Document 317302

Request for Qualified DVBE Subcontractors and/or Suppliers for the following:
M A R V I S TA H I G H S C H O O L - D E F E R R E D E L E C T R I C A L
M A I N T E N A N C E ( G R O U N D I N G ) , C H U L A V I S TA , C A
PROJECT NO. 45-2452-LC
B I D D AT E / T I M E : O C T O B E R 2 1 , 2 0 1 4 - 1 0 : 0 0 A . M .
Please respond by: October 14, 2014
OWNER: STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
#07-2W5404 - FOR BUILDING CONSTRUCTION IN KERN COUNTY IN LEBEC AT
THE LEBEC MAINTENANCE STATION AT 1586 LEBEC SERVICE ROAD, LEBEC, CA
BID DATE: OCTOBER 15, 2014 @ 2:00 P.M.
DVBE FIRMS & SUPPLIERS
BOWE CONTRACTORS INC., PHONE: 661-940-0899/FAX: 661-940-8198
Request for qualified Disabled Veteran Business Enterprises (DVBE)
Subcontractors/Suppliers required for: Abatement, Demo, Concrete Supplier,
Switchboard and Panelboard Suppliers.
Work Categories Bidding but not limited to: DEMOLITION, CMU, REINFORCING STEEL, ROOFING,
WOOD TRUSSES, GRADING, HVAC, ROLL UP DOORS, MISC. STEEL, CAR WASH, PAINTING, DOORS
& HARDWARE, ELECTRICAL, PLUMBING, PRECAST.
Plans and specifications may be obtained by contacting NEI Contracting and
Engineering, Inc. at [email protected] or by calling 619-434-6156.
Bowe Contractors Inc. is an equal opportunity employer willing to seriously negotiate and assist a subcontractor
and/or supplier as needed. Any item of work, portion of an item, or combination thereof, will be considered.
Performance and Payment bonds may be required. Bonding assistance is available; notify our office 5 business
days prior to bid date. Plans and specifications are available at www.dot.ca.gov/hq/esc/oe/weekly_ads or for
review at our Lancaster Office.
For more information contact:
NEI Contracting and Engineering, Inc.
Dawn Andalora
335 “E” Street, Suite B
C h u l a Vi s t a , C A 9 1 9 1 0
619-434-6156 • Fax 619-434-6137
we are an equal opportunity employer
Please Direct Quotes and Inquiries to:
Bowe Contractors Inc.
42424 N. 4th St. East, Lancaster, CA 93535
Phone: 661-940-0899 • Fax: 661-940-8198 or 661-940-5770
OHL USA, INC.
MATICH CORPORATION
1596 Harry Sheppard Blvd., San Bernardino, CA 92408
W E A R E R E Q U E S T I N G S U B - B I D S A N D M AT E R I A L Q U O T E S F R O M
QUALIFIED DBE SUBCONTRACTORS AND/OR SUPPLIERS
F O R T H E F O L L O W I N G P R O J E C T:
STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION
ROUTE 95 IN BLYTHE, CA
#08-163704
BID DATE/TIME: OCTOBER 28, 2014 - 2:00 PM
Please respond by Bid Date & Time
Matich Corporation is requesting quotes from qualified DBE Subcontractors &
S u p p l i e r s i n t h e f o l l o w i n g t r a d e s : L e a d C o m p l i a n c e P l a n , A r e a S i g n s , Tr a ff i c
C o n t r o l , P C M S , W P C P, F e n c i n g , C o l d P l a n e , A C D i k e , M i n o r C o n c r e t e ( S t r u c t u r e
& R a m p ) , G u a r d r a i l , S t r i p i n g & M a r k i n g , P a v e m e n t M a r k e r s & L o o p D e t e c t o r.
REQUESTING SUB-BIDS ON ALL TRADES
From Qualified Subcontractors & Suppliers especially SBE (SBE Goal 11%)
For the following Caltrans Project :
#07-2881U4 - FEDERAL-AID PROJECT NO. ACNHPI-210-1-(823) E
STATE HIGHWAY 210 IN LOS ANGELES COUNTY
LA CANADA FLINTRIDGE, GLENDALE & PASADENA
The general work description for this Caltrans Project consists mostly of the concrete pavement
construction, precast concrete panels and slab installation along the 210 state highway in Los
Angeles County from Dunsmore Avenue Undercrossing to North Los Robles Ave Overcrossing.
SCOPE OF WORK: Survey, Quality Control and Assurance, Environmental, Water Pollution Control, Solid
Waste Disposal & Recycling, Remove Striping, Hazardous Waste and Substance Removal, Remove Treated
Wood Waste, Clearing and Grubbing, Roadway Excavation and Backfill, Landscape and Irrigation, Aggregate
Base, Hot Mix Asphalt, Removal of HMA, PCC Pavement Furnish and Place, Structural Concrete, Concrete
Barriers, Waterproofing and Asphaltic Emulsion, Structural Steel, Signage, 15”, 18”, 24” & 36” RCP, 12” & 18”
Corrugated Steel Pipe, Underdrain, Curb & Grate Inlets, Junction Structures, Concrete Collars, Storm Drain
Manholes, Curb Drain, Cast Iron Pipe, 60” CIDH, Curb and Gutter, Sidewalks, Cross and Longitudinal
Gutter, Storm Water Pump System, PVC, Chain Link Fence and Railing, Street Bridge Demo, Striping and
Markings, Electrical (Lighting & Illumination), Tunnels & Control Building.
THIS BID IS SUBMITTED ELECTRONICALLY via Bid Express by the Prime/General Contractor
therefore please provide ahead of time License Number, Type and Expiration Number if you are
anticipating to bid as a subcontractor.
NEW BID DATE: BIDS: THURSDAY, OCTOBER 16, 2014 AT 2:00 PM
BIDS DUE BEFORE: October 16, 2014
Plans can be reviewed at Agency or our office.
We w i l l p r o v i d e n e c e s s a r y a s s i s t a n c e .
Plans & Specs are available at OHL offices from 7:00 am - 5:00 pm, Monday through Friday at:
OHL USA, INC. is an AAE/EOE
1920 Main St., Suite 310, Irvine, CA 92614
Phone: 949-242-4432 • Fax: 949-231-1255/949-231-1256
Or anytime at the Caltrans web site
Contact: Estimating Department. - Craig Huss
M AT I C H C O R P O R AT I O N • M A R K H I C K M A N
( 9 0 9 ) 3 8 2 - 7 4 0 0 • F a x ( 9 0 9 ) 3 8 2 - 0 11 3
100% BONDING MAY BE REQUIRED FOR ALL SUBCONTRACTORS. ASSISTANCE AVAILABLE IN
OBTAINING BONDS, LINES OF CREDIT, INSURANCE, NECESSARY EQUIPMENT & TECHNICAL
ASSISTANCE.. OHL USA, INC. INTENDS TO CONDUCT ITSELF IN “GOOD FAITH” WITH ALL CATEGORIES
OF DISADVANTAGED, SMALL, MINORITY AND WOMEN FIRMS REGARDING PARTICIPATION ON THIS
PROJECT. THEREFORE PLEASE SEND YOUR CERTIFICATIONS PRIOR TO QUOTES.
W E
A R E
A N
E Q U A L
O P P O R T U N I T Y
E M P L O Y E R
VALENTINE CORPORATION
111 P e l i c a n Wa y, S a n R a f a e l , C A 9 4 9 0 1
Request for Qualified MBE/WBE/DBE/DVBE/SBE/UDBE
Subcontractors and/or Suppliers for the Following Project:
CALTRANS #04-3G7604 - WORK ON STATE HWY IN NAPA COUNTY NEAR
CAPELL CREEK BRIDGE - NAPA, CA
BID DATE/TIME: OCTOBER 15, 2014 @ 2:00 PM
Please respond by: October 15, 2014 @ 1:00 pm
Valentine Corporation will be bidding the above referenced project as a general contractor. Your
firm is invited to submit a sub bid in your area of expertise. Plans and specifications are
available in our office for review. Our estimating team will be available before the date of the
bid should you have any questions or require technical assistance. Areas of work that we
require sub bids for are as follows: Requesting MBE/WBE/DBE/DVBE/SBE/UDBE
Subcontractors and/or Suppliers For, But Not Limited To: Lead Compliance Plan, Const.
Area signs, Traffic Control, Landscaping, WPCP, Water Quality Report, Cold Plane AC,
AC/Hydroseed, Hydromulch, Thermoplastic Striping. We look forward to receiving your
written quotation via facsimile on or before the date of bid. It is the policy of Valentine
Corporation to encourage the utilization of MBE/WBE/DBE/DVBE/UDBE firms at all levels
of construction contracting.
Valentine Corporation may require a Performance and Payment Bond. If so, the bond
premium will be paid for by Valentine Corporation. We will contact you prior to the date of
the bid to discuss this project with you.
For more information regarding this project call:
Va l e n t i n e C o r p o r a t i o n • L i s a D a v i s
Phone 415-453-3732 ext. #10 • Fax 415-457-5820
E q u a l
O p p o r t u n i t y
E m p l o y e r
PLEASE RESPOND BACK VIA EMAIL or FAX (include ANY DISADVANTAGE CERTIFICATE and/or applicable
certifications issued and validated by pertinent agencies)
EMAIL: Craig Huss at CHuss
@ohlusa.com, FAX: (949) 231-1255/(949) 231-1256
R E Q U E S T F O R C E RT I F I E D & Q U A L I F I E D D B E
S U B C O N T R A C T O R S A N D M AT E R I A L S U P P L I E R S F O R :
CONSTRUCTION ON STATE HIGHWAY IN NEVADA AND PLACER
COUNTIES NEAR KINGVALE FROM 0.1 MILE EAST OF KINGVALE
UNDERCROSSING TO 0.2 MILE WEST OF SODA SPRINGS OVERCROSSING
Location: 03-PLA, NEV-80-69.3/69.8, 0.0/R2.3
Caltrans/Contract #03-4F3404 - Project ID 0314000147
BID DATE: OCTOBER 15, 2014
TIME: 2:00 PM
Please submit quotes by October 14, 2014 by 12:00 pm
Requesting qualified sub bids from the following subcontractors and suppliers for:
Lead Compliance Plan, Construction Area Signs, Portable Changeable Signs, Traffic Control
System, Traffic Plastic Drum, WPCP, Temp. DI Protection, Gravel Bag Berm and Concrete
Washout, Adjust Inlet, Erosion Control, Fiber Rolls, Compost, Drill and Bond, Joint Seal,
Minor Concrete, Delineator, Underdrain Marker Maintaining Existing Traffic Management
During Construction.
A California Corporation - Established in 1953
Hansen Bros. Enterprises
CSL 207705
P. O . B o x 1 5 9 9 , G r a s s Va l l e y, C A 9 5 9 4 5
Phone: (530) 273-3381 • Fax: (530) 273-4396
C o n t a c t : B r a n d o n H a l l - [email protected]
P l a n s a v a i l a b l e f r o m C a l t r a n s , c o n t r a c t o r ’s A s s o c i a t i o n s o r o u r G r a s s Va l l e y O ff i c e , a n d m a y a l s o b e
available at your local Builders Exchange.
Please call with questions or for assistance regarding bonding, insurance, plans & specifications,
m a t e r i a l s o r b i d d i n g p a r t i a l i t e m s o n l y.
.
P l e a s e f a x y o u r re s p o n s e t o ( 5 3 0 ) 2 7 3 - 4 3 9 6 .
Hansen Bros. is an Equal Opportunity Employer
G R I F F I T H C O M PA N Y
REQUESTING SUB-BIDS ON ALL TRADES
From Qualified DBE Subcontractors & Suppliers
DBE Goal: 13%, F o r t h e f o l l o w i n g p r o j e c t :
G R I F F I T H C O M PA N Y
REQUESTING SUB-BIDS ON ALL TRADES
From Qualified DBE Subcontractors & Suppliers
DBE Goal: 10%, F o r t h e f o l l o w i n g p r o j e c t :
CITY OF BAKERSFIELD - PROJECT T4K213 MEDIAN IMPROVEMENTS TO
MOUNT VERNON AVE. FROM COLUMBUS STREET TO UNIVERSITY AVE.
RPSTPLE-5109(205)
CITY OF BAKERSFIELD - PROJECT NO. T4K210 SHOULDER WIDENING AT
VARIOUS LOCATIONS: COTTONWOOD ROAD, MORNING DRIVE AND OLD
RIVER ROAD - #CML-5109(212)
SCOPE OF WORK: Maintaining Traffic, Remove Existing Asphalt Pavement, Earthwork
Median Excavation, Minor Concrete, Landscaping, Irrigation System, Electrical System,
Landscape and Irrigation Maintenance, Finish Roadway, Modify Median Noise, Remove and
Replace Median Curb
B I D S : O C T O B E R 1 4 , 2 0 1 4 AT 1 1 : 0 0 A M
B I D S D U E : O C T O B E R 1 4 , 2 0 1 4 AT 1 1 : 0 0 A M
Plans & Specs are available for review from 7:00 am - 5:00 pm
Monday through Friday at:
SCOPE OF WORK: Maintaining Traffic, SWPPP, Relocate Roadside Signs, Clearing and
Grubbing, Dust Control Plan, Earthwork, Finish Roadway, HMA (Type A), Thermoplastic Striping
B I D S : O C T O B E R 1 4 , 2 0 1 4 AT 1 1 : 0 0 A M
B I D S D U E : O C T O B E R 1 4 , 2 0 1 4 AT 1 1 : 0 0 A M
Plans & Specs are available for review from 7:00 am - 5:00 pm
Monday through Friday at:
G R I F F I T H C O M PA N Y
G R I F F I T H C O M PA N Y
(AN EQUAL OPPORTUNITY EMPLOYER)
11 2 8 C a r r i e r P a r k w a y A v e n u e , B a k e r s f i e l d , C A 9 3 3 0 8
Phone: (661) 392-6640 • Fax (661) 393-9525
C o n t a c t : S T E V E D E V E R S , E S T I M AT O R
11 2 8 C a r r i e r P a r k w a y A v e n u e , B a k e r s f i e l d , C A 9 3 3 0 8
Phone: (661) 392-6640 • Fax (661) 393-9525
C o n t a c t : S T E V E D E V E R S , E S T I M AT O R
1 0 0 % B O N D I N G M AY B E R E Q U I R E D F O R A L L S U B C O N T R A C T O R S .
