting coverage shall be added 4. The original policy shall be provided to Port prior to performing work under this Contract. 7. Contractor shall furnish certificates of insurance to SWC's Project Manager, (PO Box 422, Mapleton, OR 97453, fax 541.268.3044), certifying the existence of such insurance. Contractor shall require all subcontractors who are not covered by the insurance carried by Contractor to maintain the insurance coverage described in this Section. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled, or reduced in coverage or not renewed without 30 days advanced written notice to SWC, Davidson Industries, Inc., and the Port and the Coos Bay Railroad Operating Company, LLC, dba Coos Bay Rail Link. 8. The insurance required by 3, 4 and 5 above shall be primary and without right of contribution from other insurance that may be in effect and without subordination. A company licensed in the state where work is to be performed, and carry a minimum Best’s rating of “A-VI or better must underwrite the insurance policies. Contractor shall furnish the SWC with certificates of insurance showing compliance with these insurance provisions within seven (12) days of the Notice of Award and no later than five (5) days prior to commencement of the Work. SWC shall furnish the Port with copies of the certificates of insurance when they are received from Contractor. 9. The coverage provided by the policies required by sections 3, 4 and 5, above shall be primary and any other insurance carried by SWC, the Port of CBR is excess. Contractor shall be responsible for any deductible amounts payable under all policies of insurance. In the event a dispute arises between SWC and Contractor for which Contractor has obtained insurance, the maximum amount, which may be withheld by SWC for all such claims, shall be no more than the amount of the applicable insurance deductible. 10. Proof of Insurance as described above shall be required before a bid is awarded and shall be subsequently provided to SWC upon request throughout the term of the Project. 11. Contractor shall maintain coverage throughout the term of the Project and shall give SWC four weeks notice before any required insurance coverage is set to expire. 8 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 The insurance coverage required herein shall in no way limit the Contractor's liability under this Contract. Bonds Contractor shall at the time of the execution and delivery of this Contract and before the taking effect of same in other respects, furnish and deliver to SWC a Performance and Labor and Material Payment Bond or Bonds in the amount(s) of one hundred percent (100%) of the Contract price, with surety thereon, to ensure the faithful performance by Contractor of all the covenants and agreements on the part of Contractor contained in this Contract. Said bond(s) and surety shall be subject to the approval of SWC and Contractor shall pay the premium of said bond(s). Said bond(s) shall remain in force and effect for the full amount or in a lesser or increased amount as may at any time be specified by SWC during the term of this Contract and any extensions thereof and during any period of warranty or guaranty as to workmanship, material and/or equipment elsewhere provided in this Contract. All bonds required by this Agreement to be purchased and maintained by Contractor shall be obtained from a surety licensed or authorized in the State of Oregon to issue such bonds for the limits and coverages required herein. Contractor shall also name the Port and the Coos Bay Railroad Operating Company, LLC, dba Coos Bay Rail Link as additional obligees on said bonds. Duel obligee riders are required for both the Port and the Coos Bay Railroad Operating Company, LLC, dba Coos Bay Rail Link. Payments The Contractor may invoice the Council for the agreed upon bid amount once work is complete. The total amount charged for this project will not exceed available funding for the project. All invoices must be submitted no later than October 15, 2015. Payments will be made within 45 days of the invoice receipt from contractor, pending Council receipt of payment from funder. This agreement constitutes a subcontract whereby payment to contractor may be contingent upon reimbursement of invoiced amounts from funder. Payments for Extra Work Based on Time and Materials Any work required to carry out the intent of this contract by changes not clearly indicated in the document, or which cannot be reasonably implied from the intent and meaning of the contract and which cannot be classified under any of the items for which a lump sum price is listed in the Contractor’s proposal shall be paid on a unit price, lump sum or force account basis. If the method of payment cannot be agreed upon prior to beginning work, and the Project Manager directs that the work be done on a force account basis, then the Contractor shall furnish labor, equipment, and materials necessary to complete the work in a satisfactory manner and within a reasonable period of time. For the work performed, payment will be made for the documented actual cost of labor, materials, rental expenses, and additional insurance expenses. Labor: Non-direct labor costs, including superintendence, shall be considered part of the mark up set out in the Standards, General Requirements, Section II.09.H.c. The time to be paid for labor on the work site shall be the time the worker is in productive operation of the extra work being performed. 9 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 Equipment: The Contractor will be paid for the use of equipment at the rental rate listed for such equipment specified in the current edition of the following reference publication: “Rental Rate Blue Book” as published by Dataquest (a company of Dunn and Bradstreet Corporation), 1290 Ridder Park Drive, San Jose, CA 95131. The time to be paid for equipment on the work site shall be the time the equipment is in productive operation of the extra work being performed. Materials: The cost of materials reported shall be at invoice or the lowest current price at which materials are locally available and delivered to the job in the quantities involved, plus the cost of freight, delivery and storage. If, in the opinion of the Project Manager, the cost of materials is excessive or the Contractor does not furnish satisfactory evidence of the cost of such material, then the cost shall be deemed to be the lowest current wholesale price for the quantity concerned delivered to the work site less trade discount. The work descriptions given below are not comprehensive and only give a cursory description of work items for bidding purposes only; however, the total bid shall be for all ancillary items to complete the stream structure modifications. The Contractor must include adequate provisions in each bid item to account for incidentals, final cleanup, and other items required to complete the project and meet the intent of the project Specifications and Drawings. The SWC shall enter into a contract with the firm whose proposal/bid appears to best serve the interest of the SWC in terms of qualifications, services to be provided, timeliness and cost. Drawings and specifications are available at the SWC website (www.siuslaw.org/announcements). If you have questions or would like to schedule a site visit please see contact persons information below. Contractors have until 3pm, May 14, 2015 to respond by providing a written sealed bid to the mailing address below. Contact Person: John Sanchez SWC Contracted Cleveland Creek Project Manager Cutthroat Country Consulting 541-961-7313 [email protected] Issued By Siuslaw Watershed Council PO Box 422 Mapleton, OR 97453 (Mailing address) 10 Physical address location Siuslaw Watershed Council Mapleton School District Campus 10868 East Mapleton Road Mapleton, OR 97453 (Not Mailing address) 541-268-3044 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 This project is made possible with grants from the Oregon Watershed Enhancement Board (OWEB), Oregon Department of Fish and Wildlife R&E Board, United States Forest Service, and the United States Fish and Wildlife Service. "In accordance with Federal law and U.S. Departments of Interior and Agriculture policy, this institution is prohibited from discriminating on the basis of race, color, national origin, sex, age, or disability.(Not all prohibited bases apply to all programs.) USDI and USDA are equal opportunity providers and employers." Siuslaw Watershed Council Mission Statement The Siuslaw Watershed Council supports sound economic, social and environmental uses of natural and human resources in the Siuslaw River Basin. The Council encourages cooperation among public and private watershed entities to promote awareness and understanding of watershed functions by adopting and implementing a total watershed approach to natural resource management and production. 11 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 I. Bidder Information BIDDER: _______________________________________________________________ ADDRESS: _____________________________________________________________ PHONE: _________________ FAX: __________________ DATE: ________________ The undersigned, hereinafter called the Bidder, declares that the only person(s) interested in this Bid are those named herein; that the Bid is in all respects fair and without fraud; and, that it is made without any connection or collusion with any other person making a bid on this project. The Bidder further declares that he/she has carefully examined the Plans, Specifications, and Contract Documents, hereinafter referred to as the Document, for the construction of the proposed project improvement; has personally inspected the site; is satisfied as to the type and quantities of materials, the types of equipment, the conditions of and the work involved, including the fact that the description of and the quantities of work and materials, the types of equipment, the conditions of and the work involved as included herein, is brief and is intended only to indicate the general nature of the work and to identify the said quantities with the detailed requirements of the Document; and, that this Bid is made in accordance with the provisions and the terms of the Contract and included in the Document. The Bidder agrees that if this Bid is accepted he/she will within five (5) working days, not including Saturdays, Sundays and legal holidays, after notification of acceptance execute the Contract with the Siuslaw Watershed Council in the form of the Contract included in the Document. The Bidder further agrees, to the extent of this Bid, to furnish all machinery, tools, apparatus, and other means of construction and do the work and furnish all of the materials necessary to complete the work in the manner, in the time, and according to the methods as specified in the Document and required by the Engineer. The Bidder further agrees to begin work by July 1, 2015 and to complete all construction by September 15, 2015. Work will not be allowed to commence until the Siuslaw Watershed Council receives a signed Contract. The Bidder further agrees to accept as payment for the work proposed under this project, as herein specified and under the provisions included in the Contract Documents, the unit prices included on the Bid Form. The Bidder further represents a true measure of the labor and materials required to perform the work including all allowances for overhead and profit for each type of work called for in the Plan Set and Bid Form. The Bidder further agrees to accept, as payment for “on-call” services, unit bid prices for items listed below. On-call services are meant to fairly compensate the contractor for performance of work that may be necessary for completion of work, and of which quantities are limited but of unknown extent. 12 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 II. Schedule of Items Description Pay Unit Quantity 1 Mobilization Lump Sum 1 2 Temporary Signs SQFT 124 3 Temporary Barricades, Type III Each 7 4 Temporary Water Management Facility at Station 15+30 Lump Sum 1 5 Erosion Control Lump Sum 1 6 Pollution Control Plan Lump Sum 1 7 Construction Survey Work Lump Sum 1 8 Removal of Structures and Obstructions Lump Sum 1 9 Clearing and Grubbing Lump Sum 1 10 General Excavation Lump Sum 1 11 Structure Excavation Lump Sum 1 12 Granular Structure Backfill Lump Sum 1 13 HP 14x89 Piling, Furnished/Driven LF 120 14 Reinforced Pile Tips Each 6 15 Precast Concrete Wingwall CPW2 Each 4 16 Precast Concrete End Cap CPC4 Each 2 17 30" x 7'-0" Double Box Beam LF 66 18 Wood Sign Posts FBM 171 19 Type "R" Signs in Place SQFT 50 20 Type "W1" Signs in Place SQFT 10 21 Type "Y1" Signs in Place SQFT 13 22 Waterway Enhancements Lump Sum 1 23 Reconstruct Railroad Track Lump Sum 1 24 Unit Price Up to Total The enclosed schedule of items, contract specifications and engineering drawings provides the detail sufficient for project orientation and conducting cost estimates. 13 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 III. Bidder Railroad Culvert/Bridge Replacement Project History and References Bidders with experience performing similar stream enhancement work involving railroads will be favored when proposals are evaluated. Please fill out the following table with your most relevant work or attach a resume/work history with references. Name of Client, Project Location 14 Description of Work Completed Contact Name/Phone Number Invitation to Bid: Cleveland Creek Railroad Bridge 2015 IV. Bidder Certification The name of the Bidder submitting this Bid Proposal is: ________________________________________________________________________ doing business at__________________________________________________________ which is the address to which all communications concerned with the Bid and with the Contract shall be sent. (If Corporation) In witness whereof the undersigned Corporation has caused this instrument to be executed and its seal affixed by its duly authorized officers this _____day of_________________________, 2015. ____________________________________________________ NAME OF CORPORATION By:___________________________________________________ ______________________________________________________ Title Attest:_________________________________________________ Secretary (If Partnership) In witness whereof the undersigned Partnership has caused this instrument to be executed by its duly authorized officer(s) this ________ day of ____________________, 2015. _____________________________________________________ NAME OF PARTNERSHIP By:__________________________________________________ _____________________________________________________ Title Attest:________________________________________________ Secretary (If Sole Proprietor) In witness whereof the undersigned has set his hand and caused this instrument to be executed this___________ day of _______________________________, 2015. ________________________________________________ SIGNATURE OF BIDDER Attest:___________________________________________ 15 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 A Complete Bid Packet Shall Include the Following: Items I-IV Documents provided to Potential Bidders: Invitation to Bid (includes Items I-IV) Final Plans: Plan, Profile, and Cross-sectional Drawings by HDR, Inc. ODOT Standard Drawings for Reference Project Specifications Field Rail Weld Record Staging Areas Map 16 Invitation to Bid: Cleveland Creek Railroad Bridge 2015 General Installation Notes: Primary Sign a. Signing details shown on this sheet are intended to convey "typical" conditions only. Individual locations may require installation different from those shown. Primary Sign For guidance regarding unique installations or exceptions call the Project Sign Designer or Region Traffic Section. TM200.dgn Secondary Sign 7’-0" Min. See Notes (4) (6). Note: Verify minimum clearance on both sides of post. b. Locate breakaway supports away from ditches to avoid problems with erosion, corrosion, debris, maintenance and breakaway performance. See Dwg. No. TM635 for more information. 7’-0" min. See Note (6). 7’-0" min. See Note (4) (6). 7’-0" min. See Note (5). Treat complex route assemblies as a single sign for vertical clearance Sign(s) ( If present) 7’-0" min. See Note (6). 1-6-2012 7’-0" min. See Note (5). Secondary Note: Verify minimum clearance on both sides of post. c. For wood post support details see Dwg. No. TM670. d. For perforated steelsquare tube support details see Dwg. No. TM681. e. For triangular base breakaway support details see Dwg. No. TM602. Pavement Elevation Pavement Elevation f. For multi-post breakaway support details see Dwg. No. TM600. g. Mounting heights should not be more than 3 inches more than the minimum heights shown, where practical. MOUNTING HEIGHT All Other Signs MOUNTING HEIGHT Guide Sign h. 2" vertical spacing between all signs. Notes: 12’-0" min. See Notes (1),(2). 1’-0" min. 1’-0" min. 1). 6’ minimum if behind barrier. 2). 2’ minimum if restricted R/W. 6’-0" min. See Note (2). 6’-0" min. See Note (2). 3). 20’ for ramp terminals. 4). 8’ minimum if bicycle path underneath. R/W line R/W line 5). 8’ minimum if secondary signs attached. 6). 5’ minimum if outside clearzone, in rural areas and no pedestrians underneath. 7). For multi-post installations measure distance from post closest to roadway. CALC. BOOK NO. Fog Line Edge of shoulder, curb or guardrail. Fog Line Edge of shoulder, curb or guardrail. N/A BASELINE REPORT DATE NOTE: 01/06/2012 All material and workmanship shall be in accordance with the current Oregon Standard Specifications OREGON STANDARD DRAWINGS SIGN INSTALLATION DETAILS TM200 30’-0" typ. See Note (3) (7). 2008 DATE LATERAL OFFSET All Other Signs LATERAL OFFSET Guide Signs F:\mgk\Traffic\Standard Drawings\2012_July_Update\plotfile_TM200s_500s.dgn :: Default 7/6/2012 3:50:36 PM REVISION DESCRIPTION 12-10-09 Sheet Completely Revised 12-30-11 Added note (7) explaining lateral offset for multi-post signs hwyr20m Effective Date: December 1, 2012 - May 31, 2013 TM200 o o 3 3 o 3 More than 10’ o 3 Edge of Shoulder, Curb or Guardrail 10’ or less Fog line o 1-6-2012 90 o End of Bridge Handrail 90 Guardrail TM201.dgn 5’-0" Top of pavement SIGN PLACEMENT 7’-0" 6’-0" Sign 6’-0" Gore "EXIT" Sign ELEVATION 4’- 0" PLAN SIGN LOCATION FOR FREEWAY OVERCROSSING (MINIMUM VALUES) EX IT Edge of pavement RAM 4’-0" P CALC. BOOK NO. N/A BASELINE REPORT DATE NOTE: 12-10-09 All material and workmanship shall be in accordance with the current Oregon Standard Specifications OREGON STANDARD DRAWINGS TYPICAL "EXIT" SIGN INSTALLATION MISCELLANEOUS SIGN TM201 PLACEMENT DETAILS 2008 DATE F:\mgk\Traffic\Standard Drawings\2012_July_Update\plotfile_TM200s_500s.dgn :: Default 7/6/2012 3:50:42 PM REVISION DESCRIPTION 07-01-09 Updated Drawings To Fit Given Dimensions 12-10-09 Updated Drawings To Fit Given Dimensions For Typical Exit hwyr20m Effective Date: December 1, 2012 - May 31, 2013 TM201 3/8 " bolt (1" long for aluminum signs) -stainless steel (2" long for wood signs) -galvanized 1/4 " R 7/8 " O.D., 3/8 " I.D., 1/16 " thick flat washer. 3" 7/8 " O.D., 3/8 " I.D., 1/16 " thick nylon washer. 18" 1 1/4 " 3/4 " > H 1 1/2 " H/2 1/2 " x 2" Slot for 3/8 " bolt with flat and nylon washers. Place one flat and one lock washer on back of slot. 1/2 " Sign Width Sign Width Sign Sign Width 2" (1 1/2 " x 1/4 " Aluminum Strap) H/4 2 1/2 " YIELD SIGNS Elevation > > 1-6-2012 18" H 48" DETAIL OF BRACE SLOT H/4 { Brace 3/8 " nut. For sign attachment see Standard Drawing TM676 Sign Panel Sign Width TM206.dgn Sign Width Varies 7/8 " O.D., 3/8 " I.D., 1/16 " thick lock washer. 7/8 " O.D., 3/8 " I.D., 1/16 " thick flat washer. H/4 1 1/4 " (Typ.) Brace Slot 2 1/2 " 2 1/2 " BOLT, NUT AND WASHER H/2 H/2 INSTALLATION DETAIL 1’-4" (2’-4" *) 1’-4" (2’-4" *) H >48" Wood post: 3/8 " x 3" galvanized lag bolt with flat and nylon washers. Place nylon washer against aluminum brace. 1 1/2 " x 1/4 " Aluminum Strap H/4 Steel post: Use manufacturer-recommended bolts and washers. Note: * For sign width 60" and over Plan SIGN BRACING STOP SIGN OTHER SIGNS WARNING SIGNS NOTES: 1. Sign braces are only installed when specified in the contract plans, in the special provisions, or by the engineer. 2. When attaching bolts to brace slot, hold bolt head in place and turn nut on opposite side. 3. Use nylon washer against both sides of aluminum brace when using galvanized hardware. TYPICAL LOCATION OF BRACING (Adjust location of bracing so that bolts will miss legend) CALC. BOOK NO. N/A BASELINE REPORT DATE NOTE: BRACE LENGTHS ** POST SIZE SIGN WIDTH > >60" (Steel) 32 1/2 " 56 1/2 " 2 1/2 " X 2 1/2 " (Steel) 32 1/2 " 56 1/2 " 4" X 4" (Wood) 33 1/2 " 57" 4" X 6" (Wood) 35" 57 1/2 " TM206 6" X 6" 6" X 8" (Wood) (Wood) 35 1/2 " 37 1/2 " All material and workmanship shall be in accordance with the current Oregon Standard Specifications 60" 2" X 2" 12-10-09 OREGON STANDARD DRAWINGS ** Verify lengths before bending and attaching to sign and post. SIGN BRACING DETAIL 2008 58" DATE REVISION DESCRIPTION 07-01-09 Added Sign Brace Details, Added Table And Bolt, Nut And Washer Detail 12-10-09 Sheet Completely Revised 59 " F:\mgk\Traffic\Standard Drawings\2012_July_Update\plotfile_TM200s_500s.dgn :: Default 7/6/2012 3:50:50 PM hwyr20m Effective Date: December 1, 2012 - May 31, 2013 TM206 X B X B B B 3" 1. B 3" Sign Area Center Y B Y B B B B B B B B 2. Material shall be Douglas Fir No. 1 and according to Section 02110.40. 3. For horizontal and vertical clearances of permanent signs refer to TM200 and of temporary signs refer to TM821. 4. B B B B Center 4"B 18" B B 4"B 18" B Z Z B b Temporary signing uses an Ir = 0.45 for a recurrence interval of 1.5 years. A A (Typ.) b B 11. 4" x 4" posts should not be used in snow plow areas. B B Permanent signing uses an Ir = 0.71 for a recurrence interval of 10 years. 9. B 4" B Post Embedment Installation: "D" (Typ.) "D" (Typ.) B B B B "D" B * - 0.6*X when X >= 12’. B B B B B B ** - 0.35*X when X >= 20’. - 7’ when 15’ < = X < 20’. 1. compaction equipment. B B ELEVATION No scale ( X * Y * Z ) in ft 3 Field Post Drilled Embedment Hole Depth Diameters "D" Excavate the hole at least 12" larger in diameter than the diagonal dimension of the post. Maintain at least 6" of space around the edges of the post to accomodate B tm670.dgn 18" B B 18" 18" 4" B B B note 10) 4" diameters. (See B B B See Tables for B 08-JAN-2010 A (Typ.) The sign width to sign height or sign height to sign width ratio shall not exceed 5.0. 8. 10. Posts protected by barrier or guardrail do not require field drilled holes. (See note 10) A B (See note 10) Field Drilled Holes. B B B diameters. (Typ.) b B B diameters. (Typ.) 7. B B Z See Tables for B B B B b See Tables for General design parameters are Kz = 0.87, SIF (duration factor) = 1.6, Cd (sign) = 1.20, and G = 1.14. b B A b Use the 3 second gust wind speeds shown on TM671 for the site specific sign location. 6. B B B Field Drilled Holes. Larger Posts A B B for 4"x6" and Field Drilled Holes. B B (Typ.) 5. (Typ.) * 7’-0" Min. 6" Min. B B 6" Min. Signals. ** 7’-0" Min. ** 7’-0" Min. Wood post design in accordance with the 5th Edition 2009 AASHTO Standard Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic B B B Y Wood posts are available in the following commercial lengths: 12’, 14’, 16’, 18’, 20’, 22’, 24’, 26’. Sign Area Center Sign Area Y General Notes: B 5’-6" Min. B B B 5’-3" Max. X B 15’-0" Min. B B 3" X 2. Align the post in the hole to a vertical position. 3. The space around the wood post shall be backfilled to finished ground surface. 4. Backfill with selected general backfill meeting the requirements of 00330.13. 5. Place in layers not greater than 6 inches. 6. Solidly ram and tamp the layers into the excavation area around the post. 7. Dampen during placement if too dry to compact properly. 8. Replace and finish the surface around the post to match the surrounding surface. 3 Second Gust Wind Speed (TM671) Number of Posts Number of Posts Number of Posts b B B 105 and 110 MPH B 95 MPH B 85 MPH Field Drilled 3 * 3 * X=15’ X>=20’ 1 2 3 * 3 * X=15’ X>=20’ 1 2 3 * 3 * X=15’ X>=20’ Holes. See Tables d / 2 2 for diameters. 231 62 124 132 186 56 120 168 Not Req’d 4’ - 0" 347 486 130 260 278 390 117 234 112 250 351 1 1/2 " 5’ - 0" 6" x 6" 270 540 578 810 216 432 462 648 195 390 417 585 2" 5’ - 0" 6" x 8" 494 988 1058 1482 395 790 846 1185 356 712 762 1068 3" 7’ - 0" ** * - Linear Interpolate X*Y*Z 3 post values for signs greater than 15’ and less than 20’. ** - See note 8 ( X * Y * Z ) in ft 3 Field Post Drilled Embedment Hole Depth Diameters "D" 3 Second Gust Wind Speed (TM671) 85 MPH 95 MPH 105 and 110 MPH Number of Posts Number of Posts Number of Posts B PERMANENT WOOD POST TABLE d 165 324 { 154 162 B 77 4" x 6" Direction of Travel 4" x 4" B b x d B POST SIZE 1 B Face of post that the sign is attached. SECTION A-A CALC. BOOK NO. 5850 No scale BASELINE REPORT DATE 08-JAN-2010 ACCOMPANIED BY DWGS. SHEET TM200, TM671, TM821 1 OF 1 NOTE: All material and workmanship shall be in accordance with b x d TM670 POST SIZE the current Oregon Standard Specifications 3 * 3 * 1 2 3 * 1 2 X=15’ X>=20’ 4" x 4" 122 244 261 366 98 196 4" x 6" 257 514 550 771 205 410 6" x 6" 426 852 912 1278 341 682 6" x 8" 779 1558 1669 2337 624 1248 1337 3 * 1 2 3 * 3 OREGON STANDARD DRAWINGS * X=15’ X>=20’ X=15’ X>=20’ 210 294 88 176 188 264 Not Req’d 4’ - 0" 439 615 185 370 396 555 1 1/2 " 5’ - 0" 730 1023 308 616 660 924 2" 5’ - 0" 1872 563 1126 1206 1689 3" 7’ - 0" TEMPORARY WOOD POST TABLE ** * - Linear Interpolate X*Y*Z 3 post values for signs greater than 15’ and less than 20’. ** - See note 9 WOOD POST SIGN SUPPORTS 2008 DATE REVISION DESCRIPTION 09 01/ Revised 100 mph and 110 mph X*Y*Z values. 