Tender calculations reports and analysis
The following reports have been produced from tender calculations and will allow
contractor gaining a better understanding of base costs and resources required to
carry out works included in this project.
The attached analysis consists of following reports:
Summary -
Graphical analysis of financial aspects of calculations
Finances per element - Detailed analysis of costs per each priced item of work
Finances per stage -
Analysis of costs per each stage of work
Resources per item -
Analysis of resources required to carry out each priced
item of work
Resources per stage - Analysis of resources required to carry out each stage of
work
Unpriced materials list -Unpriced list of materials required for the project. This
may be used to obtain alternative materials quotations.
Priced materials list -
Full list of required materials including prices and suppliers
offering those materials.
Base Costs
All tender calculations have been based on following information confirmed by the contractor.
Labour Rates
Trade
Foreman
Bricklayer
Plasterer
Carpenter
Roofer
Tiler
Decorator
Labourer
General Operative
Dryliner
Plumber
Mate
Sample Estimate.xlsx
Rate
£18.00
£14.25
£7.00
£14.50
£15.20
£13.50
£12.00
£9.00
£14.50
£12.50
£17.50
£9.00
Unit
h
h
m2
h
h
h
h
h
h
h
h
h
25/01/2013
Page 1 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Preliminary Costs
Cost
Rate
PL Insurance
£750.00
Contract Insurance
£300.00
PI Insurance
£150.00
Overheads
£1,500.00
Multiproject
3.50%
Other Licences
£45.00
Parking susp., skip licence£145.00
Unit
pcm
pcm
pcm
pcm
fee
pw
pw
Contractor's markups
Resource type
Labour
Material
Plant
Sundry
Subcontract
Preliminaries
Provisional
PC_Sum
Sample Estimate.xlsx
Profit
50.00%
20.00%
20.00%
20.00%
20.00%
20.00%
Wastage
5.00%
5.00%
5.00%
5.00%
10.00%
5.00%
5.00%
25/01/2013
Page 2 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Tender price breakdown
Values
Total Cost
Total Wastage Total Profit
PM fee
Total Tender
£74,808.61
£1,646.64
£16,990.46
£3,063.66
£96,509.36
Total
3%#
Total#Cost#
18%#
2%#
Total#Wastage#
Total#Profit#
77%#
PM#fee#
Tender finances summary
Row Labels
Labour
Material
Plant
Preliminaries
Provisional
Subcontract
Sundry
Grand Total
Values
Cost
£11,859.29
£16,847.78
£1,544.22
£4,828.62
£8,300.00
£30,872.90
£555.80
£74,808.61
Wastage
£592.96
£842.39
£77.21
£106.28
£0.00
£0.00
£27.79
£1,646.64
Cost%%
Profit
£5,929.65
£3,369.56
£308.84
£1,096.67
£0.00
£6,174.58
£111.16
£16,990.46
Wastage%%
Profit%%
PM fee
£665.88
£762.89
£69.92
£197.75
£1,342.05
£25.17
£3,063.66
Tender
£19,047.79
£21,822.61
£2,000.20
£6,229.32
£8,300.00
£38,389.53
£719.91
£96,509.36
PM%fee%
£45,000.00#
£40,000.00#
£35,000.00#
£30,000.00#
£25,000.00#
£20,000.00#
£15,000.00#
£10,000.00#
£5,000.00#
£0.00#
Labour#
Sample Estimate.xlsx
Material#
Plant#
Preliminaries# Provisional# Subcontract#
25/01/2013
Sundry#
Page 3 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Analysis of work stages
Row Labels
Preliminaries
Completion
Demolitions
Groundworks
Structure
Roofing
2nd Fix Carpentery
Decorations
1st fix Carpentery
Drylining
Finishes
Plastering
1st Fix Elec
1st Fix Plumb
2nd fix Elec
Grand Total
Values
Cost
£13,128.62
£335.95
£3,925.18
£3,220.16
£13,838.75
£441.58
£4,156.33
£1,911.08
£15,981.98
£2,012.53
£702.80
£1,518.09
£1,840.00
£7,363.46
£4,432.12
£74,808.61
Wastage
£106.28
£16.80
£123.40
£132.59
£452.65
£22.08
£207.11
£95.55
£193.81
£100.48
£32.78
£74.51
£0.00
£0.00
£88.61
£1,646.64
Cost##
Profit
£1,096.67
£126.62
£1,524.21
£820.09
£3,984.15
£117.94
£959.53
£766.50
£3,392.81
£637.81
£264.25
£572.75
£368.00
£1,472.69
£886.42
£16,990.46
Wastage##
Profit##
PM Fee
£197.75
£17.37
£201.87
£151.16
£662.03
£21.07
£192.82
£100.46
£708.87
£99.65
£36.22
£78.44
£79.98
£320.09
£195.87
£3,063.66
Tender
£14,529.32
£496.73
£5,774.65
£4,324.00
£18,937.58
£602.66
£5,515.80
£2,873.59
£20,277.47
£2,850.47
£1,036.05
£2,243.79
£2,287.98
£9,156.24
£5,603.02
£96,509.36
PM#Fee#
2nd#fix#Elec#
1st#Fix#Plumb#
1st#Fix#Elec#
Plastering#
Finishes#
Drylining#
1st#fix#Carpentery#
DecoraIons#
2nd#Fix#Carpentery#
Roofing#
Structure#
Groundworks#
DemoliIons#
CompleIon#
Preliminaries#
£0#
£5#
£10#
£15#
£20#
£25#
Thousands%
Sample Estimate.xlsx
25/01/2013
Page 4 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Analysis of finances per each stage of works
Stage
1st fix Carpentery
Preliminaries
1st Fix Elec
1st Fix Plumb
Demolitions
Groundworks
Structure
Plastering
Drylining
Roofing
2nd Fix Carpentery
Decorations
Sample Estimate.xlsx
Data
Cost
Wastage Profit
PM fee
Tender
£15,981.98
£193.81 £3,392.81
£708.87 £20,277.47
Labour
£654.71
£32.74
£327.36
£36.76 £1,051.57
Material
£3,207.41
£160.37
£641.48
£145.24 £4,154.50
Subcontract
£12,105.85
£0.00 £2,421.17
£526.24 £15,053.26
Sundry
£14.00
£0.70
£2.80
£0.63
£18.13
£13,128.62
£106.28 £1,096.67
£197.75 £14,529.32
Preliminaries
£4,828.62
£106.28 £1,096.67
£197.75 £6,229.32
Provisional
£8,300.00
£0.00
£0.00
£0.00 £8,300.00
£1,840.00
£0.00
£368.00
£79.98 £2,287.98
Subcontract
£1,840.00
£0.00
£368.00
£79.98 £2,287.98
