BDR Thermea Supplier excellence manual 2 3 4 Andrew Vaughan - Group Procurement Director We recognise the importance of effective and open working relationships with our suppliers and are committed to building and developing these relationships. The supplier excellence manual helps support this collaborative approach which is crucial to maximising mutual benefits. Patrick van de Werdt – Group Quality Director BDR Thermea’s success is dependent on our ability to offer the highest value to our customers through quality, service and price. A close and professional working relationship with our supplier base is key, and helps to overcome challenges as we strive to lead the industry. Andrew Horton – Group Supply Chain Director As we look to achieve operational excellence by adopting lean principals, it is crucial that our suppliers are aligned with our vision. We recognise that we must work together with our suppliers during the continuous improvement journey. This supplier excellence manual is intended to support this collaborative approach which is vital in achieving our goals. 5 CONTENTS 1 Doing business with BDR Thermea 8 1.1 Purpose of this supplier manual 8 1.2 About BDR Thermea 8 1.3 Key roles and responsibilities BDR Thermea 9 1.4 Key roles and responsibilities supplier 9 1.5 L anguage 9 1.6 S ustainability 9 2 Supplier selection and management 10 2.1 P urpose and segmentation 10 2.2 D efinitions 11 2.3 Contracts and other agreements 12 2.4 Risk management 13 2.5 Supplier quality assessment 14 2.6 Corporate social responsibility 14 2.7 Supply chain 14 2.8 Information technology 15 2.9 P artnership 15 2.10 R &D 15 2.11 Commercial 15 3 Product qualification and release 6 16 3.1 New product creation process (NPCP) 16 3.2 Stage gates 17 3.3 Product qualification process 17 3.4 Production part approval process (PPAP) and submissions 18 3.5 PPAP level 18 3.6 Parts submission warrant (PSW) 18 3.7 Design legality 18 3.8 Declaration of performance document (DOP) 18 3.9 Timing and scope of the program 19 3.10 Advanced quality planning and PPAP deliverables 20 4 Lifecycle management 21 4.1 Logistics requirements 21 4.2 Delivery lead times 21 4.3 F actory gate collections 21 4.4 Waste 21 4.5 F orecasts 21 4.6 Call-off 21 4.7 Delivery notification 22 4.8 Packaging requirements 22 4.9 Service level 22 4.10 Returns of non-compliant goods and packaging 22 4.11 N on-conforming material 22 4.12 C hange management process 23 4.13 S upplier complaint handling 23 4.14 Traceability at supplier 24 4.15 Process audits 24 4.16 Quality management systems 24 4.17 Documentation and archiving 24 4.18 Spares requirements 24 5 Supplier evaluation 25 5.1 Overview 25 5.2 Vendor rating 25 5.3 KPI Calculation 26 5.4 Supplier relationship management (SRM) 26 6 Revision history 27 7 Addendum 1 - Cost breakdown template 28 8 Addendum 2 - Parts submission warrant 29 9 Addendum 3 – Product change request (PCR) 30 7 1. Doing business with BDR Thermea 1.1 Purpose of this supplier manual The purpose of this supplier manual is to clearly communicate to our suppliers the requirements for high quality components and assemblies which need to be delivered effectively to BDR Thermea and its subsidiaries. It will outline how we work together with our suppliers to reduce the total cost of supply and remove waste from the whole supply chain. We appreciate that suppliers are key to the success of BDR Thermea enabling delivery of high quality products to our customers. It is therefore important that we tell the supplier about our expectations so that we can both clearly identify opportunities for improvement and be able to effectively monitor improvements. BDR Thermea values long-term relationships with suppliers who achieve the required standards of quality, cost, delivery and continuous improvement. The intention is to achieve our zero defect target throughout the supply chain through cooperation based on partnership. We understand that our suppliers provide a diverse range of commodities which may have unique customer requirements. The processes and tools described in this manual represent the core BDR Thermea expectations and requirements. The differences suppliers may encounter across the BDR Thermea organisation will generally be minimal and driven by customer, product, and/or market specific requirements. 1.2 About BDR Thermea BDR Thermea owns some of the leading brands in the European market for heating products. These include De Dietrich, Baxi, Remeha, Brötje, Chappée and Baymak. The Group has a high market position in key European countries and strong positions in the rapidly growing markets of Eastern Europe, Turkey, Russia, North America and China. In total BDR Thermea operates in more than 70 countries worldwide. 8 1.3 Key roles and responsibilities BDR Thermea We understand that the way our individual businesses operate may differ slightly and in some cases have unique roles and responsibilities. However, the roles and responsibilities represented in this section represent the core of our business and the differences the supplier will see across our organisation will be minimal. Buyer The buyer is the primary contact for all purchasing-related issues. The supplier must inform the buyer of any issue that impacts delivery, or to request any changes. Commodity Manager Many of BDR Thermea’s suppliers are engaged with multiple BDR Thermea business units. The Group Commodity Manager is responsible for ensuring that there is one face to BDR Thermea and our suppliers’ actions support the global strategy through a consistent approach. 1.4 Key roles and responsibilities supplier Customer Representative The supplier will identify a contact within the supplier organisation to communicate with BDR Thermea. This customer representative is the primary contact within the supplier’s organisation for any key communications including any quality, delivery, or commercial issue resolution. 