IBJ elektronische Systeme Project : MSP-2100 FRM Name : Manual Container MSP-2100 Doc. Nr.: P-W-T-S-C-Container Manual 1_B.lwp Project: MSP-2100 FRM Name: Manual Container MSP-2100 Doc.-No.: P-W-T-S-C-Container Manual 1_B.lwp Abstract This document is the manual for the MSP-2100 container. It includes General Description Transportation Operation Electric Distribution . IBJ Elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk nach DIN 34 beachten / Copyright reserved Date : 22.03.2014 Issue : B Page 1 of 21 IBJ elektronische Systeme Project : MSP-2100 FRM Name : Manual Container MSP-2100 Doc. Nr.: P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue : B Page 2 of 21 Content 1. GENERAL DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1. OPERATOR CONSOLE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2. TRANSPORTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1. UNLOADING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2. LOADING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3. OPERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.1. LOCKING/UNLOCKING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.2. ANTENNA CONNECTION FIELD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.3. EXTERNAL LAMP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.4. FAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.5. INTERNAL LAMPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.6. WINDOW AND BLIND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.7. OPERATION MODE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.8. FURNITURE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.9. KITCHEN AREA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4. ELECTRICAL DISTRIBUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.1. EMERGENCY STOP . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IBJ Elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk nach DIN 34 beachten / Copyright reserved . . . Page 3 . . . Page 8 . . Page 10 . . Page 10 . . Page 11 .. .. .. .. .. .. .. .. .. .. Page 12 Page 12 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 18 . . Page 19 . . Page 20 IBJ elektronische Systeme Project : MSP-2100 FRM Name : Manual Container MSP-2100 Doc. Nr.: P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue : B Page 3 of 21 1. General Description A modified 20’ container with standard outer dimensions is used as control container for the pedestal. The container layout has been designed taking into consideration an optimised man-machine interface and the possibility for the operator to stay in the container for a complete day. The main differences to a standard 20’ container are described in the following sections. In order to provide maximum internal space and in order to avoid humidity problems, all walls are made from flat steel. This also allows for optimised thermal isolation. The door is at one small wall of the container. At this side the container wall is installed approx. 65cm from the end of the structure providing space for air-conditioning and ladder without increasing the outer dimension. Space for installation of a mast is provided (mast not included). A drawing of the container is contained on the next page. The internal layout including console layout has been ergonomically optimised. The container has a EMI protected door and a full size EMI protection window with external blinds (operated from inside), which allows direct view to the track mount. The window can be opened. The door and window are equipped with EMC attenuation material which has an attenuation of -30dB at 10GHz. Width Height Length Weight Construction Color Thermal isolation Air conditioning Power connection Power consumption Signal connection field Antenna connection field : 2438mm : 2591mm : 6058mm : Standard version <6to (3mm wall) : welded structure with flat walls and standard ISO corners 1 * EMI protected door 1 * EMI protected window with blind 1 * infrastructure area for installation of - air conditioning compressor - ladder to roof - space for installation of antenna mast (not provided) : high-quality acrylic paint combined with a multi-component foundation : provided : 4.7kW split inverter system : 1 * 3-phase 230V/50Hz 32A CEE connector : < 6kW : frame for installation of Weibel provided connector panel : 6 lightning protected RF feed-throughs, 1 plate for customer specific connectors etc. IBJ Elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk nach DIN 34 beachten / Copyright reserved IBJ elektronische Systeme Installed equipment Project : MSP-2100 FRM Name : Manual Container MSP-2100 Doc. Nr.: P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue : B Page 4 of 21 : - Power distribution with