A S S I S TA N C E AVA I L A B L E I N O B TA I N I N G B O N D S , L I N E S O F C R E D I T, I N S U R A N C E ,
N E C E S S A R Y E Q U I P M E N T & T E C H N I C A L A S S I S TA N C E . G R I F F I T H C O M PA N Y I N T E N D S
T O C O N D U C T I T S E L F I N “ G O O D FA I T H ” W I T H D B E F I R M S R E G A R D I N G
PA R T I C I PAT I O N O N T H I S P R O J E C T.
1 0 0 % B O N D I N G M AY B E R E Q U I R E D F O R A L L S U B C O N T R A C T O R S .
A S S I S TA N C E AVA I L A B L E I N O B TA I N I N G B O N D S , L I N E S O F C R E D I T, I N S U R A N C E ,
N E C E S S A R Y E Q U I P M E N T & T E C H N I C A L A S S I S TA N C E . G R I F F I T H C O M PA N Y I N T E N D S
T O C O N D U C T I T S E L F I N “ G O O D FA I T H ” W I T H D B E F I R M S R E G A R D I N G
PA R T I C I PAT I O N O N T H I S P R O J E C T.
(AN EQUAL OPPORTUNITY EMPLOYER)
REQUEST FOR QUALIFIED UDBE/DBE SUBCONTRACTORS & SUPPLIERS FOR:
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION - CALTRANS
RETAINING WALL, COLORED AND TEXTURED SIDEWALK, COLORED CURB AND
GUTTER - CONSTRUCTION ON STATE HIGHWAY IN SHASTA COUNTY AT SHASTA
FROM 0.1 MILE WEST OF FRENCH ALLEY TO RED BLUFF ROAD
CONTRACT # 02-4G4804 - ENGINEER’S ESTIMATE: $1,630,000.00
BID DATE: 10/29/14 @ 2:00 PM
GOAL: 12% DBE
J.F. Shea Construction is requesting quotes from all qualified subcontractors and suppliers including
certified UDBE/DBE firms for all items of work, including but not limited to: LEAD COMPLIANCE PLAN;
CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM; FLASHING ARROW SIGN; TYPE III
BARRICADE; TEMPORARY TRAFFIC STRIPE (TAPE); TEMPORARY PAVEMENT MARKING (TAPE);
CHANNELIZER (SURFACE MOUNTED); PORTABLE CHANGEABLE MESSAGE SIGN (LS); TEMPORARY
RAILING (TYPE K); TEMPORARY CRASH CUSHION MODULE; TEMPORARY CRASH CUSHION; JOB
SITE MANAGEMENT; PREPARE WATER POLLUTION CONTROL PROGRAM; TEMPORARY DRAINAGE
INLET PROTECTION; TEMPORARY FIBER ROLL; TEMPORARY SILT FENCE; STREET SWEEPING;
TEMPORARY CONCRETE WASHOUT; TEMPORARY FENCE (TYPE ESA); HEALTH AND SAFETY
PLAN; TREATED WOOD WASTE; EXCAVATION, SAMPLING, AND TRANSPORTATION PLAN; REMOVE
FENCE; REMOVE THERMOPLASTIC TRAFFIC STRIPE (HIGH PRESSURE BLASTING); REMOVE
PAINTED PAVEMENT MARKING (HIGH PRESSURE BLASTING); REMOVE PAVEMENT MARKER;
REMOVE ROADSIDE SIGN; REMOVE CULVERT (LF); RELOCATE ROADSIDE SIGN (WOOD POST);
COLD PLANE ASPHALT CONCRETE PAVEMENT; REMOVE CONCRETE (CY); CLEARING AND
GRUBBING (LS); ROADWAY EXCAVATION (TYPE H); ROADWAY EXCAVATION; STRUCTURE
EXCAVATION (BRIDGE); STRUCTURE EXCAVATION (RETAINING WALL); STRUCTURE BACKFILL
(BRIDGE); STRUCTURE BACKFILL (RETAINING WALL); ROCK BLANKET; CONTROL AND NEUTRAL
CONDUCTORS (ARMOR-CLAD); BATTERY POWERED IRRIGATION CONTROLLER; 3/4” GALVANIZED
STEEL PIPE (SUPPLY LINE); WATER METER; 3/4” BACKFLOW PREVENTER ASSEMBLY; DRIP
VALVE ASSEMBLY; PLANT POCKET ASSEMBLY; 1/2” PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE);
3/4” PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE); ROLLED EROSION CONTROL PRODUCT
(NETTING); HYDROMULCH; HYDROSEED; COMPOST; CLASS 2 AGGREGATE BASE (CY); HOT MIX
ASPHALT (TYPE A); TACK COAT; GROUND ANCHOR (VERTICAL); STRUCTURAL CONCRETE,
BRIDGE FOOTING; STRUCTURAL CONCRETE, BRIDGE; STRUCTURAL CONCRETE, RETAINING
WALL; MINOR CONCRETE (MINOR STRUCTURE); CONCRETE RELIEF MOTIF; WOOD PLANK
TEXTURE; BAR REINFORCING STEEL (BRIDGE); BAR REINFORCING STEEL (RETAINING WALL);
FURNISH SINGLE SHEET ALUMINUM SIGN (0.063”-UNFRAMED); ROADSIDE SIGN-ONE POST;
STAIN GALVANIZED SURFACES; PREPARE AND STAIN CONCRETE; PREPARE AND STAIN
CONCRETE (CONCRETE RELIEF MOTIF); ANTI-GRAFFITI COATING; CONCRETE BACKFILL (PIPE
TRENCH); 18” PLASTIC PIPE; 8” CORRUGATED STEEL PIPE (.064” THICK); 12” CORRUGATED
STEEL PIPE (.079” THICK); DRAINAGE INLET MARKER; 48” PRECAST CONCRETE PIPE MANHOLE;
ROCK SLOPE PROTECTION FABRIC (CLASS 8); MINOR CONCRETE (CURB) (LF) COLORED
CONCRETE); DETECTABLE WARNING SURFACE; MINOR CONCRETE (CURB AND GUTTER)
(COLORED CONCRETE); MINOR CONCRETE (DECOMPOSED GRANITE TEXTURE); MINOR
CONCRETE (TEXTURED PAVING); MINOR CONCRETE (TEXTURED PAVING) SAMPLES;
MISCELLANEOUS IRON AND STEEL; DECORATIVE PLATE; MANHOLE FRAME AND COVER;
ARCHITECTURAL TREATMENT (VENEERS); CHAIN LINK FENCE (TYPE CL-4); 4’ CHAIN LINK GATE
(TYPE CL-4); MARKER (CULVERT); MARKER (CULVERT) (SURFACE MOUNTED); TUBULAR
PEDESTRIAN RAILING; ORNAMENTAL RAILING; THERMOPLASTIC PAVEMENT MARKING;
THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE); PAVEMENT MARKER (RETROREFLECTIVERECESSED); MOBILIZATION.
MATICH CORPORATION
1596 Harry Sheppard Blvd., San Bernardino, CA 92408
W E A R E R E Q U E S T I N G S U B - B I D S A N D M AT E R I A L Q U O T E S F R O M
QUALIFIED DBE SUBCONTRACTORS AND/OR SUPPLIERS
F O R T H E F O L L O W I N G P R O J E C T:
OMNITRANS - PAVEMENT REHABILITATION ON E STREET
SAN BERNARDINO, CA
PROJECT NO. 10334
BID DATE/TIME: OCTOBER 24, 2014 - 2:00 PM
Please respond by Bid Date & Time
Matich Corporation is requesting quotes from qualified DBE Subcontractors &
S u p p l i e r s i n t h e f o l l o w i n g t r a d e s : D u s t C o n t r o l , Tr a ff i c C o n t r o l , I n f o S i g n , C l e a r &
G r u b , P C C ( C u r b , G u t t e r, S W, D W, R a m p s , C r o s s G u t t e r ) , C o l d M i l l , U n c l a s s i f i e d
E x c a v a t i o n , G e o g r i d , C r u s h e d A g g r e g a t e B a s e , F a b r i c & Tr u c k i n g .
Plans can be reviewed at Agency or our office.
We w i l l p r o v i d e n e c e s s a r y a s s i s t a n c e .
M AT I C H C O R P O R AT I O N • R O B E R T M AT I C H
( 9 0 9 ) 3 8 2 - 7 4 0 0 • F a x ( 9 0 9 ) 3 8 2 - 0 11 3
W E
A R E
A N
E Q U A L
O P P O R T U N I T Y
E M P L O Y E R
Steve Manning Construction, Inc.
REQUEST FOR DBE SUBCONTRACTORS & SUPPLIERS FOR:
BID DATE: OCTOBER 15, 2014 @ 2:00 PM
DBE GOAL FROM PROJECT: 10%
CONTRACT # 02-4E90U4 - TEHAMA COUNTY ABOUT 18 MILES EAST OF FOREST
RANCH FROM 1.6 MILES TO 2.9 MILES EAST OF SODA SPRINGS ROAD
J.F. Shea Construction, Inc. is a union signatory contractor. Subcontractors must possess a current
contractor’s license, insurance coverage and worker’s compensation for the entire length of the contract.
All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and
performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding,
equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at
17400 Clear Creek Road, Redding, CA 96001 or call for any additional needed project information. J.F.
Shea Construction Inc. intends to work cooperatively with all qualified firms seeking work on this project.
We are an equal opportunity employer and will work with any interested subcontractor to identify
opportunities to break items into economically feasible packages. Women and Minority Employees
are encouraged to apply.
Steve Manning Construction is requesting quotes from all qualified subcontractors and suppliers
including certified DBE/SBE/DVBE/WBE firms for the following types of work; items of particular
interest are: LEAD COMPLIANCE PLAN, CAS, TRAFFIC CONTROL, CHANGEABLE MESSAGE
SIGN, SWPPP, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING & ANALYSIS DAY, STORM
WATER ANNUAL REPORT, CHECK DAM, FIBER ROLL, SILT FENCE, CONCRETE WASHOUT,
REMOVE GUARDRAIL, TURNABLE ROADSIDE SIGN, COLD PLANE ASPHALT CONCRETE
PAVEMENT, SHOULDER BACKING, SUBGRADE ENHANCEMENT GEOGRID, HYDROSEED, CLASS
2 AGGREGATE BASE, HOT MIX ASPHALT (HMA), PLACE HMA, TACK COAT, CONCRETE,
ALUMINUM SIGN, ROADSIDE SIGN, STEEL PIPE, ANCHOR ASSEMBLY, STEEL PIPE ENERGY
DISSIPATER, STEEL FLARED END SECTION, ROCK SLOPE PROTECTION, MISC. IRON & STEEL,
STRIPING AND MARKERS, MIDWEST GUARDRAIL SYSTEM, FLARED TERMINAL SYSTEM, END
ANCHOR ASSEMBLY.
Steve Manning Construction is a Union signatory contractor, as such all subcontractors must be
signatory or willing to sign a one time agreement. We are an equal opportunity employer.
Subcontractors must possess a current contractor’s license, insurance coverage, and worker’s
compensation for the entire length of the contract. Please call if you need assistance in obtaining
insurance, bonding, equipment, materials and/or supplies. Plans and specifications can be viewed at
our office located at 5211 Churn Creek Rd., Redding, CA 96002 or call if you need any additional
project information. Steve Manning Construction, Inc. will work cooperatively with all qualified
subcontractors and suppliers interested in work on this project to identify opportunities to break items
into economically feasible packages.
J.F. SHEA CONSTRUCTION, INC.
STEVE MANNING CONSTRUCTION, INC.
P.O. Box 494519, Redding, CA 96049
Phone: (530) 246-4292 • Fax: (530) 246-9940
An Equal Opportunity Employer
REQUEST FOR QUALIFIED UDBE/DBE SUBCONTRACTORS & SUPPLIERS FOR:
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION - CALTRANS
REHABILITATE PAVEMENT - CONSTRUCTION ON STATE HIGHWAY IN SHASTA
COUNTY IN AND NEAR PALO CEDRO FROM 0.1 MILE EAST OF AIRPORT ROAD TO
0.1 MILE EAST OF BEAR CREEK BRIDGE
CONTRACT # 02-4E4304 - ENGINEER’S ESTIMATE: $5,200,000.00
BID DATE: 10/22/14 @ 2:00 PM
GOAL: 8% DBE
J.F. Shea Construction is requesting quotes from all qualified subcontractors and suppliers including
certified UDBE/DBE firms for all items of work, including but not limited to: LEAD COMPLIANCE PLAN;
TIME-RELATED OVERHEAD (WDAY); CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM;
PORTABLE CHANGEABLE MESSAGE SIGN (LS); JOB SITE MANAGEMENT; PREPARE WATER
POLLUTION CONTROL PROGRAM; TEMPORARY FIBER ROLL; TEMPORARY CONCRETE WASHOUT;
TREATED WOOD WASTE; REMOVE GUARDRAIL; REMOVE THERMOPLASTIC PAVEMENT MARKING;
REMOVE ROADSIDE SIGN; REMOVE ROADSIDE SIGN PANEL; REMOVE ASPHALT CONCRETE
DIKE; REMOVE CULVERT (LF); REMOVE INLET; REMOVE HEADWALL; RECONSTRUCT FENCE;
RECONSTRUCT GUARDRAIL; RECONSTRUCT GUARDRAIL (7’ POST); RECONSTRUCT TERMINAL
SYSTEM; RECONSTRUCT TRANSITION RAILING (TYPE WB); RESET 24” REINFORCED CONCRETE
PIPE; COLD PLANE ASPHALT CONCRETE PAVEMENT; CLEANING, INSPECTING, AND PREPARING
CULVERT (LF); 24” CURED IN PLACE PIPELINER; 30” CURED IN PLACE PIPELINER; CLEARING
AND GRUBBING (LS); DEVELOP WATER SUPPLY; SHOULDER BACKING; DITCH EXCAVATION;
EROSION CONTROL (DRY SEED) (SQFT); STRAW; CLASS 2 AGGREGATE BASE (CY); PREPAVING
INERTIAL PROFILER; PREPAVING GRINDING DAY; REPLACE ASPHALT CONCRETE SURFACING;
HOT MIX ASPHALT (TYPE A); RUBBERIZED HOT MIX ASPHALT (GAP GRADED); RUBBERIZED HOT
MIX ASPHALT (OPEN GRADED); SHOULDER RUMBLE STRIP (HMA, GROUND-IN INDENTATIONS);
CENTERLINE RUMBLE STRIP (HMA, GROUND-IN INDENTATIONS); DATA CORE; PLACE HOT MIX
ASPHALT DIKE (TYPE F); TACK COAT; MINOR CONCRETE (MINOR STRUCTURE); DRILL AND
BOND DOWEL (CHEMICAL ADHESIVE); SHOTCRETE; FURNISH LAMINATED PANEL SIGN (2 1/2”
TYPE B); FURNISH SINGLE SHEET ALUMINUM SIGN (0.063”-UNFRAMED); FURNISH SINGLE SHEET
ALUMINUM SIGN (0.080”-FRAMED); ROADSIDE SIGN-ONE POST; ROADSIDE SIGN-TWO POST;
INSTALL ROADSIDE SIGN PANEL ON EXISTING POST; INSTALL ROADSIDE SIGN (LAMINATED
WOOD BOX POST); 24” ALTERNATIVE PIPE CULVERT; CONCRETE BACKFILL (PIPE TRENCH); 18”
CORRUGATED STEEL PIPE (.138” THICK); 36” CORRUGATED STEEL PIPE INLET (.109” THICK);
STEEL FLARED END SECTION; SMALL-ROCK SLOPE PROTECTION; ROCK SLOPE PROTECTION
(1/4 T. METHOD B) (CY); ROCK SLOPE PROTECTION FABRIC (CLASS 8); MINOR CONCRETE
(SIDEWALK); MISCELLANEOUS IRON AND STEEL; DELINEATOR (CLASS 1); DELINEATOR (CLASS
2); MILEPOST MARKER; MARKER (CULVERT); OBJECT MARKER; VEGETATION CONTROL (MINOR
CONCRETE); SINGLE THRIE BEAM BARRIER; TRANSITION RAILING (TYPE WB); ALTERNATIVE
FLARED TERMINAL SYSTEM; THERMOPLASTIC PAVEMENT MARKING; THERMOPLASTIC TRAFFIC
STRIPE (SPRAYABLE); PAVEMENT MARKER (RETROREFLECTIVE); PAVEMENT MARKER
(RETROREFLECTIVE-RECESSED); MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM
ELEMENTS DURING CONSTRUCTION; TRAFFIC COUNT STATION; MOBILIZATION.
