ee v Jo ha l Running head: COMPONENTS OF A DISASTER RECOVERY PLAN Components of a Disaster Recovery Plan Charanjeev Johal C ha ra nj DeVry Institute of Technology 1 COMPONENTS OF A DISASTER RECOVERY PLAN 2 Components of a Disaster Recovery Plan Jo ha l Disasters do strike without warning. Extreme weather events represent one end of the stick. On the other end, human error can render an organization's business inoperable ranging from a few hours to several days. Whatever the circumstances, it’s critical for an organization to have a disaster recovery plan in place. A disaster recovery plan (DRP) is “a plan designed to reduce the impact of a disaster and shorten the time needed to recover from a disaster whether v natural or man-made.” (Whitman, & Mattord, 2007, p. 524). The DRP provides an efficient ee solution that can be used to recover all essential business processes in a specific time frame. The DRP document should include specific and detailed guidelines and procedures for restoring lost nj or damaged organizational I.T capability. ra The DR team must have a team leader, this leader should also be a member of the contingency planning management team (CPMT). Disaster recovery team is made up of several ha teams based on the size of the organization. These teams are the disaster management team, communications team, computer recovery (hardware) team, systems recovery (OS) team, C network recovery team, storage recovery team, applications recovery team, data management team, vendor contact team, damage assessment and salvage team, business interface team, logistics team, and other teams as needed. The Disaster management team is the command and control team responsible for planning and coordination activities during a disaster, this team coordinates all efforts and receives reports and feedback from other teams and accordingly assigns work to them. The communications team is made up of members from the public relations and legal departments. They express the needs from the upper management and giving COMPONENTS OF A DISASTER RECOVERY PLAN 3 feedback to anyone in need of additional information about the organization’s efforts in recovering from the disaster such as the press or the families of employees. The computer recovery (hardware) team works towards recovering physical computing assets that might be Jo ha l useable after the disaster. Systems recovery (OS) team recovers and restores operating systems and could also re-establish user accounts and remote connectivity in conjunction with the network team. The Network recovery team focuses on extent of damage to the network hardware infrastructure as well as Internet and intranet connectivity. They work towards re-establishing v connectivity by repairing or replacing damaged or destroyed parts. They work closely with the ee Internet service provider (ISP) to re-establish connectivity. The Storage recovery team deals with network attached storage (NAS), they work with nj the others to recover data/information and re-establish operations. The applications recovery team recovers applications and reintegrates users back into the systems once the previous groups ra have systems back up and running. The data management team works with all of other teams, ha their key focus is on data restoration and recovery which could be on-site, off-site, or online transactional data. This team is expected to swiftly assess the recoverability of data from systems C on site and follow with recommendations to the management team as to whether off-site data recovery is needed. The vendor contact team coordinates with suppliers and vendors to replace damaged or destroyed materials, equipment, or services, based on the feedback from the other teams. The damage assessment and salvage team this team is specialized at providing initial assessment of the extent of damage to materials, inventory, equipment, and systems on location. They are in-charge of physically recovering salvageable items to be relocated to a location where COMPONENTS OF A DISASTER RECOVERY PLAN 4 the other teams can evaluate them. This team is also in charge for coordinating physical security with law enforcement and any private security service. Jo ha l The Business interface team works with the rest of the organization to assist in the recovery of non-technology functions. The most critical functions are rebuild first. As the liaison between business and IT, this team makes certain that each team can work on their own recovery efforts, without interfering with each other. The Logistics team is in-charge for providing needed supplies, space, materials, food, services, or facilities needed at the primary location. Finally, v other teams could be implemented as needed based on specialized needs to assist in the recovery ee operations. After the DR teams and members are identified, The DR Team takes the Incident nj Response (IR) team’s incident-handling procedures and starts developing its unique procedures ra for the DR plan i.e. the DR team transforms the incidents to disasters However any through DR plan will include three key activities and components which are “during the disaster”, “after the ha disaster”, and “before the disaster”. In addition, there to other activities which are Plan Testing, C Training, and Exercises and Plan Maintenance During the disaster phase, planners develop, expand, and document the procedures that need be carried out while the disaster is in progress. These procedures are grouped and assigned to teams and team members. For example, network administrators’ tasks would differ from managerial tasks, so it is critical for members of planning committee to draft a set of functionspecific procedures during the disaster. However, certain disasters may hinder organizational response, unless the team members are at on-site when the disaster strikes. For such disasters, COMPONENTS OF A DISASTER RECOVERY PLAN 5 evacuation plans/exits, shelters locations, fire suppression systems, and other emergency reaction items such as first aid kits must be organized and located into accessible and easy-to-read documents which could be referred to during the disaster. Jo ha l In the after the disaster phase, after the procedures and guidelines for handling or reacting to a disaster are drafted, the DR team planners develop and document the procedures that must be taken immediately and swiftly after the disaster has come to an end. It should be noted that, separate functional areas could develop various procedures. Finally, if the damage from the v disaster is considerable enough, crisis management procedures may be needed. ee In the before the disaster phase, the planners scheme a third set of procedures cataloging tasks that need be performed in order to prepare for the disaster. These procedures include nj information/data backups, disaster recovery preparations, staff training schedules, testing plans, ra copies of service agreements, and business continuity plans, if implemented by the organization. The Plan Testing, Training, and Exercises phase focuses on training management and staff ha in the proper performance of their specific roles as laid down in the disaster recovery plan to test the cogency and effectiveness of the DR plan as well as prepare the various teams to use it. Any C issues that arise in the plan during training are incorporated into the draft document. Once the drafts have been reviewed and tested, the final assembly can commence. Finally, in the Plan Maintenance phase, the DR plan is updated regularly to remain current with I.T enhancements. It is advisable for the DR lead team to revisit the plan once a year to update the necessary changes. In conclusion, every organizations is vulnerable to encountering a severe incident, preventing it from continuing every day operations at any time. Beyond disasters such as COMPONENTS OF A DISASTER RECOVERY PLAN 6 electronic warfare, terrorist attacks, man-made disasters such as fire or political disasters such as the ones seen in Egypt and other unforeseen possibilities can cause bring an organization to a halt. Anticipating disaster and preparing is critical and advisable, as does regular testing of IT Jo ha l services and back-ups. A well-structured and coherent disaster recovery plan will enable an organization to recover rapidly and efficiently from an unforeseen disasters, thus avoiding C ha ra nj ee v significant organization interruption and or loss. COMPONENTS OF A DISASTER RECOVERY PLAN 7 Jo ha l References Whitman, M. E., & Mattord, H. J. (2007). Principles of incident response and disaster recovery. C ha ra nj ee v Boston, Mass: Thomson Course Technology.
© Copyright 2024