5.the Begin fromtothe left hand tongue-side against wall.installation Use spacers maintain ancorner, even expansion gap the the wall. wall. Use Use spacers spacers to to maintain maintain an an even even expansion expansion gap gap a llowance. a allowance. llowance. Läggningsanvisning - Molaloc plus (G5) 6. Alignthe the nextboard, board, lay it down and push downward until the 6. 6. Align Align the next next board, lay lay itit down down and and push push downward downward until until the the short edge’s plastic tongue clicks into locking position. Proceed with short edge’s plastic tongue clicks into locking position. Proceed 3. Sub Floor Preparations short edge’s plastic tongue clicks into locking position. Proceed wit with h Molandelivery, golv lagt flytande Bryt inte emballaget förrän skall läggas. Förvara golvet vid 20°C thegolv. subse quent boards in similar manner togolvet complete the installed subse quent boards in similar manner to complete the installed Before makesom sure that the the building where the floorings would be installed are the subsequent boards in similar manner to complete the installed first row. first row. completed, all moisture or water related works such as masonry, plastering, wall och medincluding en normal relativ luftfuktighet (RF) på 35-65% i minst 2 dygn före läggning. I nybyggnad får emfirst row. etc. All openings should på alsonytt, already be completed (roof; paketen på ströer. Läs hela anvisningen 1painting, 2 balleratplumbing, Molan gutters golv inte förvaras direkt golv. Lägg 15gjutet mm windows; doors). As a rule-of-thumb, ready-made wood flooring should be one of the last innan arbetet items delivered andpåbörjas. installed in the building. Any concrete sub-floor must be completely cured and dried (8~12 weeks old), with minimum surface temperature ofedge 15ºplastic Cplastic (60ºtongues F)tongues and latch 7. shows the short edge locking Thefigure figure shows the short latch locking 7.7.The The figure shows the short edge plastic tongues latch locking maximum moisture-content of 2% dry-weight basis. The ideal relative humidity in the room OBSERVERA: Brädorna ska kontrolleras i dagsljus före montering. Brädor med synliga fel, såsom glans-, m echanism. m echanism. mechanism. should be 55%. A moisture test is required using either the Calcium Chloride method or an dimensions-, färg-, nivåskillnader etc. ska frånsorteras. Reklamation över brädor med synliga defekter, acceptable moisture meter. som monterats, kommer att avvisas. 4. TEKA Soft Loc Installation Guide for Floating Installation 1 3 2 8. For reasons, on starting the next row, always make Golvet läggs flytande, brädorna sammanfogas utan lim. Använd brädor från Foraesthetical aesthetical reasons, starting the next row, always make 1.5 After cleaning the floor, roll over the vapour barrier sheet 8.8.sub For aesthetical reasons, onon starting the next row, always make sure to the joints by at least 30cm (12in ch). Try to use sure tostagger stagger theend end joints by at least 30cm (12in ch). Try to och use nyansspel. Det skall paket löpande för att garantera ett harmoniskt färgwith a minimum 20cm (8inch) overlap. Unroll the sheet along the sure to stagger the end joints by at least 30cm (12in ch). Try to use 4 piece row to start a new one. cccut piecefrom fromthe theprevious previous row start a new one. longest wall. överallt där fukt förekomma. ututdiffusionsspärr piece from the previous row to to start akan new one. flera vara 1. the left hand corner, tongue-side against 5. Begin installation from Börja golvläggningen i rummets vänstra hörn med spontsidan in mot väggen. Det the wall. Use spacers toexakta maintain anlong even expansion gap 6 Underlayment may ges tongue with groove at 15° 9. Connect the ed avståndet (min. 10and mm) till väggen kan avpassas när tre rader har lagts (bild 9. Connect the long ges tongue with the groove at some 2. be the used for sound insulation / orthe for 9. Connect the long eded ges tongue with the groove at some some 15°15° 5. Begin installation from left hand corner, tongue-side against asmoothing llowance. out slightaaangle and lay it down. irregularities the sub floor. Do not overlap ngle andlay layitofitdown. down. 2). and ngle the wall. Use spacers to maintain an even expansion gap the underlayment. allowance. 