£7,363.46
£0.00 £1,472.69
£320.09 £9,156.24
Subcontract
£7,363.46
£0.00 £1,472.69
£320.09 £9,156.24
£3,925.18
£123.40 £1,524.21
£201.87 £5,774.65
Labour
£2,463.90
£123.20 £1,231.95
£138.34 £3,957.39
Subcontract
£1,457.27
£0.00
£291.45
£63.35 £1,812.08
Sundry
£4.00
£0.20
£0.80
£0.18
£5.18
£3,220.16
£132.59
£820.09
£151.16 £4,324.00
Labour
£586.88
£29.34
£293.44
£32.95
£942.61
Material
£969.08
£48.45
£193.82
£43.88 £1,255.22
Subcontract
£568.45
£0.00
£113.69
£24.71
£706.85
Sundry
£3.00
£0.15
£0.60
£0.14
£3.89
Plant
£1,092.76
£54.64
£218.55
£49.48 £1,415.43
£13,838.75
£452.65 £3,984.15
£662.03 £18,937.58
Labour
£4,054.65
£202.73 £2,027.33
£227.66 £6,512.37
Material
£4,402.36
£220.12
£880.47
£199.34 £5,702.29
Subcontract
£4,785.83
£0.00
£957.17
£208.04 £5,951.03
Sundry
£144.45
£7.22
£28.89
£6.54
£187.11
Plant
£451.47
£22.57
£90.29
£20.44
£584.78
£1,518.09
£74.51
£572.75
£78.44 £2,243.79
Labour
£897.12
£44.86
£448.56
£50.37 £1,440.91
Material
£395.25
£19.76
£79.05
£17.90
£511.96
Subcontract
£27.84
£0.00
£5.57
£1.21
£34.62
Sundry
£197.88
£9.89
£39.58
£8.96
£256.31
£2,012.53
£100.48
£637.81
£99.65 £2,850.47
Labour
£784.35
£39.22
£392.17
£44.04 £1,259.78
Material
£1,187.48
£59.37
£237.50
£53.77 £1,538.12
Subcontract
£2.95
£0.00
£0.59
£0.13
£3.67
Sundry
£37.76
£1.89
£7.55
£1.71
£48.91
£441.58
£22.08
£117.94
£21.07
£602.66
Labour
£98.74
£4.94
£49.37
£5.54
£158.58
Material
£312.84
£15.64
£62.57
£14.17
£405.22
Sundry
£30.00
£1.50
£6.00
£1.36
£38.86
£4,156.33
£207.11
£959.53
£192.82 £5,515.80
Labour
£427.56
£21.38
£213.78
£24.01
£686.72
Material
£3,695.48
£184.77
£739.10
£167.34 £4,786.68
Subcontract
£14.05
£0.00
£2.81
£0.61
£17.47
Sundry
£19.24
£0.96
£3.85
£0.87
£24.92
£1,911.08
£95.55
£766.50
£100.46 £2,873.59
Labour
£1,280.96
£64.05
£640.48
£71.92 £2,057.42
Type
25/01/2013
Page 5 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Stage
Decorations
Type
Material
Sundry
Finishes
Labour
Material
Subcontract
Sundry
2nd fix Elec
Material
Subcontract
Completion
Labour
Material
Sundry
Grand Total
Sample Estimate.xlsx
Data
Cost
Wastage Profit
PM fee
Tender
£588.64
£29.43
£117.73
£26.65
£762.46
£41.47
£2.07
£8.29
£1.88
£53.71
£702.80
£32.78
£264.25
£36.22 £1,036.05
£412.31
£20.62
£206.15
£23.15
£662.22
£200.87
£10.04
£40.17
£9.10
£260.19
£47.20
£0.00
£9.44
£2.05
£58.69
£42.42
£2.12
£8.48
£1.92
£54.95
£4,432.12
£88.61
£886.42
£195.87 £5,603.02
£1,772.12
£88.61
£354.42
£80.24 £2,295.39
£2,660.00
£0.00
£532.00
£115.63 £3,307.63
£335.95
£16.80
£126.62
£17.37
£496.73
£198.12
£9.91
£99.06
£11.12
£318.20
£116.25
£5.81
£23.25
£5.26
£150.58
£21.58
£1.08
£4.32
£0.98
£27.95
£74,808.61 £1,646.64 £16,990.46 £3,063.66 £96,509.36
25/01/2013
Page 6 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Analysis of finances per each priced item of works.
Item No.
Type
1.01
Preliminaries
1.02
Provisional
1.03
Provisional
2.01
Subcontract
2.02
Provisional
2.03
Labour
Sundry
2.04
Labour
Subcontract
Sundry
2.05
Labour
Subcontract
Labour
Subcontract
2.07
Labour
Subcontract
Sundry
2.08
Subcontract
Sundry
Plant
Labour
Subcontract
2.1
Labour
Subcontract
Sundry
2.11
Subcontract
Sundry
Labour
Subcontract
2.13
Labour
Subcontract
2.14
Labour
Subcontract
Sundry
2.15
Sample Estimate.xlsx
Data
Cost
Wastage Profit
PM fee
Tender
£4,828.62
£106.28 £1,096.67
£197.75 £6,229.32
£4,828.62
£106.28 £1,096.67
£197.75 £6,229.32
£3,000.00
£0.00
£0.00
£0.00 £3,000.00
£3,000.00
£0.00
£0.00
£0.00 £3,000.00
£3,000.00
£0.00
£0.00
£0.00 £3,000.00
£3,000.00
£0.00
£0.00
£0.00 £3,000.00
£243.00
£0.00
£48.60
£10.56
£302.16
£243.00
£0.00
£48.60
£10.56
£302.16
£2,000.00
£0.00
£0.00
£0.00 £2,000.00
£2,000.00
£0.00
£0.00
£0.00 £2,000.00
£35.85
£1.79
£17.63
£2.00
£57.27
£34.85
£1.74
£17.43
£1.96
£55.97
£1.00
£0.05
£0.20
£0.05
£1.30
£249.50
£2.85
£66.70
£11.56
£330.61
£56.00
£2.80
£28.00
£3.14
£89.94
£192.50
£0.00
£38.50
£8.37
£239.37
£1.00
£0.05
£0.20
£0.05
£1.30
£552.50
£11.75
£181.00
£27.00
£772.25
£235.00
£11.75
£117.50
£13.19
£377.44
£317.50
£0.00
£63.50
£13.80
£394.80
£86.95
£4.35
£43.48
£4.88
£139.65
£67.44
£0.00
£13.49
£2.93
£83.86
£1,080.09
£28.48
£386.93
£54.17 £1,549.67
£569.70
£28.48
£284.85
£31.99
£915.02
£510.39
£0.00
£102.08
£22.19
£634.66
£0.00
£0.00
£0.00
£0.00
£0.00
£247.22
£7.56
£81.97
£12.20
£348.94
£96.03
£0.00
£19.21
£4.17
£119.41
£0.00
£0.00
£0.00
£0.00
£0.00
£42.76
£2.14
£8.55
£1.94
£55.38
£16.45
£0.82
£8.23
£0.92
£26.42
£16.30
£0.00
£3.26
£0.71
£20.27
£28.23
£1.14
£12.48
£1.52
£43.37
£22.80
£1.14
£11.40
£1.28
£36.61
£5.43
£0.00
£1.09
£0.24
£6.76
£0.00
£0.00
£0.00
£0.00
£0.00
£80.50
£4.03
£39.95
£4.51
£128.98
£0.00
£0.00
£0.00
£0.00
£0.00
£1.00
£0.05
£0.20
£0.05
£1.30
£834.02
£41.70
£417.01
£46.83 £1,339.55
£165.39
£0.00
£33.08
£7.19
£205.66
£206.01
£8.64
£93.02
£11.15
£318.81
£172.73
£8.64
£86.36
£9.70
£277.42
£33.29
£0.00
£6.66
£1.45
£41.39
£459.19
£16.76
£192.39
£24.21
£692.55
£335.17
£16.76
£167.58
£18.82
£538.33
£124.02
£0.00
£24.80
£5.39
£154.22
£0.00
£0.00
£0.00
£0.00
£0.00
£46.75
£1.09
£15.58
£2.30
£65.71
25/01/2013
Page 7 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Item No.
