INTEGRATED PERFORMANCE REPORT – COVER SHEET Meeting Date: 30 May 2012 Agenda Item: 1.10 Paper No: E Title: Integrated Performance Report Purpose: To report on performance against key indicators for the Trust in April 2012. Summary: Financial Performance The Trust has achieved a surplus of £28k for the month of April 2012 against a planned deficit of £38k. The reported surplus includes nonrecurring income / costs in line with plan, which contribute a total of £40k. The ‘normalised’ deficit for the month before non-recurring elements is therefore -£(12)k Cash at the end of April is £17.6m against plan of £15.7m. Cash at the end of April was higher than the true underlying position because of high level of capital creditors and high level of trade creditors. The Trusts Financial Risk Rating (‘FRR’) for the month is 3. The Trust’s level of financial performance is only marginally above that which would reduce FRR to 2 (Headroom of only £25k). Clinical Performance & Quality All Cancer standards were achieved for March and Qtr 4. All three RTT targets achieved in April. A&E performance against the 95% target was achieved in April. Recommendation: For discussion and noting. Prepared PAUL TURNER by: Director of Finance / KATE THOMAS Performance Manager Presented by: This report is relevant to: (Please tick relevant box) Assurance Framework PAUL TURNER Director of Finance MARY SHERRY Chief Operation Officer MARTIN SMITS Director of Nursing SARAH-JANE TAYLOR HR Director Risk Register I/D No. Healthcare Standards: Please specify which standard Monitor compliance Financial implications YES Human Resources implications YES Internal monitoring Legal implications NO INTEGRATED PERFORMANCE REPORT TRUST PERFORMANCE SUMMARY April 2012 Target / Limit Year End 23.0 18.0 2012-13 2011-12 Feb-12 Mar-12 Apr-12 Direction # 2010-11 Year To Date Year End YTD/ current Actual YTD Target / Limit 18.9 - 17.4 - 94.5% 90% 1.0 96.1% 95% 1.0 92.7% 92% 1.0 90.1% 85% 100.0% 90% 100.0% 98% 100.0% 94% 99.3% 94% 100.0% 96% 95.8% 93% 100.0% 93% 95.8% 95% Forecast Monitor targets & weightings ACCESS AND TARGETS Referral to waiting time (weeks) for admitted (95th centile) Referral to waiting time (weeks) for non-admitted (95th centile) RTT Referral to treatment (18 weeks) for admitted Referral to treatment (18 weeks) for non-admitted 18.3 90% 95% 14.7 97.6% 98.7% 24.3 17.0 88.7% 97.0% 21.3 17.0 92.5% 96.6% Referral to waiting time (18 weeks) for incomplete pathways 92% 0.0 94.8% 93.5% Maximum 62 day wait from referral to treatment for all cancers 85% 91.6% 92.1% 90.1% 62 day wait for 1st treatment - consultant screening service (all) 90% 100.0% 100.0% 100.0% cancer 31 day wait for 2nd or sub treatment : Anti cancer drug treat 98% 100.0% 100.0% 100.0% 31 day wait for 2nd or sub treatment : Surgery 94% 90.3% 100.0% 100.0% 31 day wait for 2nd or sub treatment : Radiotherapy 94% 31 days wait diagnosis to start of 1st treatment: All cancers 96% 99.2% 100.0% 100.0% 2 week wait from urgent GP referral to 1st appt (susp cancer) 93% 97.3% 98.1% 95.8% 2 week wait for Symptomatic Breast Patients 93% 94.8% 93.3% 100.0% percentage of patients within the 4 hour target 95% 98.6% 97.2% 96.1% 99.3% 18.9 17.4 94.5% 96.1% 92.7% 99.3% 95.8% A&E Total time in A+E (95th centile) from Q1 =< 4 hours Time to initial asessement (95th centile) from Q2 =< 15 mins Time to treatment decision (median) from Q2 =< 60 mins 56 67 51 =< 5% 3.33% 2.83% 2.97% =< 5% 3.09% 3.35% 3.03% Unplanned reattendance rate from Q2 Left without being seen from Q2 cardiac Heart attack patients to receive thrombolysis within 60 mins of call 3hrs 59 3hrs 59 3hrs 59 12 12 15 access breast screen 68% 75% 2 week maximum wait for Rapid Access Chest Pain Clinic appt 0 0 0 0 0 No waits more than 6 weeks for diagnostic investigations 0 78 29 27 17 Elective Access - rebooking 0 0 0 1 0 Patients who spend at least 90% of their time on a stroke unit 80% 70% 68% 68% 82.1% Higher risk TIA cases who are treated within 24 hours 60% 80% Outpatient Access : ASIs at =< 4% 4% 11% 8% 8% 7% Screening to normal results within 14 days 90% 96.4% 97.3% 96.8% 96.1% Screening to assessment in 21 days - screening to 1st appt offer 90% 96.9% 100.0% 94.8% 96.0% Screening to assessment in 21 days - screening to attended appt 90% of eligible woman screened within 36 months 90% 88.2% 98.6% 92.2% 94.4% 90% 99.5% 99.2% 99.2% 97.2% ↑ ↓ ↑ ↓ ↓ ↓ ↔ ↔ ↔ ↔ ↔ ↓ ↑ ↓ ↔ ↓ ↑ ↓ ↑ ↔ ↔ ↑ ↑ ↓ ↑ ↑ ↓ ↑ ↑ ↓ 3hrs 59 =< 4 hours 15 =< 15 mins 51 =< 60 mins 2.97% =< 5% 3.03% =< 5% 100% 68% 0 0 17 0 0 0 82.1% 80% 80% 60% 7% 4% 96.1% 90% 96.0% 90% 94.4% 90% 97.2% 90% 1.0 1.0 0.5 0.5 1.0 15.7 2011-12 Target / Limit Year End Delayed transfers of care to be maintained at a minimal level 3.5% 5.4% 3.2% 6.2% 2.3% Trauma inpatients (fit for surgery) receive treatment within 48 hrs Hip fractures (fit for surgery) receive treatment within 48 hrs 95% 93% 98% 96% 94% 95% 89% 94% 96% 97% 100 81.9 75.6 All deaths - actual as % of expected (Dr Foster) 100% 105% 76% HSMR deaths - actual as % of expected (Dr Foster) 100% 100% 76% all 9 0 1 1 0 11 0 1 1 Theatre Utilisation - Main 85% 88% 85% 87% 86% Theatre Utilisation - Day 85% 73% 75% 74% 77% Day Case Rates (basket of 25) Bed Occupancy 75% 86% 82% 95% 96% 100% 96% meeting the C-Diff objective (ytd) =<24 42 22 24 2 meeting the MRSA objective (ytd) =<1 4 1 1 0 Feb-12 Mar-12 Apr-12 Direction # 2010-11 ↑ ↓ ↑ Year To Date Year End YTD/ current Actual YTD Target / Limit 2.3% 3.5% 94% 95% 97% 95% 75.6 10000% 76% 100% 76% 100% 1 all 1 0 86% 85% 77% 85% 82% 75% 96% 95% 2 =<24 1.0 0 =<1 1.0 Forecast Monitor targets & weightings CLINICAL QUALITY Dr Foster Mortality relative risk rating (3 month rolling) Number of SUIs reported within appropriate timeframe Number of Serious Untoward Incidents (SUIs) ↑ ↑ ↑ ↔ ↔ OPERATIONAL EFFICIENCY 96% ↓ ↑ ↑ ↔ PATIENT EXPERIENCE ↔ ↔ STAFF EXPERIENCE Staff Turnover (Overall) Staff Turnover (Auxiliaries and HCAs) Absence <=11% 0.64% 0.28% 0.92% 0.50% <= 13.5% 0.84% 0.44% 1.54% 0.87% <=3.5% 3.58% 3.59% 3.58% 3.58% 9.0 15.2 15.4 17.6 ↑ ↑ ↔ 0.50% <=11% 0.87% <= 13.5% 3.58% <=3.5% FINANCE & ACTIVITY Cash balance 17.6 15.7 13.4 193.9 179.9 Income 188.80 16.21 21.20 15.97 15.97 15.97 Operating Expenditure 181.70 14.76 20.30 14.94 14.94 15.0 7.30 1.45 0.70 1.03 0.82 0.82 1.03 0.75 11.2 5.9% EBITDA EBITDA % 3.9% 8.9% 3.3% 6.5% 5.2% 5.2% 6.5% 4.8% Surplus/Deficit -4.30 0.40 -0.30 0.04 0.03 0.04 0.03 -(0.04) 2.1 SLA over / (under) performance n/a - 0.1 0.15 0.0 0.0 0.15 0.0 0.0 0.0 CIP 6.6 1.1 0.8 0.44 0.4 0.4 0.44 0.46 8.3 2 3 3 3 3 3 3 3 Financial Risk rating # : Arrow direction indicates improvement ↑, deterioration ↓, or no change ↔ in performance since the previous month INTEGRATED FINANCE AND