operation mode switch, over voltage protection, circuit breakers, fault current protector, emergency switch - Lighting with 2 switches and two lamps in ceiling - Kitchen area with fresh/waste water, refrigerator, coffee machine, microwave oven - Cupboard/wardrobe for storage of documentation Attention: Transportation by forklift is not allowed! Attention: Smooth handling (especially putting on ground by crane) is required. Shocks may damage internal equipment! IBJ Elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk nach DIN 34 beachten / Copyright reserved IBJ elektronische Systeme Project : MSP-2100 FRM Name : Manual Container MSP-2100 Doc. Nr.: P-W-T-S-C-Container Manual 1_B.lwp IBJ Elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk nach DIN 34 beachten / Copyright reserved Date : 22.03.2014 Issue : B Page 5 of 21 IBJ elektronische Systeme Project : MSP-2100 FRM Date : 22.03.2014 Name : Manual Real-Time Processing Container Issue : B Doc. Nr.: P-W-T-S-C-Container Manual 1_B.lwp Page 6 of 21 Layout Container MSP Weibel Heating Refrigerator Kitchen Airconditioning (Split) AC Compressor Space for Mast Cupboards Window with EMI protection - Documentation - Tools - Clothing - Stoware area for antennas IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved Control Console Kitchen Area Infrastructure Area - Monitors (PC and video) - Keypads (Track, Sensor) - Joytsick - Real-Time Processing Container - Video PCs - Radar RTP/PCs - Cupboards - Refrigerator - Sink with fresh- and wastewater - Microwave oven - Coffee machine - Entrance door with EMI protection - AC Compressor - Space for fix installed Antennas (GPS) - Ladder to roof - Installation area for mast (customer provided) - Stairs for installation on lorry Project : MSP-2100 FRM Date : 22.03.2014 Name : Manual Real-Time Processing Container Issue : B Doc. Nr.: P-W-T-S-C-Container Manual 1_B.lwp Page 7 of 21 IBJ IBJ elektronische Systeme elektronische Systeme DH-44S DH-44P Weibel Com Video-PC MFL (MPC) Dual C201 (DLM) 20" Video Monitor 2 (VM2) DVI DVI DVI 20" Track Monitor (TVM) Ethernet DVI DH-15S DH-15P Systembus C202 DH-44S DH-44P Weibel Com DVI DVI Ethernet DVI DVI Video out 1 Video out 2 DVI DH-15S DH-15P Systembus DE-9P DE-9S DVI DH-44S DH-44P Weibel Com Video-PC ACQ (APC) DVI Video out 3 Video out 4 DVI DVI Video-PC IR (IPC) DVI Ethernet C203/1m DVI MFLGigE from Weibel Comm System (copper) DH-15S DH-15P Systembus IR GigE from Weibel Comm System (copper) ACQ GigE from Weibel Comm System (copper) HSHR GigE from Weibel Comm System (copper) DH-44S DH-44P Weibel Com Synchronous Link Weibel RTP DVI Camera-PC HSHR (HPC) Ethernet DH-15S DH-15P Systembus C207 DE-9P DE-9P DE-9S CAN-Bus DE-9S CAN-Bus DE-9S DE-9P Crossbar DE-9P DE-9S CAN-Bus DE-9P FO SC Real-Time Processing Container (RTPC) +24V Power DE-9S CAN-Bus DE-9S DE-9P DE-9P DE-9S CAN-Bus CAN-Bus DE-9S DE-9P DE-9P DE-9S CAN-Bus C205 IRIG-B DC Code RS-422 from Weibel +24V Power C204/1m C204/1m CAN-Bus DE-9S DE-9P 1 * SM fiber to RTPM IRIG-B DC DH-15P DH-15S C206 IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Tracker Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22C204/1m Benutzungsrechtsverweis nach VG 95034 beachten Keypad (TKP) Schutzvermerk ISO16016 beachten / Copyright reserved Weibel CAN Bus 24V Power Supply Container IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 8 of 21 1.1. Operator Console The console is a modular implementation. All electronic components for real-time data processing, video processing and storage, data storage and all standard handling of the system are installed in a 19“ console, which is 3 * 19“ wide. This is a specially tailored console made from steel and painted RAL7035. IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 9 of 21 The Real-Time Processing Container (RTPC) is the central interface to the keypads. Furthermore it controls the Crossbar Switch (video) and converts the signals of the local CAN bus to a serial protocol for communication with the counter part Real-Time Processing Pedestal (RTPP), which is installed in the pedestal of the MSP-2100. This conversion is transparent and performs a synchronisation of the local CAN busses in the container and the pedestal. The RTPC is installed together with power supplies on the System Control Plate (SCP), which is installed in the rack behind the middle monitor. The CAN bus in the container is connecting the three keypads (Video, Sensor, Radar) with all Video PCs (APC, MPC, IPC, HSPC) and the CAN interface of the IC2100. The CAN bus in the MSP-2100 pedestal is used for communication with the HSHR telescope. The signals between the RTPC and RTPP are transmitted via a single mode fiber optical connection using a bi-directional link via