Type
2.15 Subcontract
Sundry
3.01
Labour
Material
Subcontract
Sundry
Plant
3.02
Labour
Material
Subcontract
Sundry
Plant
3.03
Labour
Material
Subcontract
Sundry
Plant
3.04
Labour
Material
Subcontract
Sundry
3.05
Labour
Material
Subcontract
Sundry
3.06
Labour
Material
Subcontract
Plant
3.07
Labour
Material
Subcontract
Sundry
Plant
3.08
Labour
Material
Subcontract
Sundry
3.09
Labour
Material
Sundry
4.01
Labour
Material
Sample Estimate.xlsx
Data
Cost
£25.00
£1.00
£1,731.36
£348.75
£694.11
£337.50
£1.00
£350.00
£645.88
£72.03
£153.16
£69.70
£1.00
£350.00
£595.70
£57.67
£121.81
£65.22
£1.00
£350.00
£2,165.65
£1,083.13
£1,011.96
£50.40
£20.16
£5,371.60
£395.21
£148.46
£4,822.80
£5.12
£5,256.99
£1,665.64
£2,717.46
£813.89
£60.00
£5,430.73
£756.36
£368.64
£3,904.26
£70.01
£331.47
£289.84
£158.20
£101.77
£4.30
£25.56
£110.35
£41.85
£58.50
£10.00
£993.09
£541.23
£414.10
Wastage Profit
PM fee
Tender
£0.00
£5.00
£1.09
£31.09
£0.05
£0.20
£0.05
£1.30
£69.69
£450.90
£81.58 £2,333.53
£17.44
£174.38
£19.58
£560.15
£34.71
£138.82
£31.43
£899.07
£0.00
£67.50
£14.67
£419.67
£0.05
£0.20
£0.05
£1.30
£17.50
£70.00
£15.85
£453.35
£28.81
£150.78
£29.90
£855.38
£3.60
£36.01
£4.04
£115.68
£7.66
£30.63
£6.94
£198.38
£0.00
£13.94
£3.03
£86.67
£0.05
£0.20
£0.05
£1.30
£17.50
£70.00
£15.85
£453.35
£26.52
£136.44
£27.48
£786.15
£2.88
£28.84
£3.24
£92.63
£6.09
£24.36
£5.52
£157.78
£0.00
£13.04
£2.84
£81.10
£0.05
£0.20
£0.05
£1.30
£17.50
£70.00
£15.85
£453.35
£105.76
£758.07
£109.74 £3,139.23
£54.16
£541.57
£60.82 £1,739.67
£50.60
£202.39
£45.82 £1,310.77
£0.00
£10.08
£2.19
£62.67
£1.01
£4.03
£0.91
£26.11
£27.44 £1,192.88
£238.79 £6,830.71
£19.76
£197.61
£22.19
£634.77
£7.42
£29.69
£6.72
£192.30
£0.00
£964.56
£209.65 £5,997.01
£0.26
£1.02
£0.23
£6.63
£222.16 £1,551.09
£254.67 £7,284.91
£83.28
£832.82
£93.52 £2,675.27
£135.87
£543.49
£123.05 £3,519.87
£0.00
£162.78
£35.38 £1,012.05
£3.00
£12.00
£2.72
£77.72
£76.32 £1,313.05
£247.06 £7,067.16
£37.82
£378.18
£42.47 £1,214.82
£18.43
£73.73
£16.69
£477.49
£0.00
£780.85
£169.72 £4,854.83
£3.50
£14.00
£3.17
£90.68
£16.57
£66.29
£15.01
£429.34
£14.28
£105.43
£14.84
£424.38
£7.91
£79.10
£8.88
£254.10
£5.09
£20.35
£4.61
£131.82
£0.00
£0.86
£0.19
£5.35
£1.28
£5.11
£1.16
£33.11
£5.52
£34.63
£5.45
£155.94
£2.09
£20.93
£2.35
£67.22
£2.93
£11.70
£2.65
£75.77
£0.50
£2.00
£0.45
£12.95
£49.65
£360.99
£50.85 £1,454.58
£27.06
£270.61
£30.39
£869.29
£20.71
£82.82
£18.75
£536.38
25/01/2013
Page 8 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Item No.
Type
4.01 Sundry
4.02
Labour
Material
Subcontract
Sundry
4.03
Labour
Material
Sundry
4.04
Labour
Material
Sundry
4.05
Labour
Material
Subcontract
Sundry
4.06
Labour
Material
Subcontract
Sundry
4.07
Labour
Material
Sundry
4.08
Provisional
5.01
Labour
Material
Subcontract
Sundry
5.02
Labour
Material
Subcontract
Sundry
5.03
Labour
Material
Sundry
5.04
Labour
Material
Sundry
5.05
Labour
Material
Subcontract
Sundry
Sample Estimate.xlsx
Data
Cost
£37.76
£1,671.87
£635.99
£968.27
£53.12
£14.48
£3,084.40
£181.50
£2,892.90
£10.00
£1,784.30
£117.50
£1,664.80
£2.00
£2,617.11
£151.58
£1,750.00
£709.53
£6.00
£464.45
£158.48
£280.68
£14.05
£11.24
£420.60
£117.60
£276.80
£26.20
£300.00
£300.00
£894.69
£639.52
£83.41
£22.84
£148.92
£202.80
£140.00
£35.04
£5.00
£22.76
£983.21
£599.61
£358.61
£24.99
£798.30
£639.54
£144.30
£14.47
£4,428.05
£470.58
£144.82
£3,756.02
£56.64
Wastage Profit
PM fee
Tender
£1.89
£7.55
£1.71
£48.91
£80.94
£525.17
£82.52 £2,360.50
£31.80
£318.00
£35.71 £1,021.50
£48.41
£193.65
£43.84 £1,254.18
£0.00
£10.62
£2.31
£66.06
£0.72
£2.90
£0.66
£18.75
£154.22
£671.33
£141.64 £4,051.59
£9.08
£90.75
£10.19
£291.52
£144.65
£578.58
£130.99 £3,747.12
£0.50
£2.00
£0.45
£12.95
£89.22
£392.11
£82.07 £2,347.70
£5.88
£58.75
£6.60
£188.72
£83.24
£332.96
£75.38 £2,156.38
£0.10
£0.40
£0.09
£2.59
£95.38
£568.89
£118.87 £3,400.25
£7.58
£75.79
£8.51
£243.45
£87.50
£350.00
£79.24 £2,266.74
£0.00
£141.91
£30.84
£882.28
£0.30
£1.20
£0.27
£7.77
£22.52
£140.44
£22.73
£650.14
£7.92
£79.24
£8.90
£254.55
£14.03
£56.14
£12.71
£363.56
£0.00
£2.81
£0.61
£17.47
£0.56
£2.25
£0.51
£14.56
£21.03
£119.40
£20.32
£581.36
£5.88
£58.80
£6.60
£188.88
£13.84
£55.36
£12.53
£358.54
£1.31
£5.24
£1.19
£33.94
£0.00
£0.00
£0.00
£300.00
£0.00
£0.00
£0.00
£300.00
£43.59
£370.79
£47.42 £1,356.49
£31.98
£319.76
£35.91 £1,027.16
£4.17
£16.68
£3.78
£108.03
£0.00
£4.57
£0.99
£28.40
£7.45
£29.78
£6.74
£192.89
£9.89
£82.56
£10.70
£305.94
£7.00
£70.00
£7.86
£224.86
£1.75
£7.01
£1.59
£45.39
£0.00
£1.00
£0.22
£6.22
£1.14
£4.55
£1.03
£29.48
£49.16
£376.52
£51.04 £1,459.93
£29.98
£299.80
£33.67
£963.06
£17.93
£71.72
£16.24
£464.50
£1.25
£5.00
£1.13
£32.37
£39.92
£351.52
£43.10 £1,232.84
£31.98
£319.77
£35.91 £1,027.20
£7.21
£28.86
£6.53
£186.91
£0.72
£2.89
£0.66
£18.74
£33.60 £1,026.78
£198.82 £5,687.26
£23.53
£235.29
£26.42
£755.82
£7.24
£28.96
£6.56
£187.58
£0.00
£751.20
£163.27 £4,670.50
£2.83
£11.33
£2.56
£73.36
25/01/2013
Page 9 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Item No.