J.F. Shea Construction, Inc. is a union signatory contractor. Subcontractors must possess a current
contractor’s license, insurance coverage and worker’s compensation for the entire length of the contract.
All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and
performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding,
equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at
17400 Clear Creek Road, Redding, CA 96001 or call for any additional needed project information. J.F.
Shea Construction Inc. intends to work cooperatively with all qualified firms seeking work on this project.
We are an equal opportunity employer and will work with any interested subcontractor to identify
opportunities to break items into economically feasible packages. Women and Minority Employees
are encouraged to apply.
PROJECT MANAGER
P. O . B o x 4 9 1 6 6 0 • R e d d i n g , C A 9 6 0 4 9 - 1 6 6 0
P h o n e : 5 3 0 / 2 2 2 - 0 8 1 0 • FA X 5 3 0 / 2 2 2 - 4 9 0 8
REQUEST FOR QUALIFIED UDBE/DBE SUBCONTRACTORS & SUPPLIERS FOR:
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION - CALTRANS
RHMA-WMA OVERLAY, MBGR CONSTRUCTION AND STRIPING - CONSTRUCTION ON
STATE HIGHWAY IN DEL NORTE COUNTY NEAR KLAMATH FROM 0.4 MILE NORTH
OF KLAMATH RIVER BRIDGE TO HIGH PRAIRIE CREEK BRIDGE
CONTRACT # 01-0B0804 - ENGINEER’S ESTIMATE: $3,320,000.00
BID DATE: 10/15/14 @ 2:00 PM
GOAL: 10% DBE
J.F. Shea Construction is requesting quotes from all qualified subcontractors and suppliers including
certified UDBE/DBE firms for all items of work, including but not limited to: LEAD COMPLIANCE PLAN,
TRAFFIC CONTROL SYSTEM, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC
STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE CHANGEABLE MESSAGE SIGN
(LS), TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE
MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY CONCRETE
WASHOUT, TREATED WOOD WASTE, REMOVE MBGR, REMOVE THERMOPLASTIC TRAFFIC
STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING; REMOVE PAVEMENT MARKER;
REMOVE ASPHALT CONCRETE DIKE; REMOVE DOWNDRAIN (EA), REMOVE BASE AND SURFACING,
COLD PLANE ASPHALT CONCRETE PAVEMENT, CLEARING AND GRUBBING (LS), SHOULDER
BACKING; ROLLED EROSION CONTROL PRODUCT (BLANKET), HOT MIX ASPHALT (TYPE A),
RUBBERIZED HOT MIX ASPHALT (GAP GRADED), RUBBERIZED HOT MIX ASPHALT (OPEN GRADED),
CENTERLINE RUMBLE STRIP (SINUSOIDAL), DATA CORE, PLACE HOT MIX ASPHALT
(MISCELLANEOUS AREA), TACK COAT, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063”UNFRADED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080”-UNFRAMED), INSTALL ROADSIDE
SIGN PANEL ON EXISTING POST, GUARD RAILING DELINEATOR, MBGR (WOOD POST), MBGR (7’
WOOD POST), CONCRETE BARRIER (TRANSITION), TRANSITION RAILING (TYPE WB), END CAP
(TYPE TC), ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE FLARED TERMINAL SYSTEM,
4” THERMOPLASTIC TRAFFIC STRIPE, 8” THERMOPLASTIC TRAFFIC STRIPE, THERMOPLASTIC
PAVEMENT MARKING, PAVEMENT MARKER (RETROREFLECTIVE), MOBILIZATION.
J.F. Shea Construction, Inc. is a union signatory contractor. Subcontractors must possess a current
contractor ’s license, insurance coverage and worker ’s compensation for the entire length of the contract.
All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and
performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding,
equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at
17400 Clear Creek Road, Redding, CA 96001 or call for any additional needed project information. J.F.
Shea Construction Inc. intends to work cooperatively with all qualified firms seeking work on this project.
We are an equal opportunity employer and will work with any interested subcontractor to identify
opportunities to break items into economically feasible packages. Women and Minority Employees
are encouraged to apply.
J . F. S H E A C O N S T R U C T I O N , I N C .
P. O . B o x 4 9 4 5 1 9 , R e d d i n g , C A 9 6 0 4 9
Phone: (530) 246-4292 • Fax: (530) 246-9940
An Equal Opportunity Employer
REQUEST FOR QUALIFIED DVBE SUBCONTRACTORS & SUPPLIERS FOR:
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION - CALTRANS
HOT MIX ASPHALT, AGGREGATE BASE, ROADWAY EXCAVATION
CONSTRUCTION ON STATE HIGHWAY IN SISKIYOU COUNTY NEAR WEED FROM
ANGEL VALLEY ROAD TO MAPLE AVENUE
CONTRACT # 02-4G00U4 - ENGINEER’S ESTIMATE: $430,000.00
BID DATE: 10/16/14 @ 2:00 PM
GOAL: 5% DVBE
J.F. Shea Construction is requesting quotes from all qualified subcontractors and suppliers including
certified DVBE firms for all items of work, including but not limited to: LEAD COMPLIANCE PLAN,
CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE
SIGN (LS), JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM,
TEMPORARY FIBER ROLL, TEMPORARY FENCE (TYPE ESA), TREATED WOOD WASTE, REMOVE
MARKER, REMOVE THERMOPLASTIC PAVEMENT MARKING, REMOVE ROADSIDE SIGN (WOOD
POST), REMOVE DELINEATOR, RESET MAILBOX, RESET ROADSIDE SIGN (ONE POST), COLD
PLANE ASPHALT CONCRETE PAVEMENT, CLEARING AND GRUBBING (LS), DEVELOP WATER
SUPPLY; ROADWAY EXCAVATION, SHOULDER BACKING, IMPORTED BORROW (CY), HYDROSEED,
CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), TACK COAT, FURNISH SINGLE
SHEET ALUMINUM SIGN (0.063”-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080”UNFRAMED), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, DELINEATOR (CLASS
2), MARKER (CULVERT), OBJECT MARKER (TYPE L-1), THERMOPLASTIC PAVEMENT MARKING,
THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE), MAINTAINING EXISTING TRAFFIC MANAGEMENT
SYSTEM ELEMENTS DURING CONSTRUCTION.
J.F. SHEA CONSTRUCTION, INC.
J.F. Shea Construction, Inc. is a union signatory contractor. Subcontractors must possess a current
contractor’s license, insurance coverage and worker’s compensation for the entire length of the contract.
All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and
performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding,
equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at
17400 Clear Creek Road, Redding, CA 96001 or call for any additional needed project information. J.F.
Shea Construction Inc. intends to work cooperatively with all qualified firms seeking work on this project.
We are an equal opportunity employer and will work with any interested subcontractor to identify
opportunities to break items into economically feasible packages. Women and Minority Employees
are encouraged to apply.
P.O. Box 494519, Redding, CA 96049
Phone: (530) 246-4292 • Fax: (530) 246-9940
An Equal Opportunity Employer
P.O. Box 494519, Redding, CA 96049
Phone: (530) 246-4292 • Fax: (530) 246-9940
An Equal Opportunity Employer
J.F. SHEA CONSTRUCTION, INC.
REQUEST FOR QUALIFIED UDBE/DBE SUBCONTRACTORS & SUPPLIERS FOR:
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION - CALTRANS
EARTHWORK, HOT MIX ASPHALT PAVING AND DRAINAGE WORK - CONSTRUCTION ON STATE
HIGHWAY IN SHASTA COUNTY ABOUT 20 MILES WEST OF REDDING FRO 0.3 MILE EAST OF
TRINITY COUNTY TO 0.9 MILE WEST OF CRYSTAL CREEK ROAD
CONTRACT # 02-3E4104 - ENGINEER’S ESTIMATE: $28,000,000.00
BID DATE: 11/19/14 @ 2:00 PM
GOAL: 11% DBE
J.F. Shea Construction is requesting quotes from all qualified subcontractors and suppliers including certified UDBE/DBE firms
for all items of work, including but not limited to: LEAD COMPLIANCE PLAN; PROGRESS SCHEDULE (CRITICAL PATH METHOD);
TIME-RELATED OVERHEAD (WDAY); CONSTRUCTION AREA SIGNS; TRAFFIC CONTROL SYSTEM; TEMPORARY TRAFFIC
STRIPE (PAINT); CHANNELIZER (SURFACE MOUNTED); PORTABLE CHANGEABLE MESSAGE SIGN (LS); TEMPORARY RAILING
(TYPE K); JOB SITE MANAGEMENT; PREPARE STORM WATER POLLUTION PREVENTION PLAN; RAIN EVENT ACTION PLAN;
STORM WATER SAMPLING AND ANALYSIS DAY; STORM WATER ANNUAL REPORT; MOVE-IN/MOVE-OUT (TEMPORARY
EROSION CONTROL); TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX); TEMPORARY TACKED STRAW; TEMPORARY
COVER; TEMPORARY CHECK DAM; TEMPORARY DRAINAGE INLET PROTECTION; TEMPORARY FIBER ROLL; TEMPORARY
SEDIMENT TRAP; TEMPORARY CONCRETE WASHOUT; WATER QUALITY SAMPLING AND ANALYSIS DAY; WATER QUALITY
MONITORING REPORT; TEMPORARY FENCE (TYPE ESA); TREATED WOOD WASTE; CONTRACTOR-SUPPLIED BIOLOGIST
(LS); ABANDON CULVERT (LF); ABANDON INLET; REMOVE MARKER; REMOVE VEGETATION CONTROL (MINOR CONCRETE);
REMOVE GUARDRAIL; REMOVE GUARDRAIL (SPECIAL); REMOVE FLARED END SECTION; REMOVE CABLE RAILING;
REMOVE ROADSIDE SIGN; REMOVE ASPHALT CONCRETE PAVEMENT (SQFT); REMOVE ASPHALT CONCRETE DIKE; REMOVE
CULVERT (LF); REMOVE DOWNDRAIN; REMOVE REINFORCED CONCRETE BOX CULVERT (LS) (PORTION); REMOVE INLET;
REMOVE HEADWALL; REMOVE RISER; REMOVE DEBRIS RACK CAGE; REMOVE RETAINING WALL (PORTION) (GABION);
REMOVE RETAINING WALL (PORTION) (SOLDIER PILE); REMOVE RETAINING WALL (SOIL NAIL); REMOVE RETAINING WALL
(PORTION) (MASONRY); REMOVE SACK CONCRETE SLOPE PROTECTION; REMOVE DELINEATOR; SALVAGE ROADSIDE
SIGN; RESET GUARDRAIL (STEEL POST); RESET GATE; RECONSTRUCT TURNABLE ROADSIDE SIGN; RESET TERMINAL
SYSTEM; RESET INTERMEDIATE ANCHOR ASSEMBLY (MODIFIED TYPE SFT); RESET END ANCHOR ASSEMBLY (TYPE SFT);
RELOCATE ROADSIDE SIGN; ADJUST FRAME AND GRATE TO GRADE; COLD PLANE ASPHALT CONCRETE PAVEMENT;
CLEANING, INSPECTING, AND PREPARING CULVERT (LF); CONCRETE INVERT PAVING; SAND BACKFILL; CLEARING AND
GRUBBING (ACRE); DEVELOP WATER SUPPLY; DUST PALLIATIVE; ROADWAY EXCAVATION; SHOULDER BACKING; STRUCTURE
EXCAVATION (RETAINING WALL); STRUCTURE BACKFILL (RETAINING WALL); CONCRETE BACKFILL; DITCH EXCAVATION;
WOOD MULCH; 1 1/2” PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE); 6” PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE);
EROSION CONTROL ESTABLISHMENT CONTACT; EROSION CONTROL (BONDED FIBER MATRIX) (SQFT); ROLLED EROSION
CONTROL PRODUCT (NETTING); HYDROSEED; FINISHING ROADWAY; CLASS 2 AGGREGATE BASE (CY); HOT MIX ASPHALT
(TYPE A); DATA CORE; PLACE HOT MIX ASPHALT DIKE (TYPE C); PLACE HOT MIX ASPHALT DIKE (TYPE D); PLACE HOT
MIX ASPHALT DIKE (TYPE E); PLACE HOT MIX ASPHALT DIKE (TYPE F); PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA);
TACK COAT; RAIL ELEMENT WALL; STRUCTURAL CONCRETE, RETAINING WALL; STRUCTURAL CONCRETE BOX CULVERT;
MINOR CONCRETE (MINOR STRUCTURE); PRECAST REINFORCED CONCRETE BOX (4’ X 3’); BAR REINFORCING STEEL
(RETAINING WALL); BAR REINFORCING STEEL (BOX CULVERT); FURNISH SINGLE SHEET ALUMINUM SIGN (0.063”UNFRAMED); ROADSIDE SIGN-ONE POST; ROADSIDE SIGN-TURNABLE; 12” PLASTIC PIPE; 18” PLASTIC PIPE; 24” PLASTIC
PIPE; 18” REINFORCED CONCRETE PIPE; 30’ REINFORCED CONCRETE PIPE; 24” REINFORCED CONCRETE PIPE (CLASS
V); 36” REINFORCED CONCRETE PIPE (CLASS V); 18: CORRUGATED STEEL PIPE (.109” THICK; 24” CORRUGATED STEEL
PIPE (.079” THICK); 24” CORRUGATED STEEL PIPE (.138” THICK); 32” TO 18” CORRUGATED STEEL PIPE ECCENTRIC
REDUCER (.109” THICK); 30” CORRUGATED STEEL PIPE (.109” THICK); 30” CORRUGATED STEEL PIPE (.138” THICK); 36”