10 01/ Updated all X*Y*Z values for Douglas Fir No. 1 material, changed 6" x 8" D from 5’ to 7’, and added 3 post X*Y*Z values for signs greater than 15’ and less than 20’. Effective Date: December 1, 2012 - May 31, 2013 TM670 Reflective sheeting sign face Nylon washer, nom. 3/8 " I.D. 7/8 " O.D., 1/16 " thick tm676.dgn 05-JAN-2009 Hold bolt head in place and turn nut on opposite side, Except for Lag Bolts 7/8 " O.D. min. Double Stainless steel ASTM 316 flat washers* Note: 1)When signs are placed on opposing sides of post, 3/8 " x 3" lag bolts can be used instead of through bolt. 2) Use nylon and stainless steel washers when signs are placed on both sides of post. 3) Burr threads at junction with nut when locknuts are not used. 4) Post bolts to extend beyond the tightened nuts within the limits of 1/4 " to 1". Wood Post, C channel, or Square Tube (Wood Post Shown) Nut w/ nylon locking feature ** 3/8 " ł Galvanized steel bolt inside 7/16 " ł mounting hole (length as required by support) 7/8 " O.D. min. ASTM 316 Stainless steel flat washer * * Stainless steel washer with neoprene layer is an acceptable substitue ** Acceptable substitute for nylon locking nuts: ANCO PIN-LOC TRI-LOC R R Top Lock Locknut SIGN ATTACHMENT DETAIL CALC. BOOK NO. BASELINE REPORT DATE ACCOMPANIED BY DWGS. SHEET 1 OF 1 NOTE: All material and workmanship shall be in accordance with the current Oregon Standard Specifications OREGON STANDARD DRAWINGS SIGN ATTACHMENTS TM676 2008 DATE REVISION DESCRIPTION Effective Date: December 1, 2012 - May 31, 2013 TM676 X X B B X B B B X B GENERAL NOTES: B Standard Specifications for Structural Supports for Highway Signs, Luminaires, and Traffic B B 1. Perforated Steel Square Supports are designed in accordance with the AASHTO Sign Area Center B B Sign Area Center Signals 4th Edition, 2001, 2002, 2003, and 2006 interim revisions. Y Y TM671. B B B Sign Area B Y 2. The design basic wind speed (3 second gust) shall be according to the wind map shown on Center B B 3. Material grade for base hardware connection shall be according to the manufacturer’s recommendation and based on crash testing. B B 4. Use 7/16 " diameter holes at 1" spacing on each of the 4 sides. B 5. Steel post shall have a minimum yield stress of 50 ksi. B 6. Steel shall be galvanized according to ASTM A653 with coating designation G140. Y 7. General design parameters are Kz = 0.87, Cd (sign) = 1.20, and G = 1.14. B 9’-0" Max. Z Z B Z B B 9’-0" Max. 9. Temporary signing uses an Ir = 0.45 for a recurrence interval of 1.5 years. 10. The sign width to sign height or sign height to sign width ratio shall not exceed 5.0. 11. For horizontal and vertical clearances of permanent signs refer to TM200 and of B temporary signs refer to TM821. See Base Requirments for base type 12. Posts protected by barrier or guardrail do not require slip bases. B B B 4" Max. B B B 4" Max. 4" Max. See Base Requirments for base type B B B 06-JAN-2012 3’-0" Max. (Typ.) 8. Permanent signing uses an Ir = 0.71 for a recurrence interval of 10 years. 2’-0" Min. B See Base Requirments for base type tm681.dgn B B 9’-0" Max. 2’-0" Min. B B 3’-0" Max. (Typ.) B See Note 4 for hole requirements. (Typ.) 0.15X Min. B 2’-0" Min. B 0.15X Min. SINGLE POST ELEVATION TWO POST ELEVATION No scale No scale THREE POST ELEVATION 2 1/4 " - 12 ga. Perforated Steel ( X * Y * Z ) in ft 3 No scale Square Tube B 3 Second Gust Wind Speed (TM671) 85 MPH 95 MPH 105 or 110 MPH Number of Posts Number of Posts Number of Posts 2 1/2 " - 12 ga. Perforated Steel B Square Tube Size 1 2"-12 ga. 2 3 1 2 3 1 2 Square Tube 3 79 158 237 63 126 189 57 114 171 2 1/2 "-12 ga. 136 272 408 109 218 327 98 196 294 2 1/2 "-10 ga. 165 330 495 132 264 396 119 238 357 2 1/4 " & 2 1/2 "-12 ga. * 231 462 693 185 370 555 167 334 501 2 1/4 " - 12 ga. PSST to extend entire length inside of the 2 1/2 " - 12 ga. PSST. 2 1/4 " & 2 1/2 " - 12 GA. DETAIL No scale PERMANENT PERFORATED STEEL SQUARE TUBE TABLE ( X * Y * Z ) in ft 3 Number of Posts 3 Second Gust Wind Speed (TM671) 85 MPH Square Tube Size 95 MPH 2"-12 ga. 105 or 110 MPH 2 1/2 "-12 ga. Number of Posts Square Tube Size 1 2"-12 ga. 125 2 250 Number of Posts 3 375 1 100 2 200 1 2 3 Anchor Anchor N/A Anchor Slip 300 1 90 2 180 BASELINE REPORT DATE ACCOMPANIED BY DWGS. SHEET 5752 06-JAN-2012 TM200, TM671, TM687, TM688, TM775 1 OF 3 Slip Number of Posts 3 CALC. BOOK NO. NOTE: 3 2 1/2 "-10 ga. Slip Slip Slip 2 1/4 " & 2 1/2 "-12 ga. * Slip Slip Slip 270 All material and workmanship shall be in accordance with the current Oregon Standard Specifications OREGON STANDARD DRAWINGS 1. Anchor - See Drawing TM687 for PSST anchor TM681 2 1/2 "-12 ga. 215 430 645 172 344 516 155 310 465 2 1/2 "-10 ga. 261 522 783 209 418 627 189 378 567 2 1/4 " & 2 1/2 "-12 ga. * 364 728 1092 292 584 876 263 526 789 PERFORATED STEEL SQUARE TUBE (PSST) SIGN SUPPORT INSTALLATION foundation details. 2. Slip - See Drawing TM688 for PSST slip base foundation details. 3. N/A - Do not use this option. TEMPORARY PERFORATED STEEL SQUARE TUBE TABLE BASE REQUIREMENTS 2008 DATE * - See 2 1/4 " & 2 1/2 " - 12 ga. detail. REVISION DESCRIPTION 09 01/ Added multiple posts, slip bases, and X*Y*Z values. 11 01/ Changed TM775 to TM821. 12 01/ Added Baseline Report Date. Effective Date: December 1, 2012 - May 31, 2013 TM681 2 1/2 "x2 1/2 "x12 ga. Outside PSST 3/8 "‘ bolt w/ flatwasher and lockwasher under nut and flatwasher under head each way. Material grade for base hardware connection shall be according to the manufacturer’s recommendation and based on crash testing. Anchor steel shall be hot dipped galvanized or approved equal. 1" Footing concrete shall be Commercial Grade Concrete (fc = 3000 psi) per Specification 00440. The CGC mixture may be accepted at the site of 4" M axim um placement according to 00440.14. Inside PSST 2’ - 9 1/4 " 3’ - 0" Outside Tube 4" M axim um 1’ - 6" Minimum 2 3/4 " 3/4 " 1" 2 3/4 " Tube 1’ - 6" Outside PSST 2’ - 0" Minimum B B Inside 1. 3. B 2’ - 9 1/4 " General Notes: Inside PSST 2. B 4. The estimated concrete volume is .09 cubic yards. 2 1/2 "x2 1/2 "x7 ga. Outside Tube 2 1/4 "x2 1/4 "x12 ga. Middle PSST B 6 " tm687.dgn 6 " 06-JAN-2012 3’ - 0" Middle PSST 2"x2"x12 ga. 3/8 "‘ bolt w/ flatwasher and lockwasher under nut and flatwasher under head each way. B Inside PSST 3/4 " 2"x2"x12 ga. B Well compacted granular material 1’ - 0" Perforated Steel Square Tube Sign Support 1’ - 0" 2" OPTIONAL ANCHOR DETAIL B Bolt shall be Anchor B perpendicular 2" ANCHOR DETAIL No scale to major or critical B B Well compacted granular material B traffic flow. B No scale 3/8 "‘ bolt w/ flatwasher and lockwasher under nut and flatwasher under head each way. 3/4 " 2 1/2 "x2 1/2 "x12 ga. Sign Face Inside PSST B 4" M a xim of Travel Direction 1" um 1’ - 6" Minimum Inside PSST 2’ - 9 1/4 " No scale B B 3’ - 0" Outside Tube 2 3/4 " B PLAN B 3"x3"x7 ga. Outside Tube CALC. BOOK NO. 5752 BASELINE REPORT DATE 06-JAN-2012 ACCOMPANIED BY DWGS. SHEET TM681, TM688 2 OF 3 NOTE: All material and workmanship shall be in accordance with the current Oregon Standard Specifications OREGON STANDARD DRAWINGS 6 " PERFORATED STEEL SQUARE TUBE (PSST) Well compacted granular material 2008 B TM687 ANCHOR FOUNDATION B 1’ - 0" B 2 1/2 " ANCHOR DETAIL DATE REVISION DESCRIPTION 11 01/ Moved bolts, added 3/4 " dimensions, and added two direction arrow. 12 01/ Added Baseline Report Date. No scale Effective Date: December 1, 2012 - May 31, 2013 TM687 NOTES: Use Pre-Construction Posted Speed to Select the Correct Design Speed from the Tables below: NOTES: NOTES: Install PCMS beyond the outside shoulder, when possible. When paved shoulders adjacent to excavations are less than four feet wide protect abrupt edge as shown. Install Flagger Station Lighting beyond the outside shoulder, when possible. Use the appropriate type of barricade panels for PCMS location. Right shoulder, use Type B(III)R Left shoulder, use Type B(III)L Use aggregate wedge when abrupt edge is 2 inches or greater. Use six tubular markers in shoulder taper on 10’ spacing. Use six drums in shoulder taper on 20’ spacing. CONCRETE BARRIER FLARE RATE TABLE SPEED (mph) 8:1 9:1 10:1 12:1 14:1 16:1 18:1 19:1 30 35 40 45 50 55 60 65 01-JUL-2012 Detail as shown is also used for Portable Traffic Signal installation and Portable Traffic Management System. MINIMUM FLARE RATE Extg. pavement 2" or Greater 100’ 50’ Sl. 1 :3 40’ Portable changeable message sign (PCMS) Flagger Station Lighting 8’ B(III)R Temp. Plastic Drums 10’ 28" Tubular Markers Shoulder or aggregate base rock tm800.dgn MINIMUM LENGTHS *TAPER "L" (ft) W = Width being closed. (Lane or Shoulder) Speed (mph) W 25 30 35 40 45 50 55 60 65 W = 12 125 180 245 320 540 600 660 720 780 10 105 150 205 265 450 500 550 600 650 W = 14 145 210 285 375 630 700 770 840 910 W = 16 165 240 325 430 720 800 880 960 1040 TABLE BUFFER "B" (ft) 75 100 125 150 180 210 250 285 325 PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) INSTALLATION DETAIL EXCAVATION ABRUPT EDGE GENERAL NOTES FOR ALL TCP DRAWINGS: NOTES: Abrupt edges may be created by paving, operations, excavations or other roadway work. Use abrupt edge signing for abrupt edges of 1 inch or greater. Signs and other Traffic Control Devices (TCD) shown are the minimum required. If the excavation is located on left side of traffic, replace the 8’ B(III)R barricades with 8’ B(III)L barricades and replace the "RIGHT" (CW21-8C-18) riders with "LEFT" (CW21-8A-18) riders. Place Temporary Sign Support (TSS) approx. 10’ behind barricade. * > For Lane or Shoulder closure where W 10’ , Use "L" value for W = 10’ Use 1000 feet for freeway lane closure taper lengths, See Drgs. TM860, TM861, and TM862 panelStyle:construction_warning.ssi constructPanels:36|24|18 constructPanelMode:0 panelRoundCorners:0 panelStation:none panelHeightLock:0 panelWidthLock:0 legendMaterial:0 panelMounting:0 panelName:name panelQuantity:1 panelMaterial:0 marginAlign:9 panelSizes: LEFT TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE Sign Spacing (ft) Speed (mph) A 20 - 30 100 B 100 C 100 20 36x18 (As noted) 350 350 350 20 45 - 55 500 500 500 40 Freeway 1000 CENTER 32x11 48x48 LEFT 35 - 40 EDGE EDGE Max. Channelizing Device Spacing (ft) For work duration of greater than 3 days, remove or cover existing pavement markings, as directed. 32x11 ABRUPT OR UNDER CONSTRUCTION Place sequential arrow approx. 40’ behind barricade for posted speeds 45 mph or greater. panelStyle:construction_warning.ssi constructPanels:36|24|18 constructPanelMode:0 panelRoundCorners:0 panelStation:none panelHeightLock:0 panelWidthLock:0 legendMaterial:0 panelMounting:0 panelName:name panelQuantity:1 panelMaterial:0 marginAlign:9 panelSizes: ABRUPT UNDER TRAFFIC Place sequential arrow approx. 20’ behind barricade for posted speeds less than 45 mph. If roll-up signs are used, attach the correct (CW21-9-11) plaques to the sign face using hook and loop fasteners. Place roll-up signs in advance of barricades. Temp. Plastic Drums See TCD Spacing Table for max. spacing. 28" Tubular Markers See TCD Spacing Table for max. spacing. Place Portable Changeable Message Sign (PCMS) approx. 40’ behind barricade. Continue signing and other traffic control devices throughout excavation area at spacings shown. NOTE: FLAGGER STATION LIGHTING DELINEATION Arrows shown in roadway are not pavement legends, but directional arrows to indicate traffic movements. panelStyle:regulatory.ssi constructPanels:36|24|18 constructPanelMode:0 panelRoundCorners:0 panelStation:none panelHeightLock:1 legendMaterial:0 panelWidthLock:1 panelMounting:0 panelName:name panelMaterial:0 panelQuantity:1 marginAlign:9 panelSizes: RIGHT 42x18 (As needed) (Mount on TSS) 48x48 (As needed) (Roll-up sign) RIGHT 32x11 All signs are type "O4" flourescent orange, unless otherwise shown. To be accompanied by Drg. Nos. TM820 & TM821 CALC. BOOK NO. Abrupt edge TM09-01 01-JUL-2012 BASELINE REPORT DATE NOTE: All material and workmanship shall be in accordance with the current Oregon Standard Specifications 1500 2640 40 NOTE: OREGON STANDARD DRAWINGS 2 - 8’ B(III)R TM800 TABLES, ABRUPT EDGE AND PCMS DETAILS 2 - 8’ B(III)R Place traffic control devices on 10 ft. spacings for intersection and access radii. 1/4 mi. 1/4 mi. 1/4 mi. 2008 When necessary, sign spacing may be adjusted to fit site conditions. Limit spacing adjustments to 20% of the "A" dimension for speeds 45 mph. Limit spacing adjustments to 10% of the "A" dimension for speeds 45 mph. DATE 01-01-2010 TYPICAL ABRUPT EDGE DELINEATION \\wpdotclrl004\hwye05m\ODOT_DATA\projects\Std Drawings\2012_JULY\TM800\PTM800.dgn :: Default 6/26/2012 10:36:50 AM REVISION DESCRIPTION REVISED DRAWING AND NOTES 01-01-2011 REVISED NOTES 07-01-2011 REVISED AND ADDED NOTES 01-01-2012 REVISED NOTES AND ADDED DRAWING 07-01-2012 REVISED DRAWING AND NOTES hwye05m Effective Date: December 1, 2012 - May 31, 2013 TM800 4’ min. - 8’ max. 24" min. C L GENERAL NOTES FOR ALL DETAILS: ^ 45 45^ C L Var. 12" C L TYPE I 20" For rails less than 36" long, 4" wide stripes shall be used. Rails must be 8" min. to 12" max. in height. Use barricades from ODOT Qualified Products List (QPL). C L 12" Var. 45^ White and orange encapsulated lens sheeting on rail 36" min. 20" 6" min. 6" Extg. ground Extg. ground tm820.dgn White and orange encapsulated lens sheeting on rail min. Var. 01-JUL-2011 36" Min. C L White and orange encapsulated lens sheeting on rail Sandbags (approximately 25 lb sack filled with sand) may be placed on lower frame to provide additional ballast. 60" min. 6" 20" 6" 24" min. - 48" max. min. 6" Extg. ground TYPE II Use 4’ Type III barricades where horizontal space is limited. min. 6" min. All non-reflectorized surfaces shall be white. TYPE III BARRICADE RAIL LAYOUT NOTES: Markings for barricade rails shall slope downward at an angle of 45^ in the direction traffic is to pass. C L Where a barricade extends entirely across a roadway, it is desirable that the stripes slope downward in the direction toward which traffic must turn in detouring. C L Traffic Traffic Barricade Barricade type Indicates barricade placement on the roadway Where both right and left turns are provided for, slope the chevron striping downward in both directions from the center of the barricade. For full roadway closures, the C or LR barricade may be used. Extend barricades completely across roadway unless access is required for local road users. B(III)R LT. SIDE - L RT. SIDE - R (For approaching traffic) (For approaching traffic) BARRICADE NOTATION C L C L CALC. BOOK NO. N/A BASELINE REPORT DATE NOTE: Traffic 01-JUL-2011 All material and workmanship shall be in accordance with the current Oregon Standard Specifications Traffic OREGON STANDARD DRAWINGS TEMPORARY BARRICADES TM820 CLOSED - C (For approaching traffic) LT. / RT. - LR 2008 (For approaching traffic) DATE REVISION DESCRIPTION 07-01-2011 REVISED AND ADDED DRAWINGS AND NOTES DIAGRAM FOR BARRICADE PLACEMENT AND SLOPE MARKING \\wpdotclrl004\hwye05m\ODOT_DATA\projects\Std Drawings\2012_JULY\TM820\PTM820.dgn :: Default 6/26/2012 10:49:37 AM hwye05m Effective Date: December 1, 2012 - May 31, 2013 TM820 NOTES: 48"x 48" sign (typ.) 2 - 3/8" dia. bolts per support (typ.) NOTES: Use Double Post TSS for a total sign area of 40 sq. ft. or less. 3/4 "x 5 1/2 "x 37" Use Single Post TSS for a total sign area of 9 sq. ft. or less. Position double post TSS 10’ behind an 8’ (4’ - where space is limited) Type (III) barricade, unless otherwise shown. Position single post TSS 10’ behind an 8’ (4’ - where spce is limited) Type (III) barricade, except for installation of "BUSINESS ACCESS" signs. 36"x 36" sign (typ.) 2 - 3/8 " dia. bolts 4"x 4"x 12’ 2 - 3/8 "x 3" lag screws per support (typ.) 2 - 3/8" dia. bolts per support (typ.) 2 - 2"x 4" @ 45^ angle Sandbags (25 lb. max./sack) (as needed) 2"x 6"x 37" 1 - 3/8 "x 3" lag screw per side (typ.) 1 - 3/8 "x 3" lag screw per side (typ.) 01-JUL-2012 40" 36" 2 - 3/8 " dia. bolts per side (typ.) 4"x 4"x 10’ DO NOT TIP OVER TSS. When not in use, locate TSS a minimum of 30’ from the roadway and turn away from traffic; or, turn or cover sign and retain the Type (III) barricade for delineation. 2 - 3/8 "x 3" lag screws 2"x 4"x35" @ 45^ angle Sandbags (25 lb. max./sack) (as needed) Use either Douglas Fir or Hem Fir, which is surfaced four sides (S4S) and free of heart center (FOHC). 2"x 4"x 6" 2 - 3/8 "x 3" lag screws 4 - 3/8 "x 4" lag screws 4 - 3/8 "x 4" lag screws See "Temporary Sign Placement" detail for sign installation heights. 4 - 2"x 6" 1- 2"x 4" 1 - 3/8 " dia. bolts 40" 1 - 3/8 " dia. bolts 2 - 3/8 " dia. bolts 1 - 4"x 4"x 4" 1 - 3/8 " dia. bolts 60" 72" 2 - 2"x 4" 1 - 4"x 4"x 4" tm821.dgn 2 - 4"x 4"x 5 1/2 " 1 - 2"x 4" DOUBLE POST SINGLE POST TEMPORARY SIGN SUPPORT (TSS) TEMPORARY SIGN SUPPORT (TSS) NOTE: NOTES: Avoid locating sign supports in areas designated for bicycle or pedestrian traffic. When TSS or post mounted signs are located on or over a sidewalk or bicycle facility, install secondary sign (rider) at a minimum height of 7’-0" from top of sidewalk or bicycle facility to bottom of rider. 10" 6" max. 6" 2" 2" Use for supporting a maximum 9 sq. ft. of total sign area. 1/4 Weld steel according to American Welding Society (AWS) D.1.1. 16 1/2 " Conc. Barrier Do not use clipped signs. 4’-0" min. 9 6 d eg 15 1/2 " 7’-0" min. Edge of pavement Place support at connection between two concrete barrier sections. 2 1/2 " Sch. 40 pipe 18 1/2 " 6’-0" min. 7’-0" min. 2" Sch. 40 pipe 48" L 2 1/2 "x 2 1/2 "x 5/16 " 1/4 Curb Support fits both 32" and 42" tall "F" barrier. 9 1/2 " 1/4 " dia. pin wth head and clip 6’ - 12’ All structural steel shall conform to ASTM A36. 36" x 36" sign (max. 9 sq. ft. of total sign area) 6" 3" 3" 1/4 1/4 L 2 1/2 "x 2 1/2 "x 5/16 " 2’ (min.) Drill additional holes so sign can be rotated 90 degrees and pinned when not in use. 2 1/2 " Sch. 40 pipe CALC. BOOK NO. N/A BASELINE REPORT DATE NOTE: 01-JUL-2012 All material and workmanship shall be in accordance with the current Oregon Standard Specifications 1’ min. R/W OREGON STANDARD DRAWINGS L 2-1/2"x 2-1/2"x 5/16" TEMPORARY SIGN SUPPORTS TM821 13 1/8 " URBAN AREAS WITH CURB URBAN AREAS - NO CURB RURAL AREAS - CURB OR NO CURB TEMPORARY SIGN PLACEMENT \\wpdotclrl004\hwye05m\ODOT_DATA\Projects\Std Drawings\2012_JULY\TM821\PTM821.dgn :: Default 2008 DATE CONCRETE BARRIER SIGN SUPPORT 8/8/2012 10:50:47 AM REVISION DESCRIPTION 01-01-2010 REVISED NOTES 01-01-2011 REVISED DRAWING AND NOTES 07-01-2011 REVISED DRAWING AND NOTES 01-01-2012 REVISED DRAWING 07-01-2012 REVISED NOTES hwyr30c Effective Date: December 1, 2012 - May 31, 2013 TM821 ` 1‚ " B-17 2'-2" 10" 6'-6" D1101b A A1A1 6'-8" D100 (EF) 5'-6" D911b D1101b ` OF 8-TON SWIFT LIFT ANCHOR D911b DO NOT USE THIS D807b D202 (EF) FOR LIFTING D205 (EF) D807b 4'-6ƒ " D701b (TYP.) 2 @ 6• " D903b SWIFT LIFT ANCHOR 8‚ " CU.YD. 1 LOT REINFORCING STEEL (PER SCHEDULE, THIS SHEET) 2 EA. EMBED PLATE •x8 x 2'-0" (PER DETAIL, PLAN NO. 501000, SHEET C2) 1 EA. EMBED PLATE ƒx28 x 14'-0" (PER DETAIL, PLAN NO. 501000, SHEET C2) 8 EA. 1‚" B-17 DOUBLE FLARED COIL LOOP INSERT 3 EA. 8-TON SWIFT LIFT ANCHOR D701b 5" ` OF LIFTING ANCHORS 2" DIA. HOLE (TYP.) FLARED COIL 6-F1802 LOOP INSERT REINFORCING SCHEDULE 2 @ 9• " D1802 (EF) ` 1‚" B-17 4000 P.S.I. CONCRETE (PER SPECIFICATIONS, PLAN NO. 501000, SHEET C2) 5" ADDITIONAL 8-TON DESCRIPTION (QUANTITY PER CAP) REQ'D MARK SIZE LENGTH 4 D100 #5 1'-0" 4 D106 #5 1'-6" 4 D202 #5 2'-2" 4 D205 #5 2'-5" 4 D209 #5 2'-9" 2 D401b #5 4'-1" 26 D701b #5 7'-1" 2 D807b #5 8'-7" 2 D903b #5 9'-3" 2 D911b #5 9'-11" 2'-0" 1'-5† " 2'-0" 6" D106 (EF) D903b DOUBLE 5.8 D209 (EF) 5" ALL OUTSIDE CORNERS UNIT 6'-6ƒ " ƒ" x ƒ" CHAMFER (QUANTITY PER CAP) REQ'D 1'-0ƒ " 1'-5" B A1A1 9'-3" BILL OF MATERIAL 2'-0" 7'-11" DOUBLE FLARED ` OF CAP (SYMMETRICAL) 1'-4" COIL LOOP INSERT 18'-6" 2" CLR. (TYP.) SHAPE ` DRAIN 1'-0" 1'-0" E800b 6" D401b D401b 1'-6" 1'-6" 2'-0" 6-D1802 4 D1101b #5 11'-1" 12 D1802 #5 18'-2" 72 E800b #6 8'-0" 6 E1802 #6 18'-2" 6 F1802 #7 18'-2" 6-E1802 EMBED PLATE E800b (TYP.) •x8 x 2'-0" PER DETAIL, PLAN NO. EMBED PLATE ƒx28 x 14'-0" 501000, SHEET C2 PER DETAIL, PLAN NO. 3'-6" ` 1‚" B-17 DOUBLE FLARED 501000 SHEET C2 6" 2'-1" 5" EST. WT. OF REINFORCING STEEL FOR CAP = 1,993 LB. COIL LOOP INSERT 2'-3" 7'-0" 3" 12 SPA. @ 6" = 6'-0" 6" 4 SPA.@ 6ƒ"=2'-3" 26 E800b ON EACH SIDE OF 13 D701b 3" 3'-0" 10 E800b BENDING DIAGRAM D911b D903b D1101b D807b 4'-6" C708b C1304b 6'-2ƒ " D701b C608b 3'-8• " 4'-2" C508b 9" LIFT ANCHOR CORNERS ƒ" x ƒ" 5'-5" 5" 4• " ` 8-TON SWIFT CHAMFER ALL 4'-10" 10" 11 3'-5" 4• " DETAILS AND NOTES. 5" 6" 8'-6" 2'-10" (HOLD) D701b D807b D903b C608b C708b C1304b D911b D1101b ` 8-TON SWIFT LIFT ANCHOR 135° STD. HOOK 1'-0" D701b 3ƒ " ` 8-TON SWIFT LIFT ANCHOR 1'-8" 1'-0" C310b C408b C508b 9" ` 1" DIA. HOLES 3'-6" 3" 9 4'-10" 1'-4" 2'-0" 2" DIA. HOLES 3'-8" 2'-6•" D401b C703 (EF) C408b 2'-0" 2'-6ƒ " BY THE LETTER "b" IF BENT. BAR SIZES ARE REPRESENTED BY (QUANTITY PER WINGWALL) C310b 1'-0" C1304b 1.2 CU.YD. LOT 3 3" 8" 4 SPA. @ 9" =3'-0" 4 SPA. @ 9" = 3'-0" 2 2@8"=1'-4" 2'-1" FILE NAME: SCALE: HARDWARE CLOTH 1 EA. 8-TON SWIFT LIFT ANCHOR 5 EA. STEEL WASHER MK. W100, GALVANIZED (PER DETAIL, PLAN NO. 502000, SHEET 1) 5 EA. 1‚" DIA. x 13" COIL BOLT, DAYTON-RICHMOND B-14 ANCHORED FIRMLY REINFORCING SCHEDULE 3" ƒ"=1'-0" THIS IS A COMBINED BNSF-UP ELEMENT. 2 3 4 5 6 7 8 SIZE # C 4 AND INCHES WITH THE FIRST DIGIT(S) D 5 INDICATING FEET AND THE LAST TWO E 6 DIGITS INDICATING INCHES. F 7 EST. WT. PRECAST CAP CPC4 = 24,500 LB. (12.3 TONS) 4" 2'-4" 10 11 12 4" 3'-0" REQ'D MARK SIZE LENGTH 1 C310b #4 3'-10" SHAPE 2 C405 #4 4'-5" 8 C406 #4 4'-6" 1 C408b #4 4'-8" 2 C500 #4 5'-0" 1 C508b #4 5'-8" 2 C601 #4 6'-1" 1 C608b #4 6'-8" DATE LTR. A SECTION SCALE: ƒ"=1'-0" A A1A1 REVISIONS 2 C703 #4 7'-3" 1/13 1 C708b #4 7'-8" / 6 C802 #4 8'-2" / 7 C1304b #4 13'-4" / EST. WT. OF REINFORCING STEEL FOR WINGWALL = 170 LB. 9 LETTER 18. BAR LENGTHS ARE GIVEN IN FEET EACH DRAIN / / 1 SPONDING TO BAR NUMBERS 2 THROUGH TO CONCRETE AT (QUANTITY PER WINGWALL) SHIP WITH 5-W100 WASHERS AND 5-1‚" DIA. x 13" COIL BOLTS. INCHES THE LETTERS A THROUGH L CORRE- EST. WT. PRECAST WINGWALL CPW2 = 4,900 LB. (2.5 TONS) PRECAST WINGWALL CPW2 1 #4 WIRE MESH REINFORCING STEEL (PER SCHEDULE, THIS SHEET) 2" DIA. HOLES 4'-5" SQUARE ALUMINUM 4000 P.S.I. CONCRETE (PER SPECIFICATIONS, PLAN NO. 501000, SHEET C2) 5 C1304b 2'-0" A 2% SLOPE WITH 4" DESCRIPTION 2'-0" UNIT 3" 6" (EF) REQ'D 1 6'-6ƒ " 2'-5" C508b 4 SPA. @ 9" = 3'-0" C708b C601 (EF) 2'-0" BAR DESIGNATIONS CONSIST OF BAR SIZE AND LENGTH FOLLOWED BILL OF MATERIAL 3-C802 (EF) C500 (EF) 6 4 E800b 1" 2" DIA. DRAIN WITH C608b 5 1'-8" 4-C406 (EF) 3@6" = 1'-6" 4" 2'-0" C405 (EF) 2@9" = 1'-6" 7 1'-0ƒ " 2'-1ƒ " 8 P:\dgn\std\bnsf_upcaps_std.dgn 3'-2• " THIS IS A COMBINED BNSF-UP ELEMENT. 2. SEE PLAN NO. 531010 FOR BEARING PAD 10 C408b ƒ"=1'-0" 2'-8• " SCALE: CONSTRUCTION NOTES. C310b DETAIL OF STEEL EMBED PLATES AND (DIMENSIONS ARE OUT TO OUT) 2'-2• " PRECAST CAP CPC4 1.SEE PLAN NO. 501000, SHEET C2, FOR 12 SCALE: ƒ"=1'-0" B A1A1 1'-9• " VIEW NOTES: DESCRIPTION RAILWAY DESIGN BY: UPRR DRAWN BY: HDR CHECKED BY: HDR BRIDGE STANDARDS APPROVED: CONCRETE BEAM BRIDGES REVISED EMBED PLATE BNSF - ASSISTANT DIRECTOR STRUCTURES DESIGN 4-17-2007 UPRR - MGR SPECIAL PROJECTS STRUCTURES DESIGN 30" DOUBLE CELL BOX BEAM PRECAST CONCRETE END CAP FRAMING & REINFORCING FILE OWNER: UPRR PLAN NO.: 501000 Copyright c 2007 by Union Pacific Railroad DATE: SHEET: PLOTTED: 1/18/2013 A1 4:52:29 PM All concrete materials, placement and workmanship shall be in accordance with Part 1, Chapter 8 of the current AREMA Manual for Railway Engineering. Compressive strength - 4000 Lb. per square inch at 28 days. 8" 2" CONCRETE: 2" = 4" PL•x8 x 2'-0" 2 SPA. @ PRECAST CONCRETE NOTES: Exposed surfaces shall be formed in a manner which will produce a smooth and uniform appearance without rubbing or plastering. Exposed edges of 90 degrees or less are to be chamfered ƒ" x ƒ". Top surface to have a smooth 2" 1•" 4 SPA. @ 5‚" finish, free of all float or trowel marks. 1•" Concrete shall be proportioned such that the water - cement ratio (by = 1'-9" weight) does not exceed 0.45. Concrete must contain a minimum of 6• sacks of cement per cubic yard of concrete. 2'-0" ƒ" DIA. x 2'-0" DEFORMED Cement shall be Type I, Type II or Type III Portland Cement. BAR ANCHOR (ASTM A496) (3 TOTAL) Coarse aggregate shall be size No. 67. •" DIA. x 6" Fine aggregate shall be natural sand. END WELDED STUD (4 TOTAL) Air content shall be between 5% and 7% (by volume). 1 Admixtures shall not be used without approval by Engineer. 