The Weekly Bulletin Serving the Construction Industry and Bay Area Community since 1932 2014 BOARD OF DIRECTORS OFFICERS Nancy Brinkerhoff, President Ironwood Commercial Builders, Inc. Lydia Roze, Vice President Vista Universal, Inc. www.bayareabx.com October 10, 2014 Four Sales Myths Debunked By Joe Diliberto, Sandler Training, Oakland, CA Forrest Towe, Past President Anvil Builders Every profession has its own lineup of myths that need busting. Those who have spent the majority of their career in a sales role have heard them all. The fact is that sales is an exciting, sometimes grueling and often rewarding profession. We're the frontline of an organization and vital to its growth. However, like it or not, many myths exist about who the "ideal" salesperson is and what a career in sales is like. John C. Roeber, Past President J. Roeber & Associates The following four myths are among some of the most popular assumptions about the sales profession. Eric Kavert, Treasurer Pacific Coast General Engineering, Inc. DIRECTORS Greg Adams, Shimmick Construction Co., Inc. Joe Maltifano London Construction Thom Miles TMA Construction Services. John Parker Janus Corporation Ken Regevig K. Regevig Roofing EXECUTIVE DIRECTOR Scott P Leary DIRECTOR OF OPERATIONS Denice McDavid The Weekly Bulletin (USP3 3633) is published every Week by the BAY AREA BUILDERS EXCHANGE, 3055 Alvarado Street, San Leandro, CA 94577-5711. Subscription rate for non-members is $525 per year. POSTMASTER: Send address changes to BAY AREA Builders Exchange , 3055 Alvarado Street, San Leandro, CA 945775711.. Tel.: 510.483.8880. Fax 510.352.1509. Can you think of any other myths that need busting? Myth #1: Salespeople need to be extroverts. Reality: Contrary to popular belief, introverts excel at selling, too. While it's not always the case introverts tend to be better listeners, more understanding and more focused on others. Sandler believe that sales professionals can be trained to overcome their inherent introverted tendencies through reinforcing behaviors, attitudes and techniques. Myth #2: The gift of gab is all you need to be good at sales. Reality: The phrase "telling is not selling" is a classic among the Sandler community. That's because successful salespeople know that the prospect should be doing at least 80% of the talking, while the salesperson fills in the remaining 20% with questions, restating what they're hearing and finding their way to prospects pain. Myth #3: If you do a good job, referrals come to you. Reality: While word-of-mouth referrals leave you feeling warm and fuzzy, they often are few and far between and can't be counted on for a steady Continued on the next page … Sales Myths Continued from front page … flow of business. When asking for referrals the key is to explain how you work with clients and describe your ideal prospect. Otherwise, it's hard for your referral source to envision someone who could be right for you. All in all, you've done a good job and earned the right to ask for referrals. Asking for referrals is an essential part of growing your business and it's your responsibility to take the opportunity to ask. Myth #4: Selling is a one-person job. Reality: Sandler believes that selling is a team activity. A smart salesperson relies on several people throughout the sales process. Whether you're working with marketing on a sales piece, bouncing a tactic of a peer, seeking counsel from a sales manager or consulting with a trainer, selling is far from a one-person job. About Joe Diliberto Joe specializes in working with business owners, CEO's and senior managers to maximize the return on what is often their most underutilized resource, the sales team. To contact Joe, email to:[email protected], or call 510/530-5060. *** November Workers Compensation Insurance Renewals: ASK FOR: Group 825 “Workers Comp Insurance Quote” State Fund + BAY AREA Builders Exchange = 6% SAVINGS Bay Area Builders Exchange presents EXITING YOUR BUSINESS PROTECTING YOUR WEALTH Guiding Business Owners Through the Process of Exit Planning Two Dates and Locations Wednesday October 29th Wednesday November 5th 8AM - 10AM 8AM - 10AM or 3055 Alvarado St 2440 Stanwell Dr. San Leandro, CA 94577 Concord, CA 94520 Q&A and Lunch provided following the presentation Exiting your company is often your most significant financial event. Exiting Your Business, Protecting Your Wealth is for owners who want to understand their options and optimize their results. You’ll learn about your Value Gap, the different Exit Routes, and how to work to Protect Wealth in the process. Whether you want out today, or years from now; whether you plan to sell, or want to hand it to family – this planning process could be key. Please RSVP by Friday October 24th to Nicole Capra at 925.866.7800 or [email protected] Each attendee will receive a free copy of “Exiting Your Business, Protecting Your Wealth” and have the opportunity to take the BERI Survey (Business Exit Readiness Index) Separate from the financial plan and a Summit advisors' role as financial planner, an advisor may recommend the purchase of specific investment or insurance products or accounts. These product recommendations are not part of the financial plan and clients are under no obligation to follow them. Summit Financial Group LLC 2000 Crow Canyon Place Suite 450 San Ramon CA 94583 Securities and investment advisory services offered through Securian Financial Services, Inc., Member FINRA/SIPC. Securities dealer and registered investment advisor. Summit Financial Group LLC is independently owned and operated. TR#950605 DOFU 06/2014 Mike Brown Electric Co. is seeking MBE/DBE/WBE/DVBE subcontractors/material for the following project: EBMUD, Adeline Maintenance Center Complex Fire Alarm System Upgrade, Specification 2062A Trades include: Fire Alarm Systems, Electrical Material, Scheduling, Storage Containers, Clean Up, Acoustical Panel Ceilings and Painting Bid date: October 15, 2014 @ 2pm Contact: Yuriy Vorobyev Phone: 707-792-8100 Fax: 707-792-8111 www. thebluebook .com Triple S. Electric Company is seeking MBE/DBE/WBE/DVBE subcontractors material for the following project: EBMUD, Adeline maintenance center complex fire alar m system upgr ade, specification 2062A Trades include: Fire alarm systems, electrical material, scheduling, storage containers, clean up. Bid date: October 15, 2014 @ 2pm Contact: Steve Slauson Phone: 510-846-3529 Fax: 510-523-8563 A Special Seminar FRIDAY, NOVEMBER 7TH 8:30 A.M. to 12:30 P.M. COST (due in advance): $150.00 per person LOCATION: Bay Area Builders Exchange 3055 Alvarado Street, San Leandro, CA 94577 (510) 483-8880 MAKE YOUR RESERVATIONS NOW……...DEADLINE IS NOVEMBER 3RD Contact: Larry Levy at 415-892-1497 or FAX reservation to 415-8926596. Make check payable to Larry Levy. Mail to 458 San Marin Drive, Novato, CA 94945 Thank you, Larry. We are planning to come. Enclosed is my check. Names of participants: ___________________________________________________________________________ ___________________________________________________________________________ From (Co. or Org.) ___________________________________________________________________________ OUTLINE Overtime Requirements as of January 2014 Overtime Exemptions Make-up Time is Available Alternative Workweeks — New Law Itemization of Wage Statements When does the Work Week begin? Timekeeping Minimum Wage Violations — New Law Wage Theft — New Law Misclassification of Independent Contractors vs. Employees — New Law Commission Agreements — New Law Meal and Rest Periods — New Laws San Francisco Ordinances— New Laws Compensable (“Comp.”) Time On-Call Time Waiting Time The Company’s vs. the Employees’ Tools Paid Vacation Paid Sick Leave — New Law Paid Holidays Deductions from Paychecks Final Paychecks Frequency of Paying Employees Travel Time — New Law; Heads Up, Contractors! Determining the Difference between Exempt vs. Non-exempt Employees B.O.B. Construction Contractor Academy 2014 ACPWA is offering a FREE workshop series for small & local construction contractors interested in breaking into public works contracting or growing their business in the public contracting sector. Four Saturday morning sessions have been designed to deliver the maximum learning experience for all in attendance. Breakfast & course materials will be provided FREE for all participants. Attendees can expect to gain in-depth knowledge of public works contracting from experienced industry professionals. BOB MEETING CALENDAR 2010 Ed Duarte, CEO of Aztec Consultants, will lead the bulk of this series. He has over 30 years of experience in construction management on over $250 million of public works contracts & various other projects. Session topics will cover the following: Improving Bid Estimation Skills & Constructing Competitive Bids Utilizing Local Business Certifications Insider Tips on Public Works Contracting & Tools for Tracking Upcoming Projects Marketing Strategies for Connecting with Prime Contractors Panel Discussion with Prime Contractors Regularly Bidding Alameda County Contracts Information about upcoming Contracting Opportunities with Alameda County Agencies Schedule for 2014 BOB Contractors Academy Bid Estimating & Preparation Constructing Competitive Bids Pursuing Contracting Opportunities Connecting with Primes for Smart Partnerships Saturday, 9-27-14 Saturday, 10-04-14 Saturday, 10-11-14 Saturday, 10-18-14 Workshops will be from 9 a.m. to 12 p.m. at 3055 Alvarado St., San Leandro, CA 94577. Attendees will receive coaching from PWA prime contractors. Successful subcontractors who have connected with these primes & have worked on Public Works projects will also share their techniques. Participants who attend all four sessions will receive a certificate of completion & a FREE 90 day trial membership for the Bay Area Builders Exchange. Enrollment is limited. To register for the series or find out more about ACPWA’s BOB program, please contact Sheldon Jefferson at 510-670-6407 or at [email protected]. You must register by September 25th. Breakfast will be provided by the following sponsors: This workshop series is organized & facilitated by: Executive Office Space for Lease Small Private Offices Available: TWO LOCATIONS 110 - 300 square feet San Leandro Concord Ideal space for satellite office, estimators, sales & service representatives Amenities include: GREAT LOCATIONS Free WiFi FREE PARKING UPS SERVICE DAILY SECURITY SYSTEM ACCESS TO KITCHEN JANITORIAL SERVICE ALL UTILITIES 24 HOUR ACCESS CONFERENCE | BOARD ROOMS MAIL PICKUP AND DELIVERY FAX / COPY Machines Available San Leandro Concord 3055 Alvarado Street San Leandro, CA 94577 510.483.8880 2440 Stanwell Drive Concord, CA 94520 925.685.8630 For more information call Scott Leary at 510.483.8880 (San Leandro) or Denice McDavid at 925.685.8630 (Concord) Misc.: Leases are month to month. 1st month and security deposit to start lease. Credit Check. Telephone / upgraded cable internet service not included. Advertising Rates Weekly Bulletin Our Bulletin runs weekly in 8 1/2 " X 11 " Size Format, Black & White Member (Total cost) NonMember (Total cost) $100 $150 $150 $200 $75 $110 $115 $150 $35 $60 $50 $80 $30 $50 $50 $75 Full Page: One or two weeks Three or four weeks 1/2 PAGE: One or two weeks Three or four weeks 1/4 PAGE: One or two weeks Three or four weeks Business Card & MBE/WBE/SBE Sub Bid Requests: One or two weeks Three or four weeks CLASSIFIED: Up to 7 lines One or two weeks $25 Three or four weeks $35 (Each additional line) $2.50 Note: A line is 30 Character / spaces. $40 $55 $4.50 Please fax a typed written sample of your ad to 510-352-1509 or email copy text to [email protected] and indicate the number of Weekly Bulletin issues the ad is to run. Ad deadline is 12:00 P.M. Thursdays, the Weekly Bulletin is published every Friday. **** Ads for Nonmembers must be paid in advance. 3055 Alvarado Street, San Leandro, CA 94577. Tel: 510-483-8880. Fax 510-352-1509. www.bayareabx.com. [email protected] BAY AREA BUILDERS EXCHANGE - TELEPHONE (510) 483-8880. FAX (510) 352-1509 WEEKLY PLAN LIST - Friday, October 10, 2014 To view plans online go to: www.beac.com Bid Date Bid Time Location Plan Name / Scope of Work 10/10/2014 10:00 AM RFP-Ohlone Elementary School-Tower Dry Rot Repair and Concrete Improvements Watsonville Prebid Information Engineers # of Plan Estimate Addenda # ONLINE MAND 10/3 @ 10am Removal of four (4) windows; removal of rotten framing members and installation of four (4) new windows; tile work; repair/replacement of an drywall stucco & tile works from construction; removal of expansion jint in main entrance walkways & installation of non-shrink grout. THIS IS A PREVAILING WAGE PROJECT aDAM lINT @ 831-786-2100, EXT 2583 10:00 AM San Bruno RFP-Turnkey Services for City of San Bruno Streetlight Conversion to Led ONLINE MAND 9/16 @ 10AM at 567 El Camino Real, San Bruno The City of San Bruno (City) is solicitng proposals from qualified Firms/Consultants (Consultant) to enter into an Energy Service Contract in order undertake a turnkey project for the conversion of aproximately 2,00 existing High Presure Sodium (HPS) and Metal Halide (MH) stretlights to Light Emiting Diode (LED) throughouthe City. The requested services contemplated under the Energy Services Contract consist of furnishing al study and design services, labor, materials, suplies, vehicles, facilties and equipment to perform the Scope of Work identified below. The proposals submited in response to this RFP wil be used as a basis for selecting the firm to complete the Scope of Work. The proposal wil be evaluated and ranked acording to the criteria provided in Section VI “Evaluation of Proposals” in this RFP. William Li @ 650-616-7069 11:00 AM Visalia 2:00 PM Berkeley 2:00 PM San Francisco Supply & Installation of Various Generators (Natural Gas & Diesel) MAND 9/4 @ 11AM & 9/9 @ 1PM $500000 ONLINE Supply & install natural gas & diesel generators at various locations $7700000 MAND 10/1 @ 10AM at 1936 University Ave., 2nd Fl, Berkeley Construction & installatoion of new center hung scoreboard, new bowl public announcement system, specialty lighting, acoustical treatments, broadcast cabling, LED video boards, expansion of the video production room & electrical, mechanical & low voltage systems Haas Pavilion Scoreboard and Sound System Modernization General Contractor Prequalification NEW Rental Assistance Demonstration (RAD) Relocation Consultant The Authority is requesting proposals from qualified firms interested in leading the authority-wide relocation efforts related to the RAD conversion. The selected firm should have extensive experience with RAD and the requirements of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended, (URA), as they relate to the public housing conversion process. Page 1 of 42 ONLINE ONLINE Bid Date Bid Time Location 10/10/2014 2:00 PM San Joaquin County Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE NEW Physical Needs Assessment, Sartini Manor Physical inspection of the property. The successful proposer shall visit the HACSJ’s Sartini Manor Property identified below and prepare a Physical Needs Assessments (PNA’s) in accordance with the document “Fannie Mae Physical Needs Assessment Guidance to the Property Evaluator”, except as modified herein. The document “Fannie Mae Physical Needs Assessment Guidance to the Property Evaluator” is included as an attachment hereto by reference. 