Type
5.06
Labour
Material
Sundry
5.07
Labour
Material
Sundry
6.01
Material
Subcontract
6.02
Subcontract
6.03
Labour
Material
Subcontract
Sundry
7.01
Labour
Material
Sundry
Plant
Grand Total
Sample Estimate.xlsx
Data
Cost
Wastage Profit
PM fee
Tender
£255.50
£12.78
£82.56
£12.71
£363.54
£104.85
£5.24
£52.43
£5.89
£168.40
£145.99
£7.30
£29.20
£6.61
£189.10
£4.66
£0.23
£0.93
£0.21
£6.04
£158.79
£7.94
£45.12
£7.67
£219.53
£44.55
£2.23
£22.28
£2.50
£71.56
£110.16
£5.51
£22.03
£4.99
£142.69
£4.08
£0.20
£0.82
£0.18
£5.28
£6,192.12
£88.61 £1,238.42
£272.38 £7,791.53
£1,772.12
£88.61
£354.42
£80.24 £2,295.39
£4,420.00
£0.00
£884.00
£192.14 £5,496.14
£7,200.46
£0.00 £1,440.09
£313.00 £8,953.56
£7,200.46
£0.00 £1,440.09
£313.00 £8,953.56
£3,269.08
£22.08
£683.44
£143.98 £4,118.57
£98.74
£4.94
£49.37
£5.54
£158.58
£312.84
£15.64
£62.57
£14.17
£405.22
£2,827.50
£0.00
£565.50
£122.91 £3,515.91
£30.00
£1.50
£6.00
£1.36
£38.86
£247.69
£12.38
£69.59
£11.94
£341.61
£66.85
£3.34
£33.43
£3.75
£107.37
£117.08
£5.85
£23.42
£5.30
£151.65
£3.76
£0.19
£0.75
£0.17
£4.87
£60.00
£3.00
£12.00
£2.72
£77.72
£74,808.61 £1,646.64 £16,990.46 £3,063.66 £96,509.36
25/01/2013
Page 10 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Resources required for each stage of work
Quantity
Stage
1st fix Carpentery
Type
Labour
Material
Subcontract
Preliminaries
1st Fix Elec
1st Fix Plumb
Sundry
Provisional
Subcontract
Subcontract
Demolitions
Labour
Groundworks
Subcontract
Sundry
Labour
Material
Subcontract
Sundry
Plant
Structure
Labour
Material
Sample Estimate.xlsx
Resource
Carpenter
Labourer
Mate
Roofer
sundry
5x80mm gold screw
40mm goldscrew
door liner
Timber; Ply; WBP; 12mm
Window
Cavity closer
Timber; Joists; 100x47
7yd skip
Specialist subcontractor
sundry
Contractors PS
Electrician- point
Plumber - subcontract
Plumber - point
UFH
Carpenter
Labourer
General Operative
7yd skip
sundry
Labourer
Foreman
General Operative
Ready mix concrete
Timber; OSB board; 18mm
Timber; Joists; 75x47
7yd skip
sundry
Concrete Pump
Concrete breaker
Carpenter
Labourer
Foreman
General Operative
Bricklayer
Mate
cement
DPM
Parimeter insulation
Joist hangers
Wall ties
Lintels - 1200 - concrete
Timber; Battens; 50x25
Timber; Joists; 200x47
25/01/2013
Unit
h
h
h
h
item
pack 100
box 100
item
sheet 2.4x1.2
each
m
ln m
skip
item
item
item
point
point
item
h
h
h
skip
item
h
h
h
m3
sheet 2.4x1.2
ln m
skip
item
item
day
h
h
h
h
h
h
bag 25kg
m2
sheet 8x4
item
each
item
ln m
ln m
Total
20.14
20.14
7.50
7.50
2.36
1.80
1.04
3.00
6.94
1.00
1.00
76.48
0.20
4.00
14.00
4.00
23.00
33.00
2.00
1.00
24.47
107.31
78.85
5.83
4.00
22.33
17.72
4.61
5.80
10.00
60.00
2.27
3.00
3.00
0.35
21.86
35.82
13.53
2.84
137.46
139.87
170.54
57.05
7.92
18.00
151.68
2.00
98.40
30.15
Page 11 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Subcontract
Sundry
Plant
Plastering
Labour
Material
Subcontract
Sundry
Drylining
Labour
Material
Sample Estimate.xlsx
Timber; Joists; 150x47
Blocks; Aerated; 3.6N; 100mm
DPC; 100mm
DPC; 337mm
Aggregates; Building sand
Aggregates; Ballast
Aggregates; Sharp sand
Aggregates; Ballast; bagged
Bricks; Engineering Class B
Landscaping fabric
Paving; PC Sum
Reinforcement; Mesh A142
Bricks; PC Sum £500 per 1000
ln m
each
Roll 30m
Roll 30m
bag 50kg
tonne
tonne
bag 50kg
each
m2
m2
sheet 3.6x2.4
each
39.60
201.60
0.56
0.28
46.23
15.95
4.49
0.51
614.40
3.00
1.50
1.00
1209.60
Insulation; Rockwool cavity; 120mm
DPC; 225mm
Reinforcement; Mesh A393
Insulation; Rockfloor; 50mm
Insulation; Rockfloor; 60mm
Timber; Planed board; 200x25
7yd skip
Steel
Intumiscent paint - PC Sum - 60
mins
sundry
40mm gold screw
80mm gold screw
Compactor plate
454kg Lift/stacker Manual Sl10
3000kg Chain Hoist-6m Lift
Mate
Decorator
Plasterer
Multifinish
Thin coat angle bead 2.4m
Thistle Hardwall
Coving - plaster 120mm
Cove adhesive
Plaster; Angle bead stainless steel;
3m
7yd skip
sundry
PVA 5L
Scrim tape
Labourer
Dryliner
Mate
sundry
32mm plasterboard screw
Timber; Ply; WBP; 12mm
Insulation; Multiroll; 100mm
Plasterboard; 12.5mm
Casoline MF; MF5 ceiling furring
Casoline MF; MF6A parimeter
channel
3.28m2
Roll 30m
sheet 4.8x2.4
sheet 1x0.6
sheet 1x0.6
ln m
skip
tonne
6.15
0.05
3.00
47.54
47.54
1.60
3.58
1.92
25/01/2013
m2
item
box 100
box 100
days
days
days
h
h
m2
bag 25kg
2.4m length
bag 25kg
1 ln m
5 kg
3m length
skip
item
can 5L
roll 25m
h
h
h
item
pack 1000
sheet 2.4x1.2
Roll 11m2
sheet 2.4x1.2
3.6m length
3.6m length
29.52
124.91
2.00
2.70
2.00
1.50
1.50
5.60
5.60
111.36
10.70
3.00
9.51
26.20
2.62
2.00
0.11
45.79
9.35
13.60
11.31
36.48
25.17
2.46
4.38
5.00
4.26
15.19
25.00
7.00
Page 12 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Roofing
Subcontract
Sundry
Labour
2nd Fix Carpentery
Sundry
Labour
Decorations
Subcontract
Sundry
Labour
Material
Casoline MF; MF7 primary channel 3.6m length
Casoline MF; MF8 strap hanger
25m coil
10.00
1.00
Casoline MF; MF9 preformed clips
Casoline MFl MF11 nut and bolt
Plasterboard; 12.5mm fireline
Insulation; Rockwool acoustic;
65mm
7yd skip
sundry
Mate
Roofer
Guttering; downpipe connector
Guttering; Downpipe offset
Guttering; Downpipe shoe
Guttering; Downpipe; 1.8m
sundry
Carpenter
Other ironmongery
Gripfill
80mm hammer fixing
Skirting; sw Ogee; 150mm
Doors
7yd skip
sundry
Labourer
Decorator
Wood filler
Smartmix Extra - filler
Paint; Dulux primer
Paint; Dulux undercoat
Paint; Dulux High Gloss
Paint; Leytex - mist coat
Paint; Dulux Trade Vinyl Matt
m
pack of 200
sheet 2.4x1.2
1.00
1.00
14.00
15m2
skip
item
h
h
each
each
each
each
item
h
item
tube
no
ln m
item
skip
item
h
h
can 1L
bucket 20Kg
can 2.5L
can 1L
can 5L
bucket 15L
can 5L
10.00
0.01
37.76
4.08
4.08
0.00
2.00
2.00
4.00
2.00
18.19
0.00
5.62
56.20
56.20
2.00
0.06
19.24
61.00
61.00
1.01
1.98
0.02
0.02
0.02
0.21
1.26
Paint; Farrow&Ball; Emulsion primer can 5L - 8m2 coverage 1.54
Paint; Farrow&Ball; Estate Emulsion can 5L - 8m2 coverage 3.07
Paint; Farrow&Ball; Interior wood
primer
can 5L - 10m2 coverage 0.48
Paint; Farrow&Ball; Internal
Undercoat
can 5L - 8m2 coverage 0.60
Sundry
Finishes
Labour
Material
Sample Estimate.xlsx
Paint; Farrow&Ball; Estate Eggshell
Wallpaper
sundry
No nosense decorators caulk
Carpenter
Labourer
Tiler
PVA 5L
Dunlop rapid set adhesive - grey
Dunlop grout - white
Underlay
25/01/2013
can 5L - 10m2 coverage 0.48
m2
4.08
item
29.97
tube
11.02
h
13.08
h
17.74
h
4.66
can 5L
0.04
bag 20kg
0.40
bag 10kg
0.13
m2
37.76
Page 13 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
2nd fix Elec
Subcontract
Sundry
Material
Subcontract
Completion
Labour
Material
Sundry
Sample Estimate.xlsx
Wood glue
Tiles
Flooring, Underlay foam, 2.5mm
7yd skip
sundry
Smoke/ heat
Lights
Light switches
Single sockets
Electrician - fuseboard
Electrician- point
Decorator
Paint; Sikkens Cetol Filter Clear;
Woodstain
Paint; Floor lacquer; Bona Resident
Plus
sundry
25/01/2013
bottle 1L
m2
roll 15m2
skip
item
item
item
item
item
item
point
h
1.89
2.00
3.00
0.19
42.42
1.00
1.00
9.00
16.00
1.00
27.00
16.51
can 1L-16m2 coverage 1.01
bottle 5L-9m2/l
item
1.68
43.16
Page 14 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Resources required for each priced item of work.
