Efficiency Survey Checklist E-Mail: Phone: Contact Information Owner Operator Charterer Length of charter: General Information Vessel name IMO number (Lloyds number) Main engine type and quantity (Example: 12k98ME-C7.1-GI-TII) Auxiliary engines (type and quantity) Onboard frequency (e.g. 50 Hz.) Hull number/Yard Year of build Design / maker of engine safety Engine data Propulsion engine Auxiliary engine Engine operating hours Engine builder Engine building number Picture of engine name plate PrimeServ Efficiency Survey Checklist O yes O no O yes O no Page 1 of 4 Automation systems Maker and Model of: Power Management System Safety System Engine Control System Speed Governor Alarm System Turbocharger data Propulsion engine Auxiliary engine Turbocharger (maker and model) Number of Turbochargers Turbocharger serial number Turbocharger running hours O yes Picture of turbocharger name plate O no O yes O no Propeller data Number of propellers Propeller type (fixed/controllable Pitch) Propeller maker/model Nozzle O yes O no Nozzle maker/model Operating Speed Max. speed Normal service speed Design/Scantling draught Today In future PrimeServ Efficiency Survey Checklist Page 2 of 4 Future operating Profile Usage of fuel oil in % HFO MDO/MGO Gas Currently In future (from 2015 regarding new SECA) Operating Profile Annual operating profile (e.g. 5000 h seagoing, 1500 h manoeuvring, 2000 h harbouring) Seagoing in h Manoeuvring in h Harbouring in h Currently In future Average load when operating in below conditions Load Seagoing Manoeuvring Harbouring Load in percent Number of engines in use Miscellaneous % of operation in emission controlled areas (ECAs) Usual ports Cylinder oil feed rate Fuel oil quality (heat rate/sulphur content) Frequency controlled cooling system Online Monitoring system O yes O no O yes O no Maintenance schedule and scope of work Last Service Next Service Next dry dock PrimeServ Efficiency Survey Checklist Page 3 of 4 Significant observations (e.g. smoke emissions, vibrations, noise) Measures planned to comply with emissions regulations after 2015 (SOx) and 2016 (NOx) Measures planned to comply with emissions regulations after 2020-2025 (SOx and NOx) Optimizations/Retrofits already done in the last years (e.g. Slide fuel valves, Alpha Lube, MGO/MGO Upgrade) Thank you. You have successfully completed our Efficiency Survey. Please send the filled checklist to [email protected] PrimeServ Efficiency Survey Checklist Page 4 of 4
© Copyright 2024