TM Our Company Orion Solar Racking specializes in Engineering, designing, development and Manufacturing of PV Mounting solutions. Since its foundation Orion has released a wide range of quality and innovative mounting systems. We provide roof mount; ground mount; Pole mount; single axis trackers; car-ports for Commercial, agriculture, industrial, government & educational as well as utility grade projects. Each and every day we endeavor to make simple yet innovative solar racking solution, Orion provides LIVE technical support for all of distributors, dealers and contractors. Here at OSR You can trust our knowledge of installation, code compliance and necessary technical documentation to always be above the rest. Online tools like our On-line calculator, installation videos and our In-House Research & Design teams are eager to help you solve your toughest Construction challenges. We now play a leading role in the solar industry and have a rapidly gained recognition amongst system integrators, installers and distributors across the world.. Mission Statement Our mission has always been to provide quality products and promote green renewable energy Solutions, that reduce our dependency on earth depleting methods that may contaminate our environment -Over 80% pre-assembled -Adjustable from 10-60 degrees of tilt -Simple yet innovative design -Compatible with most roofing materials -Commercial & residential solution -Code compliant (**Bolts, Washers, nuts and Legs all are set-in place) C US Mars Series Adjustable Tilt-Angle TM Handling & Installing Orion Solar Racking It is critically important to observe standard safety practices when installing Orion Solar Racking: Stop work during stormy weather. Solar modules can be blown in high winds Never step or sit on the glass surface of a solar module. The glass may break, resulting in shock or bodily injury Do not throw or roughly handle any Orion Solar Racking components Do not bring Orion Solar Racking into contact with sharp or heavy objects Do not modify Orion Solar Racking components in any way. The exchange of bolts, drilling of holes, bending and any other physical changes not intended in standard installation procedure will void the warranty Products should be installed and maintained by qualified personnel. Keep unauthorized personnel away from solar modules It is the installer’s responsibility to verify the integrity of the structure to which Orion Solar Racking is fixed. Roofs or structures with rotten/rusted bearers, undersized bearers, excessively spaced bearers or any other unsuitable substructure cannot be used with Orion Solar Racking Installation on such structures could result in death or serious injury and will void the warranty Rail Calculation & Design Rail Calculations based on code approved stress equations, and allowable margins of safety. Beam calculations have been conservatively performed under wind loads, snow, dead loads Components have had full envelope forces applied to each components from the standard tables. for more detailed information regarding our products and site specific data please visit our Website www.OrionRacking.com or give our customer service department a call to assist you with any documentation that might be necessary for submittal, or building permit applications. Features Aluminum 6005-T5 extrusion Suitable for buildings up to 30’ in height Suitable for roof slope range from 0° to 65° Static load capacity from 20 N to 1800 N Significantly higher strength-to-weight ratio than other framing products System comes 75% pre-assembled, saving time and labor cost System is fully adjustable from 5 Degrees of tilt to 60 Degrees Complies with ASCE 7-05 guidance for wind load design Before Installing CAUTION Installation team must read this Installation manual before attempting installation. Failure to correctly establish the requirements of the proposed installation site is dangerous and can also void the framing & Roofing warranty. 1 18 Index Tools Handling & installation 1 Rail Calculation 1 Features 1 Tools 2 Component List 3 Component List Continued 4 Module Planning & Assembly 5 System Layout 6 Rail Attachment 7 Integrated Grounding/End Clamp 8 Integrated Grounding Details 9 Integrated Grounding/Mid Clamp 10 Splicing Detail 11 SPlicing Kit 12 Front Leg Mounting 13 Rear Leg Mounting 14 Adjustable Legs 15 Span Chart 16 Index 17 17 6mm & 8mm Metric Allen Key/ 6mm & 8mm Hexagonal Driver Bit Chalk line Reel Construction Hard Hat Construction Gloves Measuring Tape Safety Harness Drill w/ 7/32 bit 2 Component List Span Chart Rail Mid Clamp Clear&Black Anodized OSR-R Clear&Black Anodized OSR-MC- Orion Solar Racking: EXP. B* Splice Bar Ground Lug Clear&Black Anodized OSR-SPL-B OSR-G-MGL Universal End Clamp End Clamp Clear&Black Anodized OSR-EC-UNV Clear&Black Anodized OSR-EC Grip Mid Clamp Grip End Clamp (optional) OSR-GMC (optional) OSR-GEC 3 Orion Solar Racking: EXP. C* 16 Adjustable legs Component List (Continued) Adjustable Rear Legs ** Front Adjustable Leg OSR-AT-FL 30 To 60 Degree OSR-AT-RL3060 1. 