Quantity
Item No. Type
1.02 Provisional
1.03 Provisional
2.01 Subcontract
2.02
2.03
Provisional
Labour
2.04
Sundry
Labour
2.05
Subcontract
Sundry
Labour
2.06
Subcontract
Labour
2.07
Subcontract
Labour
2.08
Subcontract
Labour
2.09
Subcontract
Plant
Labour
2.1
Subcontract
Labour
2.11
Subcontract
Labour
2.12
Sundry
Labour
2.13
Subcontract
Labour
2.14
Subcontract
Labour
2.15
Subcontract
Labour
3.01
Subcontract
Sundry
Labour
Sample Estimate.xlsx
Resource
Contractors PS
Contractors PS
Plumber - subcontract
Electrician- point
Contractors PS
Labourer
General Operative
sundry
Labourer
General Operative
7yd skip
sundry
Labourer
General Operative
7yd skip
Labourer
General Operative
7yd skip
Labourer
General Operative
7yd skip
Labourer
General Operative
7yd skip
Concrete breaker
Labourer
General Operative
7yd skip
Labourer
General Operative
7yd skip
Labourer
General Operative
sundry
Carpenter
Labourer
General Operative
7yd skip
Carpenter
Labourer
7yd skip
Labourer
General Operative
7yd skip
Labourer
General Operative
7yd skip
sundry
Labourer
Foreman
25/01/2013
Unit
item
item
item
point
item
h
h
item
h
h
skip
item
h
h
skip
h
h
skip
h
h
skip
h
h
skip
day
h
h
skip
h
h
skip
h
h
item
h
h
h
skip
h
h
skip
h
h
skip
h
h
skip
item
h
h
Total
1.00
1.00
1.00
1.00
1.00
2.10
1.10
1.00
3.00
2.00
0.77
1.00
10.00
10.00
1.27
3.70
3.70
0.27
24.24
24.24
2.04
4.61
4.61
0.38
0.35
0.70
0.70
0.07
0.97
0.97
0.02
4.00
3.00
1.00
17.12
35.49
18.38
0.66
7.35
7.35
0.13
14.26
14.26
0.50
1.50
0.50
0.10
1.00
12.92
12.92
Page 15 of 22
Material
3.02
Subcontract
Sundry
Plant
Labour
Material
3.03
Subcontract
Sundry
Plant
Labour
Material
3.04
Subcontract
Sundry
Plant
Labour
Material
3.05
Subcontract
Sundry
Labour
Material
Subcontract
3.06
Sundry
Labour
Material
Subcontract
Plant
Sample Estimate.xlsx
Ready mix concrete
Timber; OSB board; 18mm
Timber; Joists; 75x47
7yd skip
sundry
Concrete Pump
Labourer
Foreman
Ready mix concrete
Timber; OSB board; 18mm
Timber; Joists; 75x47
7yd skip
sundry
Concrete Pump
Labourer
Foreman
Ready mix concrete
Timber; OSB board; 18mm
Timber; Joists; 75x47
7yd skip
sundry
Concrete Pump
Bricklayer
Mate
cement
Wall ties
Blocks; Aerated; 3.6N; 100mm
DPC; 100mm
DPC; 337mm
Aggregates; Building sand
Bricks; PC Sum £500 per 1000
Insulation; Rockwool cavity; 120mm
7yd skip
sundry
Bricklayer
Mate
cement
Wall ties
Aggregates; Building sand
Bricks; Engineering Class B
DPC; 225mm
7yd skip
Specialist subcontractor
sundry
Bricklayer
Mate
cement
DPM
Parimeter insulation
Aggregates; Ballast
Aggregates; Sharp sand
Reinforcement; Mesh A393
Insulation; Rockfloor; 50mm
Insulation; Rockfloor; 60mm
7yd skip
Compactor plate
25/01/2013
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
m3
4.14
sheet 2.4x1.2
7.00
ln m
46.00
skip
1.35
item
1.00
item
1.00
h
2.67
h
2.67
m3
0.86
sheet 2.4x1.2
2.00
ln m
10.00
skip
0.28
item
1.00
item
1.00
h
2.14
h
2.14
m3
0.80
sheet 2.4x1.2
1.00
ln m
4.00
skip
0.26
item
1.00
item
1.00
h
46.59
h
46.59
bag 25kg
9.22
each
120.96
each
201.60
Roll 30m
0.56
Roll 30m
0.28
bag 50kg
36.86
each
1209.60
3.28m2
6.15
skip
0.20
item
20.16
h
17.00
h
17.00
bag 25kg
2.34
each
30.72
bag 50kg
9.36
each
614.40
Roll 30m
0.05
skip
0.05
item
1.00
item
5.12
h
71.64
h
71.64
bag 25kg
145.34
m2
57.05
sheet 8x4
7.92
tonne
15.28
tonne
4.35
sheet 4.8x2.4
3.00
sheet 1x0.6
47.54
sheet 1x0.6
47.54
skip
3.26
days
1.00
Page 16 of 22
3.07
Labour
Material
Subcontract
Sundry
Plant
3.08
Labour
Subcontract
Sundry
3.09
Labour
4.01
Material
Sundry
Labour
Material
4.02
Sundry
Labour
Material
Sample Estimate.xlsx
Carpenter
Labourer
Dryliner
Foreman
Bricklayer
sundry
cement
Joist hangers
32mm plasterboard screw
Timber; Ply; WBP; 12mm
Timber; Battens; 50x25
Insulation; Multiroll; 100mm
Plasterboard; 12.5mm
Timber; Joists; 200x47
Aggregates; Ballast; bagged
7yd skip
Steel
Intumiscent paint - PC Sum - 60 mins
sundry
40mm gold screw
80mm gold screw
454kg Lift/stacker Manual Sl10
3000kg Chain Hoist-6m Lift
Carpenter
Labourer
Timber; Joists; 150x47
7yd skip
sundry
80mm gold screw
Bricklayer
Mate
Lintels - 1200 - concrete
sundry
Dryliner
Mate
32mm plasterboard screw
Insulation; Multiroll; 100mm
Casoline MF; MF5 ceiling furring
Casoline MF; MF6A parimeter channel
Casoline MF; MF7 primary channel
Casoline MF; MF8 strap hanger
Casoline MF; MF9 preformed clips
Casoline MFl MF11 nut and bolt
Plasterboard; 12.5mm fireline
sundry
Carpenter
Labourer
Dryliner
Decorator
sundry
5x80mm gold screw
40mm goldscrew
door liner
32mm plasterboard screw
Wood filler
Timber; Ply; WBP; 12mm
25/01/2013
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
h
14.97
h
34.34
h
5.41
h
13.53
h
0.43
item
2.46
bag 25kg
6.86
item
18.00
pack 1000
0.18
sheet 2.4x1.2
5.00
ln m
98.40
Roll 11m2
1.12
sheet 2.4x1.2
5.00
ln m
30.15
bag 50kg
0.51
skip
0.06
tonne
1.92
m2
29.52
item
65.28
box 100
1.00
box 100
0.90
days
1.50
days
1.50
h
6.73
h
6.73
ln m
39.60
skip
0.02
item
19.80
box 100
1.80
h
1.80
h
1.80
item
2.00
item
10.00
h
25.17
h
25.17
pack 1000
3.78
Roll 11m2
3.15
3.6m length
25.00
3.6m length
7.00
3.6m length
10.00
25m coil
1.00
m
1.00
pack of 200
1.00
sheet 2.4x1.2
14.00
item
37.76
h
20.30
h
27.73
h
5.90
h
1.54
item
2.36
pack 100
1.80
box 100
1.04
item
3.00
pack 1000
0.42
can 1L
0.05
sheet 2.4x1.2
6.94
Page 17 of 22
Subcontract
Sundry
4.03
Labour
Material
4.04
Sundry
Labour
4.05
Sundry
Labour
4.06
Subcontract
Sundry
Labour
Material
4.07
Subcontract
Sundry