PERFORMANCE REPORT Month One - April 2012 Key Issue Trust Performance – Monitor Targets Executive Summary KPI All cancer targets were met in March and Q4, the most recent data available. The monthly cancer report and charts are appended Cancer A&E has achieved the 95% target for April. ED Note: The Trust rating for Quarter 4 2011/12 has been altered by Monitor to amber/green due to February failure of RTT18 (admitted patients). RTT MRSA Monitor scorecard Action : Exception report is appended Both MRSA and C-Diff performance have sustained improvement in the previous year and therefore achieving their target. Sch G The 2011-12 monitor scorecard is comprised of 14 key indicators. All have been achieved in April, or March /Q4 where this is the most up to date data available. Admitted RTT (94.5%), non Admitted RTT (96.1%) and RTT incomplete pathways (92.7%) were achieved for April at aggregate level. The clearance of the general surgery and gynaecology backlog within the aggregate target will be undertaken during Q1, without compromising trust aggregate performance. RTT Exception Report appended. RAG Key Issue Trust Performance – Finance & Activity Executive Summary KPI The Trust has achieved a surplus of £28k for the month of April 2012 against a planned deficit of £38k. The reported surplus includes the following non-recurring income / costs (both in line with plan) • • donated income merger costs The Trusts Financial Risk Rating (‘FRR’) for the month is 3. only marginally above that which would reduce FRR to 2. The Trust’s level of financial performance is The Trust has not yet identified all the necessary savings required to deliver the targeted surplus for the year. There is therefore a significant risk that the targeted surplus of £2.1m will not be achieved. (Separate report to Finance and Investment Committee in May) Sch G Trust I&E table Cash at the end of April is £17.6m against plan of £15.7m. Cash at the end of April was higher than the true underlying position because of high level of capital creditors (Varian upgrades) and high level of trade creditors. All financial variances with specific focus on: •Income •EBITDA •CIP •Cash •Capital spend RAG Key Issue Trust Performance – Access and Targets Executive Summary KPI RAG Sch The Access and Targets scorecard is comprised of 22 key indicators, of which only 3 are red rated. • • RTT Admitted RTT (94.5%), non Admitted RTT (96.1%) and RTT incomplete pathways (92.7%) were achieved for April at aggregate level. The clearance of the general surgery and gynaecology backlog within the aggregate target will be undertaken during Q1, without compromising trust aggregate performance. RTT Exception Report appended. Diagnostic Access There were 17 Endoscopy patients waiting in excess of the 6 week diagnostic target at the end of April, an improvement on the previous month, and the lowest level since March 2010. Action : The Department Has now met with the PCT to discuss the findings of the IST review and will continue to work wit the PCT to reduce referrals where possible. Exception Report is appended Delayed Transfers of Care The delayed discharge percentage for April is 2.3%, bed occupancy (month average) continued to exceed 95% in April . Action : There continues to be a number of targeted actions in progress to reduce delays further. Exception and Update Reports appended • Outpatient Access The ASIs percentage has reduced to 7%, exceeding the 4% PCT target. Action: The Trust continues to flex polling ranges in line with national guidance, and has reviewed the underlying ASI reasons. System changes are also planned to improve the Trusts ability to protect new slots. • 48 hours standard for #NoF and Trauma The 48 hour operating target (95%) was achieved for fractured neck of femur patients (97%) but not general trauma (94%) in April. Exception Report is appended • Emergency Department : 4 hour target (95%) : The 4 hour wait target of 95% was met in April. Exception Report is appended • Stroke The 80% target was achieved in April (82.1%). Exception Report is appended Cancer A-G RTT Diagnostic Access Delayed Transfers of Care Outpatient Access 48 hours standard for #NoF & Trauma ED 4 hr target 95% Stroke Access and Targets Scorecard • Cancer All cancer targets were met in March and Qtr 4. The monthly cancer report and charts are appended for March Trust Performance – Patient Experience • • Theatre Utilisation Main Theatre 86% Day theatre 77% Theatre Utilisation • Bed Occupancy Average bed occupancy has exceeded 95% in April (96%). Bed occupancy The Patient Experience scorecard is comprised of 6 key indicators, 3 of these are part of the Monitor scorecard. For the most recent year to date position (March 2011) there are no red rated indicators: • • • Sch G A-G G Mortality SUI The Efficiency scorecard is comprised of 4 key indicators; none of these are part of the Monitor scorecard. For the most recent year to date position ( February/April 2012) there are two red rated indicators: C-Diff There have been 2 cases of C-Diff during the period 1 to 30 April 2012 . The annual objective set by Monitor is to maintain/ improve upon the previous year’s performance (24), which is being achieved. RAG Patient Experience Scorecard The Clinical Quality scorecard is comprised of 5 key indicators, none of which are part of the Monitor scorecard. For the most recent year to date position (February/April 2012) there is one red rated indicator relating to a single SUI in April , this was reported within the appropriate timescale. Mortality continues to perform better than expected (as defined by Dr Foster) Trust Performance – Efficiency KPI Efficiency Scorecard Trust Performance – Clinical Quality Executive Summary Clinical Quality Scorecard Key Issue C Diff objective MRSA There have been no further cases of MRSA since May 2011. Action :Infection Control issues under continued scrutiny by Performance and Director of Nursing/Infection Control. MRSA objective MSA There have been no breaches of mixed sex accommodation (MSA) in April. Mandatory reporting of MSA via Unify commenced in April. Mixed Sex Accomodation Trust I&E Month - April Year to Date Full Year Actual Plan Variance Last Year Actual Plan Variance Last Year Forecast Plan Last Year £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 £'000 9,570 3,798 353 367 1,679 15,767 200 15,967 9,570 3,798 353 367 1,686 15,774 200 15,974 0 0 0 0 (7) (7) 0 (7) 9,457 3,798 315 375 1,608 15,553 0 15,553 9,570 3,798 353 367 1,679 15,767 200 15,967 9,570 3,798 353 367 1,686 15,774 200 15,974 0 0 0 0 (7) (7) 0 (7) 9,457 3,798 315 375 1,608 15,553 0 15,553 114,834 45,572 4,234 4,400 22,038 191,078 2,813 193,891 114,834 45,572 4,234 4,400 