1.5 Language The language to be used for all communications between BDR Thermea and the supplier is English. 1.6 Sustainability BDR Thermea believes in a sustainable future based on developments that meet the needs of the present without affecting resources required for the future. We recognise and support all national and international environmental legislation and we believe we have a duty to pursue sustainable development in all we do. Protecting the environment for a sustainable future is important to BDR Thermea and is reflected in our innovative products and sustainable initiatives. We are focused on ensuring our supply chain correctly manages recycling, disposal, packaging and transport. We work with our partners to remove waste from our shared supply chain. Sustainable procurement policy This policy describes the framework within which BDR Thermea group companies’ procurement functions will conduct their activities in order to contribute towards our total sustainable objectives. Our sustainable procurement policy is available on the BDR Thermea website. Ethical sourcing code The principles of this code apply to all suppliers to the Group, but, within the EU, compliance will be defined as adherence to local legislative minimum standards. This code of practice is written specifically as a guide for supplying companies and factories based outside the EU. The ethical sourcing code is available on the BDR Thermea website. 9 2. Supplier selection and management 2.1 Purpose and segmentation BDR Thermea collaborates with suppliers that best support our business and who can deliver the required level of quality, cost, delivery performance and innovation. The diagram below reflects how we segment our supply base. We work in close collaboration with those suppliers we identify as partners, actively manage the supplier relationship with our supplier relationship management (SRM) suppliers at a Group level, those identified as preferred suppliers are eligible to be shortlisted to take part in the development of new products and vendor rating is carried out at local sites in a consistent way with a larger selection of important suppliers. 10 2.2 Definitions BDR Thermea is constantly striving to achieve the most relevant supply base and the pyramid below shows how suppliers are categorised to achieve this. Preferred supplier Supplier performance New supplier Specialist supplier Ac4vely eliminate Essen4al parts No new business To achieve preferred supplier status new suppliers are evaluated using our supplier selection criteria listed below. This ensures that suppliers are of a sufficiently high standard to supply consistent quality products on time at a competitive price and are also able to collaborate with BDR Thermea on new products and initiatives. Only suppliers that meet these criteria will be considered eligible to be selected for inclusion in our NPCP. The following table describes the evaluation criteria. Item Criteria Contracts Is a contract in place Risk BDR Thermea risk assessment score Dunn & Bradstreet risk rating Quality Supplier potential review score Quality performance (PPM) Warranty Performance (PPM) CSR CSR audit results (EcoVadis) Supply chain Delivery performance (on time in full) Supply methods (Kanban/VMI) Systems compatibility Supplier integration CAD/IT Supplier partnership Level of collaboration Supports multi sites Continual improvements R&D New development support Support future needs Commercial Provides open book costing NPCP target agreement Collaborate in VA/VE/product teardowns 11 2. Supplier selection and management 2.3 Contracts and other agreements Order of precedence The requirements within this document are intended to be a supplement, not a replacement for or altering of the terms or conditions within existing supply agreements, engineering drawings, or specifications. If conflicting interpretations of the standards arise, the following order of precedence applies unless agreed otherwise in our agreements: 1. Confidentiality agreements 2. Specification requirements 3. Supply agreements/contracts/trade products agreement 4. Terms and conditions 5. Design and development agreement 6. Service level agreement 7. BDR Thermea purchase orders 8. This supplier manual Explanation and use of agreements • Confidentiality agreements All suppliers to BDR Thermea must sign a non-disclosure agreement. It is our policy to use a BDR Thermea standard form that has been created for this purpose. The supplier shall not use, transmit or disclose confidential information to any third party except in accordance with the terms of the non-disclosure or any other written agreement. We value the relationship with our suppliers and therefore would like to protect it through the use of this formal agreement. The non-disclosure agreement can be found on the BDR Thermea website. • Specification requirements A drawing or technical/part specification created by BDR Thermea R&D and used to describe components or materials. A specification will contain the dimensions, functionality, quality requirements and other details necessary to manufacture reliable parts. • Supply agreements In addition to the requirements contained in this manual, we will determine if a supply agreement is required with the supplier. Once the need is determined based on risk and strategic benefit, it is expected that suppliers will work with BDR Thermea to put this agreement in place. Our supply agreement outlines our specific requirements for cost, quality, supply chain and other elements of our business relationship. The purpose is to outline the responsibilities of the two parties and the problem resolution process. 