100% of the dwelling units shall be inspected in a non-intrusive manner (lists of addresses and unit descriptions are attached). Most dwelling units are occupied. The selected Contractor will coordinate with HACSJ staff when inspections of occupied units are to take place, as the HACSJ is required to give the tenants advanced notice of such inspections. All site improvements, common facilities, building exteriors, and units accessible for the handicapped shall be inspected. The inspections shall include a review of any pertinent documentation, i.e. repair/replacement records and as-built drawings, and interviews with the property owner, management staff, and tenants as needed. The developments to be included in this PNA will be determined by HACSJ and include: 1. Sartini Manor property located in Thornton California 2:00 PM San Leandro 2:00 PM Stockton 2:30 PM San Mateo Cornerstone Family Housing (No GC Openings) Cannon Constructors North is the general contractor for Cornerstone Housing project in San Leandro, CA. We are soliciting subcontractor proposals for this apartment project consisting of a concrete below grade and grade level parking and amenity space structure with four levels of modular and site-built wood frame structure for a total of 115 living units. It is anticipated construction will start late November 2014. Important to note: • There is a San Leandro local business goal of 15% • This is a prevailing wage job • Construction start is earmarked for November 2014 There will be no formal job walk, however, contractors are encouraged to visit the site to become familiar with site and neighborhood conditions, access, and other site-specific conditions. Janitorial Services for Stockton Metropolitan Airport MAND 9/8 @ 9AM at 5000 S. Airport Way, Stockton The County of San Joaquin is soliciting Request for Bids to contract with a qualified janitorial service company to provide the highest standards of professional janitorial services. Contractor will furnish all labor, uniforms, badges, materials, equipment, transportation, supervision and management required to provide Janitorial services in accordance with all terms and conditions of this Request for Bid. ONLINE ONLINE Gina Guttierez @ 209-468-2074 3:00 PM Alameda 3:00 PM San Francisco Channel Piling and Navigation Light Installation Project Driving a 14" square (normal size) concrete pile; installing a pre-fabricated galvanized steel platform (supplied by the narbormaster); intalling a pre-fabricated galvanized ladder (supplied by Harbormaster); and installing a navigational light atop of the lantern stand (supplied by Harbormaster) on the platform RFP-Central County Complete Streets Implementation 9/24 @ 1PM Alameda CTC is requesting proposals from interested firms currently on the qualified list in the “Multimodal Transportation Planning, Design and Engineering” and “Bicycle and Pedestrian Planning, Design and Engineering” categories of the Sustainable Communities Technical Assistance Program (“SC-TAP”) for the Central County Complete Streets Implementation Project, pursuant to the SC-TAP Statements of Qualifications submitted by such firms in response to Alameda CTC RFQ No. A13-0019. $225000 Ocean Avenue Campus Entrance Door & Hardware Replacement 9/26/14 @ 3pm Replace existing exterior doors/storefront doors at 12 locations within 5 buildings, at two of these locations replace overhead transom and or storefront window systems. Page 2 of 42 ONLINE ONLINE 019C/R0 Bid Date Bid Time Location Plan Name / Scope of Work 10/10/2014 4:00 PM Woodland Fairfield Inn and Suites Building Package Woodland Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Construct a new Fairfield Inn and Suites, trades needed include erosion control, pavement marking, reinforcing steel, masonry, architectural casework, damp proofing and waterproofing, exterior insulation and finish systems, metal roof and wall panels, roof hatches, access doors, tile, flooring, visual display boards, flagpoles, fire extinguishers and cabinets, registration equipment, laundry chute, entrance mats, fire sprinkler system, electrical, grading and paving, underground utilities, cast-in-place concrete, rough carpentry, panel work, water repellent, fireproofing, flashing and sheet metal, joint sealants, aluminum entrance and storefront, acoustical ceilings, painting, wall and door protection, signage, metal storage shelving, food service equipment, residential appliances, swimming pools, plumbing, demolition, landscaping, gypsum concrete, finish carpentry, solid surfacing countertops, insulation, fire stopping, roofing, doors / frames / hardware, gypsum board, athletic flooring, wall coverings, fireplace and stoves, metal lockers, toilet and bath accessories, laundry equipment, hydraulic elevators and HVAC / sheet metal. 5:00 PM Patterson $140000 RFP-Safe Routes 2 School Improvements on American Eagle between Peregrine and State Highway 33 ONLINE It is the intent of the City of Patterson to hire a qualified consultant to provide design & engineering services in the design of public infrastructure projects, demonstrate recent experience & successful completion with designs similar in size & scope & possess an engineering license issued by the California board for professional engineers & land surveyors with demonstrated expertise. The project improvements include the installation of crosswalks, sidewalks, bike lanes, safety lighting/in-pavement crosswalk lighting & traffic striping 5:00 PM 5:00 PM San Bruno San Bruno ONLINE RFP-Engineering Services for Design of Crystal Springs Avenue Sewer & Water Replacement Project The City of San Bruno, through the Public Services Dept, seeks to retain professional engineering services for the design of the sewer & water main replacement in Crystal Springs Avenue RFP-Engineering Services for Design Spyglass Pump Station 9/25 @ 10AM at 2085 Spyglass Dr., San Bruno ONLINE Rehabilitation The City of San Bruno, through the Public Services Dept, seeks to retain professional engineering services for the design of the Spyglass wastewater pumo station 10/13/2014 10:00 AM 2:00 PM San Francisco Rodeo 10/6 @ 11AM & 10/7 @ 11AM Larkin Street Youth Services Project The following trades are needed: final cleaning, demo, lightweight concrete, millwork & finish carpentry, insulation, roofing, doors, frames & hardware, glass/glazing, drywall & metal studs, tile flooring, resilient flooring & carpet, interior & exterior painting, signage, window film, light fixtures, fire sprinklers, fire alarm, plumbing, HVAC and electrical. $1087000 Comprehensive Wastewater Master Plan Near Term Improvements - MAND 09/24/14 @ 9:00 am at 189 Parker Avenue, Rodeo ONLINE ONLINE Sewer Year 1 Improvements Pipebursting rehabilitation of 2,400 lineal feet of 6-inch VCP sewer with same size or larger diameter HDPE SDR17 pipe; open-cut replacement of 2,400 lineal feet of 6, 8, 10, and 15-inch VCP or PVC sewer with larger diameter PVC SDR-26 sewer; open cut installation of 1,600 lineal feet of 6, 8, and 12-inch PVC SDR26 sewer; replacement of 19 existing manholes with new manholes; installation of 14 new manholes; replacement and or reconnection of approximately 110 building laterals; abandonment of approximately 1,700 lineal feet of 6 and 8-inch VCP sewer; traffic control, SWPPP requirements, and miscellaneous surface restoration work. 2:00 PM West Sacramento ONLINE Newport South Water Meter Project Replacement of any pavement, concrete, sidewalk, concrete curb & gutter, concrete driveway & concrete valley gutter, or publi & private landscaping removed or damaged as a consequence of the execution of this contract, as well as traffic stripes, pavement markings & all necessary traffic control. Page 3 of 42 Bid Date Bid Time Location Plan Name / Scope of Work 10/13/2014 2:00 PM RFQ-San Leandro Transit Center-Construction Management-A & E Design San Leandro Prebid Information Engineers # of Plan Estimate Addenda # ONLINE The District is requesting statements of qualifications from Architect & Engineering firms for services associated with the San Leandro Transit Center - A&E Design project. 2:00 PM San Leandro 2:00 PM Pleasant Hill 2:00 PM San Francisco ONLINE RFQ-San Leandro Transit Center-Construction Management The District is requesting statements of qualifications from Architect & Engineering firms for services associated with the San Leandro Transit Center Construction Management project. Diablo Vista Water System Manifold Improvement Project MAND 9/23 @ 10AM or 9/25 @ 10AM at 100 Gregory Ln., $150000 Pleasant Hill Removal and replacement of the Diablo Vista Water System's Pump House discharge piping, discharge manifold, surge tank, slide gate, and all other work, items or details required to do the work. The project will require pedestrian traffic control, maintain staging area, and the safety of the project site. ONLINE Complete documents will be posted once available 2:30 PM Modesto 4:00 PM Alameda 10/14/2014 10:00 AM San Jose Mission Bay Block 7 West (Related) Design-Build Fire Sprinkler ONLINE 9/29 @ 10AM at 180 Hubbel St., San Francisco The project is approximately 230,000 sf of mixed-use residential / retail with (200) units within the western portion of Block 7 located on 4th St. between China Basin and Mission Bay Blvd North. Construction will be one level of concrete with four levels of wood construction above the western half of the building and three levels of wood on the eastern half. Level 1 consists of concrete garage, leasing / property management offices, lounges, laundry room, and exercise rooms. Open space consists of a mid-block passage mews, balconies, patios, an at-grade courtyard, and a podium courtyard. Public improvements at 4th St., Mission Bay Blvd., and China Basin St. will include site furnishings and lighting. A landscaped access easement will be provided along the east edge of the site. Electronic Access Control System at Tenth Street Place MAND 9/22 @ 1PM at 1010-10th St., Modesto The County of Stanislaus (County) on behalf of the City-County Capital Improvements and Financing Agency, a Joint Powers Agency between the City of Modesto and the County of Stanislaus (the “JPA”) is seeking proposals from qualified, experienced and licensed Contractors for the installation of electronic access control systems at Tenth Street Place, located at 1010 10th Street in Modesto, California. The intent of this Bid is to select a vendor to remove the former electronic access and CCTV system(s) and replace with a new Lenel Access Control System, (LACS), and, subject to the availability of adequate funding, a new video surveillance system. RFP-Main Street Neighborhood Specific Plan for Alameda Point 9/22 @ 1PM at 2263 Santa Clara Ave, 3rd Fl, Alameda The City is seeking proposals from an interdisciplinary team of consultants to assist City staff and engage the community in preparing and adopting a Specific Plan for a 100-acre portion of Alameda Point, referred to as the Main Street Neighborhood. This sub-district of Alameda Point is envisioned to be a mixed-use neighborhood that supports alternative modes of transportation, and will build upon existing assets and character-defining features of the NAS Alameda Historical District. ONLINE ONLINE ONLINE Fitness Evolution-San Jose Tenant Improvement. Trades to include: Sawcut, demolition, concrete, structural steel, illwork/finish carpentry, insulation, roofing (patch), doors/frames/hardware, glazing/mirrors, drywall/metal raming, ceramic tile, resilient flooring, concrete sealing, painting, toilet partitions/accessories, lockers, fire sprinklers, plumbing, HVAC and electrical 10:00 AM Sausalito $500000 FFIP Ross Sausalito Pipeline Replacement This contract is for the installation of 2720 feet of 12” welded steel piping. Page 4 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/14/2014 10:00 AM Fitness Evolution-Sacramento Sacramento Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Tenant improvement work to include: demolition, concrete patch back, masonry, strucutral steel, architectural millwork/finish carpentry, insulation, roofing, doors & hardware, storefront/mirrors, metal stud/drywall, ceramic tile, acoustical ceiling, resilient flooring, sealed concrete, painting, toilet accessories, lockers, fire sprinklers, plumbing, HVAC, electrical 10:00 AM Rancho Cordova ONLINE Fitness Evolution-Rancho Cordova Tenant improvement work to include: demolition, concrete patch back, masonry, strucutral steel, architectural millwork/finish carpentry, insulation, roofing, doors & hardware, storefront/mirrors, metal stud/drywall, ceramic tile, acoustical ceiling, resilient flooring, sealed concrete, painting, toilet accessories, lockers, fire sprinklers, plumbing, HVAC, electrical 2:00 PM Novato $1000000 $1200000 LED Streetlight Retrofit Phase III ONLINE The work to be done includes, but is not limited to, the following: Replacing all remaining streetlights in the City with LED lighting fixtures. 2:00 PM Tracy Portable Water Storage Tank Cleaning Services at Deuel Vocational Institution ONLINE The contractor shall remove sediment & sand from the floor & walls of each tank. 2:00 PM Suisun City 2:00 PM Santa Rosa 2:00 PM San Francisco Well & Pump Maintenance & Repair @ Grizzly Island Wildlife Area Complex-Rebid Contractor shall provide an on-call, as-needed, or emergency basis all labor, materials, tools, equipment & incidentals necessary to repair pumps, well, lift stations, mechanical, plumbing & electrical systems, including residences, apartment duplexes, offices, shops/miscellaneous buildings, hunter creek station City Hall Annex HVAC Equipment Replacement MAND 9/24 @ 10AM HVAC equioment replacement, including electrical work $99000000 RFP - Project Management Support Services for The Airport Hotel 9/23 @ 10AM ONLINE ONLINE ONLINE Program The Airport Hotel Program encompasses three separate projects, which will need significant and careful planning and coordination. All three projects will require thoughtful phasing and scheduling coordination from the planning phase to Grand Opening. The selected Branded Hotel Operator ("Operator") will work closely with Airport Project Manager, the PMSS and Design/Build teams to develop a building program that meets the Hotel Project's requirements. The Operator will provide programming and product-standard guidelines and input throughout the project duration. Proposer will coordinate, as required and identified by the Airport, with the Operator throughout the design, construction, activation and close-out phases. Judi Mosqueda, Contract Mgr, @ 650-821-0163 2:00 PM Sacramento $53000 MAND 9/30 @ 10AM at 625 Q St., Sacramento The Contractor shall provide all labor, equipment, and materials required to remove the specified existing steam and condensate expansion joints identified in Table-A, Equipment List, install new steam or condensate expansion joints provided by the State of California, Building Manager. Expansion Joints Installation Central Plant Building Page 5 of 42 ONLINE Engineers # of Plan Estimate Addenda # Bid Date Bid Time Location Plan Name / Scope of Work 10/14/2014 2:00 PM Rodeo 2:00 PM Vallejo $75000 MAND 9/2 @ 10AM at 470 Parker Ave, Rodeo The Contra Costa County Public Works Department (County) is soliciting proposals from qualified firms and/or individuals to provide Landscape Maintenance Services (Project) for Countywide Lighting and Landscaping District (LL-2) Zone 38. The purpose of the Project is to maintain landscape features at four locations in Rodeo, as further described in this Request for Proposal (RFP) under Section V, Scope of Work: a) Parker Avenue Trees, located in the Parker Avenue frontages between San Pablo Boulevard and First Street; b) Rodeo Creek Trail, from Mariner’s Point Boulevard to Investment Avenue; c) Lefty Gomez Recreation Center and Ball Field Complex, located at 470 Parker Avenue in Rodeo and; d) Rodeo Sign Board Area, located at the southwest intersection of Parker Avenue and San Pablo Avenue in Rodeo. A map of the area is attached to this RFP as Exhibit H. RFP for HVAC Maintenance and Repairs 2014 MAND 9/30 @ 10AM The Vallejo Sanitation and Flood Control District (District) is seeking a qualified firm to provide a comprehensive maintenance and repair program for the District. The work will include the provision of a total maintenance program including, but not limited to the inspection, preventative maintenance, repair, programming and other tasks and services necessary to insure safe, well maintained HVAC systems providing quality air for District employees and the public. 2:00 PM Ceres 2:00 PM Pittsburg 2:00 PM Menlo Park 2:00 PM Menlo Park Prebid Information RFP-Landscape Maintenance Services LL-2 Zone 38 $530000 Ryno Park Improvement The work consists of in general of installing storm drain lines,7,996 sf of 4” concrete, 590 lf of 6” concrete curb, concrete picnic tables, bike racks, benches, drinking fountain, BBQ fixtures, play structures, kids cabin, swings, basketball standard, 30’ x 30’ pavillion, concrete seat walls, sod, shrubs, trees, irrigation system, fencing, security lighting and associated work. $158300 Maintenance and Emergency Equipment Storage Structure 9/9 @ 9AM at 2600 Pittsburg-Antioch Hwy. Pittsburg Demolition, cutting & patching; excavation, bedding & backfill; concrete; reinforcement steel; metal fabrications; joint sealants; painting & protective coatings; preengineered structures $20000 Belle Haven Pool Variable Frequency Drive Upgrades MAND 10/2 @ 3PM at 100 Terminal Ave, Menlo Park Install & startup of variable frequency drive systems at Belle haven Pool $60000 Burgess Aquatic Center Lap and Instructional Pools Variable MAND 10/2 @ 2PM at 501 Laurel St., Menlo Park Frequency Drive Upgrades Install & startip of variable frequency drive systems & install new impellers on each pump & instructional pools Page 6 of 42 ONLINE ONLINE ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/14/2014 2:00 PM Coral St. and Fountain Ave. Pump Stations Wet Well and Castroville MAND 9/18 @ 10AM at 14811 Del Monte Blvd, Marina Pump Station Vault Rehabilitation Marina Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Coral St. Pump Station: Rehabilitation of the wet well structure which includes but is not limited to the following: bypass pumping, repair to the concrete structure (hydroblasting or abrasive blasting the surface, resurfacing, and coating the structures), repair of leaking sluice gate, demolition and install new bar rack at Coral St., bubbler modification work, demolition and installation of anti-vortex plates and a suction elbow, and miscellaneous demolition work. The Work includes performance of construction activities in a permit-required confined space (wet well structure and manhole) and fall protection shall also be provided by theContractor. Fountain Ave. Pump Station: Rehabilitation of the wet well structure which includes but is not limited to the following: bypass pumping, repair to the concrete structure (hydroblasting or abrasive blasting the surface, resurfacing, and coating the structures), demolition and install new bar rack, bubbler modification work, modification of the stop gates, demolition and installation of anti-vortex plates, and miscellaneous demolition work Documents will be posted once available 2:00 PM Fairfield 2:00 PM Fairfield MAND 9/30 @ 10AM at 5110 Water Works Ln, Fairfield Removal & replacement of the sand & granular activated carbon media in a two-bay filter. North Bay Regional Water Treatment Plant Filter Influent and Waste MAND 9/30 @ 10AM at 5110 Water Works Ln, Fairfield Replacement of Media in Filter #3 $300000 ONLINE $650000 ONLINE Gate Valve Replacement Miscellaneous metalwork, protective coating, identifying devices, valves, valve actuators, butterfly valves 2:00 PM Danville Holiday Tree Lights Repairs and Maintenance ONLINE 2:00 PM Oakland The contractor shall repair, replace & maintain the tree lights so that the minimum of 95% of the lights on each tree is lit from Non 25, 2014 until January 9, 2015 RFP-Bi-Annual Maintenance of Underwater Structures and MAND 10/2 @ 10AM ONLINE Equipment at Lake Merritt Pump Station The Alameda County Flood Control & Water Conservation District is requesting proposals for the Bi-Annual Maintenance of Underwater facilities of Lake Merritt Pump Station, including but not limited to cleaning heat exchangers, apron areas, sediment trenches, & trash racks. The contract awarded will include on-call diving services at additional Alameda County locations should the need arise 3:00 PM Roseville ONLINE Roseville Historic Old Town Lighting Upgrade Lighting upgrades 3:00 PM Palo Alto 3:00 PM Palo Alto $85000 Pre-proposal Teleconference 10/2 @ 10AM The City of Palo Alto is seeking proposals from qualified firms to provide professional services for surveying services for Gas Main Replacement (GMR) 22/23 and Sanitary Sewer Rehabilitation (SSR) 27/28 design. The City has budgeted a maximum of $85,000 for these services in the 2013/2014 Fiscal Year. The required services are described in the Scope of Services. RFP-Surveying Services for GMR 22/23 and SSR 27/28 Design NEW RFQ-Anthracite Cole for Dual Media Filters 1.2-.14mm<1.5uc The City of Palo Alto is seeking quotes for the purchase, installation and delivery Anthracite Cole For Dual Media Filters 1.2-.14mm<1.5uc, as per the specifications in the Request for Quotation and the requirements of the City of Palo Alto. Bid documents are attached. Page 7 of 42 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/14/2014 3:00 PM Coast Casey Storm Water Pump Station Access Manhole Installation 10/2 @ 11AM Mountain View Prebid Information Engineers # of Plan Estimate Addenda # ONLINE The work to be performed under this contract consists of, in general, the installation of three (3) access manholes at Coast Casey Storm Water Pump Station. Contract work includes, but is not limited to, saw cutting the existing slab over the existing wet well, installation of steel reinforcing, and placing forms and concrete. 