1 Curing shall be accomplished by wet curing or the application of a Type 2 membrane. The fabricator shall stencil the fabricator's name, date of fabrication, bridge number, and piece mark at location shown. EMBED PLATE •x8 x 2'-0" Production procedures for the manufacture of precast members shall be in SCALE: accordance with the AREMA Manual for Railway Engineering and the ƒ"=1'-0" Prestressed Concrete Institute's Manual MNL 116-77 for Quality Control. EST. WT. = 37.8 LB. Dimensional tolerances governing the manufacture of precast members shall conform to Division VI, Section 6.4.6 of the Precast Concrete Institute's Manual MNL 116-77 for Quality Control. Tolerance for location of lifting devices shall be +•". The fabricator will be responsible for loading and properly securing all precast concrete members for shipment. All concrete components shall be inspected, by the Railroad, at the fabricators plant prior to shipment. 4‚" x 4‚" CHAMFER, 8" T-BAR ANCHOR REINFORCING STEEL: (TYP. FOUR TOP CORNERS) Reinforcing steel shall be deformed, new billet bars per current ASTM A615 Specifications and to meet grade 60 requirements. Welding of reinforcing steel shall conform to AWS D1.4. Welding shall be performed by a certified welder. Fabrication of reinforcing steel shall be per Chapter 7 of the CRSI Manual of standard practice. Dimensions of bending details are out to out of bar. Reinforcing steel is to be blocked to proper location and securely wired 12 against displacement. Tack welding of reinforcing is prohibited. Minimum DETAIL SCALE: NONE concrete cover on reinforcement shall meet current AREMA Specifications. A C1 C2 STRUCTURAL STEEL: Steel plate shall conform to ASTM A36 OR A709-Grade 36 Specifications. 11 Studs shall be C1015, C1017 or C1020 cold drawn steel which conform to ASTM A108 Specifications. LIFTING ANCHORS: Swift lift anchors shall be Dayton Richmond P-52SL Anchors or approved 14'-0" alternate, with a minimum safe working load of 12,200 lb. per anchor with 10 1'-6" edge distance. The safe working load shall provide a minimum safety ` ‡" DIA. x 4" 3" 6 SPA. @ 1'-0" = 6'-0" 1'-6" 6 SPA. @ 1'-0" = 6'-0" 3" factor of 4. END WELDED STUD MISCELLANEOUS HARDWARE: 3" (42 TOTAL) 8" T-Bar Anchors as manufactured by Burke Company, or approved alternate. 2'-4" 11" 11" 9 3" 8 ` ‡" DIA. x 8" 9" 6 SPA. @ 1'-0" = 6'-0" 6" 6 SPA. @ 1'-0" = 6'-0" 9" END WELDED STUD 7 (42 TOTAL) 14'-0" 6 ‡" DIA. x 8" ‡" DIA. x 4" END WELDED STUD END WELDED STUD (TYP.) (TYP.) 5 PLƒx28 x 14'-0" EMBED PLATE ƒx28 x 14'-0" SCALE: 3 RAILWAY 2 REVISIONS DATE LTR. 1/13 A DESCRIPTION DESIGN BY: HDR DRAWN BY: HDR CHECKED BY: HDR BRIDGE STANDARDS APPROVED: NOTE: CONCRETE BEAM BRIDGES REVISED EMBED PLATE DO NOT PAINT OR GALVANIZE PLATES. / 1 / FILE NAME: P:\dgn\std\bnsf_upcaps_std.dgn •"=1'-0" EST. WT. = 1,087 LB. 4 BNSF - ASSISTANT DIRECTOR STRUCTURES DESIGN / / / INCHES 1 2 3 4 5 6 7 8 9 10 11 12 4-17-2007 UPRR - MGR SPECIAL PROJECTS STRUCTURES DESIGN PRECAST CONCRETE PILE CAP SHEET 2 OF 2 FILE OWNER: UPRR PLAN NO.: 501000 Copyright c 2007 by Union Pacific Railroad DATE: SHEET: PLOTTED: 1/18/2013 C2 4:50:40 PM " 7" " 4" 8" 4" 8" " 4" 7" 4" " 4" 4" 8" 3" 4" 3" 4" PLx2 x 0’-3" 2" PLx7 x 0’-8" PLx2 x 0’-8" (TYP.) 9" PLx2 x 0’-8" (TYP.) PLx2 x 0’-8" (TYP.) 2" 9" PLx2 x 0’-3" PLx7 x 0’-8" PLx8 x 6’-11" PLx8 x 7’-2" PLx8 x 7’-2" TYP. 4" 4" TYP. 4" 6’ -5" 4" TYP. 4" 6’ -5" DECK PLATE MK. CDP1 DECK PLATE MK. CDP2 DECK PLATE MK. CDP4 SCALE: SCALE: SCALE: 1"=1’-0" 4" 6’ -11" 1"=1’-0" 1"=1’-0" EST. WT. = 83.6 LB. EA. EST. WT. = 77.6 LB. EA. EST. WT. = 77.0 LB. EA. GALVANIZE AFTER FABRICATION GALVANIZE AFTER FABRICATION GALVANIZE AFTER FABRICATION NOTES: 1. Material shall conform to the following requirements: Rolled shapes & plates ASTM A36 2. Design, fabrication, and erection per the AREMA Manual 12 5" 1" 4" 5" for Railway Engineering, Chapter 15, Steel Structures. 6" 4" 3. Welding requirements: 8" 2" PLx2 x 0’-3" 4" A. All welding shall be with the SAW or SMAW process. 2" B. All welding per AWS D1.1, Structural Welding Code. PL1x6 x 0’-10" " 4" C. 11 " PLx4 x 0’-4" with ASTM A123. After galvanizing, all elements shall be surface defects. 2" TYP. PLx2 x 0’-8" 5 free of fins, abrasions, rough or sharp edges, and other 4" 5 2" Washer W100 to be galvanized after fabrication in accordance 9 5" Welders must possess valid certification. 4. Deck Plate assemblies CDP1, CDP2, CDP3, and CDP4 and " 1 L6x4x (TYP.) 10 1" DIA. HOLE 1’ BEAM STOP MK. GS-2 -7 PLx8 x 2’-0" " SCALE: 1"=1’-0" EST. WT. = 34.5 LB. EA. 9 WASHER MK. W100 SCALE: 3"=1’-0" EST. WT. = 2.7 LB. EA. 10" GALVANIZE AFTER FABRICATION " 8 4" 4" 2" DECK PLATE MK. CDP3 1"=1’-0" " GUSSET PLATE EST. WT. = 23.0 LB. EA. GALVANIZE AFTER FABRICATION " SCALE: 7 4 L6x4x 6 BEAM STOP MK. GS-3 SCALE: 1"=1’-0" " " 1" " " x " (TYP.) 3" 1" " 1" CLIP " x " " x " 1" (TYP.) Formerly Plan No. 530010 (UPRR Only), Sheet 1 " 1 " 1 3" 1" CLIP (TYP.) " " " 3" 1" CLIP 1 " " " 4 1’ -2" BAR 1" DIA. x 6" 7" " 11" " " 3 RAILWAY BAR 1" DIA. x 6" BAR 1" DIA. x 6" PLx3 x 0’-7" PLx3 x 0’-11" 2 REVISIONS PLx3 x 1’-2" 1 SEISMIC STRAP MK. SS-I FILE NAME: P:\dgn\!standards\Bridges (Concrete)\bnsf_uphardware_std.dgn EST. WT. = 18.6 LB. EA. 5 SCALE: SEISMIC STRAP MK. SS-EB 1"=1’-0" SCALE: SEISMIC STRAP MK. SS-ES 1"=1’-0" EST. WT. = 8.3 LB. EA. SCALE: EST. WT. = 7.0 LB. EA. 1"=1’-0" EST. WT. = 5.3 LB. EA. DATE LTR. 9 /07 A ADDED SEISMIC STRAPS 5 /10 B CHANGE WASHER MK. W100 TO SQUARE / 1 2 3 4 5 6 7 8 9 10 11 12 DESIGN BY: MLM DRAWN BY: MLM CHECKED BY: BRIDGE STANDARDS APPROVED: CONCRETE BEAM BRIDGES BNSF - ASSISTANT DIRECTOR STRUCTURES DESIGN / / / INCHES DESCRIPTION 4-17-2007 UPRR - MGR SPECIAL PROJECTS STRUCTURES DESIGN DECK PLATES AND BEAM STOPS STEEL DETAILS FILE OWNER: UPPR PLAN NO.: 502000 Copyright c 2007 by Union Pacific Railroad DATE: SHEET: PLOTTED: 6/17/2013 1 3:12:53 PM END CAP BENT #1 BENT #2 BENT #3 BENT #"N" BENT #"N"+1 BENT #1 BENT #2 BENT #3 BENT #"N" BENT #"N"+1 INTERIOR CAP (TYP.) A A SPAN 2 INTERIOR SPANS SPAN "N" (L) + 2" = (GL) + 4" (L) = (GL) + 2" (L) (TYP. FOR ALL (L) = (GL) + 2" 6’-9 " RIGHT SPAN 1 (FIRST SPAN ONLY) A SPAN 1 SPAN 2 INTERIOR SPANS SPAN "N" RIGHT A ‘ BRIDGE A ‘ BRIDGE A INTERIOR SPANS) FACE OF BEAM STOPS B BEAM STOP MK. GS-2 (TYP.) B (L)+2" TO (L) TO FAR FACE BACKWALL (FIRST B BEAM STOP MK. GS-3 B NEXT MK. GS-2 B NOT SHOWN FOR CLARITY TIGHT AGAINST SPAN ONLY) B C EXPANSION JOINT FILLER CORNER OF BEAM B BEAM STOP STEP 1 STEP 4 BEAM STOP 1" GAP NOM. TIGHT AGAINST CORNER OF BEAM EXPANSION JOINT FILLER NOT SHOWN FOR CLARITY BENT #1 BENT #2 BENT #3 BENT #"N" BENT #"N"+1 BENT #1 BENT #2 BEAM STOP MK. GS-2 BENT #3 D BENT #"N" BENT #"N"+1 B C A ‘ BRIDGE SPAN 2 INTERIOR SPANS SPAN "N" RIGHT SPAN 1 SPAN 1 SPAN 2 INTERIOR SPANS SPAN "N" RIGHT JOINT FILLER JOINT FILLER) EXPANSION 6’-4" 12 (TYPICAL FOR 4" ‘ BRIDGE A 4 PLIES EXPANSION 2" NOM. 11 C STEP 5 10 STEP 2 B MK. GS-3 BENT #1 1. BENT #2 BENT #3 BENT #"N" A form straight line exactly 6’-9" from centerline of bridge. end with beam placement in either order; modify instructions to suit. BENT #"N"+1 Drive piles and place all caps, including end caps if possible. B Weld all beam stops on right side of caps. Place beam stops to placed before left beams. Construction may actually proceed from either D BEAM STOP A RECOMMENDED CONSTRUCTION SEQUENCE: For illustration purposes, construction sequence based on assumptions that construction starts at Bent #1 (end cap) and that right beams will be B 9 GENERAL NOTES: Center MK. GS-3 on end cap. Locate far face of MK. GS-2 to provide Construction sequence may be varied due to site or project constraints. guide for placement of beam (see Step 4.B). C Slab beams shown in details; box beam installation sequence is 2. identical. 8 Install handrail assembly on each beam before lifting into place. ‘ BRIDGE INTERIOR SPANS 3. Install " elastomeric pads. A Place expansion joint filler against left side of backwall. B Place Span 1 left beam tight against and lined up with right beam. SPAN "N" RIGHT 7 proper beam spacing. SPAN 2 Place expansion joint filler against right side of backwall. B C Place Span 1 right beam tight against pad. Adjust number of plies of expansion joint filler as required to maintain SPAN 1 A C LIFTING LOOP REMOVAL: Install " elastomeric pads. D Weld left side Beam Stop MK. GS-3 on end cap, tight against pad. After each beam is set and in final position, remove lifting loops flush 4. with concrete surface. A Place expansion joint filler against Span 1 right side beam, notching around Beam Stop MK. GS-2 as needed. B 6 Install " elastomeric pads. C Place Span 2 right beam; seat corner firmly against both faces of Bent #2 Beam Stop MK. GS-2, leaving a gap at Bent #3 MK. GS-2. 5. A Place expansion joint filler against Span 1 left side beam, cutting notch for Beam Stop MK. GS-2 (to be placed later). B Place Span 2 left beam tight against and lined up with right beam. C Install " elastomeric pads. D Place Bent #2 left side Beam Stop MK. GS-2 tight against corner of CONSTRUCTION SEQUENCE SCALE: STEP 3 Span #2 beam (leaving gap to Span #1 beam). Weld in place. 6. "=1’-0" Repeat steps 4 and 5 for all remaining spans. Place Beam Stop MK. GS-3 on left side of end bent after placement of final beam. 4 Each wingwall may be placed at any time after corresponding end span and " x 7" x 1’-2" Beam Stop MK. GS-3 have been installed. ELASTOMERIC BEARING PAD " x 7" x 0’-7" ELASTOMERIC BACKWALL BEARING PAD (TYP.) GLUE BEARING PAD TO 3 BEAM OR BEAM STOP WITH GLUE BEARING PAD TO BEAM OR BEAM STOP WITH PL-400 CONSTRUCTION ADHESIVE OR APPROVED EQUAL PL-400 CONSTRUCTION ADHESIVE OR APPROVED EQUAL CAP 2 CAP P/S CONC. BEAM (TYP.) BEAM STOP P/S CONC. MK. GS-2 BEAM (TYP.) BEAM STOP REVISIONS DATE LTR. 9 /07 A DESCRIPTION DESIGN BY:UPRR DRAWN BY: UPRR CHECKED BY: HDR BRIDGE STANDARDS APPROVED: CONCRETE BEAM BRIDGES GENERAL UPDATE MK. GS-3 AT END BENTS AT INTERIOR BENTS 1 / CONSTRUCTION SEQUENCE & BEAM STOP INSTALLATION / FILE NAME: P:\dgn\!standards\Bridges (Concrete)\bnsf_upgenarr_std.dgn 5 BEAM STOP INSTALLATION DETAIL SCALE: 1"=1’-0" / / / INCHES 1 2 3 4 5 6 7 8 9 10 11 12 4-17-2007 UPRR - MGR SPECIAL PROJECTS STRUCTURES DESIGN FILE OWNER: UPRR PLAN NO.: 530000 Copyright c 2007 by Union Pacific Railroad DATE: SHEET: PLOTTED: 6/17/2013 A1 3:32:14 PM PILE LAYOUT FOR END BENTS 8" BALLAST UNDER TIMBER TIES (FOR END BENTS - TONS) bays on bridges longer than 200 ft. See Sheets A6 & A7. 3-PILE BENT EQUILIBRIUM END BENTS BEAM DEPTH Longitudinal bracing between bents required in selected 3-PILE BENT INSIDE PILE PLUMB END BENTS GENERAL NOTES: MAXIMUM PILE LOAD PILE LAYOUT FOR END BENTS 12" BALLAST UNDER CONCRETE TIES ON INSIDE PILE SPAN L SUPERELEVATION BEAM DEPTH 3:12 FORWARD BATTER 4-PILE BENT 4-PILE BENT INSIDE PILES PLUMB SPAN L Pile capacities: 3:12 FORWARD BATTER For required driven pile capacities, see "Maximum Pile Load" ON INSIDE PILES SPAN L table. SPAN L Steel: yENDCAP X X2 Z yENDCAP X X2 Z 34’ 32’ 30’ 28’ 34’ 32’ 30’ 28’ 34’ 32’ 30’ 28’ 34’ 32’ 30’ 28’ 14" 4’-6" 5’-8" 4’-2" 1’-1" 14" 4’-11" 5’-8" 4’-2" 1’-3" 0" 82 79 76 72 113 112 111 110 -- -- -- -- -- -- -- -- 16" 4’-8" 5’-8" 4’-2" 1’-2" 16" 5’-1" 5’-9" 4’-3" 1’-3" 2" 89 86 82 79 113 112 111 110 -- -- -- -- -- -- -- -- 18" 4’-10" 5’-8" 4’-2" 1’-2" 18" 5’-3" 5’-9" 4’-3" 1’-4" 3" 92 89 85 81 113 112 111 110 -- -- -- -- -- -- -- -- 20" 5’-0" 5’-9" 4’-3" 1’-3" 20" 5’-5" 5’-9" 4’-3" 1’-4" 4" -- -- -- -- -- -- -- -- 75 72 69 67 100 95 90 86 30" 5’-10" 5’-10" 4’-4" 1’-5" 30" 6’-3" 5’-11" 4’-5" 1’-7" 7" -- -- -- -- -- -- -- -- 85 82 78 75 109 104 99 94 Piles - ASTM A588 Pile splices - ASTM A572 Gr. 50 or A588 Bracing - ASTM A588 Shop paint: None Welding: Use shielded metal arc welding (SMAW) or flux core arc welding (FCAW) process per AWS D1.5. Acceptable filler metal is E7018 electrode for SMAW and E70T-1 or E70T-5 electrode for FCAW. For other acceptable electrodes, refer to AWS D1.5. Splices: Splices shall be made a sufficient distance above the ‘ BRIDGE ground or water (not less than one foot) so that the 4’-10" splice can be observed during driving. The number of ‘ CAP splices shall be kept to a minimum. 1’-6" permitted. B/RAIL B/RAIL BACKFILL DRILLED HOLES WITH FLOWABLE FILL OR SAND NOTE: Z FOR SUPERELEVATED TRACK, HP14x89 PILE TOP OF B/RAIL REFERS TO LOW RAIL. w/ TIP COMPETENT yENDCAP Splicing cut-offs or short pieces to make a main bearing pile is not 3’-4" ROCK The pile shall be driven so that the upper splice is at least 10 feet below the ground surface. Tip reinforcement: Pile tip reinforcement shall be used where piles may be damaged by driving through heavy gravel, cobbles, boulders or formations known to contain obstructions. Tip reinforcement shall also be used when the pile will bear on rock. CONCRETE Driving tolerances: Variations greater than inch per foot from vertical or X batter line shall not be allowed. The deviation of the top of piles in a bent shall not exceed one inch from the 6’-0" 1’-6" X2 plan location. Rotation of pile about its centerline BOTTOM OF shall not exceed 5 degrees from its orientation as shown PILE CAP in plans. Piles not meeting tolerance requirements or out of line as to impair usefulness, or piles that are 5’-0" MIN. damaged in driving as to impair structural capacity, INSIDE PILE(S) shall be pulled and redriven or an additional pile shall be driven to provide added support. If any numbered pile cannot be driven to their capacity, notify the Structures Design Group, Office of AVP Engineering Design. * 3:12 FORWARD BATTER TYP. ON INSIDE PILE(S) 12 2 *3 BENT DESIGN NOTES: OUTSIDE TIMBER TIES: PILES Selection of pile configuration and maximum heights yCAP IS BASED ON 1" TIE PLATE, 7" TIE, AND 8" BALLAST DEPTH UNDER TIE. 12 HP14x89 PILE based on equilibrium superelevation (regardless of actual 12 superelevation installed). Refer to UPRR Track Standards (TYP.) yCAP IS BASED ON " RAIL PAD, 8" TIE, AND 12" BALLAST DEPTH UNDER TIE. (FOR yCAP DIMENSION OUTSIDE DEFINED RANGE, ADJUST PILE LATERAL LOCATION DIMENSIONS AT B/RAIL.) 10 3 PILE END BENT ELEVATION *NOTE: SIDE VIEW DRIVE PILE TO SEAT Preferred pile configuration is with 2:12 transverse pile batter on interior bents and all plumb pile for end bents. Standard design is valid for minimum pile penetration of 10’ if geotechnical investigation demonstrates that piles can be firmly seated in hard rock or shale; otherwise minimum pile penetration of 25’ required. If these 2" DIA. values cannot be achieved, piles shall be socketed BORE HOLE into rock per detail on this sheet. For any other conditions, special design is required. FORWARD BATTER ON INSIDE PILE(S) NOT REQUIRED FOR BRIDGES COMPOSED ENTIRELY OF CONCRETE BEAM SPANS. 9 4 PILE END BENT Book, Std. Dwg. 0020 latest revision. 2’-6" DIA. (MIN.) CONCRETE TIES: 2 SOCKET DIAMETERS 11 END BENT PILE LAYOUT For span lengths less than 28’, use values shown for SCALE: 28’ spans. "=1’-0" Bent shall be driven per requirements of longer span length supported. For example, for a bent supporting 28’ and 34’ spans, drive per 34’ span requirements. H-PILE PILE SOCKET DETAIL 8 SCALE: Maximum track offset (from bridge centerline) is 6" with this bent standard. "=1’-0" EST. VOLUME OF CONCRETE = 0.9 CU. YD. PER 5’ SOCKET DEPTH NOTCH PILE IN FIELD TO FIT UPPER HP14x89 UPPER HP14x89 SPLICE SPACER PILE PILE 7 DFP TUFTIP MODEL PILE SOCKET NOTES: H-777 OR APF HARD-BITE POINT TYP. TYP. 1. SEE BENT DESIGN NOTES TO DETERMINE WHEN PILE MODEL HP-77600-B H-PILE SPLICE (GR 50) SOCKETING IS REQUIRED. 2. PILING SHALL BE SEATED IN PREDRILLED HOLES IN THE 6 TYP. NOTE: TYP. ROCK AND ENCASED IN CONCRETE WITHIN THE BEDROCK (SEE DETAIL). BEVEL ONE PILE ONLY. TYP. 3. MINIMUM DEPTH OF PILE SOCKET SHALL BE 5’-0" INTO ROCK. LOWER HP14x89 LOWER HP14x89 PILE PILE ROCK SOCKET AND DRIVEN TO ACHIEVE REQUIRED CAPACITY. 5. SEATED PILE SHALL BE ENCASED IN ROCK SOCKET WITH CONCRETE. 1. FIT POINT ONTO SQUARE CUT PILE. INSTALLATION INSTRUCTIONS: ALTERNATE PILE SPLICE DETAIL (NOTE: SPLICE IS SHOWN INSTALLED ON UPPER SCALE: PILE SECTION FIRST. ALTERNATIVELY, SPLICE 4 1"=1’-0" 2. WELD POINT TO THE PILE IN EITHER FLAT OR 6. MINIMUM COMPRESSIVE STRENGTH OF CONCRETE SHALL BE VERTICAL POSITION. 4000 LB. PER SQUARE INCH AT 28 DAYS. 3. FILL THE AREA ACROSS BOTH FLANGES WITH 7. BORE 2" DIA. HOLE IN CENTER OF PILE SEAT TO A WELD. MAY BE INSTALLED ON BOTTOM SECTION FIRST.) MINIMUM DEPTH OF 2 SOCKET DIAMETERS. 1. NOTCH THE END OF H-PILE SECTION TO RECEIVE SPLICE FIRST (NOTCH TO ACCOMMODATE THE SPLICE SPACER BAR). 3 PILE TIP DETAIL 2. FIT SPLICE OVER NOTCHED END OF H-PILE SCALE: 1"=1’-0" AND FILLET WELD SPLICE END TO PILE WEB AS SHOWN. 3. PLACE THE UPPER H-PILE SECTION INTO POSITION ONTO THE LOWER SECTION. 2 REVISIONS 4. COMPLETE FILLET WELD ALONG SPLICE EDGES. 5. WELD FLANGE JOINT BETWEEN UPPER AND LOWER PILE SECTIONS. DATE LTR. 9 /07 A DESCRIPTION DESIGN BY:UPRR DRAWN BY:UPRR CHECKED BY: HDR BRIDGE STANDARDS APPROVED: CONCRETE BEAM BRIDGES REVISED SOCKET NOTES & GEN. UPDATE H-PILE AND BRACING LAYOUT END BENT LAYOUT AND PILE LOADS PILE INSTALLATION DETAILS AND NOTES BENT DESIGN AND GENERAL NOTES (SHEET 1 OF 4) / 1 FILE NAME: P:\dgn\!standards\Bridges (Concrete)\bnsf_upgenarr_std.dgn 4. PILING WITH TIP REINFORCEMENT SHALL BE PLACED INTO TIP REINFORCEMENT INSTALLATION INSTRUCTIONS: 5 PILE SPLICE DETAIL / SCALE: / 1"=1’-0" / / INCHES 1 2 3 4 5 6 7 8 9 10 11 12 4-17-2007 UPRR - MGR SPECIAL PROJECTS STRUCTURES DESIGN FILE OWNER: UPRR PLAN NO.: 530000 Copyright c 2007 by Union Pacific Railroad DATE: SHEET: PLOTTED: 6/17/2013 A2 3:32:55 PM B/RAIL (CONCRETE TIES) PRECAST WINGWALL B/RAIL (TIMBER TIES) CPW2 END CAP CPC4 TOP OF SUBGRADE 3’-8" 1’-6" " MK. SS-EB 1 5’-10 5’-4 " 5’-9 6’-3 " " SEISMIC STRAP 1" DIA. x 13" COIL BOLT, " x 7" x 1’-2" ELASTOMERIC PAD 1 BEAM STOP DAYTON/RICHMOND B-14 OR MK. GS-3 EQ., w/ WASHER MK. W100 (SHIPS WITH WINGWALL) 1’-4" 6" 6" 1" 30" BOX BEAM BOTTOM OF CAP END BENT FILL BEHIND END BENT 6" WITH WELL-GRADED 1 1" MAXIMUM SIZE CRUSHED ROCK 2 WINGWALL TO END CAP DETAIL HEAD OF BANK DETAILS SCALE: SCALE: "=1’-0" "=1’-0" " x 7" x 0’-7" ELASTOMERIC PAD 12 SEISMIC STRAP 30" BOX 11 MK. SS-I (TYP.) BEAM (TYP.) ‘ BENT BEAM STOP MK. GS-2 2" 1" 10 TYP. 1" 2" 30" BOX BEAM (TYP.) DECK PLATE DECK PLATE 30" BOX BEAM (TYP.) MK. CDP3 INTERIOR BENT MK. CDP3 SEISMIC STRAP DETAIL 9 SCALE: "=1’-0" DECK PLATE MK. CDP1 OR CDP2 NOTE: 8 DECK PLATE MK. FILL GAP BETWEEN ENDS OF SEISMIC STRAPS TO BE USED ONLY CDP1 OR CDP2 BEAMS WITH 4 @ " x 28" x 6’-4" WHEN REQUIRED BY THE DESIGN DRAWINGS. PLIES OF PREMOLDED JOINT FILLER FILL GAP BETWEEN END OF 7 BEAM AND END CAP BACKWALL WITH 4 @ " x 28" x 6’-4" " x 7" x 0’-7" " x 7" x 1’-2" PLIES OF PREMOLDED JOINT ELASTOMERIC PAD FILLER ELASTOMERIC PAD 6 4 BEAM STOP BEAM STOP MK. GS-2 MK. GS-3 " ELASTOMERIC FIELD CUT 7" H x 6" W NOTCH " ELASTOMERIC IN CORNER OF JOINT FILLER AS BEARING PAD (TYP.) BEARING PAD (TYP.) REQ’D TO CLEAR BEAM STOP 8" 9" 8" ‘ BEARING ‘ BEARING ‘ BEARING 3 INTERIOR BENT END BENT 2 REVISIONS BEARING DETAILS SCALE: 1"=1’-0" (HANDRAILS & WINGWALLS 1 NOT SHOWN FOR CLARITY) FILE NAME: P:\dgn\!standards\Bridges (Concrete)\bnsf_upgenarr_std.dgn 5 DATE LTR. 9 /07 A DESCRIPTION DESIGN BY:UPRR DRAWN BY:UPRR CHECKED BY: HDR BRIDGE STANDARDS APPROVED: CONCRETE BEAM BRIDGES ADDED SEISMIC STRAP & GEN. UPDATE PRESTRESSED CONCRETE 30" BOX BEAM SPANS MISCELLANEOUS DETAILS / / / / / INCHES 1 2 3 4 5 6 7 8 9 10 11 12 4-17-2007 UPRR - MGR SPECIAL PROJECTS STRUCTURES DESIGN FILE OWNER: UPRR PLAN NO.: 530000 Copyright c 2007 by Union Pacific Railroad DATE: SHEET: PLOTTED: 6/17/2013 B3 3:44:25 PM 15’-0" 10" 8" 1’-11" 1’-2" 1’-11" 8" 8" 8" BEARING PAD SPECIFICATIONS: 1’-11" 1’-2" 1’-11" 8" 10" Bearing pads shall be Random Oriented Fiber elastomeric material comprised of high-quality ozone-resistant virgin elastomer and synthetic fibers. Pads shall 10" 5" ‘ PILE CAP conform to the following minimum material properties: 80 + - 5 Tensile Strength, psi (ASTM D412, Die C) 1000 + - 100 Ultimate Elongation, minimum % 40 10" 6" Heat Aging (ASTM D573, 70 Hrs. @ noted temperature): Durometer, 212 F, maximum point change + - 10 + - 25 + - 25 Tensile Strength, 158 F, maximum % change 5" Ultimate Elongation, 212 F, maximum % change " THICK BEARING PAD (TYP.) 15’-0" PILE CAP Hardness (Shore A, ASTM D2240) Compression, minimum ultimate strength, psi 8000 Apparent Shear Modulus (GA), psi, based on tests conduted at 230 + - 30 70 F to 80 F under uniform compressive stresses of 500, 1000, and 1500 psi and at applied horizontal shear plus slip strain of BEARING PAD PLACEMENT DETAIL - BOX BEAM 50%. GA is constant in all directions parallel to the bearing plane. SCALE: "=1’-0" Bearing pads shall be Voss Engineering, Inc., "Fiberlast" expansion bearing pads or approved equal. 14’-0" Cutting of the pads shall be done so that the edges have no tears or other 4" 8" 1’-11" 1’-2" 1’-11" 8" 8" 8" 1’-11" 1’-2" 1’-11" jagged areas. 8" 4" Permissible tolerances of the pad shall be as stated in Section 11.5.6, Chapter 15 of the 2012 AREMA Manual. following procedure: clean pads according to manufacturer’s recommendations; 10" 5" ‘ PILE CAP The cap fabricator shall fasten the bearing pads to the cap by using the prime contact surface and glue to cap with Sikadur 31 Hi-Mod Gel (1:1 mix ratio) or approved equal. 10" 6" 18’-6" END CAP CPC4 5" " THICK BEARING PAD 4" " THICK BEARING PAD (TYP.) 14’-0" PILE CAP BEARING PAD PLACEMENT DETAIL - BOX BEAM "=1’-0" 1’-0" 10" SCALE: 12 15’-0" 2’-7" 11" 6’-2" 10" 6’-2" 8" 1’-11" 1’-2" 1’-11" 8" 8" 8" 1’-11" 1’-2" 1’-11" 8" 2’-7" 11" 11 10" 6" "=1’-0" 5" 10 10" 5" ‘ PILE CAP BEARING PAD PLACEMENT DETAIL- BOX BEAM SCALE: 9 " THICK BEARING PAD (TYP.) 15’-0" PILE CAP BEARING PAD PLACEMENT DETAIL - SLAB BEAM SCALE: "=1’-0" 8 14’-0" 5" 6’-2" 10" 6’-2" 5" 6" 5" 10" 6 10" 5" ‘ PILE CAP 7 5 " THICK BEARING PAD (TYP.) 14’-0" PILE CAP BEARING PAD PLACEMENT DETAIL - SLAB BEAM SCALE: "=1’-0" 4 This drawing supplements Plan No. 501000, 3 2 REVISIONS DATE LTR. 11/12 A DESCRIPTION DESIGN BY: MLM DRAWN BY: MLM CHECKED BY: BRIDGE STANDARDS APPROVED: CONCRETE BEAM BRIDGES CHANGED PAD GLUE SPEC’S. PRECAST CONCRETE PILE CAP BEARING PADS (UPRR) / 1 / FILE NAME: P:\dgn\std\bnsf_upcaps_std.dgn Sheets A1, C1 & C2. / / / INCHES 1 2 3 4 5 6 7 8 9 10 11 12 4-17-2007 UPRR - MGR SPECIAL PROJECTS STRUCTURES DESIGN FILE OWNER: UPRR PLAN NO.: 531010 Copyright c 2007 by Union Pacific Railroad DATE: SHEET: PLOTTED: 11/7/2012 1 2:35:40 PM Cleveland Creek Railroad Culvert Replacement Contractor Requirements Project Specifications APPLICABLE SPECIFICATIONS The Specification that is applicable to the Work on this Project is the 2008 edition of the "Oregon Standard Specifications for Construction". All number references in these Special Provisions shall be understood to refer to the Sections and subsections of the Standard Specifications and Supplemental Specifications bearing like numbers and to Sections and subsections contained in these Special Provisions in their entirety. Bridge components are designed to UPRR Standards using UPRR Standard Bridge Notes and Bridge Standards including Standard Drawings. Provisions in the UPRR Bridge Notes, Bridge Standards and Standard Drawings shall take precedence over these specifications in the case of a conflict. 1 Special Provisions Table of Contents 00180 00210 00245 00280 00290 00305 00310 00320 00330 00390 00443 00510 00520 00550 00582 00910 00940 01050 01091 02001 02010 02015 02020 02030 02040 02110 02210 02320 02510 02520 02560 02630 02690 02910 03020 04300 Contractor Requirements (Railroad) Prosecution and Progress Mobilization Temporary Water Management Erosion and Sediment Control Environmental Protection Construction Survey Work Removal of Structures and Obstructions Clearing and Grubbing Earthwork Riprap Protection Rapid Setting Controlled Low Strength Materials Structure Excavation and Backfill Driven Piles Precast Prestressed Concrete Members Bridge Bearings Wood Sign Posts Signs Fences Waterway Enhancements Concrete Portland Cement PCC Repair Water Modifiers Chemical Admixtures Posts, Blocks, and Braces Coating Materials for Timber and Concrete Geosynthetics Reinforcement Steel and Concrete Piles Fasteners Base Aggregate PCC Aggregate Sign Materials Erosion Materials Reconstruct Railroad Track 2 3 CONTRACTOR REQUIREMENTS (RAILROAD) 1.01 General 1.01.01 The Contractor shall cooperate with Coos Bay Rail Link hereinafter referred to as "Railway" where work is over, under, on, or adjacent to Railway property and/or right-of-way, hereafter referred to as "Railway Property", during the construction of Cleveland Creek Culvert Replacement. 1.01.02 The Contractor shall plan, schedule and conduct all work activities so as not to interfere with the movement of any trains on Railway Property. 1.01.03 The Contractor is subject to the absolute right of Railway to cause the Contractor's work above Railway Property to cease if, in the opinion of Railway, the Contractor's activities create a hazard to Railway Property, employees, and/or operations. 1.01.04 The Contractor shall notify the Agency Project Manager and notify the Railway's General Manager, Duke Rodley at 541-391-2530, at least 30 working days before commencing any work on Railway Property. The Contractors notification to Railway, shall refer to Cleveland Creek Culvert Replacement. 