Efficiency Survey Checklist Contact Information

Efficiency Survey Checklist
E-Mail:
Phone:
Contact Information
Owner
Operator
Charterer
Length of charter:
General Information
Vessel name
IMO number (Lloyds number)
Main engine type and quantity
(Example: 12k98ME-C7.1-GI-TII)
Auxiliary engines (type and quantity)
Onboard frequency (e.g. 50 Hz.)
Hull number/Yard
Year of build
Design / maker of engine safety
Engine data
Propulsion engine
Auxiliary engine
Engine operating hours
Engine builder
Engine building number
Picture of engine name plate
PrimeServ Efficiency Survey Checklist
O yes
O no
O yes
O no
Page 1 of 4
Automation systems
Maker and Model of:
Power Management System
Safety System
Engine Control System
Speed Governor
Alarm System
Turbocharger data
Propulsion engine
Auxiliary engine
Turbocharger (maker and model)
Number of Turbochargers
Turbocharger serial number
Turbocharger running hours
O yes
Picture of turbocharger name plate
O no
O yes
O no
Propeller data
Number of propellers
Propeller type (fixed/controllable
Pitch)
Propeller maker/model
Nozzle
O yes
O no
Nozzle maker/model
Operating Speed
Max. speed
Normal service speed
Design/Scantling draught
Today
In future
PrimeServ Efficiency Survey Checklist
Page 2 of 4
Future operating Profile
Usage of fuel oil in %
HFO
MDO/MGO
Gas
Currently
In future (from 2015
regarding new SECA)
Operating Profile
Annual operating profile (e.g. 5000 h seagoing, 1500 h manoeuvring,
2000 h harbouring)
Seagoing in h
Manoeuvring in h
Harbouring in h
Currently
In future
Average load when operating in below conditions
Load
Seagoing
Manoeuvring
Harbouring
Load in percent
Number of engines in
use
Miscellaneous
% of operation in emission
controlled areas (ECAs)
Usual ports
Cylinder oil feed rate
Fuel oil quality
(heat rate/sulphur content)
Frequency controlled
cooling system
Online Monitoring system
O yes
O no
O yes
O no
Maintenance schedule
and scope of work
Last Service
Next Service
Next dry dock
PrimeServ Efficiency Survey Checklist
Page 3 of 4
Significant observations (e.g. smoke emissions, vibrations, noise)
Measures planned to comply with emissions regulations after 2015 (SOx) and 2016 (NOx)
Measures planned to comply with emissions regulations after 2020-2025 (SOx and NOx)
Optimizations/Retrofits already done in the last years (e.g. Slide fuel valves, Alpha Lube, MGO/MGO
Upgrade)
Thank you. You have successfully completed our Efficiency Survey.
Please send the filled checklist to
[email protected]
PrimeServ Efficiency Survey Checklist
Page 4 of 4