DHA CITY SUSTAINABLE ENERGY FRAMEWORK OSMANI & COMPANY (PVT.) (PVT ) LTD LTD. CONSULTING ENGINEERS – ARCHITECTS – PLANNERS www.osmani.com Energy Convention 2015 – Karachi, Pakistan OSMANI & COMPANY (PVT.) (PVT ) LTD. LTD Established in 1960 – 55 Years of Effective Existence Operations throughout Pakistan & Middle East Current Strength: 700+ Professionals & Support Staff Extensive Experience with 4000+ completed projects in Government,, Multinational & Private sector Comprehensive range of Consultancy Services in Engineering, Architecture, Planning, Mapping & Technology fields PKR 550+ billion (USD 5.5 billion) projects under execution Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan INFRASTRUCTURE SERVICES BY OSMANI Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan INFRASTRUCTURE PROJECTS UNDER EXECUTION ((PKR 550+ BILLION)) Project Size Infrastructure Energy Cost PRK DHA City Karachi 11,600 acre Yes Yes 100 B Hawksbay Scheme 42, Karachi 11,460 acre Yes Yes 65 B Hyderabad Development Package & GIS 253,000 acre Yes Yes 8B B dd B d l Island Buddo-Bundal I l d 12 000 acre 12,000 Y Yes Y Yes 300 B DHA Phase VIII, Karachi 4,140 acre Yes Yes 15 B e Malir a Housing ous g Karachi a ac New 4,400 , 00 ac acree Yes es Yes es 100 B M3 - Industrial City, Faisalabad 4,000 acre Yes Yes 6B Gulistan-e-Sarmast Housing, Hyderabad 4,800 acre Yes Yes 15 B 750 Water Filtration Plants in Sindh 750 towns Water only Yes 4B Islamabad Sewerage Treatment Project 60 MGD Water only Yes 6B K IV Greater Karachi Bulk Water Supply K-IV 260 MGD Water only Yes 30 B KPT Wetland Park Karachi 100 MGD Water only Yes 4B Combined Effluent Treatment Plants Karachi 80 MGD Water only Yes 7B 1000+ km Roads only Yes 10 B ADB Flood Effected Roads Rehab Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan RENEWABLE RENEWABLE ENERGY INITIATIVES IN PAKISTAN ENERGY INITIATIVES IN PAKISTAN RE Except p for some wind farms,, onlyy small scale sustainabilityy initiatives taken in Pakistan, and no holistic initiative has been taken for large scale Renewable Energy development Karachi, the largest city of Pakistan with a population of approx. 20 M people is facing the worst impacts of the Energy crisis DHA City Karachi (DCK) is the 1st ever large scale sustainable urban d l development t project j t utilizing tili i 30% Renewable R bl E Energy i.e. i 150 MW DCK is targeted to be a landmark urban development with a high quality of living for 600,000 residents and to serve as a model sustainable Pakistani city of the 21st century Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan VISION OF DHA CITY KARACHI (DCK) VISION OF DHA CITY KARACHI (DCK) * Quality Infrastructure Planning, Design & Implementation of a world class 24/7 transportation & utilities infrastructure infrastructure. Emphasis on water & energy needs of city * Safety & Security The safest city suburb in Pakistan with safety features incorporated through planning & information technology interventions * Proximity Facilities for work, education, healthcare, shopping, recreation & community activities in close proximity * Environment Provide P id a beautiful b tif l natural t l living li i environment i t with ith highest quality of life in Pakistan Sustainability Most Energy efficient suburb of Pakistan with a sustainable Infrastructure with Renewable Energy systems Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan LOCATION OF DHA CITY KARACHI LOCATION OF DHA CITY KARACHI Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan DCK 1 DCK 1ST SUSTAINABLE CITY OF PAKISTAN CITY OF PAKISTAN 1. Residential areas designed as Pedestrian Units 2. Natural ventilation through street grid layout 3. Preservation of Natural drains (Nullahs) 4. Sustainable Transportation 5. Downtown District – Pedestrian oriented 6. Eco landscape & Natural Habitats l d & l bi 7. Sustainable Water Systems 8 Sustainable Energy Systems 8. S stainable Energ S stems 9. Smart Information Systems 10 Sustainable Economy & Business 10.Sustainable Economy & Business Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan SUSTAINABLE ENERGY SOURCES SUSTAINABLE ENERGY SOURCES RENEWABLES Wind Solar Hydro Biomass NON ‐ RENEWABLES Geothermal Petroleum Copyright © 2015 Osmani & Company (Pvt.) Ltd. Coal Natural Gas Nuclear energy All Rights Reserved Energy Convention 2015 – Karachi, Pakistan DCK SUSTAINABLE ENERGY INTERVENTIONS DCK SUSTAINABLE ENERGY INTERVENTIONS DHA City’s holistic plan for sustainable energy, with demand management combined with renewable energy utilization bi d i h bl ili i 4. Reduce conventional energy demand by 50% Conventional Energy = 350 MW Renewable Energy = 150 MW Renewable Energy 150 MW Wind + Solar + Biomass + Waste‐Energy Waste Energy 3. Renewable energy usage to 30% Mandatory LED based street lights from Day 1 – Efficient A/C 2. Increase efficiency of appliances 5% 