5 3 4 7 7 2. Nästa bräda läggs tätt intill den föregående, och pressas/trycks ner till dess låset 6 ”klickar i” (bild 3). Lägg hela första raden på detta vis (bild 3) – med undantag av... 10. Connect the long edges tongue with the groove at some 15° 3. Align Lay athe loose board upside down as a edges proper height guide against 10.Connect Connect theand long edges tongue with the groove at some 10. the long tongue with the groove at some 15°15° 6. next board, layit itdown down and push downward until the 6. Align the next board, lay push downward until the ss s push to the board along the joint towards the previou the door jamb. Cutangle, the oftoslide the frame off, leaving the required 3.bottom angle, push slide the board along the joint previou angle, push to slide the board along the joint towards thethe previou short edge’s plastic tongue clicks into locking position. Proceed wittowards h board. Align and lay itit it down, until the short edges plastic tongue short edge’s plastic tongue clicks into locking position. Proceed wit h expansion gap allowance. board. Align and lay down, until the short edges plastic tongue board. Align and lay down, until the short edges plastic tongue the subsequent boards in similar manner to complete ...sista brädan i första raden –installed denna bräda skaboards kapas och läggas med föreskrivet the subsequent clicks locking position. Proceed w 20°÷30° the ininto similar toposition. complete the mm) installed clicks intothe themanner locking Proceed w(bild ith subsequent boards ith thethe subsequent boards clicks into the locking position. Proceed with firstsubse row. quent boards avstånd till väggen (min. 10 4). in a similar manner to complete the row. ininaasimilar thethe row. similarmanner mannertotocomplete complete row. first row. 11. All joints shall have a tight fit. When necessary use a tapping 4. block hammer to gently tapfit.any gapped joints. use Never hit the 11. Alland joints shall have a tight When necessary a tapping 4. The Boards shall runfloor lengthwise against the longest wall. When Börja andra raden med den bit (min. 300 mm), som board directly with a hammer or mallet. shows the short edge plastic tongues latch locking 7. figure block and hammer to gently tap any gapped joints. Never hit the blev possible try to run floor boards parallel to incoming sunlight or main echanism. m floor board directly with a hammer or mallet. light source. T-mould8 is required for rooms exceeding 100m² 5. ft). shows the short edge plastic tongues latch locking 7.(1.080sq The figure över från rad ett (bild 5). Tryck brädan i vinkel mot föregående rad, och tryck den därefter ned mot golvet mechanism. PlyQuet Holzimport 6*28357 Bremen*Tel:+49 421 34 888 0 8 (bild GmbH*Buschhöhe 6). PlyQuet GmbH*Buschhöhe Bremen*Tel:+49 421 34 888 0 0 12. When necessary use 6*28357 a 6*28357 pull bar and hammer to tap PlyQuetHolzimport Holzimport GmbH*Buschhöhe Bremen*Tel:+49 421 34gapped 888 Fax: +49 421 34 777 11*e-mail: [email protected] Fax: +49 421 11*e-mail: [email protected] Fax:at +49 4213434777 777 11*e-mail: [email protected] joints adjoining walls and door jambs. 44 4 8. For aesthetical reasons, starting the row, always make to tap gapped and hammer 12. Whenonnecessary usenext a pull bar 6. joints ch). Try to use sure to stagger thejoints end by at least (12injambs. at adjoining walls30cm and door Nästarow bräda monteras i vinkel på ca 15° och trycks in så att kortändsskarven blir tät. to start a new one. cut piece from the previous Härefter pressas/trycks brädan ner till dess låset ”klickar i” (bild 7). Observera! vara förskjutna min. 300 mm. 8. For aesthetical reasons, on startingÄndskarvar the next row, ska always make 9a 9 13. To6*28357 lay theBremen*Tel:+49 last row, place421 a full length floor board directly on top PlyQuet Holzimport GmbH*Buschhöhe 34 888 0 3 9b 7.ges +49 421 34 long 777of 11*e-mail: [email protected] the lasttongue installed cut15° the correct width by withrow. the Measure groove atand some 9.Fax: Connect the ed sure to stagger the end joints by at least 30cm (12inch). Try to use 13. To lay the last place a full length floor board directly on top cautngle piece from the previous startrow, a kan new one. puttin arow fullto width scrap board with spacers inserted thebrädorna. Dessa avlägsnas med Vidg läggningen det uppstå mindre fogaragainst mellan and lay it down. of the last installed row. Measure and cut the correct width by all. w hjälp av width en hammare/slagkloss ochinserted parkettjärn g a full scrap board with spacers against (bild the puttin wall. 8). 8. 