Government of West Bengal Public Works Department Establishment Branch Notification

Government of West Bengal
Public Works Department
Establishment Branch
Writers’ Buildings, Kolkata-700001
No. 277
Notification
Date: 10.10.2014
The Governor is pleased in the interest of the Public Service to transfer the table mentioned Assistant
Engineers from their present place of posting and to post them on such transfer, to the charge of the Office(s)
as indicated against their names, with immediate effect. All the officers’ are further instructed to continue
holding their respective charges as stated below till further orders. T.A/D.A. is admissible as per rules.
Sl.
No
1
Name of the Assistant
Engineer
Sri Partha Roy
Present place of posting
Chetla Sub-Division, P.W.D.
2
Sri Krishnapada Acharya
Highway Survey Division No.I
under State Highway Planning
Circle, P.W. (R) Dte.
Kolaghat NH Subdivision, under
NH Divn-II, P.W.(R) Dte.
3
Sri Asish Hazra.
4
Sri Subrata Chowdhury
Torsa Bridge Construction SubDivision-II under Torsa Bridge
Construction Division, P.W. Dte.
5
Sri Bholanath Sahoo
Bidhannagar East Sub-Division-III
(erstwhile Bidhannagar SubDivision-IV) under Bidhannagar
East Division, P.W. Dte.
6
Sri Debapratim Maity
7
Sri Dilip Aich
North Kolkata Health Sub-DivisionII (erstwhile Belgachiya
Construction Sub-Division) under
North Kolkata Health Division, P.W.
Dte.
Diamond Harbour National
Highway Sub-Division under
National Highway Division-I, P.W.
(Roads) Dte.
8
Sri Jhulan
Chattopadhyay
Malda Sub-Division under Malda
Division, P.W. Dte.
9
Sri Subhas Biswas
10
Sri Subrata Sarkar
Office of the Chief Engineer,
National Highway, P.W. (Roads)
Dte.
Highway Design Divn.VI, P.W.
(Roads) Dte.
11
Sri Anindya Chanda
12
Sri Dibyendu Laha
13
Sri Ashoke Kumar Ghosh
14
Sri Nayan Ranjan Mandal
Kolkata East Sub-Division-I, under
Kolkata East Divn, P.W. Dte.
Highway Survey Divn.III, P.W.
(Roads) Dte.
Resources Division-I, P.W. (Roads)
Dte.
Resources Division-II, P.W. (Roads)
Dte.
Place of posting on Transfer
Housing Planning Division under
Housing Directorate vice Sri Sudip
Nath Chandra since transferred.
Canning Sub-Division under South
24-Parganas Division, Social Sector,
P.W. Dte. since vacant.
Salboni National Highway SubDivision under National Highway
Division-II, P.W.(R) Dte. Vice Sri Nilay
Kumar Mandal since transferred.
Bidhannagar East Sub-Division-III
(erstwhile Bidhannagar Sub-DivisionIV) under Bidhannagar East Division,
P.W. Dte. Vice Sri Bholanath Sahoo
since transferred.
North Kolkata Health Sub-Division-II
(erstwhile Belgachiya Construction
Sub-Division) under North Kolkata
Health Division, P.W. Dte. Vice Sri
Debapratim Maity since transferred.
Assistant Engineer, Rehabilitation
Division, Social Sector, P.W. Dte.
since vacant.
Torsa Bridge Construction SubDivision-II under Torsa Bridge
Construction Division, P.W. Dte. vice
Sri Subrata Chowdhury since
transferred.
Design Division, Social Sector, P.W.
Dte. vice Sri Swapan Kumar Mandal
since transferred.
Malda Sub-Division under Malda
Division, P.W. Dte. vice Sri Jhulan
Chattopadhyay transferred.
Coochbehar National Highway SubDivision under National Highway
Division-X, P.W. (Roads) Dte. since
vacant.
Chetla Sub-Division, PWD since
transferred.
Kolkata East Sub-Division-I, under
Kolkata East Divn, P.W. Dte. P.W.
Dte. since transferred.
Falta EPZ Highway Sub-Division,
P.W. (Roads) Dte. since transferred.
Highway Survey Divn.III, P.W. (Roads)
Dte. since transferred.
By order of the Governor,
[P.P.Kar]
Joint Secretary
to the Govt of West Bengal
Contd.......p/2
No. 3055/1(25)-E/E-1/2T-7/11(Pt-2)
Date: 10.10.2014
Copy forwarded for information to the :1. Principal Accountant General, (A&E), West Bengal
2. Pay & Accounts Officer, Kolkata Pay & Accounts Office-I/II/III
3. Treasury Officer,______________________________________, West Bengal
4. Accounts Officer, P.W.D.
5. P.W.(Roads) Dte. /Housing Directorate.
6. Chief Engineer P.W.Dte.(HQ)/ Social Sector/ North/ South/ West/ Planning.
7. Chief Engineer P.W.(Roads) Dte.(HQ)/ NH Wing/Planning/ North/ South/ West.
8. Superintending Engineer, ______________________ Circle, __________________ Dte.
9. Executive Engineer, __________________________ Division, ________________ Dte.
10. Sri_____________________________ Assistant Engineer,
11.Executive Engineer, I.T.Division, P.W. Dte.
[P.P.Kar]
Joint Secretary
to the Govt of West Bengal