12 • Trade products agreement Occasionally we will buy in finished goods and services and brand them. If we do this we will want to agree on issues such as branding, contract period, exclusivity etc. • Design and development agreement We may want to design a new product or service in cooperation with our suppliers, and will require our chosen partners to agree to the process and project details including timescale, deliverables and IP ownership. We will do this under our design and development agreement. • Terms and conditions (available on the BDR Thermea website) Our general terms and conditions. • Service level agreements Our specific logistics requirements pertaining to individual sites • BDR Thermea purchase orders An order raised by a manufacturing site to authorise the manufacture of products. This is normally preceded by a supply agreement which sets out the working arrangements. The order may be for an open quantity to cover such parts as we wish to order or it may be for a specific quantity. • This supplier manual 2.4 Risk management Business continuity As a supplier to our business we require the supplier to have a formal business continuity/disaster recovery plan in place to ensure no interruption in supply to our production line. We understand that contingency plans cannot be developed for all possible scenarios, but we do expect the supplier to maintain robust plans to enable a rapid resolution in the event of disruptions. We need the supplier to have a crisis management approach to deal with potential disruptions. The approach should include action and communication plans, activity checklists, escalation procedures, and the organization of teams, roles, and responsibilities. This plan should address the recovery time needed for a variety of business interruptions, contact information for key locations, supply chain assessment of risk to our products and/or services provided. 13 2. Supplier selection and management 2.5 Supplier quality assessment Supplier potential review The supplier assessment process is designed to get an insight into a supplier’s ability to meet our quality, delivery and cost requirements during the creation and realisation of products and services. An audit of the main suppliers process, the supplier potential review, is part of the process and will focus on :• Product development process • Product realisation process • Management process • Customer satisfaction • Change management The supplier potential review score will result in a final rating of A to D. Rating Requirements A. Quality capable / no action plan required Potential score > 85% and all individual elements score a minimum of 71% B. Partially quality capable / action plan voluntary Potential score > 71% ~ 84% or score > 85% with elements < 70% C. Potentially quality incapable / action plan mandatory Potential score > 60% ~ 70% D. Not quality capable / supplier is non-preferred Potential score < 59% or one or more elements score < 59% 2.6 Corporate social responsibility Our suppliers must meet our minimum standards of CSR and must achieve our minimum required standard using the EcoVadis sustainable supply management online audit. See http://www.ecovadis.com and also comply with our Ethical Sourcing Code GPP.01.003 available to download on the BDR Thermea website. 2.7 Supply chain Suppliers must deliver on time and in full. BDR Thermea has appointed a fourth party logistics provider who organises all collections and deliveries to BDR Thermea sites and suppliers must follow the required process. 2.8 Information technology Our minimum compatible CAD file type that suppliers should be able to output is a neutral format IGES file and suppliers must have the ability to communicate electronically. If required electronic consolidated invoices, delivery information and other two way data sharing using EDI and other data transmission methods will be used. 14 2.9 Partnership • Collaboration Suppliers should consider BDR Thermea as the customer of choice and will allocate resources to BDR Thermea first and be prepared to share intellectual property for our mutual benefit. Suppliers must be prepared to integrate with project teams and potentially other suppliers in the BDR Thermea NPCP and join quality improvement teams as well as providing market intelligence and assistance with the sales and marketing of products. • Support Our suppliers should support us with a high level of commitment in providing a timely service. Communication is essential so any situation can be jointly managed at the earliest point to minimise adverse effect. Rapid response to enquiries for new products, changes in specification or other communications should be dealt with in a positive way. When a problem occurs the supplier should be prepared to own and positively resolve it in a timely and effective way. • Continuous improvement Suppliers should be prepared to integrate with BDR Thermea and may be asked to participate in the BDR Thermea procurement excellence - vendor rating and SRM programme. 2.10 R&D BDR Thermea would like suppliers to have an open dialogue to present on-going development strategies and interesting new technologies for products and processes which can be shared with senior management both at the supplier and/or BDR Thermea. BDR Thermea would also like to work with suppliers so that specifications are developed to remove transactional costs through investment in equipment and processes and to quickly and effectively overcome technical challenges during the design process to achieve reliable, affordable and cost effective components. Suppliers to BDR Thermea should be capable of supporting the BDR Thermea product road-map and allocate sufficient resources to product development projects which may include providing development resource, embedded team members or expertise to support BDR Thermea in achieving reliable specifications, the correct total cost outcome and on time project completion. 