Overview
• On-going experiments on agriculture & livestock
carried out by the LSMS team, in collaboration
with partners
– Aligned w/ Global Strategy to Improve Agricultural &
Rural Statistics, Livestock Data Innovation in Africa
(LDIA) Program
– Informed by field experience, country-level interactions
– Underlined by iterative, peer review
Research Areas
•
•
•
•
•
•
•
Land area
Crop production (continuous crops)
Soil fertility
Labor
Skill testing
Milk production
Pastoralist populations
Measuring production
• Farmers don’t keep records
• Crops like cassava harvested in small
quantities over several months
• Recall widely used but does not always
work
• Measured in non-standard units of varying
size
• Different units along the value chain,
different states
• What are the alternatives?
– Need validation!
Quantifying cassava
Is using diaries an option?
• Compare recall and diary methods for crop
production estimates (and consumption from
own production) in Uganda
• Lack of gold standard
– “well-administered” diary?
– Crop cutting?
• Does it vary by crop type?
– Extended-harvest crops
» Cassava
» Banana
Deininger, Carletto and Savastano (2012). “Can Diaries Help Improve
Agricultural Production Statistics? Evidence from Uganda.” Journal of
Development Economics
Measuring Cassava
Productivity in Zanzibar
Objective
• To test the accuracy and feasibility of various methods for
the measurement of cassava productivity, in two districts in
Zanzibar, Tanzania.
Implementing Partners
• Ministry of Agriculture and Natural Resources (MANR),
Zanzibar
– Experiment being conducted by MANR Block Extension Officers (BEOs)
• Office of the Chief Government Statistician (OCGS),
Zanzibar
Measuring Cassava
Productivity in Zanzibar (cont’d)
• The experiment foresees the collection of cassava production data using
four different methodologies, namely:
(1) a diary, assisted through frequent visit by local Block Extension Officers
(BEOs);
(2) a diary, assisted through frequent phone calls to the farmers from a call center
established as part of the project;
(3) two six-month recall interviews; and
(4) a 12-month recall visit.
In addition, crop cutting is being carried out on one random plot per cassava
farm.
• Land areas for all cassava plots is being measured using several methods,
including compass-and-rope, GPS and farmer’s self-reporting.
Measuring Cassava
Productivity in Zanzibar (cont’d)
Sampling
• 1,260 households across two districts in Zanzibar:
– 864 households in North B district in Unguja
– 396 households in Chake Chake district in Pemba
• Each Block Extension Officer (BEO) responsible for 36
households in 1-2 Shahias
– 24 BEOs in North B and 11 in Chake Chake
Zanzibar: Experiment on Cassava
Productivity Measurement
Summary of the Methodology
Land Area
Cassava Production
Compass and rope
GPS measurement
Crop-cutting with balance scales  for one
randomly selected cassava field for all households
Farmer self-reported area
315 D1 households: crop diaries with BEO visits
twice a week
(to be conducted for all
cassava fields owned and/or
cultivated by all households)
315 D2 households: crop diaries with telephone
calls twice a week
315 R1 households: farmer self-reported harvest
(6-month recall)
315 R2 households: farmer self-reported harvest
(12-month recall)
Measuring Cassava
Collaboration with Global Strategy
ZANZIBAR
• In Zanzibar, the experiment is conducted by LSMS Team and fieldwork started in May
2013 and is expected to be completed in April 2014.
MALAWI
• Preliminary lessons will be learned from Zanzibar experiment for designing a second
experiment in Malawi.
•
WB (LSMS) and FAO (Global Strategy) will work together to prepare and conduct the
validation exercise in Malawi with funding from the research component of the Global
Strategy.
•
Preparation will start in the Fall but field work will depend on the season probably start
early 2014
•
LSMS Team has started identification of potential teams to do the fieldwork and put
together a budget and define administrative and financial arrangements.