United Nations Economic and Social Commission for Western Asia (ESCWA) ESCWA INITIATIVE ON TECHNOLOGY, EMPLOYMENT AND POVERTY ALLEVIATION (TEPA) BUSINESS PLAN FOR A MULTIPURPOSE TECHNOLOGY COMMUNITY CENTER PILOT PROJECT Draft version 4.0 Prepared by Wajdi Mattar June 2003 – Beirut PREFACE This business plan aims at promoting multipurpose technology community centres (MTCCs) in ESCWA member countries. It strives to strengthen the capacity of communities by empowering them to take forward their own operations and achieve sustainable development. It is one of the first visible outputs of the initiative launched by ESCWA in collaboration with ILO, namely, the Regional Agenda for Action “Technology, Employment and Poverty Alleviation” (RATPA). The business plan seeks to enable local communities in ESCWA member countries to realize their potentials through: a. Promoting investment in community facilities and assets; b. Improving community services and access; c. Working with local non-profit organization and ESCWA to reduce unemployment and poverty; d. Securing funds as well as maximizing the return and amount of granted funds; e. Cooperating with key local partners from private sector to develop local capacities; f. Bridging the digital divide. The business plan provides all the elements needed for setting up a pilot MTCC, including an estimated cost for operating it. The final cost for launching and operating a pilot MTCC depends on the offers and labor cost in the specific targeted communities. In some cases, it is possible to arrange for special grants as mentioned in footnote 2 on the second page of this document, whereby ESCWA secured from Microsoft free licenses for Tal Abbass pilot facility. ii CONTENT I. AN EXECUTIVE SUMMARY ............................................................................................................................1 II. DESCRIPTION OF THE PILOT PROJECT ......................................................................................................3 III. PILOT MTCC SERVICES.................................................................................................................................4 A. BASIC SERVICES ..............................................................................................................................................5 B. EXTENDED SERVICES .......................................................................................................................................6 IV. SELECTED LOCATION AND MARKET .......................................................................................................8 V. THE COMPETITION .........................................................................................................................................9 A. VOCATIONAL TRAINING SCHOOLS ...................................................................................................................9 B. COMMUNITY CENTERS ...................................................................................................................................11 C. INTERNET CAFES ............................................................................................................................................11 VI. ORGANIZATION AND MANAGEMENT ....................................................................................................12 A. IMPLEMENTATION PHASE ..............................................................................................................................12 B. OPERATIONAL PHASE ....................................................................................................................................13 C. LEGAL STRUCTURE ........................................................................................................................................14 D. INSURANCE ....................................................................................................................................................15 E. MANAGEMENT ISSUES ...................................................................................................................................15 F. HUMAN RESOURCES .......................................................................................................................................16 VII. FACILITIES, CAPITAL EQUIPMENT AND FURNITURE LISTS............................................................17 A. FACILITIES .....................................................................................................................................................17 B. FURNITURE ....................................................................................................................................................18 C. HARDWARE AND SOFTWARE EQUIPMENT ......................................................................................................18 VIII. FINANCIAL PLANNING ............................................................................................................................20 A. SETUP COST ...................................................................................................................................................20 B. OPERATIONAL COST ......................................................................................................................................22 C. FINANCIAL ANALYSIS ....................................................................................................................................22 APPENDIX ............................................................................................................................................................27 APPENDIX A – HIGH LEVEL PROJECT PLAN FOR LAUNCHING ............................................................................27 APPENDIX B – SURVEY OF AKKAR AREA IN NORTH LEBANON .........................................................................29 APPENDIX C – SAMPLE MTCC SCHEDULE ........................................................................................................31 iii I. AN EXECUTIVE SUMMARY This pilot project is part of the ESCWA Initiative aimed at building and developing member country capacity to harness new technologies in combating unemployment and poverty (refer to frame 1). Frame 1: Summary on the Initiative and the Forum on Technology, Employment and Poverty Alleviation The Initiative: The initiative launched by ESCWA in collaboration with ILO, namely, the Regional Agenda for Action “Technology, Employment and Poverty Alleviation (RATPA),” aims at harnessing selected new technologies for employment creation and poverty alleviation. It is to act as an umbrella to a host of national and regional programmes designed to promote new technology inputs emphasizing new ICTs, selected biotechnologies and new materials technologies. The Forum: ESCWA held a Forum on “Technology, Employment, and Poverty Alleviation,” in collaboration with the International Labor Organization (ILO), Beirut, July 16-17, 2002. The Forum was attended by a group of outstanding scientists, technologists and economists, including the Nobel Laureate, Professor A. Zewail, together with a large group of high-level policy and decision makers from the member countries. The Forum highlighted the need to: formulate a new vision of science, technology, and innovation (STI), create new institutional forms, promote research and development, and to overhaul educational systems. The Forum’s recommendations were adopted by a resolution of the Twenty-Second ESCWA Session, held at the United Nations house in Beirut from 14th to 17th April 2003. In addition to endorsing the need for the above task groups, the resolution adopted by the Session underlined the need for: - - The establishment of a new institutional framework in ESCWA member countries, with the focus on centers of excellence, technology parks, technology incubators and services and productive communities, all supported by high technology; The strengthening and coordination of research and development endeavors and increasing of the amounts allocated thereto in ESCWA member countries; The development of the national education and vocational training systems, with a view to eradicating traditional and technological illiteracy. One line of action adopted by this Initiative seeks to design and launch Multipurpose Technology Community Centers (MTCCs) targeting the use of selected ICTs and new technologies in unemployment and poverty reduction in impoverished communities. MTCCs are being planned and implemented as pilot projects in cooperation with prominent nongovernmental organizations (NGOs) and local authorities, mainly municipalities. 