1.01.05 Subject to the movement of Railway's trains, Railway will cooperate with the Contractor such that the work may be handled and performed in an efficient manner. The Contractor shall have no claim whatsoever for any type of damages or for extra or additional compensation in the event Contractor’s work is delayed by the Railway. 1.02 Railway Requirements 1.02.01 The Contractor shall take protective measures as necessary to keep Railway facilities, including track ballast, free of sand, debris, and other foreign objects and materials resulting from Contractor’s operations. Any damage to Railway facilities resulting from the Contractor's operations will be repaired or replaced by Railway and the cost of such repairs or replacement shall be paid for by the Contractor. 1.02.02 The Contractor shall submit for Right-of-Entry permit to IMG Rail Services. Access may be found on Railway website at: www.coosbayraillink.com under Applications. 1.03 Protection of Railway Facilities and Railway Flagger Services 1.03.01 The Contractor shall give a minimum of 7 working days notice to the General Manager, Duke Rodley at 541-391-2530, in advance of when flagging services will be required. 1.03.02 Railway flagger services will be required, but not limited thereto for the following conditions: 1.03.02a When in the opinion of the Railway representative it is necessary to safeguard Railway Property, employees, trains, engines and facilities. 4 1.03.02b When any excavation is performed below the bottom of tie elevation, if, in the opinion of Railway representative, track or other Railway facilities may be subject to movement or settlement. 1.03.02c When work in any way interferes with the safe operation of trains at timetable speeds or will be occurring within 20-feet of the centerline of track. 1.03.02d When any hazard is presented to Railway track, communications, signal, electrical, or other facilities either due to persons, material, equipment or blasting in the vicinity. 1.03.02e Special permission shall be obtained from the Railway before moving heavy or cumbersome objects or equipment which might result in making the track impassable. 1.03.03 Flagging services shall be performed by qualified Railway flaggers. 1.03.03a Flagging crew generally consists of one employee. However, additional personnel may be required to protect Railway Property and operations, if deemed necessary by the Railway representative. 1.03.03b Each time a flagger is called, the minimum period for billing shall be the eight hour basic day. 1.03.03c The cost of flagger services provided by the Railway, when deemed necessary by the Railway representative, will be borne by the Railway. 1.04 Working on Railway Property 1.04.01 Each Contractor that will perform work within 20 feet of the centerline of a track must develop and implement a Roadway Worker Protection/On Track Safety Program and work with Railway Project Representative to develop an on track safety strategy as described in the guidelines listed in the on track safety portion of the Safety Orientation. This Program must provide Roadway Worker protection/on track training for all employees of the Contractor, its subcontractors, agents or invitees. This training is reinforced at the job site through job safety briefings. Additionally, each Contractor must develop and implement the Safety Action Plan, as provided for on the web site www.contractororientation.com, which will be made available to Railway prior to commencement of any work on Railway Property. During the performance of work, the Contractor must audit its work activities. The Contractor must designate an on-site Project Supervisor who will serve as the contact person for the Railway and who will maintain a copy of the Safety Action Plan, safety audits, and Material Safety Datasheets (MSDS), at the job site. 1.04.02 Workers must not work within 20 feet of the centerline of any track without an on track safety strategy approved by the Railway’s Project Representative. When authority is provided, every contractor employee must know: (1) who the Railway flagger is, and how to contact the flagger, (2) limits of the authority, (3) the method of communication to stop and resume work, and (4) location of the designated places of safety. Persons or equipment entering flag/work limits that were not previously job briefed, must notify the flagger immediately, and be given a job briefing when working within 25 feet of the center line of track. 5 1.04.03 Work in the proximity of railway track(s) is potentially hazardous where movement of trains and equipment can occur at any time and in any direction. All work performed by contractors within 20 feet of any track must be in compliance with FRA Roadway Worker Protection Regulations. 1.04.04 Before beginning any task on Railway Property, a thorough job safety briefing must be conducted with all personnel involved with the task and repeated when the personnel or task changes. If the task is within 20 feet of any track, the job briefing must include the Railway's flagger, as applicable, and include the procedures the Contractor will use to protect its employees, subcontractors, agents or invitees from moving any equipment adjacent to or across any Railway track(s). SECTION 00180 - PROSECUTION AND PROGRESS Comply with Section 00180 of the Standard Specifications modified as follows: 00180.21(d) Terms of Subcontracts - Replace this subsection, except for the subsection number and title, with the following: Subcontracts shall provide that work performed under the subcontract shall be conducted and performed according to the terms of the Contract. All subcontracts, including Contractor's with the first-tier Subcontractors and those of the first-tier Subcontractors with their subcontractors, and any other lower tier subcontracts shall contain a clause or condition that if the Contractor or a Subcontractor fails, neglects, or refuses to make payment to an Entity furnishing labor or Materials in connection with the Contract, the Entity may file a complaint with the Construction Contractors Board, unless payment is subject to a good-faith dispute as defined in ORS 279C.580. Additionally, according to the provisions of ORS 279C.580, subcontracts shall include: (1) A payment clause that obligates the Contractor to pay the first-tier Subcontractor for satisfactory performance under the subcontract within 10 Calendar Days out of amounts the Agency pays to the Contractor under the Contract. (2) A clause that requires the Contractor to provide the first-tier Subcontractor with a standard form that the first-tier Subcontractor may use as an application for payment or as another method by which the Subcontractor may claim a payment due from the Contractor. (3) A clause that requires the Contractor, except as otherwise provided in this subsection, to use the same form and regular administrative procedures for processing payments during the entire term of the subcontract. The Contractor may change the form or the regular administrative procedures the Contractor uses for processing payments if the Contractor: • Notifies the Subcontractor in writing at least 45 Calendar days before the date on which the Contractor makes the change; and • Includes with the written notice a copy of the new or changed form or a description of the new or changed procedure. (4) An interest penalty clause that obligates the Contractor, if the Contractor does not pay the first-tier Subcontractor within 30 Calendar Days after receiving payment from the Agency, to 6 pay the first-tier Subcontractor an interest penalty on amounts due in each payment the Contractor does not make in accordance with the payment clause included in the subcontract under 00180.21(d-1). The Contractor or first-tier Subcontractor is not obligated to pay an interest penalty if the only reason that the Contractor or first-tier Subcontractor did not make payment when payment was due is that the Contractor or first-tier Subcontractor did not receive payment from the Agency or the Contractor when payment was due. The interest penalty applies to the period that begins on the day after the required payment date and ends on the date on which the amount due is paid; and shall be computed at the rate specified in 00170.10(c). (5) A clause that requires the Contractor's first-tier Subcontractor to include a payment clause and an interest penalty clause that conform to the standards of ORS 279C.580 (see 00180.21(d-1) and 00180.21(d-4)) in each of the first-tier Subcontractor's subcontracts and to require each of the first-tier Subcontractor's subcontractors to include such clauses in their subcontracts with each lower-tier subcontractor or Material supplier. These payment clauses shall require the Contractor to return all retainage withheld from the Subcontractor, whether held by the Contractor or the Agency, as specified in 00195.50(d). As required by ORS 279C.800 through ORS 279C.870, subcontracts shall include: • A provision requiring the subcontractor to have a public works bond filed with the Construction Contractors Board before starting Work on the Project, unless exempt. • A provision requiring that the workers shall be paid not less than the specified minimum hourly rate of wage. Add the following subsection: 00180.21(g) Mentor-Protégé Agreement - If the Contractor enters into a subcontract with an Emerging Small Business (ESB) subcontractor, the Agency may offer the Contractor and its ESB subcontractor an opportunity to enter into a project specific Mentor-Protégé Agreement. The project specific Mentor-Protégé Agreement will be paid for and specified by Change Order. Add the following subsection: 00180.40(c) Specific Limitations - Limitations of operations specified in these Special Provisions include, but are not limited to, the following: Limitations Subsection Cooperation with Utilities ......................................... 00150.50 Railway Work ....................................................... 00170.01(e) Contract Completion Time ................................... 00180.50(h) In-water Work Restrictions ................................... 00290.34(a) Be aware of and subject to schedule limitations in the Standard Specifications that are not listed in this subsection. 7 00180.41 Project Work Schedules - After the paragraph that begins "Contractor's activity…" add the following paragraphs: The Contractor shall submit a supplemental "look ahead" Project Work schedule each week to the Engineer. The "look ahead" Project Work schedule is supplemental to the Type A, B, or C schedule specified below. The supplemental "look ahead" Project Work schedule shall: • Identify the sequencing of activities and time required for prosecution of the Work. • Provide for orderly, timely, and efficient prosecution of the Work. • Contain sufficient detail to enable both the Contractor and the Engineer to plan, coordinate, analyze, document, and control their respective Contract responsibilities. The supplemental "look ahead" Project Work schedule shall be written in common terminology and show the planned Work activities broken down into logical, separate activities by area, stage, and size and include the following information: • The resources the Contractor, subcontractors, or services will use. • The locations of each activity that will be done including the limits of the work by mile posts, stations, or other indicators. • The time frames of each activity by Calendar Days, shifts, and hours. • All anticipated shoulder, lane, and road closures. At a minimum, the Contractor shall prepare a bar chart that: • Shows at least three weeks of activity including the week the bar chart is issued. • Uses a largest time scale unit of one Calendar Day. Smaller time scale units may be used if needed. • Is appropriate to the activities. • Identifies each Calendar Day by month and day. Include the Contract name, Contract number, Contractor's name, and date of issue on each page of the bar chart. The Contractor shall submit the supplemental "look ahead" Project Work schedule starting at First Notification and continuing each week until Second Notification has been issued and all punch list items and final trimming and clean up has been completed. The Contractor shall meet with the Engineer each week to review the supplemental "look ahead" Project Work schedule. If the Engineer or the Contractor determines that the current supplemental "look ahead" Project Work schedule requires changes or additions, either notations can be made on the current schedule or the Engineer may require the submittal of a revised supplemental "look ahead" Project Work schedule. Review of the current and subsequent supplemental "look ahead" Project Work schedules does not relieve the Contractor of responsibility for timely and efficient execution of the Contract. Add the following subsection: 00180.50(h) Contract Time - There are two Contract Times on this Project as follows: (1) Track Outage Time - Railroad track may be taken out of service for 12-hour daily work windows (7:00 a.m. to 7:00 p.m. Monday through Thursday) and one 60-hour work window per week (Friday 7:00 a.m. to Sunday 7:00 p.m.). Contractor must return the track, in a safe 8 condition to run trains, by the end of the daily or 60-hour work window. Contractor may make other arrangements with the railroad. Such modified arrangements need to be in writing, signed by the railroad and Contractor with copies provided to the Engineer. (2) Complete all Work to be done under the Contract, except for seeding establishment, not later than September 15, 2015. 00180.85(b) Liquidated Damages - Add the following paragraph: The liquidated damages for failure to complete the Work on time for each work window required by 00180.50(h)(1) will be $1000.00 per Calendar Day *. * Calendar Day amounts are applicable when the Contract time is expressed on the Calendar Day or fixed date basis. SECTION 00210 – MOBILIZATION Comply with Section 00210 of the Standard Specifications. SECTION 00245 - TEMPORARY WATER MANAGEMENT Section 00245, which is not a Standard Specification, is included in this Project by Special Provision. Description 00245.00 Scope - This work consists of furnishing, installing, operating, maintaining, and removing temporary water management facilities in regulated work areas. The Agency Temporary Water Management Plan consists of installing an upstream dam, pumping the water through a pipe around the work zone, and discharging downstream of the work in a controlled manner such that erosion and turbidity are not caused. Pipe may be placed between railroad ties beyond the section of track to be removed. 00245.02 Definitions: Temporary Water Management Facility - A facility that conveys water around work areas, removes water from work areas, and treats and discharges water at locations outside work areas. 00245.03 Temporary Water Management Plan - The Agency Temporary Water Management Plan (TWMP) is a concept plan. 28 Calendar Days before beginning work in regulated work areas, submit stamped working drawings of a Contractor-developed TWMP, according to 00150.35, based on either the Agency’s concept plan or an independent plan that meets water quality and environmental guideline requirements and does not affect neighboring properties or water rights. Include at least the following information: • The sequence and schedule for dewatering and re-watering. 9 • How the work area will be isolated from the active stream flow upstream, through, and downstream. • How the stream flow will be routed and conveyed around or through the isolated work area. • How the isolated area will be de-watered. • How the pumped water will be treated before it is discharged downstream. • Discuss all construction stages. • A list of on-site backup materials and equipment • Calculations of water withdraw pumps capacity. Obtain the Engineer's written approval before beginning work in in-water work areas. Materials 00245.10 Materials - Furnish materials meeting the following requirements: Pipe ..................................................................... 00445.11 Plastic Sheeting ............................................... 00280.14(a) Sandbags ........................................................ 00280.15(a) Water Intake Screening.................................... 00290.34(c) Furnish pumps that are: • Self priming. • Equipped with a variable speed governor. • Equipped with a power source. • Able to pump water that contains soft and hard solid. Construction 00245.40 Fish Removal - The Agency or ODFW biologists will remove fish and aquatic life from the isolation work areas. Allow them access into the isolation work areas before and after installation of the temporary water management facilities as follows: • Before Installation of Facilities - Before installing temporary water management facilities they will remove fish and aquatic life within the proposed isolated work area. • After Installation of Facilities - After installing temporary water management facilities begin reducing the water level through the isolated work area. They will remove all fish and aquatic life as the water level is reduced. Do not de-water the isolation area until all fish and aquatic life have been removed. 00245.41 Installation - During installation of the temporary water management facility, maintain a downstream water flow rate of at least 50 percent of the upstream water flow rate. 00245.42 Operation - Operate temporary water management as follows: • Protect fish and fish habitat according to 00290.34. 10 • Maintain and control water flow downstream of the isolated work area for the duration of the diversion to prevent downstream de-watering. • Clean and repair water intake screening to maintain adequate flow and protection of aquatic life. 00245.43 Maintenance - Monitor water turbidity according to 00290.30(a-8). 00245.44 Removal - Remove the temporary water management facility and rewater and restore the stream flow when approved by the Engineer. Maintain downstream water flow during removal of the facility. Measurement 00245.80 Measurement - No measurement of quantities will be made for temporary water management facilities. Turbidity monitoring will be measured according to 00290.80. Payment 00245.90 Payment - The accepted quantities of temporary water management facilities will be paid for at the Contract lump sum amount for the item "Temporary Water Management Facility". Payment will be payment in full for furnishing and placing all materials, and for furnishing all equipment, labor, and incidentals necessary to complete the work as specified. Turbidity monitoring will be paid according to 00290.90. No separate or additional payment will be made for designing, maintaining, operating, moving, and removing the facility. SECTION 00280 - EROSION AND SEDIMENT CONTROL Comply with Section 00280 of the Standard Specifications modified as follows: 00280.30 Erosion and Sediment Control Manager - Replace the paragraph and corresponding six bullets that begins: Designate and provide…" with the following paragraph: Designate and provide an ESCM that possesses a valid ODOT ESCM certificate. In the bullet that begins "Inspect erosion control BMP…", replace the value "5/8 inch" with "1/2 inch". 00280.80(d) Area Basis - Replace the paragraph that begins "Area basis items..." with the following paragraph: 11 Area basis items will be measured on the area basis along the ground surface, and computed to the square yard or acre as appropriate. SECTION 00290 - ENVIRONMENTAL PROTECTION Comply with Section 00290 of the Standard Specifications modified as follows: 00290.20(c-2) Clean "OAR 340-093-0030". Fill - In the paragraph, replace "OAR 340-093-0030(13)" with 00290.20(c-3) Reuse, Recycle, and Dispose of Materials - Replace the bullet that begins "Reuse demolition…" with the following bullet: • Reuse demolition debris. 00290.20(c-3-d) Concrete and Masonry - Replace the paragraph that begins "Concrete and masonry…" with the following paragraph: Concrete and masonry, that is not recycled and does not contain hazardous substances, may be reused to fill basements or be buried in embankments on-site, provided that the materials are broken into pieces not exceeding 15 inches in any dimension, and placed so that: 00290.20(d) Hazardous Waste Management - In the paragraph that begins "In addition to current Laws…", replace the two bullets that begin "If the quantity of hazardous waste projected to be…" with the following three bullets: • If the quantity of hazardous waste projected to be generated meets the requirements for a LQG, prepare a full Hazardous Waste Contingency Plan according to 40 CFR 265 Subpart D. Maintain a copy of the Contingency Plan on-site at all times during construction activities, readily available to employees and inspectors. • If the quantity of hazardous waste projected to be generated meets the requirements for a SQG, prepare a modified Hazardous Waste Contingency Plan according to 40 CFR 262.34(d)(5) and 40 CFR 265 Subpart C. Maintain a copy of the modified Contingency Plan on-site at all times during construction activities, readily available to employees and inspectors. • If the quantity of hazardous waste projected to be generated meets the requirements for a CEG, follow the contingency planning and storage requirements of the SQG unless the only potentially hazardous waste is aerosol cans smaller than 20 ounces. Limit storage to 180 days and 2,200 pounds. Prepare a modified Hazardous Waste Contingency Plan and keep a copy on-site with emergency response procedures and contact information. 00290.20(g) Spills and Releases - In the paragraph that begins "Obtain a response agreement…", replace the term "29 CFR 1920.120" with the term "29 CFR 1910.120". Replace the lead-in paragraph that begins "In the event…", with the following lead-in paragraph: 12 In the event of a spill or release of a hazardous substance or hazardous waste or the release of any other material that has the potential to harm human health or the environment, do the following: 00290.30(a) Pollution Control Measures - Add the following subsections and bullets: (7) Water Quality: • Do not discharge contaminated or sediment-laden water, including drilling fluids and waste, or water contained within a work area isolation, directly into any waters of the State or U.S. until it has been satisfactorily treated (for example: bioswale, filter, settlement pond, pumping to vegetated upland location, bio-bags, dirt-bags). Treatment shall meet the turbidity requirements below. • Do not cause turbidity in waters of the State or U.S. greater than 10% above background reading (up to 100 feet upstream of the Project), as measured 100 feet downstream of the Project. • During construction, monitor in-stream turbidity and inspect all erosion controls daily during the rainy season and weekly during the dry season, or more often as necessary, to ensure the erosion controls are working adequately meeting treatment requirements. • If construction discharge water is released using an outfall or diffuser port, do not exceed velocities more than 4 feet per second, and do not exceed an aperture size of 1 inch. • If monitoring or inspection shows that the erosion and sediment controls are ineffective, mobilize work crews immediately to make repairs, install replacements, or install additional controls as necessary. • Underwater blasting is not allowed. • Implement containment measures adequate to prevent pollutants or construction and demolition materials, such as waste spoils, fuel or petroleum products, concrete cured less than 24 hours, concrete cure water, silt, welding slag and grindings, concrete saw cutting by-products and sandblasting abrasives, from entering waters of the state or U.S. • End-dumping of riprap within the waters of the state or U.S. is not allowed. Place riprap from above the bank line. • Cease project operations under high flow conditions that may result in inundation of the project area, except for efforts to avoid or minimize resource damage. • The Project Manager retains the authority to temporarily halt or modify the Project in case of excessive turbidity or damage to natural resources. 00290.34 Protection of Fish and Fish Habitat - Add the following paragraph: Meet with an Agency Biologist, Resource Representative, and SWC Project Manager before moving equipment on-site or beginning any work, to ensure that all parties understand the locations of sensitive biological sites and the measures that are required to be taken to protect them. 00290.34(a) Regulated Work Areas - Add the following to the end of this subsection: The regulated work area is the area within the ordinary high water (OHW) elevation that is shown on the plans. • For this Project, the regulated work area is the area at or below 69.5 feet elevation at creek station 14+17 and 74.8 feet elevation at creek station 15+37. 