6/27/2011 Concentrix. Focus on Power. Soitec, a leading company in Concentrator Photovoltaics • Soitec, with more than 1100 employees develops innovative materials and technologies for electronics and energy industries Soitec semiconductor manufacturing site for engineered substrates in France • Through acquisition of Concentrix Solar in 2009, Soitec became a leading manufacturer of highly efficient Concentrator Photovoltaic (CPV) modules and supplier of solar power plants international workshop • Concentrix™ technology provides a market CPV – CONCENTRATOR PHOTOVOLTAIC leading solar module efficiency of 27%, which is two times the efficiency of standard silicon PV Soitec manufacturing site for CPV modules in Germany understanding advanced technology for high energy production and deployment CPV deployment around the world. 1 MW in Questa, USA Fabio Brunner, Head of Sales in Europe and South America, Soitec Verona Fair, 4 May 2011 1 CPV Deployment around the World: Questa 1 MW Concentrix. Focus on Power. The Questa Conquest │ May 2011 2 Concentrix. Focus on Power. Why CPV? Questa Solar Resource is Ideal for CPV • • • • Chevron 1.0 MWAC CPV solar power plant in Questa, New Mexico CPV Deployment around the World: Questa 1 MW Mining │ May 2011 Tailing site of Chevron Inc’s molybdenum mine Turn a Brownfield into a “green field” Best PERFORMANCE in high DNI areas INNOVATIVE possibly “game changing” technology Best TECHNOLOGY for Brownfield Applications Fit the SOCIO ECONOMIC framework of the Questa project, allowing for local jobs Major milestone for CPV industry 10 Daily Average DNI (kWh/m2/day) Major win for Concentrix Solar 9 Direct Normal Irradiance (DNI) 8 7 6 5 4 Alamosa, CO 3 2 Questa, NM 1 0 Jan. Feb. Mar. Apr. May Jun. Jul. Aug Sept. Oct. Nov. Dec. 3 CPV Deployment around the World: Questa 1 MW Concentrix. Focus on Power. Cooperation Among Multiple Partners │ May 2011 4 Concentrix. Focus on Power. Project Location • Chevron Technology Ventures • Chevron Mining • Environmental Agencies • State Economic Development • Village of Questa • Kit Carson Electric Cooperative • Local Construction and Installation Teams (from left to right): Hansjorg Lerchenmuller, Concentrix CEO; Desmond King, Chevron Technology Ventures President; Esther Garcia, Village of Questa Mayor; Fred Nelson, Chevron Mining Inc. President; Bill Richardson, New Mexico Governor; Luis Reyes, Kit Carson Electric Cooperative CEO; Malaquias Rael, former mayor Village of Questa; Ron Curry, Secretary New Mexico Environment Department. (Chevron Photo) CPV Deployment around the World: Questa 1 MW │ May 2011 5 CPV Deployment around the World: Questa 1 MW │ May 2011 6 1 6/27/2011 Concentrix. Focus on Power. Concentrix. Focus on Power. Concentrix Solar CPV: Fast and Flexible Field Deployment Local Economic Development and Jobs • Scalable project sizes • Construction jobs • Utility scale installations from 1 MW to 100+ MW - Local construction labor - Local electricians • O&M • Site selection flexibility - Locally sourced skilled jobs • Minimal grading • Economic development • Slope tolerant - Partner with local communities • Commission in phases - Educational development • Simple installation • Employ local workforce CPV Deployment around the World: Questa 1 MW │ May 2011 CPV Deployment around the World: Questa 1 MW 7 Concentrix. Focus on Power. The Final Product │ May 2011 8 Concentrix. Focus on Power. The Final Product CPV Deployment around the World: Questa 1 MW │ May 2011 9 CPV Deployment around the World: Questa 1 MW Concentrix. Focus on Power. Expected Energy Output: ca. 2,37 GWh per year │ May 2011 10 Concentrix. Focus on Power. Power Plant Output on April 15th 2011 PVSyst Model • Model development and validation finished • Validation results were published at CPV-7 conference • Uncertainty comparable to flatplate PV: 2% on AC Energy for typical CPV sites (high DNI, dry, >80 km from the sea) CPV Deployment around the World: Questa 1 MW │ May 2011 11 CPV Deployment around the World: Questa 1 MW │ May 2011 12 2 6/27/2011 Concentrix. Focus on Power. Initial Results: 1.05 MW Output on 21.04.11 Concentrix. Focus on Power. Lessons learned: Performance with Snow 08:25 08:35 08:40 Total power produced η = 0.0% 1.050 kW η = 0.0% η = 5.9% CPV Deployment around the World: Questa 1 MW │ May 2011 η = 1.2% 09:00 08:45 η = 17.8% 09:15 η = 20.1% CPV Deployment around the World: Questa 1 MW 13 Concentrix. Focus on Power. May 2011 14 Concentrix. Focus on Power. Questa Conquered Performance Without Snow 08:25 │ 08:35 08:40 Photo taken January 27, 2011 during commissioning Commissioning completed January 28, 2011 173 Concentrix Solar CPV trackers installed 75 local construction jobs at peak η = 8.4% η = 10.7% 09:00 08:45 η = 15.3% η = 12.7% η = 17.8% 09:15 η = 21.8% CPV Deployment around the World: Questa 1 MW │ May 2011 15 16 Concentrix. Focus on Power. Thank You ! Fabio Brunner Bötzinger Str. 31 79111 Freiburg (Germany) Email: [email protected] 3
© Copyright 2024