1 Two essential aspects will be addressed in the design and management of intended pilot MTCCs: (a) Facilitating access by disadvantaged communities to technologies with a view to creating gainful employment; (b) Helping enterprises achieve higher efficiencies and lower costs as they communicate with one another and with regulatory authorities, improve their sourcing, and access to markets; hence enhancing their competitiveness and possibilities for creating new employment opportunities. Pilot MTCC projects are conceived as business ventures that do not seek immediate profit. Rather, the present approach targets sustainable operation, with some possibilities for further expansion, both in terms of geography and physical presence as well as range of services and facilities offered. The present document presents a business plan for a pilot facility to be established in the Akkar region in North Lebanon. See appendix B for a survey of Akkar area. Cost sharing will be adopted whenever required to cover the establishment of pilot MTCC and their running costs. In-kind contributions by local NGOs, ESCWA, and other collaborating bodies1 will be accounted for prior to execution of the MTCC programme and will be re-evaluated at its conclusion for auditing purposes and future reference. With this in mind, requirements for establishing national pilot MTCC facilities will be considered in this business plan. The proposed plan will provide technical and financial data required by concerned institutions for the design and management of pilot MTCC projects in the domains addressed by the programme. The estimated cost for one MTCC is summarized in figure 1 below. FIGURE 1: ESTIMATED COST FOR A PILOT MTCC PROJECT IN LEBANON’S AKKAR REGION2 Locally assembled PC with one-year guarantee $20,200.00 $3,000.00 Setup cost Cash as initial working capital Operational cost 1st year $ 23,200.00 2nd year $ 24,100.00 3rd year $ 24,100.00 Replacement cost of major hardware at end of 3rd year 6,000.00 Note: Numbers are rounded up to the neasrest hundred 1 Such as municipalities and governments. The numbers presented could very based on several factors case; for example, ESCWA has secured free Microsoft licenses for the pilot MTCC to be hosted in Tal Abbass municipality, thus reducing the setup cost by USD 3,924.00. 2 2 II. DESCRIPTION OF THE PILOT PROJECT Multipurpose Technology Community Centers (MTCC) have proven to be an effective mechanism for empowering individual and for supporting community development. The proposed MTCC, located in rural areas, will be managed by staff from local communities in cooperation with national experts to provide various opportunities for community development. Typical location will be in municipalities and schools. The project’s mission statement is to: “Provide livelihood benefits to impoverished segments of the population as well as local enterprises through the various use of new technology inputs including ICTs; the design of the MTCC will be put forth in such a way that it will eventually become a self-sustainable business unit.” Pilot MTCC projects are conceived as business ventures that do not seek immediate profit. Rather, the present approach targets sustainable operation, with some possibilities for further expansion, both in terms of geography and physical presence as well as range of services and facilities offered. The target markets will be rural areas where similar centers are not present. The final location will be deduced from the feedback and recommendations of both local non-government organizations (NGOs) and third party consultants hired from ESCWA to conduct a survey of the designated area. The location needs to be a focal point serving several other neighboring villages, and an adequate number of citizens in order to generate profitable operation on the long run (Appendix A provides a high level project plan). The project will not compete with local firms but rather provides complementary services. Targeted populations include youth, women, in general and entrepreneurs. MTCCs are intended to deliver a wide range of services, this flexibility is required to provide competitive edge and to capture new opportunities as well as adjust to market changes. Section IV provides a complete list of services. However, certain basic services are being targeted as core services in order to improve the learning curve and lower overhead cost. Pilot MTCC services will include Internet public access, training in secretarial duties, basic computer training and certification, such as International Computer Driving License (ICDL). Plans are being finalized for delivery of literacy programmes, basic accounting skills and tele-centers services. Project Partners This pilot project is based on a tripartite partnership, involving local NGOs and community civil servants in order to acquire early ownership and share responsibility for the project’s success. All parties are expected to allocate financial and/or in-kind contributions. Local NGOs will provide indigenous insight with regard to local communities needs and advise on the selection of the project’s location. The three main parties involved for launching this pilot project in the Akkar region are: 3 ESCWA3 The Economic Commission for Western Asia (ECWA) was established by Economic and Social Council resolution 1818 (LV) of 9 August 1973 as the successor to the United Nations Economic and Social Office in Beirut (UNESOB). In 1985, the Commission was redesignated the Economic and Social Commission for Western Asia (ESCWA), in accordance with Economic and Social Council resolution 1985/69 of 26 July 1985, in order to acknowledge more fully the social aspect of the Commission's activities. It is one of the five regional commissions that report to the Economic and Social Council, the principal organ of the United Nations responsible for coordinating economic and social activities in the United Nations system. ESCWA promotes economic and social development through regional and sub-regional cooperation and integration and serves as the main general economic and social development forum within the United Nations system for the ESCWA region. It formulates and promotes development assistance activities and projects commensurate with the needs and priorities of the region and acts as an executing agency for relevant operational projects. ESCWA coordinates its activities with those of the major departments/offices of the United Nations at Headquarters and of specialized agencies and intergovernmental organizations, with a view to avoid duplication and ensure complementarity, synergy and exchange of information. Issam Fares Foundation4 (local NGO) The Fares Foundation is a private, non-profit institution registered under number 117, 15 August 1987, in the Lebanese Ministry of Interior. It acquired “Public Interest Status” through Presidential Decree #5308, 26 June 1994. It was founded by Issam M. Fares in order to organize his donations and contributions and ensure their continuity. The Foundation is active in the fields of human and social development in Lebanon. It pays particular attention to underprivileged groups, communities, and regions, and includes programs and services in health, education, humanitarian