Labour
Material
4.08
5.01
Sundry
Provisional
Labour
Material
Subcontract
Sundry
5.02
Labour
Material
Subcontract
Sundry
Sample Estimate.xlsx
Paint; Dulux primer
Paint; Dulux undercoat
Paint; Dulux High Gloss
Plasterboard; 12.5mm
Timber; Joists; 100x47
Insulation; Rockwool acoustic; 65mm
Timber; Planed board; 200x25
7yd skip
sundry
40mm gold screw
No nosense decorators caulk
Mate
Roofer
Window
Cavity closer
sundry
Carpenter
Labourer
Doors
sundry
Carpenter
Labourer
Doors
Specialist subcontractor
sundry
Carpenter
Labourer
Gripfill
80mm hammer fixing
Skirting; sw Ogee; 150mm
7yd skip
sundry
Mate
Decorator
Coving - plaster 120mm
Cove adhesive
sundry
Contractors PS
Plasterer
Multifinish
Thin coat angle bead 2.4m
Thistle Hardwall
Plaster; Angle bead stainless steel; 3m
7yd skip
sundry
PVA 5L
Scrim tape
Plasterer
Multifinish
Thin coat angle bead 2.4m
Thistle Hardwall
Plaster; Angle bead stainless steel; 3m
7yd skip
sundry
PVA 5L
Scrim tape
25/01/2013
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
can 2.5L
0.02
can 1L
0.02
can 5L
0.02
sheet 2.4x1.2
10.19
ln m
76.48
15m2
10.00
ln m
1.60
skip
0.21
item
5.11
box 100
1.00
tube
0.31
h
7.50
h
7.50
each
1.00
m
1.00
item
10.00
h
5.00
h
5.00
item
1.00
item
2.00
h
6.45
h
6.45
item
1.00
item
1.00
item
6.00
h
6.74
h
6.74
tube
5.62
no
56.20
ln m
56.20
skip
0.06
item
11.24
h
5.60
h
5.60
1 ln m
26.20
5 kg
2.62
item
26.20
item
1.00
m2
91.36
bag 25kg
9.40
2.4m length
2.00
bag 25kg
5.96
3m length
1.00
skip
0.09
item
16.59
can 5L
8.02
roll 25m
12.00
m2
20.00
bag 25kg
1.30
2.4m length
1.00
bag 25kg
3.55
3m length
1.00
skip
0.02
item
3.00
can 5L
1.33
roll 25m
1.60
Page 18 of 22
5.03
Labour
Material
Sundry
5.04
Labour
Material
Sundry
5.05
Labour
Material
Subcontract
5.06
Sundry
Labour
Material
5.07
Sundry
Labour
6.01
Material
Sundry
Material
Subcontract
6.02
Subcontract
6.03
Labour
Sample Estimate.xlsx
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Labourer
h
28.55
Decorator
h
28.55
Smartmix Extra - filler
bucket 20Kg
1.98
Paint; Leytex - mist coat
bucket 15L
0.21
Paint; Dulux Trade Vinyl Matt
can 5L
1.26
can 5L - 8m2
Paint; Farrow&Ball; Emulsion primer
coverage
1.54
can 5L - 8m2
Paint; Farrow&Ball; Estate Emulsion
coverage
3.07
sundry
item
19.82
No nosense decorators caulk
tube
4.96
Labourer
h
28.79
Decorator
h
31.70
Wood filler
can 1L
0.96
can 5L - 10m2
Paint; Farrow&Ball; Interior wood primer
coverage
0.48
can 5L - 8m2
Paint; Farrow&Ball; Internal Undercoat
coverage
0.60
can 5L - 10m2
Paint; Farrow&Ball; Estate Eggshell
coverage
0.48
can 1L-16m2
Paint; Sikkens Cetol Filter Clear; Woodstain coverage
1.01
sundry
item
11.16
No nosense decorators caulk
tube
5.76
Carpenter
h
13.08
Labourer
h
13.08
Decorator
h
13.59
Underlay
m2
37.76
Wood glue
bottle 1L
1.89
Flooring, Underlay foam, 2.5mm
roll 15m2
3.00
Paint; Floor lacquer; Bona Resident Plus
bottle 5L-9m2/l
1.68
7yd skip
skip
0.19
Specialist subcontractor
item
1.00
sundry
item
75.52
Labourer
h
4.66
Tiler
h
4.66
PVA 5L
can 5L
0.04
Dunlop rapid set adhesive - grey
bag 20kg
0.40
Dunlop grout - white
bag 10kg
0.13
Tiles
m2
2.00
sundry
item
4.66
Labourer
h
2.12
Decorator
h
2.12
Wallpaper
m2
4.08
sundry
item
4.08
Smoke/ heat
item
1.00
Lights
item
1.00
Light switches
item
9.00
Single sockets
item
16.00
Electrician - fuseboard
item
1.00
Electrician- point
point
49.00
Plumber - subcontract
item
2.00
m2
30.00
Plumber - point
point
2.00
UFH
item
1.00
Mate
h
4.08
25/01/2013
Page 19 of 22
7.01
Subcontract
Sundry
Labour
Material
Sundry
Plant
Sample Estimate.xlsx
Roofer
Guttering; Gutter outlet
Guttering; Downpipe offset
Guttering; Downpipe shoe
Guttering; Downpipe; 1.8m
Specialist subcontractor
sundry
General Operative
Mate
cement
Aggregates; Ballast
Aggregates; Sharp sand
Landscaping fabric
Paving; PC Sum
Reinforcement; Mesh A142
sundry
Compactor plate
25/01/2013
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
h
4.08
each
2.00
each
2.00
each
2.00
each
4.00
item
1.00
item
2.00
h
2.84
h
2.84
bag 25kg
6.79
tonne
0.67
tonne
0.14
m2
3.00
m2
1.50
sheet 3.6x2.4
1.00
item
3.76
days
1.00
Page 20 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
List of all required materials, unpriced
Quantity
Stage
1st fix Carpentery
Preliminaries
Groundworks
Structure
Plastering
Drylining
Sample Estimate.xlsx
Resource
sundry
5x80mm gold screw
40mm goldscrew
door liner
Timber; Ply; WBP; 12mm
Window
Cavity closer
Timber; Joists; 100x47
Contractors PS
Ready mix concrete
Timber; OSB board; 18mm
Timber; Joists; 75x47
cement
DPM
Parimeter insulation
Joist hangers
Wall ties
Lintels - 1200 - concrete
Timber; Battens; 50x25
Timber; Joists; 200x47
Timber; Joists; 150x47
Blocks; Aerated; 3.6N; 100mm
DPC; 100mm
DPC; 337mm
Aggregates; Building sand
Aggregates; Ballast
Aggregates; Sharp sand
Aggregates; Ballast; bagged
Bricks; Engineering Class B
Landscaping fabric
Paving; PC Sum
Reinforcement; Mesh A142
Bricks; PC Sum £500 per 1000
Insulation; Rockwool cavity; 120mm
DPC; 225mm
Reinforcement; Mesh A393
Insulation; Rockfloor; 50mm
Insulation; Rockfloor; 60mm
Timber; Planed board; 200x25
Multifinish
Thin coat angle bead 2.4m
Thistle Hardwall
Coving - plaster 120mm
Cove adhesive
Plaster; Angle bead stainless steel; 3m
sundry
32mm plasterboard screw
Timber; Ply; WBP; 12mm
Insulation; Multiroll; 100mm
25/01/2013
Unit
item
pack 100
box 100
item
sheet 2.4x1.2
each
m
ln m
item
m3
sheet 2.4x1.2
ln m
bag 25kg
m2
sheet 8x4