a single fiber. For this purpose, a bi-directional FO converter with eight multiplexed in- and outputs is used for conversion of the electrical signals to fiber optical signals and vide versa. Presently only two channels are used for bi-directional CAN bus synchronisation and uni-directional transmission of IRIG-B DC code to the RTPP. IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 10 of 21 2. Transportation 2.1. Unloading Attention: Transportation by forklift is not allowed! Attention: Smooth handling (especially putting on ground by crane) is required. Shocks may damage internal equipment! The container can be lifted to a lorry by means of a crane. Crane lifting chains can be attached to the four upper ISO corners using shackles. The ladder allows for climbing on the roof of the container. The ladder has two parts, a larger part is continuously fixed at the container, the smaller part can be separated and can be used for reaching the fix installed part in case the container is on a lorry. A retractable handrail is installed. For preparation, the star knob at the bottom bracket needs to be unscrewed, turned clockwise until the rail is released and moved to the middle bracket. There it shall be moved into the bayonet slot, rotated to the left and screwed to fix connection. Now the handrail can be used for operator support during climbing onto the roof. After having finished the work on the roof, the handrail need to be brought into its lower position. Attention: Climbing onto the roof is only allowed with installed handrail! Attention: The roof of the container may be slippery! The operator needs to protect himself during attachment of the chains! Attention: The container need to be mounted on small wooden blocks on the ground in order to protect the flat bottom surface. IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 11 of 21 Attention: The container need to be levelled within ±1°. In case the tilting level is higher, water may drop out of the indoor air-conditioning unit into the console and may damage the electronic components. Four M12 threads are installed in the lower corners close to the ISO corners. These bolds can be used for attachment of grounding straps. One more M8 attachment thread for grounding straps is installed in the Power Connection Field. Attention: It is mandatory to connect grounding straps to at least one of the threads! The external 32A 400V 3-phase power supply is connected to the CEE connector at the Power Connection Field. The cover of the Power Connection Field is locked. The flap is spring loaded. Attention: The UPS in the rack is continuously supplied after connection of external power. This is required to allow for battery charging! Additional communication connectors will also be installed in this connection field. 2.2. Loading Attention: As a preparation for transportation all equipment inside the container need to be securely stored. This is especially necessary for chairs, kitchen equipment, folders, tools etc. The operation mode switch need to be in position „0“. Afterwards the CEE connector can be removed. Furthermore all external antennas, which are outside the 20’ dimensions need to be removed and safely stored. In the next step the handrail of the ladder need to be installed and the crane chains can be attached. IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 12 of 21 3. Operation 3.1. Locking/Unlocking The container is equipped with a door providing EMI reduction. Therefor this door has a special handle, which ensures the EMI reduction only in case the handle is rotated to the vertical position. This ensures sufficient contact between the container structure and the EMI sealing of the door. The installed lock allows unlocking from the inside even in case the door has been locked from outside. 3.2. Antenna Connection Field An antenna connection field is located behind the top part of the ladder. The connection field is covered with a spring loaded flap, that can be locked. Connectors with lightning protection are installed in the connection field. A round cover is installed above a hole. This hole can be used to feed special cables through the wall. IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 13 of 21 3.3. External Lamp A lamp with separate proximity sensor is installed at the stainless steel plate above the entrance door. This lamp is enabled with a switch located at the left wall inside the entrance door. IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 14 of 21 3.4. Fan A fan is installed at the right side wall when entering the container. The air exit is installed on the opposite wall behind the window. The air outlet can be closed by rotating the inner part. The fan is