CR-UC1 & CBR-V2 Sample Layout CBR-V2 Detail Water filter detail

CBR-V2 Detail
CR-UC1 & CBR-V2 Sample Layout
CR-UC1: 12” W x 23.5 D x 21” H (25” with legs)
Threaded Shaft and tubing
must either clear top of unit or
sit off set of unit location for
clearance. Minimum 10”
Water filter detail
Leave at least 8” to remove
top lid and access water
bath.
Trunkline
Trunkline
or
23.5”
8”
Exhaust air out
21”
Evap coil:
air in
48”
Notes: Provide ventilated cabinet doors and sides to allow for fresh
air into the Evap Coil side and Exhaust air out of the other sides.
Without proper ventilation the unit will not perform properly and
you will short life the compressor.
Exhaust air out
Evap coil:
air in
Top down view.
Two Sample options in a
48” x 24” Cabinet
CBR-V2 draft tower needs 10”
of bottom clearance for stem
and connections.
48”
Filter system
17”
Filter
system
Exhaust air out
24”
Exhaust
air out
CR-UC1
12”
20 lbs CO2
8” Dia
CR-UC1
Evap coil:
air in
23.5”
20 lbs CO2
or
8” Dia
12”
23.5”
Evap coil:
air in
Exhaust air out
Ventilated/louvered
doors and side panel
Ventilated/louvered
doors
1/2” drain hole when
using DP-CT
CBR-V2 Tower and Drain pan hole cut detail.