10 10 avståndet till väggen, när treofförsta raderna är lagda. Anbringa kilar mel14. Avpassa Trimming the boards width will unable thede use the plastic lan golv och vägg. Avståndet till väggen ska vara min.a10 mm. tongue at the boards short edge. Remove the plastic tongue; apply 10. Connect the long edges tongue with the groove at some 15° Trimming the boards width at willsome unable the use of the plastic 9. Connect the long14. edges tongue with the groove 15°the elya lineboards of the bead of towards adhesive along lip. Immediat slower angle, push to slidecontinuous the board along joint the previou tongue at the short edge. Remove the plastic tongue; apply angle and layand it down. ld down the wipe off any excessive adhesive with damp cloth. Ho board. Align lay it down, until the short edges plastic tongue 9. continuous line of bead of adhesive along the lower lip. Immediately the adhesive cures.Hold down the board with some weights wh the subsequent boards clicks into the locking Proceed with wipe off any excessive adhesive with damp cloth. Sista raden sågas tillile med angivet avstånd till väggen och sammanfogas med näst11position. in a similar mannerboard to complete the row. ile the adhesive cures.golvlisterna. I dörröppningar och vid större withraden some weights whHärefter sista (bild 9). monteras ska golvytan delas med en to dilatationsfog. (Max 8 x 12 m. 12 m r 15. arealer In the case that the installed board needs be removed, eithe because of poor colour blending or because of any other reason, brädorna). 15. In the case that the installed board needs to be removed, either the row of and insert the special start at the sided boardorofbecause because of most poor right colour blending any other reason, ng tool into the groove. separati at the most right sided board of the row and insert the special 10. Connect the longstart edges tongue with the the groove. groove at some 15° ng tool intoAlla separati Golvvärme: Molans trägolv för flytande läggning, utom bokträ och angle, push to slide the board along the joint towards the previous board. Align and lay it down, until the short edges plastic tongue ved from the row. board to bewremo clicks into the lockingtargeted position. Proceed ith the subsequent boards 16. Lift up the right side board and remove it. Carry on to the in a similar manner to complete the to row. targeted board be removed from the row. är behandlade från fabrik, kan till golvvärme. PlyQuet Holzimport GmbH*Buschhöhe 6*28357 Bremen*Tel:+49 421 34 888 0 användas 4 Fax: +49 421 34 777 11*e-mail: [email protected] kontakta Molans 16. Lift up the right side representant. board and remove it. Carry on to the 12 längs med Lönn, som Se specialanvisning eller Att tänka på Vid leverans: - Kontrollera så att det inte är några transportskador, samt att de mottagna varorna överensstämmer med fraktsedeln/följesedeln. - Eventuella transportskador skall omgående anmälas till transportören. Uppackning av brädorna: - Kontollera brädorna före läggning. - Brädor med synliga fel, som ligger utanför gällande toleranser, såsom nivå-, glans-, dimensions-, färgskillnader m.m. ska frånsorteras. Dessa kan bytas utan kostnad. Enstaka brädor med acceptabla småfel kan användas på ställen där de inte är iögonfallande, eller användas vid tillsågning. - Kortare längder kan förekomma (upp till 12,5% av brädorna). - Reklamation över defekta brädorr, som framställs efter det att brädorna har monterats, kommer att avvisas. - Särskilt beträffande plankgolv: Observera att det kan förekomma torksprickor, minisprickor, små tvärgående sprickor samt sprickor kring och i kvist. Fuktförhållanden/fuktspärr: - Byggfukten skall vara under kontroll, dvs. konstant mellan 35-65% relativ luftfuktighet (RF), allt efter årstid, innan golvet lägges. - Byggnaden skall vara sluten och allt arbete med vattenhaltiga material som puts, målning etc. skall vara avslutade och materialen skall vara torra. - Värmeanläggning skall vara i drift, temperaturen i rummet ca 20°C. - Rummet skall ha varit uppvärmt och ventilerat i minst 4 veckor före läggning. - Fuktinnehållet i betongen och ev. avjämningsmassor skall vara i jämvikt med den för årstiden normala RF, dvs. porfuktinnehållet i betongen skall vara max 65 %. - Om PE-folie (min 0,20 mm) används, kan golvet läggas på betong med porfuktinnehåll max 85 %, under förutsättning att RF i rummet inte överstiger 65 %. På befintligt trägolv: - Det befintliga trägolvet skall vara fast och plant ((+/-2 mm med en 2 m rätskiva eller +/-0,6 mm med en 0,25 m rätskiva). Det får inte ”gunga” eller kunna ge efter. - Heltäckningsmattor och liknande skall avlägsnas. - Lösa golvbrädor spikas eller skruvas fast. - Om det är stora mellanrum mellan brädorna på det gamla golvet, kan det vara en fördel att lägga det nya golvet vinkelrätt mot det gamla. - Om golvet är ojämnt skall