2.11 Commercial • Open book costing We want to work with suppliers to reduce the total cost of the parts we purchase and cost breakdowns enable us to understand the elements of total cost and enable us to work with suppliers in reducing this. Cost breakdowns should be on the BDR Thermea cost breakdown template. • NPCP target agreement Suppliers should be willing and able to work with target costing agreements to achieve the correct product cost. • VA/VE Value analysis/value engineering is a technique used in BDR Thermea to remove unnecessary product cost. Suppliers should be willing to collaborate with VA/VE cost down initiatives which could include product teardowns and deliver cost saving ideas to improve competitiveness. 15 3. Product Qualification and Release 3.1 New product creation process (NPCP) Introduction It is our expectation that our suppliers actively participate in our NPCP. It is essential that we work together to understand requirements, design for manufacture, design robust processes where capabilities are understood and effectively controlled so that together we will deliver a cost effective and reliable solution. We want our suppliers to actively participate in the entire process, be open to changes and look for ways to continuously improve in all aspects of the product and processes. BDR suppliers should be familiar with the NPCP concepts: 16 3.2 Stage gates Introduction Stage reviews between stages of a project are described as process stage gates and the structure of each stage gate is similar. A decision to progress the project is judged by a measurement of the quality of the pre-determined stage deliverables against set criteria. Criteria are what the project is judged against in order to make the go/kill decisions. These criteria should be agreed prior to the stage gate review meeting. Criteria should contain both financial and qualitative criteria but change from gate to gate. 3.3 Product qualification process The BDR Thermea product and qualification process involves the advanced quality planning (AQP) process and the production part approval process (PPAP). These are structured methods to define the steps necessary to assure all manufactured parts always meet the customer requirements. These steps are standardised and defined in 15 quality planning requirements, the 15 PPAP elements. These 15 PPAP elements shall be worked out during the different phases of the project. 17 3. Product qualification and release 3.4 PPAP and submissions The following circumstances shall require a part approval submission: • New product/routine re-submissions • Engineering changes • Tooling transfer, replacement or refurbishment • Correction of a discrepancy • Changes to optional construction or material • Sub-supplier or material source change • Parts produced at additional location or original location has changed • Process change This list is not exhaustive and all changes must be communicated to BDR Thermea supplier quality assurance (SQA). The BDR Thermea PPAP checklist should be used to track and report PPAP progress. 3.5 PPAP Level PPAP submission levels will be defined as part of the BDR Thermea Advanced Quality Planning Process system. Unless otherwise advised by BDR Thermea SQA, the PPAP will default to level 3. Level requirements are in-line with the automotive Industry. 3.6 Parts submission warrant (PSW) The parts submission warrant (PSW) shall have all the relevant sections completed and clearly identify the engineering drawing change revision level and part specification approval. 3.7 Design legality Where specified the design of the device must meet relevant international standards and regulations. The supplier shall therefore perform all the required actions to obtain the related approvals and provide all the test reports or any needed information to allow the customer to demonstrate the compliance on request of any local authority. Where a specific country of manufacture or sale is specified by the customer it is the responsibility of the supplier to identify all relevant standards and ensure product design of the device is compliant therewith. 3.8 Declaration of performance document (DOP) The supplier must be compliant with the DOP. The DOP is the key concept in the construction products regulation (CPR). The DOP gives the manufacturer the opportunity to deliver the information about the essential characteristics of the product he wants to deliver to the market. The manufacturer shall draw up a DOP when a product covered by a harmonised standard (hEN) or a European technical assessment (ETA) is placed on the market. 18 3.9 Timing and scope of the programme At BDR Thermea, projects are carried out according to the NPCP. In the NPCP nine stage gates are defined. According to supplied parts the key deliverables for the supplier are shown in key deliverables supplier. The BDR Thermea AQP shall be matching with these stage gates and shall be part of the project planning of the supplier. IMAGE The scope of the BDR Thermea AQP, in other words the scope of applicable PPAP requirements, depends on the type and complexity of the part. The scope will be mentioned in the request for quotation (RFQ) and will be identified and communicated on the PSW which will be submitted by BDR Thermea at the start of the project. 19 3. Product qualification and release 3.10 Advanced quality planning and PPAP deliverables BDR Thermea will review the status of the PPAP file at the different stage gates. The PPAP requirements shall either be submitted to BDR Thermea or reviewed by BDR Thermea at the location of the supplier. Beside the PSW for series validation at stage gate 6, BDR Thermea will define a PSW for sample delivery at each stage gate. On this PSW the applicable stage gate is mentioned and the requested PPAP requirements are marked with an S (submitted to BDR Thermea) or an R (required and to be reviewed at BDR Thermea) IMAGE 20 4. Lifecycle management 4.1 Logistics requirements Our basic logistics requirements are flexibility, good communication and the ability to supply to our manufacturing sites on a next day just in sequence basis. Any agreement detailing how this will be achieved will be recorded in a BDR Thermea multi site agreement. If there are circumstances where an individual country has exceptional requirements, they can be found in the local logistics “service level agreements” (SLAs). 