13 • Perform work within the regulated work area only during the in-water work period. The inwater work period is from July 1 to September 15. Submit a schedule to complete all work within the regulated work area within the in-water work period at least 10 days prior to the preconstruction conference. 00290.34(b) Prohibited Operations - Add the following bullets to the end of this subsection: • Allow equipment to enter or work in or on the water. Add the following subsection: 00290.34(c) Fish Protection Measures Required by Environmental Permits: (1) General Equipment Requirements - Use heavy equipment as follows: • Choice of equipment must have the least adverse effects on the environment (for example: minimally sized, low ground pressure). • Before operations begin and as often as necessary during operation, steam clean all equipment that will be used below the regulated work area until all visible oil, grease, mud, and other visible contaminants are removed. Complete all cleaning in approved staging areas. • Secure absorbent material around all stationary power equipment ( for example: generators, cranes, drilling equipment) operated within 150 feet of wetlands, waters of the State and U. S., drainage ditches, or water quality facilities to prevent leaks, unless suitable containment is provided to prevent spills from entering waters of the state and U.S. • Do not cross directly through a stream for construction access, unless shown or approved. • Do not install fish ladders (for example: pool and weirs, vertical slots, fishways) or fish trapping systems. • The volume of material filled or discharged into waters of the state or U.S. plus the volume excavated shall not exceed 212 cubic yards. • Do not apply surface fertilizer within 50 feet of any stream channel. (2) Work Area Isolation - Provide work isolation according to Section 00245. (3) Water Intake Screening - Install, operate, and maintain fish screens on each water intake used for project construction, including pumps used to isolate an in-water work area. When drawing or pumping water from any stream, protect fish by equipping intakes with screens having a minimum 27% open area and meeting the following requirements: • Perforated plate openings shall be 3/32 inch or smaller. • Mesh or woven wire screen openings shall be 3/32 inch or smaller in the narrowest direction. • Profile bar screen or wedge wire openings shall be 1/16 inch or smaller in the narrow direction. Choose size and position of screens to meet the following criteria: 14 Type Ditch Screen Approach Velocity 1 (Ft./Sec.) ≤ 0.4 Sweeping Velocity 2 (Ft./Sec.) Divide max. Shall exceed water flow rate approach (cfs) by velocity 0.4 fps Screen with proven selfcleaning system ≤ 0.4 – Screen with no cleaning system other than manual ≤ 0.2 – 1 2 Wetted Area of Screen (Sq. Ft.) Divide max. water flow rate (cfs) by 0.4 fps Divide max. water flow rate (cfs) by 0.2 fps Comments If screen is longer than 4 feet, angle 45° or less to stream flow – Pump rate 1 cfs or less Velocity perpendicular to screen face at a distance of approximately 3 inches Velocity parallel to screen Provide ditch screens with a bypass system to transport fish safely and rapidly back to the stream. (4) Special Aquatic Habitats - The following exploration or construction activities are not allowed in special aquatic habitats: • Use of pesticides and herbicides. • Use of short pieces of plastic ribbon to determine flow patterns. • Temporary roads or drilling pads built on steep slopes, where grade, soil type, or other features suggest a likelihood of excessive erosion or slope failure. • Exploratory drilling in estuaries that cannot be conducted from a work barge, or an existing bridge, dock, or wharf. • Installation of a fish screen on any permanent water diversion or intake that is not already screened. • Projects that require in-water installation of hollow steel piling greater than 24 inches in diameter, or use of H-pile larger than designation HP24. • Drilling or sampling in an EPA-designated Superfund Site, a state-designated clean-up area, or the likely impact zone of a significant contaminant source, as identified by historical information or U. S. Army Corps of Engineer representative. (5) Site Restoration - Restore damaged streambanks to a natural slope, pattern, and profile suitable for establishment of permanent woody vegetation unless precluded by pre-project conditions (for example: natural rock substrate): • Replant all damaged streambanks outside of project limits before the first April 15 following construction. • If use of large wood, native topsoil, or native channel material is required for the site restoration according to the roadside development plans, stockpile all large wood, native vegetation, weed-free topsoil, and native channel material displaced by construction. Cut trees or large wood and trees into pieces of no less than 20 feet in length, or as 15 shown on the roadside development plans or as directed. Stockpiled native wood and vegetation remain the property of the Agency. • Stabilize all disturbed soils, including obliteration of temporary access roads, following any break in work unless construction will resume in 4 Calendar Days. (6) Surface Water Diversions - Surface water may be diverted to meet construction needs other than work area isolation, consistent with Oregon law, only if water from sources that are already developed, such as municipal supplies, small ponds, reservoirs, or tank trucks, is unavailable or inadequate, and meeting the following conditions: • When alternative surface sources are available, divert from the stream with the greatest flow. • Install, operate, and maintain a temporary fish screen. • Do not exceed a pumping rate and volume of 10% of the available flow. For streams with less than 5 cubic feet per second, do not exceed drafting of 18,000 gallons per day. Do not use more than one pump for each site. (7) Hydro-Acoustic - Hollow steel piling 24 inches in diameter or smaller and H-pile designated as HP24 or smaller may be installed below the ordinary high water as follows: • Minimize the number and diameter of pilings, as feasible. • Repairs, upgrades, and replacement of existing pilings consistent with these conditions are allowed. In addition, up to five single pilings or one dolphin consisting of three to five pilings may be added to an existing facility. • Whenever feasible, use vibratory hammer for piling installation. Otherwise, use the smallest drop or hydraulic impact hammer necessary to complete the job, and set the drop height to the minimum necessary to drive the piling. • When using an impact hammer to drive or proof steel pile, one of the following sound attenuation devices must be used to reduce sound pressure levels by 20 dB. • Place a block of wood or other sound dampening material between the hammer and the piling being driven. • If water velocity is 1.7 miles per hour or less, surround the piling being driven by an unconfined bubble curtain that will distribute small air bubbles around 100% of the piling perimeter for the full depth of the water column. Contract the Project Manager for guidance on how to deploy an effective, economical bubble curtain. • If water velocity is greater than 1.7 miles per hour, surround the piling being driven by a confined bubble curtain (for example: a bubble ring surrounded by a fabric or metal sleeve) that will distribute air bubbles around 100% of the piling perimeter for the full depth of the water column. • Written approval of an alternative sound attenuation plan may be requested to the U. S. Army Corps of Engineers through the Project Manager, provided the plan will maintain sound pressure levels below 150dB rms (1 micro Pascal) for a minimum of 50% of the driver strikes, and peak sound pressure levels below 180 dB rms (1 micro Pascal) for all strikes. (8) Drilling, Boring, or Jacking - If drilling, boring, or jacking is used, the following conditions apply: • Design, build, and maintain facilities to collect and treat all construction and drilling discharge water using the best available technology applicable to site conditions. 16 • • • • • Provide treatment to remove debris, nutrients, sediment, petroleum hydrocarbons, metals, and other pollutants likely to be present. An alternate to treatment is collection and proper disposal offsite. Isolate drilling operations from wetted stream to prevent drilling fluids from contacting waters of the state and U.S. Use casing to prevent loss of drilling fluid to the subsurface formation. Do not drill open hole. If it is necessary to drill through an over-water bridge deck, use containment measures to prevent drilling debris from entering the stream channel. If drilling fluid or waste is released to surface water, wetland or other sensitive environment, cease all drilling pending written approval from appropriate regulatory agencies through the Project Manager to resume drilling. Recover all waste and spoils if precipitation is falling or imminent. Recover, recycle, or dispose of all drilling fluids and waste to prevent entry into flowing water. • Recycle drilling fluids using a tank instead of drill recovery/recycling pits, whenever feasible. • When drilling is completed, make attempts to remove the remaining drilling fluid from the sleeve (for example: by pumping) to reduce turbidity when the sleeve is removed. (9) Treated Wood - Do not use lumber, pilings, or other wood products that are treated or preserved with pesticidal compounds below the ordinary high water (OHW) or as part of an inwater or over-water structure, except as described below: • Store treated wood shipped to the Project out of contact with standing water and wet soil, and protected from precipitation. • Visually inspect each load and piece of treated wood. Reject for use in or above aquatic environments if visible residues, bleeding of preservative, preservative-saturated sawdust, contaminated soil, or other matter is present. • Pilings treated with ammoniacal copper zinc arsenate, chromated copper arsenate, or creosote may be installed below OHW provided that no more than 50 piles are used. No other use for treated wood or preservative type is allowed below or over the OHW. • Use pre-fabrication to the extent feasible. When field fabrication is necessary, all cutting and drilling of treated wood, and field preservative treatment of wood exposed by cutting and drilling, shall occur above the OHW. Use tarps, plastic tubs, or similar devices to contain the bulk of any fabrication debris, and wipe off any excess field preservative. • All treated wood structures, including pilings, shall have design features to avoid or minimize impacts and abrasion by livestock, pedestrians, vehicles, vessels, and floats. • Treated wood may be used to construct a bridge, over-water structure or an in-water structure, provided that all surfaces exposed to leaching by precipitation, overtopping waves, or submersion are coated with a water-proof seal or barrier are maintained. Apply and contain coatings and paint-on field treatment to prevent contamination. Surfaces that are not exposed to precipitation or wave attack, such as parts of a timber bridge completely covered by the bridge deck, are exempt from this requirement. • During demolition of treated wood, ensure that no treated wood debris falls into the water. If treated wood debris does fall into the water, remove it immediately. • Store removed treated wood debris in appropriate dry storage areas, at least 150 feet away from the regulated work area. (10) Piling Removal - If a temporary or permanent piling will be removed, the following conditions apply: 17 • Dislodge the piling with a vibratory hammer, whenever feasible. • Once loose, place the piling onto the construction barge or other appropriate dry storage site. • Ensure remaining treated wood piling is broken, cut, or pushed at least 3 feet below the sediment surface and covered with a cap of clean, native substrates that match surrounding streambed materials. • Fill holes left by each piling with clean, native sediments whenever feasible. (11) Ditch and Culvert Cleaning - Complete ditch cleaning, culvert and trash rack cleaning by working from the top of bank, unless work area isolation would result in less habitat disturbance. • Do not work more than 20 feet upstream or downstream the culvert or trash rack. • Remove only the minimum amount of wood, sediment, or other natural debris necessary to maintain the facility’s function, without disturbing spawning gravel or changing the configuration of the original ditch, unless the new configuration is part of the project design. • Place all large wood, cobbles, and gravels recovered from during culvert and trash rack cleaning downstream from the structure. • Complete drift removal in the following priority, as directed: • Pull and release whole logs or trees downstream. • Pull whole logs and trees and place in the riparian area, as directed. • Remove whole logs or trees only if roadside development plans have been developed for replacement in-kind. • Pull, cut only as necessary, and release logs and trees downstream. (12) Floating Structures - The following types of over-water or in-water structures are not allowed: • • • • • • • • • • boat house boat ramp made of asphalt buoy or float in an active anchorage or fleeting area covered moorage floating storage unit houseboat marine pier non-water related facilities (including staging areas) inside riparian management areas any other over-water structure more than 6-feet wide unless otherwise approved in writing by appropriate regulatory agencies through the Project Manager The following conditions apply to floatation structures: • Concrete boat ramps that consist of pre-cast concrete slabs below the ordinary high water elevation, and higher elevation portions that are completed in the dry so that no wet concrete that has cured less than 24 hours is allowed to contact any wetland or waters of the state and U.S. 18 • Rock may be used to construct a boat ramp footing, or other protection necessary to prevent scouring, down-cutting, or failure of the boat ramp, provided that the rock does not extend further than 4 feet from the edge of the ramp in any direction. • Any replacement roof, wall, or garage door for covered moorages and boat houses must be made of translucent materials or skylights. In addition, each side, except the door, of the boat house shall have windows at least 4 feet wide installed the length of the boat house, subject to breaks only for structural support. • An existing marina may be modified within the existing footprint of the moorage, or in the water more than 50 feet from the shoreline and more than 20 feet deep, except that structures may not be placed in areas that support aquatic vegetation or areas where boat operations may damage aquatic vegetation. • Fit all pilings, mooring buoys, and navigational aides with devices to prevent perching by piscivorous birds. • Permanently encapsulate all synthetic flotation material to prevent breakup into small pieces and dispersal in water. • Install small temporary floats less than 7 Calendar Days before a scheduled event, remove them five days after a scheduled event is concluded, and do not leave them in place longer than 21 Calendar Days. • Install mooring buoys and temporary floats (for example: shellfish traps) more than 300 feet from native submerged aquatic vegetation, more than 50 feet from the shoreline, and in water deeper than 20 feet deep at all times, or as necessary to ensure that gear does not ground out unnecessarily, and boats do not prop wash the bottom. Add the following subsection: 00290.36(c) Avoid Nesting - Comply with Migratory Bird Treaty Act (16 U.S.C. 703-712). Submit a migratory bird protection plan for review and approval at least 10 Calendar Days before the pre-construction conference. Include the following: • Describe measures to avoid disturbance to migratory bird nesting habitat (vegetation, structures) from March 1 to September 1 of each year. • Do not begin work until the migratory bird protection plan is approved. • In the event the nesting birds or bats are encountered during construction, the Engineer may suspend the work according to 00180.70 SECTION 00305 - CONSTRUCTION SURVEY WORK Section 00305, which is not a Standard Specification, is included for this Project by Special Provision. Description 00305.00 Scope - Provide construction survey work according to the current edition on the date of Advertisement, of the ODOT "Construction Surveying Manual for Contractors". This manual is available on the web at: http://www.oregon.gov/ODOT/HWY/GEOMETRONICS/documents.shtml Measurement 19 00305.80 Measurement - No measurement of quantities will be made for construction survey work. Payment 00305.90 Payment - The accepted quantities of construction survey work will be paid for at the Contract lump sum amount for the item "Construction Survey Work". Payment will be payment in full for furnishing all material, equipment, labor, and incidentals necessary to complete the work as specified. No separate or additional payment will be made for all temporary protection and direction of traffic measures including flaggers and signing necessary for the performance of the construction survey work. No separate or additional payment will be made for preparing surveying documents including but not limited to office time, preparing and checking survey notes, and all other related preparation work. Progress payments will not be in excess of the reasonable value of the surveying work estimated by the Engineer. Costs incurred caused by survey errors will be at the Contractor's expense. These costs include price adjustments for failure to meet requirements of the "Construction Surveying Manual for Contractors", repair or removal and replacement of deficient product, and over-run of material. SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS Comply with Section 00310 of the Standard Specifications modified as follows: 00310.41(a) General - Replace this subsection, except for the subsection number and title, with the following: Where an abutting structure or part of a structure is to be left in place, make clean, smooth, vertical cuts with a saw or other approved cutting device. Avoid operations that may damage any portion of the remaining structure. SECTION 00320 - CLEARING AND GRUBBING Comply with Section 00320 of the Standard Specifications modified as follows: 00320.40(b) Preserving and Trimming Vegetation - Add the following to the end of this subsection: 20 (4) Trees To Be Saved - The Engineer will identify and mark trees to be saved. Provide and place orange plastic mesh fencing, from the QPL, around critical root zones of marked trees or tree groups as directed. Do not begin construction activity or move equipment into existing tree areas until the plastic mesh fencing is in place. Do not work within the critical root zone of marked trees unless written approval is obtained from the Engineer. Be responsible for all damage to or for removal of marked trees. Tree damage will be determined by a certified arborist selected by the Engineer. 00320.42 Ownership and Disposal of Matter - Replace this subsection with the following subsection: 00320.42 Disposal of Matter - Dispose of all matter and debris according to 00290.20. 00320.90 Payment - Add the following after the first paragraph of this subsection: No separate or additional payment will be made for plastic mesh fencing. SECTION 00330 - EARTHWORK Comply with Section 00330 of the Standard Specifications modified as follows: 00330.03 Basis of Performance - Add the following paragraph to the end of this subsection: Perform all earthwork under this Section on the excavation basis. 00330.20 Tamping Foot Rollers - In the paragraph, replace "115 tons" with "15 tons". 00330.41(a-5) Waste Materials - Replace this subsection, except for the subsection number and title, with the following: Unless otherwise specifically allowed and subject to the requirements of 00280.03, dispose of materials, classed as waste materials in 00330.41(a-3) and 00330.41(a-4), outside and beyond the limits of the Project and Agency controlled property according to 00290.20. Do not dispose of materials on wetlands, either public or private, or within 300 feet of rivers or streams. 00330.71 Daily Progress Reports - Delete this subsection. 00330.92 Kinds of Incidental Earthwork - Delete the bullet that reads "If shown on the plans.". Add the following bullet: • Saw cutting of pavement SECTION 00390 - RIPRAP PROTECTION Comply with Section 00390 of the Standard Specifications modified as follows: 21 00390.11(b) Test Requirements - Under the "Material Test" column next to "Degradation" replace (ODOT TM 208A) with (ODOT TM 208). Under the "Requirement" column next to "Sediment Height" replace 8" with 8.0". 00390.44(b) Loose Riprap - Replace the bullet that begins "According to 00350.43…" with the following bullet: • According to 00350.41(d), if riprap is placed on geotextile. SECTION 00443 - RAPID SETTING CONTROLLED LOW STRENGTH MATERIALS Section 00443, which is not a Standard Specification, is included in this Project by Special Provision. Description 00443.00 Scope - This work consists of furnishing and placing rapid setting controlled low-strength materials (RSCLSM) in lieu of placing a backing plate and compacting granular structural backfill under the end bent caps. 00443.01 Definition - RSCLSM is flowable mixture of sand, cementitious materials, water, and additives. Materials 00443.10 Materials - Furnish materials meeting the following: Admixtures .............................................................. Modifiers ................................................................. Portland Cement ..................................................... Water ...................................................................... 02040 02030 02010 02020 00443.11 Fine Aggregates - Furnish fine aggregates that are commercial quality concrete sand. 00443.12 RSCLSM Mixture - Provide a RSCLSM mixture that achieves at least 500 psi, measured by concrete pocket penetrometer, within 5 hours of placement and at least 50 psi within 1 hour of placement. Placement of granular structural backfill may commence when RSCLSM can be walked on without indenting more than 1-inch. 00443.13 Submittals - Furnish the following to the Engineer, before using RSCLSM: • Mix design showing all proportions and additives. • Time and unconfined compressive strength data using concrete pocket penetrometer from a trial batch or from a previous installation that used a RSCLSM mixture of similar proportioning. 00443.14 Acceptance - Acceptance will be based on the Engineer's review of the mix design and checked by visual observation and concrete pocket penetrometer after placement. 22 Measurement 00443.80 Measurement - No measurement of quantities will be made for RSCLSM. Payment 00443.90 Payment - No separate or additional payment will be made for RSCLSM. Payment will be included in payment made for the appropriate items under which this work is required. SECTION 00510 - STRUCTURE EXCAVATION AND BACKFILL Comply with Section 00510 of the Standard Specifications modified as follows: 00510.80(b-1) Structure Excavation (Lump Sum) - Add the following to the end of this subsection: The estimated quantity of structure excavation is: Location End Bent 1 End Bent 2 Structure Excavation (Cubic Yard) 32 32 00510.80(c-1) Structure Excavation Below Elevations Shown (Lump Sum) - In the first bullet, replace "00190.10(f)" with "00190.10(h)". 00510.80(d) Granular Wall/Structure Backfill - Replace this subsection, except for the subsection number and title, with the following: No measurement of quantities will be made for granular wall backfill or granular structure backfill. The estimated quantity of granular wall backfill or granular structure backfill is: Location End Bent 1 End Bent 2 Granular Structure Backfill (Cubic Yard) 20 20 00510.90(c-1) Structure Excavation Below Elevations Shown (Lump Sum) - In the sentence that begins "For excavation 0 to 3 feet…", replace "00190.10(f)" with "00190.10(h)". 00510.90(d) Granular Wall/Structure Backfill - Replace this subsection, except for the subsection number and title, with the following: Granular structure backfill will be paid for at the Contract lump sum amount for the items "Granular Wall Backfill" or "Granular Structure Backfill", as applicable. 23 Rapid set controlled low strength material in accordance with 00443 may be substituted for Granular Structure Backfill and placement of the ⅜” x 24” steel plate in the area beneath precast concrete end bent caps and wingwalls. 