CORRUGATED STEEL PIPE (.109” THICK); 36:” CORRUGATED STEEL PIPE (.138” THICK); 48:” CORRUGATED STEEL PIPE
(.18” THICK); 18: CORRUGATED STEEL PIPE (.138” THICK); 60” STRUCTURAL STEEL PLATE PIPE (.280” THICK); 8” PERFORATED
PLASTIC PIPE UNDERDRAIN GEOMEMBRANE; 18” CORRUGATED STEEL PIPE DOWNDRAIN (.109” THICK); 24” CORRUGATED
STEEL PIPE DOWNDRAIN (.109” THICK); 24” CORRUGATED STEEL PIPE DOWNDRAIN (.138” THICK; 30” CORRUGATED STEEL
PIPE DOWNDRAIN (.109” THICK); 36” CORRUGATED STEEL PIPE DOWNDRAIN (.109” THICK); 18” ANCHOR ASSEMBLY; 24”
ANCHOR ASSEMBLY; 30” ANCHOR ASSEMBLY; 36” ANCHOR ASSEMBLY; 36” CORRUGATED STEEL PIPE INLET (.109” THICK);
18” CORRUGATED STEEL PIPE ENERGY DISSIPATER (.109” THICK); 60” SLOTTED CORRUGATED STEEL PIPE INLET (.168”
THICK); 72” SLOTTED CORRUGATED STEEL PIPE INLET (.079” THICK); 30” JACKED WELDED STEEL PIPE (.239” THICK); 30”
WELDED STEEL PIPE DOWNDRAIN (.239” THICK); 18” CONCRETE FLARED END SECTION; 36” DEBRIS RACK CAGE (H=4’);
60” DEBRIS RACK CAGE (H=6’); 72” DEBRIS RACK CAGE (H=6’); 36” PRECAST CONCRETE PIPE INLET; SMALL-ROCK SLOPE
PROTECTION; ROCK SLOPE PROTECTION (1/4 T, METHOD B); ROCK SLOPE PROTECTION (LIGHT, METHOD B); ROCK
SLOPE PROTECTION (FACING, METHOD B) (CY); ROCK SLOPE PROTECTION (1T, METHOD B); ROCK SLOPE PROTECTION
(NO. 2, METHOD B) (CY); CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (C); GABION; FILTER FABRIC;
ROCK SLOPE PROTECTION FABRIC (CLASS 10); MINOR CONCRETE (GUTTER DEPRESSION); MISCELLANEOUS IRON AND
STEEL; DELINEATOR (CLASS 2); MILEPOST MARKER; MARKER (CULVERT); OBJECT MARKER (TYPE L); OBJECT MARKER
(TYPE P); OBJECT MARKER (TYPE L-1); METAL BEAM GUARD RAILING (STEEL POST); METAL BEAM GUARD RAILING (7’
STEEL POST); VEGETATION CONTROL (MINOR CONCRETE); TUBULAR BICYCLE RAILING; CABLE RAILING; TRANSITION
RAILING (TYPE WB); END ANCHOR ASSEMBLY (TYPE SFT); INTERMEDIATE ANCHOR ASSEMBLY (MODIFIED TYPE SFT);
ALTERNATIVE IN-LINE TERMINAL SYSTEM; ALTERNATIVE FLARED TERMINAL SYSTEM; CONCRETE BARRIER (TYPE 736A
MODIFIED); THERMOPLASTIC PAVEMENT MARKING; THERMOPLASTIC TRAFFIC STRIPE (SPRAYABLE); PAVEMENT MARKER
(RETROREFLECTIVE-RECESSED); MOBILIZATION.
J.F. Shea Construction, Inc. is a union signatory contractor. Subcontractors must possess a current contractor’s license, insurance
coverage and worker’s compensation for the entire length of the contract. All subcontractors will be required to sign our standard
Subcontract Agreement. 100% payment and performance bonds may be required. Please call if you need assistance in obtaining
insurance, bonding, equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at 17400
Clear Creek Road, Redding, CA 96001 or call for any additional needed project information. J.F. Shea Construction Inc. intends
to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with
any interested subcontractor to identify opportunities to break items into economically feasible packages. Women and Minority
Employees are encouraged to apply.
J.F. SHEA CONSTRUCTION, INC.
P.O. Box 494519, Redding, CA 96049
Phone: (530) 246-4292 • Fax: (530) 246-9940
An Equal Opportunity Employer
Gallagher & Burk, Inc.
PAVING & GRADING CONTRCTORS • LICENSE NO. 141140A
800 HIGH STREET • P'O' BOX 3--3 • OAKLAND# CA <0.+*
Gallagher & Burk# Inc' is preparing a bid as a Prime Contractor
for the project listed below:
PROJECT: CONSTRUCTION IN THE CITY OF FREMONT, ALAMEDA COUNTY, 2014
PAVEMENT REHABILITATION PROJECT, City Project No. 8234-O (PWC),
Federal-Aid Project No. STPL-5322(054)
OWNER: CITY OF FREMONT - DEPARTMENT OF PUBLIC WORKS,
ENGINEERING DIVISION - 3300 Capitol Avenue, Fremont, CA 94538
ESTIMATOR: STEVE LIPPIS
BID DATE: OCTOBER 21, 2014 @ 2:00 P.M.
We hereby encourage responsible participation of local Disadvantaged Business Enterprises, and solicit
their subcontractor or materials and/or suppliers quotation for the following types of work including but not
limited to: ADJUST IRON, CRACK SEALING, ELECTRICAL, MINOR CONCRETE, ROADSIDE SIGNS,
STRIPING, TRUCKING, WATER TRUCKS, STREET SWEEPING, HOT MIX ASPHALT (TYPE B)
MATERIAL.
*++= Performance and Payment Bonds may be required for full amounts of the subcontract
price' Surety company will have to be approved by Gallagher & Burk# Inc' Gallagher & Burk# Inc'
will pay bond premium up to -=' Subcontractors must possess current insurance and worker’s
compensation coverage meeting Gallagher & Burk# Inc'’s requirements' Please call if you need
assistance in obtaining bonding# insurance# equipment# materials and/or supplies' Plans and
specifications are available for review at our office'
VALENTINE CORPORATION
111 P e l i c a n Wa y, S a n R a f a e l , C A 9 4 9 0 1
Request for Qualified MBE/WBE/DBE/DVBE/SBE/UDBE
Subcontractors and/or Suppliers for the Following Project:
PETE MILLER ROAD BRIDGE AT DELTA MENDOTA IN STANISLAUS COUNTY
PROJECT NO. 9407
B I D D AT E / T I M E : O C T O B E R 2 2 , 2 0 1 4 @ 2 : 0 0 P M
Please respond by: October 22, 2014 @ 1:00 pm
Valentine Corporation will be bidding the above referenced project as a general contractor. Your
firm is invited to submit a sub bid in your area of expertise. Plans and specifications are
available in our office for review. Our estimating team will be available before the date of the
bid should you have any questions or require technical assistance. Areas of work that we
require sub bids for are as follows: Requesting MBE/WBE/DBE/DVBE/SBE/UDBE
Subcontractors and/or Suppliers For, But Not Limited To: Const. Area Signage, Traffic
Control, SWPPP< Hydraulic Mulch, Erosion Control, Core Concrete, Lead Compliance Plan,
Asbestos Plan, Hydroseed, AC, Rebar, MBGR, Fencing. We look forward to receiving your
written quotation via facsimile on or before the date of bid. It is the policy of Valentine
Corporation to encourage the utilization of MBE/WBE/DBE/DVBE/UDBE firms at all levels
of construction contracting.
Valentine Corporation may require a Performance and Payment Bond. If so, the bond
premium will be paid for by Valentine Corporation. We will contact you prior to the date of
the bid to discuss this project with you.
For more information regarding this project call:
For more information regarding this project call:
GALLAGHER & BURK# INC'
Va l e n t i n e C o r p o r a t i o n • L i s a D a v i s
PHONE )*+/-.*/+0.. • FAX )*+/-.*/+034
E q u a l
O p p o r t u n i t y
Phone 415-453-3732 ext. #10 • Fax 415-457-5820
E m p l o y e r
E q u a l
Sub Bids Requested From Qualified (DBE) Subs and Suppliers
FOR:
CALTRANS
LOS ANGELES COUNTY FROM 0.5 MILE EAST OF ROUTE 18/138
JUNCTION TO SAN BERNARDINO COUNTY LINE
CONTRACT NO. 07-2656U4
BID DATE: NOVEMBER 6, 2014 @ 2:00 PM
TRADES REQUESTED (but not limited to):
AC DIKE, CHANGEABLE MESSAGE SIGNS-PORTABLE, CLEARING/GRUBBING, COLD
PLANE, CONCRETE BARRIER, CONSTRUCTION AREA SIGNS, ELECTRIC, FENCINGTEMPORARY/K-RAILING, GUARDRAIL-MIDWEST SYSTEM, LANDSCAPE/IRRIGATION,
LEAD COMPLIANCE PLAN, SIGNS-ALUMINUM/ROADSIDE, STRIPING & MARKING,
SWPPP, EQUIPMENT RENTALS, MATERIALS AND TRUCKING
S U L LY- M I L L E R C O N T R A C T I N G C O M PA N Y
An Equal Opportunity Employer
O p p o r t u n i t y
E m p l o y e r
Environmental Construction, Inc.
2 1 5 5 0 O X N A R D S T. , S U I T E # 1 0 5 0
• WOODLAND HILLS, CA 91367
Request for Qualified HUD SECTION 3
Subcontractors and/or Suppliers for the following:
ALAMITOS PARK PROJECT PARK IMPROVEMENTS
LONG BEACH, CA - PROJECT NO. K-6986
B I D D AT E / T I M E : O C T O B E R 2 9 , 2 0 1 4 @ 1 0 : 0 0 A M
Please respond by: October 29, 2014 - 8:00 am
R e q u e s t i n g q u o t a t i o n s f ro m q u a l i f i e d H U D S E C T I O N 3 S u b c o n t r a c t o r s
and/or Suppliers for the following trades: AC Paving, Cold Milling, Play
Equipment Installers, Fencing, Electrical.
License No. 747612A, C-10
1 3 5 S . S t a t e C o l l e g e B o u l e v a rd , S u i t e 4 0 0 , B re a , C A 9 2 8 2 1
Phone: (714) 578-9600 • Fax: (714) 578-9672
Contact: Estimating Department
Plans, specifications and project requirements are available on the Sully-Miller
Contracting web site at: www.sully-miller.com. Plans, specifications and project
requirements may be obtained at www.dot.ca.gov. Sully-Miller is willing to set aside any
portion of work, no matter how small to encourage (DBE) participation. If you require
information regarding assistance in obtaining bonding, insurance, credit, equipment, supplies,
materials, or related services, please call our office.
Plans & Specs are available for viewing in our office.
Assistance available with Bonds & Insurance.
For more information regarding this project contact:
Environmental Construction, Inc.
Contact: Joe Ortega
Phone 818-449-8920 • Fax 818-703-9073
E q u a l
100% Payment and Performance Bonds May Be Required
AP Construction Group Inc.
15537 Cabrito Rd.
Van Nuys, CA 91406
APCG is requesting sub bids from qualified
MBE/WBE/DBE/DVBE/SBE/UDBE
Subcontractors and Suppliers For the Following:
RIVERSIDE CITY COLLEGE
STUDENT SERVICES & ADMINISTRATION BUILDING
BID NO. 2014/15-21 HVAC
RIVERSIDE, CA 92506
BID DATE & TIME: OCTOBER 16, 2014 @ 2:00 PM
Scope of work includes, but not limited to: Air Distribution, Controls,
Insulation, Test & Balance, Pumps, Vibration isolation, Split System, Air
Handler, Boiler and Hydronic Piping.
For more information please contact:
Dave Djouzaie
Phone (818) 780-8855 • Fax (818) 780-2408
E: [email protected]
we are an equal opportunity employer
O p p o r t u n i t y
E m p l o y e r
S U B - B I D S R E Q U E S T E D F O R A N Y P O RT I O N O F W O R K F R O M Q U A L I F I E D &
C E RT I F I E D D B E S U B C O N T R A C TO R S A N D S U P P L I E R S F O R :
Concrete-ready-mix, grind - pulverize, pavement marking.
PLANS & SPECS AVAILABLE AT:
https://www.dropbox.com/sh/t1gesztr1q129wx/AACY4Kq1SUQpWoM_ImiwY91Ca?d1=0,
For the following project:
PROJECT: EAST PALM CANYON RESURFACING PROJECT
OWNER: CITY OF CATHEDRAL CITY
BID DUE: 10/21/14 AT 2:00 PM
C o n t a c t J O E R I C H A R D S O N a t G R A N I T E C O N S T R U C T I O N C O M PA N Y
38000 Monroe Street, Indio, CA 92203; Phone: 760/775-7500; Fax: 760/775-8229
Granite Construction Company (CA License 89) is an equal opportunity employer willing to
seriously negotiate and assist a subcontractor and/or supplier as needed. Any item of work,
portion of an item, or combination thereof, will be considered. Performance and Payment Bonds
will be required. Bonding assistance is available. Plans and Specifications are available for
review at CDOT, Granite’s office or Drop Box site link listed above. For more information on
the availability of scope of work, plans and specifications and our policy concerning assistance
to subcontractors in obtaining bonds, lines of credit, and/or insurance, please contact our office.