4.2 Delivery lead times BDR Thermea embraces the principle of lean supply and requires suppliers to commit to and adopt the same philosophy. Suppliers will be required to be able to offer and maintain lead times in keeping with lean supply chain (ie Kanban or Just in Sequence (JIS)) using logistics arrangements, relocation, local stock or other techniques. 4.3 Factory gate collections BDR Thermea uses a nominated logistic provider to organise all collections of goods from suppliers’ premises and to deliver goods to BDR Thermea production facilities. Suppliers should comply with the processes employed by the nominated carrier in order to achieve agreed lead times. The logistic provider will measure supplier compliance with requested lead times and quantities and report them to BDR Thermea. 4.4 Waste We strive to remove waste throughout the supply chain and therefore we require our suppliers to embrace lean techniques such as value stream mapping and process capability and work together with BDR Thermea and our customers to make materials flow effectively. 4.5 Forecasts BDR Thermea will provide a forecast of our requirements in order to help suppliers plan the demand of BDR Thermea in their facilities. It is the supplier’s responsibility to monitor this information along with actual usage and, to the fullest extent possible, adjust its capacity and processes to accommodate any indicated changes in demand. Any large variances should be checked and confirmed with BDR Thermea purchasing department. 4.6 Call-off Suppliers should use lean principles to enable supply to BDR Thermea with a maximum of one day’s stock being held at BDR Thermea. The supply methods, delivery point, packaging and other details should be in line with the BDR Thermea standard methods as defined in the BDR Thermea logistics SLA. BDR Thermea will give advance notice of delivery requirements. Where it is agreed that suppliers are supporting a lean manufacturing processes this will be a maximum of one day in advance. If a supplier is unable to adhere to any delivery requirements notification is required immediately and the consequences and remedies can be agreed. Parts delivered which are not in accordance with any delivery request will be rejected. In the event of a late or incorrect delivery or other failure, we will require a full investigation and corrective actions to ensure the standards we require are met in full. 21 4. Lifecycle management 4.7 Delivery notification A detailed delivery note is required. If agreed this may be in electronic form and be input directly to the BDR Thermea ERP system. Any outer packaging containing a delivery note must be marked accordingly. 4.8 Packaging requirements Packaging should be as detailed in the BDR Thermea labelling and packaging service level agreement. 4.9 Service level Deliveries should be on time and in full. Compliance with this requirement will be measured and communicated to key suppliers each month. Any site specific requirements are available from the specific BDR Thermea site logistics team. • Baxi Commercial • Baxi Spain • Heatrae Sadia • Baymak • Baxi UK • Remeha • Chappée • Brötje • SenerTec • Baxi Italy • De Dietrich • Sofath Site contact details are listed on the BDR Thermea website. 4.10 Returns of non-compliant goods and packaging This will be managed through our fourth party logistics provider at the supplier’s cost. 4.11 Non-conforming material Notification of nonconforming material - customer Suppliers must notify BDR Thermea of nonconforming or suspect material immediately, whether they are may be in transit or already delivered. This action is required by BDR Thermea to reduce the impact of a quality incident. Communications must be directed to the BDR Thermea site that receives the goods, and to the commodity manager and local buyers. Containment of nonconforming material at the supplier facility Suppliers must contain any nonconforming or suspect parts immediately to minimise the impact on BDR Thermea production and shall implement 100% off-line inspection of suspect parts. Records of nonconforming material and customer notification shall be kept per quality system requirements and made available if requested by BDR Thermea supply chain management and/or the receiving BDR Thermea site. 22 Deviation request Suppliers must quarantine nonconforming, suspect, or unapproved material and may be granted a concession in order to continue shipments. A request to be granted a concession should be directed to the receiving BDR Thermea site and copied to the commodity manager and buyer. BDR Thermea will evaluate any risks in using nonconforming material and any impact on production schedules and customer deliveries prior to approval being given. Material must not be delivered under concession unless written approved is given by the receiving BDR Thermea site. Concessions will be for a specific quantity or time period which will be determined by the receiving BDR Thermea site. Should a concession be granted and parts shipped to BDR Thermea, these parts must be labelled on all four sides of the packaging. If necessary a receiving site could request additional labelling at the supplier’s expense. 