ITAC Status Board Time Size 5 10 15 20 L x W ÷ 3 Gallons Value ARRIVAL REPORT Yes Situation Snapshot No Declare Side-A Transitional Water Supply Initiate Command Rescue Investigation Mode Investigating BIG SIX SIZE-UP Get Team Going Value -Time-Size F- S-VO-PO-E-A Identify Hazards Draft Initial Plan from & on Defensive to Offensive from & at; at & on Verified or Compelling Evidence sides; from & on F-S-VO-PO-E-A & Hazards Preparing for offensive, from & on Ventilation Controlled + Value Offensive from & on Coordinated 2-in / 2-out Defensive Exposures! No Value = No Offensive Time y l n O e e l c p u d m Sa Repro t o N Do ______________ Establishing ______________________ Command, Command Post at ____________ (on side-________). Apparatus Park (Base at _____________), personnel report to Temporary Staging at the Command Post. _______________Command is (now) Offensive from side-________, on floor-________. Standard Offensive Game Plan SIZE-UP REPORT Occupancy Snapshot LIFE Big Six Report R rescue Call the Play S&R Summon Resources Team Leader or CP search & rescue PS primary search STABILIZATION PROPERTY EV FE evacuate forcible entry EX exposure C PSAL confine primary salvage V ventilate E extinguish SUPPORT SS OH SSAL secondary search overhaul secondary salvage FDC sprinkler/standpipe WS RIT = SB + BU water supply RIT = standby + backup UT utilities COMMAND POST Name and Locate The following companies are now assigned to _____________ (repeat): Capture Resources _____________ Acknowledge Provide Support _____________ Acknowledge Coordinate Objectives _____________ Acknowledge Manage Span of Control _____________ Acknowledgment complete. (NOTE: use wet erase pen or grease pencil) ITAC Hardware Designed by 6.30.2008 Part #: IMS-100-200 All Rights Reserved Manufactured by IMSalliance.com Copyright © 2008
© Copyright 2024