3:00 PM 5:00 PM Palo Alto Albany ONLINE RFP-Palo Alto Landfill Groundwater, Leachate, Landfill Gas and Storm Water Environmental Monitoring and Colnsulting Services The City of Palo Alto, Department of Public Works Environmental Services Division is seeking proposals for professional services for conducting sampling and analyses, providing onsite monitoring and preparing reports related to the landfill’s gas, leachate, stormwater, and groundwater monitoring systems at the Palo Alto Landfill. On –call services also include the completion of technical reports or studies related to the landfill or other facilities as requested by the City. The required services and performance conditions are described in the Scope of Services. RFP-Professional Architectural Services for the Senior Center ADA MAND 10/6 @ 2PM ONLINE Renovation Project The City of Albany is seeking proposals from qualified professional architectural firms to demonstrate qualifications, experience & proposed approach for architectural design & preparation of construction plans, specifications & estimate & bid and construction support for the Senior Center ADA Renovation project. 5:00 PM 10/15/2014 1:30 PM 1:30 PM $975000 Sacramento NEW RFQ-Remodel for Brachytherapy Room Project consists of renovating an existing CT room for brachytherapy procedures and a future CT scanner. Room will be divided between control and treatment spaces. Project includes door and wall relocations. Doors, walls and ceiling to be shielded with lead bricks. Includes structural steel frame to support lead bricks. New doors, walls, ceiling, flooring, lighting, casework, all finishes, HVAC, electrical, structural support, IT, equipment anchoring, and radiation shielding are planned. ONLINE Richmond RFQ-Reverse Osmosis Membrane Elements-ON HOLD ONLINE Oakland It is the intent of these specificatuibs, terms & conditions to describe the requirements for the fabrication & F.O.B. shipment of Reverse Osmosis membrane elements to the EBMUD's RARE Recycled Water Treatment Plant located in Richmond. The RO membrane will be used to purify water from brackish secoindary effluent from West County Wasterwater District. The secondary effluent will receive pretreatment by MicroFiltration prior to the RO system. $500000 Adeline Maintenance Center Complex Fire Alarm System Upgrade 9/23 @ 10AM at 100-21st St., Oakland E829B/0 $850000 Work includes the replacement of the existing fire alarm system (FAS) for the six buildings at the Adeline Maintenance Center (AMC) complex with a new FAS utilizing new fire alarm control units (FACU). The Contractor shall demolish the existing FAS and furnish, install, test, and commission the new FAS for the AMC complex buildings. Work includes, but is not limited to, removing existing conduit and wiring, salvaging existing equipment (as noted), providing fire alarm final design and permit ready submittals to the Oakland Fire Department, obtaining fire alarm construction permits, furnishing new equipment as indicated, installing new conduit and wiring, installing new equipment as noted, testing wiring and new FAS equipment, coordinating and providing FAS training for EBMUD staff, commissioning the new FAS with the Oakland Fire Department, and associated ancillary work related to the tasks above. 10:00 AM 10:00 AM Santa Rosa NEW Dollar Tree Store Tenant fit out expansion NEW See's Candy-Salinas Salinas Demolition, drywall/acoustical/carpentry, finish carpentry, dryvit/EIFS (patch storefront & rear door), door/frame/hardware, HVAC, fire alarm, glass/glazing (new storefront, new entry doors), flooring (VCT, SHT Vinyl) diamond grind floor, paint/wall covering, plumbing, sprinkler, electroical, restroom accessories Page 8 of 42 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/15/2014 11:00 AM Aluminum Chlorohydate Chemical Supply Contract 2015-2016 11:00 AM 2:00 PM 2:00 PM Lodi Prebid Information Engineers # of Plan Estimate Addenda # The work consists of supply and delivery of Aluminum Chlorohydrate to the City's Surface Water Treatment Facility. This chemical is used for the application of drinking water to meet regulatory compliance and must be NSF certified. $75000 10/2 @ 9AM San Rafael* NEW Shop and Admin Building Remodel 2014 Div_02-mobilization, selective demolition; Div_05-pipe & tube railings; Div_06-interior arch woodwork; Div_08-hollow metal doors & frames, flush wood doors, aluminum windows, door hardware, glazing; Div_09-gypsum board assemblies, acoustical panel ceilings, resilient flooring, resilient base & accessories, carpet, painting; Div_22-plumbing; Div_23-HVAC; Div_26-lighting, testing, electrical work TG15.2-Facade Access Equipment (Window Washing Equipment) Encouraged 8/28 @ 2PM at 175 Beale St., San Francisco San Francisco Webcor/Obayashi Joint Venture seeks trade suncontractors that have significant experience with furnishing, designing & installation of davit sockets, davit arms & fall arrest systems on complex projects which require significant coordination with adjacent properties & traffic relocation located in an urban environment; including the engineering, coordination, pocurement & complete installation of their respective systems in the following trade:Facade Access Equipment $120000 Bertolini Student Center Restoration Project (Prequalified MAND 10/3 @ 10AM Santa Rosa ONLINE E838B/0 ONLINE ONLINE Contractors Only) 2:00 PM San Jose 2:00 PM Redwood City Installing protective barriers to prevent contamination on the third floorto furniture, computers, personal & work related items; Setting up contaminents & extablishing a negative air containment to prevent the spread of dust to the other floors; placing crfitical barriers over the air supply vents & openings to the HVAC systems; removing all ceiling tiles on the third floor; removing all sound insulation above the ceiling tiles; cleaning all surfaces in the attic; claning all surfaces on the third floor; cleaning all HVAC systems, installation of new ceiling tiles; performing a final air washing & cleaning of both floors; final testing to verify that cleaning has been accomplished Office Management Services for VTA Facilities 9/23 @ 10AM at 3331 North First St, Bldg A, San Jose Perform office management services for VTA facilities Mills Way Building Improvement (Lease-Leaseback Project 10/7 @ 10AM at 1090 Mills Way, Redwood City E822B ONLINE Alten Construction is the selected general contractor for this lease-leaseback project. 2:00 PM El Dorado Hills Trades Needed, but not limited to:demolition; earthwork; erosion control; site drainage; water distribution: sanitary sewer; asphalt paving; pavement markings; site signage; fences & gates; concrete reinforcement; site & structurak concrete; structural & misc steel; rough & finish carpentry; cabinets; waterproofing; insulation; roof patching; sheet metal flashing; vapor control systems; joint sealants; doors, frames, hardware; overhead doors; storefront systems; glass & glazing; cement plaster; gypsum board; acoustical ceilinfs; resilient flooring; frp p[anels; painting; window coverings; fire sprinklers; plumbing; HVAC; electrical Francisco Drive Right-Turn Pocket 10/7/14 @ 2pm The project is located along Francisco Drive and El Dorado Hills Blvd., in El Dorado Hills in County of El Dorado. The Work to be done is shown on the Plans, and generally consists of, but is not limited to: Widening 300 feet of Francisco Drive and 900 feet of El Dorado Hills Blvd. to Francisco Drive and El Dorado Hills Blvd. intersection, roadway improvements, including multi-use trail on Francisco Drive, Class I bike lane on El Dorado Hills Blvd. HMA paving, curb ramp, signing and striping, cold planing, permanent and temporary fence removal & construction, stage construction to facilitate grading, clearing and grubbing. Other items or details not mentioned above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed. Page 9 of 42 Online O Bid Date Bid Time Location 10/15/2014 2:00 PM Citrus Heights Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE NEW Harbor Freight Tools Retail Store (No GC Openings) Construct 12,376 SF of tenant improvements in an existing strip center, trades needed include demolition, concrete, masonry (door openings, in-fills), steel (bollards, RTU frames, lintels), drywall, acoustical, carpentry, roofing (at façade / parapet), EIFS, glass / glazing, paint, wall covering, plumbing, sprinklers, HVAC, electrical, fire alarm and burglar alarm. **This project originally bid on 9/26 and Marco Contractors was awarded the bid, if you have not already submitted a bid, they invite you to do so now. 2:00 PM Burlingame NEW Skyline Boulevard Pavement Repair-Informal Bid Mobilization, excavation, provide a traffic control plan for review, install traffic stripe, reconstruct approximately 120-foot long 2-foot wide curb & gutter on the east side of Skyhline Blvd, reconstruct 120-foot by 18-foot area with a structural section of 7-inches asphalt concrete ONLINE Sundaresh Begur @ 650-375-7444 2:00 PM ONLINE San Rafael Sprouts Farmers Market-San Rafael 2:30 PM San Francisco This is a tenant improvement for a new Sprouts Market in San Rafael. Scope consists of demo for utility trenching and areas of slab replacement, new interior finishes and decor, cases, cooler boxes, etc $700000 Landscaping and Tree Maintenance Various Locations Contract - 1 09/25/14 @9:30 am at 30 Van Ness, 5th Floor, San Francisco Furnish & install trees; provide a 3-year long term plant establishment period for all newly planted trees; tree maintenance & pruning of existing trees; tree removal; stump grinding; emergency tree services & related tree maintenance work 2:30 PM San Francisco ONLINE Carla Short, Proj Mgr, @ 415-554-5349 Pavement Renovation, Sewer Replacement & WaterMain Installation - Height Street & Hayes Street 9/17 @ 1:30PM at 1680 Mission St., San Francisco $13000000 ONLINE Demolition, pavement renovation, curb ramp construction, sewer replacement & drainage work, matermain installation, AWSS relocation traffic signal conduits, audible pedestrian signal installation, traffic control Ramon Kong, Proj Mgr, @ 415-554-8280 2:30 PM 2:30 PM San Francisco Soquel RFQ-As-Needed Civil Engineering Services 2014 9/25 @ 1:30PM at 30 Van Ness Ave, 5th Fl, San Francisco $2700000 The City & County of San Francisco announces a Request for Qualifications for the provision of professional civil engineering & related services on an asneeded basis which will include services for roadway, curb ramp, sewer system & site improvement project $715000 Aptos Pump Station Project Optional 10/1 @ 2:30PM at 5180 Soquel Dr., Soquel Div-02-existing facilities; Div_03-concrete; Div-04-concrete unit masonry, glass masonry; Div_05-metal fabrications; Div_06-rough carpentry, glued laminated construction; Div_07-masonry water repellent coating, asphalt shingle roofing, flashing & sheet metal, roof specialties, joint sealers; Div_08-steel doors, frames & hardware, louvers; Div_09-painting; Div_22-plumbing; Div-26-lighting, electrical; Div_31-geotextile, clearing & demolition, trenching, backfilling & compacting, structural excavation, structural fill, rolled erosion control produstc; Div_32-asphalt paving & seals; chain link fences, planting; Div_33-utilities Page 10 of 42 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/15/2014 3:00 PM Recreation Park Solar Project Auburn Prebid Information Engineers # of Plan Estimate Addenda # MAND 9/23 @ 9AM at 123 Recreation Dr., Auburn The project consists of 204 photovoltaic modules & (4) utility interactive inverters. PV modules shall be mounted parallel on an existing composite shingle roog using quick mount PV/Everest racking ONLINE Pamela Vann, Landscape Architect, @ 530-885-0611, Ext 102 4:00 PM Berkeley $7000000 $10000000 RFQ-Architectural Services for Moffitt Library 4th and 5th Floor Renovations ONLINE The select firm will prepare conceptual, design & construction documents, support the bid process & provide construction phase services & will be responsible for engaging & coordinating all sub consultants including, but not limited to, electrical, mechanical. telecpm & fire protection Beth Piatnitza @ 510-643-2082 10/16/2014 1:00 PM Various Cities $5400000 Hazardous and Universal Waste Removal and Disposal Services ONLINE This is a Master Agreement in which the Contractor shall provide all labor, materials, supplies, equipment, travel, per diem and every other item of expense necessary for the collection, removal, packaging, loading, transportation and disposal of all hazardous and universal waste from the designated locations to the final disposition for the California Department of Corrections and Rehabilitation (CDCR) and the California Prison Industry Authority (CAL-PIA) as indicated in Exhibit E, List of Participating Institutions/Facilities. 1:00 PM Cupertino 10:00 AM Concord MOT Restrooms Remodel at Operations Center ONLINE MAND 10/1 @ 9:30AM at 10301 Vista Dr., Cupertino Remodel MOT Department's women's and men's restroom Concord Boulevard Paving and Striping (From Sixth Street to Farm Bureau Road) $150000 $250000 ONLINE The Work to be done, in general, consists of saw cut up to 7' from lip of gutter, dig out existing pavement and base, reconstruct base, replace pavement and striping. The width of te work varies as shown on the plans. Necessary work to construct these items shall include, but not limited to: Clearing and grubbing, roadway excavation, traffic control, and adjustment of valve box, and all other work as specified in the plans and specifications. For information regarding this project, contact: Mark Migliore, PE, Project Manager at 925-671-3422. 10:00 AM Elk Grove Bartholomew Sports Park Metal Maintenance Building $160000 ONLINE Includes design, fabricate, permitting and construction of a 950 SF metal maintenance building, which includes onsite clearing and grubbing, excavation, offhaul and minor grading; installation of concrete paving, curbs, decomposed granite surfacing, electrical work, chain link fencing, irrigation modifications and landscaping. Sheri Noblett @ 916-405-5354 2:00 PM Fremont Unity Art and The Gladys Williamson Memorial $91500 Div_02-demolition, earthwork, aggregate base & subbase, irrigation, site furnishings, planting; Div_03-concrete framework, concrete reinforcement, cast-in-place concrete, pre-cast concrete; Div_16-design-build electrical Eva Lee, Proj Mgr, @ 510-494-4776 Page 11 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/16/2014 2:00 PM RFP-Mangement Services for the Operation of Off-Street Downtown Parking Facilities and Metered On-Street Parking Spaces Stockton Prebid Information Engineers # of Plan Estimate Addenda # ONLINE MAND 9/24 @ 9AM at 425 North El Dorado St., Stockton The Parking Authority of Stockton is soilicting proposals from qualified parking management firms to provide the operation & management of Parking Authority's downtown off-street parking lots & garages & metered on-street parking spaces. If selected, the goal of the parking operator will be to provide the highest quality of service at the least cost to manage, operate, mao=intain & improve Parking Authority's downtown off-street parking facilities & metered on-street parking spaces. Alan Montaneli @ 209-937-8350 2:00 PM Sonora 2:00 PM San Francisco MAND 10/9 @ 10AM at 21925 Lyons Bald Mountain Rd., Sonora Div_02-demolition; Div_05-miscellaneous metal; Div_06-rough carpentry, finish carpentry; Div_07-insulation, sheet metal, sealants & caulking; Div_08-flush wood doors & frames, access panels & frames, finish hardware; Div_09-gypsum board, resilient flooring-linoleum flooring, epoxy flooring, fiber reinforced wall coating, painting; Div_10-toilet partitions, wall protection, identifhying devices, toilet accessories; Div_12-plastic laminate casework, solid surface countertops; Div_16-fire alarm, lighting, electrical; Div_22-plumbing, HVAC $4107880 Boarding Area 'G' 400 Hertz System Infrastructure Improvements 10/1 @ 10AM Foothill Horizons Shower and Restroom Upgrade ONLINE ONLINE This project calls for the completion of upgrading the existing 400 Hertz system at Boarding Area 'G' by installing new equipment such as cables, conduits, pantographs, circuit breakers, disconnect switches, and gate boxes. 