22,038 191,078 2,813 193,891 118,639 45,914 4,855 4,203 21,140 194,751 301 195,052 Pay Costs Non-Pay Costs (10,591) (4,355) (10,593) (4,426) 2 71 (10,394) (4,282) (10,591) (4,355) (10,593) (4,426) 2 71 (10,394) (4,282) (127,711) (52,172) (127,711) (52,172) (127,940) (54,247) Total Operating Expenditure (14,946) (15,019) 73 (14,676) (14,946) (15,019) 73 (14,676) (179,883) (179,883) (182,187) 0 0 0 0 0 0 0 0 0 0 (218) 821 (747) 4 (250) 755 (749) 6 (250) 66 2 (2) 0 877 (730) 8 (258) 821 (747) 4 (250) 755 (749) 6 (250) 66 2 (2) 0 877 (730) 8 (258) 11,195 (8,986) 78 (3,000) 11,195 (8,986) 78 (3,000) 12,346 (8,859) 95 (2,928) 28 0 28 40 (12) (38) 0 (38) 40 (78) 66 0 66 0 66 (103) 0 (103) 83 (186) 28 0 28 40 (12) (38) 0 (38) 40 (78) 66 0 66 0 66 (103) 0 0 83 (186) 2,100 0 2,100 400 1,700 2,100 0 2,100 400 1,700 955 (839) 116 (2,175) 3,130 Contract Income - B&P PCT Contract Income - Dorset PCT Contract Income - Specialist Commissioning Contract Income - Other Other Operating Income Total Operating Income Charitable Income Total Income Profit/(Loss) on disposal of fixed assets EBITDA Depreciation Interest Receivable/(Payable) Dividend Surplus/(Deficit) Impairment Surplus/(Deficit) after Impariment Non-recurring income / (costs) incl. above Normalised Surplus/(Deficit) Key Observations The Trust has achieved a surplus of £28k for the month of April 2012 against a planned deficit of £38k. The reported surplus includes the following non-recurring income / costs (both in line with plan) • • £200k donated income. The income relating to confirmed donated assets (MRI, oncology management system etc) totals £2.4m and is being released in equal 12ths. A further £0.4m relating to cardiac development not yet confirmed is included in financial plan in March 2013 £100k relating to merger costs. Plan assumes £1.2m for year which has been phased in equal 12ths. £100k per month will be charged per month unless it becomes clear that the total for the year is significantly over/under-stated. Forecast Key Actions PERFORMANCE EXCEPTION REPORT Emergency Department Professional Standards The Risk: At month end in April all six key performance indicators were met (an improvement from March when the clinician seen time was not met). The clinician seen time median performance was 51 minutes in April (target = 60 minutes), an improvement of 16 minutes from the March performance. Current Position and Actions: The Emergency Department delivered the 4 hour target for April (95.84%). This was a decline from the March overall position of 96.11%, however the month of April included the Easter break and consequently some high attendance patterns. Some of this was predicted and planned for, however there were a number of days where presentations were over 200 in a 24 hour period, which had not been predicted. The action plan remains in place. It is clear that there remain day to day issues which need to be tackled and there are a number of “avoidable” breaches, which if all processes were robustly implemented every hour of the day and night could improve the position. However, it is also clear from the review work undertaken that the department is understaffed to deliver a higher performance and this can be particularly pertinent at certain times of the day (6pm to midnight in particular). The Business case for staffing remains unresolved, as funding has yet to be identified. Staffing continues to be the biggest risk to performance, and there are additional challenges expected from August due to a reduction in SpR numbers. Actions to seek overseas staff, and alternative skill-mix staffing solutions are being developed. The indicators are monitored daily by the team and action taken to improve where standards appear to be dropping. Poole Hospital NHS Foundation Trust Weekly Progress Chart - A&E 4 hour 95% target Weekly and Quarterly Position 100.00% 98.00% 96.00% 94.00% 92.00% 90.00% 88.00% 86.00% 84.00% 82.00% 13-May-12 98% target 06-May-12 Sarah Knight Directorate Manager – Emergency Services 14 May 2012 95% target 29-Apr-12 qtr to date % seen within 4 hours 22-Apr-12 weekly % within 4 hours 15-Apr-12 08-Apr-12 25-Mar-12 01-Apr-12 18-Mar-12 11-Mar-12 04-Mar-12 26-Feb-12 19-Feb-12 12-Feb-12 05-Feb-12 29-Jan-12 22-Jan-12 15-Jan-12 08-Jan-12 01-Jan-12 25-Dec-11 18-Dec-11 11-Dec-11 27-Nov-11 04-Dec-11 20-Nov-11 13-Nov-11 06-Nov-11 30-Oct-11 23-Oct-11 16-Oct-11 09-Oct-11 02-Oct-11 week ended PERFORMANCE EXCEPTION REPORT Referral to Treatment (RTT) - Admitted: Trust performance for April is 94.5% Summary: Although the Trust achieved the 90% RTT target, General Surgery breached at 88.9% along with Gynaecology at 87.2%. ENT achieved the target in April with 96.6% and is out of ‘recovery’. Current Position: At 14th May 2012, the predicted performance for May is 87.8% in General Surgery, and 80.6% in Gynaecology. It has been agreed with the PCT that the 90% target for these specialities does not have to be achieved in May. Actions for May 2012: 1. Overall Strategy and Target • • • It has been agreed with the PCT that General Surgery must achieve and sustain 90% from June onwards, and Gynaecology from July onwards. Accepting that an agreement has been made with the PCT that the 90% target for these specialities does not have to be achieved in May, the Surgical Admissions Office is focusing upon booking as many breaches as possible, without compromising the Trust’s overall performance. Having worked closely with the Consultant Gynaecologists to identify suitable patients, the Division is working closely with the PCT to transfer day case patients and inpatients to the private sector; once treated, it has been agreed these will be recorded by the Trust as nonadmitted breaches. 2. Increasing capacity within General Surgery and Gynaecology • • • • • Additional weekday lists in General Surgery and Gynaecology continue Within General Surgery, the waiting list is being analysed by two Consultant Surgeons to identify which patients can be operated on by a Clinical Fellow, freeing up their time to operate on the more clinically complex patients. Within General Surgery work is identifying if the case mix of an Associate Specialist can be increased, if the theatre schedule can be altered, to ensure they are operating whilst a Consultant Upper GI Surgeon is present in theatres. Within Gynaecology, processes are being put in place to ensure that when a decision to admit is made, the admitting Consultant can identify which Consultant colleagues could undertake the procedure, allowing for more booking flexibility. Theatre schedule continues to be reviewed to increase capacity for additional activity in May onwards. 