How Tucson Electric Power uses the PI System to balance Reliability and Variable

How Tucson Electric
Power uses the
PI System to balance
Reliability and Variable
Generation
Presented by Stan Hollowell, Tucson Electric Power
Carlos Arocho, Tucson Electric Power
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
Tucson Electric Power History
• Founded in 1892, TEPC is the principal subsidiary of UNS
Energy Corporation.
– Serve over 400,000 customers in the Tucson metro area.
– More than 2,200 megawatts of generating capacity
– Approximately 1,100 miles of EHV (345 kV and 500 kV) lines and 8
EHV substations
– Estimated variable energy 280 MW and counting…
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
2
The good….. the bad….. and the swag!
• THE GOOD – Renewable energy and variable
generation.
• THE BAD - How much variable generation is
installed and what is the impact to the system?
• THE SWAG - Forecasting solar weather
patterns?!?!?!
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
3
Weather
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
4
THE GOOD
• Renewable energy and variable generation
• Renewable Energy Standard and Tariff (REST), approved in
2008 by the Arizona Corporation Commission (ACC) requiring
15 percent of total power sales by 2025.
• Estimated variable energy 280 MW
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
5
The GOOD - Solar PV Sites
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
6
The GOOD - Solar Sensors
• Irradiance sensors
deployed for forecasting.
• TEP PV generation sites
providing EMS data.
• PV system used in
hindcasting study.
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
7
The BAD – Safety and Reliability impact
• How much variable generation is installed and what is the
impact to the system?
– Type of variable energy
• Solar
• Wind
– Type of construction of technology
• Dual Axis
• Single Axis
• Fixed
– Communication method
• Real-time
• Monthly
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
8
The BAD – Safety and Reliability impact
• Continued
– Type of solar technology
• Double axis
• Single axis
• Fixed or rooftop
– Solar
• Utility Scale – EMS, real time telemetry and MDM validated
• Commercial – EMS estimated and MDM validated
• Residential - EMS estimated and MDM validated
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
9
Ramp Rates
• Observed Ramp Rates:
– From a 34 MW system we see 20 MW / 120 sec
– From a 1.6 MW system we see 1.2 MW / 8 sec
– From a 2 kW system we see 1.6 kW / 5 sec
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
10
Solar Data
TEP Solar Displayed Using Single Scale
30
ANALOG:UA_TECH.UT4_EONM1MW
4.700
MW
ANALOG:UA_TECH.UT_AEYM1MW
4.104
MW
ANALOG:UA_TECH.UT_AMXMW
0.88115
25
ANALOG:UA_TECH.UT_SOL1M1MW
1.887
MW
ANALOG:UA_TECH.UT_SOLMW
1.0151
20
15
ANALOG:RENEWABLES.FRV_C861M1MW
9.500
MW
ANALOG:RENEWABLES.NP_C928M1MW
26.349
MW
ANALOG:RENEWABLES.SPF_SPF3M1MW
3.347
MW
10
5
0
-5
9/15/2013 1:56:42 PM
2.00 days
9/17/2013 1:56:42 PM
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
11
Solar Data
TEP Solar Displayed Using Multiple Scale
6 5
1.2
3
1.4
20
30
4.5
ANALOG:UA_TECH.UT4_EONM1MW
4.700
MW
ANALOG:UA_TECH.UT_AEYM1MW
4.100
MW
ANALOG:UA_TECH.UT_AMXMW
0.8918
5
ANALOG:UA_TECH.UT_SOL1M1MW
1.994
MW
ANALOG:UA_TECH.UT_SOLMW
1.0597
4
ANALOG:RENEWABLES.FRV_C861M1MW
9.500
MW
ANALOG:RENEWABLES.NP_C928M1MW
26.305
MW
ANALOG:RENEWABLES.SPF_SPF3M1MW
3.400
MW
3
2
1
0 0
-0.2
9/15/2013 1:59:32 PM
0
-0.2
0
-5
0
2.00 days
9/17/2013 1:59:32 PM
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
12
The SWAG?!?!?!
• Forecasting solar weather patterns?!?!?!
– How does PV generation compare to total load?
– How does geographic diversity smooth aggregate ramp
rates?
– Can we use PV data to forecast output?
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
13
PC at TEP solar test yard
U of A Architecture
LabView
program
Physical
sensors
GSM
Modem
sensors
Utility EMS
DG Meters
Utility MDM
Primary
SQL db
Re-binned
SQL db
DG
inverters
Data from
installers
SQL
update
scripts
SSH, SFTP
Email,
terminals
UAPV server at UA
Computers at UA Atmo.
NWS
data
WRF
UAPV server at UA
model
Local SQL
db
Web GUI
Web GUI
UA REN web designers
SQL
copy
U
Improved
Web GUI
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
14
Tools used to create data file
- PI OLEDB
data access method
- VBScript
program code to make calls to PI archive and
create data file
- Perl
used to substitute meter names in data file to ID #’s
- VisualCron
excellent scheduler, run tasks and ftp the file
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
15
TEP PI System Data and U of A forecast
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
16
TEP PI System Data and U of A forecast
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
17
PI Notifications
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
18
PI Notifications
From: [email protected] [mailto:[email protected]]
Sent: Friday, August 30, 2013 9:00 AM
To: Arocho, Carlos
Subject: EMS METERS\Station: Renewables\Notifications[FRV Accumulator Alert] generated a new
notification event.
Name: FRV Accumulator Alert
Database: TEPPIUDS
Trigger Time: 08/30/2013 09:00:16
Target: EMS METERS\Station: Renewables
State: OutsideControl
Value: 63834.91
Priority: Normal
Actions:
Acknowledge
Acknowledge With Comment
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
19
PI System Expansion
PI Systems for UNS Generation
6/25/2013
Springerville Gen Station
HW Sundt Gen Station
Solid lines: Currently exists
Units 1-4
Data
SGS
Data
Fir
ew
all
SGS
PI Server
Units 1, 2, 4
Data
Corporate Network
DCS
DCS Data
Corp
PI Server 2
Corp
PI Server 1
SGS
Operator
Rounds
Data
all
ew
Fir
DCS
EtaPRO
Calculations
PI Manual Logger
PI Manual Logger
Firewall
Docked
Or
WiFi
EMS Network
ICT
Data
Docked
Or
WiFi
Sundt
Operator
Rounds
Data
EMS PI
Servers
Firewall
Irvington
EMS Servers
EMS
Core
ICT’s
ICT’s
Vail
EMS Servers
North
Loop
(4 ICTs)
U of A
Variable Generation
Data
Valencia
Sundt
(2 ICTs)
Black
Mountain
DeMoss
Substations and
Variable Gen.
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
20
Summary
• Benefits of PI System
–
–
–
–
–
–
Innovative Product Line
Data Consolidation
Diversity of Data Exchange
Flexible Reporting
Application Development
Excellent Technical Support
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
21
Questions?
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .
22
Stan Hollowell
[email protected]
EMS Supervisor
Tucson Electric Power
Carlos Arocho
[email protected]
EMS Engineer
Tucson Electric Power
© C o p yr i g h t 2 0 1 3 O S Is o f t , L L C .