2:00 PM San Francisco 2:00 PM Hughson 2:00 PM Berkeley Tin Nguyen, Contract Mgr, @ 650-821-5540 NEW Communications/Resident Engagement Consultant $100000 The San Francisco Housing Authority is interested in contracting with a consultant for communications and resident engagement consulting for an initial one year period with options to renew annually for a cumulative total of four (4) years. The services this consultant will provide will include an overall communications assessment, development of communication and resident engagement plans, actively participating in the implementation of the plans, acting as the point of contact for emergency communications, and assisting in the re-imaging of the Authority. Keyes Union School District Admin Building 10/10 @ 10AM at 5277 Washington Rd., Hughson Cast-in-place concrete; rough carpentry; sheathing; shop fabricated wood trusses, arch wood casework; thermal insulation; asphalt shingles; sheet metal flashing; joint sealants; hollow metal doors; flush wood doors; door hardware; glzing; portland cement plastering; gypsum board, tiling, acoustical ceilings; resileint flooring; carpeting; painting & coating; signage; toilet compartments; wall & door protection; fire protection specialties, plumbing, HVAC, lighting; electrical; site clearing; earth moving; chain link fence $134000 NEW College of Chemistry 1st Riser MAND 10/7 @ 11AM nstallation of new communication riser from new main Telecom Room Located in 113 Lewis Hall to Ground Level floor, First Floor, Second Floor, and Third Floor, cable trays for horizontal distribution, cabling infrastructure build out of tel/data room. Work includes all conduit, cabling, equipment, devices and minor patching/painting and restoration of finishes. Lewis Hall is a fully occupied Laboratory Research and Classroom Building. **Note: The pulling of data cables and termination are NOT part of the scope of this project. The actual cable work will be bid under a separate project.** Page 12 of 42 ONLINE ONLINE ONLINE Bid Date Bid Time Location 10/16/2014 2:00 PM 2:00 PM 2:00 PM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW Water Treatment Plant PLC Replacement Project Encouraged 10/1 @ 9AM Replacement of existing GE Fanuc 90-70 Series PLC, 1. hardwired trip units, vintage power supplies, terminal blocks and fork connectors and associated I/O boards. 2. Installation of GE RX3i PLC with new backpanel, redundant switching supplies, screw clamp terminal blocks, and install internal panel wiring per UL508A standards. 3. Associated electrical and instrumentation work not specifically defined above but described in the specifications and shown on the drawings. RFP-HVAC Upgrades 10/1 @ 10AM Atwater/Wint on Remove, replace & upgrade HVAC systems for two (2) residential housing projects in the City of Atwater & community of Winton. Foothill College Modernization Project 121-Library and Learning MAND 9/16 @ 11AM and 9/25 @ 11AM Los Altos Center Renovation (Lease-Leaseback Project) Hills The project will be constructed utilizing multiple trade conctracvtors, each working under a separate contract with Kitchell CEM, who is the lease/lease back contractor for the new library moderniation at Foothill College. Benicia ONLINE ONLINE ONLINE The Following is a list of varius Trade Bid packages: Trade Bid Package 00 44 01:Demolition Trade Bid Package 00 44 02:Misc Trades Trade Bid Package 00 44 03:Roofing Trade Bid Package 00 44 04:Doors & Hardware Trade Bid Package 00 44 05:Glazing Trade Bid Package 00 44 06:Painting Trade Bid Package 00 44 07:Framing, Insulation & GWB Trade Bid package 00 44 08: Flooring Trade Bid Package 00 44 09:Acoustical Trade Bid Package 00 44 10:Mechanical, Plumbing & Fire Sprinkler Trade Bid Package 00 44 11:Electrical Trade Bid Package 00 44 12:Landscaping 3:00 PM San Jose NOTE: Bidders must be prequalified to submit a bid to Kitchell. The prequalification application must be submiited to Kitchell by no later than September 30, 2014. 7749-Fire Station No. 16 Repiping, Restroom and Kitchen Renovation MAND 10/1 @ 10AM at 2001 S. King Rd., San Jose Div_02-drilling, sawcutting & removal of concrete, minor demolition & remodeling, trenching & backfilling for utilities; Div_03-concrete; Div_06-rough carpentry, finish carpentry, custom cabinetwrok, fiberglass reinforced plastic panels; Div_07-underslab vapor barrier, insulation; Div_08-access panels; Div_09-gypsum board, ceramic tile, concrete polishing flooring & base, retro-plate special concrete floor finishes, with colored dye specifications, painting; Div_10-toilet accessories & fixtures; Div_15-plumbing, machanical sir curtain; Div_16-electrical Edwin Garcia, proj Mgr, @ 408-975-7249 Page 13 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/16/2014 3:00 PM 7645-Miscellaneous Sanitary Sewer Repairs FY 2014-2015 (Package II) San Jose Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Dust control, mobilization, water pollution control, clearing & grubbing, watering, finishing roadway, aggregate bases, deep lift asphalt base, asphalt concrete, concrete structures, reinforcement, concrete, curbs & sidewalks, monuments, traffic stripes & pavement markings, signals, lighting & electrical systems, asphaltic emulsions, pipes & structures, trench excavation, bedding & backfill, pipe installation, sanitary sewer rehabilitation, cleaning pipelines, sanitary manhole rehabilitation 3:00 PM Lincoln Dustin Shitanishi, Proj Mgr, @ 408-793-5517 NEW Waste Water Treatment Plant Decommissioning, Grading & $400000 ONLINE Asbestos Pipe Removal (Lincoln WWTP Includes asbestos pipe location and removal, grading activities and erosion control provisions. 3:00 PM Dixon Traffic Signal and Electrical Maintenance Services (3 Years) ONLINE Providing traffic signal, flashing beacon & street, park & facility light maintenance services to include:preventive maintenance; emergency on-call 24 hours a day, seven days a week; repair or replacement of electrical equipment; inspection & tuning of electrical equipment; and inspection & repair of emergency vehicle pre-emption equipment 3:00 PM Stockton Technology - Cyber Security Assessment Project ONLINE Deployment of outdoor fiber optic cable plant; centralized communications facilities & field hubs, WAN/LAN/WLAN services, virtualization, storage, network management, firewall/gateway, & backup solutions In order to receive the RFP, the vendor must sign and return the attached Non-Disclosure Agreement to me via email, [email protected], or fax (209)4657244. 3:00 PM San Jose 6915-Ryegate Court and Scottsville Court Sanitary Sewer ONLINE Dust control, mobilization, water pollution control, clearing & grubbing, watering, finishing roadway, aggregate bases, deep lift asphalt base, asphalt concrete, concrete structures, reinforcement, concrete, curbs & sidewalks, monuments, traffic stripes & pavement markings, signals, lighting & electrical systems, asphaltic emulsions, pipes & structures, trench excavation, bedding & backfill, pipe installation, sanitary sewer rehabilitation, cleaning pipelines, sanitary manhole rehabilitation 4:30 PM San Francisco James Thompson, Proj Mgr, @ 408-535-5300 NEW Generator and Diesel Fuel System Testing, Maintenance and Repair ONLINE This project encompasses several fuel distribution and underground tank-related tasks, including the replacement of an aboveground tank, repair of underground fuel lines, testing and certification of leak monitoring systems, Visible Emissions Examination of emergency generators, replacement of leak monitoring panels, sensors and annunciators, and several miscellaneous fueling facility safety and code upgrades. Libi Yap @ 650-821-7730 5:00 PM Petaluma ONLINE NEW Pool Maintenance Pool maintenance services Page 14 of 42 Bid Date Bid Time Location 10/17/2014 11:00 AM Sonora Plan Name / Scope of Work Prebid Information NEW Public Health Window Treatment Installation Fabrication & installation of six (6) vinyl vertical window blinds Engineers # of Plan Estimate Addenda # ONLINE MAND 10/13 @ 10AM at 20011 N Cedar Rd., Sonora Byron Johnson @ 209-533-5660 2:00 PM San Francisco San Francisco Roadway Bridges Replacement Project 9/4 @ 9AM at 1250 San Carlos Ave, San Carlos $8000000 008C Remove/replace existing two-span steel-through girder bridges due to deteriorated condition; remove/relocate/reconstruct existing utility lines; provide temporary support as applicable at each bridge 2:00 PM Vacaville 2:00 PM Stockton 2:00 PM Fairfield 2:00 PM Eldridge 2:00 PM Tracy ONLINE NEW Solano Credit Union (No GC Openings) Tenant Improvements. DO NOT CALL OWNER?ARCHITECT/CONSULTANTS 9/30 @ 11AM REVAILING RATE OF WAGES (STATE DETERMINATION) PROJECT: NUMBER OF STORIES: TWO, FIRE SPRINKLERS: YES, ZONING: GENERAL INDUSTRIAL (I G) , GENERAL PLAN DESIGNATION: ADMINISTRATIVE PROFESSIONAL BUILDING CODE: WRITTEN STATEMENT: PROJECT AREA: THIS PROJECT TO COMPLY WITH 2013 CBC, CPC, CMC, CFC, CEC, CEES & 2013 CGBS (CALIFORNIA GREEN BUILDING STANDARDS) THIS PROJECT IS A NON-STRUCTURAL TENANT IMPROVEMENT FOR THE SAN JOAQUIN COUNTY OFFICE OF EDUCATION'S VENTURE ACADEMY II. SCOPE OF WORK TO INCLUDE THE RENOVATION OF AN EXISTING FOOD SERVICE SPACE ADDING NEW PARTITION WALLS, PLUMBING, MECHANICAL, ELECTRICAL & EQUIPMENT, ALONG WITH THE RELOCATION OF EXISTING ELECTRICAL, MECHANICAL, AND FIRE SPRINKLERS; PROJECT AREA: 904SF *The specifications for the project are a sheet spec included in the project plans. Please see the A0 sheet in the plan set. Ventureland Cafe/Deli NEW Ford Lincoln Fairfield Div_02-selective structure demolition; Div_04-unit masonry; Div_06-rough carpentry, sheathing, finish carpentry, interior arch woodwork, plastic paneling; Div_07-thermal insulation, vapor emission & alkalinity control, sheet metal flashing & trim, penetration firestopping, joint sealants; Div_08-hollow metal doors & frames, aluminim window frames, flush wood doors, access doors & frames, aluminum-framed entrances & storefronts, finish hardware, glazing; Div_09-gypsum board, tiling, acoustical panel ceilings, resilient flooring, carpeting, painting; Div_10-toilet compartments; Div_13-metal building systems; Div_22-plumbing; Div_23-HVAC, testing, adjusting & balancing HJVAC; Div_26-lighting, electrical $120000 Arnold Drive Tree Maintenance Optional 10/15 @ 10AM at 15000 Arnold Dr., Eldridge ontractor to furnish all labor, materials, tools, equipment and transportation necessary to remove 12 trees, replace 5 of the removed Red Oak trees, haul, chip, grind stumps, excavate, supply topsoil, chemical nutrients and replacement trees. In addition, prune, make structural augmentations, remove dead wood, crossing, broken or hazardous branches, remove mistletoe and apply growth inhibitor to approximately 31 additional trees and 2 Oaks in the backyard of Residence House 139. Diablo Homes 2014 Water Assembly Analysis and Site Repair Designs ONLINE ONLINE ONLINE ONLINE The Hosuing Authorityof the County of San Joaquin is seeking quotes for the licensed Civil Engineer to perform surveying, geotechnical engineering & civil site engineering design services for the Diablo Homes Water Meter Replacement & Driveway Repairs 3:00 PM Oakley Uninterruptible Power Supply for Randall Bold Water Treatment Plant The Contra Costa Water District is seeking bids from qualified firms to provide an Uniterruptible Power Supply system to be utilized at the CCWD's Randall Bold Water Treatment Plant facility (electrical room) Page 15 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/17/2014 4:00 PM RFP-Design Engineering Services for the Walnut Grove Road Bridge (29C-131) Replacement Project San Joaquin County Prebid Information Engineers # of Plan Estimate Addenda # ONLINE San Joaquin County Department of Public Works will solicit qualified consultants to provide professional & technical engineering services for the design of the proposed in-kind replacement Walnut Grove Road Bridge. The objective of the project, in general, is to construct a new in-kind brisge that will accommodate two12-foot travel lanes with shoulders to replace the existing single swing steel truss structure over the Mokelumne Rover 5:00 PM Danville ONLINE RFP-2015-2020 Comprehensive Economic Development Plan Prepare a comprehensive economic development plan with policies & implementation measures that will guide the Economic Development Division's vision & work plan for the next five years 10/20/2014 1:00 PM 10:00 AM 2:00 PM MAND 8/22 @ 10AM at 7900 Beryessa-Knoxville Rd., Napa $1429500 Cosntruction of an environmental education camp, including grading; paving of roadways; parking lots & trails; watr system, water treatment, tank & distribution greywater system with subsurface drip disposal; camp host site; tent cabins; c ombination restroom shower building with composting toilets; covered activity areas; boat boarding dock; electrical system with photovoltaic array & miscellaneous other site improvements/modification. Permits for this work shall be secured by the District. Interim Fire Alarm System MAND 9/17 @ 10AM at 43600 Mission Blvd., Fremont Fremont Fire alarm system & electrical work $121500 MAND 10/14 @ 10AM at 4300 Llano Rd., Santa Rosa Santa Rosa NEW Laguna Treatment Plant Belt Press Building ReRoof and HVAC Napa Camp Berryessa Improvement Project ONLINE ONLINE ONLINE Improvements Mobilization & demobilization, demolition & disposal of existing roofing syste, installation of roofing system, mechanical ductwork improvements 2:00 PM Watsonville 2:00 PM Hollister ONLINE RFP-Asebstos Hazard Emergency Response Act (AHERA) Triennial Inspection and Management Plan Development Pajaro Valley Unified School District is seeking qualified firms to provide hazardous material surveying, testing and on-site observations at District facilities Elevator Maintenance Services $9000 $12000 ONLINE $200000 ONLINE Elevator Maintenance Services to (4) Four County-owned elevators 10/21/2014 11:00 AM 2:00 PM 2:00 PM 2:00 PM Watsonville Well 8 Emergency Power Project Installation of a 250 KW diesel engine generator with concrete pad, an automatic transfer switch, and a five (5) foot tall masonry retaining wall. NEW Swing Space - Music Department MAND 10/13 @ 1PM Tile carpeting, acosutical wall panels Carpet Replacement at Pacific Station Strongly Encouraged 10/8 @ 9AM at 920 Pacific Ave, Santa Cruz Santa Cruz Carpet replacement $900000 TG07.8 Expansion Joints 9/3 @ 2PM at 175 Beale St., San Francisco San Francisco Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with expansion joints, miscellaneous metals and engineering on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems. Fremont Page 16 of 42 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/21/2014 2:00 PM TG16.9 Prefabricated Buildings 2:00 PM San Francisco Rohnert Park Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with Prefabricated Buildings, including but not limited to, security station/guard booths, transit bus driver operation booth(s) with restrooms and transit operations office with ramps on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems in the following trade:TG16.9 Prefabricated Buildings $35000 NEW Student Recreation Center South Window Remodel 10/10 @ 10AM ONLINE Remove & replace six (6) pairs of windows at the Recreation Center 2:00 PM 2:00 PM 09/16/14 @ 10:00 AM $375000 $425000 Oakland Refurbish Breakroom Marina The Contractor shall perform all of the work specified in Table -1, Section 01 11 00 page 4 of Summary of Work. The Contractor shall remove the tables, chairs and appliances during construction. Furniture and appliances shall be cleaned and stored in a protected area and returned upon breakroom completion. Contractor shall clean interior of breakroom, paint, install ceiling tiles, where applicable, provide and install bulletin boards. The contractor is required to work a minimum of two breakrooms per week until completed. Each location shall be completed within 5 working days. Repair Asphalt Concrete Paving at Hangar 510 at the Marina 10/8 @ 10AM at 3240 Imjin Rd., Marina ONLINE ONLINE Municipal Airport Mobilization, sawcut, removal & disposal, earthwork, aggregate base, asphalt concrete pavement 2:00 PM Fremont $2700000 2014 Pavement Rehabilitation Project ONLINE Remove asphalt roadway surfacing by grinding; install deep lift hot mix asphalt base repairs; seal cracks; replace traffic signal detector loops & related facilities; place hot mix asphalt overlay on designated street segments; conctruct concrete curb ramps & passageways; construct curn, gutter & sidewalk & place traffic stripes, pavement markings & reflective pavement markers Edward Nakayama, Proj Mgr, @ 510-494-4775 2:00 PM Fairfield 2:00 PM Danville $240000 MAND 10/14 @ 9AM Furnishing all labor, materials, equipment & other services necessary for the complete maintenance of all the landscape areas, playgrounds, hardscapes & irrigatrion in areas as described in these special provisions & as directed by the City of Engineer Landscape Maintenance District No. 15 Goldridge ONLINE Complete documents will be posted once available 2:00 PM Berkeley $2790000 2014/15 Pavement Rehabilitation Project Preparatory tree trimming; storm drain inlet relocation; removal & replacement of existing storm drain pipe; removal & replacement of existing Portland Cement concrete curb, sidewalk, curb ramp & valley gutter; subdrain installation; removal & replacement of existing asphalt concrete pavement (digouts); pavement cold planning; intsllation of paving mat; installation of asphalt concrete overlay; removal & replacement of asphalt concrete speed lumps; removal & replacement new traffic loop detectors; adjusting to grade of survey monument castings; water valve castings; storm drain & sanitary sewer manhole covers & other utility lids; removal & replacement of existing paving striping & markers; traffic control $1020000 Sanitary Sewer Rehabilitation - Martin Luther King Jr. Way, Fifth NEW 10/15 @ 10:30 AM Street, Cedar Street The work to be done consists, in general, of rehabilitation and construction of approximately 4036 linear feet of 8-inch diameter sanitary sewer, construction of manholes, manhole rehabilitation, excavation, replacement of approximately 2025 linear feet of 4-inch and 6-inch diameter sewer laterals, and related work. Page 17 of 42 ONLINE ONLINE Bid Date Bid Time Location 10/21/2014 2:00 PM Berkeley Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW Sanitary Sewer Rehabilitation - Hearst Avenue from Bonita Avenue $455000 ONLINE to Shattuck Avenue 2:00 PM Bay Area Cities 2:00 PM Milpitas 2:30 PM San Mateo 3:00 PM El Dorado Hills 3:00 PM Santa Cruz 3:00 PM Palo Alto 3:00 PM Roseville 10/22/2014 10:00 AM 10:00 AM The work to be done consists of, but is not limited to, the rehabilitation and construction of 1001 linear feet of 8-inch diameter sanitary sewer pipe via pipebursting (Method 'B'), manhole rehabilitation, excavation of approximately 821 linear feet of 4-inch and 6-inch diameter sanitary sewer laterals, and related work. $3000000 RFQ-Sustaining Construction Management Services 9/23 @ 1PM at 300 Lakeside Dr., 15th Fl, Oakland ONLINE Consultants shall assist & advice the San Francisco Bay Area Rapid Transit District in construction management & related issues associated with BART construction projects $275000 McCarthy Blvd. Lighting and Landscape Improvements Phase 1 MAND 10/2 @ 10AM 014C $325000 Demolition, lighting, refurbish existing fence/sign, paving, planting, irrigation, water pollution control & traffic control. $231000 NEW Coyote Point Maina Fuel Dock Improvements 10/15 @ 10AM at 1900 Coyote point Dr., San Mateo Mobilization, water pollution control, maintaining traffic, erosion &sediment control, signs & markers, chain link fence, marina fuel piping & monitoring system NEW RFP-El Dorado Hills WWTP Odor Control Design Professional ONLINE Services Provide engineering services to modify the existing 24,000 cfm above ground biofilter, two rectangular primary clarifiers, two MG steel equalization tanks and grit chamber to further enhance odor control at the El Dorado Wastewater Treatment Plant. Marine Mammal Pools Renovation Phase 1 MAND 9/30 @ 2PM at 1156 High St., Santa Cruz Renovation of mammal tanks, relocation of fiberglass pool & shed, providing & installing new FRP metabolic tank, constructing new ramps, bridges, gates, concrete curbs & associated work including utilities RFP-Boranda Lake Aquatic Vegetation Removal 10/6 @ 10:30AM The City of Palo Alto is seeking proposals from qualified firms to provide services to remove Aquatic Vegetation at Boranda Lake located at Foothills Park, Palo Alto CA. The required services are described in the Scope of Services. NEW RFP-Turf Convesions & On-Call General Site Construction Services The City of Roseville (hereinafter “City”), is soliciting proposals for Turf Conversions & On-Call General Site Construction Services. This will be a competitive negotiation process. Qualified individuals, firms, contractors, consultants or entities (hereinafter “Contractor(s)”), that meet the requirements set forth in this Request for Proposals (hereinafter “RFP”), and are capable of providing the services requested are encouraged to participate. MAND 10/10 @ 10AM at 18250 Bengal Ave. Hayward Hayward/Sa NEW Exterior Handrailing Replacement Multiple School Sites n Lorenzo Replacing existing temporary wood railing with galvanized steel round tubing (klee kamp) had railing manufacturing system at existing exterior corridor locations at multiple sites Rancho Cordova ONLINE Complete documents will be posted once available NEW Sunrise Blvd Sidewalk Improvements $80000 nstallation of new PCC sidewalk and sidewalk ramps on Sunrise Blvd from Gold Country Blvd to S. Bridge Street in the City of Rancho Cordova. Page 18 of 42 ONLINE ONLINE ONLINE Pending ONLINE Bid Date Bid Time Location 10/22/2014 11:00 AM Oakland 12:00 PM Oakland Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW RFQ-District-Wide Security Safety Maintenance and Training Project The project comprises of maintenance & training of previously installed cameras, servers, switches & associated infrastructure district-wide at seven (7) campus locations. Also includes monitors & equipment in the PCCD Control Center, & maintenance of all previously installed electrical & data infrastructure $900000 RFP-As-Needed Electrical Testing and Engineering Services at 10/8 @ 9:30AM at 530 Water St., Oakland ONLINE ONLINE Oakland International Airport and Maritime Area 2:00 PM Emeryville The Port of Oakland (“Port”) is soliciting proposals from NETA-certified firms for electrical engineering testing, power distribution coordination, protection engineering, design support, revenue/non-revenue utility meter calibration and technical consulting services to enhance the reliability of the electrical power distribution system at the Oakland International Airport and the Port of Oakland, Seaport. The Port may enter into more than one contract for this work. The aggregate compensation for all such contracts shall not exceed $900,000 over the three-year term of the contract. $1000000 Fire Station Improvements MAND 10/9 @ 10AM at 2333 Powell St., Emeryville The City of Emeryville Fire Station Improvements Project consists of but is not limited to: ONLINE 1.Demolition of standing seam metal roofing, and built-up roofing and sloped plywood and 2x sleepers, flashing, thin brick veneer, interior finishes, furnishings, equipment, mechanical, electrical and plumbing as shown on drawings 2.Replacement of thin brick veneer, glazing, standing seam metal and built-up roofing, flashing, gutters, 3.New Accessible parking space. 4.New interior finishes where designated. 5.New kitchens and toilet rooms & renovated toilet rooms. 6.Repair and refinishing of designated surfaces. 7.New casework for reception area. 8.New doors and hardware as indicated. 9.New mechanical (HVAC) equipment and distribution as indicated. 10.Extension of existing automatic fire sprinkler system. 11.New electrical distribution as indicated. 12.New lighting as indicated. 13.New fire alarm system detection and signal components as indicated. 2:00 PM Stanislaus County Pete Miller Road Bridge at Delta Mendota Canal $570000 ONLINE $8600000 ONLINE Bridge seismic retrofit & barrier replacement 2:00 PM San Francisco 9/10 @2PM TGO7.3-Miscellaneous Metals Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with rails, metal covers, fences, metal plate and covers on walls and columns, bike racks, site metal fabrications, enclosing profile, façade access track, and overhead catenary system on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems. 2:00 PM San Francisco $7500000 NEW Buchanan Park Apartments Modifications & rehabiulitation to the existing four buildings, 68-unit residential low-income apartment units. Trades needed, but not limited to, site work, concrete, metals, wood & plastics, thermal & moisture protection, doors & windows, finishes, specialties, equipment, special construction, plumbing, mechanical, electrical & hazmat Page 19 of 42 T001 Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 10/22/2014 2:00 PM Furnishing Maintenance and On-Call Service for Various Elevators, Escalators and Moving Walkways at Port of Oakland Facilities 10/8 @ 9AM at 530 Water St., Oakland Oakland 2:00 PM Corte Madera 2:00 PM Sacramento Engineers # of Plan Estimate Addenda # $300000 Maintenance of elevators, escalators, lifts, conveyors & moving walkways; hydraulic leveling & door controls upfrade $15000 HVAC Duct Cleaning at the Corte Madera DMV Field Office-Rebid MAND 10/1 @ 10:30AM at 75 Tamal Vista Blvd, Corte Madera The Contractor agrees to provide to the Department of Motor Vehicles all labor, tools, materials and equipment necessary to provide HVAC Duct Cleaning Services. ONLINE ONLINE Kevin Childers @ 916-657-7822 MAND 10/14 @ 9AM at 3904 Rio Linda Blvd, Sacramento $3450000 The City of Sacramento seeks bids from qualified Contractors to rehabilitate Wells 94, 107, 120, 122, 126, 129, 133, and 138. The project consists of two major components, well casing rehabilitation, and installation and construction of new site improvements. Site improvements include but are not limited to new fencing, pumping, electrical, and chemical systems, paving, switchgear enclosures, piping fabrication, and wellhead demolition and construction. Contractors are to provide all labor, materials, and equipment necessary to successfully complete the project Groundwater Well Rehabilitation Ph 3 ONLINE Megan Thomas, Associate Engr, @ 916-808-1729 2:30 PM San Francisco NEW Various Locations Pavement Renovation No. 17 Sewer Replacement $5800000 ONLINE $80000 ONLINE and Watermain Installation Pavement renovation, sewer replacement, watermain installation, traffic control Ramon Kong, Proj Mgr, @ 415-554-8280 3:00 PM Lodi Handicap Ramp Improvements 2014 The work in general consists of constructing new handicap ramp returns at various locations in Ripon. Related work items shall be but are not limited to: asphalt removal, concrete removal, tree removal, pavement striping, catch basin installation/adjustment, pot hole existing utilities and sign relocation $175000 Aldea Housing Gutter Replacement MAND 10/8 @ 9AM at 155 Johnstone Dr., San Francisco 3:00 PM San Francisco 3:30 PM Sonora MAND 10/10 @ 10AM A General Contract for the Building F Reconstruction, a one-story classroom building, at Sonora Elementary School; including selective demolition, concrete, architectural, structural, mechanical, plumbing, electrical, and other work as necessary or indicated to construct The Project. 4:00 PM San Francisco RFP-Landscape Architecture Consultant Candlestick Point-Hunters Point Shipyard Phase 2 ONLINE $185000 Div_07-asphalt shingles, sheet metal flashing & trim; Div_09-exterior painting Sonora Elementary School Building F Reconstruction Increment 2 10/8 @ 2PM at One Sansome St., Ste 3200, San Francisco 1) Streetscape design for all streets in Sub Phase 02 03 04 CP Street (Exhibit A, use PDF layers to view Sub Phase boundaries). 2)Community engagement and streetscape design for Gilman Avenue between Arelious Walker Drive and Third Street. 3)Wedge Plaza park design. MBEs,WBEs,SBEs and LBEs are encouraged to submit proposals. Page 20 of 42 ONLINE ONLINE Engineers # of Plan Estimate Addenda # Bid Date Bid Time Location Plan Name / Scope of Work 10/22/2014 5:00 PM Sacramento Relocate and Construct CSA Auxiliary Boiler System MAND 10/1 @ 10AM at 5000-83rd St., Sacramento Remove, transport, design/execute integration of, and commission a fully functional and complete Auxillary Boiler (#2) to SCA Cogeneration Plant using SMUDprovided boiler and appurtenances currently stored at off-site location. Scope includes modification to existing boiler storage site (e.g. sliding door area and roof) as needed to safely remove the boiler equipment, transport of the equipment to new foundations, and restoration and clean-up of modified areas to preconstruction functional condition and cleanlines. Contractor has the option to use any or all SMUD-provided equipment and/or appurtenances, or to supply new or refurbished replacement equipment/appurtenances. ONLINE 10/23/2014 1:00 PM Alameda USCGC Stratton (WMSL 752) Dockside Repairs FQ1 FY15 ONLINE 2:00 PM Mountain View Prebid Information The Contractor shall furnish all the necessary labor, material services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, to perform dry docking repairs, and alterations to the vessel, in accordance with the solicitation and attached specifications. Failure to read the specifications in their entirety will not relieve the offeror from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the offerors risk. All proposals submitted in response to this solicitation shall stand firm for 90 calendar days from the response date of this solicitation. $2800000 2012-2013 Miscellaneous Water and Sewer Main Replacements Encouraged 10/16 @ 11AM ONLINE $3000000 The work to be performed under this contract includes the replacement of water and sanitary sewer mains. Contract work includes abandonment or removal of existing facilities, replacement of new pipelines by both open trench and pipe bursting methods, replacement of water service line and sewer lateral, reconnection to existing pipelines, sidewalk replacement, and doing all other incidental work necessary to complete the projects. 2:00 PM Union City 2:00 PM Stockton 2:00 PM Sonora NEW Whipple Road Pavement Rehabilitation Project Road pavement MAND 10/6 @ 1PM at 2101 E. Earhart Ave. Stockton The County of San Joaquin is soliciting Request for Bids to contract with a qualified janitorial service company to provide the highest standards of professional janitorial services. Sonora High School Measure J Improvements MAND 10/8 @ 3:30PM & 10/13 @ 3:30PM The work is generally described as: • New Track and Field Surfacing • New Aquatics Facility and Support Buildings • New Pedestrian Foot Bridge • Modernization of Humanities Two-Story Classroom (Building D) • Modernization and Addition to Cafeteria (Building F) • Access, Compliance Ramps, Paving and Parking • Fire Lanes, Hydrants, and Sprinkler Systems • Related Underground Wet and Dry Utility Infrastructure • Related Landscape and Irrigation Improvements DVBE Contract Goal is 3%. All prospective bidders must register with A&I Reprographics in order to receive notification of project addenda and/or other pertinent information. WLC Construction Services, Inc. cannot be responsible for missing documents for plan holders not registered with A&I Reprographics. Janitorial Services-Robert J. Cabral Agricultural Center Page 21 of 42 ONLINE ONLINE ONLINE Bid Date Bid Time Location 10/23/2014 2:00 PM 2:00 PM Sonora San Jose Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $728600 NEW Jamestown Sidewalks Project MAND 10/1 @ 10AM Prevailing rate of wages (State & Davis Bacon - higher of the two) project consisting of, in general, of demolition and removal of existing sidewalks, sawcutting and removal of asphalt concrete and base, construction of new sidewalk, curb and gutter, minor concrete, installation of sidewalk plaques, patch paving with hot mix asphalt, construction of bus turnouts with shelters, lighted crosswalks, striping, remove and replace fence, and drainage improvements. Work is anticipated to take place in the spring of 2015. The County has designated both onsite and nearby disposal sites for excess earthwork and broken concrete (without rebar). Construction and equipment staging will be allowed within the County right-of-way on Willow Street, Fifth Avenue, Seco Street and Ninth Street. Willow Street and Ninth Street may be restricted to one-way traffic control during working hours with an approved traffic control plan. Curb, gutter and sidewalk may be poured monolithically. The Engineer’s Estimate for this project is: $728,600 The DBE contract goal for this project is: 4.86% NEW Capitol Expressway Pavement Repair Between Seven Trees Blvd ONLINE ONLINE and Hwy 101 2:00 PM 2:00 PM 2:00 PM 2:00 PM San Francisco San Francisco Roadway excavation, pavement repair, crack sealing, removal & replacement of curb & gutter, removal of concrete sidewalk & pedestrian ramps, construction of ADA curb ramps, retrofit ADA curb ramps, replace & modify drainage inlets & other details of work not mentioned above that are required by the project plans $8000000 As-Needed Spot Sewer Replacement 10/7 @ 10am Online The objective of the project is to provide contingency-based as-needed replacement of sections of existing sewer pipelines on short notice at locations to be determined within the City and County of San Francisco. The work is to be performed in San Francisco, California. The Engineer's estimate is $8,000,000. The Contract will be awarded to the lowest responsible and responsive bidder. TG10.4 Electrical, Communications, Security & Integrated Networks 02/18/14 @ 2:00 pm ONLINE Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) and concurrent Invitation for Bids (IFB) from Trade Subcontractors interested in bidding the TG10.4 Electrical, Communications, Security and Integrated Networks Construction Services on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California. Bidders that have already pre-qualified do not need to respond to the RFQ. CRC HVAC Infrastructure Renovation 10/8 @ 11am Sacramento Procurement and installation of HVAC equipment and infrastructure. $115000 NEW Blue Rock Springs Golf Course-Cart Barn Project 10/14 @ 2PM