aid, culture, infrastructure, research, and conferences. A large part of these activities are prepared and implemented by the staff of the Foundation. The Foundation also seeks cooperation from other organizations and institutions to implement these activities. Local municipalities This party plays an important role in the operations and future success of the project. It will host the pilot MTCC project and provide basic services and support for its day-to-day operations. It will also ensure that the pilot MTCC is open to the community as well as coordinate with other parties in assigning a suitable manager for the pilot project. III. PILOT MTCC SERVICES The pilot MTCC is designed to deliver a wide range of services, this will enhance competitive edge and help capture new opportunities as well as adjust to market and other changes. The schedule for delivering these services must respond to community needs, reflect focus areas determined by this initiative5, and must be realistic in terms of the demands it makes of staff, space, and budget (refer to appendix C for a sample MTCC schedule). However, basic services 3 4 5 Source: http://www.escwa.org.lb/ Source: http://db.fares.org.lb/profile.asp Use of technology for unemployment and poverty reduction. 4 need to be identified as core services in order to increase the learning curve and thus lower overhead cost. All basic services are fee-based services that help to cover expenses for literacy courses for members of the community. The next paragraphs describe the basic and extended services for a MTCC. A. Basic services The basic services are grouped in three main categories, namely: language and literacy courses, information technology courses, and office administrative skills courses. 1. Language and literacy courses a. Literacy programmes: Teaching literacy (and non-native languages) using computers can be a good solution to further enhance the learning process. The use of user friendly and intuitive software that relies on icons and pictures rather than words can be instrumental in designing a hybrid classroom-computer curriculum. Students undergo orientation on the use of the mouse and very simple language learning software. After orientation, students are able to continue learning at their own pace and on their own. With a self-paced yet engaging setup the students are motivated to learn literacy skills or a new language. This course is for free. b. Self-paced language courses: Self-paced language courses using computer-based training allow professionals and literate people, with minimal computer skills (basic computer training course), to learn a new language at their own pace. With a few orientation sessions on the software, the trainees are ready to start learning a new language on their own. The tool focuses on reading, listening, writing, and speaking skills previously described in the illiteracy training section. Most professionals find it difficult to attend regular classes and prefer self-paced training. 2. Information technology courses a. Basic computer training: Basic computer training as a prerequisite for success with any computer based training. This course targets literate people that are computer illiterate. Although some parts are similar to the illiteracy course regarding mouse and keyboard skills, the two courses definitely target different audiences and run at different paces. The basic computer training gives the minimum skills to start using a computer and introduces the student to the most important concepts and applications. This course is one week long and is merely an introductory course. b. Computer skills certification course The International Computer Driver’s License (ICDL) is a course and exam that thoroughly covers these computer skills. The ICDL syllabus is comprehensive and describes the Basic Business Skills course at a micro-skill level. The ICDL test provides a measurable assessment of the success rate for this course. Test results provide a way to measure performance of the trainees as well as the trainers. The test can provide statistics at the micro-skill level. This will allow center managers to identify sections in courses given by specific trainers that need to be improved. These skills course can be expanded further with the ICDL advanced modules. Candidates who successfully pass the ICDL exam receive a recognized certificate as proof for the acquired computer skills. 5 c. Hardware and software support courses A hardware and software support course can be offered on a regular basis at the community center. The course will no doubt yield employable skills and build capacity in the community to promote using technology. The hardware part of the course would cover issues related to setting up and connecting a computer, the basic components inside the computer, troubleshooting of hardware problems and can easily extend to assembling new computers. Assembling parts locally significantly reduces the cost of the computer. Computer assembly is a demanded skill that can create jobs in the community. The software part covers configuring the BIOS, installing and troubleshooting operating system and applications problems. The trainees are informed of licensing and intellectual property issues, and are taught to respect them. Options for the use of open source, freeware and shareware software are introduced to the trainees. 3. Office administrative skills courses a. Tele-center and public access area Public access area allows users to access the Internet, word process, print and scan documents and practice what they have learned. Computers with access to the Internet and a printer provide a very attractive service to a wide range of people. The public access area does not have to offer computers only; photocopying machines, faxing, phones and other services can be offered for a fee to individuals and small businesses that cannot afford their own equipment. b. Basic accounting skills for small and micro enterprises (SMEs) The course offers an explanation of fundamental accounting terms and functions as well as provides participants with skills in recording financial information using basic accounting principles. It aims at developing a greater understanding of financial reporting practices, preparing basic accounts, and becoming familiar with financial statements6. c. Secretarial skills The course delivers secretarial skills and management support such as advanced keyboarding, time management, organizational ability, communication skills, meetings and minutes preparation. B. Extended services 1. E-health E-health brings new technologies’ benefits to delivering healthcare to the society. It empowers poor communities with access to health related information that could mitigate the consequences of certain epidemic diseases. Furthermore, it reduces cost of basic healthcare services in impoverished areas through the use of ICT-based solutions such as telemedicine (refer to frame 2). Services will focus on two main areas, namely: 6 Such as: balance sheets, income statement, cash flow statement, and bank reconciliation. 