3. Booking strategy • • The Performance Manager has provided the Division and the Surgical Admissions Office with data as to how many breach patients can be booked in the month whilst achieving the Trust 90% aggregate level target. The Senior Admissions Officer is working closely within the Business Manager (Surgery) regarding breach patients who remain on the waiting list without a date for their operation. 4. Performance and Monitoring Strategy • • • • • The performance team, admissions and management continue to validate, on a week by week basis, all patients admitted in the last 7 days who have breached 18 weeks. Weekly progress meetings to be held with the Chief Operating Officer. An intensive review of current processes and practices was undertaken w/c 9th April 2012, by an external operational manager who will meet with key Divisional staff; recommendations for change are being implemented. A review of the reports required to manage RTT from an operational perspective continues. Following attendance at an NHS South of England workshop on RTT, recommendations for delivery of RTT will be reviewed and adopted where appropriate COO Additional Note The Board will be kept informed on a monthly basis on progress. The up to date position will be shared with the Board at the May Board Meeting. Suzie Scaddan Business Manager – Surgical Services 14 May 2012 Cancer Waiting Times MARCH 2012: Poole Hospital NHS Foundation Trust – Summary report The following convention is used for indicating compliance with the performance standards. Standard achieved or exceeded Performance within 10% of standard Performance more than 10% below standard Data are taken from the Open Exeter national database for Cancer Waiting Times. Scorecard The arrows in the scorecard indicate whether performance has increased decreased or stayed the same relative to the previous month. 14 days: Urgent GP referral to Date First Seen Maximum 2 week wait from urgent GP referral for suspected cancer to first hospital assessment by 2000 Measure Everyone with suspected cancer will be able to see a specialist within two weeks of their GP deciding they need to be seen urgently and requesting an appointment by 2000 Target 93% or more Source National Cancer Waiting Times Database (Open Exeter) Time Period MARCH 2012 Tumour Type Total % meeting referrals standard seen in Poole during the period Suspected brain/central nervous system tumours Suspected breast cancer Suspected children's cancer Suspected gynaecological cancer Suspected haematological malignancies (excluding acute leukaemia) Median wait National % meeting standard 6 98 100 100 11 5 97.4 97.7 4 100 9 97.7 27 96.3 8 96.4 1 100 2 97.3 Suspected head & neck cancer 62 91.9 10 96.9 Suspected lower gastrointestinal cancer 78 89.7 12 94.7 Suspected lung cancer 16 100 10 98.1 Suspected other cancer 1 100 2 99.3 1 100 4 97.1 80 31 405 98.8 93.5 95.8 7 11 96.9 94.6 96.2 Suspected sarcoma Suspected skin cancer Suspected upper gastrointestinal cancer Totals Breach reasons No. of patients Breach reasons st 16 Patient cancelled/declined 1 . OPA/investigation within target 1 Lack of availability of clinic slots 14 days: All breast symptom referrals Measure Maximum 2 week wait from referral of any patient with breast symptoms to first hospital assessment by DECEMBER 2010 Target 93% or more Source National Cancer Waiting Times Database (Open Exeter) Time Period MARCH 2012 Totals Total referrals seen during the period % meeting standard at Poole 42 100 Median National wait % meeting standard 7 96.2 Breach reasons No breaches 31 days: Decision to Treat to First Treatment Measure Maximum 31 day wait from decision to treat to first treatment for all cancers by 2005 Target 96% or more Source National Cancer Waiting Times Database (Open Exeter) Time Period MARCH 2012 a) By tumour site Tumour Type Patients treated following an urgent referral for suspected cancer Total treated 0 3 3 0 100 11 100 Breast 11 23 23 0 100 11 99.6 Gynaecological 10 20 20 0 100 8 98 Haematological 4 12 12 0 100 9 99.9 Head & Neck 8 11 11 0 100 12 97.8 Lower Gastrointestinal 5 17 17 0 100 9 98.7 Lung 4 24 24 0 100 8 99.4 Sarcoma 0 1 1 0 100 2 97.2 10 22 22 0 100 4 98.5 2 14 14 0 100 1 99.4 3 57 6 153 6 153 0 0 100 100 0 97.1 98.7 Brain/Central Nervous System Skin Upper Gastrointestinal Urological All Cancers Treated on Treated Poole % Median or within after 31 meeting Waiting 31 days days standard Time National % meeting standard b) By treatment type Treatment Group Patients Patients Patients Patients Total treated treated treated treated treated following an following following following urgent an urgent an urgent a referral referral for referral referral from suspected for breast from an another cancer symptoms NHS source or Cancer urgency Screening Service Treated Treated Poole % Median National on or after 31 meeting Waiting % within 31 days standard Time meeting days standard Drug Treatments 16 0 1 15 32 32 0 100 4 99.9 Palliative Treatments 5 0 0 17 22 22 0 100 0 100 Radiotherapy Treatments 10 0 0 21 31 31 0 100 9 98.8 Surgery 26 0 12 30 68 68 0 100 14 97.8 All Treatments 57 0 13 83 153 153 0 100 Breach reasons No breaches 31 days: Second and Subsequent Treatments Measure Maximum 1 month wait from ready to treat to treatment for all second and subsequent treatments (chemotherapy and surgery by December 2008, all other treatments DECEMBER 2010) Target 98% - Anti Cancer drug treatments ; 94% - Surgery treatments ; 94% - Radiotherapy treatments Source National Cancer Waiting Times Database (Open Exeter) Time Period MARCH 2012 98.7 a) By tumour site Tumour Type Total treated Treated on or within 31 days 2 2 0 100 7 99.1 Breast 101 101 0 100 7 98.7 Gynaecological 21 21 0 100 2 99.4 Haematological 18 18 0 100 2 99.1 Head & Neck 15 14 1 93.3 27 97.6 Lower Gastrointestinal 19 19 0 100 1 98.8 Lung 26 26 0 100 7 99.4 Other 1 1 0 100 0 99.6 Sarcoma 4 4 0 100 5 99.7 Skin 20 20 0 100 15 98.4 Upper Gastrointestinal Urological All Cancers 13 64 304 13 64 303 0 0 1 100 100 99.7 3 0 98.7 97.6 98.6 Treated Poole % Median after 31 meeting Waiting days standard Time National % meeting standard Brain/Central Nervous System Treated Poole % Median after 31 meeting Waiting days standard Time National % meeting standard b) By treatment type Treatment Group Drug Treatments Other Treatments Palliative Treatments Radiotherapy Treatments Surgery All Treatments Total treated Treated on or within 31 days 87 3 32 149 33 304 87 3 32 148 33 303 0 0 0 1 0 1 100 100 100 99.3 100 99.7 1 27 0 8 20 99.7 97.1 99.9 98.2 97.4 98.6 Breach reasons Tumour Type Wait Report Days Head & Neck 39 Patient needed several extractions prior to starting RT - was admitted 22/2/12 but session overran and patient refused to wait so had to be re-booked. Delay in dental extractions caused 1-2 week delay in radiotherapy. 