at 555 Santa Clara St., Vallejo Vallejo Design, plan review process, procurement, fabrication, and construction of a metal building system including all associated ventilation, electrical, signage, doors, and hardware as specified in the plans and specifications Online ONLINE Roland Rojas, Proj Mgr, @ 707-648-4557 2:00 PM Marshall 2:00 PM Los Banos 10/9 @ 1PM at 18863 Highway 1, Shoreline Hwy, Marshall $810000 This project involves the construction of on-lot septic tank and effluent pumping systems, approximately one mile of collection force main, a secondary treatment system at the existing Marshall Community Wastewater site, and addition of 600 lineal feet of standard gravity leaching trench to the existing leach field system serving the community of Marshall, California. Marshall Phase 2 Community Wastewater Project Documents will be posted once available NEW New Middle School (Lease-leaseback Project) 10/16 @ 2PM The Work includes consists of a new middle school campus of four steel frame buildings with on-site and off-site improvements. Page 22 of 42 E835B/0 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 10/23/2014 2:00 PM Fremont NEW American High School Modular Site Work-Informal Bid Modular site work. 2:00 PM Fremont Cafe and Freight Office at Centerville Train Depot 2:00 PM Fremont 2:00 PM Felton/Scott s Valley MAND 10/9 @ 4PM at 36300 Fremont Blvd., Fremont Engineers # of Plan Estimate Addenda # $100000 10/7 @ 10AM at 37260 Fremont Blvd, Fremont The City has prepared a scope for prospective operators in RFP #15-003 which generally includes: lease and operation of the Cafe/Restaurant space, and/or lease and operation of the Freight Office Building space. The City has set forth on RFP Exhibit “A,” requirements for a business plan, background information and description of the areas for lease (Café and Freight Office), the City’s general expectations for use of the spaces and an outline of proposed lease terms and conditions. The description of proposed lease terms and conditions set forth on RFP Exhibit “A” and the standard sample lease attached to this RFP are presented for the primary purpose of allowing the City to compare proposals. The final terms and conditions of the Lease Agreement will be based upon RFP Exhibit “A” as well as Proposal Exhibit “A” to be submitted by the Proposer as a part of the proposal and may be the subject of negotiations between the City and the successful Proposer NEW Utility Infrastructure Upgrade Project Phase II Selective demolition, electrical, communcations, clearing & grubbing, excavation & fill, utility trenching & backfilling, portland cement concrete, aggregate base course, asphalt paving, water distribution center, sanitary sewerage system 016C ONLINE ONLINE Notice to Bidders pages are garbled 2:00 PM Sacramento 3:00 PM San Jose 10/8 @ 10AM Regional Water System Interties No. 2, 3 and 4 $6500000 Demolition, site preparation, earyhwork for pipeline & structures, water system piping & accessories, drainage, paving & resurfacing, concrete curbs, gutters, sidewalks & bus stops, concrete forms & accessories, concrete joint b& acessories, reinforcing steel, cast-in-place concrete, hot-weather concreting, cold weather concreting, concrete curing, concrete finishes, grouts, repair of defective concrete, basic masonry materials & methods, concrete masonry units, structural steel fasteners, metal fabrications (miscellaneous metal), rough carpentry, metal plate connected wood trusses, modified bituminous sheet membrane waterproofing, water repellent sealer, insulation, lightweight concrete shingle roofing, fiber cement siding, flashing & sheet metal, roof accessories, joint sealants, hollow metal work, finish hardware, louvers, painting, building specialties, general equipment, electric motor drives, vertical centrifugal water pumps, lighting, electrical $1800000 HVAC Infrastructure Renovation @ Cosumnes River College 10/8 @ 11AM Procure and install HVAC equipment and infrastructure 7744-Norman Y. Mineta San Jose International Airport Building Trades Contract 14-15 Under this contract, Task Orders shall be issued for project work, which may include, but not limited to performing the repair, remodeling, addition to and/or renovation of an existing building, new building work, moving, maintenance, rough & finish carpentry, millwork, architectural finishes, glazing, signage, door & window installation & hardware & other building miscellaneous components Ravi Parimanam, Preoj Mgr, @ 408-392-1168 Page 23 of 42 ONLINE ONLINE ONLINE Bid Date Bid Time Location 10/23/2014 5:00 PM San Francisco Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE NEW As Needed Lead-Based Paint, Mold and Asbestos Contractor Services This Solicitation will award two (2) contracts to Contractors that specialize in asbestos and lead based paint stabilization, encapsulation and/or removal in compliance with HUD, Cal OSHA and local ordinances on an emergency standby and a task assignment basis, in an amount not to exceed $50,000 each. Solomon Gebala @ 415-715-3152 The Contractors are required to provide a detailed cost estimate proposal within 3 calendar days after request using unit prices and provide fast abatement services after Notice to Proceed (NTP) is faxed to their office. Scope includes notifying residents, CalOSHA, SFDPH, signage and safety equipment per attached requirements as provided in Detailed Scope of Work, Exhibits A, B and C. 10/24/2014 12:00 PM 2:00 PM San Joaquin County Oakland NEW Site General Building Contractor, Mountain View Revitalization Pilot ONLINE 10/14 @ 10AM at 741 Flint Ave, Stockton Program, Conway Homes and Sierra Vista Homes The Housing Authority of the County of San Joaquin (HACSJ) is seeking bids from licensed and bonded General Contractors (“Contractor”) to provide construction services for the Site General Building Contractor, Mountain View Revitalization Pilot Program, Conway Homes and Sierra Vista Homes. Bid packages & specifications may be downloaded from the HACSJ website at HACSJ.com under the “Vendors & Contractors” tab. $5500000 AC Transit Advanced Utility Relocations 10/3 @ 10AM @ 1600 Franklin St., Oakland ONLINE $7000000 Relocation of sewer lines, manholes & other appurtenances as required, to clear the project area of any conflict with the future construction of bus lanes & platforms of the East Bay Rapid Transit Project. The work involves the removal of & abandonement of sections of existing sewer main & service laterlas & the installation of new sewer mains & service laterals & the installation and/or removal of existing sewer manholes & cleanouts, including sawcutting of pavement & concrete curb, gutter & sidewalk, excavation, backfill, shoring for deep excavation, pavement restoration & concrete curb, gutter & sidewalk replacement. 2:00 PM 2:00 PM Sacramento San Jose RFQ-Mechanical and Electrical Consulting Firms for Future Projects The County of Sacramento, Architectural Services Division, is requesting qualifications statements from local mechanical & electrical consultants for the purpose of establishing a hiring list for future architectural services division projects, including jails, youth detention facilities, administration buildings, airport facilities, medical facilities & parks & recreation facilities River Oaks Complex Building B Lobby Reconfiguration 10/9 @ 10AM at 3331 N. First St., San Jose Selective demolition, tenant improvements, CCTV & security improvements Page 24 of 42 ONLINE E836B/0 Bid Date Bid Time Location Plan Name / Scope of Work 10/24/2014 2:00 PM RFP-Eden Township Exterior Repainting San Leandro Prebid Information Engineers # of Plan Estimate Addenda # ONLINE This is a subcontracting opportunity under Alameda County's Job Order Contract (JOC) program to work for MTM Construction. For more details regarding this specific job order please contact General Contractor Joshua Lee at (626) 934-1112 or via email at [email protected] . Repaint the Exterior of the Eden Township building located at 15001 Foothill Drive San Leandro General: The scope will include the prepping and painting existing surfaces “as is” and GSA JOC program will repair/replace with like materials as necessary for paint. The preparation will require the necessary safety measures to contain flaking chips of paint during the preparation phase as based on the environmental report. - Assess the need to provide exterior scaffolding for any David Barba, Proj Mgr, @ 510-208-9586 2:00 PM 3:00 PM 3:00 PM Stockton Demolition of Single Family Residence (440 Clayton Avenue, Stockton) Online O MAND 10/8/14 @ 10am San Joaquin County is seeking a qualified vendor for the demolition of an abated single family resoidence and the destruction of the property's septic tank. MAND 10/15 @ 9AM Santa Clara NEW RFQ-Sidewalk and Gutter Replacement/Repair County The County of Santa Clara is requesting quotes for replacing and repairing sidewalks, curbs, and gutters as per the attached scope of work and site map. All work and detailing shall conform to City of San Jose Department of Public Works curb, gutter and sidewalk standards. Contractor shall block gutter off from water and concrete sediment run-off prior to and during construction. Contractor shall obtain all applicable permits, including parking meter removal permit, from the City of San Jose, and work shall be compliant with City of San Jose regulations. RFP-Design Build Services 123 Rico Street-HVAC Modernization, Salinas ONLINE ONLINE Roof Replacement and Solar The Housing Authority of the County of Monterey proposes to modernize the HVAC/Mechanical system for the headquarters office building in Salinas. In addition, the HACM is requesting replacement costs of roofing & a roof top or carport solar installation 4:00 PM Davis $5460000 RFQ Chemistry Seismic and Life Corrections ONLINE The Project consists of the following work for the Chemistry and Chemistry Annex buildings: 1.Structural corrections to address seismic deficiencies. 2.New site fire service and full fire suppression system. 3.Renovations as required to incorporate the work scope above. 5:00 PM 5:00 PM San Rafael Sacramento RFP-Essential Facilities Project Management and Pre-Construction Services The City of San Rafael wishes to retain the services of a project management/construction management firm to manage the essential facilities strategic plan process to guide improvements to its essential facilities . The strategic plan process will consider all of the City's public safety facilities which will include seven fire stattions & a police station RFP - Franchise Tax Board - Butterfield Complex MAND 08/19/14 @ 10:00 am at site All Qualified Pool members are invited to review and respond to this Request for Proposal (RFP) for the installation and operation of solar photovoltaic (PV) energy generation systems under a third party ownership power purchase agreement business model. In submitting your response you must comply with all instructions as provided in this RFP. Page 25 of 42 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/27/2014 10:00 AM Warning Lights School Crosswalk Project Pacifica Prebid Information Engineers # of Plan Estimate Addenda # $100000 Pending Installation of crosswalk illumination devices, thermoplastic striping & related signage for five schools in the City of Pacifica Complete documents will be posted once available 10:00 AM 10/28/2014 2:00 PM 2:00 PM 2:00 PM San Rafael NEW Citywide Traffic Signal LED Relamping Project Relamping all vehicle indications (including indivations of programmable visibility heads) with new LED in incandescent look & all pedestrian indicatyions with new countdown LED in incandescent look E837B/0 10/6 @ 10AM at 1600 Franklin St., Oakland This is a public works project and will require payment of prevailing wages. A Project Labor Agreement (PLA) is also included in the project. In order to perform the work, bidders at the time of the bid opening and for the duration of the project shall possess a valid California Class “A” Contractor’s License in order to qualify to perform the work. The work in the project, involves in general, of furnishing all permits, materials, labor, tools, and equipment, and for doing all the work involved in reconstructing a section of Derby Avenue, E 10th Street, and San Leandro Street, as shown on the plans, Pavement overlay will be constructed at Derby Avenue at its intersections with E 12th Street (NB & SB) and at the intersection of Fruitvale Avenue and E10th Street/San Leandro Street. New pavement sections will be constructed at Derby Avenue and E 10th Street. Concrete curb ramps, driveways, curb and gutter and sidewalk will be constructed. Signal and lighting will be installed or modified at two (2) intersections. Pavement delineation and signs will be installed, drainage system will be modified, and roadway lighting will be installed. $20000 MAND 10/16 @ 10AM Ukiah/Fortun NEW Flooring Replacement a Replace the existing flooring in the kitchen area of the CCC Fortuna site, located at 1500 Alamar Way in Fortuna and/or the CCC Ukiah site, located at 2600 Old River Rd, Ukiah Administrative Department Operations Center Video Wall and San 10/7 @ 1:30PM Headquarters Digital Signage System for New Police Headquarters Francisco ONLINE Oakland AC Transit Streets and Parking Lots Improvement Project ONLINE ONLINE on the Public Safety Campus 2:00 PM 2:00 PM 2:00 PM 2:00 PM 2:00 PM Video wall solution at the SAdmin DOC in police headquarters; digital signage solution at the Admin DOC in Police headquarters; service to maintain the new system NEW Tree Removal and Pruning Services 10/15 @ 11AM 2180 Milvia St., 1st fl, Berkeley Berkeley Tree removal & pruning services at various locations in City of Berkeley $675000 Arden Middle School Restroom Upgrades MAND 10/9 @ 2PM at 1640 Watt Ave, Sacramento Sacramento Restroom upgrades $1878000 NEW Camino Pablo Pavement Rehabilitation Recommended 10/20 @ 10AM Orinda Pavement rehabilitation, including base repairs, cold planing, asphalt pavement, HMA overlay, concrete improvements, traffic signal modifications & striping $450000 New Generator at 2530 Arnold Drive 10/7 @ 2pm Martinez Work includes the installation of a new emergency power generator and associated work at an existing office building that will be occupied during construction. NEW Hesperian Landscaping, Chabot College - Rebid MAND 10/15 @ 10AM at 25555 Hesperian Blvd, Bldg 3000, Hayward Hayward Landscaping work Plans will be posted once available Page 26 of 42 ONLINE ONLINE ONLINE Online ONLINE Bid Date Bid Time Location 10/28/2014 2:00 PM Fremont Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW RFQ Design-Build Services for Technology Infrastructure at Several MAND 10/7 @ 10AM & 10/9 @ 10AM ONLINE Schools 2:00 PM Daly City 2:00 PM Eden Township 2:00 PM Oakland 3:00 PM Palo Alto The Fremont Unified School District is requesting qualified persons, firms, partnerships, corporations, associations, or professional organizations to provide full design-build services for the technology infrastructure at Ardenwood Elem School, Brookvale Elem School, Kennedy High School & Vallejo Mill Elem School campuses NEW Janitorial Services for Daly City DMV Optional 10/7 @ 10AM Contractor agrees to provide the Dept of Motor Vehicles all labor, tools, materials, equipment & travel necessary to perform janitorial services at the Daly City DMV. ONLINE Melanie Pilliard @ 916-657-6975 MAND 10/7 @ 10:30AM at 951 Turner Ct., Rm 230A, Hayward Removing & replacing damaged curbs, gutters, driveways, sidewalks, removal of tree roots & installation of root barrier control system $1165000 Replace Glass Panels at Coliseum, San Leandro, Bay Fair and South 10/02/14 @ 10:00 AM at 300 Lakeside Drive, conference Hayward Stations Platforms room 1700, Oakland The work in general consists of placing and/or replacing drain culverts, placing new curb, gutter, and sidewalk, placing hot mix asphalt, and placing thermoplastic striping along Powerline Road from 15th. Avenue to north of 9th. Avenue. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed. Repair of Damaged and Displaced Sections of Curbs, Gutters and Sidewalks Unit No. 17 NEW Mitchell Park Parking Lot Project Asphalt base repairs, replacement of damaged concrete structures, removal of existing asphalt, placement of asphalt, placement of asphalt concrete paving & replacing of tsriping E834B/6 ONLINE ONLINE Holly Boyd, Proj Mgr, @ 650-329-2612 3:00 PM Palo Alto 4:00 PM Oakland 10/1 @ 10AM The City of Palo Alto is seeking proposals from qualified firms to provide services to provide data center and computer cloud backup implementation services NEW RFP-Hazardous Material Abatement Design and Construction MAND 10/8 @ 2PM at 955 High St., Oakland RFP-Data Center and Computer Cloud Backup Implementation ONLINE ONLINE Services for Various School Sites Oakland School District is requesting the submission of proposals for a hazardous material abatement consultant firm to provide hazardous material abatement design & construction monitoring associated with the various sites within district. 