4.12 Change management process Suppliers shall request in writing, approval from BDR Thermea for ALL changes prior to their implementation by means of a product change request (PCR). This includes, but is not limited to, changes in supplier(s) of raw materials, packaging, package size, product name, product specification or dimensions, manufacturing location, process conditions, manufacturing equipment, raw materials or sub-components. Requests for changes shall be submitted using a BDR Thermea PCR form shown and sent to the local commodity manager and the buyer. Change requests to BDR Thermea are only considered to be received when the requesting supplier receives a confirmation back from BDR Thermea after submitting the PCR. A request and an acknowledgement is not a guarantee that approval will be granted. When the request is reviewed the supplier will be notified: • if the request is rejected, • if a PPAP should be submitted for the change • or if a waiver of PPAP is approved. BDR Thermea reserves the right to determine the timeline for change implementations. No change will be allowed without prior written approval from the receiving BDR Thermea site. BDR Thermea may require test samples for plant trial run requirements. All suppliers are expected to notify BDR Thermea when a change in the management structure and/or ownership of the organisation occurs. 4.13 Supplier complaint handling BDR Thermea has implemented a uniform complaint handling system. A complaint notification is documented by BDR Thermea when a complaint occurs and the complaint handling form should be available from the affected BDR Thermea site. Suppliers are expected to use structured problem solving techniques such as 8D or 5-why, to generate a timely response with corrective actions that permanently eliminate the root cause of the defect (see structured problem solving section). Responses are expected in common electronic format (e.g. MS Word, MS Excel) and should be submitted via e-mail. 23 4. Lifecycle management Structured problem solving Suppliers to BDR Thermea are expected to implement and support a system of structured problem solving. Suppliers are welcome to use their own systems or the BDR Thermea system as long as a cross-functional team is able to identify the root cause of a problem and implement permanent corrective actions. The root cause definition should include the process root cause (how did the manufacturing process fail), the system root cause (how did the quality system fail) and the detection root cause (why was the non-conformance not discovered). Suppliers should evaluate the effectiveness of the corrective actions for long-term system support within their company. 4.14 Traceability at supplier Suppliers will ensure, by identification of the parts, or if this is not possible then by other suitable means, that if defects are detected in a product, it can immediately be established which other products could be affected. BDR Thermea should not be obliged to accept any products that are not adequately marked and shall be entitled to return them to the supplier at the supplier’s expense. Tracing must be designed in such a way that parts have traceable delivery data back to the original workstation and also to the sub-suppliers level. 4.15 Process audits BDR Thermea conducts process audits of Tier 1 and 2 suppliers if one or more of the following events occur:• Product change • Process change • Supplier evaluation • Material change • Sub supplier change • Complaints The extent of the audit is based on the VDA 6.3 standard as defined by the German association of the automotive industry. 4.16 Quality management systems It is our minimum requirement that our suppliers are certified to ISO 9001 or equal. If a supplier quality system certification is suspended, placed on probation, expired, receives any major non-conforming compliance or a warning letter from ISO notified bodies then the supplier must let us know within five days of this occurring. New quality system certification is required by BDR Thermea if the old one becomes invalid, for example under mergers, acquisitions etc. 4.17 Documentation and archiving Suppliers must archive all resulting quality data for a period of at least 10 years. 4.18 Spares requirements The supplier should supply and maintain availability of spare parts for a minimum of 15 years after the cessation of serial supply. 24 5. Supplier evaluation 5.1 Overview The following diagram describes the supplier management processes of vendor rating and SRM: IMAGE 5.2 Vendor rating BDR Thermea will measure supplier performance and report the results on a monthly basis to top suppliers. Elements of measurement Quality Line PPM Field PPM Response to quality issues Number of corrective action reports per month Logistics OTIF Supply chain flexibility/communication NPCP Support and achieve targets Commercial Commercial performance and MPV • MPV – Price variance against budgeted standard price. • OTIF – Delivery on time in full • PPM – Parts per million rejects Evaluation will be against our specific requirements as detailed in a multi-site agreement. 25 5. Supplier evaluation 5.3 KPI Calculation OTIF = On time in full calculation Sum of all correct lines Coverage (12mth) Stock (Average last 12mth) x 100 Sum of All lines the OTIF was calculated for x 30 days Consumption (Average last 12mth) PPM Quantity Rejected x 1,000,000 Quantity Receipts 5.4 Supplier relationship management Purpose To identify those suppliers which are strategically important and provide a methodical process for supplier performance improvement in key areas and identify areas of value which are available to be exploited to improve profit and customer satisfaction. To formalise the SRM process such that Group companies adopt a common approach when using the Group SRM process. BDR Thermea has multiple sites and may receive varying levels of service. The focus of SRM is: • to develop mutually beneficial relationships with strategic supply partners • to deliver greater levels of innovation and competitive advantage than could be achieved by operating independently or through a traditional, transactional purchasing arrangement To be eligible to take part in our SRM programme a supplier should: • Deliver in the top section of criticality and value • Deliver strategically important components • Be open to work in mutually beneficial cooperation. BDR Thermea uses a supplier scorecard to rate suppliers for strategic meetings. • Strategic meetings are usually held once or twice a year to discuss the results and improve collaboration between us. These should be supported at a high level by the supplier. 