62 days: Urgent GP referral to First Treatment Measure Maximum 62 day wait from urgent GP referral to first treatment for all cancers by 2005 Target 85% or more Source National Cancer Waiting Times Database (Open Exeter) Time Period MARCH 2012 a) By tumour site Actual no. treated Accountable Accountable Poole % National total over meeting total treated % target standard meeting standard 11 0 100 98.1 Breast 11 Gynaecological 10 6.5 0 100 89.1 Haematological 4 3.5 1 71.4 86.4 Head & Neck 8 6.5 1 84.6 81.2 Lower GI 5 5 1 80 82.1 Lung 6 4 0.5 87.5 84.4 Skin 10 10 0 100 98.1 Upper Gastrointestinal 3 2 1 50 81.3 Urological 3 2 0.5 75 84.2 60 50.5 5 90.1 88.5 Total b) By treatment type Treatment Group Actual no. treated Drug Treatments Palliative Treatments Radiotherapy Surgery Totals 16 5 10 29 60 Accountable Accountable Poole % National total treated total over meeting % target standard meeting standard 15 0 100 86.2 4.5 1 77.8 92 7 3.5 50 71.8 24 0.5 97.9 90.6 50.5 5 90.1 88.5 Breach reasons Tumour Type Upper Gastrointestinal First First Wait Seen Treatment Report Days Trust Trust Late referral from Poole RD3 RDZ 74 Haematological (Excluding Acute Leukaemia) RD3 RD3 141 Initially referred from Haem to Head and Neck for further investigations. Head & Neck RD3 RD3 84 Complex diagnostic pathway (unknown primary). Patient has been referred across three specialities. Lower Gastrointestinal RD3 RD3 70 Lung RBD RD3 117 Upper Gastrointestinal RNZ RD3 75 Urological (Excluding Testicular) RDZ RD3 265 Patient was provisionally booked for treatment within target date but initially declined treatment. On further consideration patient decided to have treatment but treatment within target was no longer possible. Late referral from other Trust. Complex patient needed cardiac review to assess suitability for GA for histological diagnosis. Oncologist was not available to sign consent form and start radiotherapy within target date. Referred from other trust. CARP received 28/1/12 and clinical referral received 16/11/11. Patient delayed many investigations due to holidays and also required a TURP (not first treatment) to alleviate symptoms. 62 days: Suspected cancer patients detected through national screening programmes Measure Maximum 2 month wait from referral from NHS Cancer Screening Programme to treatment by December 2008 Target 90% or more Source National Cancer Waiting Times Database (Open Exeter) Time Period MARCH 2012 a) Breast First Seen Provider First Treatment Provider Actual Total treated RD3 RD3 RD3 Total RBD RD3 RDZ 7 9 9 25 Accountable Accountable Poole % Median total treated total over meeting Waiting target standard Time 3.5 9 4.5 17 0 0 0 0 100 100 100 100 26 41 25 National % meeting standard 98.8 98.8 98.8 98.8 b) Gynaecological First Seen Provider First Treatment Provider Actual Total treated RD3 Total RD3 3 3 Accountable Accountable Poole % Median total treated total over meeting Waiting target standard Time 3 3 0 0 100 100 23 National % meeting standard 100 100 c) Lower Gastrointestinal First Seen Provider First Treatment Provider Actual Total treated RD3 Total RD3 1 1 Accountable Accountable Poole % Median total treated total over meeting Waiting target standard Time 1 1 0 0 100 100 55 55 ALL SCREENING PROGRAMMES First Seen Provider First Treatment Provider Actual Total treated RD3 RD3 RD3 Total RBD RD3 RDZ 7 13 9 29 Accountable Accountable Poole % National total treated total over meeting % target standard meeting standard 3.5 0 100 97.8 13 0 100 97.8 4.5 0 100 97.8 21 0 100 97.8 National % meeting standard 91.9 91.9 Breach reasons No breaches 62 days: Suspected cancer patients not referred urgently and upgraded by Consultants Measure Maximum 2 month wait from consultant upgrade of urgency of a referral to first treatment by December 2008 Target PCT target - 90% Source National Cancer Waiting Times Database (Open Exeter) Time Period MARCH 2012 Lower GI Lung Totals Accountable Accountable Poole % National total treated total over meeting % target standard meeting standard 7 0 100 92.9 2 0 100 91.2 9 0 100 94 No breaches 62 days: Breast symptomatic referral (non cancer) to first treatment Measure Maximum 2 month wait from breast symptomatic referral (non cancer) to first treatment Target No standard set Source National Cancer Waiting Times Database (Open Exeter) Time Period MARCH 2012 No patients Key of Trust Codes: RBD DORSET COUNTY HOSPITAL NHS FOUNDATION TRUST RD3 POOLE HOSPITAL NHS FOUNDATION TRUST RDZ THE ROYAL BOURNEMOUTH AND CHRISTCHURCH HOSPITALS NHS FOUNDATION TRUST RHM SOUTHAMPTON UNIVERSITY HOSPITALS NHS TRUST RAN ROYAL NATIONAL ORTHOPAEDIC HOSPITAL NHS TRUST RNZ SALISBURY NHS FOUNDATION TRUST RA4 YEOVIL DISTRICT HOSPITAL NHS FOUNDATION TRUST RPY THE ROYAL MARSDEN NHS FOUNDATION TRUST RBA TAUNTON AND SOMERSET NHS FOUNDATION TRUST RM1 NORFOLK AND NORWICH UNIVERSITY HOSPITALS NHS FOUNDATION TRUST CWT Trends in performance PERFORMANCE EXCEPTION REPORT Diagnostic Access Times: Patients waiting in excess of 6 weeks The Risk: There continue to be breaches of the six week diagnostic access target in Endoscopy. This is primarily due to an increase in referrals, and a backlog developing in the waiting list as a result. This remains an issue and the Trust is working with the PCT to manage the situation. Current Position: The number of patients waiting 6 weeks and above at the end of April is 17 (27 at the end of March). Of the total number of patients waiting, 95% are waiting less than 6 weeks. The total number of patients on the waiting list has decreased to 353 (375 at the end of March). This improved position is partly a false view created by the additional capacity commissioned by the PCT for the public health campaign, without the anticipated increase of referrals in February. The level of referrals has since increased, peaking in March. The position has improved despite this increase in referrals due to the additional lists commissioned by the PCT, as well as three additional lists put on by the department in March to cover lists closed due to annual leave. Endoscopy Breaches 120 Number of Patients 100 80 60 Target 40 6+ Endoscopy Waiters 20 0 Jan- Feb- M Apr- M Jun- Jul- Aug- Sep- Oct- N Dec- Jan- Feb- M Apr11 11 ar- 11 ay- 11 11 11 11 11 ov- 11 12 12 ar- 12 11 11 11 12 The Department of Health’s national bowel cancer awareness public health campaign began at the end of January and finished at the end of March. The campaign was predicted to create demand equivalent to two extra colonoscopy lists per week for ten weeks, with the greatest increase in demand for endoscopy expected 4-6 weeks into the