24 SHORING DESIGN CHECKLIST Instructions - This shoring design checklist was developed to facilitate the design, review, and erection of shoring to be used for ODOT bridge construction projects. This checklist is intended to act as a reminder to design or check for specific important aspects of this construction. It is not a substitute for plan and/or design criteria or specification requirements. The Checklist is to be completed and signed by the shoring design engineer. Answer every question. Attach to the Checklist an explanation of any negative responses. Submit the Checklist according to 00510.04. A. NO N/A Are the shoring plans prepared, stamped, and signed by an engineer registered to practice in Oregon? ____ ____ ____ Have three copies (five copies if railroad approval is required) of the complete design calculations accompanied the shoring drawings submittal? ____ ____ ____ Are shoring plans in compliance with the requirements of the construction plans general notes and the AREMA Manual for Railway Engineering Chapter 8 if supporting railway track? ____ ____ ____ Are shoring plans in compliance with contract plan structural details? ____ ____ ____ Are shoring plans in compliance with the requirements of the Oregon Standard Specifications for Construction, subsection 00150.35? ____ ____ ____ Are all existing, adjusted or new utilities in proximity with the proposed shoring shown on the shoring plans and is protection of these utilities addressed? ____ ____ ____ Are clearance requirements satisfied and shown on the shoring plans? ____ ____ ____ Are the magnitude and location of all loads, equipment and personnel that will be supported by the shoring shown or noted on the shoring plans? ____ ____ ____ Are design loads and material properties used to determine design stresses shown for each different shoring member shown on the shoring plans? ____ ____ ____ Does the shoring design assume water saturated soil ____ ____ ____ Contract Plans, Specifications, Permits, etc. 1. 2. 3. 4. 5. 6. 7. B. YES Loads 1. 2. 3. 25 pressure acts on the full height of the shoring? 4. C. 2. 2. ____ Have the design loads used for shoring design of all members been noted in the design calculations? ____ ____ ____ Are the allowable stress and the calculated stress listed in the summary for each different shoring member? ____ ____ ____ Are timber grades consistent with material to be delivered to the construction site and noted on shoring drawings and in accompanying calculations for all timber shoring material? ____ ____ ____ If "rough" lumber is specified for shoring by the shoring designer are the actual lumber dimensions used in calculations shown? ____ ____ ____ Are steel structural shapes and plates identified by ASTM number on the shoring plans and in the calculations? ____ ____ ____ Have steel beams been checked for bending, shear, web crippling and buckling of the compression flange? ____ ____ ____ Has general buckling been evaluated for all compression members? ____ ____ ____ Has bracing been provided at all points of assumed support for compression members? ____ ____ ____ Is bracing strength and stiffness sufficient for the intended purpose? ____ ____ ____ Have all connections been designed and detailed? ____ ____ ____ Steel Construction 1. 2. F. ____ Timber Construction 1. E. ____ Allowable Stresses 1. D. Has percolation into the excavation been addressed? Compression Members, Bracing, Members and Connections 1. 2. 3. 4. _________________________ Designer's Signature _______________ Date 26 SECTION 00520 - DRIVEN PILES Comply with Section 00520 of the Standard Specifications modified as follows: 00520.11 Engineer's Estimated Length List - Add the following to the end of this subsection: The Engineer's estimated lengths of steel piling are: Location No. Length (Feet) End Bent 1 End Bent 2 3 3 20 20 Kind HP 14x89 HP 14x89 00520.20(d)(2) Standard Evaluation Method – Replace Table 00520-1 Pile Hammer Requirements with the following: Nominal Pile Bearing Resistance (Kips) 180 Minimum Field Energy (foot-pounds) 30,000 In using the FHWA Gates Equation, a minimum Factor of Safety of 2 for the Rn value shall be obtained if practical refusal cannot be reached. 00520.43(d) Reinforced Pile Tips - Add the following sentence to the end of this subsection: For steel pipe piling, provide (inside) (outside) fit, open end cutting shoes meeting the requirements of 02520.10(e). 00520.44(c) Strength Before Driving - Replace "00550.12(d)" with "00550.12(c)". Add the following subsection: 00520.50 Pile Driving Inspection and Records: Contractor shall provide record of pile driving for each pile on the Pile Driving Record form included in this section. In addition the final tip elevation and bearing value shall be included in red-lined record plans for submittal to the Engineer and Railway. 00520.80(b) (1) Steel Piles - Replace this subsection, except for the subsection number and title, with the following: Steel piles will be the length of each pile in place, prior to abutment excavation, from pile tip to initial cut-off at or below bottom of rail. Final cut-off elevation to be at bottom of end bent cap. 00520.90 Payment - Replace this subsection, except for the subsection number and title, with the following: The accepted quantities of work performed under this Section will be paid for at the Contract unit price, per unit of measurement, for the following items: 27 Pay Item Unit of Measurement HP14x89 Piling, Furnished/Driven ……………………….. Foot Reinforced Pile Tips ……………………………………… Each Partial payments will be made as follows: • When driving piles is complete and equipment has been removed from site.........75% • When welds to pile cap have been approved………………………………………….25% Payment will be payment in full for furnishing and placing all materials including reinforced pile driving tips, and for furnishing all equipment, labor, and incidentals necessary to complete the work as specified. No separate or additional payment will be made for furnishing or maintaining pile driving equipment. No separate or additional payment will be made for furnishing, driving, cutting, or welding of piles or welding of pile driving tips to the piles. No separate or additional payment will be made for welding inspection performed according to 00520.43(g-2). 28 PILE DRIVING RECORD PROJECT ________________________________________________ DATE __________________________________________ PILE NO. ________________________________________________ LOCATION _____________________________________ CONTRACTOR ___________________________________________ FOREMAN _______________________________________________ GROUND ELEVATION ___________________________ OBSERVER ______________________________________________ PILE TIP ELEVATION ____________________________ CUTOFF ELEVATION ____________________________ HAMMER TYPE/SIZE _____________________________________ PILE TYPE/SIZE _________________________________ CAP/HELMET/CUSION ____________________________________ LENGTH _______________________________________ RAM WEIGHT ____________________________________________ BATTER ________________________________________ THROTTLE SETTING _____________________________________ Depth ft 0-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10-11 11-12 12-13 13-14 14-15 15-16 16-17 17-18 18-19 19-20 20-21 21-22 22-23 23-24 24-25 Blows foot Stroke Depth ft 25-26 26-27 27-28 28-29 29-30 30-31 31-32 32-33 33-34 34-35 35-36 36-37 37-38 38-39 39-40 40-41 41-42 42-43 43-44 44-45 45-46 46-47 47-48 48-49 49-50 Blows foot Stroke Depth ft 50-51 51-52 52-53 53-54 54-55 55-56 56-57 57-58 58-59 59-60 60-61 61-62 62-63 63-64 64-65 65-66 66-67 67-68 68-69 69-70 70-71 71-72 72-73 73-74 74-75 Blows foot Stroke Depth ft 75-76 76-77 77-78 78-79 79-80 80-81 81-82 82-83 83-84 84-85 85-86 86-87 87-88 88-89 89-90 90-91 91-92 92-93 93-94 94-95 95-96 96-97 97-98 98-99 99-100 Blows foot Stroke REMARKS: ______________________________________________________________________________________________________ _________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________ _________________________________________________________________________________________________________________ TIME OF START ____________________________________ TIME OF STOP _________________________________ 29 SECTION 00550 - PRECAST PRESTRESSED CONCRETE MEMBERS Comply with Section 00550 of the Standard Specifications modified as follows: 00550.00 Scope – Add the following to this subsection: This work also consists of the manufacture, storage, transportation and installation of precast concrete wingwalls and end bent caps. 00550.11 Materials - Replace the Concrete Coating line with the following: Concrete Coating .................................................... 02210 In the list of materials, add the following line: PCC Repair Material ................................................ 02015 00550.47 Surface Finish - In the paragraph that begins "Provide a roadway finish…", replace the sentence that begins " Provide a roadway finish …" with the following two sentences: Provide a roadway finish on the tops of members that do not have an asphalt concrete wearing surface. Provide a light broom finish on the tops of members that have an asphalt concrete wearing surface. 00550.47(a) General Surface Finish - In the paragraph that begins “Remove all metal form…”, replace the sentence that begins “Repair air pockets…” with the following sentence: Repair air pockets over 1/2 inch in depth, all form tie removals, rock pockets and unsound concrete, and fill resulting holes or depressions with concrete or PCC repair material. 00550.47(b) Class 1 Surface Finish (Ground and Coated) - In the bullet that begins "Thoroughly saturate the surface…", replace "02210.30(c)" with "02210.30". 00550.50 Tie Rods - In the third bullet, replace the sentence that begins "Install compressible washer…" with the following sentence: Install compressible washer type direct tension indicators under the turned nuts and tighten the nuts as recommended by the manufacturer until the gaps in the indicators are nil or as shown. 00550.80 Measurement – Replace this subsection, except for the subsection number and title, with the following: The quantities of precast wingwalls and precast end bent caps will be measured on the unit basis of each member installed. The quantities of precast prestressed beams will be measured on the length basis, and will be the sum of the horizontal lengths shown for each type and size of member. Field measurement of each member length will not be made. The quantities will be 30 determined by calculating the theoretical horizontal length shown, added together for a total for each type and size, then rounded to the nearest foot. The estimated quantity of miscellaneous steel is 445 pounds. 00550.90 Payment - Replace this subsection, except for the subsection number and title, with the following: The accepted quantities of work performed under this Section will be paid for at the Contract unit price, per unit of measurement, for the following items: Pay Item Unit of Measurement Precast Concrete Wingwall CPW2………………………….Each Precast Concrete End Cap CPC4…………………………..Each 30" x 7'-0" Double Box Beam…….………………………….Foot Payment will be payment in full for furnishing and placing all materials, and for furnishing all equipment, labor, and incidentals necessary to complete the work as specified. No separate or additional payment will be made for embedded steel plates and appurtenances, deck plates, beam stops, attachments, inserts, or hardware. SECTION 00582 - BRIDGE BEARINGS Comply with Section 00582 of the Standard Specifications modified as follows: 00582.00 Scope - Replace this subsection, except for the subsection number and title, with the following: This work consists of furnishing and installing elastomeric bridge bearings for bridges as shown, specified, or directed. Add the following subsection: 00582.03 Design - Design and fabricate elastomeric bridge bearings according to the latest edition of the AREMA Manual for Railway Engineering, Chapter 15, Part 5 Bearing Design and Construction. 00582.10 Materials - Replace this subsection, except for the subsection number and title, with the following: Furnish elastomeric bridge bearings from the QPL in the thickness, sizes and hardness shown on the plans and meeting the requirements of Section 02571. SECTION 00910 - WOOD SIGN POSTS Comply with Section 00910 of the Standard Specifications modified as follows: 31 00910.10 Materials - Replace the sentence that begins "Furnish wood posts…" with the following sentence: Furnish Douglas fir wood posts meeting the following requirements: 00910.80 Measurement - In the paragraph that begins “The quantities of wood…”, replace the first sentence with the following sentence: The quantities of wood sign posts will be measured on the volume basis in units of foot board measure (FBM). SECTION 00940 - SIGNS Comply with Section 00940 of the Standard Specifications modified as follows: 00940.03 Drawings - Replace the sentence that begins “The ODOT sign policy…” with the following sentence: The ODOT sign policy is available on the ODOT Traffic-Roadway Section web site. 00940.46 Inspection - Replace the sentences that begin "Inspection will…" and "Testing for…" with the following sentence: Inspection will be for conformance to the plans and Specifications, and for conformance to nighttime visibility. SECTION 01050 - FENCES Comply with Section 01050 of the Standard Specifications. SECTION 01091 - WATERWAY ENHANCEMENTS Section 01091, which is not a Standard Specification, is included in this Project by Special Provision. Description 01091.00 Scope - This work consists of constructing waterway enhancements such as rocks, streambed material, and other types of waterway items as shown or directed. Based on the existing conditions of this project, the following recommendations should be considered for this project: 32 • • • Temporary roadways or entry ways created as a means of access to the stream channel shall leave minimal damage to the existing stream banks. Haul road shall not be cut in the stream channel slopes. Provide for specialized excavation equipment that will minimize impacts to the stream banks. Methods that will further minimize impacts to the stream such as craning, daisy chaining with additional excavators, or similar processes shall be used to transport material into the channel. Pushing materials down the stream banks with machinery will not be allowed. Material delivery methods and excavation methods for the stream channel shall be pre-approved by the Engineer before construction begins. Materials 1091.10 Material - Provide materials meeting the following requirements: (a) Waterway Enhancement Rocks –Rounded rock consisting of clean, hard, durable material meeting the gradation requirements of Class 200 Riprap Section 00390.11(c). Furnish rock satisfying the testing requirements of Section 00390.11(b). Waterway Enhancement Rock will be accepted pending visual inspection from the Engineer. (b) Waterway Enhancement Filter Blanket – Gravel material meeting the requirement of Section 00390.13 for Class 200 Riprap (c) Waterway Enhancement Streambed Material – Streambed material will consist of a mixture of large and small cobbles, gravel, and fine material. Streambed material shall consist of the following gradation: Percent Passing by weight 100 85-100 50-85 15-50 Diameter (inches or sieve size) 10 inches 4 inches 1.5 inches 0.5 inches 10-15 No. 20 Waterway streambed enhancement material shall consist of round clean, hard, durable material that is well graded from the maximum size to the minimum size. Waterway Enhancement Streambed Material will be accepted pending visual inspection from the Engineer. Waterway streambed enhancement material can be the native material excavated from the streambed during construction. If the Contractor prefers to reuse excavated streambed material, care must be taken to keep this material separated from other general excavation during excavation, removal, storage, and placement. Water Enhancement Streambed Materials obtained from excavation may be used upon visual inspection from the Engineer. Material obtained from the project excavation shall be used on the top lift. 33 (d) Waterway Enhancement Sand - Sand material shall consist of clean material satisfying Section 00360.10 – Sand Drainage Blanket. Construction 01091.40 General: Unless otherwise directed, place the riprap protection as the embankment is constructed. Its placement shall lag behind embankment construction only as necessary to allow proper embankment construction and prevent mixture of embankment and riprap material. (a) Waterway Enhancement Rocks – Place rocks on the prepared area as shown in the project plans for construction of sediment retention sills and along disturbed stream bank areas: • • • • • • With a clam-shell, orange-peel bucket, skip or similar approved device which will contain the riprap material to its final destination. Do not open the bucket until it has been lowered to the slope on which the material is being placed. To its full course thickness in one operation. By methods that do not cause segregation of riprap or displace the underlying material. To produce a compact riprap protection in which all sizes of material are placed in their proper proportion. With some hand placing, or rearranging of individual stones by mechanical equipment, or some other approved means to provide a smooth finished surface. Without causing any damage to the railroad bridge structure. (b) Waterway Enhancement Filter Blanket – Place filter blanket on the prepared area to the full specified thickness in one operation, using methods which will not cause segregation. The surface of the finished layer shall be reasonably even. (c) Waterway Enhancement Streambed Material – Mix cobbles, gravel and fine mixture onsite to assure well graded mixture. Place mixture in a series of lifts with no lift exceeding a depth of 1.5 feet. Each lift shall be compacted well through the use of the excavator and bucket. The final lift shall incorporate, to the maximum extent possible, materials obtained from the excavation of the streambed. (d) Waterway Enhancement Sand - Place 2 inches of clean sand over waterway streambed enhancement material and hydrowash with high pressure water to force the fines to fill the void spaces and further compact the streambed material. Apply water until it pools briefly. Avoid overwatering and causing turbidity downstream or subsurface flow. Only imported water is to be used. Maintenance 01091.60 General - Maintain the riprap protection until accepted. displaced by any cause at no additional cost to the Agency. Replace any material Measurement 34 01091.80 Section. General - No measurement of quantities will be made for work performed under this The estimated quantities of Waterway Enhancements are: Waterway Enhancement Rock Waterway Enhancement Filter Blanket Waterway Enhancement Streambed Materials Waterway Enhancement Sand 200 Cubic Yard 300 Square Yard 86 Cubic Yard 12 Cubic Yard Payment 01091.90 General - Payment for waterway enhancement work will be paid for at the Contract lump sum amount for the item “Waterway Enhancements”. Payment will be payment in full for furnishing and placing all materials and for furnishing all equipment, labor, and incidentals necessary to complete the work as specified. SECTION 02001 - CONCRETE Comply with Section 02001 of the Standard Specifications modified as follows: 02001.02 Abbreviations and Definitions - Replace the "Modifiers" line with the following: Modifiers - Pozzolans, ground granulated blast furnace slag, and latex. Replace the "Pozzolans" line with the following: Pozzolans - Fly ash, silica fume, and metakaolin. 02001.20 Concrete Properties, Tolerances, and Limits – replace paragraphs (a), (b) and (c) with the following: Precast Concrete, using a ¾” aggregate, shall have minimum compressive strength, f’c, of 4000 psi at 28 days and a maximum water/cement ratio of 0.45. The minimum cement content shall be 611 pounds per cubic yard. Air entrainment for precast concrete using ¾” aggregate, as measured prior to placement, shall be plus or minus 1 percent of 6%. Slump as measured prior to placement without the use of water reducing admixtures shall be plus or minus 1-inch from 3inches. Precast, Prestressed concrete, using a ¾” aggregate, shall have a minimum compressive strength, f’c, of 5000 psi at release and 7000 psi at 28 days with a maximum water/cement ratio of 0.40. The minimum cement content shall be 658 lbs. per cubic yard. Air entrainment for precast, prestressed concrete using ¾” aggregate, as measured prior to placement, shall be plus or minus 1 percent of 6%. Fabricator may use a high range water reducing admixture to increase the slump greater than 3-inches but must be less than 9-inches. Curb concrete placed on precast, prestressed concrete members shall meet the requirements of Precast Concrete. 35 Segregation of aggregates is not allowed with the use of water reducing admixtures or high range water reducing admixtures. 02001.30 Concrete Mix Design - In the paragraph that begins “Submit new or current…”, replace the sentence that begins “Allow 14 calendar days…” with the following sentence: Allow 21 calendar days for the review. Replace the paragraph that begins "High performance concrete..." with the following paragraph and bullets: High performance concrete (HPC) mix designs shall contain any of the following: • Cementitious material with 81% portland cement, 15% fly ash, and 4% silica fume. • Cementitious material with modifiers proportioned according to 02001.31(c) and with trial batches performed to demonstrate that the proposed alternate mix design provides a maximum of 1,000 coulombs at 90 days when tested according to AASTHO T 277. • Cementitious material with modifiers and with trial batches performed to demonstrate that the proposed alternate mix design provides a maximum of 1,000 coulombs at 90 days when tested according to AASTHO T 277. 02001.31(b) Pozzolans - Replace this subsection, except for the subsection number and title, with the following: Pozzolans or GGBFS may be used separately or in combinations up to 15% of the total cementitious materials content. 02001.31(c) Modifiers - Replace this subsection, except for the subsection number and title, with the following: Modifiers may be used separately or in combinations as approved by the Engineer. Alternate HPC proportions may be: Fly Ash 12% - 18% GGBFS 20% - 35% Silica Fume 3% - 5% For alternate HPC mix designs do not replace more than 15% of total cementitious material with modifiers. When silica fume is added to truck mixed concrete, mix the batch a minimum of 100 revolutions at the mixing speed specified by the manufacturer before leaving the batch plant. 02001.31(f) Aggregate - Replace the paragraph that begins "If the nominal... and the three bullets with the following paragraph and bullets: If the nominal maximum size of the coarse aggregate is not included as a part of the class of concrete, or shown on the plans, any size from 1 1/2 inch to 3/8 inch nominal maximum size aggregate may be used according to the ACI guidelines except: 36 • Use 3/4 inch nominal maximum size or larger aggregates in bridge deck, precast and precast-prestressed concrete. • Use 1 1/2 inch nominal maximum size aggregates in paving concrete unless otherwise indicated. • Use 3/8 inch nominal maximum size aggregates in drilled shafts unless otherwise indicated. 02001.32(b) Plastic Concrete - Add the following to the bottom of the test and test method list: Length Change Permeability ASTM C 157 AASHTO T 277 Add the following subsections: 02001.32(d) Length Change Tests - For all HPC mix designs, make at least three specimens from the trial batch for length change testing. Test samples according to ASTM C 157. Wet cure the samples until they have reached an age of 14 days, including the period in the molds. Store and measure samples according to ASTM C 157, section 11.1.2. Report length change results at 4, 7, 14, 28, and 56 day time intervals. 02001.32(e) Permeability Tests - For alternate HPC mix designs, make at least three specimens for permeability testing. Prepare, cure, dry and test according to AASHTO T 277. Report permeability in coulombs at 90 days. Permeability tests are not required when HPC mix designs contain cementitious material with 66% portland cement, 30% fly ash, and 4% silica fume. 02001.34 Current Mix Designs - Add the following paragraphs to the end of this subsection: For HPC mix designs, test according to the following and submit results: Test Length Change Permeability Test Method ASTM C 157 AASHTO T 277 Acceptance Value − 1,000 coulombs (max.) at 90 days Add the following subsections: 02001.34(a) Length Change Tests - For all HPC mix designs make at least three specimens for length change testing. Test samples according to ASTM C 157. Wet cure the samples until they have reached an age of 14 days, including the period in the molds. Store and measure samples according to ASTM C 157, section 11.1.2. Report length change results at 4, 7, 14, 28, and 56 day time intervals. 02001.34(b) Permeability Tests - For alternate HPC mix designs make at least three specimens for permeability testing. Prepare, cure, dry and test according to AASHTO T 277. Report permeability in coulombs at 90 days. Permeability tests are not required when HPC mix designs contain cementitious material with 66% portland cement, 30% fly ash, and 4% silica fume. 37 SECTION 02010 - PORTLAND CEMENT Comply with Section 02010 of the Standard Specifications modified as follows: 02010.10(b) Specifications - Replace the bullet that begins "Cement used west…” with the following bullet: • Cement shall have a total alkali content (sodium and potassium oxide calculated as Na2O + 0.658 K2O) not exceeding 0.60%. 