det rätas upp, ev. genom spackling eller hyvlas plant. Ev. kan 19 mm golvspånskivor med not och fjäder monteras. - Kom ihåg: använd inte fuktspärr på befintligt trägolv eller annat organiskt material. - För stegljudsdämpning används filt som underlag. Vi rekommenderar Molatex / MolaSound. På betong och klinker: - Undergolvet skall vara helt plant (+/-2 mm med en 2 m rätskiva eller +/-0,6 mm med en 0,25 m rätskiva). Spackla ev. för att räta upp. - Heltäckningsmattor och liknande skall avlägsnas. - Lägg ut en fuktspärr (min 0,20 mm PE-folie) med min 15-20 cm överlappning. Tejpa skarvarna och dra upp fuktspärren 10-15 cm på väggarna. Molafilt / MolaSound, som är en kombinerad fuktspärr och filt är lämplig att använda. Kom ihåg beträffande golv som lägges flytande: - Undergolvet skall vara helt plant. Spackla ev. för att räta upp. - Golvet ska kunna röra sig, det får inte göras fast i underlaget. - Det skall vara min 10 mm springa mot väggar och fasta installationer. - Golvet får inte läggas under fasta skåp, braskamin, köksbänkar etc. - Golvet delas vid alla dörröppningar, ev med dilatationslist eller fog. - Stora golvytor skall delas med dilatationslist eller fog. (max 8 x 12 m. 12 m längs med brädorna). - Golvlister, trekantslister eller kvartsstav skall fästas i väggen. - Dörrstoppar o.d. som monteras ovanpå golvet, monteras så att de inte låser fast golvet. - Underlag över 2 mm ska ej användas. Behandling/underhåll/rengöring: - Efter läggningen bör golvet täckas, speciellt där ”byggtrafik” förekommer. Som täckningsmaterial rekommenderas kraftig Moland golvpapp 500 g/m². Täckningsmaterialet skall vara diffusionsöppet och får inte färga golvytan. OBS! Täckningsmaterialet får inte fästas med tejp mot golvet. - Se alltid till att slutbrukaren får underhållsvägledning. Bristande underhåll kan skada golvet. - Oljebehandlade golv, som utsätts för hög belastning (kök, kontor, offentliga lokaler etc.) bör ges en extra oljebehandling innan de tages i bruk. - För att skona trägolvet rekommenderas att använda möbeltassar under stols- och bordsben. Under kontorstolar med hjul bör en akrylskiva läggas. Kontorsstolar kan förses med speciella hjul avsedda för trägolv. Lägg torkmattor vid entreér och ingångspartier, för att skydda golvet mot fukt och smuts. I övrigt hänvisas till GBR:s läggningsanvisningar. Generella anvisningar: Om man väljer ett lack- eller oljebehandlat trägolv är beroende på individuell smak och inredning. Ett oljebehandlat trägolv framhäver träets naturliga färger och ådring ar, och det är lätt att göra små reparationer om olycken skulle vara framme. Även om Molans oljebehandlade golv levereras färdiga att tas i bruk, bör man räkna med att använda lite mer tid på underhåll i början, d.v.s. tvättning och underhållsoljering, för att uppnå en jämn och mättad yta. Trägolvet kan ha ett något ojämnt utseende, vad beträffar färg och glans, särskilt om det besiktigas i direkt motljus. Glans- och färgskillnader, som endast kan ses i motljus är inte reklamationsberättigade. Observera att det är stor skillnad på träsorternas egenskaper, och att trä alltid rör sig i förhållande till luftfuktigheten. Hygroskopiciteten är en del av träets naturliga egenskaper. Det innebär, att trä anpassar fuktinnehållet till omgivningen. Denna procedur betecknar man som att träet ”arbetar” (utvidgar och krymper). Vid en luftfuktighet över 65 % (på sommaren) eller under 35 % (under eldningssäsongen) kan parkettelementens dimension därför förändra sig synligt med kupning under sommaren och bredare fogar under eldningssäsongen. Både människans och trägolvets välbefinnande kräver ett sunt inneklimat med RF på ca 50 % (min 35 % och max 65 % under mycket korta perioder) och en rumstemperatur på ca 20°C. Om luftfuktigheten faller mycket under vinterhalvåret, rekommenderas att använda en elektrisk luftfuktare för att undvika uttorkning av trägolvet. Luftfuktaren skall användas från starten av vintersäsongen. Skaffa eventuellt en hygrometer. Läggningsanvisningen bygger på omfattande erfarenhet och är till för att vägleda dig på bästa sätt. För att minska risken för att fel uppstår, har vi också tagit med en del negativ information och försiktighetsåtgärder. Naturligtvis kan läggningsanvisningen inte ta upp alla möjliga nuvarande och framtida säregenheter, som kan hänföras till träets många egenskaper. Vi står självklart till förfogande, om tveksamheter uppstår. Vi påtar oss inte ansvar för läggningens resultat, då vi inte kan påverka korrektheten i arbetet. Du är välkommen att kontakta Molans representant om du har frågor.
© Copyright 2024