campaign. Colorectal referrals have increased from an average of 43.6 per week in January (before the public health campaign) to an average of 55.25 per week in April. The department continues to monitor the level of referrals on a weekly basis. There are emerging issues with the surveillance (planned) waiting list, for which an action plan is in place. The department is working to eliminate the backlog to ensure we meet JAG accreditation in September and continues to validate the waiting list. The department is also working to address ongoing surveillance capacity issues with additional surveillance capacity on a regular basis with a middle grade doctor and training of a second nurse endoscopist. Action: The active waiting list backlog and number of breaches continues to improve. The department continues to manage the waiting list closely, as well as managing and monitoring referrals. The department is currently re-assessing department capacity to ensure we’re able to effectively meet the 6 week wait target, as well as demand for surveillance (planned) procedures. Laura Bennett Endoscopy and Bowel Cancer Screening Programme Project Manager 4th May 2012 PERFORMANCE EXCEPTION REPORT Department: Delayed Transfers of Care The Risk: Delayed Transfers of Care have an adverse effect on patient length of stay and hospital capacity Current Position: The percentage of patients formally delayed on the last Thursday of April (DH reporting methodology) was 2.3%, 1.2% below the Trusts target of 3.5% and the lowest recorded in over two years. The majority of delays during April were due to community hospitals (31%), the CHC assessment process (19%) and self funding patients (33%). Actions: A number of actions continue to be implemented and planned to improve delays overall and focus on the main causes of delays: • • • • • • The implementation of an integrated approach between the hospital, social services, CHC staff, community services, including community hospitals will commence during May. Three phases will lead to the majority of discharge support agencies being located within one area and working in an integrated way. Phase one will be completed during May which will result in all social services, the hospital discharge support team and CHC staff being located within the same area. Daily team meetings will be held between all agencies to review complex cases and new referrals leading to improved communication and reducing unnecessary delays A review of discharge practices within Poole, Bournemouth and Dorchester hospitals is planned in order to identify further opportunities and share best practice The trial of a dedicated CHC discharge support worker is planned to commence during May working in partnership with the PCT in order to give greater focus on reducing unnecessary delays in gathering evidence and completion of the assessment process The implementation of the twelve month screening service pilot continues and is expected to go live during June, supporting a reduction in delays and improvements in discharge planning overall In addition to the weekly multi organisational complex discharge meeting a mini review meeting is planned to commence on a Tuesday morning as part of the daily operations meetings. The review meeting will focus on all delays but specifically self funding and CHC patients and work to ensure actions are being progressed as necessary The Trust is leading the development of a pan Dorset set of reporting principles to ensure consistent and transparent application of DH guidance DToC Update May 2012 The percentage of patients formally delayed on the last Thursday of April (DH reporting methodology) was 2.3%, 1.2% below the Trusts target of 3.5% and the lowest recorded in over two years. The reduction is associated with a continued improvement in relation to waits for Community Hospitals, Continuing Healthcare and Intermediate Care. Delays during the first part of May (1st to 11th) have remained at similar levels with 3% of patients delayed. In line with the above improvements the overall number of bed days lost during April reduced to 480 bed days, a reduction of 12 patients per day compared to the same period during 2011/12. The number of bed days lost due to self funding patients increased slightly during April to 159 bed days compared to 149 in March. Focus remains on reducing delays and a new screening service due to be implemented from June is expected lead to earlier identification of self funding patients and consequently a reduction in delays. On average 5 patients per day were delayed waiting for a community hospital during April, compared to an average of 7 per day during March. A meeting between hospital therapists and the community hospitals took place recently and actions agreed to further improve the referral process. The number of patients delayed as a result of the Continuing Health Care (CHC) assessment process reduced during April to an average of 3 per day, compared to an average of 5 per day during March. Joint work with the PCT continues and a trial of a dedicated CHC discharge support worker is planned in order to support ward staff and reduce delays in gathering evidence and completing the assessment process. Delays for intermediate care reduced significantly during April with 33 bed days lost compared to 109 during March. The improvement is predominantly due to the new re-ablement service in Poole and further improvements are expected as capacity is increased to 500hrs per week as planned. On average 1 patient was delayed each day during April due to social services, the lowest number of patients recorded in the last 35 months. Increased social services support within the RACE unit is having a positive impact with further support from Bournemouth social services expected to commence soon. Poole local authority is planning to commence a weekend service in the near future further supporting weekend discharge and also 7 day discharge planning. The majority of delays during April were due to community hospitals (31%), the CHC assessment process (19%) and self funding patients (33%). A number of actions continue to be implemented and planned to improve delays overall and focus on the main causes of delays: • • The implementation of an integrated approach between the hospital, social services, CHC staff, community services, including community hospitals will commence during May. Three phases will lead to the majority of discharge support agencies being located within one area and working in an integrated way. Phase one will be completed during May which will result in all social services, the hospital discharge support team and CHC staff being located within the same