02010.20 Blended Hydraulic Cement - Replace the paragraph that begins “Blended hydraulic cement…” with the following paragraph: Blended hydraulic cement shall be either Type IS-Portland blast-furnace slag cement, Type IP-Portland-pozzolan cement, or Type IT-ternary blended cement according to AASHTO M 240, modified as follows: Add the following paragraph to the end of this subsection: Furnish blended hydraulic cement from the QPL. SECTION 02015 - PCC REPAIR Section 02015, which is not a Standard Specification, is included in this Project by Special Provision. Description 02015.00 Scope - This Section includes the requirements for PCC Repair materials. Materials 02015.10 Materials - All PCC repair materials are acceptable for structural applications when used according to the manufacturer’s recommendations. 02015.20 PCC Repair - Furnish PCC repair material from the QPL. 02015.30 PCC Repair, Polymer Modified - Furnish polymer modified PCC repair material from the QPL. 02015.40 PCC Repair, High Performance - Furnish High Performance PCC repair material from the QPL. SECTION 02020 - WATER 38 Comply with Section 02020 of the Standard Specifications modified as follows: 02020.10 Water - Replace this subsection, except for the subsection number and title, with the following: (a) General - Water used in mixing or curing concrete, mortar, grout, and in mixing cement-treated base shall be reasonably clean, and free of oil, sugar, organic matter, or other substances injurious to the finished product. (b) Potable - Potable water may be used without testing if the Contractor provides a quality compliance certificate verifying that the water has met the limits and ranges of ASTM C 1602, according to tests made within the last two years. Water approved for public use by the Oregon Health Division may be accepted for use without testing. (c) Non-Potable, Unknown Quality, or Suspected Quality - Non-potable, Unknown Quality, or Suspected Quality water shall be tested at no additional cost to the Agency. Test according to ASTM C 114 and ASTM C 1603. Water from concrete production operations is considered Unknown Quality. Results of testing shall comply with the limits and ranges of ASTM C 1602 and shall be available for review upon request. SECTION 02030 - MODIFIERS Comply with Section 02030 of the Standard Specifications modified as follows: 02030.10 Fly Ash - Replace this subsection with the following subsection: 02030.10 Fly Ash - Furnish Class C, Class F, or Class N fly ash from the QPL and conforming to AASHTO M 295 (ASTM C 618). 02030.20(a) Types - Replace the sentence that begins “The silica fume portion…” with the following two sentences: The silica fume portion shall conform to AASHTO M 307. Total alkalis, as equivalent Sodium Oxide (Na2O), shall be 1.5 percent maximum. Add the following subsection: 02030.50 Metakaolin - Provide metakaolin from the QPL and conforming to AASHTO M 295 (ASTM C 618) Class N. SECTION 02040 - CHEMICAL ADMIXTURES Comply with Section 02040 of the Standard Specifications modified as follows: 39 02040.10 Materials - Replace the table with the following: Admixture Specification Air-entraining Type A - Water-reducing Type B - Retarding Type C - Accelerating Type D - Water-reducing and Retarding Type E - Water-reducing and Accelerating Type F - Water-reducing, High Range Type G - Water-reducing, High Range and Retarding Type S - Specific Performance AASHTO M 154 (ASTM C 260) AASHTO M 194 (ASTM C 494) AASHTO M 194 (ASTM C 494) AASHTO M 194 (ASTM C 494) AASHTO M 194 (ASTM C 494) AASHTO M 194 (ASTM C 494) AASHTO M 194 (ASTM C 494) AASHTO M 194 (ASTM C 494) AASHTO M 194 (ASTM C 494) Admixtures shall not have any chloride content. SECTION 02110 - POSTS, BLOCKS, AND BRACES Comply with Section 02110 of the Standard Specifications modified as follows: 02110.40 Wood Sign Posts - Replace the sentence that begins "Fabricate wood sign posts…" with the following sentence: Fabricate wood sign posts from Douglas fir, surfaced four sides (S4S) and free of heart center (FOHC). 02110.40(a) Grading - Replace the Douglas Fir and Hem-Fir grading requirements with the following grading requirements: Species Douglas Fir 4" x 4" 4" x 6" 6" x 6" and Larger No. 1 124-b WCLIB 42.11 WWPA No. 1 123-b WCLIB 62.11 WWPA No. 1 131-b WCLIB 80.11 WWPA SECTION 02210 - COATING MATERIALS FOR TIMBER AND CONCRETE Comply with Section 02210 of the Standard Specifications modified as follows: 02210.10 General - Replace this subsection with the following subsection: 02210.10 General: (a) Manufacturing - Furnish coating material meeting the following requirements: • All coats in the coating system shall be from the same manufacturer. 40 • Multi -component coating materials shall be proportioned by the manufacturer with each component in its correct proportion and furnished in separate containers ready for field mixing. • Be homogeneous, free of contamination, and of a consistency suitable for the specified use. • Not vary in composition without prior notice by the manufacturer and approval of the Engineer. • The coating material is not reformulated. Use the coating material before expiration of the manufacturer's recommended shelf life. (b) Packaging - Package the material in containers meeting the following requirements: • Be new steel or plastic of not more than 6 gallon capacity. • Meet U.S. Department of Transportation's Hazardous Material Shipping Regulations. • Be original and unopened. • Be labeled with the following: • Manufacturer's name • Exact title of coating material • Manufacturer's batch number • Date of manufacture SECTION 02320 - GEOSYNTHETICS Comply with Section 02320 of the Standard Specifications modified as follows: 02320.10(a-1) Geotextiles - Replace the bullet that begins "Meet or exceed…" with the following bullet: • Meet or exceed the properties specified in 02320.20. 02320.10(c-2) Level B - Manufacturer's Quality Compliance Certificate - In the paragraph that begins "If the brochure…" replace the words "in Table 02320-1" with the words "in 02320.20". 02320.20 Geotextile Property Values - Replace Table 02320-1 with the following tables: 41 Table 02320-1 Geotextile Property Values for Drainage Geotextile * Geotextile Property Requirements ASTM Test Method Unit s Grab Tensile Strength (minimum) Machine and Cross Machine Directions D 4632 Grab Failure Strain (minimum) Machine and Cross Machine Directions Geotextile Property Type 1 Type 2 Wove n Nonwove n Wove n Nonwove n lb 180 115 250 160 D 4632 % < 50 ≥ 50 < 50 ≥ 50 Tear Strength (minimum) D 4533 lb 67 40 90 56 Puncture Strength (minimum) D 6241 lb 370 220 495 310 Apparent Opening Size (AOS) (maximum) U.S. Standard Sieve D 4751 — 40 40 40 40 Permittivity (minimum) D 4491 sec-1 0.5 0.5 0.5 0.5 D 4355 (at 500 hours) % 50 50 50 50 Ultraviolet Stability Retained Strength (minimum) * Woven slit film geotextiles (geotextiles that are made from yarns of a flat, tape-like character) are not acceptable. Table 02320-2 Geotextile Property Values for Riprap Geotextile * Geotextile Property Requirements ASTM Test Method Unit s Grab Tensile Strength (minimum) Machine and Cross Machine Directions D 4632 Grab Failure Strain (minimum) Machine and Cross Machine Directions Tear Strength (minimum) Geotextile Property Type 1 Type 2 Wove n Nonwove n Wove n Nonwove n lb 250 160 315 200 D 4632 % < 50 ≥ 50 < 50 ≥ 50 D 4533 lb 90 56 110 80 42 Puncture Strength (minimum) D 6241 lb 495 310 620 430 Apparent Opening Size (AOS) (maximum) U.S. Standard Sieve D 4751 — 40 40 40 40 Permittivity (minimum) D 4491 sec-1 0.5 0.5 0.5 0.5 D 4355 (at 500 hours) % 70 70 70 70 Ultraviolet Stability Retained Strength (minimum) * Woven slit film geotextiles (geotextiles that are made from yarns of a flat, tape-like character) are not acceptable. 43 Table 02320-3 Geotextile Property Values for Sediment Fence Geotextile Property Requirements Geotextile Property ASTM Units Test Method Supported Unsupported — Elongation * ≥ 50% Elongation * ≤ 50% Grab Tensile Strength (minimum) Machine and Cross Machine Directions D 4632 lb 90 90 120 100 120 100 Apparent Opening Size (AOS) (maximum) U.S. Standard Sieve D 4751 — 30 30 30 Permittivity (minimum) D 4491 sec-1 0.05 0.05 0.05 D 4355 (at 500 hours) % 70 70 70 Ultraviolet Stability Retained Strength (minimum) * Measured according to ASTM D 4632. Table 02320-4 Geotextile Property Values for Subgrade Geotextile (Separation) Geotextile Property ASTM Units Test Method Geotextile Property Requirements Woven Nonwoven Grab Tensile Strength (minimum) Machine and Cross Machine Directions D 4632 lb 180 113 Grab Failure Strain (minimum) Machine and Cross Machine Directions D 4632 % < 50 ≥ 50 Tear Strength (minimum) D 4533 lb 68 41 Puncture Strength (minimum) D 6241 lb 371 223 Apparent Opening Size (AOS) (maximum) U.S. Standard Sieve D 4751 — 30 30 Permittivity (minimum) D 4491 sec-1 0.05 0.05 D 4355 (at 500 hours) % 50 50 Ultraviolet Stability Retained Strength (minimum) 44 Table 02320-5 Geotextile Property Values for Embankment Geotextile ASTM Test Method Units Grab Tensile Strength (minimum) Machine and Cross Machine Directions D 4632 Grab Failure Strain (minimum) Machine and Cross Machine Directions Geotextile Property Geotextile Property Requirements Woven Nonwoven lb 315 200 D 4632 % < 50 ≥ 50 Tear Strength (minimum) D 4533 lb 110 80 Puncture Strength (minimum) D 6241 lb 620 430 Apparent Opening Size (AOS) (maximum) U.S. Standard Sieve D 4751 — 30 30 Permittivity (minimum) D 4491 sec-1 0.02 0.02 D 4355 (at 500 hours) % 50 50 Ultraviolet Stability Retained Strength (minimum) Table 02320-6 Geotextile Property Values for Pavement Overlay Geotextile Geotextile Property Requirements ASTM Test Method Units Grab Tensile Strength (minimum) Machine and Cross Machine Directions D 4632 lb 100 Grab Failure Strain (minimum) Machine and Cross Machine Directions D 4632 % ≥ 50 Asphalt Retention (minimum) D 6140 oz./sq.ft. 2.8 Melting Point (minimum) D 276 °F 300 Geotextile Property Nonwoven 45 SECTION 02510 - REINFORCEMENT Comply with Section 02510 of the Standard Specifications modified as follows: 02510.10 Deformed Bar Reinforcement - Replace the sentence that begins "Unless otherwise specified…" with the following sentence: Unless otherwise specified or shown, all reinforcing bars shall be Grade 60. 02510.20 Mechanical Splices - Replace the bullet that begins “Provide mechanical splices…” with the following bullet: • Provide mechanical splices from the QPL that develop at least the specified tensile strength or 135% of the specified minimum yield strength of the reinforcing bars in tension, whichever is less. Where bars of different sizes or strengths are connected, the governing strength shall be the strength of the smaller or weaker bar. Add the following subsection: 02510.25 Headed Bar Reinforcement - Furnish Class HA headed steel bar from the QPL for concrete reinforcement. The headed steel bar shall develop the specified minimum tensile strength of the reinforcing bars, according to ASTM A 970. Ferrous-filler coupling sleeves, forged headed steel bars, and welded headed steel bars are not allowed for concrete reinforcement. 02510.40 Welded Wire Fabric - Replace this subsection with the following subsection: 02510.40 Welded Wire Reinforcement - Welded wire reinforcement shall conform to AASHTO M 55 (ASTM A 185). Deformed welded wire reinforcement shall conform to AASHTO M 221 (ASTM A 497). SECTION 02520 - STEEL AND CONCRETE PILES Comply with Section 02520 of the Standard Specifications modified as follows: 02520.10(c) Steel H-Piles - Replace the sentence that begins "Steel shall conform to..." with the following sentence: Steel shall conform to the requirements of ASTM A 588 or ASTM A 572, Grade 50. 02520.10(e) Reinforced Pile Tips – Replace the sentence that begins “Provide reinforced tips…” with the following: Reinforced pile tips shall be DFP TUFTIP H-777 or APF Hard-Bite Point Model HP-776000-B or approved equal. 46 SECTION 02560 - FASTENERS Comply with Section 02560 of the Standard Specifications modified as follows: 02560.30 Tie Rods and Anchor Bolts - Replace this subsection with the following subsection: 02560.30 Tie Rods, Anchor Bolts, and Anchor Rods: (a) Steel Tie Rods, Anchor Bolts, and Anchor Rods - Steel tie rods, anchor bolts, and anchor rods shall conform to: AASHTO M 314, Grade 36 or 55; ASTM F 1554, Grade 36 or 55. (b) High-Strength Tie Rods, High-Strength Anchor Bolts, and High-Strength Anchor Rods - High-strength tie rods, high-strength anchor bolts, and high-strength anchor rods shall conform to: AASHTO M 314, Grade 105; ASTM F 1554, Grade 105; or ASTM A 449, Type 1. (c) Nuts - Nuts for tie rods, anchor bolts, and anchor rods shall conform to the requirements of the following, or equivalent: Plain Steel Tie Rods, Anchor Bolts, and Anchor Rods: • All - Heavy Hex AASHTO M 291 (ASTM A 563), Grade A Galvanized Steel Tie Rods, Anchor Bolts, and Anchor Rods: • All - Heavy Hex AASHTO M 291 (ASTM A 563), Grade A, C, D, or DH 02560.40 Galvanizing and Coating of Fasteners, Tie Rods, and Anchor Bolts - Replace this subsection title with the title "Galvanizing and Coating:" 02560.40(a) Galvanizing of Fasteners, Tie Rods, and Anchor Bolts - Replace this subsection with the following subsection: 02560.40(a) Galvanizing of Fasteners, Tie Rods, Anchor Bolts, and Anchor Rods - Hot-dip galvanize fasteners, tie rods, anchor bolts, anchor rods, nuts, and washers according to AASHTO M 111 (ASTM A 123) or AASHTO M 232 (ASTM A 153) as appropriate to the product. When specified, mechanically galvanize fasteners according to ASTM B 695, Class 50, Type 1. Match galvanized bolts, tie rods, anchor bolts, and anchor rods with appropriate galvanized nuts for assembly. Ship nuts in the same container consisting of bolts, tie rods, anchor bolts, or anchor rods. Overtap nuts for galvanized fasteners, galvanized tie rods, galvanized anchor bolts, and galvanized anchor rods according to AASHTO M 291 (ASTM A 563). Measure the zinc thickness on the wrench flats or top of bolt head of galvanized bolts and on the wrench flats of galvanized nuts. 47 02560.60(a) Rotational Capacity Test - In the paragraph that begins "Test all high-strength fasteners…", replace the first sentence with the following sentence: Test all high-strength fasteners, except high-strength tie rods, high-strength anchor bolts, and high-strength anchor rods, according to Method 1 or 2 below, as applicable. 02560.60(b) Other Test Requirements - Replace the two paragraphs that begin "Provide three extra high strength bolt assemblies…" and "Provide three extra high strength tie rod and…" with the following two paragraphs: Provide three high-strength bolt assemblies per size per lot for check testing. Provide one high-strength tie rod assembly, one high-strength anchor bolt assembly, and one high-strength anchor rod assembly per size per lot for check testing. 02560.70 Lubricating Fasteners - Replace this subsection, except for the subsection number and title, with the following: Furnish all galvanized and coated fasteners with a factory applied commercial water-soluble wax that contains a visible dye of a color that contrasts with the color of galvanizing or coating. Black fasteners shall be "oily" to the touch when installed. Field lubricate galvanized bolts in tapped holes, galvanized anchor rods, and galvanized tie rods with a lubricant from the QPL. Apply lubricant to threads and to bearing surfaces that will turn during installation. Protect fasteners from dirt and moisture at the job site. Clean, relubricate with a lubricant from the QPL, and retest fasteners that do not pass the field rotational capacity test. Obtain the Manufacturer's approval before relubricating tension control fasteners that are designed to automatically provide the tension. Coat the outer surface of the collar in lock-pin and collar fasteners with an approved Manufacturer lubricant. SECTION 02571 – ELASTOMERIC BEARING PADS Revise Section 02571, Elastomeric Bearing Pads to include the following: 02571.00 Scope – This section includes the requirements for plain, laminated and random oriented fiber elastomeric bearing pads. 02571.13 Random Oriented Fiber Bearing Pads for Railroad Bridges - shall conform to the following minimum material properties: Test or Property Criteria Shore A Hardness (ASTM D2240) 80, +/- 5 Tensile Strength, psi (ASTM D412, Die C) 1000 +/- 100 48 Test or Property Criteria Ultimate Elongation, minimum % 40 Heat Aging (ASTM D573, 70 hours @ noted temperature): +/- 10 +/- 25 +/- 25 Durometer, 212° F, maximum point change) Tensile Strength, (58° F, maximum) Ultimate Elongation, 212° F, maximum % change Compression, minimum ultimate strength, psi Apparent shear modulus (GA), psi, based on tests conducted at 70° F under uniform compressive stress of 500, 1000 and 1500 psi and at applied horizontal shear plus slip strain of 50%. GA is constant in all directions parallel to the bearing plane. 8000 230 +/- 30 2571.23 Manufacturing requirements - Random oriented fiber elastomeric bearing pads Random oriented fiber elastomeric bearing pads shall be Voss Engineering, Inc., “Fiberlast” expansion bearing pads or approved equal. Thickness and size of the pads shall be as shown in the drawings. Cutting of the pads shall be done so that the edges have no tears or other jagged areas. Permissible tolerances of the pad shall be as stated in AREMA Manual for Railway Engineering, Chapter 15, Part 5 Bearing Design and Construction. 02571.28 Installation Requirements: The contractor shall fasten the bearing pads to the top surface of the end bent cap by using the following procedure: 1. Clean pads according to manufacturer’s recommendations; 2. Prime contact surface and glue to the top surface of the end bent cap in positions shown in the standard plans with an approved epoxy. SECTION 02630 - BASE AGGREGATE Comply with Section 02630 of the Standard Specifications modified as follows: 02630.10(a) Grading - In Table 02630-01, add the following sieve size line before the No. 10 sieve size line and add the following footnote at the end to the table: No. 4 * − − − − − * Report percent passing sieve when no grading requirements are listed 02630.10(b) Fracture of Rounded Rock - In the sentence that begins "Fracture of rounded rock…", replace "AASHTO TP 61" with "AASHTO T 335". 49 02630.11(b) Fracture of Rounded Rock - In the sentence that begins "Fracture of rounded rock…", replace "AASHTO TP 61" with "AASHTO T 335". SECTION 02690 - PCC AGGREGATE Comply with Section 02690 of the Standard Specifications modified as follows: 02690.20(e-1) Fracture - In the sentence that begins "Provide aggregate…", replace "AASHTO TP 61" with "AASHTO T 335". SECTION 02910 - SIGN MATERIALS Comply with Section 02910 of the Standard Specifications modified as follows: 02910.02 Types of Signs - Add "O6", "O8", "W12", and "YW" sign types and replace the "B2", "B3", "C1", "C2", "F1", "G1", "G2", "G3", "G4", "O3", "O4", "O5", "R1","W9", "W11", and "Y7" sign types with the following: "B2" Blue Type III or Type IV sheeting background with white Type IX permanent removable legend. "B3" Blue Type IX sheeting background with white Type IX permanent or removable legend or white Type IX sheeting overlaid with blue transparent paste background, with retroreflective silver-white screened legend. "C1" Brown Type III or Type IV sheeting background with white Type IX permanent or removable legend. "C2" Brown Type IX sheeting background with white Type IX permanent or removable legend or white Type IX sheeting overlaid with brown transparent paste background, with retroreflective silver-white screened legend. "F1" White Type IX sheeting background overlaid with red and blue transparent paste background with white Type IX permanent legend. "G1" Green Type III or Type IV sheeting background with white Type IX removable legend. "G2" Green Type III or Type IV sheeting background with white Type IX permanent legend. "G3" Green Type IX sheeting background with white Type IX permanent legend, or white Type IX sheeting background overlaid with green transparent paste background with retroreflective silver-white screened legend. "G4" Green Type IX sheeting background with white Type IX removable legend. 50 "O3" Fluorescent orange Type VIII, or Type IX sheeting background with black nonreflective permanent legend and red retroreflective symbol (Stop or Yield Ahead Symbol Sign). "O4" Fluorescent orange Type VIII or Type IX sheeting background with black nonreflective permanent legend. "O5" Fluorescent orange Type VIII or Type IX sheeting background with black nonreflective removable legend. "O6" Fluorescent orange Type VIII or Type IX sheeting background with black nonreflective permanent legend and red, yellow, and green Type VIII and Type IX circles. (Signal Ahead Symbol Sign) "O8" Fluorescent orange Type VIII or Type IX sheeting background with black nonreflective screened or cut-out permanent legend and silver-white Type VIII or Type IX symbol. (Speed Reduction Symbol Sign) "R1" White Type IX sheeting background overlaid with red transparent paste background with white Type IX permanent legend. "W9" Silver-white Type III or Type IV sheeting background with blue nonreflective screened or cut-out permanent legend. "W11" Silver-white Type III or Type IV sheeting background with black nonreflective screened or cut-out permanent legend with red Type III or Type IV symbol. "W12" Silver-white Type III or Type IV sheeting background with transparent green screened legend or green Type III or Type IV cut-out permanent legend with blue Type III or Type IV symbol. "Y7" Fluorescent yellow Type IX sheeting background with black nonreflective screened or cut-out permanent legend and red Type IX symbol. (Stop or Yield Ahead Symbol Sign) "YW" Yellow Type III or Type IV sheeting background with black nonreflective screened or cut-out permanent legend, and white Type III or Type IV sheeting background with black nonreflective screened or cut-out permanent legend and red Type III or Type IV symbol. 02910.10 Aluminum - In the paragraph that begins "Fabricate sheet...", replace the sentence that begins "Fabricate sheet aluminum..." with the following two sentences: Fabricate sheet aluminum signs from aluminum alloy 6061-T6, 5052-H38, 5154-H38, or approved equal. Give a chromate treatment conforming to ASTM B 449, Class 2 or a titaniumbased coating according to ASTM B 921. 02910.20(a) General - Replace the sentence that begins "Use reflective sheeting…" with the following sentence: Use reflective sheeting Type I and retroreflective sheeting Type III, Type IV, Type VIII, and Type IX from the QPL and the following: 51 02910.32(b) Retroreflective Sheeting Legend - In the paragraph that begins "The silver-white or…", replace the sentence that begins "The white retroreflective sheeting…" with the following sentence: The white retroreflective sheeting shall consist of Type IX sheeting conforming to 02910.20. 02910.75 Manufacturer's Warranty - Replace the paragraph that begins "For retroreflective Type III…" with the following paragraph: For retroreflective Type III and Type IV sheeting used for permanent signs, provide a Warranty, for a Warranty period of 10 years, for restoring sign panels and replacing sheeting if the sheeting has failed as defined below. In the paragraph that begins "For purposed of the Warranty…", replace the bullet that begins "70% of minimum coefficient…", with the following bullet: • 70% of minimum coefficient of retroreflection for designated sheeting or cuttable film according to ASTM D 4956 for the remaining 3 years of the Warranty period for Type III and Type IV sheeting and remaining 5 years of the Warranty period for Type IX sheeting. SECTION 03020 - EROSION MATERIALS Section 03020, which is not a Standard Specification, is included in this Project by Special Provision. Description 03020.00 Scope - This Section includes the requirements for erosion control materials. Materials 03020.10 Commercially compost that: Manufactured Compost - Furnish commercially manufactured • Is processed through thermophilic composting meeting the EPA's definition of "Process to Further Reduce Pathogens". • Is from a commercial compost facility that holds a current DEQ composting permit or is registered with DEQ as a composting facility. • Meets the requirements of the US Composting Council (USCC) and it's Seal of Testing Assurance (STA) program. • Contains a minimum 65% by volume of the following recycled plant waste: • Source-separated yard and garden wastes • Wood wastes • Agricultural crop residues • Wax-coated cardboard 52 • Preconsumer vegetative food wastes • Other similar source-separated materials that the DEQ has determined to have a comparable low level of risk in hazardous substances, human pathogens, and physical contaminants. • Manure or biosolids based composts when approved. • Meets the following compost particle size and media parameters: Compost Particle Size Compost Type Sieve Size Fine* Medium* Coarse** Percent Passing (By Dry Weight) 3" 100 100 100 1" 100 95-100 90-100 3/4" 100 95-100 70-100 5/8" 100 90-100 70-100 1/2" 100 90-100 70-100 1/4" 100 50-60 30-50 * maximum 3 inch particle length ** maximum 6 inch particle length Media Parameters Test Test Method Requirements Physical Contaminants* TMECC** 03.08-A Less than 1.0% Organic Matter TMECC** 05.07-A 35% (Minimum) pH TMECC** 04.11-A 6.0 to 8.5 Soluble Salt Concentration TMECC** 04.10-A 5 dS/m (Maximum) Total Carbon Total Nitrogen TMECC** 04.02-D TMECC** 04.02-D Carbon/Nitrogen Ratio Fine Medium & Coarse <25:1 <30:1 Stability TMECC** 05.08-B 5 to 7 Maturity TMECC** 05.05-A 80% or Greater Moisture Content TMECC** 03.09-A 35-60% (Wet Weight) * Man-made Inert ** Test Methods for Evaluation of Compost and Composting 03020.90 Acceptance - Acceptance of commercially manufactured compost material will be the following: • Quality compliance certification according to 00165.35. • Copies of STA lab analysis. 