item
each
item
ln m
ln m
ln m
each
Roll 30m
Roll 30m
bag 50kg
tonne
tonne
bag 50kg
each
m2
m2
sheet 3.6x2.4
each
3.28m2
Roll 30m
sheet 4.8x2.4
sheet 1x0.6
sheet 1x0.6
ln m
bag 25kg
2.4m length
bag 25kg
1 ln m
5 kg
3m length
item
pack 1000
sheet 2.4x1.2
Roll 11m2
Total
2.36
1.80
1.04
3.00
6.94
1.00
1.00
76.48
4.00
5.80
10.00
60.00
170.54
57.05
7.92
18.00
151.68
2.00
98.40
30.15
39.60
201.60
0.56
0.28
46.23
15.95
4.49
0.51
614.40
3.00
1.50
1.00
1209.60
6.15
0.05
3.00
47.54
47.54
1.60
10.70
3.00
9.51
26.20
2.62
2.00
2.46
4.38
5.00
4.26
Page 21 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Decorations
Finishes
2nd fix Elec
Completion
Sample Estimate.xlsx
Casoline MF; MF5 ceiling furring
Casoline MF; MF6A parimeter channel
Casoline MF; MF7 primary channel
Casoline MF; MF8 strap hanger
Casoline MF; MF9 preformed clips
Casoline MFl MF11 nut and bolt
Plasterboard; 12.5mm fireline
Insulation; Rockwool acoustic; 65mm
Guttering; Gutter outlet
Guttering; Downpipe offset
Guttering; Downpipe shoe
Guttering; Downpipe; 1.8m
Gripfill
80mm hammer fixing
Skirting; sw Ogee; 150mm
Doors
Wood filler
Smartmix Extra - filler
Paint; Dulux primer
Paint; Dulux undercoat
Paint; Dulux High Gloss
Paint; Leytex - mist coat
Paint; Dulux Trade Vinyl Matt
Paint; Farrow&Ball; Emulsion primer
Paint; Farrow&Ball; Estate Emulsion
Paint; Farrow&Ball; Interior wood primer
Paint; Farrow&Ball; Internal Undercoat
Paint; Farrow&Ball; Estate Eggshell
Wallpaper
PVA 5L
Dunlop rapid set adhesive - grey
Dunlop grout - white
Underlay
Wood glue
Tiles
Flooring, Underlay foam, 2.5mm
Smoke/ heat
Lights
Light switches
Single sockets
Paint; Sikkens Cetol Filter Clear; Woodstain
Paint; Floor lacquer; Bona Resident Plus
25/01/2013
3.6m length
3.6m length
3.6m length
25m coil
m
pack of 200
sheet 2.4x1.2
15m2
each
each
each
each
tube
no
ln m
item
can 1L
bucket 20Kg
can 2.5L
can 1L
can 5L
bucket 15L
can 5L
can 5L - 8m2 coverage
can 5L - 8m2 coverage
can 5L - 10m2 coverage
can 5L - 8m2 coverage
can 5L - 10m2 coverage
m2
can 5L
bag 20kg
bag 10kg
m2
bottle 1L
m2
roll 15m2
item
item
item
item
can 1L-16m2 coverage
bottle 5L-9m2/l
25.00
7.00
10.00
1.00
1.00
1.00
14.00
10.00
2.00
2.00
2.00
4.00
5.62
56.20
56.20
2.00
1.01
1.98
0.02
0.02
0.02
0.21
1.26
1.54
3.07
0.48
0.60
0.48
4.08
0.04
0.40
0.13
37.76
1.89
2.00
3.00
1.00
1.00
9.00
16.00
1.01
1.68
Page 22 of 22
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
List of all required materials, priced
Stage
1st fix Carpentery
Groundworks
Structure
Sample Estimate.xlsx
Resource
sundry
Supplier
Unspecified
Unit
item
5x80mm gold screw
Screwfix
pack 100
40mm goldscrew
Screwfix
box 100
door liner
Selco
item
Timber; Ply; WBP; 12mm
Selco
sheet 2.4x1.2
Window
Selco
each
Cavity closer
Screwfix
m
Timber; Joists; 100x47
Selco
ln m
Ready mix concrete
Jim'll Mix it
m3
Timber; OSB board; 18mm
Selco
sheet 2.4x1.2
Timber; Joists; 75x47
Selco
ln m
cement
DPM
Selco
Selco
bag 25kg
m2
Parimeter insulation
Selco
sheet 8x4
Joist hangers
Selco
item
Wall ties
Selco
each
25/01/2013
Data
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Total
2.36
£1.00
1.80
£5.15
1.04
£1.85
3.00
£19.09
6.94
£17.25
1.00
£2,887.30
1.00
£5.60
76.48
£1.62
5.80
£125.00
10.00
£16.49
60.00
£1.33
170.54
57.05
£0.40
7.92
£11.19
18.00
£2.85
151.68
£0.10
Page 1 of 7
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Sample Estimate.xlsx
Lintels - catnic - length up to 2.1m
http://www.discountbuildsupplies.co.uk/shopdis
playproducts.asp?id=562&cat=Catnic+CX70%2F
100+7085mm+Extra+Heavy+Duty+Cavity+Wall+Lintel
each
Timber; Battens; 50x25
Selco
ln m
Timber; Joists; 200x47
Selco
ln m
Timber; Joists; 150x47
Selco
ln m
Blocks; Aerated; 3.6N; 100mm
Selco
each
DPC; 100mm
Selco
Roll 30m
DPC; 337mm
Selco
Roll 30m
Aggregates; Building sand
Selco
bag 50kg
Aggregates; Ballast
Selco
tonne
Aggregates; Sharp sand
Selco
tonne
Aggregates; Ballast; bagged
Selco
bag 50kg
Bricks; Engineering Class B
Selco
each
Landscaping fabric
Screwfix
m2
Paving; PC Sum
Unspecified
m2
25/01/2013
Quantity
Price
Price
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
0.00
£101.55
£10.99
£29.25
98.40
£0.63
30.15
£3.44
39.60
£2.57
201.60
£0.79
0.56
£3.29
0.28
£10.85
46.23
£1.55
15.95
£60.00
4.49
£50.00
0.51
£1.89
614.40
£0.20
3.00
£0.57
1.50
£20.00
Page 2 of 7
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Plastering
Sample Estimate.xlsx
Reinforcement; Mesh A142
http://www.busybee.uk.com/product_list.php?li
mit=25&starting_point=0&product_search=&pro
duct_group_id=59&page=1
sheet 3.6x2.4
Bricks; PC Sum £500 per 1000
Selco
Insulation; Rockwool cavity; 120mm
http://www.builderdepot.co.uk/rockwool-cavity120mm-x-455mm-x-1200mm-6-per-pack-3-28m2pack.html
3.28m2
DPC; 225mm
Selco
Roll 30m
Reinforcement; Mesh A393
http://www.dyersmetalmesh.co.uk/enGB/reinforcingfabric.aspx
Quantity
Price
Quantity
Price
1.00
£15.99
1209.60
£0.50
Quantity
Price
Quantity
Price
6.15
£23.40
0.05
£7.35
sheet 4.8x2.4
Quantity
Price
3.00
£65.00
Insulation; Rockfloor; 50mm
http://www.insulationdirect2u.co.uk/insulationproducts/139-cheap-rockwool-rockfloorinsulation-supplier.aspx
sheet 1x0.6
Quantity
Price
47.54
£8.35
Insulation; Rockfloor; 60mm
http://www.insulationdirect2u.co.uk/insulationproducts/139-cheap-rockwool-rockfloorinsulation-supplier.aspx
sheet 1x0.6
Timber; Planed board; 200x25
Selco
ln m
Multifinish
Selco
bag 25kg
Thin coat angle bead 2.4m
Screwfix
2.4m length