10 To 15 Degree OSR-AT-RL1015 15 To 30 Degree OSR-At-RL1530 Grounding Clip OSR-G-WEEB-OCR 30 To 60 Degree OSR-AT-RL3060 15 To 30 Degree OSR-AT-RL1530 2. ** Please note that we provide 3 different types of adjustable legs. Please see page 11 Bonding Jumper OSR-G-BJ 10 To 15 Degree OSR-AT-RL1015 3. Both WEEB clips and bonding jumper are used to create an electrical connection between two pieces of anodized aluminum which have been mechanically spliced 15 4 Planning Your Module Layout and Assembly Rear Leg Module Mounting 25% Recommended Span** 25% Inter row spacing will vary depending upon the Tilt angle of the array Rear leg can be adjusted to desired height to achieve correct tilt angle Rails must be set inside (as shown above) ** Must follow PV Module manufactures recommended span between Clamp attachment End Clamp Installation Mid Clamp Universal End-Clamp When calculating rail lengths add 1/2” inch per Mid-clamp and 2 1/2 “ inches per End-clamp. Maximum rail span between Rafters, standoff’s or attachment points with Orion standard rail is 4Ft to 6ft. if using Orion HD Rail, installer can span up to 8ft between Rafters, standoff’s or attachment points. Tilt in channel nut 5 Set channel nut Tighten Channel nut 14 Complete Front Leg Module Mounting Orion Mars Adjustable System Layout Find rafter or truss spacing, most common rafter or truss spans found are: 16” O.C. to 24” O.C. Mark the center of rafters and begin pre-drill pilot hole for the lag bolts, pilot holes must not exit the bottom of the rafter or truss. Set both legs to desired Tilt angle, by using an angle finder, straight edge or a string-line level Truss Spanner Tilt-in End clamp to front leg and fasten to PV Module and then proceed to install Mid-clamp and the next PV module keeping all edges A spanner can also be installed to provide an attachment point if truss or rafter cannot be found or is not suitable for installation. Orion Mars Adjustable L-Foot Installation End Clamp Installation Tilt in channel nut Set channel nut Tighten Channel nut 13 Complete 6 Rail Attachment Rail Splice Kit Rear leg assembly ge t gh tr Ed Use splice bars when expanding rail length ai S To splice Rails start by inserting splice bar kit into side channel Attach rails to front and rear legs Once rails are in place and fastened, installer can use a straight edge, PV module or piece of surplus rail to set a uniform tilt angle on both front and rear legs Tighten M8 Set-screws to 12 ft-lbs nominal torque Front leg assembly (As shown above) Splice Bar Front View Rail Rail Side View Rear Leg Adjustment Side View 1. Tilt in rail on side channel Front View 2. 3. Set channel nut 7 Once leg is adjusted to desired height set screw should be tightened and hex nut should also be tightened to lock set-screw in place Tighten channel Nut bolt 12 Orion Integrated Grounding w/End Splicing Detail Front View DETAIL VIEW SPLICING C A B ROUND MID CLAMP OSR-RAIL Step 1: Insert the Grip End Clamps, each consisting of (2) caps, (1) lock washer, (1) serrated washer, (1) hex bolt, and (1) channel nut into the rail (do not tighten the hex bolt, but provide 2 turns to ensure that the bolt stay in place Step 2: Set the PV panel at the end of the row in place, and Insert the end spacer (do not tighten the hex bolt of the grip end clamp.) A OSR-RAIL C B PBO-BST BALLASTED STRAP WEIGHT TRAY 11 DETAIL VIEW OF SPLICING Step 3: Tighten the hex bolt using 7/16” socket to 14.6 ft. lbs. Torque. (end spacers are available to match the correct PV frame thickness) 8 Orion Integrated Grounding w/Mid Integrated Grounding/Mid Grip Details Front View A B C Step 1: Insert the Grip Mid Clamps , each consisting of (1) cap, (1) lock washer, (1) serrated washer, (1) hex bolt, and (1) channel nut into the Rail that is holding an existing PV panel. (do not tighten the hex bolt, but provide 2 turns to ensure that the bolt stay in place) A Step 2: Set the PV panel parallel to the existing PV panel with the 2 grip mid clamps in between. (do not tighten the hex bolt of the grip mid clamp.) 6-10 AWG WIRE BARE COPPER GROUNDING WIRE OSR-SGC - GROUNDING CLIP BONDS THE GROUND WIRE TO THE RAIL/END MODULE OSR-GEC -END CLAMP C B Step 3: Tighten the hex bolt using 7/16” socket to 14.6 ft. lbs. Torque. SOLAR MODULE OSR-R-STD - ORION RAIL OSR-GMC - MID CLAMP MODULE TO MODULE BONDING 9 10
© Copyright 2024