5:00 PM Antioch Request for Information, POC HVAC Evaluation and Replacement Delta Diablo ("District") issues this Request for Information (RFI) via BidSync for planning and information gathering purposes. The District is in the planning phase for replacing the existing Building Management System (BMS) in operation at its Plant Operations Center building in Antioch, CA. The BMS system currently operates and monitors the heating, ventilating, and air conditioning (HVAC) equipment. Page 27 of 42 Online Bid Date Bid Time Location 10/29/2014 1:00 PM 10:30 AM 10:30 AM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $500000 10/15 @ 10AM Sacramento NEW Fence Construction and Repairs As Needed Through 2016 The Contractor shall furnish all supervision, labor, materials, equipment and incidentals necessary to install new fencing, install new gates, and make fence additions, repairs or changes to various SMUD fences. The work generally consists of: Constructing 4’, 6’, and 8’ high chain link fence with 1”x 1” fabric; repair of existing chain link fences; furnishing temporary chain link fence, either stand alone or with imbedded posts; gate construction and repairs; installation of fence toppings on new or existing fences, including “V” arms with 4 strands of barbed wire and razor ribbon; construction of isolation panels; construction of 6’ redwood fences; fabrication and installation of 2’ wall topping; installation of security panels; and various other adjustments, repairs or replacements that may arise during the contract period $500000 Port Security Fences Phase 4 10/15 @ 10:30AM San Francisco Environemantl management of excavated materials, fences, electronic gate operators. San Francisco Division 02170 & Division 02826 were not posted in the port of san francisco website NEW Beltline Building Project - Phase 1 MAND 10/16 @ 10:30AM $300000 ONLINE ONLINE ONLINE Installation of public men's & women's restrooms in historic Beltline Buildings 1944 addition, including selective demolition & hazardous material removal, installation of walls, doors, tile, flooring, toilet partitions, installation & repairs of plumbing, mechanical & electrical fixture and systems 2:00 PM $746876 Sacramento NEW North Natomas Regional Park Phase 5B Rebid-Farmer's Market & ONLINE Parking Lot The work to be performed consists of developing the North Natomas Regional Park, Phase 5B-Farmer’s Market and Additional Parking in Sacramento. The improvements will consist of finish grading, drainage, concrete walkway, curbs, asphalt paving, installation of metal shade structures, automatic irrigation system, electrical, drinking fountain, landscaping, parking lot, signage, and site furniture. Dennis Day @ 916-808-7633 2:00 PM 2:00 PM 2:00 PM San Francisco Optional 8/26 @ 2PM at 175 Beale St. San Francisco TG15.1-Dock Levelers & Bumpers $200000 Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with with furnishing and installing dock levelers, bumpers, truck restraints and bin lifters on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems. $98500 MAND 10/15/14 @ 10:30 am Bodega Bay NEW Bodega Bay Aquaculture Reroof Provide all labor, materials, equipment, tools, transportation, insurance and services to remove the top layer existing Hypalon roofing material and prepare the existing built-up roofing substrate to receive the new roofing application. Patch and repair with like materials any dry-rotted existing roof decking encountered. Install sloping underlayment on low flat roof section, sloping to existing roof drains. Reroof with a new fleece backed TPO roofing system, approximately 15,825 square feet. $1200000 MAND 10/15 @ 10AM at 69 Stony Circle, Santa Rosa Santa Rosa NEW Water Pump Station 3 Modifications $1300000 Water pollution control, traffic control, clearing & grubbing, earthwork, roadway excavation (F), subgrade stabilization, stabilization fabric, class 2 aggregate base, slurry seal, asphalt concrete surface, concrete curb, pump station addition concrete slab foundation, concrete apron, median curb, chain link fence, gates, removal of existing fence & gate, asphalt concrete dike, generator bldg concrete slab foundation, precast drainage structures, storm drain, pump station water pipe & sppurtenances, 100 HP booster pump, pump station building addition & roof, generator building, miscellaneous electrical work, motor control center, PG&E meter & main switchboard, antenna mast assembly. 230kw generator set Page 28 of 42 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 10/29/2014 2:00 PM Removal of Rubber Deposits and Painted Ground Markings from Airport Pavements 10/15 @ 99:30AM at 8500 Earhart Rd., Oakland Oakland 2:30 PM Sacramento 2:30 PM San Pablo 3:00 PM Sunnyvale 3:00 PM Sunnyvale Engineers # of Plan Estimate Addenda # $300000 The work of this annual contract consists generally of removing approximately 1,000,000 square feet per year of rubber deposits and approximately 10,000 square feet per year of painted ground markings from airport pavements using high-pressure water. Asbestos Abatement for DMV Headquarters. MAND 10/9/14 @ 11am Asbestos Abatement for DMV Headquarters. $250568 NEW Davis Park Play Area Renovation Replacement & installation of new play structure & resurfacing of Davis Park. NEW Curb Ramps Installation CDBG 2015 Optional 10/22 # 2:30PM at 456 W. Olive Ave, Sunnyvale Construction of ADA ramps & remove & reconstruct certain curbs, gutters & sidewalks, adjust to grade, existing traffic boxes, meters & others city-owned facilities within the limits of the new ADA curb ramps. ONLINE Online O ONLINE ONLINE Chucky Lambert @ 408-730-7406 Concrete Sidewalk, Curb, Gutter and Driveway Approaches CGBG 2015 Optional 10/22 @ 2:30PM at 456 W. Olive Ave, Sunnyvale ONLINE Concrete sidewalks, gutter, driveway approaches & curb ramps 3:00 PM 3:00 PM Sebastopol Santa Clara MAND 10/7 @ 10AM at 390 Morris St., Sebastapol Div_03-cast-in-place concrete; Div_06-interior architectural woodwork; Div_07-joint sealants; Div_08-aluminum windows, door hardware, glazing; Div_09ceramic tile, painting; Div_10-sheet vinyl, door mat, microflex structures, toilet accessories, drinking fountain, lighting, electrical Sebastopol Community Cultural Center Office Remodel NOTICE TO CONTRACTORS:In order to be eligible to submit a bid for this project, contractors must be included on the plan holders list maintained by the Sebastopol Engineering Department. Buds must be submitted on forms provided by the City as described in the Notice to Bidders included in this document Winter 2014/15 Preparation Work for the Phase Shifting Transformer Strongly Recommended 10/7 @ 10:30AM at 1500 Project Warburton Ave, Santa Clara Site demolition; asphalt concrete demolition; earthwork; utility trenching & backfill; storm water pollution prevention; caissons; asphalt concrete paving; cast-inplace concrete, concrete reinforcement; cast-in-place concrete; concrete curing; structural steel; metal fabrications; concrete waterproofing; yard lighting; electrical ONLINE ONLINE Voula Margelos Brown @ 408-261-5036 4:30 PM Modesto NEW 2605 Alexia Way MAND 10/16 @ 2PM at 2605 Alexia Way, Modesto Reroof, replace some doors, replaced HVAC system and new flooring and painting the exterior of house Gregory Williams @ 209-577-5392 Page 29 of 42 ONLINE Bid Date Bid Time Location 10/29/2014 5:00 PM San Jose Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW RFQ-Master Agreement for Landscape Architectural Services The Department of Public Works, City Facilities Architectural Services Division, is seeking firms or individuals (“Consultant”) to provide a full compliment of architectural consultant design services. The Consultant will be required to provide multi-discipline architectural services for the projects identified and for various citywide projects. The City of San José- is seeking to provide. ONLINE Based on this RFQ, the City will enter into one (1) or more consultant agreement(s) with the highest ranked Consultant(s). The agreement(s) will have a maximum compensation limit of $270,000 and shall expire approximately five (5) years from the date of execution, unless the compensation level is reached earlier 10/30/2014 1:30 PM San Rafael $2631000 10/9 @ 11AM at 1301 Andersen Dr., San Rafael The Project consists of removing and replacing the sludge thickening system, as described in the Contract Documents. The work includes demolition of the two (2) existing dissolved air flotation thickeners and associated equipment and piping, furnish and installation of two (2) rotary drum thickeners and associated equipment to provide a complete, functional installation, control integration of new equipment into the existing treatment plant process control system and testing of the completed system to ensure proper operation Sludge Thickening System Replacement ONLINE Brian Thomas @ 415-459-1455, extension 121 2:00 PM Davis 2:00 PM San Francisco $875000 MAND 10/16/14 @ 1:00 pm Provide all labor, materials, equipment, tools, transportation, insurance, and services required to install approximately 100 feet of roof mounted steam and condensate piping, 400 feet of underground steam and condensate piping, and general tenant improvements to an unimproved bay of the CNPRC Shop Building for the purpose of serving a future cage wash machine. Site work shall include excavation, installation of underground piping, poured in place insulation and patching of asphalt roadway. Tenant improvements to the 2,200 sq. foot open bay shall include concrete slab, concrete flatwork, plumbing, steam fitting, electrical, HVAC and architectural sheet metal improvements. Work will be performed within the California National Primate Center and shall require health screenings for all workers. TG07.9 Bollards & Barriers 8/27 @ 2PM at 175 Beale St., San Francisco NEW CNPRC Cage Wash Facility ONLINE ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with designing, furnishing and installing bollards, wedge barriers, impact attenuators, hydraulic power units, controls and piping, and integration with safety and security systems on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems. 2:00 PM Richmond ONLINE RFP-Hilltop and Marina Landscape Maintenance Assessment Districts Annual Engineer's Report The purpose of this invitation is to identify a company that will, as a result of passage of Proposition 218, prepare a new Engineer's report for the Hilltop & Marina Landscape Maintenance Assessment Districts Yader Bermudez @ 510-774-6300 2:00 PM Pleasanton Janitorial Services for the Pleasanton DMV Field Office Janitorial Services Page 30 of 42 10/9/14 @ 10am Online O Bid Date Bid Time Location 10/30/2014 2:00 PM 2:00 PM Pine Grove Oakland Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # MAND 10/7 @ 10AM Div_02-site preparation, chain link fence, gravel surfacing, demolition, blasting, concrete mat & pad foundation, groundwork for structures, rock removal; Div_03concrete; Div_04-concrete unit masonry; Div_05-metal decking, metal fabrications, welding, structural steel, ladders; Div_06-rough carpentry; Div_07-cold fluid applied waterproofing, metal roof panels, metal wall panels, roof hatches, sealants; Div_08-hollow metal frames, hollow metal doors, door hardware; Div-09painting, elastomeric coating; Div_13-self-supporting steel communication tower; Div_22-plumbing; Div_23-HVAC; Siv_26-stand-by generator, automatic transfer switches, electrical work $2531165 NEW The Rehabilitation of Sanitary Sewers in the area bounded by Park Voluntary 10/14 @ 10:30AM at 250 Frank Ogawa Plaza, Boulevard, Hollywood Avenue, Sunnyhills Road, and Brighton Oakland CHP Enhanced Radio System Replace Towers and Vaults ONLINE ONLINE Avenue The proposed work consists, in general, of rehabilitating approximately 2,953 linear feet of existing 6” diameter sewer pipes and approximately 13,774 linear feet of existing 8” diameter sewer pipes by pipe-expanding method; rehabilitating sewer structures; reconnecting house connection sewers; rehabilitating house connections sewers, and other related works as indicated on the plans and specifications. 2:00 PM Davis David Ng, Proj Mgr, @ 510-238-7267 NEW UC Davis International Complex-Subcontractor Bids for Select Bid ONLINE Packages Construct a new 60,000 SF office and classroom building which will include a Commons area, Multi-purpose room, offices, meeting rooms, Media Resource room, classrooms, misc. support rooms and all associated site improvements; bid packages include 1) pavement markings and site signage, 2) precast unit pavers, 3) decomposed granite, 4) landscaping, 5) CMU masonry, 6) aluminum column covers, 7) architectural millwork and wood paneling, 8) fireproofing, 9) joint sealants, 10) tile, 11) acoustical ceilings and wood ceilings, 12) flooring, 13) concrete sealer and stain, 14) architectural sheetmetal, 15) paint, 16) toilet accessories and partitions, 17) visual display surfaces, 18) signage, 19) operable partitions, 20) fire protections specialties, 21) lockers, 22) projection screens, 23) entrance floor mats, 24) window coverings, 25) elevator smoke curtains and 26) sun shades. **MEP trades, steel, concrete, glazing, doors and hardware, metal framing and drywall, stucco, elevator, metal decking, rebar, roofing, stone veneer, fire suppression, and sitework are EXCLUDED and have been selected through the Design-Build process. 2:00 PM Cupertino MAND Pre-Bid Conference 10/13 @ 3:30PM and Site Visit $180000 10/16 @ 3:30PM The Project consists of providing all material, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to relocate storage sheds and fence post & fabric, provide and install a new transformer & distribution panel, install all low voltage wiring for Power, Fire Alarm, Clock\Bell Paging, Intercom Phone, Data, install new fence posts & fabric for the New Interim Housing Portables at Hyde Middle School. Hyde Middle School Interim Housing Portables Pending Mark Casini @ 408-483-7599 Complete documents will be posted once available 2:00 PM Concord 09/29/14 @ 10:00 am at 2477 Arnold Industrial Way SCOPE OF WORK. It is the intent of County Connection to have the contractor furnish and install the necessary labor and materials to upgrade and replace the existing security gates per the technical specifications of this bid package and the Contractor’s bid. Upgrade and Installation of Security Gates Page 31 of 42 066C Bid Date Bid Time Location 10/30/2014 2:00 PM Oakland Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $170250 NEW The Rehabilitation of Sanitary Sewers at Lakeside Park Pump Station Voluntary 10/14 @ 10:30AM at 250 FRank Ogawa Plaza, Oakland The proposed work consists, in general, of remove of the existing sanitary sewer pumps, excavation, dewatering, shoring and installation of a pre-engineered and pre-fabricated complete pump station system with associated electrical and alarm systems, install precast holding tank, and other items of work state in the Special Provisions and the project plans or as required for a fully functional sanitary sewer pump station. ONLINE Gunawan Santoso, Proj Mgr, @ 510-238-7260 2:30 PM Walnut Creek 3:00 PM San Jose 3:00 PM Cupertino 3:00 PM San Jose $45000 Tennis Courts Resurfacing Project The Project includes, but is not limited to, performing the following Work: •Courts preparation •Clean out the cracks and crack seal •Clean surface •Leveling for only two (2) courts at Larkey Park, as determined in the field by the engineer •Apply special surface coating •Apply color coat •Provide line painting, including pickleball lines for two courts at Rudgear Park •Restore pipe netting, netting, and perimeter courts fencing NEW 7585-Demolition of Kelley House 10/20 @ 10AM at 1300 Senter Rd., San Jose Materials disposal, hazmat protection procedures, back fill, demolition ONLINE ONLINE Raj Verma, Proj Mgr, @ 408-535-8443 MAND Pre-Bid Conference 10/14 @ 3:30PM & Site Visist $260000 10/17 @ 3:30 PM The Project consists of providing all material, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to relocate storage sheds and fence post & fabric, install new fire suppression line & hydrant, provide and install a new transformer & distribution panel, install all low voltage wiring for Power, Fire Alarm, Clock/Bell Paging, Intercom Phone, Data, install new fence posts & fabric for the New Interim Housing Portables at Miller Middle School. 7458-Police Administration and Communication Buildings (PAB/C) NEW MAND 10/16 @ 10AM at 201 W. Mission St., San Jose Miller Middle School Interim Housing Portables Pending ONLINE Chiller Replacements Project Div-15-plumbing, HVAC, testing, adjusting & balancing; Div-16-electrical work Jim Wilson, proj Mgr, @ 408-535-8441 4:00 PM Sacramento ONLINE 2015 Pre-Selected Consultants RFQ This Request for Qualifications (RFQ) solicits qualified firms to provide an array of Pre-Selected professional services to the Department of Public Works (DPW).Respondents to this RFQ must demonstrate experience and capacity to deliver the services offered, as well as sufficient understanding of Public Works needs and to tailor its services to successfully address them. Page 32 of 42 Bid Date Bid Time Location 10/30/2014 4:00 PM San Francisco Plan Name / Scope of Work Prebid Information NEW RFQ-As-Needed Design, Engineering, & Professional Consulting Engineers # of Plan Estimate Addenda # 10/14 @ 2:30PM ONLINE Services Treasure Island Project TICD is soliciting Statements of Interest and Qualifications from qualified design, engineering and professional consulting firms to provide As-Needed Professional Services for components of the development of the Treasure Island Project ("Project”). The selected consulting firms will be added to a Qualified Vendor List, and, subsequent to a future fee proposal submittal process, may contract directly with a joint venture managed by TICD, the Master Developer of the Project, who will provide direct oversight and management of the scope of work. 10/31/2014 2:00 PM Los Altos Hills RFQ-Lease-Leaseback Services for New District Offices MAND 10/7 @ 10AM at 12345 El Monte Rd., Los Altos Hill ONLINE The Foothill-DeAnza Community College Dist is issuing the RFQ requesting statements of qualifications from contractors qualified to provide the District with services deescribed in this document for construction of the New District Offices at the Foothill College campus in Los Altos Hills 2:00 PM Modesto ONLINE NEW RFP-Transportation Engineering Services for Federal Project CML 5059 State Route 132 (D Street-14th Street) Intersection developments 2:00 PM Stockton The City of Modesto is soliciting requests for proposals for Transportation Engineering Services, which consists of a traffic study that will include a technical analysis report. Janitorial Services for Employment and Economic Development MAND 10/07 @ 10AM at 56 S. Lincoln St., Stockton ONLINE Department Building Janitorial services 4:00 PM San Francisco RFQ Holloway Avenue Development Opportunity MAND 10/1 @ 11AM ONLINE SF State and UCorp are requesting qualifications from interested entities as a first step toward identifying qualified developers to plan, finance, construct and derive income from the operation of a development project on property located at the campus of San Francisco State University in San Francisco, California. 