area. Daily team meetings will be held between all agencies to review complex cases and new referrals leading to improved communication and reducing unnecessary delays A review of discharge practices within Poole, Bournemouth and Dorchester hospitals is planned in order to identify further opportunities and share best practice • • • • The trial of a dedicated CHC discharge support worker is planned to commence during May working in partnership with the PCT in order to give greater focus on reducing unnecessary delays in gathering evidence and completion of the assessment process The implementation of the twelve month screening service pilot continues and is expected to go live during June, supporting a reduction in delays and improvements in discharge planning overall In addition to the weekly multi organisational complex discharge meeting a mini review meeting is planned to commence on a Tuesday morning as part of the daily operations meetings. The review meeting will focus on all delays but specifically self funding and CHC patients and work to ensure actions are being progressed as necessary The Trust is leading the development of a pan Dorset set of reporting principles to ensure consistent and transparent application of DH guidance Chris Bailey Operations Manager May 2012 PERFORMANCE EXCEPTION REPORT Trauma Directorate: Waiting Times for Surgery: Fractured Neck of Femur within 36 hours of admission (Best Practice Tariff Criteria) Fractured Neck of Femur within 36 hours of being clinically appropriate for surgery (PCT) Trauma Patients within 48 hours of being deemed fit for surgery The Risk: Fractured neck of femur patients 69% within 36 hours of admission (internal target 90%) 75% within 36 hours of being clinically appropriate for surgery (PCT target 85% April – September 2012 on a cumulative basis and 95% October 2012- March 2013) 97% within 48 hours of being fit for surgery (target 95%) All trauma patients (including fractured neck of femur) 79% within 24 hours of being fit for surgery 94% within 48 hours of being fit for surgery (target 95%) The targets being reported against have changed from April 2012. For 2012-12 the PCT initially included a quality standard that, in line with the Best Practice Criteria, fractured neck of femur patients should be operated on within 36 hours of admission and they set a cumulative threshold of 85% for the first six months (April-September 2012) followed by a cumulative total of 95% for th second six months 9October 2012-March 2013). However, this has now been amended to patients being operated on within 36 hours of being deemed clinically appropriate for surgery, where by the decision is made by the clinicians as to what is considered to be clinically appropriate. This change is in recognition of the fact that a percentage of patients will not be fit for surgery form the time of admission. The risk remains the ability to meet the clinical standards on a consistent basis month on month due, in the main, to fluctuations in the number of and case mix of trauma patients admitted. Current Position: There were 386 trauma patients admitted in total in April and of these 77 were admitted with a fractured neck of femur. 76 fractured necks of femur were operated in month, including two patients admitted at the end of March that underwent surgery on 1 April. Overall, 25 of the fractured neck of femur patients admitted in March breached the target of surgery within 36 hours of admission. Of these 7 were deemed unfit upon admission, with 6 of these going to theatre within 36hours of being considered fit for surgery. The breakdown of breaches is detailed below. Whilst dedicated theatre time has continued to be made available for fractured neck of femur surgery on a daily basis, other trauma had to take priority on occasions during the month and the performance was again affected by the number of fractured neck of femur patients admitted in any 24/48 hour period. As in previous months there were occasions when patients breached the access targets, whilst at other times there were lists that had some under utilisation. Overall there were three more fractured neck of femur breaches due to lack of capacity/other trauma taking precedence than in March. There were a reduced number of lists available on Good Friday and Easter Monday and whilst the early part of the Easter weekend went well with all surgery being up to date, by Easter Monday there were issues with managing the clinical priority of patients and on the morning of Tuesday 10 April there were several fractured neck of femur patients awaiting surgery. The ideal is to be able to operate on all admissions (unless clinically inappropriate) on the day of or day after admission and for the patients waiting at home to be admitted on a date advised at the time of their clinic/ED attendance, or on the following morning. The reinstatement of the second Saturday list and the two additional weekday lists implemented in January 2012 has helped towards achieving a slightly more consistent performance than last year. The graphs at the end of this report show the treatment times for fractured neck of femur and general trauma patients after they have breached their respective targets. % Patients Operated on within 36hrs Number of NOF's admitted Number of Trauma Admissions 100% 500 % operated within 36hrs of admission 450 80% 400 350 60% 300 250 40% 200 150 20% 78 80 72 68 95 75 100 92 72 79 74 67 77 72 50 0% 0 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 69% 72% 77% 58% 51% 46% 55% 77% 72% 77% 78% 73% 69% Number of NOF's admitted 78 68 72 80 75 72 95 67 92 74 79 72 77 Number of Trauma Admissions 357 421 370 394 400 472 435 384 381 364 360 358 386 % Patients Operated on within 36hrs Patients not fit pre-op & needed optimising Other trauma cases taking priority/ran out of time Insufficient theatre capacity Awaited specialist surgeon for THR Awaited for a CT scan 7 6 10 2 0 Actions: Phased implementation of the Trauma Business case, which supports the achievement of the Fragility Fracture best practice tariff and improved access to theatres for all Trauma patients, commenced in April. The second Saturday all day list, reinstated on a weekly basis with effect from 7 January 2012, continued from 1 April 2012 with full funding. The business case included an additional 4 weekday lists and 2.75 lists per week will commence in May 2012. X-ray facilities will not be immediately available for these lists, which may on occasions affect their utilisation. The purchase of an additional image intensifier has been agreed and the increase in radiographer cover approved with the intention that staffing will be in place by July. The remaining 