CBR-V2 Detail CR-UC1 & CBR-V2 Sample Layout CR-UC1: 12” W x 23.5 D x 21” H (25” with legs) Threaded Shaft and tubing must either clear top of unit or sit off set of unit location for clearance. Minimum 10” Water filter detail Leave at least 8” to remove top lid and access water bath. Trunkline Trunkline or 23.5” 8” Exhaust air out 21” Evap coil: air in 48” Notes: Provide ventilated cabinet doors and sides to allow for fresh air into the Evap Coil side and Exhaust air out of the other sides. Without proper ventilation the unit will not perform properly and you will short life the compressor. Exhaust air out Evap coil: air in Top down view. Two Sample options in a 48” x 24” Cabinet CBR-V2 draft tower needs 10” of bottom clearance for stem and connections. 48” Filter system 17” Filter system Exhaust air out 24” Exhaust air out CR-UC1 12” 20 lbs CO2 8” Dia CR-UC1 Evap coil: air in 23.5” 20 lbs CO2 or 8” Dia 12” 23.5” Evap coil: air in Exhaust air out Ventilated/louvered doors and side panel Ventilated/louvered doors 1/2” drain hole when using DP-CT CBR-V2 Tower and Drain pan hole cut detail.
© Copyright 2024