REQUEST FOR QUALIFIED UDBE/DBE SUBCONTRACTORS & SUPPLIERS FOR:
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION - CALTRANS
COLD PLANE AC, DIGOUTS, RUBBERIZED HMA, MBGR, STRIPING, CRACK SEALING
CONSTRUCTION ON STATE HIGHWAY IN HUMBOLDT COUNTY NEAR BLUE LAKE
FROM BLUE LAKE UNDERCROSSING TO NORTH FORK MAD RIVER BRIDGE CONTRACT # 01-0C4604 - ENGINEER’S ESTIMATE: $4,930,000.00
BID DATE: 10/16/14 @ 2:00 PM
GOAL: 9% DBE
J.F. Shea Construction is requesting quotes from all qualified subcontractors and suppliers including
certified UDBE/DBE firms for all items of work, including but not limited to: LEAD COMPLIANCE PLAN,
CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY PAVEMENT MARKING
(PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE
CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL
PROGRAM, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED
WOOD WASTE, REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC
PAVEMENT MARKING; REMOVE CHANNELIZERS; REMOVE ROADSIDE SIGN, REMOVE ASPHALT
CONCRETE DIKE, ADJUST GUARDRAIL, COLD PLANE ASPHALT CONCRETE PAVEMENT, SHOULDER
BACKING, CRACK TREATMENT, PREPAVING INERTIAL PROFILER, REPLACE ASPHALT CONCRETE
SURFACING, HOT MIX ASPHALT (TYPE A), RUBBERIZED HOT MIX ASPHALT (GAP GRADED),
RUBBERIZED HOT MIX ASPHALT (OPEN GRADED), CENTERLINE RUMBLE STRIP, SHOULDER
RUMBLE STRIP, DATA CORE, PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT
DIKE (TYPE C), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE
F), TACK COAT, FURNISH SINGLE SHEET ALUMINUM SIGN (0.080”-UNFRAMED), ROADSIDE SIGN
- ONE POST, DELINEATOR (CLASS 1), 4” THERMOPLASTIC TRAFFIC STRIPE, 8” THERMOPLASTIC
TRAFFIC STRIPE, THERMOPLASTIC PAVEMENT MARKING; 4” THERMOPLASTIC TRAFFIC STRIPE
(BROKEN 36-12), 4” THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7), PAVEMENT MARKER
(RETROREFLECTIVE-RECESSED), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM
ELEMENTS DURING CONSTRUCTION, MOBILIZATION.
J.F. Shea Construction, Inc. is a union signatory contractor. Subcontractors must possess a current
contractor ’s license, insurance coverage and worker ’s compensation for the entire length of the contract.
All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and
performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding,
equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at
17400 Clear Creek Road, Redding, CA 96001 or call for any additional needed project information. J.F.
Shea Construction Inc. intends to work cooperatively with all qualified firms seeking work on this project.
We are an equal opportunity employer and will work with any interested subcontractor to identify
opportunities to break items into economically feasible packages. Women and Minority Employees
are encouraged to apply.
J . F. S H E A C O N S T R U C T I O N , I N C .
P. O . B o x 4 9 4 5 1 9 , R e d d i n g , C A 9 6 0 4 9
Phone: (530) 246-4292 • Fax: (530) 246-9940
An Equal Opportunity Employer
MATICH CORPORATION
1596 Harry Sheppard Blvd., San Bernardino, CA 92408
W E A R E R E Q U E S T I N G S U B - B I D S A N D M AT E R I A L Q U O T E S F R O M
QUALIFIED DBE SUBCONTRACTORS AND/OR SUPPLIERS
F O R T H E F O L L O W I N G P R O J E C T:
CITY OF CATHEDRAL CITY - EAST PALM CANYON DRIVE
STREET IMPROVEMENTS, CATHEDRAL CITY, CA
PROJECT NO. 8913
BID DATE/TIME: OCTOBER 21, 2014 - 2:00 PM
Please respond by Bid Date & Time
Matich Corporation is requesting quotes from qualified DBE Subcontractors &
S u p p l i e r s i n t h e f o l l o w i n g t r a d e s : Tr a ff i c C o n t r o l , R u s t C o n t r o l , B M P S W P P P,
U n c l a s s i f i e d E x c a v a t i o n , P u l v e r i z a t i o n C o n c r e t e ( C u r b & G u t t e r, S W, R a m p s , &
Cross Gutter), Signing, Striping, and Adjust Utilities.
Plans can be reviewed at Agency or our office.
We w i l l p r o v i d e n e c e s s a r y a s s i s t a n c e .
M AT I C H C O R P O R AT I O N • R O B E R T M AT I C H
( 9 0 9 ) 3 8 2 - 7 4 0 0 • F a x ( 9 0 9 ) 3 8 2 - 0 11 3
W E
A R E
A N
E Q U A L
O P P O R T U N I T Y
E M P L O Y E R
15505 e. lincoln avenue
p.o. box 620
orange, ca 92856
714-637-1550
fax 714-637-6321
R.J. NOBLE
company
R . J . N O B L E C O M PA N Y I S R E Q U E S T I N G PA RT I C I PAT I O N
F R O M A L L Q U A L I F I E D & C E RT I F I E D D B E & S E C T I O N 3
S U B C O N T R A C TO R S A N D / O R S U P P L I E R S F O R T H E F O L L O W I N G P R O J E C T:
STUDEBAKER ROAD STREET IMPROVEMENTS FROM SOUTH STREET
TO ARTESIA BLVD. - CITY OF CERRITOS
PROJECT NO. 13032 BID NO. 1191-15/STPL-5325(016)
BID DATE/TIME: OCTOBER 13, 2014 at 11:00 AM
Please respond by: October 13, 2014 by 10:00 am
MATICH CORPORATION
1596 Harry Sheppard Blvd., San Bernardino, CA 92408
W E A R E R E Q U E S T I N G S U B - B I D S A N D M AT E R I A L Q U O T E S F R O M
QUALIFIED DBE SUBCONTRACTORS AND/OR SUPPLIERS
F O R T H E F O L L O W I N G P R O J E C T:
RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT
62nd AVENUE RESURFACING PROJECT
COACHELLA VALLEY, CA
PROJECT NO. C1-0599
BID DATE/TIME: OCTOBER 29, 2014 - 2:00 PM
Please respond by Bid Date & Time
S E E K I N G Q U A L I F I E D & C E RT I F I E D D B E & S E C T I O N 3 S U B C O N T R A C TO R S F O R :
COLD MILLING, CRACK SEAL, CONCRETE, STRIPING & SIGNAGE, TRAFFIC
LOOPS, ADJUST UTILITIES.
Matich Corporation is requesting quotes from qualified DBE Subcontractors &
S u p p l i e r s i n t h e f o l l o w i n g t r a d e s : D u s t A b a t e m e n t , Tr a ff i c C o n t r o l , C l e a r & G r u b ,
PCMS, Grinding, Cold plane, Thermoplastic Striping & Marking, and Pavement
Marker (Reflective).
Please call if you have any questions.
Plans can be reviewed at Agency or our office.
We w i l l p r o v i d e n e c e s s a r y a s s i s t a n c e .
R . J . N O B L E C O M PA N Y
C O N TA C T : B R A D E N P O R T E R , E S T I M AT O R
714-637-1550 • Fax 714-637-6321
E Q U A L
O P P O R T U N I T Y
E M P L O Y E R
1 8 2 0 7 M c D U R M O T T E A S T, S T E . G
I RV I N E , C A 9 2 6 1 4
FM & Sons, Inc.
FM & Sons, Inc. is seeking qualified
MBE/WBE/DBE/DVBE/SBE/UDBE
subcontractors and/or material suppliers
for the following project:
HIGH SCHOOL #5
I RV I N E , C A L I F O R N I A
M AT I C H C O R P O R AT I O N • M A R K H I C K M A N
( 9 0 9 ) 3 8 2 - 7 4 0 0 • F a x ( 9 0 9 ) 3 8 2 - 0 11 3
W E
A R E
A N
Joshual Melgoza
AN
EQUAL OPPORTUNITY
EMPLOYER
Brown & Fowler Construction, Inc.
3008 Antonino Avenue • Bakersfield, CA 93308
Project:
CDBG DELANO COMMUNITY CENTER REHABILITATION PROJECT
DELANO, CA
BID DATE/TIME: OCTOBER 16, 2014 @ 2:00 PM
Please respond by: October 15, 2014 by Noon
Requesting Bids From Certified MBE, WBE and Section 3 subcontractors in the
following areas: Grading/Demo, Concrete, Paving, Electrical, Underground,
Carpentry, Flooring, Tile, Plastering/Sheet Rock and Painting and Plumbing.
For more information contact:
DAVID L. BROWN
(661) 324-4142 • Fax (661) 324-0714
e q u a l
o p p o r t u n i t y
e m p l o y e r
R E Q U E S T FOR SUBCONTRACTORS, SUPPLIERS & VENDORS BID
Los Angeles Engineering, Inc. is requesting Subcontractor bids, Supplier bids & Vendor bids from
certified DBE Firms for the following Work Codes: C1200 CONSTRUCTION AREA SIGNS C1201
TRAFFIC CONTROL SYSTEM C1901 ROADWAY EXCAVATION C1940 DITCHES EXCAVATION
C2000 HIGHWAY PLANTING C2030 EROSION CONTROL C2065 IRRIGATION SYSTEM C3940
PLACE ASPHALT CONCRETE DIKE & MISC C7215 CONCRETED-ROCK SLOPE PROTECTION
C7218 AIR-BLOWN MORTAR (SLOPE PAVING) C8602 SIGNAL & LIGHTING
OWNER: CALTRANS
PROJECT: CONSTRUCTION ON STATE HIGHWAY IN ORANGE COUNTY IN SANTA
ANA & TUSTIN FROM 0.2 MILE SOUTH OF DYER ROAD UNDERCROSSING TO 0.1
MILE SOUTH OF McFADDEN AVENUE OVERCROSSING
CONTRACT NO. 12-0J6404
BIDS: OCTOBER 21, 2014 AT 2:00 PM
Plans, specifications and requirements for the work are available for review in our office at 633 N.
Barranca Ave., Covina, CA 91723, Mon-Fri 8:00 am - 5:00 pm, or by Owner at: Caltrans web site
www.dot.ca.gov.
Los Angeles Engineering, Inc. will provide information to interested business enterprises including
DBE’s in obtaining bonding, lines of credit, and insurance required by the Owner or Los Angeles
Engineering, Inc. upon request. Los Angeles Engineering will assist interested business enterprises
including DBE’s in obtaining necessary equipment, supplies, materials or related assistance. Bonds
may be required for subcontracts over $100,000.00.
F o r t e c h n i c a l a s s i s t a n c e re l a t e d t o p l a n s , s p e c i f i c a t i o n s , a n d re q u i re m e n t s f o r t h e w o r k c a l l
Joseph Haygood at 626-454-5222 Ext. 208 or email at [email protected].
I n a c c o rd a n c e w i t h C a l i f o r n i a P u b l i c C o n t r a c t C o d e S e c t i o n 4 1 0 8 a m e n d e d J a n u a r y 0 1 , 1 9 9 2 ,
a l l s u b c o n t r a c t s w i l l b e a w a rd e d o n L o s A n g e l e s E n g i n e e r i n g , I n c . s t a n d a rd f o r m o f
s u b c o n t r a c t a n d m a y i n c l u d e t h e re q u i re m e n t t o p ro v i d e a P a y m e n t a n d P e r f o r m a n c e B o n d
f ro m a T- L i s t e d S u re t y. We w i l l p a y p re m i u m u p t o 1 . 5 % o f B i d A m o u n t .
For additional information contact Joseph Haygood at (626) 454-5222 Ext. 208.
Los Angeles Engineering, Inc.
6 3 3 N . B a r r a n c a Av e . , C o v i n a , C A 9 1 7 2 3
(626) 454-5222 x208 • Fax (626) 454-5226
C o n t r a c t o r ’ s L i c e n s e N o . 5 9 11 7 6
A N
E Q U A L
O P P O R T U N I T Y
E M P L O Y E R
E M P L O Y E R
PROJECT: WEIGH STATION CONSTRUCTION AND PAVEMENT
REHABILITATION IN LOS ANGELES COUNTY IN CARSON FROM CARSON
STREET UNDERCROSSING TO MAIN STREET UNDERCROSSING
CALTRANS #07-288504 - 07-LA-405-10.5/12.6
ESTIMATE: $4,690,000 (6% DBE)
BID DATE: OCTOBER 16, 2014
Seeking MBE/WBE/DBE/DVBE/SBE/UDBE Subcontractors and/or
Material Suppliers including, but not limited to: Striping,
S w e e p i n g , S W P P, S l u r r y, S e a l i n g S u b c o n t r a c t o r b i d s .
Phone (714) 966-5278 • Fax (714) 708-5171
O P P O R T U N I T Y
Request for Qualified DBE Subcontractors & Suppliers for the following:
B I D D AT E : N O V E M B E R 1 , 2 0 1 4
For more information regarding this project contact:
E Q U A L
For more information contact:
To b o C o n s t r u c t i o n , I n c .
Suzie Na, Controller
239 N. Ridgewood Place
Los Angeles, CA 90004
Ph: 323-465-1600 • Fax 877-411-8626
[email protected]
we are an equal opportunity employer
R E Q U E S T F O R C E RT I F I E D D B E S U B C O N T R A C T O R S & S U P P L I E R S :
ROUTE 5 LERDO AVE TO ROUTE 5/46 SEPARATION - KERN COUNTY
CONTRACT NO. 06-0P1404
OWNER: DEPARTMENT OF TRANSPORTATION (CALTRANS) - DBE Goal - 5%
BID DATE: NOVEMBER 5, 2014 AT 2:00 P.M.
Quotes requested for, but not limited to, the following types of work:
• AC Dike • Aggregate Supply • Asphalt Paving • Cold Plane AC • Concrete Barrier • Concrete
Supply • Construction Area Signs • Drainage • Drill and Bond (Dowel Bar) • Electrical • Erosion
Control • Grinding • Guardrail • Hydroseed • Joint Seal • Materials Trucking • Minor Concrete
• Misc. Iron and Steel • Overhead Signs • Pipe Supply • Railing • Reinforcing Steel • Roadside
Sign • Street Sweeping • Striping • Survey • Tack Coat • Temp. Crash Cushion • Terminal System
Plans and specifications can be downloaded, at no cost from Caltrans web site at:
http://dot.ca.gov/hq/sec/oe/project_ads_addenda/06/06-0P1404/. Additionally, plans and specifications are
available at the offices in San Marcos, CA and Chino Hills, CA. Please call to make an appointment to view
plans and specifications.
Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies and materials is available
upon request. Flatiron/Papich, a Joint Venture analyzes and considers each DBE quote, including those
that are broken down into economically feasible units to facilitate bidding. Quotations must be valid
for same duration as specified by Owner for contract award. Bond Requirements: Notwithstanding
any contrary language in a bid to Flatiron/Papich, a Joint Venture. (”Flatiron/Papich”) or any prior
course of dealing between Flatiron/Papich and a bidder, and unless waived in writing by Flatiron/Papich,
Flatiron/Papich reserve the right, pursuant to Public Contract Code Section 4108 and otherwise, to
require each bidder to provide payment and performance bonds assuring bidder’s obligations to
Flatiron/Papich in the amount of 100 percent of the bid to Flatiron/Papich. Flatiron/Papich will
reimburse the bond premium at actual cost not to exceed 3%. The surety on the bonds must be a
California admitted surety.
Non-DBE Subs/Suppliers: Indicate 2nd tier DBE participation offered on your quotation as it will be
evaluated with your price.
F L AT I R O N / PA P I C H , A J O I N T V E N T U R E
1 7 7 0 L a C o s t a M e a d o w s D r i v e , S a n M a rc o s , C A 9 2 0 7 8
Phone (909) 597-8413 (ext. 2439) • Fax (909) 597-8635
C o n t a c t : S a n d r a F re n c h , E s t i m a t i n g A d m i n i s t r a t o r
E m a i l : O C L A B i d s @ f l a t i ro n c o r p . c o m
An Equal Opportunity Employer
R E Q U E S T FOR SUB-BIDS
Los Angeles Engineering, Inc. is requesting sub-bids from certified OBE/MBE/WBE firms for the
following trades: Construction Area Signs, Clearing and Grubbing, Highway Planting, Soil
Amendments, Irrigation System, PCC Pavement, Concrete Curb and Sidewalk.
OWNER: TRUST FOR PUBLIC LAND
PROJECT: GREEN ALLEYS LOW IMPACT
BIDS: OCTOBER 27, 2014 AT 4:00 PM
Plans, specifications and requirements for the work are available for review in our office at 633 N.
Barranca Ave., Covina, CA 91723, Mon-Fri 8:00 am - 5:00 pm, or by Owner at: Trust for Public Land,
135 W. Green Street, 2nd Floor, Pasadena, CA 91105.
Los Angeles Engineering, Inc. will provide information to interested business enterprises including
OBE/MBE/WBE’s in obtaining bonding, lines of credit, and insurance required by the Owner or Los
Angeles Engineering, Inc. upon request. Los Angeles Engineering will assist interested business
enterprises including OBE/MBE/WBE’s in obtaining necessary equipment, supplies, materials or
related assistance. Bonds may be required for subcontracts over $100,000.00.
For technical assistance related to plans, specifications, and requirements for the work call
Joseph Haygood at 626-454-5222 Ext. 208 or email at [email protected].
In accordance with California Public Contract Code Section 4108 amended January 01, 1992,
all subcontracts will be awarded on Los Angeles Engineering, Inc. standard form of
subcontract and may include the requirement to provide a Payment and Performance Bond
from a T-Listed Surety. We will pay premium up to 1.5% of Bid Amount.
For additional information contact Joseph Haygood at (626) 454-5222 Ext. 208.
Los Angeles Engineering, Inc.
633 N. Barranca Ave., Covina, CA 91723
(626) 454-5222 x208 • Fax (626) 454-5226
Contractor’s License No. 591176
AN
EQUAL
OPPORTUNITY
EMPLOYER
R E Q U E S T F O R C E RT I F I E D D B E S U B C O N T R A C T O R S & S U P P L I E R S :
REQUEST FOR DBE Subcontractors and Suppliers for:
ROUTE 58 AT HINKLEY ROAD TO HIDDEN RIVER ROAD
CONTRACT NO. 08-043514 - LOCATION: BARSTOW, CA
OWNER: DEPARTMENT OF TRANSPORTATION (CALTRANS) - DBE Goal - 9%
BID DATE: OCTOBER 30, 2014 AT 2:00 P.M.
Quotes requested for, but not limited to, the following types of work:
• AC Dike • Aggregate Supply • Asphalt Paving • Biologist • Clear & Grub • Cold Plane AC
• Concrete Barrier • Concrete Supply • Construction Area Signs • Electrical • Erosion Control
• Fence & Gates • Formliners • Guardrails • Hydroseed • Imported Borrow • Joint Seal • Material
Trucking • Minor Concrete • Miscellaneous Iron & Steel • Overhead Signs • PCC Supplies • Pipe
Supply • Precast Concrete • Prestressing • Railing • Reinforcing Steel • Roadside Signs • Rock Slope
Protection • Slope Paving • Stain Concrete • Striping.
Plans and specifications can be downloaded, at no cost from Caltrans web site at:
http://dot.ca.gov/hq/sec/oe/project_ads_addenda/08/08-043514/. Additionally, plans and specifications are
available at the offices in San Marcos, CA and Chino Hills, CA. Please call to make an appointment to view
plans and specifications.
Assistance in obtaining bonding, lines of credit, insurance, equipment, supplies and materials is available
upon request. Flatiron/Sukut, a Joint Venture analyzes and considers each DBE quote, including those
that are broken down into economically feasible units to facilitate bidding. Quotations must be valid
for same duration as specified by Owner for contract award. Bond Requirements: Notwithstanding
any contrary language in a bid to Flatiron/Sukut, a Joint Venture. (”Flatiron/Sukut”) or any prior course
of dealing between Flatiron/Sukut and a bidder, and unless waived in writing by Flatiron/Sukut,
Flatiron/Sukut reserve the right, pursuant to Public Contract Code Section 4108 and otherwise, to require
each bidder to provide payment and performance bonds assuring bidder’s obligations to Flatiron/Sukut
in the amount of 100 percent of the bid to Flatiron/Sukut. Flatiron/Sukut will reimburse the bond
premium at actual cost not to exceed 3%. The surety on the bonds must be a California admitted surety.
Non-DBE Subs/Suppliers: Indicate 2nd tier DBE participation offered on your quotation as it will be
evaluated with your price.
F L AT I R O N / S U K U T, A J O I N T V E N T U R E
1 7 7 0 L a C o s t a M e a d o w s D r i v e , S a n M a rc o s , C A 9 2 0 7 8
Phone (909) 597-8413 (ext. 2439) • Fax (909) 597-8635
C o n t a c t : S a n d r a F re n c h , E s t i m a t i n g A d m i n i s t r a t o r
E m a i l : O C L A B i d s @ f l a t i ro n c o r p . c o m
An Equal Opportunity Employer
D E S I LVA G A T E S
Construction
11555 Dublin Blvd., P.O. Box 2909
Dublin, CA 94568-2909
(925) 829-9220 • Fax (925) 803-4263
Contractors License No. 704195A
Desilva Gates Construction Is requesting Qualified
DBE (Disadvantaged Business Enterprises)
subcontractors/suppliers for the following Project:
PROJECT: CALTRANS ROUTE 20 - CONSTRUCTION ON STATE HIGHWAY IN YUBA
COUNTY ABOUT 12 MILES EAST OF MARYSVILLE FROM MARYSVILLE ROAD TO
0.3 MILE EAST OF LOWER SMARTSVILLE ROAD
Contract No. 03-3F0004, Federal Aid Project ACNH-P020(9171)
OWNER: STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
1727 30th Street, Bidder’s Exchange, MS 26, Sacramento, CA 95816
BID DATE: OCTOBER 28, 2014 @ 2:00 P.M. ESTIMATOR: VICTOR LE
We hereby encourage responsible participation of local Disadvantaged Business Enterprises, and solicit
their subcontractor or materials and/or suppliers quotation for the following types of work including but
not limited to: AC DIKE, CLEARING AND GRUBBING/DEMOLITION, CONSTRUCTION AREA SIGN,
CRACK SEALING, ELECTRICAL, GUARDRAIL, LEAD COMPLIANCE PLAN, MINOR CONCRETE,
DELINEATOR, MARKERS, STRIPING, VEGETATION CONTROL, TRUCKING, WATER TRUCKS,
STREET SWEEPING, HOT MIX ASPHALT (TYPE A) MATERIAL, RUBBERIZED HMA (OPEN GRADE)
MATERIAL, RUBBERIZED HMA (GAP GRADE) MATERIAL.
100% Performance and Payment Bonds may be required for full amounts of the subcontract price. Surety
company will have to be approved by DeSilva Gates Construction. DeSilva Gates Construction will pay
bond premium up to 2%. Subcontractors must possess current insurance and worker’s compensation
coverage meeting DeSilva Gates Construction’s requirements. Please call if you need assistance in
obtaining bonding, insurance, equipment, materials and/or supplies. Plans and specifications are available
for review at our Dublin office.
CHUMO CONSTRUCTION, INC.
I S S E E K I N G Q U A L I F I E D , C E RT I F I E D M B E / W B E / D B E / D V B E / S B E / U D B E
SUBCONTRACTORS AND SUPPLIERS FOR:
#07-3X8204 - The Dept. will receive sealed bids for CONSTRUCTION ON
STATE HIGHWAY IN LOS ANGELES COUNTY AT 0.2 MILE NORTH OF
CARPENTER CANYON BRIDGE AND AT 0.2 MILE SOUTH OF PEJSA
CANYON BRIDGE, 07-LA-39-21.7, 22.0 - (6% DBE)
BID DATE/TIME: OCTOBER 16, 2014
Please respond by: 2:00 pm
We h a v e i n f o r m a t i o n a b o u t t h e p l a n s , s p e c i f i c a t i o n s , a n d r e q u i r e m e n t s i n o u r
office located at 14425 Joanbridge St., Baldwin Park, CA. Our office hours
are 8:00 am to 4:30 pm. Copying services are available.
CHUMO CONSTRUCTION, INC.
Contact: George Chumo
626-960-9502 • FAX 626-960-3887
14425 Joanbridge Street
Baldwin Park, CA 91706
an equal opportunity employer
Hwy 20 Lake County
Caltrans #01-488604
BID DATE: OCTOBER 22, 2014 @ 2:00 PM
We are soliciting quotes for (including but not limited to):
Trucking, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Portable Changeable
Message Sign, SWPPP, Rain Event Action Plan, Storm Water Sampling & Analysis, Sweeping, Treated
Wood Waste, Abandon Culvert, Cold Plane AC, Sand Backfill, Clearing & Grubbing, Rock Blanket, Weed
Control Mat., Gravel Mulch, Boulders, Erosion Control, Compost, Lime Stabilized Soil, Geosynthetic
Pavement Interlayer, AC Dike, Tack Coat, Minor Concrete, Joint Seal, Roadside Signs, Oxidizing Stain,
Anti-Graffiti Coating, Underground, Geocomoposite Drain, Redwood Cover, Detectable Warning Surface,
Pre-Post Construction Survey, Misc. Iron & Steel, Fencing, Delineator, Object Marker, Striping & marking,
Electrical, Shoulder Backing, Dust Palliative, Jointed Plain Concrete Pavement, Slope Paving - Concrete
and Construction Materials
O.C. Jones & Sons, Inc.
1 5 2 0 F o u r t h S t . , B e r k e l e y, C A 9 4 7 1 0
510/526-3424 • Fax 510/526-0990
Contact: Jean Sicard
An Equal Opportunity Employer
100% Performance & Payment Bonds may be required. Worker’s Compensation Waiver of Subrogation required.
Please call OCJ for assistance with bonding, insurance, necessary equipment, material and/or supplies. OCJ
is willing to breakout any portion of work to encourage DBE Participation. Plans & Specs are available for
viewing at our office or through the Caltrans web site at www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php.
WESTERN ENGINEERING CONTRACTORS, INC.
IS REQUESTING QUALIFIED SUBCONTRACTORS AND/OR SUPPLIERS
I N C L U D I N G D B E F I R M S F O R T H E F O L L O W I N G P R O J E C T:
FRANCISCO DRIVE RIGHT-TURN POCKET - FRANCISCO DRIVE & EL DORADO HILLS
BLVD., EL DORADO COUNTY, CA
CONTRACT NO. PW 14-31068 - CIP NO. 71358
BID DATE/TIME: OCTOBER 15, 2014 @ 2:00 PM
Please respond by: October 14, 2014 @ 5:00 pm
We are looking for DBE subs for the following: (DBE GOAL 7%) CONSTRUCTION AREA
SIGNS, K-RAIL, SWPPP, CLEARING & GRUB, COLD PLANE, TRUCKING, CRACK
TREATMENT, SLURRY SEAL (TYPE II), SPLIT RAIL FENCE, STRIPING AND SIGNS.
Western Engineering Contractors is an Equal Opportunity Employer. Assistance is available in
obtaining bonds, lines of credit, insurance or other technical information. Plans are available from
agency, builders exchange or available for review at our office in Loomis prior to bid day. Please
contact our office at 916-652-3990 for more information.
100% Payment and Performance Bonds may be required. Contractor will pay bond premium up to 1%.
C o n t a c t : E S T I M AT I N G
WESTERN ENGINEERING CONTRACTORS, INC.
3171 Rippey Road • Loomis, CA 95650
P h o n e ( 9 1 6 ) 6 5 2 - 3 9 9 0 • FA X ( 9 1 6 ) 6 5 2 - 3 9 9 5
G R I F F I T H C O M PA N Y
REQUESTING SUB-BIDS ON ALL TRADES
From Qualified DBE Subcontractors & Suppliers
DALP Goal: DBE 7.0% For the following project:
CALTRANS - CONSTRUCTION ON STATE HIGHWAY IN KERN COUNTY IN
BAKERSFIELD AT SUNNY LANE PEDESTRIAN OVERCROSSING
CONTRACT NO. 06-0H6414, FEDERAL AID PROJECT NO. ACNHP-P178(064)E
S C O P E O F W O R K : T R A F F I C C O N T R O L , T R A F F I C C O N T R O L D E V I C E S , S W P P P,
D E M O L I T I O N , C L E A R I N G & G R U B B I N G , H E AV Y E Q U I P M E N T R E N TA L , L A N D S C A P E ,
I R R I G AT I O N , A S P H A LT, PAV I N G , R E A D Y M I X C O N C R E T E , J O I N T S E A L I N G , R E B A R ,
A G G R E G AT E S , M I S C E L L A N E O U S M E TA L S , F E N C E , G U A R D R A I L , S T R U C T U R A L
CONCRETE
B I D S : O C T O B E R 2 2 , 2 0 1 4 AT 2 : 0 0 P M
B I D S D U E : O C T O B E R 2 2 , 2 0 1 4 AT 2 : 0 0 P M
Plans & Specs are available for review from 7:00 am - 5:00 pm
Monday through Friday at:
G R I F F I T H C O M PA N Y
(AN EQUAL OPPORTUNITY EMPLOYER)
3050 E. Birch Street, Brea, CA 92821
Phone: (714) 984-5500 • Fax (714) 854-0227
C o n t a c t : B R A D A U S T I N , E S T I M AT O R
100% Performance and Payment bonds with a surety company subject to approval of Chumo
C o n s t r u c t i o n C o m p a n y, I n c . a r e r e q u i r e d o f s u b c o n t r a c t o r s f o r t h i s p r o j e c t . C h u m o
Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide
by terms and conditions of the AGC Master Labor Agreements and to execute an agreement
utilizing the latest AGC Standard Long Form Subcontract incorporating prime contract
t e r m s a n d c o n d i t i o n s , i n c l u d i n g p a y m e n t p r o v i s i o n s . C h u m o C o n s t r u c t i o n ’s l i s t i n g o f a
S u b c o n t r a c t o r i s n o t t o b e c o n s t r u e d a s a n a c c e p t a n c e o f a l l o f t h e S u b c o n t r a c t o r ’s
c o n d i t i o n s o r e x c e p t i o n s i n c l u d e d w i t h t h e S u b c o n t r a c t o r ’s p r i c e q u o t e . C h u m o
Construction requires that Subcontractors and Suppliers price quotes be provided at a
reasonable time prior to the bid deadline to enable a complete evaluation. For assistance
with bonding, insurance or lines of credit contact George Chumo at (626) 960-9502.
