Implementation of ČEZ PI System in

Implementation of
PI System in ČEZ
Presented by Martin ZECHOVSKÝ
© Copyri g h t 2013 OSIso f t , LLC.
Agenda
– Introducing Czech Power Company CEZ
– Project CUTD
© Copyri g h t 2013 OSIso f t , LLC.
2
Czech Power
Company CEZ
© Copyri g h t 2013 OSIso f t , LLC.
3
About CEZ Group
– 1992
– 2003
– 2005
– 2012
ČEZ a.s. founded by the National Property
Fund
Created CEZ Group
Foreign expansion started, three
distribution companies in Bulgaria
Commissioning of the 600 MW wind farm
in Constanta Country
© Copyri g h t 2013 OSIso f t , LLC.
4
CEZ Group in Europe – 112 companies
Energy activity
Business activity
Country conditional interest
Active subsidiary companies
© Copyri g h t 2013 OSIso f t , LLC.
5
10 larges energy companies in Europe
10 Largest energy companies in Europe
Number of customers in 2011, in millions
61.0
Enel
37.0
EdF
30.7
Ibedrola
26.0
E.ON
24.3
RWE
10 Largest energy companies in Europe
Market capitalization in € bn as of May 2013
39.7
GdF Suez
32.2
EdF
E.ON
27.8
Enel
27.6
25.9
Ibedrola
16.8
GdF…
11.3
RWE
EdP
11.1
Fortum
12.5
CEZ
11.9
9.7
CEZ
EnBW
5.5
EnBW
8.2
PGE
5.0
PGE
7.5
© Copyri g h t 2013 OSIso f t , LLC.
6
CEZ Power plants in Czech Republic
Nuclear
Hydro
Pumpe storage
Brown Coal-fired
Biomass
Heating plant
Black Coal
Wind
Solar
Black coal and coke oven gas
CCGT
Ownership ČEZ, a.s.
Ownership of another member
ČEZ Group
© Copyri g h t 2013 OSIso f t , LLC.
7
CEZ in Czech Republic
Installed capacity
Production of electricity
© Copyri g h t 2013 OSIso f t , LLC.
8
Project CUTD
© Copyri g h t 2013 OSIso f t , LLC.
9
Project CUTD
– Baseline
– Selecting a solution
– PI System implementation
– Current status and first experience
– Expected benefits and advantages
© Copyri g h t 2013 OSIso f t , LLC.
10
Baseline
Control systems
User applications
Interfaces
© Copyri g h t 2013 OSIso f t , LLC.
11
Technical requirements for new solution
– Data collection
– Data processing
– Long term data storage
– Provision of Data
– General requirements for the system
–
–
–
–
System Security
Integration of the surrounding systems
Connection to centrally manage access roles
Infrastructure requirements
method of collection, storage, work with
data…
calculations, time slices, export data…
identification data structure, data history,
creating groups of data…
unified interface, report generation ...
centralized solution respecting standards
ČEZ ICT Services, buffering ...
Administration access, logging, auditing, ...
© Copyri g h t 2013 OSIso f t , LLC.
12
Selecting a solution
– Technical requirements
• Detailed technical evaluation
• Ready-to-use product or custom development
– Reference visits
EDP
Ibedrola
Mondi Štětí
Lovochemie Lovosice
Portugal
Spain
Czech Republic
Czech Republic
© Copyri g h t 2013 OSIso f t , LLC.
13
Implementation of the PI environment
– Phase I
Implementation of preparatory work, the creation of the
project schedule
– Phase II
Implementation of test and production environment for pilot
plants
– Phase III
Implementation environment for other plants, data migration
of all data storages to CÚTD
– Phase IV
Support for other projects providing links to applications CUTD
– Phase V
Solution acceptance
© Copyri g h t 2013 OSIso f t , LLC.
14
Solution architecture
– Local PI Servers
• For the key assets
• NPP’s Temelin and Dukovany
– Central PI Server
• For the thermal plants and
hydro
• Collects data from NPP’s
• 100.000 tags currently
© Copyri g h t 2013 OSIso f t , LLC.
15
Current status and first experience
– Connecting of power plants
• ETU, ETE, CC EPC – pilot
• EPR, EPO, EPC - rollout
– Challenges to address
• Understand what’s where
• Prepare the IT environment to start collecting data
– Testing, tuning
© Copyri g h t 2013 OSIso f t , LLC.
16
New applications
– In progress
• Operating economy
• PowerOPTI
• Valves revisions
Operating economy
PowerOPTI
Valves revisions
– Upcoming
• Chemical laboratories
• Turbine condition monitoring
• Vibrations
© Copyri g h t 2013 OSIso f t , LLC.
17
Expected benefits and advantages
– Technical advantages
• unification methods of collecting
• unification data sharing
• reducing access request directly to the control systems
– Economic benefit
• lower cost for manage applications
• lower infrastructure costs
© Copyri g h t 2013 OSIso f t , LLC.
18
Future plans
Operating economy
• More applications on top of the CUTD
• More data
PowerOPTI
Valves revisions
– PI Servers extensions
• Robustness
– HA
• More users
– PVS
• Access for equipment vendors
PI System
Users outside CEZ
© Copyri g h t 2013 OSIso f t , LLC.
19
Martin ZECHOVSKÝ
[email protected]
ČEZ, a.s.,
Power Plant Ledvice
www.cez.cz
+420 724 880 596
© Copyri g h t 2013 OSIso f t , LLC.
20
Brought to you by
&
© Copyri g h t 2013 OSIso f t , LLC.
I & C Energo
PI Implementation
&
SW Solutions
Presented by Petr HOŘENÍ
© Copyri g h t 2013 OSIso f t , LLC.
Agenda
– I & C Energo, OSIsoft partner - introduction
– PI implementation in ČEZ
– PI based software solutions
• Operating Economy - operation efficiency evaluation
• PowerOPTI - operation efficiency optimization
© Copyri g h t 2013 OSIso f t , LLC.
23
I & C Energo - Introduction
I & C Energo (since 1993)
• An engineering and supplier organization providing services
in the field of I&C systems, electric systems a information systems for power
generation, power distribution and other industries
• Main offices in Czech Republic and Slovakia, projects worldwide
Selected indicators
• Approx. 1300 employees
• 2011 revenues > 100 mil. EUR
• 2011 EBIT > 10 mil. EUR
Main products
• Capital projects
• Service (nuclear, industrial)
• Power Production Optimization
© Copyri g h t 2013 OSIso f t , LLC.
24
Power Production Optimization Division
OSIsoft Partner since 2011
OUR CUSTOMERS ARE:
 Power plants:
WE DELIVER TO OUR CUSTOMERS:
 Process and technology analyses; Advanced data
processing; Process modeling and simulation

