What we do
11-Feb-15
Page 3
A global leader
11-Feb-15
Page 4
Core business segments
Engineering, construction,
installation and
procurement of Subsea
Umbilical's, Risers and
Flowlines.
Services over the life of a
field’s production, including
inspection, repair and
maintenance.
Subsea 7 targets this
segment globally.
SURF
Life-of-Field
Fabrication and installation
of fixed platforms and their
associated pipelines in
non-harsh environments.
Addition of modules on new
platforms and refurbishment
of topsides of an existing
platform or FPSO.
Subsea 7 targets this
segment in Africa. Entry
into Mexico considered for
positioning for deep water.
Subsea 7 has traditionally
only targeted this segment in
Africa.
Conventional
11-Feb-15
Page 5
Subsea 7 performs this
work in Europe; Africa; Gulf
of Mexico and Australia and
will target specific
countries.
Hook Up
Complementary business segments
SHL JV
i-Tech
Engineering, construction,
installation and
procurement of offshore
turbines and cables for
wind farms.
ROV and
intervention
tooling support
services - onboard
semis, drill ships,
jackups, platforms,
FPSOs, anchor
handling tugs and
FSVs.
Western Europe only
(at this stage).
Renewables
Subsea 7 targets
this work globally.
Decommissioning
11-Feb-15
Page 6
Heavy Lift
ROV and
Intervention
Subsea 7 - Norway
11-Feb-15
Page 7
Aasta Hansteen – Area
•
•
•
•
Deepest field development on the Norwegian Continental shelf
First Steel Catenary Riser (SCR) system in the North sea
First reeled installation of BUBI pipe (19km) in the North sea sea
Flowlines and SCR produced at Vigra spool base
11-Feb-15
Page 8
Polarled
• 480 km pipeline 36” diameter
• Connection points for Aasta
Hansteen, Linnorm, Zidane
and other potenitial fields
• Modifications at Nyhamna
− Additional gas
processing
− Increase Langeled
export capacity
911-Feb-15
Page 9
Aasta Hansteen – Area
4 off Steel Catenary Risers
17 off Mooring Lines
SPAR platform
4 off hold back anchors
4 slot Luva Template
2 off Production Flowlines
6 off riser holdback
anchors
Dynamic Umbilical
17 off FPSO mooring
anchors
1 slot Snefrid Satelite
Umbilical Riser Base
Static Umbilicals
Gas Export PLEM
& Pipeline
2 off hold back anchors
Jumper
2 off riser holdback
anchors
1 off Production Flowline
1 off Production Flowline
11-Feb-15
Page 10
4 slot Haklang Template
4 off hold back anchors
Fiber Optic Cable
SPAR FPSO – Offshore tow configuration
11-Feb-15
Page 11
Aasta Hansteen Spar FPSO
Kilde; www.tu.no
11-Feb-15
Page 12
FPSO Concept
•
4 off Steel Catenary Risers – Approx. 1955m long
•
1 off Dynamic Umbilical
•
16 riser slots
•
17 lines polyester mooring system
Classi
11-Feb-15
ficatio
Page 13
Riser TDP 817m
13
R
BuBi Mekanisk perforert line pipe
• Karbonstålrør med
korrosjonsbestandig perforering
• Hydraulisk presset inn I røret
11-Feb-15
Page 14
Vigra spoolebase
11-Feb-15
Page 15
Flowline and SCR Scope of Work - Installation
11-Feb-15
Page 16
Flowline and SCR Scope of Work – Misc Fabrication
• Fabricate PLETs, PLET foundation plates, sleepers, SCR pull-in
heads/PLRs, pipe walking and SCR holdback anchors
11-Feb-15
Page 17
MOMEK PROGRESS IN PICTURES
11-Feb-15
Page 18
11-Feb-15
Page 19
Suction Anchor Installation – 35 Anchors
11-Feb-15
Page 20
Luva D102 & Haklang C101 Spools
11-Feb-15
Page 21
Tidligere prosjekter på Skandi Acergy
11-Feb-15
Page 22
Spool installation
11-Feb-15
Page 23
Evolusjon av oppkoblingsverktøy
11-Feb-15
Page 24
HCS Tie-in
11-Feb-15
Page 25
Store dyp øker utfordringene
11-Feb-15
Page 26
11-Feb-15
Page 27
11-Feb-15
Page 28
Global enablers
11-Feb-15
Page 32
Our engineers are getting smaller!
11-Feb-15
Page 33
Our differentiators
People
Technology
Assets
Local presence
11-Feb-15