Thistle Hardwall
Selco
bag 25kg
Coving - plaster 120mm
PC sum
1 ln m
Cove adhesive
Selco
5 kg
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
47.54
£8.57
1.60
£4.29
10.70
£3.99
3.00
£1.69
9.51
£5.95
26.20
£10.00
2.62
£5.65
each
25/01/2013
Page 3 of 7
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Drylining
Roofing
Sample Estimate.xlsx
Plaster; Angle bead stainless steel; 3m Selco
3m length
sundry
32mm plasterboard screw
Unspecified
Screwfix
item
pack 1000
Timber; Ply; WBP; 12mm
Selco
sheet 2.4x1.2
Insulation; Multiroll; 100mm
http://www.insulationplace.co.uk/SuperglassMulti-Roll-44-100mm.html
Roll 11m2
Plasterboard; 12.5mm
Selco
sheet 2.4x1.2
Casoline MF; MF5 ceiling furring
Shefields Insulations
3.6m length
Casoline MF; MF6A parimeter channel
Shefields Insulations
3.6m length
Casoline MF; MF7 primary channel
Shefields Insulations
3.6m length
Casoline MF; MF8 strap hanger
Shefields Insulations
25m coil
Casoline MF; MF9 preformed clips
http://buildingmaterials.co.uk/?Query=MF9+MF5
+to+MF7+support+clip+1+box++200+pieces&gre
en_arrow.x=14&green_arrow.y=13
m
Casoline MFl MF11 nut and bolt
Shefields Insulations
pack of 200
Plasterboard; 12.5mm fireline
Selco
sheet 2.4x1.2
Insulation; Rockwool acoustic; 65mm
http://just-insulation.com/rockslabs.html
15m2
Guttering; Gutter outlet
Selco
each
Guttering; downpipe connector
Guttering; Downpipe offset
Selco
Selco
each
each
25/01/2013
Quantity
Price
Quantity
Quantity
Price
Quantity
Price
2.00
£7.05
2.46
4.38
£7.04
5.00
£17.25
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
4.26
£14.71
15.19
£4.39
25.00
£4.60
7.00
£3.50
10.00
£5.25
1.00
£13.29
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Quantity
Price
1.00
£24.61
1.00
£17.67
14.00
£6.69
10.00
£59.73
2.00
£5.39
0.00
2.00
£5.49
Page 4 of 7
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Price
Guttering; Downpipe; 1.8m
2nd Fix Carpentery Hinges
Decorations
Sample Estimate.xlsx
http://www.drainageonline.co.uk/Guttering/CastIron-Gutter/Round-Cast-Iron-Pipes/2.5-Inch65mm-Round-Cast-Iron-Pipes.htm
each
Unspecified
Latches
PC sum
each
Skirting; sw Ogee; 150mm
Selco
ln m
Doors
MRLB Windows
item
Interfusion
item
Wood filler
Selco
can 1L
Smartmix Extra - filler
Selco
bucket 20Kg
Paint; Dulux primer
http://www.duluxdecoratorcentre.co.uk/servlet/P
roductHandler?itemId=00009075
can 2.5L
Paint; Dulux undercoat
http://www.duluxdecoratorcentre.co.uk/servlet/P
roductHandler?code=DDC10018
can 1L
Paint; Dulux High Gloss
http://www.duluxdecoratorcentre.co.uk/servlet/P
roductHandler?itemId=00008370
can 5L
Paint; Leytex - mist coat
Selco
bucket 15L
25/01/2013
£20.88
Quantity
Price
0 Quantity
Price
Quantity
Price
Price
Price
Price
Price
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
4.00
£62.33
0.00
£1.00
0.00
£1.00
£1.00
£1.00
£1.00
£2.45
£0.55
56.20
£4.25
1.00
£1,664.80
1.00
£1,750.00
1.01
£6.45
1.98
£21.29
Quantity
Price
0.02
£36.10
Quantity
Price
0.02
£10.73
Quantity
Price
Quantity
Price
0.02
£28.60
0.21
£21.35
Page 5 of 7
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
Paint; Dulux Trade Vinyl Matt
Finishes
Sample Estimate.xlsx
http://www.duluxdecoratorcentre.co.uk/servlet/P
roductHandler?itemId=00021199
can 5L
Quantity
Price
http://www.farrow-ball.com/wall-&-ceiling-primer&-undercoat/primers-and-undercoats//fcpPaint; Farrow&Ball; Emulsion primer
product/400005
can 5L - 8m2 coverage
Quantity
Price
http://www.farrow-ball.com/pointing/colours//fcpPaint; Farrow&Ball; Estate Emulsion
product/102003
can 5L - 8m2 coverage
Quantity
Price
http://www.farrow-ball.com/interior-wood-primer&-undercoat/primers-and-undercoats//fcpPaint; Farrow&Ball; Interior wood primer product/400006
can 5L - 10m2 coverage
Quantity
Price
http://www.farrow-ball.com/interior-wood-primer&-undercoat/primers-and-undercoats//fcpPaint; Farrow&Ball; Internal Undercoat product/400006
can 5L - 8m2 coverage
Quantity
Price
http://www.farrow-ball.com/pointing/colours//fcpPaint; Farrow&Ball; Estate Eggshell
product/102003
can 5L - 10m2 coverage
Quantity
Price
Wallpaper
Mr Perswall
m2
Quantity
Price
PVA 5L
Selco
can 5L
Quantity
Price
Dunlop rapid set adhesive - grey
Selco
bag 20kg
Quantity
Price
Dunlop grout - white
Selco
bag 10kg
Quantity
Underlay
Contractor
m2
Quantity
Price
Wood glue
Selco
bottle 1L
Quantity
Price
Tiles
Fired Earth
m2
Quantity
Price
Flooring, Underlay foam, 2.5mm
Selco
roll 15m2
Quantity
25/01/2013
1.26
£45.13
1.54
£50.00
3.07
£58.00
0.48
£68.00
0.60
£68.00
0.48
£80.00
4.08
£27.00
0.04
£7.99
0.40
£12.35
0.13
37.76
£0.50
1.89
£9.55
2.00
£69.70
3.00
Page 6 of 7
Multiproject (SE) Ltd
Ideas House, Station Estate
Eastwood Close,
London E18 1RT
020 7096 8235
[email protected]
2nd fix Elec
Completion
Smoke/ heat
PC sum
item
Lights
Lighting
item
Light switches
Hamilton
item
Single sockets
Hamilton
item
Paint; Sikkens Cetol Filter Clear;
Woodstain
Paint; Floor lacquer; Bona Resident
Plus
Sample Estimate.xlsx
Price
Quantity
Price
Quantity
Price
Quantity
Price
Quantity
Price
http://www.my-toolshed.co.uk/p1013831/Sikkens_Cetol_Filter_7_Pl
us_Translucent_Woodstain_1_Litre_Light_Oak/p
roduct_info.html?utm_source=google&utm_med
ium=shopping&utm_campaign=allprods
can 1L-16m2 coverage
Quantity
Price
http://www.flooringsales.co.uk/acatalog/info_226
6732.html
bottle 5L-9m2/l
Quantity
Price
25/01/2013
£5.99
1.00
£25.00
1.00
£1,274.40
9.00
£29.04
16.00
£13.21
1.01
£25.99
1.68
£53.59