1 0 0 % B O N D I N G M AY B E R E Q U I R E D F O R A L L S U B C O N T R A C T O R S .
A S S I S TA N C E AVA I L A B L E I N O B TA I N I N G B O N D S , L I N E S O F C R E D I T, I N S U R A N C E ,
N E C E S S A R Y E Q U I P M E N T & T E C H N I C A L A S S I S TA N C E . G R I F F I T H C O M PA N Y I N T E N D S
T O C O N D U C T I T S E L F I N “ G O O D FA I T H ” W I T H D B E F I R M S R E G A R D I N G
PA R T I C I PAT I O N O N T H I S P R O J E C T.
CHUMO CONSTRUCTION, INC.
VALENTINE CORPORATION
I S S E E K I N G Q U A L I F I E D , C E RT I F I E D M B E / W B E / D B E / D V B E / S B E / U D B E
SUBCONTRACTORS AND SUPPLIERS FOR:
#07-2881U4 - FOR CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES
COUNTY IN LA CANADA FLINTRIDGE, GLENDALE AND PASADENA FROM
DUNSMORE AVENUE UNDERCROSSING TO NORTH LOS ROBLES AVENUE
OVERCROSSING - 07-LA-210-R16.1/R25.8 - (11% DBE)
BID DATE/TIME: OCTOBER 16, 2014
Please respond by: 2:00 pm
We h a v e i n f o r m a t i o n a b o u t t h e p l a n s , s p e c i f i c a t i o n s , a n d r e q u i r e m e n t s i n o u r
office located at 14425 Joanbridge St., Baldwin Park, CA. Our office hours
are 8:00 am to 4:30 pm. Copying services are available.
CHUMO CONSTRUCTION, INC.
Contact: George Chumo
626-960-9502 • FAX 626-960-3887
14425 Joanbridge Street
Baldwin Park, CA 91706
an equal opportunity employer
100% Performance and Payment bonds with a surety company subject to approval of Chumo
C o n s t r u c t i o n C o m p a n y, I n c . a r e r e q u i r e d o f s u b c o n t r a c t o r s f o r t h i s p r o j e c t . C h u m o
Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide
by terms and conditions of the AGC Master Labor Agreements and to execute an agreement
utilizing the latest AGC Standard Long Form Subcontract incorporating prime contract
t e r m s a n d c o n d i t i o n s , i n c l u d i n g p a y m e n t p r o v i s i o n s . C h u m o C o n s t r u c t i o n ’s l i s t i n g o f a
S u b c o n t r a c t o r i s n o t t o b e c o n s t r u e d a s a n a c c e p t a n c e o f a l l o f t h e S u b c o n t r a c t o r ’s
c o n d i t i o n s o r e x c e p t i o n s i n c l u d e d w i t h t h e S u b c o n t r a c t o r ’s p r i c e q u o t e . C h u m o
Construction requires that Subcontractors and Suppliers price quotes be provided at a
reasonable time prior to the bid deadline to enable a complete evaluation. For assistance
with bonding, insurance or lines of credit contact George Chumo at (626) 960-9502.
111 P e l i c a n Wa y, S a n R a f a e l , C A 9 4 9 0 1
Request for Qualified MBE/WBE/DBE/DVBE/SBE/UDBE
Subcontractors and/or Suppliers for the Following Project:
CALTRANS #04-1SS024 - CONST. IN ALAMEDA COUNTY ON RT 13 AT
MORGAND NB ON RAMP - OAKLAND
B I D D AT E / T I M E : O C T O B E R 1 5 , 2 0 1 4 @ 2 : 0 0 P M
Please respond by: October 15, 2014 @ 1:00 pm
Valentine Corporation will be bidding the above referenced project as a general contractor. Your
firm is invited to submit a sub bid in your area of expertise. Plans and specifications are
available in our office for review. Our estimating team will be available before the date of the
bid should you have any questions or require technical assistance. Areas of work that we
require sub bids for are as follows: Requesting MBE/WBE/DBE/DVBE/SBE/UDBE
Subcontractors and/or Suppliers For, But Not Limited To: Const. Area Signs, Traffic Control,
PCMS, SWPPP, Storm Water Report, Hydraulic Mulch, Erosion Control, Street Sweep, Temp.
Fencing, Striping, Noise Monitoring, Cold Plane AC, Landscaping, Hydroseed, AC, CIDH,
Soil Nail, Timber Cable Railing, Lighting/Electrical. We look forward to receiving your
written quotation via facsimile on or before the date of bid. It is the policy of Valentine
Corporation to encourage the utilization of MBE/WBE/DBE/DVBE/UDBE firms at all levels
of construction contracting.
Valentine Corporation may require a Performance and Payment Bond. If so, the bond
premium will be paid for by Valentine Corporation. We will contact you prior to the date of
the bid to discuss this project with you.
For more information regarding this project call:
Va l e n t i n e C o r p o r a t i o n • L i s a D a v i s
Phone 415-453-3732 ext. #10 • Fax 415-457-5820
E q u a l
O p p o r t u n i t y
E m p l o y e r
SECURITY PAVING COMPANY, INC.
OHL USA, INC.
Request for DBE Subcontractors and/or Suppliers for the following:
REQUESTING SUB-BIDS ON ALL TRADES
From Qualified Subcontractors & Suppliers especially DBE (DBE Goal 7%)
For the following Caltrans Project in District 12 On Route 5 :
REALIGN AND WIDEN 2 TO 4 LANES EXPRESSWAY ON STATE RTE 58 IN
SAN BERNARDINO COUNTY AT HINCKLEY ROAD FROM 2.4 MILES
WEST OF HIDDEN RIVER ROAD TO 0.7 MILE EAST OF LENWOOD ROAD
CALTRANS CONTRACT #08-043514
BID DATE/TIME: THURSDAY, OCTOBER 30, 2014 AT 2:00 PM
Please respond by: Wednesday, October 29, 2014 before 5:00 pm
R E Q U E S T I N G B I D S F R O M Q U A L I F I E D D B E S U B C O N T R A C TO R S & S U P P L I E R S
P l a n s & S p e c s a re a v a i l a b l e f o r re v i e w a t o u r m a i n o ff i c e . 1 0 0 % P e r f o r m a n c e &
P a y m e n t B o n d s w i t h a S u re t y C o m p a n y s u b j e c t t o a p p ro v a l o f S e c u r i t y P a v i n g C o .
a re re q u i re d o f s u b c o n t r a c t o r s f o r t h i s p ro j e c t . S e c u r i t y P a v i n g C o . Wi l l p a y B o n d
P re m i u m u p t o 1 % . S e c u r i t y P a v i n g C o . i s s i g n a t o r y t o O p e r a t i n g E n g i n e e r s ,
L a b o re r s , Te a m s t e r s , C e m e n t M a s o n s & C a r p e n t e r s U n i o n s . S e c u r i t y P a v i n g C o . w i l l
n e g o t i a t e i n G o o d F a i t h w i t h i n t e re s t e d D B E ’ s . S e c u r i t y P a v i n g C o . w i l l d i v i d e w o r k
i n t o s m a l l e r t a s k s t o m a k e i t m o re f e a s i b l e f o r i n t e re s t e d D B E ’ s . F o r a s s i s t a n c e w i t h
B o n d i n g , I n s u r a n c e o r L i n e s o f C re d i t c o n t a c t o u r o ff i c e a t ( 8 1 8 ) 3 6 2 - 9 2 0 0 .
For more information:
SECURITY PAVING COMPANY, INC.
Contact: Joe Ferndino. Estimator
13170 Telfair Ave. • Sylmar, CA 91342
(818) 362-9200 • Fax (818) 362-9300
email: [email protected]
Equal Employment Opportunity Company
R E Q U E S T F O R C E RT I F I E D D B E S U B C O N T R A C TO R S & S U P P L I E R S :
R o u t e 5 Av e n i d a P i c o , C o n t r a c t N o . 1 2 - 0 F 9 6 A 4
Location: San Clemente, CA - Owner: Caltrans
B I D D AT E : O C TO B E R 2 3 , 2 0 1 4
Quotes requested for, but not limited to, the following types of work:
* AC Dike • Aggregate Supply • Asphalt Paving • Bridge Demolition • CIDH Pile • Clear & Grub • Cold
Plane AC • Concrete Barrier • Concrete Supply • Construction Area Signs • Electrical
• Erosion Control • Fencing & Railing • Guardrail • Hydroseed * Joint Seal • Landscape & Irrigation •
Manholes • Materials Trucking • Minor Concrete • Miscellaneous Iron & Steel • Overhead Signs • Pipe
Supply • Pre/Post Construction Surveys • Prestressing • Reinforcing Steel • Roadside Sign • Rock Slope
Protection • Shotcrete • Street Sweeping • Striping • Temporary Crash Cushion.
Plans and specifications can be downloaded, at no cost, from the Caltrans web site at:
http://www.dot.ca.gov/hq/esc/oe/project_ads_addenda/12/12-0F96A4/. Additionally, plans and specifications
are available at Flatiron’s Chino Hills and San Marcos offices. Please call to make an appointment to view
plans and specifications.
Assistance in
upon request.
economically
by Owner for
obtaining bonding, lines of credit, insurance, equipment, supplies and materials is available
Flatiron analyzes and considers each DBE quote, including those that are broken down into
feasible units to facilitate bidding. Quotations must be valid for same duration as specified
contract award.
Bond Requirements: Notwithstanding any contrary language in a bid to Flatiron West, Inc. (”Flatiron”) or
any prior course of dealing between Flatiron and a bidder, and unless waived in writing by Flatiron, Flatiron
reserves the right, pursuant to Public Contract code section 4108 and otherwise, to require each bidder to
provide payment and performance bonds assuring bidder’s obligations to Flatiron in the amount of 100
percent of the bid to Flatiron. Flatiron will reimburse the bond premium at actual cost not to exceed 3%.
The surety on the bonds must be a California admitted surety.
Non-DBE Subs/Suppliers: Indicate 2nd tier DBE participation offered on your quotation as it will be evaluated
with your price.
F L AT I R O N W E S T, I N C .
1 7 7 0 L a C o s t a M e a d o w s D r. , S a n M a r c o s , C A 9 2 0 7 8
Phone (909) 597-8413 • Fax (909) 597-8635
Contact: Sandra French, Estimating Administrator
E-mail: [email protected]
An Equal Opportunity Employer
I-5 IN SAN CLEMENTE
*ELECTRONIC BID*
The I-5 San Clemente project consists of construction on state highway I-5 in Orange County in
San Clemente from 0.4 mile south to 0.3 mile north of the Avenida Pico undercrossing. The project
will include the widening and addition of lanes and full shoulders on I-5 in both directions and
installation of a new 180’ LF bridge to replace the current one. Avenida Pico will also be widened
and renovated in both directions. Four retaining walls will be built, with one being located
alongside of an Environmentally Sensitive Area “ESA” located northeast of Avenida Pico.
SCOPE OF WORK: Construction Site Management, Storm Water Pollution Plan, Street Sweeping,
Construction Area Signs, Traffic Control System, Type III Barricade, Fencing, Portable Delineator, Temporary
Pavement Marking, Temporary Traffic Stripe, Channelize, Temporary Railing, Portable Changeable Message
Signs, Temporary Crash Cushion Module, Metal Beam Guard Railing, Roadside Signs, Abandon Culvert,
Cold Plane Concrete Pavement, Remove Concrete (Structure), Concrete Barrier, Bridge Removal, Clearing
and /Grubbing, Roadway Excavation, Develop Water Supply, Structure Excavation (Bridge), Structure
Excavation (Retaining Wall), Structure Backfill, Sand Backfill, Rock Blanket, Soil Nail, Erosion Control, Fiber
Rolls, Class 2 Aggregate Base, Hot Mix Asphalt, Place Hot Mix Asphalt Dike, Tack Coat, Concrete Pavement,
Seal Pavement Joint, Furnish & Drive Steel Pile, CIDH Concrete Piling, Prestressing CIP Concrete, Structural
Concrete (Bridge), Structural Concrete (Retaining Wall), Structure Concrete (Box Culvert), Minor Concrete,
Shot-Crete, Treat Bridge Deck, Joint Seal Assembly, Joint Seal, Bar Reinforcing Steel (Bridge), Bar Reinforcing
Steel (Retaining Wall), Furnish & Install Sign Structure, Furnish Laminated Panel, Furnish Single Sheet
Aluminum Sign, Roadside Sign, Alternative Pipe Culvert, Reinforced Concrete Pipe, Corrugated Steel Pipe,
Welded Steel Pipe Casing, Alterative Flared End Section, Rock Slope Protection, Slope Paving, Minor
Concrete, Rock Slope Protection Fabric, Miscellaneous Metal, Miscellaneous Iron and Steel, Bridge Deck
Drainage System, Chain Link Fence, Pipe Handrail, Cable Railing, Transition Railing, Terminal System,
Crash Cushion, Concrete Barrier, Thermoplastic Pavement Marking, Thermoplastic Traffic Stripe, Paint
Traffic Stripe, Pavement Marker, Signal & Lighting, Lighting & Sign Illumination, Fiber Optic Conduit,
Electric Service (Irrigation, Traffic Monitoring Station) Closed Circuit TV System, Ramp Metering System,
Slope Inclinometer, Landscape and Irrigation.