activated with a switch located at the left wall inside the entrance door. IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 15 of 21 3.5. Internal Lamps Two lamps are installed at the roof inside the container. One is located between the rack and the kitchen, the second is located in front of the rack. Switches for these lamps are located at the left wall inside the entrance door (not marked switches, see above) and on the right side of the window. IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 16 of 21 3.6. Window and Blind The container has electrically operated EMI reduction window and external blind in front of the window. Both are activated from a switch located at the right side of the window. As there is no interlocking between operation of the window and the blind, only a fix operation sequence is allowed: Attention: The window can only be opened in case the blind is fully open. The blind can only be closed in case the window is full closed. Incorrect sequence will damage the blind! Pressing the upper part of the switch will open the window/open the blind. The lower part will close the window/close the blind. IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 17 of 21 3.7. Operation Mode The system has a number of operation modes, which are controlled by a rotary switch located at the left wall inside the entrance door. This switch has the following settings: Mode 0: In this mode the following functions are enabled: Charging of UPS Internal and external lamps Refrigerator and water pump Blind and window Mode 1: In mode 1 the following functions are enabled: Fan Air conditioning Heating Mode 2: In mode 2 the following functions are enabled: All wall power outlets Mode 3: In mode 3 the following functions are enabled: UPS output resulting in activation of all electronic equipment IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 18 of 21 3.8. Furniture A number of furniture is installed at both small walls of the container. They all have doors and drawers, which can be locked during transportation. All doors and drawers are operated with a metal handle, which is normally inside the furniture. Pushing this handle extracts it and unlocks the door/drawer. Now the door/drawer can be operated with this handle. Attention: Do not forget to lock the doors/drawers before transportation of the container! 3.9. Kitchen Area A kitchen area is located besides the entrance door. A refrigerator is fix installed as part of this area. Furthermore a sink with a tap for fresh water is provided. The tap can be folded down. Opening the tap energises a small fresh water pump, which pumps water out of the fresh water canister below the sink. The waste water is flowing into the waste water canister. Both canisters can be easily removed. The right canister (blue cover) is used for fresh water, the canister with the yellow cap contains the waste water. Further equipment (microwave oven, coffee maker and boiler) can be connected to the power outlets in this are. This equipment need to be safely stored during container transportation! IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 19 of 21 4. Electrical Distribution The electrical Distribution is located in the wooden wall between the rack and the kitchen are. A number of combined RCD / fuses, relays, lamps and an over-voltage protection are installed. The RCD / fuses are as follows: F1 F2 F3 F4 F5 F6 F7 F8 Main input fuse UPS supply voltage Power outlets at wall (not kitchen) Power outlets (kitchen area) Heating Air conditioning, fan Blind, window, lamps, refrigerator, water pump Control voltage Three green lamps are indication the status if the three mains voltage phases. Furthermore a relay is installed for all operation modes. An over-voltage protection, designed for lightning protection, is installed. IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 20 of 21 4.1. Emergency Stop Two emergency stop buttons are installed, one at the top right side of the rack and one besides the entrance door. These switches disable all components which are active in operation modes 1 to 3. For activation the switch is pressed. It is released by rotating the know according to the printed arrow (clockwise). IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved 1 IBJ elektronische Systeme Project Name Doc. Nr. : MSP-2100 FRM 2 : Manual Real-Time Processing Container : P-W-T-S-C-Container Manual 1_B.lwp Date : 22.03.2014 Issue: B Page 21 of 21 3 4 A A B B C C D D 1 IBJ elektronische Systeme GmbH Schliemannstr.24 D-27749 Delmenhorst Telefon: +49 4221 9661 11 Telefax: +49 4221 9661 22 2 Benutzungsrechtsverweis nach VG 95034 beachten Schutzvermerk ISO16016 beachten / Copyright reserved 3 4
© Copyright 2024