1.25 lists are planned for September, dependent upon the impact of the initial lists, theatre re-scheduling and staff recruitment. Although initially planned as weekday lists, an analysis of weekend activity to assess the impact of weekend theatre capacity (2 all day lists Saturday, 1 all day list Sunday) on the access times following the reinstatement of the second Saturday list is ongoing and this may alter how the remaining 1.25 lists are scheduled and implemented. The impact of Bank Holiday operating hours is also under review. All NOF breaches are being looked at in detail in order to establish the cause, decisions taken further changes that can be made to reduce further the number of breaches that occur. Yvonne Hunter Directorate Manager 11 May 2012 NOFs - Treatment Times for Patients Breaching the 36 hour Target: April 2011 - April 2012 36-48 hours 2-3 days 3-4 days > 4days 30 20 15 10 5 0 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 Month Non NOFs: Treament times for Patients Breaching the 48 Hour Target: April 2011 - April 2012 2-3 days 3-4 days 4-5 days >5 days 16 14 12 Number of Patients Breached Number of patients Breaching 25 10 8 6 4 2 0 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Month Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 PERFORMANCE EXCEPTION REPORT Stroke : Target: ≥80% of patients should spend > 90% of their LOS on the Stroke Unit The Risk: The Trust failed to meet this target in March but met the target in April.. Current Position: 67.5% of patients spent > 90% of their LOS on the Stroke Unit in March (target ≥ 80%). 82.1% of patients spent 90% of their LOS on the Stroke Unit in April (target ≥ 80%). The following table indicates the number of stroke patients admitted and the % that achieved the target in the previous 3 months. No. of stroke pts admitted % of patients should spend > 90% of their LOS on the Stroke Unit Jan 43 81.4 Feb 38 68.4 Mar 40 67.5 Apr 56 82.1 Stroke admissions remain high with a continuing increase in activity year on year. MARCH We experienced a high volume of D&V (Norovirus) effecting both patients and staff during late February and early March, despite stringent infection control measures, patient areas were closed, necessitating changes to accommodate the Stroke pathway on various wards during the month. This in turn meant that March saw the Stroke pathway being re-designated to RACE unit from the end of th th th th. February until March 6 and over the weekend of March 24 & 25 until the reopening of ASU on the 26 This was due to D&V causing further bed closures on ASU. The Stroke pathway was managed successfully by allocating a thrombolysis trained Nurse to RACE during these times as well as ensuring that nursing and AHP colleagues followed patients on the RACE unit, allowing delivery of appropriate to continue. Further hospital wide bed pressures during March forced patients to be moved off the acute unit when safe and appropriate to do so to accommodate hyper acute patients, others remained as outliers or in alternative appropriate beds within DME. This also meant that there was limited capacity with Stroke if being utilised for non-stroke patients. In March there were a number of cases of patients being diagnosed with a Stroke during their hospital stay, different to the original admission diagnosis. This means they may remain outliers, or be transferred to the ASU too late to reach target. One patient was lost due to timings being recorded in days not hours this month as he remained in ED until late evening, transferred to ASU after midnight, and discharged 48 hours later. Had we recorded in hours this would have been over 90%, in days this reduced us down to below target. APRIL April saw a 29% increase in Stroke admissions, with 82.1% of patients spending more than 90% of their time on the Stroke unit. The Stroke pathway remained on ASU for the month, there were no bed, bay or ward closures and flow of patients around the site remained efficient and allowed best use of Stroke beds. 100% (6/56) of patients suitable for thrombolysis were seen and thrombolysed within 1 hour (door to needle). There were incidents during March & April that have been highlighted to the Stroke team concerning some patients who were admitted with a diagnosed Stroke were not sent directly to ASU. These patients were sent to other wards as outliers or were sent to RACE when beds were, or could have been, made available on ASU. This is being investigated further. Actions against the review of the business continuity plan continue, with conversations taking place about Stroke beds and management of pathways during times when the unit is closed. This may require investigation into movement of designated Stroke beds on the unit to allow for closures of individual bays or cubicles, if required, without impacting on wards or compromising the Stroke pathway. Actions: 1. The business continuity plan will be further reviewed and developed to provide more robust support of the management of stroke admissions during periods when access to designated stroke beds is compromised to ensure appropriate patient management. 2. Ward processes continually reviewed. Staffing and skill mix managed appropriately during times of sickness. 3. Discussions about reconfiguration of beds continue. Barry Duell Associate Directorate Manager Medical Division (DME, Diabetes & Rheumatology) th 18 May 2012 PERFORMANCE EXCEPTION REPORT Theatre Services Utilisation Measurement The Risk: Day Theatre under-utilisation Current Position: Day Theatre reached 77% utilisation for April 2012 Working on the potential operating time available for each list based on the number of cases 2 patients excluding team brief and turnaround time – 92% 3 patients - 89% 4 patients – 86% 5 patients – 82% 6 patients – 79% Based on these levels of activity it is impossible for every list to achieve 85% as any list with three patients or more is already unable to achieve the target. With the adjusted figures based on the above matrix day theatre utilisation reached 80% Total patients booked = 443 Patients episodes completed = 432 Four sessions were under booked which equated to 190 mins = 0.9 session or 3-4 patients Six patients cancelled unfit on the day which equated to 360 mins = 1.7 sessions One patient cancelled no paed bed which equated to 40 mins Four patients DNAs which equated to 178 mins Whilst there are still lost opportunities on the day theatre lists, all of the above mentioned reasons for underutilisation have improved on March 2012 figures Actions: Action plan put in place in March 2012 is continuing to be actioned and reviewed. Vivian Stevens Head of Theatres May 2012
© Copyright 2024