53 • Copy of DEQ permit or registration of the compost producer. SECTION 04300 - RECONSTRUCT RAILROAD TRACK Section 04300, which is not a Standard Specification, is included in this Project by Special Provision. Description 04300.00 Scope - The Contractor shall furnish all required materials, labor, and equipment to: (a) Remove a sufficient length of railroad track, ties, and ballast to complete the project. (b) Replace and compact the track subgrade and subballast. (c) Furnish and place new railroad ballast rock within the limits of track reconstruction. (d) Re-construct track using the removed rail and OTM, or use new rail and OTM provided by CBR, on 8.5-foot timber crossties provided by CBR. (See later sections on material allowed to be reused.) (e) Furnish and place sufficient ballast and then surface, line, and dress the track to meet the requirements of the Contract Documents for alignment, profile, and geometry. (f) Restore the timber plank crossing surface, if damaged by contractor’s operations, using like materials. 04300.02 Submittals (a) Optimum soil moisture content and post-compaction density test results per ASTM D1557. (b) Rail temperature record (c) Rail anchoring record (d) Manufacturer certificates of compliance for Contractor-furnished materials. (e) Rail installation plan (f) For ballast, Contractor shall submit current laboratory certification with “Certificates of Compliance” for the ballast for review and approval by the Engineer. No ballast shall be delivered to the job site without prior approval by Engineer. (g) Contractor shall submit scale tickets for ballast loads delivered on the day of delivery. Materials 04300.10 Salvaged Track Materials - The Contractor may salvage and re-use the following track materials subject to prior inspection by the Engineer and Railroad: the existing rails that were removed, tie plates, and rail anchors. Salvaged materials that are deemed defective by Engineer shall not be replaced in the track. All other materials required to complete the Work shall be furnished by the Railroad except for ballast. 04300.11 Track Spikes (a) All track spikes shall be new. (b) Track spikes shall be 5/8 inch x 6 inch long prime spikes with reinforced throats. (c) New track spikes shall conform to the requirements of the AREMA Manual, Chapter 5; Part 2, Section 2.1, “Specifications for Soft Steel Track Spikes”. (d) New track spikes shall conform to the dimensions specified in the AREMA Manual, Chapter 5, Part 2, Section 2.2, “Design of Cut Track Spike”. 54 04300.12 Tie-plug - Chemical plugging shall be done with a 2-part poly urethane such as that manufactured by Encore Rail Systems, Willamette Valley Company, or approved equal. 04300.13 Track Bolts, Nuts, and Washers (a) All bolts, nuts, and washers shall be new. (b) Track bolts and nuts shall conform to the dimensions specified in the AREMA Manual, Chapter 4, Part 3, Section 3.3, “Rail Drillings, Bar Punchings, and Bolts,” and Section 3.5, “Specifications for Heat Treated Carbon Steel Track Bolts and Carbon Steel Nuts.” (c) The washers shall be AREMA patterned spring washers that conform to the requirements of AREMA Manual, Chapter 4, Part 3, Section 3.6, “Specifications for Spring Washers”, and Section M12, “Spring Washers” of the AREMA Portfolio, Plan No. 100, “Specifications for Special Trackwork.” (d) Track bolts shall be of the correct length and diameter for the bars to which they are applied. (e) The spring washers shall be of the correct diameter for the bolts to which they are applied. 04300.14 Rail Anchors – New rail anchors shall be one-piece “drive-on” and should be correctly sized to fit the rails to which they are supplied. 04300.15 Tie plates (a) Tie plates may be relayed but may not be broken, cracked, warped, bent, have worn shoulders or rounded spike holes. (b) Tie plates shall be of similar size and dimensions as the existing tie plates within the project limits. The thickness at the seat shall be equal to the existing tie plates so as not to create a rail surface mis-match between plates. The plates shall be designed to support the rails. (c) Tie plates shall have a spike hole pattern that supports the existing spiking pattern. The shouldering of the tie plates shall match the existing tie plates. (d) Tie plates shall be canted and the seat area shall be free of pitting or excessive section loss. 04300.16 Treated Timber Crossties (a) Timber crossties shall be new Grade 5 oak. (b) Timber cross ties should be 7-inch grade ties as defined by the AREMA Manual, Chapter 30, Part 3, Section 3.1; “Timber Crossties”. They should be sawn to 7 inches deep x 9 inches wide x 8 feet 6 inches in length. New timber crossties will not be less than ½ inch than the length required with a horizontal measurement of not less than 8 ½ inches and a vertical measurement of not less than 6 ½ inches. (c) Seasoning shall conform to the requirements of AREMA Manual, Chapter 30; Part 3, Section 3.6.3 “Conditioning Prior to Treatment”. (d) All timber cross ties shall be pressure treated in accordance with the AREMA Manual Chapter 30, Part 3, Section 3.6; “Wood Preserving” by the empty cell process with a 50/50 creosote/petroleum solution to a minimum retention of 8 pounds per cubic foot of wood. (e) All timber cross ties shall be equipped with anti-splitting devices on each end. Those devices shall be galvanized steel multi-nail plates with 4-5 teeth per square inch. The plates shall be structural type Grade “C” steel, ASTM-A 653 or better and galvanized per ASTM-A 924 G60 coating. 55 (f) Anti-splitting devices shall conform to the AREMA Manual, Chapter 30, Part 3, Section 3.1.6, “Specifications for Devices to Control the Splitting of Wood Ties”. (g) Anti-splitting devices shall be applied in accordance with the AREMA Manual, Chapter 30, Part 3; Section 3.1.7 “Application of Anti-splitting Devices”. (h) The multi-nail plates shall be marked with the year and the name of the manufacturer. They shall be installed so that the heartwood is down when the writing is upright. (i) Timber cross ties shall be straight and sawn so that the top and bottom are parallel to each other and the sides are parallel to each other. The following tie conditions are not acceptable: heartwood exposed on the surface of the tie, bark, bark seams, wane, slanting grain, and excessive knots. The Engineer has the right to reject any ties deemed as not meeting these specifications and such ties shall be replaced at Contractor’s sole expense and effort. 04300.17 Railroad Ballast (a) Contractor shall furnish suitable No. 4 AREMA railroad ballast that complies with the gradation table below. Ballast Size No. 4 Percent Passing 2" 1 ½" 1" 100 90-100 20-55 ¾" 0-15 ½" - ⅜" 0-5 No.4 - (b) Be clean and free of contamination, organic materials, or other deleterious matter. (c) Be 100% crushed natural stone (no slag) with a minimum of 90% fractured faces. (d) Comply with the property requirements of the table below: Property Percent passing No. 200 sieve Minimum - Maximum 1.0 percent Bulk specific gravity - Rock Absorption - Rock Clay lumps and friable particles Degradation Soundness - Sodium Sulfate 5 cycles Flat or elongated particles 2.6 - 2.0 percent 0.5 percent 35 percent 5 percent Test Method ASTM C136 ASTM C117 ASTM C127 ASTM C127 ASTM C142 ASTM C535 ASTM C88 - 5 percent ASTM D4791 04300.18 Railroad Subballast (a) Subballast shall be crushed gravel or crushed stone meeting the quality and material characteristics shown in the table below. 1. Crushed gravel shall consist of material obtained by crushing gravel particles which results in a minimum of 75% of the crushed gravel that is produced having at least two fractured faces as determined in accordance with ASTM D 5821. Upon approval of the Engineer, the gradation specified for Type 1 Subballast below may be obtained by blending. 56 2. Crushed Stone shall be the angular fragments resulting from crushing by mechanical means the following types of rocks quarried from undisturbed, consolidated deposits: granite and similar phanerocrystalline igneous rocks; limestone; dolomite; sandstone; massive metamorphic quartzite, or similar rocks. QUALITY AND MATERIAL CHARACTERISTICS Coarse Aggregate Portion (Fraction retained on a No. 10 Sieve) AASHTO T104 Na2So4 Soundness (5 cycles) Los Angeles Abrasion AASHTO T96 Fine Aggregate Portion (Fraction passing a No. 40 Sieve) Plasticity Index, Max. Liquid Limit, Max AASHTO T90 AASHTO T 89 Max. % Loss = 10% Max. % Loss = 45% 10% 35% (b) Type 1 (pervious) subballast shall be well graded and shall meet the following gradation requirements: TYPE 1 SUBBALLAST GRADATION REQUIREMENTS* Sieve Size Percent Passing 2” 1” ¾” No. 4 No. 10 No. 40 100 90-100 50-84 35-65 26-50 12-30 0-8** No. 200 0-5*** * Subballast material samples shall be obtained in accordance with ASTM D-75 with sieve analyses performed in accordance with ASTM C-136 using the wet sieving technique. All percentages specified are as determined by sampling from the flowing aggregate streams, conveyor belt, or stockpile at the final production/blending site. ** Requirement for subballast material manufactured from crushed gravel, granite, quartzite, and trap rock. *** Percent passing the No. 200 sieve is 0% to 5% for limestone subballast. 04300.19 All other track materials – Other track materials necessary for completion of the work shall meet the appropriate AREMA standard, UPRR/BNSF Common Standard, or ASTM standard. Construction 04300.40 Remove Existing Track - 57 (a) Contractor shall remove existing timber plank crossing only to the extent required to complete the track work. Contractor shall maintain the crossing during construction such that it is passable to vehicular traffic. (b) Contractor shall take care to not damage or disturb track beyond the limits of the Work or Engineer’s field marks. Damage to such track shall be repaired at Contractor’s sole expense and effort. (c) Contractor shall remove track materials per the Contract Drawings in a manner that prevents undue damage to the materials. (d) Contractor shall return unused joint bars to Owner. (e) All other removed track materials, including timber crossties, shall become the property of the Contractor if the Railroad or Owner does not want them. The Contractor shall remove such materials from the Project Area and dispose of them in a lawful manner. 04300.41 Prepare Track Roadbed (a) Place and compact subgrade per 00330. (b) Place and compact subballast per 00330. (c) Store ballast only at locations marked or approved by the Engineer. (d) Excessive dumped ballast is to be picked up and redistributed at the Contractor’s expense. (e) Ballast that is mixed with soil or fouled during handling or distribution shall be removed, disposed of, and replaced at the Contractor’s expense. (f) Prior to tamping, place sufficient ballast to ensure that the tamper spades do not "run dry." (g) Compact the first lift of ballast prior to placing crossties. Use a steel vibratory compactor with a roller drum at least 48 inches wide, or approved equal. 04300.42 Crosstie Preparation for Crossties Left in Place - Spike holes in crossties left in place at rail tie-in locations shall be plugged with 2-part poly-urethane plugging compound prior to spiking. Top of crosstie is to be cleared of foreign material that may interfere with full bearing between the tie plate and crossties. Adzing crossties is not permitted. 04300.43 New Timber Crosstie Installation (a) New crossties shall be handled to avoid damage in accordance with the AREMA Manual, Chapter 30, Part 3, Section 3.5; “The Handling of Ties from the Tree into the Track”. Crossties damaged by Contractor’s actions will be rejected by Engineer and replaced by Contractor at no expense to Owner. (b) Crossties shall be installed at right angles to the rail and centered between neighboring ties and centered between the rails. Unless otherwise indicated by Engineer, ties shall be placed within 0.5 inches of perpendicular to the opposite rail. (c) Crossties shall not be spaced less than 19 inches nor more than 20 inches on center. (d) Care shall be taken in handling ties so as to not damage them with picks, machines, or other tools. Ties shall be lifted and supported during storage, transportation, and placed in such a manner as to prevent damage. Ties shall not be dropped to the roadbed. Tie tongs, lining bars, other suitable tools or tie spacing equipment shall be used. (e) Place wood ties with heartwood face down. If ties are bowed, place the tie with the bow facing up, regardless of heartwood. (f) Ties shall be fiddle marked on the side designated by the Engineer and be uniform within 0.5 inches. (g) New ties requiring more than 25% of the spikes removed and re-spiked will be replaced at Contractor’s expense and sole effort. Up to this limit, new ties will be plugged with the approved polyurethane plugging material. 58 (h) New and existing ties damaged as a result of improper handling or installation by the Contractor shall be rejected by the Engineer and shall be removed and replaced with new ties at Contractor’s expense. 04300.44 Tie Plates - The Contractor shall place one tie plate per rail on each crosstie. The tie plate shall be oriented to cant the rail inward. Single-shoulder tie plates shall be positioned so the shoulder falls on the field side of the rail. All tie plates should be positioned so that the rail base fully seats against the field-side shoulder. Tie plates should be centered longitudinally on the tie. The plates may be positioned up to ¾ inch off the longitudinal center of the tie to avoid slot spiking or spiking into an existing tie split. 04300.45 Rail Placement - The rail base and tie plate seat area shall be cleaned to remove foreign material that may interfere with the full bearing contact with the base of the rail. Rails shall be placed base down, parallel with track, avoiding excessive bending or damage, using suitable mechanical equipment. Rail shall be handled carefully. Bumping or striking rail will not be acceptable. Minor damage may be repaired as approved by the Engineer. Rail gouged, nicked, hammer-marked, and/or bent during Installation shall be removed and replaced by the Contractor at no expense to Owner. Care shall be taken to avoid placing rails on any structure that could be susceptible to damage. Contractor shall prepare a rail installation plan and submit it to Engineer prior to start of construction, indicating rail lengths, and location of proposed rail joints and adjacent existing joints. Where a rail joint is installed, it shall be laid and gapped per AREMA Volume 1, Chapter 5, Part 5, Section 5.3.1. Each rail shall be carefully placed on the ties with ends square and inserting expansion shims between the ends of adjacent rails to allow for expansion. Shims shall remain in place after all joint bolts are tightened. The thickness of the shims depends on the field-measured temperature of the rail per the following table: Table: Required Rail Shim Thicknesses 33-Foot or Less Rail Temp. Shim (Fahrenheit) Thickness < -10 5/16” -10 to 14 1/4" 15 to 34 3/16” 35 to 59 1/8” 60 to 85 1/16” > 85 No shim 39-Foot Rail Temp. Shim (Fahrenheit) Thickness <6 5/16” 6 to 25 1/4" 26 to 45 3/16” 46 to 65 1/8” 66 to 85 1/16” > 85 No shim 78-Foot Rail Temp. Shim (Fahrenheit) Thickness < 35 5/16” 35 to 47 1/4" 48 to 60 3/16” 61 to 73 1/8” 74 to 85 1/16” > 85 No shim The Contractor shall prepare and submit a rail temperature record form. The temperature of the rail shall be determined using the following procedure: Rail temperature readings shall be taken on the base of the rail, as close to the web as possible, on the shady side of the rail. A minimum of two readings shall be taken within the limits of track work and not less than one reading per hour. Two readings shall be taken or two thermometers shall be used. If the two temperatures are within 3 degrees Fahrenheit, the average shall be used. If they vary by more than 3 degree Fahrenheit, continue to spot check until a stable temperature is measured. Magnetic 59 thermometers must be left on the rail for five minutes to assure that they have equalized to the rail temperature before recording the temperature. 04300.46 Joining Rails By Joint Bars - Rails shall be joined by means of traditional joint bars unless otherwise indicated on the Contract Drawings or as authorized by the Engineer. Rail joints made up of joint bars shall be installed as follows: Bolt assemblies shall be installed in all joint bar holes. Joint bolts shall be tightened before spiking rail. Bolts shall be placed with the nuts alternatively on the inside and outside of the rail. Nuts must be placed with the flat side toward the rail. Bolts shall be torqued per AREMA Volume 1, Chapter 5, Part 5, Section 5.5, starting from the center working out. Track bolts, joint bars and finishing surfaces of rails at joint bars shall be swabbed with oil. Do not drill inside holes at future field weld locations. Before bolted joints are considered final, they shall be retightened to the specified torque. Contractor shall perform the final joint tightening within 60 days of relaying rail and applying all OTM. Install insulated joint bars and all fasteners per the manufacturer’s instructions and best practices. If insulated joints are not installed as suspended joints, Contractor shall furnish and install appropriate insulated tie plates as part of this work item. 04300.47 Track Cut Spikes - The number of spikes and spiking pattern shall be consistent with the typical number and pattern of the track within the project limits. Proper gage shall be verified immediately prior to spiking. Spikes shall be started vertically, square to the base of rail and driven straight. The shank of rail-holding spikes shall have full bearing against the base of the rail. Care shall be taken not to strike rail or fastenings when driving spikes. Spikes shall not be overdriven. Spikes should be driven as to lightly contact the top of the base on the rail. Partially driven or bent spikes will be replaced at Contractor’s expense. Driving track spikes in the middle of a tie for jacking or other purposes is not allowed. Do not place rail-holding spikes less than 2½ inches from the end of the nearest joint bar. Do not slot-spike joint bars. 04300.48 Rail Anchors - Rail anchors shall be placed in accordance with manufacturer’s recommendations and in accordance with AREMA Volume 1, Chapter 5, Part 7. Install four rail anchors per each tie to be anchored (two per rail on each side of crosstie). Do not install rail anchors on joint ties. Rail anchors shall be set with full bearing against the side of the tie and typically installed on gauge side of the rail. Drive rail anchors square to the base of rail and so that they “snap” on to base of rail and are not over-driven. Fractured or spread rail anchors will be replaced at Contractor’s expense. The amount of anchors for jointed track placed temporarily in service may be reduced as directed by Engineer. An approved rail anchoring recording form shall be used to record the required information when the track is anchored. The record shall be provided to the Engineer on the approved form for each segment. It shall contain the following data: 60 1. Date and time 2. Track number and rail (East or West) 3. Station location 4. Weather, air and base of rail temperature 5. Type of fastener 6. Nominal Lengths and gaps of rail being anchored 04300.50 Drilling Rails - The drilling of rails is not anticipated but may be authorized by Engineer. If so, Contractor shall drill rails to accept joint bars where necessary and it shall be incidental to the work. Tools used for drilling rails shall be approved rail drills. A maximum variation of 1/16 inch in size and location of bolt holes will be allowed. Holes shall be drilled using a solid clamped template or spacing device for horizontal alignment and drill mounted “shoes” for specific rail section for vertical alignment. Any additional holes in rail will be sufficient cause for rejection. Drilling through joint bars is prohibited. 04300.51 Ends of Rails - Tools used for field cutting shall be approved rail saws. Rail shall be cut with a rail saw to a tolerance of 1/16 inch from square. All burrs shall be removed and ends made smooth. Battered or severely mismatched ends must be cut off or ground off to conform to minimum tolerance of 1/16 inch on top and gage side to adjoining rail. Relay rail must not vary more than 1/16 inch in either plane for jointed rail. Torch-cutting of rails and joint bars is not allowed. 04300.52 Tamping and Dressing Ballast (a) Ballast shall be compacted with a 16-tool vibrating squeeze-type mechanical tamper equipped with lights or laser to control line or other device as approved by the Engineer. (b) Both ends of tie shall be tamped simultaneously. (c) Tampers shall be started from a nearly vertical position and worked downward past the bottom of the tie, after which the tool should be slanted toward the tie to force ballast under the tie. (d) Contractor shall make a minimum of two insertions per lift per crosstie. (e) Ballast shall be thoroughly tamped within a space from 13 inches inside either rail to the ends of the crossties. (f) Tamp simultaneously under each rail. Tamping is not permitted at the center of the tie except within limits of turnouts and crossings where the center of the ties shall be lightly tamped, with no more than one insertion per 2 inches of lift, unless prevented by trackwork. (g) Do not exceed 4 inches in a single lift. Tamp the ballast after each lift. (h) Do not exceed one (1) inch of horizontal movement in the final alignment adjustment. The track will be in good alignment before the last pass of the tamper. (i) Ties that pull loose during tamping or surfacing shall be re-seated, holes plugged, spiked, and re-tamped. (j) Do not tamp when snow is present or ballast is frozen. (k) After tamping and surfacing, a tie that has less than 2/3 of the side of the tie covered by ballast will not be considered tamped. (l) Dress the ballast with a 9-inch minimum shoulder off the ends of the ties. Ballast side slopes should not be steeper than 1 ½ horizontal to 1 vertical (1 ½ H: 1 V). The finished shoulders and slopes should be uniform. (m) Be sure the top of the ties, tie plates, and rail base are clean and free of rock. 61 04300.53 Track Geometry Requirements - All work affecting the gage, surface, alignment, cross-level, superelevation, or profile of railroad track shall meet the following requirements: (a) Track Gage: Standard gage shall be 56 1/2 inches as measured per 49 CFR Part 213.53(a). Allowable variation on tangent track is from zero to plus 1/8 inch. (b) Cross-Level: Tangent track shall have zero cross-level within a tolerance of +/- 1/4 inch. The difference in cross-level between any two points within a 25 foot length of track (tangent or curved) may not differ by more than +/- 1/4 inch. (c) Profile Run-Off (tangent track): Where a run-off is required on tangent track, the run-off shall be uniform, not exceeding 1 inch over 31 feet. Final runoff shall not deviate from uniformity by more than 1/2 inch on either rail at the mid-ordinate of a 62-foot chord. (d) Line: In both tangent and curved track, the maximum line deviation shall not be more than 3/4 inches on either rail at the mid-ordinate of a 62-foot chord. Points of curve or tangent shall not be moved without permission of the Engineer. (e) Contractor shall be responsible to return the affected track to its original alignment and profile. (f) All activities required to achieve track geometry requirements shall be considered incidental to the work. Measurement 04300.80 Measurement - No measurement of quantities will be made for reconstruction of railroad track. Payment 04300.90 Payment – Reconstruction of railroad track will be paid for at the Contract lump sum amount for “Reconstruct Railroad Track”. Payment will be payment in full for furnishing and placing all materials, and for furnishing all labor, equipment, and incidentals necessary to complete the work as specified. End of Special Provision 62 Staging Area Map: Cleveland Creek Railroad Culvert
© Copyright 2024