1. Manage and reduce energy consumption by 15% Copyright © 2015 Osmani & Company (Pvt.) Ltd. Passive Cooling & Shades Reduce A/C loads All Rights Reserved Energy Convention 2015 – Karachi, Pakistan DCK SUSTAINABLE ENERGY INTERVENTIONS DCK SUSTAINABLE ENERGY INTERVENTIONS ● ● ● ● ● ● ● Wind o 50 MW Wind Farm 50 MW Wind Farm Solar o Solar Car Parking Lots g o Solar Water Pumping o Solar Street Lighting o 12 MW Solar Farm o 100+ MW House Level Solar S Smart Grid G id Electric Buses & Street Cars 30 MW Biomass / Waste To Power / Biofuels Production Envision Rating System Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan DCK SUSTAINABLE ENERGY INTERVENTIONS DCK SUSTAINABLE ENERGY INTERVENTIONS ● ● ● ● ● ● ● Wind o 50 MW Wind Farm 50 MW Wind Farm – Feasibility complete, LoI Feasibility complete LoI received Solar o Solar Car Parking Lots ‐ g Execution in progress p g o Solar Water Pumping ‐ Execution in progress o Solar Street Lighting – Design completed o 12 MW Solar Farm – Feasibility in progress o 100+ MW House Level Solar – 500 houses under design S Smart Grid – G id Design in progress D i i Electric Buses & Street Cars – Feasibility in progress 30 MW Biomass / Waste To Power / Biofuels Production – Feasibility complete Envision Rating System – Award Received Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan WIND ENERGY AT DCK WIND ENERGY AT DCK 50 MW Wind Farm – Feasibility complete, LoI received Wind Wi dE Energy P Park k (65 Acres : 50 MW) Copyright © 2015 Osmani & Company (Pvt.) Ltd. 13 All Rights Reserved Energy Convention 2015 – Karachi, Pakistan WIND ENERGY AT DCK WIND ENERGY AT DCK FAIR 6 2 TO 6.8 6.2 6 8 m/s GOOD 6.9 to 7.4 m/s EXCELLENT 7.4 to 7.9 m/s Wind Energy Park (65 Acres : 50 MW) NREL USA Map showing DCK is in Good wind condition zone Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan WIND ENERGY AT DCK WIND ENERGY AT DCK Wind Masts installed in Sep 2013 DCK WIND MASTS CBD EDUCATION LOCATIONS AL ZONE Wind Mast (518 Ft) Wind Mast (788 Ft) 5 km Radius 7 km Radius Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan WIND ENERGY AT DCK WIND ENERGY AT DCK Wind Masts installed in Sep 2013 Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan WIND ENERGY AT DCK WIND ENERGY AT DCK Daily Mean Wind Speed (m/s) All Rights Reserved Copyright © 2015 Osmani & Company (Pvt.) Ltd. Energy Convention 2015 – Karachi, Pakistan WIND ROSE OF ROSE OF DCK N NN W NNE WNW EN E W E WSW ESE Wind Speed m/s SSW SSE S Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved 3‐5 6 – 10 11‐15 > 20 Energy Convention 2015 – Karachi, Pakistan SOLAR ENERGY UNDER SHORT TERM PLAN SOLAR ENERGY UNDER SHORT TERM PLAN Living g Accommodatio ns 1 MW Solar in Parking Lot at 1 MW Solar in Parking Lot at Campsite Building Complex (Under Execution) (Under Execution) DCK Office Bldg Visitors Centre Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan SOLAR ENERGY FARM UNDER MID TERM PLAN SOLAR ENERGY FARM UNDER MID TERM PLAN 64 Acres 12 MW Solar Farm Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan HOUSE LEVEL SOLAR UNDER LONG TERM PLAN HOUSE LEVEL SOLAR UNDER LONG TERM PLAN ● Housing units & all ““public” buildings in bli ” b ildi i DCK shall have mandatory PASSIVE mandatory PASSIVE COOLING, SOLAR WATER HEATING through byelaws 20% 40% 60% ● Through net metering, SOLAR PANELS AT HOUSE level is to be promoted 100% Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan SMART GRID SMART GRID OFC will act as backbone ● ● ● ● ● ● Reliable Secure Economic conomic Efficient Envmt friendly SMART GRID Safe Safe Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan ELECTRIC TRANSPORTATION ELECTRIC TRANSPORTATION Electric bus tender under preparation Electric bus tender under preparation Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan BIOMASS / WASTE TO ENERGY BIOMASS / WASTE TO ENERGY BIO MASS FEASIBILITY UNDER PROGRESS ● ● ● ● ● ● Wheat Husk Rice Husk Rice Husk Sugarcane Husk Solid Waste Sewage Sludge Sewage Sludge Kitchen Garbage Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan ™ SUSTAINABILITY RATING SYSTEM ENVISION SUSTAINABILITY RATING SYSTEM ENVISION Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan ™ SUSTAINABILITY RATING SYSTEM ENVISION SUSTAINABILITY RATING SYSTEM ENVISION ENERGY WATER WASTE TRANSPORT LANDSCAPE INFORMATION DCK Infrastructure was evaluated & rated by Envision System on each of above areas After 1 year long evaluation, DCK & Consultants C lt t Osmani O i & Company C were given the prestigious international award Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan ™ AWARD OF DHA CITY ENVISION AWARD OF DHA CITY ENVISION Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved Energy Convention 2015 – Karachi, Pakistan ™ AWARD OF DHA CITY ENVISION AWARD OF DHA CITY ENVISION Copyright © 2015 Osmani & Company (Pvt.) Ltd. All Rights Reserved
© Copyright 2024