6 Personal Health: Alcohol, tobacco and other drugs; alternative medicines/natural products; disease prevention; nutrition; mental and emotional health; physical activity and fitness; safety issues; violence prevention; etc. Parent and Child: Breast feeding; child nutrition and fitness; childhood obesity; parenting; poison prevention; prenatal care; etc. Frame 2: Telemedicine application This application will provide villages with Internet kiosks connected to webcams that are operated by a trained civil servant or by a private firm. The trained operator will carefully record the symptoms of the patient using templated questionnaires; in addition a voice-record of the patient and a picture can also be attached to the questionnaire in order to assist the doctor to better diagnose the disease7. Then the records are sent via Internet to either a contracted doctor or hospital. This project does not necessary have to be operated in real time, records can be sent via Internet and replies can come back later based on the severity of the patient’s case. On-line doctors can call back the Internet kiosks or conduct an on-line chatting to gain more information from the patient. In case a physical checkup or a hospital admission is required, the doctor will give an appointment for the patient to get a treatment. Source: WSIS regional preparatory conference paper on “Promoting e-health applications towards an Information Society in ESCWA member countries”, Reference E/ESCWA/ICTD/2003/WG.1/7 2. E-government E-government applications are used to offer greater convenience to the citizen and the business society by providing more governmental transparency. Two main areas will be of interest to impoverished communities: Government-to-Citizen: job search services, social security, personal documents, declaration to the police, public libraries, birth certificate, and employment services. Government-to-Business: License renewal, business registration, social contribution for employees, submission of data, environment-related permit, regulations, and import/export customs. 3. E-commerce Proposed solutions need to cater local market demands as well as serve SMEs. By targeting niche markets, e-commerce is capable of delivering new marketing channels. The most commonly traded products or services in are the following: Business-to-Consumer solutions such as promoting local craftsman and artisanal products. Business-to-Business solutions such as connecting farmers to supermarkets and grocery stores. 7 In India, Aravind Eye Hospital in the city of Madurai, has implemented such a solution to provide telemedicine to patient with eye diseases. Doctors also give appointment at the hospital where patient get free treatment. 7 In each of the above three categories, MTCC needs to investigate the feasibility of each solution as well as seek implementation partners8. IV. SELECTED LOCATION AND MARKET Six localities have been chosen to cover the all-geographical districts of Akkar. The selection is the result of exhaustive meetings between ESCWA and a local NGO, based in Akkar. Description of each locality and reasons behind our recommendations are summarized as follow: AL-MKAYBLEH: is a town with a population of 4000 peoples and located just outside the main road between the area of Wadi Khaled and Mashta. It is considered as the gate of Wadi Khaled and it is the only town in the area with a municipal council. The rented town hall is easily accessible and located on the main road toward Wadi Khaled and the room available for the IT community center is almost 4x8 square meters. This community center will serve the citizens of the town as well as the citizens of the 17 towns of Wadi Khaled and Mashta. The population served by this center is around 50,000. The town has an active municipal council and telephone lines installed. JDIDET ALJOUMEH: is a town located near Halba and closely connected to several towns like Miniara, Zawarib, Sheiktaba, Quantara, Mazraa and Karmasfour. It has a municipal council with a municipality building just located off the main Halba highway and easily accessible from the other surrounding towns. The municipality also hosts the town sport and cultural club as well as a meeting hall with a capacity of some 200 seats. Telephone lines are readily available in the town and Internet services are provided by two Internet cable companies. The center is expected to serve a population of around 15,000. AL-BOURJ: is centrally on the main Al-Joumeh road between Aynyacoub, Bazbina, Beino, Iyyat, Ouyoun, Akkaratika and Dawra. It has a municipality and the municipal building is located in an old house in the middle of the town. The municipality is willing to rent a suitable space for the recommended IT community center. Telephone lines are readily available in the town. The center may serve a population of 40,000 people. TAL-ABBASS: is the biggest town with a municipal council in Al-Sahl district. It has a two-story newly built municipal building. Tal-Abbass is surrounded by tal-Abbass Sharquy, Tal-Birri, Hissa, Massoudieh and Kouyakhat with easy access between these villages and Tal-Abbass. Tal-Abbass is the business center of the district with an active sport and cultural youth club. Telephone lines are available in the town. The center may serve a population of 25,000 people. BEBNINE: is a large town with a population of around 20,000 people. It has an active municipal council and located on the main road leading to the three towns of Quarqaf, Jadideh and WadiJammous. Bebnine is a poor town with a large number of educated unemployed young people. There is an active women association involved in agro-food fabrication and marketing. The offices of the municipality are located in a rented space with a 5x5 sqm room available for the recommended IT center. 8 One option would be to set up a B2C solution to service SMEs in specific communities. The solution could be provided by private ICT firms that lease their applications based on revenue sharing scheme. The recommended platform for delivering this service would be through the use of multipurpose technology community centers. 8 MAJDALA: is a town wit a population of around 3,000 people. It is located between Saysouk, Hmayra, Daydallom, Dahrhaddara and Berkayel. It has a municipality but does not have a municipal building. The municipality is willing to rent a suitable space for the required IT center. Telephone lines are available in the town. Figure 2 illustrates the six recommended locations for setting up MTCC in Akkar area, in north Lebanon. FIGURE 2: LOCATION OF RECOMMENDED MTCCS V. THE COMPETITION A. Vocational training schools There are 15 vocational training schools in Akkar involved in providing formal teaching and training in the field of computing and information technology (refer to appendix B Table B-1). Four of these schools are government schools and the rest are private institutions. They all teach the official program set by the Ministry of Education leading to formal certificates in computing, information technology and electronics. Certificates granted by these schools are named TS (Technique Superior) and BT (Baccalaureate Technique). TS is equivalent to three years of university education and BT to grade 12. Students registered in these programs undergo training in computer programming, software development, hardware setup, computer networks, Internet and electronics principles and applications as well as training in using Microsoft office software. Students also are taught some computer languages such as COBOL, C+, and BASIC. 9 The Akkar vocational schools can be characterized as follows: 1- They are geographically well distributed to cover the whole area of Akkar with some concentration in the Halba area (Halba is the center of Akkar). 2- Most of them offer summer continuing education courses in computer applications. The number of these courses depends on the availability of students and they consist of an average of 40 hrs of instruction and training with a cost that varies between US $100 and $125. Students taking these training courses are taught how to use the computer and some related software such as Windows, Word, Excel, and PowerPoint etc. People enrolled in these courses are regular students, housewives, unemployed people, and employed people willing to improve their skill. The number of people enrolled in each of these courses is between 4 and 10. Only introductory level computer courses are taught during these sessions. 3- Total number of students in IT field is around 20 on the average in each school. 4- Most of these schools have no Internet connection and some have a temporary one to be used only during Internet teaching sessions. In other words Internet is not a part of their daily life. 5- Some vocational training schools in Akkar have independent buildings and the rest are operating out of rented spaces in residential buildings. 