26 6. Revision history This table shows the date and responsible person for each revision to the supplier excellence manual. Revision number Issue number Date Responsible Revision 1 First Issue 29th Jan 2014 T. Tilford 27 7. Addendum 1 - Cost breakdown template QUOTATION ANALYSIS FORM Summary CONFIDENTIAL Supplier: BT 03/01/01 quote_anal1.xls Date: QAF Ref. No. of QAF Sheet: Code: Part No.: 1 1. Procured Parts Desc.: Issue/Release No: Model / Type: (from sheet 2) Volume: 0 Sub Total (1) = B.O.P. Scrap Value = 0 2. Raw Material MPE Ex. UOM Gross Net Price/ Scrap Re- Mat, O/H Unit Desc./Type/Size/Grade/Supplier Y/N Rate (e.g. Kg) Usage Usage UOM (%) claim % Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 "2.0 Raw Material Analysis" QAF - Yes/No 3. Process Costs Working Op. Operation/facility/machine-size Hrs/Wk TROLLEY SYSTEM Sub Total (2) = Mat. Scrap Value = 37.5 Heads C/Time Dir. Lab. Soc. O/H Res. O/H No./Hr. Rate/Hr. Rate/Hr. 1 80 9 Rate/Hr. 8.3 0.000 Tot Lab. M/C M/C Scrap Unit Cost Rate/Hr. Cost % Cost 0.21625 0 0 0.00% 0.21625 0 0 0 0 0 0 0 0 0 Process Scrap Value = "3.0 Process Cost Analysis" QAF - Yes/No Assumptions: Sub Total (3) = TOTAL MANUFACTURING COST 0.21625 (1) + (2) + (3) 4. Other Costs calculation: 0.21625 "4.0 O/Head Analysis" QAF - Yes/No General Overheads Design & Development Other Costs (PL specify) 5. Tooling Costs Tooling Amortisation (if applicable) 28 Production Location: TOTAL PART COST Working Days/Year: (1) + (2) + (3) + (4) + (5) Component Weight: 6. Logistics Costs Del. Quality (ppm): Transport Inco & Duty: Packaging Quoted Currency: Pallet Amortisation/Maintenance Exchange Rate: GDA Pallet cost = Signed Supplier: TOTAL OFFER PRICE Date: (1) + (2) + (3) + (4) + (5) + (6) from Sheet (2) Sub Total (4) = 0 Sub Total = 0 Sub Total (5) = 0.21625 "6.0 Logistics" QAF - Yes/No Sub Total (6) = 0 0.21625 8. Addendum 2 - Parts submission warrant Company LOGO here Part Submission Warrant Submission Number: PART INFORMATION Part Name Part Number Engineering Drawing No Issue Level SUPPLIER INFORMATION CUSTOMER INFORMATION Company Name Customer Name / Division Contact Name Buyer Address Address REASON FOR SUBMISSION New Submission Dated SQE Re-submission Initial Submission Sub-Supplier or Material source change Engineering change(s) Change in part processing Tooling transfer, replacement or refurbishment. Parts produced at additional location Tooling change or correction Other - please specify below Material Change Additional Comments : SUBMISSION REQUIREMENTS (to be agreed in advance between Supplier & BDR Thermea: A=Applicable, S=Submit) Quantity Sample Parts are required with this submission Required Result Required Result 1 Customer Inputs / Drawing / Design Records 9 Packaging Specifications 2 Design FMEA 10 Measurement System Analysis 3 Part Function / Reliability Test Plan & Results 11 Dimensional Report 4 Material Property / Composition Data Sheets 12 Appearance Approval Report 5 Material Safety / Environment Data Sheets 13 Master / Boundary Samples 6 Process Flow Chart 14 Process Capability Studies 7 Process FMEA 15 Production Process Review 8 Control Plan Additional Comments : SUPPLIER DECLARATION (to be completed and signed by the Supplier before sending sample parts or documentation) YES These results meet all drawing and specification requirements: NO (explain below) Explanation / Comments : I affirm that the samples represented by this warrant are: i. Representative of our parts. ii. Have been made to the applicable customer drawings and specifications from specified materials. iii. Parts have been made using regular production tooling with no operations other than the regular production process. iv. I certify that documented evidence of such compliance is on file and available for review. v. I agree to inform the customer SQE / Buyer of any further changes to this part as could be described in "Reason For Submission" section above. Name Title Supplier Authorised Signature Date Phone No CUSTOMER APPROVAL APPROVED INTERIM APPROVED NOT APPROVED Re-submission Date : Additional Comments : Name Doc.Nr: xx.xx.xx Released: 24.04.2012 Signature Part Submission Warrant Date Template owner: P.vd.Werdt BDR Thermea Group BV 29 9. Addendum 3 - Product change request (PCR) PRODUCT CHANGE REQUEST (sheet 1) Requested By : (Company/name) PRODUCT TYPE AFFECTED: (Please type Y in appropriate box) Department: Date Requested: 15/02/2014 Requested Target Date for Implementation : Apr-14 Project Number WHB FSB BBU Commercial Boiler Heating Box mCHP SOLAR EWH Biomass Other Quality issue Manufac. efficiency Cost Saving Health & Safety Component Standardiz. Logistic aspect Standard variation Document. update Market need VAVE Design authority : (Please type Y in appropriate box) Bassano Preston Barcelona Le Blanc Mesnil Rastede Apeldoorn Mertzwiller HSH Market : (Please type Y in appropriate box) UK IT FR SP East Europe USA/CA China South America Germany Russia ECR TYPE: (Please type Y in appropriate box only) WHAT IS THE CHANGE PROPOSAL: WHY IS THE CHANGE REQUIRED: AFFECTED PRODUCTS / ITEMS : PRODUCT DESCRIPTION TOP LEVEL PRODUCT CODE NUMBER Position Approvers "Concept" NAME Group Approvers List ITEM DESCRIPTION AFFECTED ITEM NUMBER DATE Requesting Buyer Group Comodity Manager R+D Competence Center Manager Local Procurement Manager Approvers "in Progress" Group Procurement Projects Manager Group Category Director Group Quality Director Group R&D Director Group Procurement Director Issue1 23/04/2014 30 31 Glossary Term Issue number Responsible 5-whys 5 Why’s An iterative question-asking technique used to explore the cause-and-effect relationships underlying a particular problem. 