Oppkobling og installasjon 12 Februar 2015 Jørgen Olsen 11-Feb-15 Page 2 What we do 11-Feb-15 Page 3 A global leader 11-Feb-15 Page 4 Core business segments Engineering, construction, installation and procurement of Subsea Umbilical's, Risers and Flowlines. Services over the life of a field’s production, including inspection, repair and maintenance. Subsea 7 targets this segment globally. SURF Life-of-Field Fabrication and installation of fixed platforms and their associated pipelines in non-harsh environments. Addition of modules on new platforms and refurbishment of topsides of an existing platform or FPSO. Subsea 7 targets this segment in Africa. Entry into Mexico considered for positioning for deep water. Subsea 7 has traditionally only targeted this segment in Africa. Conventional 11-Feb-15 Page 5 Subsea 7 performs this work in Europe; Africa; Gulf of Mexico and Australia and will target specific countries. Hook Up Complementary business segments SHL JV i-Tech Engineering, construction, installation and procurement of offshore turbines and cables for wind farms. ROV and intervention tooling support services - onboard semis, drill ships, jackups, platforms, FPSOs, anchor handling tugs and FSVs. Western Europe only (at this stage). Renewables Subsea 7 targets this work globally. Decommissioning 11-Feb-15 Page 6 Heavy Lift ROV and Intervention Subsea 7 - Norway 11-Feb-15 Page 7 Aasta Hansteen – Area • • • • Deepest field development on the Norwegian Continental shelf First Steel Catenary Riser (SCR) system in the North sea First reeled installation of BUBI pipe (19km) in the North sea sea Flowlines and SCR produced at Vigra spool base 11-Feb-15 Page 8 Polarled • 480 km pipeline 36” diameter • Connection points for Aasta Hansteen, Linnorm, Zidane and other potenitial fields • Modifications at Nyhamna − Additional gas processing − Increase Langeled export capacity 911-Feb-15 Page 9 Aasta Hansteen – Area 4 off Steel Catenary Risers 17 off Mooring Lines SPAR platform 4 off hold back anchors 4 slot Luva Template 2 off Production Flowlines 6 off riser holdback anchors Dynamic Umbilical 17 off FPSO mooring anchors 1 slot Snefrid Satelite Umbilical Riser Base Static Umbilicals Gas Export PLEM & Pipeline 2 off hold back anchors Jumper 2 off riser holdback anchors 1 off Production Flowline 1 off Production Flowline 11-Feb-15 Page 10 4 slot Haklang Template 4 off hold back anchors Fiber Optic Cable SPAR FPSO – Offshore tow configuration 11-Feb-15 Page 11 Aasta Hansteen Spar FPSO Kilde; www.tu.no 11-Feb-15 Page 12 FPSO Concept • 4 off Steel Catenary Risers – Approx. 1955m long • 1 off Dynamic Umbilical • 16 riser slots • 17 lines polyester mooring system Classi 11-Feb-15 ficatio Page 13 Riser TDP 817m 13 R BuBi Mekanisk perforert line pipe • Karbonstålrør med korrosjonsbestandig perforering • Hydraulisk presset inn I røret 11-Feb-15 Page 14 Vigra spoolebase 11-Feb-15 Page 15 Flowline and SCR Scope of Work - Installation 11-Feb-15 Page 16 Flowline and SCR Scope of Work – Misc Fabrication • Fabricate PLETs, PLET foundation plates, sleepers, SCR pull-in heads/PLRs, pipe walking and SCR holdback anchors 11-Feb-15 Page 17 MOMEK PROGRESS IN PICTURES 11-Feb-15 Page 18 11-Feb-15 Page 19 Suction Anchor Installation – 35 Anchors 11-Feb-15 Page 20 Luva D102 & Haklang C101 Spools 11-Feb-15 Page 21 Tidligere prosjekter på Skandi Acergy 11-Feb-15 Page 22 Spool installation 11-Feb-15 Page 23 Evolusjon av oppkoblingsverktøy 11-Feb-15 Page 24 HCS Tie-in 11-Feb-15 Page 25 Store dyp øker utfordringene 11-Feb-15 Page 26 11-Feb-15 Page 27 11-Feb-15 Page 28 Global enablers 11-Feb-15 Page 32 Our engineers are getting smaller! 11-Feb-15 Page 33 Our differentiators People Technology Assets Local presence 11-Feb-15 Page 34 Godt nok er perfekt 11-Feb-15 Page 35 11-Feb-15 Page 36
© Copyright 2024