6- There are between 6 and 12 computers in each school. Most computers processors are either Pentium III or Pentium IV. Figure 3 illustrates the location of the identified volitional training schools in Akkar area, in north Lebanon. FIGURE 3. LOCATION OF VOCATIONAL SCHOOLS 10 B. Community centers There are six IT community centers in Akkar (refer to appendix B Table B-2): three in Halba, two in Quobayat and one in Rahbeh and they are used mainly by students to prepare and type their projects. Internet access is available in these centers. Some of theses community centers are also used for computer training. The one in Rahbeh is well established and run by the municipality. It consists of some eleven personal computers and provides Internet access and computer training courses for symbolic charge (only 13 USD per course). The one in Quobayat is a small one and consists of three computers and it is part of the town public library. The second one in Quobayat is set-up by Safady Foundation and it is about to start its services. Halba hosts three IT community centers. A small one in the public library and consists of 3 computers .The second in the building of Arc-En-Ciel, a non-profit organization helping physically challenged people. This center consists of six computers and operates for long hours depending on the availability of volunteers. It offers between three and five computer training courses per year free of charge. Internet is also available and free of charge. 25% of people benefiting from this center are physically challenged. The third one in Halba is a community-training center directed by Safady Foundation and provides three daily courses in computer instruction and training at introductory level with one hour every day for research using Internet. Figure 4 illustrates the location of the identified IT community centers in Akkar area, in north Lebanon. FIGURE 4. LOCATION OF IT COMMUNITY CENTERS C. Internet cafes Fifteen Internet cafés are operating in Akkar and are located in all districts of Akkar except the areas of Wadi Kaled and Al-Sahl. The Internet cafes of Akkar are normally frequented by young people and used mainly for games, e-mail access and chatting. Owners of these cafes estimate that 11 around 10% of clients are using their facilities for school and university research projects (refer to appendix B Table B-3). Sometimes, local people use these Internet cafés to communicate with relatives immigrated in Australia, Canada and other countries. The charge fees range between 1.30 and 2.00 USD per hour and clients are charged extra fees for using printers and others facilities. The number of computers in each Internet café is between 4 and 10. Figure 5 illustrates the location of the identified Internet cafés in Akkar area, in north Lebanon. FIGURE 5. LOCATION OF INTERNET CAFES VI. ORGANIZATION AND MANAGEMENT The organization and management of MTCC will go through two phases as described below: A. Implementation phase ESCWA will supervise closely the implementation phase. Local partners, such as local NGOs, are also expected to assist in this phase. ESCWA team will also evaluate and fine-tune the design, budget, and plans of the pilot facilities for future implementations. The following is a list of the pilot project’s key milestones: 12 1. Letter of intent from partnership with local NGO or local and central government authorities; 2. Surveys; 3. Pilot facilities design; 4. Letter of intent from local municipality to coordinate on this project; 5. Municipality official decision to host the MTCC (legal requirement for local authorities); 6. Memorandum of understanding on contributions from all parties; 7. Delivery of goods and services; 8. Employment contract; 9. Training trainers; 10. Delivery and adaptation of training manuals; 11. Legal and fiscal documents; 12. Pilot facilities established; 13. Document confirming launching pilot facilities; 14. Troubleshooting reports; 15. Audit reports. B. Operational phase Two bodies will be in charge of monitoring and evaluating operations; namely an executive and a supervisory body (refer to figure 6 below). FIGURE 6: ORGANIZATION STRUCTURE Supervisory board Executive board Basic services Extended services Executive body will be in charge of the following: Supervising the day-to-day operations of the pilot facilities; Coordinating with local audit firm to issue yearly audited financial statement to supervisory board; Issuing quarterly financial statement9 to supervisory board; Improving quality of work; Suggesting new services and adjusting program to serve community better; Assuring that operations reaches and maintains sustainable operations; Providing feedback for supervisor body on need basis; Hiring and managing staffs allocated to operate the facilities; Approving purchase orders and verifying delivery of goods or services; 9 Namely balance sheet, income statement, and cash flow. 13 Reviewing performance of facilities; Evaluating customer feedback; Validating measurable indicators and statistical data gathered from the facilities; Investing profit to improve facilities. Members of the executive body will include local NGO, representative from municipality, representative from public schools, and other members from community. Supervisor body will be in charge of the following: Evaluating facilities based on measurable indicators; Reviewing yearly audited financial statement; Reviewing quarterly financial statement10; Deciding to launch new facilities or to terminate non-sustainable ones; Fine-tuning the facilities design model; Conducting random health checkup on operations of facilities and verifying that they meet minimum desired specifications; Providing fund for launching new facilities (optional); Offering in-kind contribution (optional); Setting minimum standards for facilities. Members of the supervisory body will include ESCWA, local NGO, and audit firm. Committee members should not be less than three members assuming the following positions: supervisory body chair, supervisory body secretary, and supervisory body treasurer. Measurable indicators to gauge progress: Tangible evidence needs to be produced by executive and supervisory bodies for each of the following information as a source for verifying progress: 1. Number of extended services launched: How many became sustainable? How many are still non-sustainable? How many failed? 2. Number of citizens benefiting from services provided per MTCC: data will be compiled per year and will grouped by gender and age. 3. Number of created jobs and reduced unemployment. 4. Records of training carried out. C. Legal structure One of the first issues the supervisory committee must address is the legal structure of the MTCC. Committee members must agree upon a framework under which the MTCC will operate and they must specify the nature of the decisions that are to be the responsibility of the different components of that framework. Since the MTCC will be located in municipalities, the most likely option is that it will be under the management control and criteria set by the laws governing municipalities. In all cases, municipalities must recognize that the MTCC must be governed as a non-profit organization. 