Nuclear

Coal-fired

Combined cycle
 Software solutions; Data warehouses; Diagnostics
and optimization systems; Special instrumentation

Renewable energy sources
 Information systems; SCADA systems; Control systems
 Heating plants and heat supply systems
 Software and hardware integration and consolidation
 Industry
 Complex deliveries
© Copyri g h t 2013 OSIso f t , LLC.
25
PI Implementation in ČEZ
Should-Be Analysis
• 2011 - Comprehensive comparison of
– Oracle based in-house solution
– WonderWare historian
– OSIsoft PI
Implementation
• 2012 – 2013 (presented by Martin Zechovský)
• Mainly OPC, RDBMS and UFL Interfaces
• New WDPF interface (NPP Temelín)
Integration
• More than 20 applications to be connected or based on PI System
• SQL and WebServices interfaces to PI and AF
• SharePoint applications using PI WebParts
© Copyri g h t 2013 OSIso f t , LLC.
26
Operating Economy
Operation efficiency evaluation
• First PI based application in ČEZ
• Raw operation data from I&C systems
• Supplementary data (coal quality, water consumption, etc.) entered
or imported through SharePoint application
• Data aggregated into 10 minutes values using PI Totalizer
• Energy balancing in calculation module using customized equation
tree
• 10 minutes (NPP) or 1 day balanced data returned to PI
• Energy balance .xls reports using PI Datalink available in web
browser using SharePoint Excel Services
© Copyri g h t 2013 OSIso f t , LLC.
27
Operating Economy – I&C Data Collection
© Copyri g h t 2013 OSIso f t , LLC.
28
Operating Economy – Web Client Application
© Copyri g h t 2013 OSIso f t , LLC.
29
Operating Economy – Energy Balance Report
© Copyri g h t 2013 OSIso f t , LLC.
30
PowerOpti – Main Functions and Benefits
• PowerOpti - monitoring, diagnosis and optimization of
the performance of power plants and heating plants
– Based on power plant thermodynamic model
– Increase in the precision, accuracy and reliability of
measurements (gross error detection and data reconciliation)
– Obtaining a real picture of the actual condition of the equipment
and the technological process
– Timely detection of equipment faults and malfunctions in the
technological process
– Equipment diagnosis and degradation detection
– Technological process optimization
© Copyri g h t 2013 OSIso f t , LLC.
31
PowerOpti – Data Reconciliation
© Copyri g h t 2013 OSIso f t , LLC.
32
PowerOpti – Reactor Power Output Refinement
© Copyri g h t 2013 OSIso f t , LLC.
33
PowerOpti – Cooling Circuit Optimization
990,0
Pre-optimization
Electrical Power Output Corrected [MW]
980,0
970,0
Post-optimization
960,0
950,0
Polyg. (Preoptimization)
940,0
Polyg. (Postoptimization)
930,0
920,0
2,0
4,0
6,0
8,0
10,0 12,0 14,0 16,0 18,0 20,0 22,0
Wet Bulb Temperature[°C]
© Copyri g h t 2013 OSIso f t , LLC.
34
PowerOpti – PI Based Application
•
PowerOpti RunTime
– PI Reader, SnapShot Totalizer
– Reconciliation job executing
– PI Writer
•
PowerOpti TechStudio
–
–
–
–
•
Plant thermodynamic model configuration
Reconciliation job setup
Test calculations
Recalculation
RECON
– Plant thermodynamic model development
– Reconciliation library
•
PowerOpti WebClient
– Plant schema with raw, reconciled and estimated data using PI Graphic WebPart
– Easy comparison of selected values using PI Trend WebPart
© Copyri g h t 2013 OSIso f t , LLC.
35
PowerOpti – WebClient Using PI WebParts
© Copyri g h t 2013 OSIso f t , LLC.
36
Petr Hoření
I & C Energo a.s.
Power Production Optimization Division
Vaculíkova 1a
638 00 Brno
Czech Republic
[email protected]
+420 602 546 822
© Copyri g h t 2013 OSIso f t , LLC.
37
Please don’t forget to……
Complete the Online Survey
for this session
Share what you saw with
friends on Twitter, Facebook
or Linkedin!
#UC2013
Eventmobi.com/emeauc13
© Copyri g h t 2013 OSIso f t , LLC.
38