BIDS: THURSDAY, OCTOBER 23, 2014 UNTIL 2:00 PM
BIDS DUE ON OR BEFORE: October 23, 2014 by 1:00 pm
Plans & Specs are available at OHL offices from 7:00 am - 5:00 pm, Monday through Friday at:
OHL USA, INC. is an AAE/EOE
1920 Main St., Suite 310, Irvine, CA 92614
Phone: 949-242-4432 • Fax: 949-231-1255/949-231-1256
Or anytime at the Caltrans Link below:
http://www.dot.ca.gov/hq/esc/oe/project_ads_addenda/12/12-0F96A4/
Contact: Estimating Department. - Kevin Abbott
100% BONDING MAY BE REQUIRED FOR ALL SUBCONTRACTORS. ASSISTANCE AVAILABLE IN
OBTAINING BONDS, LINES OF CREDIT, INSURANCE, NECESSARY EQUIPMENT & TECHNICAL
ASSISTANCE.. OHL USA, INC. INTENDS TO CONDUCT ITSELF IN “GOOD FAITH” WITH ALL CATEGORIES
OF DISADVANTAGED, SMALL, MINORITY AND WOMEN FIRMS REGARDING PARTICIPATION ON THIS
PROJECT. THEREFORE PLEASE SEND YOUR CERTIFICATIONS PRIOR TO QUOTES.
PLEASE RESPOND BACK VIA EMAIL or FAX (include Contractor number and ANY DISADVANTAGE CERTIFICATE
and/or applicable certifications issued and validated by pertinent agencies)
EMAIL: Kevin Abbott at [email protected], FAX: (949) 231-1255/(949) 231-1256
15505 e. lincoln avenue
p.o. box 620
orange, ca 92856
714-637-1550
fax 714-637-6321
R.J. NOBLE
company
R . J . N O B L E C O M PA N Y I S R E Q U E S T I N G PA RT I C I PAT I O N
F R O M A L L Q U A L I F I E D & C E RT I F I E D D B E & S E C T I O N 3
S U B C O N T R A C TO R S A N D / O R S U P P L I E R S F O R T H E F O L L O W I N G P R O J E C T:
STREET IMPTS FOR ASHLEY CIRCLE FROM CALENDULA AVE TO END
ASTER STREET FROM CALENDULA AVE TO JONQUIL
- VARIOUS STREETS IN WESTMINSTER
PROJECT NO. CDBG 14-15
BID DATE/TIME: OCTOBER 22, 2014 - 10:00 AM
Please respond by: September 22, 2014 by 9:00 am
S E E K I N G Q U A L I F I E D & C E RT I F I E D D B E & S E C T I O N 3 S U B C O N T R A C TO R S F O R :
C O L D P L A N I N G , S T R I P I N G , C O N C R E T E , FA B R I C , A D J U S T U T I L I T I E S , S U RV E Y.
Please call if you have any questions.
VALENTINE CORPORA TION
111 P e l i c a n Wa y, S a n R a f a e l , C A 9 4 9 0 1
Request for Qualified MBE/WBE/DBE/DVBE/SBE/UDBE
Subcontractors and/or Suppliers for the Following Project:
CALTRANS #04-1SS224 - RETAINING WALL AND PROTECTION - CLOVERDALE
B I D D AT E / T I M E : O C T O B E R 2 3 , 2 0 1 4 @ 2 : 0 0 P M
Please respond by: October 23, 2014 @ 1:00 pm
Valentine Corporation will be bidding the above referenced project as a general contractor. Your
firm is invited to submit a sub bid in your area of expertise. Plans and specifications are
available in our office for review. Our estimating team will be available before the date of the
bid should you have any questions or require technical assistance. Areas of work that we
require sub bids for are as follows: Requesting MBE/WBE/DBE/DVBE/SBE/UDBE
Subcontractors and/or Suppliers For, But Not Limited To: Lead Compliance, Const. Area
Signs, Traffic Control, Temp Signal System, WPCP, Temp Fencing, Thermoplastic Striping,
Street Sweeping, Cold Plane AC, Clear & Grub, CIDH, Hydromulch, Hydroseed, AC, Supply
Steel Pile, Supply Timber Lagging, Precast Conc., MBGR, Cable Railing. We look forward to
receiving your written quotation via facsimile on or before the date of bid. It is the policy of
Valentine Corporation to encourage the utilization of MBE/WBE/DBE/DVBE/UDBE firms at
all levels of construction contracting.
Valentine Corporation may require a Performance and Payment Bond. If so, the bond
premium will be paid for by Valentine Corporation. We will contact you prior to the date of
the bid to discuss this project with you.
R . J . N O B L E C O M PA N Y
For more information regarding this project call:
C O N TA C T : A U S T I N C A RV E R
714-637-1550 • Fax 714-637-6321
E Q U A L
O P P O R T U N I T Y
Va l e n t i n e C o r p o r a t i o n • L i s a D a v i s
Phone 415-453-3732 ext. #10 • Fax 415-457-5820
E q u a l
E M P L O Y E R
O p p o r t u n i t y
E m p l o y e r
SUBCONTRACTOR REQUEST FOR QUOTATION
S U B - B I D S R E Q U E S T E D F O R A N Y P O RT I O N O F W O R K F R O M Q U A L I F I E D &
C E RT I F I E D D B E S U B C O N T R A C TO R S A N D S U P P L I E R S F O R :
Concrete-Ready-Mix, Liquid AC, Fence/Guardrail, Pavement Marking, Grind-Cold
Plane, Signs-Area, Electrical Roadway.
PLANS & SPECS AVAILABLE AT CALTRANS WEB SITE.
For the following project:
PROJECT: #08-1C3704 - ROUTE 95 RESURFACING
OWNER: CALTRANS - FEDERAL AID#: ACSTP-P095 (027) E
BID DUE: 10/28/14 AT 2:00 PM
C o n t a c t J O E R I C H A R D S O N a t G R A N I T E C O N S T R U C T I O N C O M PA N Y
38000 Monroe Street, Indio, CA 92203; Phone: 760/775-7500; Fax: 760/775-8229
Granite Construction Company (CA License 89) is an equal opportunity employer willing to
seriously negotiate and assist a subcontractor and/or supplier as needed. Any item of work,
portion of an item, or combination thereof, will be considered. Performance and Payment Bonds
will be required. Bonding assistance is available. Plans and Specifications are available for
review at CDOT, Granite’s office or Caltrans web site. For more information on the availability
of scope of work, plans and specifications and our policy concerning assistance to subcontractors
in obtaining bonds, lines of credit, and/or insurance, please contact our office.
Ames Construction, Inc. is seeking certified and qualified DBE subcontractors and/or suppliers
to meet the 7% goal for the following:
PROJECT:
OWNER:
BID DATE/TIME:
PLEASE SUBMIT BID TO:
12-0F96A4 - FREEWAY WIDENING, BRIDGE
RECONSTRUCTION, LANDSCAPE & ELECTRICAL
CALTRANS
OCTOBER 23, 2014 @ 2:00 PM
Ames Construction, Inc.
391 N. Main St., Ste 111, Corona, CA 92880
Ph: 951-356-1275, Fax: 951-549-9003
DBE Subs/Suppliers required include, but are not limited to: Lead compliance, barricades, fencing, guardrail, railingbarrier/cable/WB, PCMS, object markers, SWPPP, erosion control, street sweeping, demo, bridge removal, clear & grub, dust
palliative, imported borrow, rock blanket, landscaping, irrigation, pvmnt marking, AC Cold Plane, imported borrow, plant
maintenance, pipe - PVC/CHDPP/RCP/OSRCP, alt pipe culvert, aggregates, lean concrete base, permeable material, asphalt
paving, HMA, dike, joint seal, ground anchor, MSE walls, F&I steel and CIDH piles, concrete-paving/barrier/PS
CIP/structural/minor/channel lining/supply/RSP, architectural treatment, rebar, signs-const area/rdway/structure, misc. iron &
steel, drainage, rock slope protection, geo-synthetics, survey, signal & lighting, electrical, utilities. Ames intends to conduct
itself in good faith with DBE firms for participation on this project. Ames will work with subcontractors to breakdown items
into economical feasible packages.
Ames will require bidder to provide performance and payment bonds for the full amount of the Subcontract values. Costs of
the bonds are to be provided as a separate line item. Please call to discuss how Ames Construction, Inc. can assist you in your
bonding, credit and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies,
or materials for this project. We are an equal opportunity employer. Ames’ Subcontract terms and conditions will apply to any
contracts resulting from this request. The Subcontractor, by submission of its bid, agrees to the “Terms and Conditions”
including all Exhibits and Attachments of Ames Subcontract Agreement. Ames reserves the right to accept or reject any or all
quotations. Pricing submitted to Ames Construction for this project must be valid and may not be withdrawn for 120
calendar days from the date of bid opening.
Our contact for this project is Thony Le. He can be reached at 951-356-1275. Please fax quotes to 951-549-9003.
Plans and specifications can be viewed and downloaded at:
Sub Bids Requested From Qualified (DBE) Subs and Suppliers
FOR:
CITY OF CAMARILLO
PANCHO ROAD REPAVING
FEDERAL PROJECT NO.: STPL-5393(034)
BID DATE: OCTOBER 21, 2014 @ 10:00 AM
TRADES REQUESTED (but not limited to):
AC DIKE, ELECTRICAL, MANHOLE-ADJUSTING, SIGNS, STRIPING/MARKING,
SURVEY/SURVEY MONUMENT, SWPPP, MATERIALS, EQUIPMENT AND TRUCKING
S U L LY- M I L L E R C O N T R A C T I N G C O M PA N Y
An Equal Opportunity Employer
License No. 747612A, C-10
1 3 5 S . S t a t e C o l l e g e B o u l e v a rd , S u i t e 4 0 0 , B re a , C A 9 2 8 2 1
Phone: (714) 578-9600 • Fax: (714) 578-9672
Contact: Estimating Department
Plans, specifications and project requirements are available in our office for viewing or
on the Sully-Miller Contracting web site at: www.sully-miller.com. Plans, specifications
and project requirements may be requested from McGraw Hill Construction Dodge at
www.construction.com or Ventura County Contractors’ Association, Lockwood Street,
Suite 110, Oxnard, CA 93030. Sully-Miller is willing to set aside any portion of work, no
matter how small to encourage (DBE) participation. If you require information regarding
assistance in obtaining bonding, insurance, credit, equipment, supplies, materials, or related
services, please call our office.
100% Payment and Performance Bonds May Be Required
R E Q U E S T FOR SUBCONTRACTORS, SUPPLIERS & VENDORS BID
Los Angeles Engineering, Inc. is requesting Subcontractor bids, Supplier bids & Vendor bids from
certified DBE Firms for the following Work Codes: C1200 CONSTRUCTION AREA SIGNS C1201
TRAFFIC CONTROL SYSTEM C2000 HIGHWAY PLANTING C2020 SOIL AMENDMENTS C2065
IRRIGATION SYSTEM C8602 SIGNAL & LIGHTING
OWNER: CALTRANS #07-2838U4
PROJECT: CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY
AT VARIOUS LOCATIONS
BIDS: OCTOBER 30, 2014 AT 2:00 PM
Plans, specifications and requirements for the work are available for review in our office at 633 N.
Barranca Ave., Covina, CA 91723, Mon-Fri 8:00 am - 5:00 pm, or by Owner at: Caltrans web site
www.dot.ca.gov.
Los Angeles Engineering, Inc. will provide information to interested business enterprises including
DBE’s in obtaining bonding, lines of credit, and insurance required by the Owner or Los Angeles
Engineering, Inc. upon request. Los Angeles Engineering will assist interested business enterprises
including DBE’s in obtaining necessary equipment, supplies, materials or related assistance. Bonds
may be required for subcontracts over $100,000.00.
For technical assistance related to plans, specifications, and requirements for the work call
Joseph Haygood at 626-454-5222 Ext. 208 or email at [email protected].
In accordance with California Public Contract Code Section 4108 amended January 01, 1992,
all subcontracts will be awarded on Los Angeles Engineering, Inc. standard form of
subcontract and may include the requirement to provide a Payment and Performance Bond
from a T-Listed Surety. We will pay premium up to 1.5% of Bid Amount.
For additional information contact Joseph Haygood at (626) 454-5222 Ext. 208.
Los Angeles Engineering, Inc.
6 3 3 N . B a r r a n c a Av e . , C o v i n a , C A 9 1 7 2 3
(626) 454-5222 x208 • Fax (626) 454-5226
C o n t r a c t o r ’ s L i c e n s e N o . 5 9 11 7 6
A N
E Q U A L
O P P O RT U N I T Y
E M P L O Y E R
Gallagher & Burk, Inc.
PAVING & GRADING CONTRCTORS • LICENSE NO. 141140A
800 HIGH STREET • P'O' BOX 3--3 • OAKLAND# CA <0.+*
Gallagher & Burk# Inc' is preparing a bid as a Prime Contractor
for the project listed below:
PROJECT: CONSTRUCTION IN THE CITY OF UNION CITY WHIPPLE ROAD
PAVEMENT REHABILITATION, CITY PROJECT NO. 13-10
OWNER: CITY OF UNION CITY - OFFICE OF CITY CLERK
34009 ALVARADO-NILES ROAD, UNION CITY, CALIFORNIA 94587
BID DATE: OCTOBER 23, 2014 @ 2:00 P.M.
ESTIMATOR: ALAN McKEAN
We hereby encourage responsible participation of local Disadvantaged Business Enterprises, and solicit
their subcontractor or materials and/or suppliers quotation for the following types of work including but
not limited to: ADJUST IRON, COLD PLANE, ELECTRICAL, MINOR CONCRETE, STRIPING,
TRUCKING, STREET SWEEPING, HOT MIX ASPHALT (TYPE A) MATERIAL.
*++= Performance and Payment Bonds may be required for full amounts of the subcontract
price' Surety company will have to be approved by Gallagher & Burk# Inc' Gallagher & Burk#
Inc' will pay bond premium up to -=' Subcontractors must possess current insurance and
worker’s compensation coverage meeting Gallagher & Burk# Inc'’s requirements' Please call if
you need assistance in obtaining bonding# insurance# equipment# materials and/or supplies' Plans
and specifications are available for review at our office'
For more information regarding this project call:
GALLAGHER & BURK# INC'
PHONE )*+/-.*/+0.. • FAX )*+/-.*/+034
E q u a l
O p p o r t u n i t y
E m p l o y e r