10 Namely balance sheet, income statement, and cash flow. 14 Two lines of defense against fraud and corruption for MTCC (MTCC governance): a. Supervisory committee. This group is responsible for making sure the MTCC remains faithful to its mission, protects its assets, and operates in the public interest. b. Private watchdog groups. Private local groups and local NGOs will monitor the behavior and performance of MTCC. D. Insurance Each MTCC must have the following insurance coverage: a. General liability insurance that covers the MTCC capital expenditures against fire, theft, and property damage as well as insurance against other liabilities such as participants or visitors injuring themselves in the center; b. Employee insurance coverage. E. Management issues Local Technical Support: A contract should be made with a company from the private sector to commission the equipment, install the software and train the center staff on the use and support of all the services purchased. The local technical support company will also provide on call support and conduct regular visits during at least the first six months of operation. Financial Considerations: The biggest challenge facing community centers is that of economic sustainability. There are few models of economically self-sufficient MTCCs, and those MTCCs that are self-sufficient, usually have unique circumstances that are not broadly replicable. Each MTCC has to determine what mix of extended services to provide for its community. Last but not least, MTCC should not price its commercial services below the market price, in order not to compete with public or private institutions that provide similar services. Security and janitorial services: The property owner, in this case the municipality, will provide these two services. These services will cover all utility expenses including the provision of electrical power generator. Rules: It is necessary to set rules for the MTCC. These rules should explicitly cover policies on handling equipment, downloading software, printing, chatting and meeting with strangers from the Internet, email and attachments, virus protection, and “adult” materials. The rules must be clear to participants before they begin their activities. Opening hours: From 7:00 am till 10:00 pm from Monday till Saturday. A possibility to change opening hours is based on availability of resources and community needs. However, the recommended opening hours aims at providing sustainable operation of the MTCC. MTCC protocols: Management will respect the mission of the center and will assist in reaching sustainable operations; Quality of services will be maintained throughout the project life cycle; No discrimination will be applied within the center; Management will make sure that reported results are valid; Facility will always be clean with properly ventilated; Restroom is made available and properly maintained; All equipment and furniture will be properly maintained. 15 F. Human resources The success of the center is subject to the quality or work and performance of its staffs. The latter should be practical, friendly, helpful, dependable, and flexible to assume a variety of tasks. This section describes the procedures pertaining to managing the MTCC’s human resources. The MTCC will have four types of staff, namely salaried, volunteers, consultants/part time, and janitorial. In accordance with the mission statement of the MTCC, it is mandatory to refer to local community resources to fulfill any of the tasks needed by all types of staffs. In case needed skills are not available locally, one solution could be “train the trainers” for the salaried staff and providing hands-on transfer of know-how to volunteers. Salaried: The salaried are the fulltime staff; they will abide to the labor law and will have the duties to fulfill their tasks with their best performance. Since the center opens for 15 hours per day, two people in charge are needed to cover two shifts: from 7 am to 3:30 pm and 3:00 pm to 10 pm. An overlap of 30 minutes between 3:00 pm and 3:30 pm has been allocated so that proper coordination and handover is done. One of the two staff will hold a slightly more administrative position and will assume a center manager position. The other staff member will report to the center manager and will hold an assistant position. Both staff should be able to perform a number of tasks that belong to the following main categories: a. Administrative; b. MTCC facility and equipment maintenance; c. Clerical and support services; d. MTCC core services (such as delivering basic computer training) Volunteers: They usually deliver a number of supportive services such as assisting in the clerical and administrative tasks. It is also common to find volunteers who are capable of delivering training or provide expert services for a specific topic. In all cases, it is strongly recommended to encourage center participants to become themselves volunteers by choosing the most devoted ones to assist the staffs. Volunteers who do not do a good job or violates MTCC rules will be asked to end their services. Consultants / part time staff: They provide special skills that are usually not frequently used or that are too expensive to hire on a fulltime basis. Usually, they deliver extended or advanced services. It is recommended to cooperate with other MTCCs or training centers in the area to either share cost of the consultant or to create a reliable demand to motivate the consultant. Janitorial and security: The municipality will provide necessary resources to fulfill these tasks. As far as recruiting is concerned, the executive body is in charge of this process. It is its responsibility to conduct the following tasks: a. To locate resources from the local community; b. To take applications for screening purposes and for keeping basic information about staff; c. To conduct interviews even if very informally, in order to assure that the center and the staff are a good match, and that the candidate has the interest, qualifications, and commitment necessary for the position; d. To make sure that staffs have no criminal record; e. To consider the staff for a probation period; f. To orient the staff to the mission and goals of the MTCC, its executive body members, its rules, and its standard operating procedures manual. 16 VII. FACILITIES, CAPITAL EQUIPMENT AND FURNITURE LISTS The section provides a description of the needed resources for setting up a MTCC. The following will be covered in details: 1. Facilities 2. Furniture 3. Hardware and software equipment A. Facilities A typical minimal setup could consist of 8 student computers and 1 teacher computer networked and connected to the Internet11. The computers are connected together through a hub in order to share files, Internet connection, laser printer, and a scanner. The room should have a power outlet for all set-ups, a phone outlet for the dialup Internet connection, a fire extinguisher, and an air condition. The layout of computers is flexible as there is no projection on the wall. The need for a projector has been eliminated through the use of lab management software. The elimination of a projector will also eliminate the need for dim lighting using heavy curtains. The only concern that needs to be addressed in this setup is the glare that might come from windows around the room. It is also important to mention here that the room should not be directly near a street or an electrical generator or any source of high noise level as it affects the performance of language learning software and the general atmosphere in the room. Additionally, physical accessibility to center for elderly and the physically challenged must be taken into consideration. New services that require separate facility will be allocated additional room; the size of the latter depends on the service provided. Figure 7 illustrates a layout of main information technology equipment used in the MTCC. FIGURE 7. COMPUTER LAB (5x4 METER ROOM) 11 Rule of thumb: Each computer requires 2 sqm of space. 17 B. Furniture TABLE 1: LIST OF FURNITURES Description Student table Teacher table Closet Chairs White Board Water cooler and vending machine Fire extinguisher Air conditioner Qty 5 1 1 10 1 Minimum specifications 150 x 72 cm, one table for every two students 150 x 72 cm 150 x 80 x 35 cm, with key lock 150 x 90 cm 1 1 For electrical equipment 1 16 btu, split unit C. Hardware and software equipment The MTCC will be equipped with locally assembled PCs in order to minimize setup up costs. A Pentium III processor is enough to run all necessary applications for the center. The following tables summarize the main items needed for setting a MTCC. Description Student Computer Teacher Computer TABLE 2: HARDWARE REQUIREMENT Qty Minimum specifications 8 Pentium III, 128 RAM, 20 GB HD, 15 " monitor, CD ROM, ethernet card 10/100. 