8D Eight Disciplines Eight Disciplines Problem Solving is a method used to approach and to resolve problems, typically employed by quality engineers or other professionals. AQP Advanced Quality Planning Framework of procedures and techniques used to develop products in industry. BBU Back Boiler Unit BDR Thermea Product. CAD Computer Aided Design The use of computer systems to assist in the creation, modification, analysis, or optimization of a design. CPR Construction Products Regulation European Union (EU) regulation harmonising performance information on construction products across the EU. CSR Corporate Social Responsibility CSR is a process with the aim to embrace responsibility for the company’s actions and encourage a positive impact through its activities on the environment, consumers, employees, communities, and all stakeholders. DFMEA Design Failure Mode Effects Analysis Design Failure Mode and Effects Analysis (DFMEA) is used to uncover design risk, which includes possible failure, degradation of performance and potential hazards. DOP Declaration of Performance Gives the manufacturer the opportunity to deliver the information about the essential characteristics of the product. EDI Electronic Data Interchange Electronic communication system that provides standards for exchanging data via any electronic means. ERP Enterprise Resource Planning Enterprise resource planning is a business management software—usually a suite of integrated applications—that a company can use to collect, store information. ETA European Technical Assessment An ETA is an approval based on testing carried out to agreed European levels. EWH Electric Water Heaters BDR Thermea Product. FMEA Failure Mode Effects Analysis FMEA activity helps to identify potential failure modes based on experience with similar products and processes - or based on common physics of failure logic. It is widely used in development and manufacturing industries in various phases of the product life cycle. Effects analysis refers to studying the consequences of those failures on different system levels. 32 FOT First Out of Tool First set of samples. FSB Floor Standing Boilers BDR Thermea Product. HEN Harmonised Standard Harmonised European Standards provide a basis for manufacturers for testing the performance of their products. Using these standards the manufacturer will be in position to make the declaration of performance (DoP) of his product as defined in the Construction Products Regulation (CPR) and to affix the CE marking. IGES Initial Graphics A file format which defines a vendor neutral data format that allows the Exchange Specification digital exchange of information among Computer aided design (CAD) systems. JIS Just In Sequence Just in sequence is an inventory strategy that matches just in time (JIT) and complete fit in sequence with variation of assembly line production. Components and parts arrive at a production line right in time as scheduled before they get assembled. Term Issue number Responsible Kanban Japanese word for Signboard or Billboard Scheduling system for lean and just-in-time (JIT) production. MCHP Micro Combined Heat and Power A micro-CHP system is a small heat engine (power plant) which provides all the power for an individual building; heating, ventilation, and air conditioning, mechanical energy and electric power. MPV Material Price Variance The difference between standard cost and current cost. MSA Measurement System Analyses Purpose of MSA is to have measurement systems where the readings can be replicated on each part. NPCP New Product Creation Process The complete process of bringing a new product to market. OTIF On Time In Full Delivery of all lines of an order at the correct time and in the correct quantity and quality. PCR Product Change Request Document containing a call for an adjustment of a system; it is of great importance in the change management process. PFMEA Process Failure Mode Effects Analysis A Process Failure Mode Effects Analysis (PFMEA) is a structured analytical tool used by an organization to identify and evaluate the potential failures of a process. PPAP Production Part Approval Process Used for establishing confidence in component suppliers and their production processes, by means of demonstrating that all customer engineering design record and specification requirements are properly understood by the supplier and the process has the potential to produce product consistently meeting these requirements during an actual production run at the quoted production rate. PPM Parts Per Million Calculated as the quantity that would be rejected if a million parts were supplied. PSW Part Submission Warrant Summary of the PPAP documents. Approval indicates that the customer has not identified any issues with a new part. RFQ Request For Quotation Invite to suppliers to participate in a bidding process to bid on specific products or services. SG Stage Gate Stage-Gate divides the effort into distinct stages separated by management decision gates. SLA Service Level Agreement An SLA is a definition of services, performance measurement, problem management, customer duties, warranties, disaster recovery, termination of agreement. SQA Supplier Quality Assurance SQA Engineers are responsible for all aspects of the quality of purchased parts. SRM Supplier Relationship Management Comprehensive approach to managing an enterprise’s interactions with suppliers. The goal is to streamline and make more effective the processes between BDR Thermea suppliers. VA/VE Value Analysis / Value Engineering Value Analysis is analyzing and understanding details of a situation. Value Engineering helps in identifying specific solutions to these detailed problems. VMI Vendor Managed Inventory The supplier takes full responsibility for maintaining an agreed inventory of the material. WHB Wall Hung Boilers BDR Thermea Product. 33
© Copyright 2024