1 Pentium III, 256 RAM, 20 GB HD, 15 " monitor, CD read/write, internal modem, ethernet card 10/100. Laser Printer with Cable Scanner Network Cables RJ 45 Plugs Hub 16 ports 10/100 UPS Headsets (with Microphone) 1 B/W, 600 resolution , 12 ppm, A4 size 1 A4 size, USB connector, flat bed scanner 1 Catergory 5, box of around 80 meters. 1 Box of 100 pieces 1 9 300 VA backup UPS 9 18 TABLE 3: SOFTWARE REQUIREMENT Description Ms Office (OEM) Windows (OEM) Rosetta Stone NetOp School 1 + 10 Clean Slate Lab Freeware software Qty Minimum specifications 9 XP Home edition version OEM 9 XP Home edition version OEM 9 Educational software for English and Arabic language 9 To take over other PC screens during training 9 Reset computer to standard format at reboot 9 Tutorial software TABLE 4: OTHER EQUIPMENT REQUIREMENT Description Photocopy Fax Telephone Electrical power stabilizer Generator Qty 1 1 1 1 1 Minimum specifications B/W laser fax 3 KVA 19 VIII. FINANCIAL PLANNING A. Setup cost12 TABLE 5. MTCC SETUP COST Summary per center Description Furniture Hardware Software: Operating system and office tools Software: Training and education Training trainers Setup and installation fees Telecenter equipment Total setup cost per center Furniture Description Student Table for two Teacher Table White Board Chairs Pens, eraser, & paper Closet Fire extinguisher AC Hardware Description Using Locally Assembled Hardware Student Computer Teacher Computer Laser Printer with Cable Scanner Cables RJ 45 Plugs Hub 16 ports 10/100 UPS Headsets (with Microphone) Supplies ( such as toner) 12 Total $2,630.00 $5,610.00 $4,274.00 $3,035.00 $1,950.00 $1,200.00 $1,460.00 $20,159.00 Unit Price $150.00 $200.00 $90.00 $50.00 $50.00 $250.00 $90.00 $850.00 Qty 4 1 1 10 1 1 1 1 Total Total $600.00 $200.00 $90.00 $500.00 $50.00 $250.00 $90.00 $850.00 $2,630.00 Unit Price Qty Total $400.00 $550.00 $500.00 $100.00 $50.00 $25.00 $125.00 $80.00 $10.00 $250.00 8 1 1 1 1 1 1 9 9 1 Total $3,200.00 $550.00 $500.00 $100.00 $50.00 $25.00 $125.00 $720.00 $90.00 $250.00 $5,610.00 Source: Study carried out for ESCWA by S.P. Habash on “ICTs and human resources development” 20 Table 5. MTCC setup cost (continued) Software: Operating system and office tools Description Unit Price MS office small business edition $316.00 Clean Slate Lab $350.00 Windows (OEM) XP version $120.00 Qty 9 1 9 Total $2,844.00 $350.00 $1,080.00 Total $4,274.00 Software: Training and education Description Rosetta Stone NetOp School 1 + 10 Unit Price $265.00 $650.00 Qty 9 1 Total Total $2,385.00 $650.00 $3,035.00 Training trainers Description Computer Literacy Computer Skills Unit Price $850.00 $1,100.00 Qty 1 1 Total Total $850.00 $1,100.00 $1,950.00 Setup and installation fees Description Electrical power stabilizer Cabling, installation, connecting Unit Price 500 $700.00 Qty 1 1 Total Total 500 $700.00 $1,200.00 Telecenter equipment Description Photocopy Fax Telephone Unit Price $1,250.00 $165.00 $45.00 Qty 1 1 1 Total Total $1,250.00 $165.00 $45.00 $1,460.00 21 B. Operational cost TABLE 6: OPERATIONAL COST FORECAST Description Rent cost of advanced courses (including trainer + manuals) Utilities (electricity, water, janitorial, generator) Salary for one manager (including social security) + one support staff Internet dial up telephone charges for 300 hrs per month (avg 10 hrs/day) Internet connection dial up membeship Stationary and supplies Maintenance telecenter equipments at 10% per year Per year per month 1 st year 2 nd year 3 rd year for free $ $ $ $ 1,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 $ 100.00 $ 1,200.00 $ 1,200.00 $ 1,200.00 $ 500.00 $ 6,000.00 $ 6,000.00 $ 6,000.00 $ $ $ 264.00 20.00 50.00 $ $ $ 3,168.00 240.00 600.00 $ $ $ $ 3,168.00 240.00 600.00 196.00 $ $ $ $ 3,168.00 240.00 600.00 196.00 Maintenance UPS, printer, and scanner at 10% per year $ 196.00 Maintenance of PC at 10% per year $ 500.00 Subtotal $ 1,934.00 $ 23,208.00 $ 24,100.00 (No inflation rate or replacement cost of damaged equipment are included in the above forecast ) $ 196.00 $ 500.00 $ 24,100.00 C. Financial analysis This section depicts three scenarios for the MTCC financial performance, namely the “worst”, “expected”, and “best” case for the forecasted sales revenue. The MTCC is expected to maintain sustainable operation if it meets its expected sales target; the MTCC would be able to renew major hardware equipment by the end of 3rd year. This forecast does not take into consideration setup costs because it assumes the three involved partners in this project cover them. a. b. c. d. Since the MTCC is based on a flexible and dynamic business model for delivering services, an analysis for every potential revenue sources must be separately investigated. The major revenue sources are the following: Basic computer training; Commercial use of facilities by SMEs and for employment enhancement; Internet connection; Advanced Certification. Figure 7 illustrates the above-mentioned three cases. Note that all literacy courses and personal use of the center for learning are for free. 22 TABLE 7. FINANCIAL ANALYSIS Assume average 12 working hours per day (other hours are for maintenance and idle time) Assume average 25 working day per month hour per day Total numbr of available hours per computer Available services Basic computer training Personal use of facilities for learning SMEs and employment enhancement Advanced Certification Internet use Total Worst average number of computer used 4 12 Qty 24 8 working days per month 25 Average required hours 10 3 hrs/day 3.5 hrs/day 24 4 hrs /day months per year 12 Total 240 900 1,068 192 1,200 3,600 total hours per year This service is provided for free 3600 percentage usage 7% 25% 30% 5% 33% 100% Revenue per computer Revenue per Revenue per hour year $ $ $ $ $ 1.50 2.00 5.00 1.30 $ $ $ $ $ $ 360.00 2,136.00 960.00 1,560.00 5,016.00 Forecasted scenarios Expected Best average average number of average average number of average revenue computer used revenue computer used revenue $ 20,064.00 6 $ 30,096.00 8 $ 40,128.00 23 1. Pro-forma income statement TABLE 8: INCOME STATEMENT MTCC Income Statement For the end of the first year 1/9/2004 Worst Sales Revenue Cost of goods sold Grossprofit 20,064.00 15,408.00 4,656.00 $ $ $ 6,000.00 1,200.00 3,401.80 400.00 600.00 180.00 11,781.80 Operating Income Income tax Net income operating expenses Salaries Utilities Depreciation Insurance Supplies Marketing material Maintenance Rent Total operating expenses $ Expected Best 30,096.00 15,408.00 14,688.00 $ $ $ 6,000.00 1,200.00 3,401.80 400.00 600.00 180.00 11,781.80 $ 6,000.00 1,200.00 3,401.80 400.00 600.00 180.00 11,781.80 $ (7,125.80) $ 2,906.20 $ 12,938.20 $ - $ (7,125.80) $ $ $ $ $ 2,906.20 $ 40,128.00 15,408.00 24,720.00 $ $ 12,938.20 Remarks: 1- Worst case assumes 4 out of 8 computers are used 2- Expected case assumes 6 out of 8 computers are used 3- Best case assumes 8 out of 8 computers are used 4- No inflation rate or replacement cost of damaged equipment are included 24 2. Balance sheet TABLE 9: BALANCE SHEET MTCC Balance sheet September 1st 2003 2004 Assets Current assets: Cash Supplies Prepaid insurance Total Current Assets $ $ $ $ Property, plant and equipement (PPE) Equipment: H/W, S/W and other Furniture Less accumulated depreciation Total PPE $14,129.00 $2,630.00 $ $ 16,759.00 $14,129.00 $2,630.00 $ 3,401.80 $ 13,357.20 $ 20,409.00 $ 21,965.20 Liabilities Current liabilities: Accounts payable Wages payable Total liabilities $ $ $ $ $ $ Stockholder's equity Retained earning contributed capital $ $ 20,409.00 $ 1,056.20 $ 20,409.00 Total liability and stockholder's equity $ 20,409.00 $ 21,965.20 Total assets 25 3,000.00 250.00 400.00 3,650.00 - $ $ $ $ 7,958.00 250.00 400.00 8,608.00 500.00 500.00 Filename: MTCC business plan v4.0 3. Cash flow statement (for expected case) TABLE 10: MONTHLY FORECASTED CASH FLOW STATEMENT month 01 $ 3,000.00 month 02 $ 3,525.67 month 03 $ 4,051.33 Cash Flow statement for the first year Expected scenario 6 out 8 PCs are used month 04 month 05 month 06 month 07 month 08 $ 4,577.00 $ 5,102.67 $ 5,628.33 $ 6,154.00 $ 6,679.67 Cash in Internet Basic computer training Advanced Certification Commercial use of facilities Accounting skills Literacy eradication Total Cash in $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 $ 780.00 $ 180.00 $ 480.00 $ 1,068.00 $ $ $ 2,508.00 Cash out Basic salary + Social security Facility insurance Telephone electricity water Generator rent security Janitorial Stationary Internet member ship Advance course fees hardware consumables Equipment maintenance Mkt materials (pamphlets) Total Cash out $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ $ 15.00 $ 1,982.33 $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ $ 15.00 $ 1,982.33 $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ $ 15.00 $ 1,982.33 $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ $ 15.00 $ 1,982.33 $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ $ 15.00 $ 1,982.33 $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ $ 15.00 $ 1,982.33 $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ $ 15.00 $ 1,982.33 $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ $ 15.00 $ 1,982.33 $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ $ 15.00 $ 1,982.33 $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ $ 15.00 $ 1,982.33 $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ $ 15.00 $ 1,982.33 $ 500.00 $ 33.33 $ 264.00 $ 60.00 $ 20.00 $ 20.00 $ $ $ $ 20.00 $ 20.00 $ 1,000.00 $ 30.00 $ 700.00 $ 15.00 $ 2,682.33 525.67 525.67 525.67 525.67 525.67 525.67 525.67 525.67 525.67 525.67 525.67 (174.33) 3525.67 4051.33 4577.00 5102.67 5628.33 6154.00 6679.67 7205.33 7731.00 8256.67 8782.33 8608.00 Beginning cash startup $ 3,000.00 Cash Flow Ending Cash 3000.00 Page 26 month 09 $ 7,205.33 month 10 $ 7,731.00 month 11 $ 8,256.67 month 12 $ 8,782.33 Filename: MTCC business plan v4.0 APPENDIX Appendix A – High level project plan for launching Figure A.1 below provides a preliminary high-level project plan for launching a pilot facility along with six other centers. A more detailed break down of the project plan is recommended before starting the pilot project. The pilot facility constitutes the first of three phases for launching the first MTCC in a given impoverished area (in this case Akkar Area). The second phase is based on expanding the scope of the MTCC to include additional services based on local community needs. The third phase finalizes the prototype for the MTCC as a prelude to disseminating the final model to other villages within the same area. The following is a summary of each phase: Phase 1: Launching pilot facility Phase 2: Expanding scope of MTCC services Phase 3: Finalizing prototype characteristics - Duration: 2 months - Duration: 7 months - Duration: 3 months It is recommended to complete a full year cycle before launching other MTCCs within the same area in order to fine-tune the selected services and to optimize the revenue structure based on maintaining sustainable operations. The full year cycle will provide better insight on local market demands as well as on seasonal fluctuations affecting revenue streams and services’ breadth /depth. Page 27 Filename: MTCC business plan v4.0 FIGURE A.1: HIGH LEVEL PROJECT PLAN FOR LAUNCHING PILOT MTCC AND FOR ROLLING OUT OTHER CENTERS Month 8 Month 9 Month 10 Month 11 Month 12 Month 20 Month 21 Month 22 Month 23 Month 24 Month 7 Month 6 Month 5 Month 4 Month 3 Month 2 Month 1 First year Pilot site Phase 1: Launch pilot facilities Phase 2: Expande scope of services Phase 4: Finalize prototype characterization Rollout other sites set up 2nd site set up 3rd site set up 4th site set up 5th site set up 6th site Troubleshoot / fine tune Page 28 Month 19 Month 18 Month 17 Month 16 Month 15 Month 14 Month 13 Second year Filename: MTCC business plan v4.0 Appendix B – Survey of Akkar Area in north Lebanon13 TABLE B-1: LIST OF VOCATIONAL TRAINING SCHOOL IN AKKAR List of Vocational School in Akkar Name Halba Technical Institute National Center for Technical Education Bara’ah Technical School Lebanese Technical Institute The High Institute for Education Shama’il Technical School Akkar Technical School Al-Joumeh Institute Abou Bakr Al-Saddik Technical Institute Qobayat Institute for Sciences and Computer Al-Fares Institute Bzal Government Technical School Meshmesh Government Technical School Halba Government Technical School Al-Hishah Government Technical School 13 Address Halba Halba Telephone 06-691914 ; 03-606225 06-693688 Director Mr. Michel Jabbour Mr. Hamza Ahmad Fneidek Abdeh Halba Berkayel Halba Aynyacoub Berkayel 06-895666; 03-346696 03-606225 06-693924 06-825895 06-693542 03-831748; 03-570400 06-825880; 03-227390 Mr. Sameeh Abdelhay Mr. Amin Al-Jabali Mr. Camille Jameel Mr. Yahya Zohby Mr. Habib Khoury Mr Jamal Abdelkader Mr. Ridwan Al-Hassan Qobayat Al-Bahsah 06-880950; 880850 03-278842 Mr. Ahmad Fares Bzal 06-370512 Mr. Mahmoud Al-Abboud Meshmesh 06-895317 Mr. Abdelraheem Youssef Halba 06-293148 Mr. Ragib Al-douhayby Wadi Kaled 03-591141 Mr. Ahmad Al-Saj fax:06- Mr. Jameel Asaad Source: Study carried out for ESCWA by Y. abdel Massih on “Preliminary Survey of New Technology Needs and Opportunities in Akkar Region” Page 29 Filename: MTCC business plan v4.0 TABLE B-2: LIST OF COMMUNITY CENTERS IN AKKAR List of IT Community Centers in Akkar Name Arc-En-Ciel Address Halba Telephone 06-693030 Halba Library Halba Qobayat Library Safady Center Qobayat Halba 06-895666 tel/ fax 03-531955 Not available 06-693920 Safady Center Qobayat Not available Rahbeh Rahbe 06-890300 Type Non-Profit Organization Physically Disabled Persons Public Municipal Library Public Municipal Library Community and Training Center Safady Foundation Community and Training Center Safady Foundation Community Center Municipality of Rahbeh TABLE B-3: LIST OF INTERNET CAFES IN AKKAR List of Internet Cafes in Akkar Name Josepf Najjar Masoud Dib Bara'ah Bara'ah Kamal Yacoub Yahya Zohby Tony Chediac Mazhar Mansour Tony Koussa Ata Koraan Address Miniara Jadideh Fneidek Hrar Sheik Mohammad Mafrak Berkayel Qobayat Qobayat Rahbeh Rahbeh Page 30 Telephone 06-692777 06-690728 06-895666; 03-531955 03-531955 06-691908 06-825895 03-906253 03-730658 06-890210; 03-812010 06-890574 for Filename: MTCC business plan v4.0 Appendix C – Sample MTCC schedule Monday center 7:00 AM 7:30 AM maintenance 8:00 AM SMEs services (such as 8:30 AM secreterial 9:00 AM 9:30 AM skills) 10:00 AM 10:30 AM Employment 11:00 AM enhancement 11:30 AM 12:00 PM 12:30 PM 1:00 PM Open access 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM After school 4:00 PM recreation 4:30 PM (learning, 5:00 PM Internet, etc.) 5:30 PM 6:00 PM 6:30 PM 7:00 PM 7:30 PM 8:00 PM Basic training 8:30 PM 9:00 PM 9:30 PM 10:00 PM Tuesday Wednesday Thursday Friday Saturday center maintenance center maintenance center maintenance center maintenance center maintenance SMEs services (such as secreterial skills) SMEs services (such as secreterial skills) SMEs services (such as secreterial skills) SMEs services (such as secreterial skills) Employment enhancement Employment enhancement Employment enhancement Employment enhancement Advanced training Open access Advanced training Open access After school recreation (learning, Internet, etc.) After school recreation (learning, Internet, etc.) After school recreation (learning, Internet, etc.) After school recreation (learning, Internet, etc.) Open access Basic training Open access Basic training Page 31 7:00 AM 7:30 AM SMEs services 8:00 AM (such as 8:30 AM secreterial 9:00 AM 9:30 AM skills) 10:00 AM Employment 10:30 AM enhancement 11:00 AM 11:30 AM 12:00 PM 12:30 PM Advanced 1:00 PM training 1:30 PM 2:00 PM 2:30 PM 3:00 PM 3:30 PM 4:00 PM 4:30 PM 5:00 PM 5:30 PM 6:00 PM Open access 6:30 PM 7:00 PM 7:30 PM 8:00 PM 8:30 PM 9:00 PM 9:30 PM 10:00 PM
© Copyright 2024