4:00 PM San Jose RFP-Design Engineering Consultant Services for Charcot Ave Extension over I-880 ONLINE The City of San Jose's Department of Transportation is seeking qualified consultant engineering firms or Partnering Organizations to provide transportation planning and engineering services related to the preparation of scoping, environmental studies, project reports, plans, specifications and estimate for the Charcot Avenue Extension Over I-880. 5:00 PM San Rafael ONLINE Essential Facilities Strategic Plan The scope of work for the first RFP (“Essential Facilities Strategic Plan”) is to update the 2003 facility condition assessments, develop space needs of essential facilities, feasibility studies of improving existing or new public safety facilities, developing project budgets and funding plan, prioritizing projects, and developing a phasing and implementation schedule. The second scope of work (“Essential Facilities Project Management and Pre-Construction Services”) is for project management and pre-construction services related to the Strategic Plan process. Jim Shultz @ 415-485-3475 11/3/2014 2:00 PM Sacramento MAND 10/24 @ 1:30PM Replace the roof & exterior siding of the California Dept of Food & Agriculture's Greenhouse offices & storage facility Roof Replacement Project Greenhouse Offices and Storage Facility Page 33 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/3/2014 4:00 PM RFP-Pilot Parklet for Temporary Sidewalk Extensions Sacramento Prebid Information Engineers # of Plan Estimate Addenda # ONLINE This Request for Proposals (RFP) solicits qualified applicants “Sponsors” to install a Parklet in the public right of way. Parklets are a new type of public space that serve as a “mini parks” and are intended to provide space for people to sit, relax and enjoy the city around them, especially where narrow sidewalks would otherwise preclude such activities. They are intended to be seen as pieces of street furniture, providing aesthetic enhancements to the overall streetscape. Parklets secure this space by repurposing on street parking spots. In the place of car parking, a platform is built to bring the grade of the sidewalk out into the street. Once the platform is installed, benches, café tables and chairs, landscaping, and bike parking can all be placed on top in order to provide a welcoming public space along the street. Parklets are sponsored by a private partner (merchant, resident, insti¬tution, etc.) but all amenities on a Parklet must remain free and open for any member of the public to use. 5:00 PM 5:00 PM NEW RFP-Design Engineering and Landscape Architecture Services for Santa Highway 101 at Airport Blvd Interchange Rosa/Winds or The County of Sonoma, Dept of Transportation & Public Works, is seeking a licensed firm for design engineering & landscape architecture services for the Highway 101 at Airport Blvd Interchange. The scope of services will include all work necessary to produce final plans, specifications & estimates. bid documents for land scaping improvements acceptable to Caltrans and the County & provide design support services during construction. On-Call and Pre-Qualified Shortlist for Transportation Engineering NEW 10/16 @ 2PM at 255 Glacier Dr., Martinez Contra Services (2015 - 2018) Costa County The Contra Costa County Public Works Department is requesting Statements of Qualifications (SOQ) from transportation engineering consultants to: ONLINE ONLINE 1. Select firms for “on-call” transportation engineering services; and, 2. Establish a shortlist of transportation engineering firms that the County may contract with for future projects. Each firm should indicate in the cover letter for the SOQ if they would like to be considered for the “on-call” contract, the pre-qualified shortlist for future project specific contracts, or both categorie 11/4/2014 10:00 AM Palo Alto $80000 NEW Gunn Signal and Sidewalk Replacement MAND 10/14 @ 10AM at 780 Arastradero Rd. Palo Alto Removal and installation of a street signal, sidewalk & striping. Associated work includes relocation & reinstallation of pull boxes, conduits, traffic detection loops & signal light related appurtenances ONLINE Complete documents will be posted once available. 12:00 PM Martinez/Ric hmond RFP-Repainting and Recarpeting of Court Facilities Repainting & recarpeting of court facilities Page 34 of 42 MAND 10/21 @ 9AM at 725 Court St., Martinez ONLINE Bid Date Bid Time Location 11/4/2014 2:00 PM Saratoga Plan Name / Scope of Work Prebid Information NEW Unit J Modernization at Prospect High School • Modernization of existing 'Unit J' to serve as Fine Arts Center • Band, Choir, 2D Art, 3D Art, Stagecraft • Complete demolition and abatement of all interior finishes • Mechanical, Electrical and Plumbing components • Data, Fire Alarm and other low voltage components • Complete Fire Sprinkler System • Outdoor Art Courtyard — with masonry kiln shed Engineers # of Plan Estimate Addenda # MAND 10/16 @ 3PM Pending Complete documents will be posted once available 2:00 PM Various Cities 2:00 PM San Francisco 2:00 PM Fort Bragg 2:00 PM Castro Valley MAND 9/29 @ 1PM, 9/30 @ 1PM & 10/1 @ 1PM Various Locations The California State University, Office of the Chancellor is seeking qualified contractors for the furnishing of all labor, materials, and equipment to implement and administer a Regional Job Order Contract (JOC) for roofing work, qualified contractors for the furnishing of all labor, materials, and equipment to implement and administer a Regional Job Order Contract (JOC) for paving work and qualified contractors for the furnishing of all labor, materials, and equipment to implement and administer a Regional Job Order Contract (JOC) for painting work to be used by campuses within the CSU system. Regional Specialty Job Order Contract Roofing, Paving, Painting NEW TG12-.2 Overhead Contact System (OCS) Upgrade Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with Overhead Contact Systems including but not limited to, OCS attachments, structures and integration with the San Francisco Municipal Transportation Agency, and connection to existing Traction Power system, routing and splicing through existing feeder duct banks on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems in the following trade:TG12.2 Overhead Contact System (OCS) Upgrade NEW Avila Center Carpet Replacement MAND 10/21 @ 10AM at 790 S. Franklin St., Fort Bragg Remove the existing carpet & install new carpeting $401000 Christensen Lane and Lake Chabot Road Sidewalk Improvements in 10/14 @ 10AM ONLINE ONLINE ONLINE 070C Castro Valley Earthwork & concrete removal; installing minor concrete standard curbs & gutters, sidewalks, driveways, pedestrian ramps & a valley gutter; installing class V reinforced concrete pipe, drop inlet with box & manhole with frame & cover; performing pavement milling & asphalt concrete base failure repair; installing pavement reinforcing fabric & asphalt concrete, type A, roadway pavement, adjust utility structures & adjustment of existing manholes; installing thermoplastic traffic stripes, thermoplastic pavement marklings & roadside signs & survey monument preservation 2:00 PM Antioch $235000 NEW Williamson Ranch Plaza Water Main Replacement Mobilization, lines & grades, watering, temporary pavement markers, trench excavation & backfill, sheeting & shoring, water mains, blow-off assemblies, cathodic protection system, miscellaneous iron & steel, traffic stripes & pavement markings Page 35 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # 11/4/2014 3:00 PM 10/16 @ 10AM at 1391-35th Ave, Sacramento Sacramento NEW Sacramento River Watershed Sanitary Survey 2015 Update The California Code of Regulations, Title 22, Chapter 17 establishes the California Surface Water Treatment Rule (SWTR) which requires that all surface water suppliers conduct a sanitary survey of their watershed(s) at least once every five years. The first of these studies was required to be completed prior to January 1, 1996 or prior to issuance of a Department of Public Health (DPH) permit for a new or expanded surface water treatment facility, whichever comes first. In December 1995, the City and West Sacramento submitted a sanitary survey of the Sacramento River watershed to DPH; in December 2000, the City and West Sacramento submitted the required first update of the sanitary survey to DPH, in April 2006 the City, West Sacramento, EBMUD, and SCWA submitted the required second update of the sanitary survey to DPH, and in December 2010 the City, Roseville, West Sacramento, EBMUD, PCWA, SCWA, and WDCWA submitted the third update of the sanitary survey to DPH. The next update to the sanitary survey is due to the State Water Resources Control Board Division of Drinking Water (State Division of Drinking Water, previously known as DPH), by December 2015. 11/5/2014 12:00 PM Santa Cruz ONLINE Elissa Callman @ 916-808-1424 MAND 10/23 @ 11:30AM at 1156 Hight St., Barn G, Santa Cruz Construction of Biomolecular Engineering Instructional Lab in the Baskiin Engineering Building on the UCSC campus NEW Alterations to Room 301B JBEB BME Lab $510000 Pending $1100000 ONLINE Documents will be posted after 10/21 2:00 PM Ceres 2:00 PM Fairfield 3:00 PM San Jose 4:00 PM Merced 11/6/2014 2:00 PM Roseville Mitchell Road Sewer Trunk Line and Lift Station Furnishing and Installing 12" thru 30" Sanitary Sewer Pipe, 48" and 60" manholes, connecting to existing sanitary sewer, furnishing and installing lift station pumps and piping and installing a city supplied control panel. NEW Utility Infrastructure Upgrade (Energy) HVAC/EMS Efficiency Project MAND 10/16 @ 2PM at 4000 Suisun Valley Rd, Bldg 100, Asbestos Abatement Fairfield The work under this contract will be in 2 phases. First phase (Buildings 800 & 1500) will be performed during Winter break of 2014 and second phase (Buildings 100, 500, 700, 1400, 1600 & 1700) will be performed during Summer of 2015 which includes, but not limited to, the removal of existing HVAC unit at Building 1600, Dry Wall, TSI/Duct Seam Tape, Lead, Gypsum Board Ceiling, and 2’x4’ false ceiling panels. Demolition, removal, and disposal of all asbestos containing materials detailed in the Asbestos Abatement Specifications for Solano Community College, and as indicated on HMS front end documents, HMS and Kleinfelder reports. All work to be performed is under a single prime contract. $270000 NEW Traffic Loop Replacement Services The City of San José hereinafter “City") is soliciting bids from qualified Contractors (hereinafter “Bidder") to provide Traffic Loop Replacement Services including all labor, material, and equipment necessary to perform such services as specified in the bid document scope of work/services. The replacement will be of 37 existing loops at 25 locations with three locatioons being Caltrans off ramps maintained bu the City of San Jose $12500 NEW Entrance Doors Retrofit at Trident Center MAND 10/15 @ 10AM at 777 W. 22nd St., Merced Provide & install replacement entrance doors NEW Lobby and Staff Lounge Remodel MAND 10/17 @ 10AM at 651 Commerce Dr., Roseville Div_02-demolition; Div_03-concrete; Div_06-rough carpentry, wood veneer-faced cabinets; Div_07-built-up bituminous roofing, joint sealants; Div_08-hollow metal doors & frames, wood doors, aluminum-framed entrances & storefronts, pass windows, door hardware, glazing; Div_09-gypsum board assemblies, acoustical ceilings, resilient flooring, carpeting, painting & coating; Div_10-signage, fire protection specialties; Div_11-kitchen appliances; Div_12-window shades; Div_15-automatic fire protection; Div_22-plumbing & utilities; Div_23-HVAC-Div_26-lighting, electrical Knat Holben, Proj Mgr, @ 916-781-4208 Page 36 of 42 ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 11/6/2014 2:00 PM Regional Groundwater Storage and Recovery-WILL NOT BE ONLINE 10/7 @ 10am 2:00 PM San Francisco San Francisco Engineers # of Plan Estimate Addenda # $47000000 $50000000 The objective of the project is to drill, install, and construct 13 groundwater well facilities, including site preparation; clearing/grubbing and grading; various work on existing groundwater wells; building foundations, temporary shoring and retaining walls; new pumps, motors and related appurtenances; ventilation system; trenching and pipeline and conduit construction; cathodic protection system; chemical treatment equipment, tanks and pumping systems; electrical power distribution systems, SCADA and I&C control systems; perimeter security fence; security monitoring and control systems; final grading and drainage; landscape and irrigation systems; sanitary and storm drain piping and connections to municipal systems; paving and various other site improvements; construct approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water transmission pipeline. The work is to be performed in San Mateo, California. The Engineer's estimate is approximately between $47 to $50 million. The Contract will be awarded to the lowest responsible and responsive bidder. NEW Job Order Contract 52, Electrical (C-10 License), San Francisco, 10/9 @ 10AM 178C ONLINE Peninsula and East Bay A Job Order Contract is an indefinite quantity contract pursuant to which the San Francisco Public Utilities Commission may accomplish a series of projects with a single, competitively bid contract awarded before the projects are identified. Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished by issuing task orders to the successful contractor during the two year term of the contract. Regina Du @ 415-554-4335 2:00 PM Los Altos 2:00 PM Oakland 2:00 PM Placerville ONLINE CIPP Corrosion Rehabilitation Project Line approximately 475 lf of existing 30" sewer main in Springer Road with cured-in-place pipe Replacement of Embarcadero Bridge Over Lake Merritt ChannelMAND 10/6 @ 3:30PM & 10/9 @ 2:30PM at 250 Frank Rebid Ogawa Plaza, Oakland The proposed work consists, in general, of the bridge replacement. Said work consists of, but is not limited to, bridge removal, structural excavation and backfill, grading, structural concrete, furnishing and driving cast-in-drilled hole concrete piles, reinforcement steel and miscellaneous metal work, new restroom building, environmental protection, traffic control and other work specifically shown on the plans or included in the specifications and these special ONLINE Nader Rabahat, Proj Mgr, @ 510-238-6605 HVAC Replacement and Air Balancing Project for Placerville DMV Office-Rebid MAND 10/16 @ 10AM at 2919 Cold Springs Rd, Placerville ONLINE 10/9 @ 3PM at 135 Van Ness Ave, San Francisco ONLINE HVAC replacement & air balanxing & electrical work Julie Phang @ 916-651-2556 11/7/2014 2:00 PM 2:00 PM San Francisco Stockton 2015 Prequalification for SFUSD Projects Eligible for State Funding The San Francisco Unified School Dist is prequalifying general contractors,, mechanical, electrical, plumbing, fire protection & underground pipeline subcontractors to bid on state-funding eligible projects NEW Demolition of Partially Built Single Family Residence 10/24 @ 10AM at 1444 N. Chrocicle Ave, Stockton San Joaquin County is seeking qualified vendors for the demoltion of a fire-damaged, partially built single family residence. The structure is being ordered demolished as a public nuisance. Page 37 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 11/10/2014 2:00 PM Light Rail Efficiency Project:Mountain View Phase 2 9/24 @ 10AM at 3331 N. First St., Bldg A, San Jose Mountain View Engineers # of Plan Estimate Addenda # The project will add a second light rail track over a distance of approximately 3,000 feet, including closure & removal of the existing Evelyn Light Rail Station, installation of light rail support systems & modeification to the municipal drain system University Park-North Garden Apartment Building #1,3,4,5&10 MAND 10/13 @ 10AM at 1600 Holloway Ave, Capital Asbestos Aba Planning & Construction, San Francisco Work consists of all labor and materials necessary to remove and dispose of asbestos-containing thermal system insulation from piping systems within the crawl spaces of Apartment Buildings #1, 3, 4, 5 & 10 at University Park North on campus. Work also includes the removal & disposal of all asbestos debris, all foreign matter, all insulation remnants existing on the surfaces of the “rat slab,” concrete footings and wood framing members throughout the crawl spaces in accordance with plans and specifications prepared by WSR Architects E824B/0 Pending 2:00 PM San Francisco 11/11/2014 3:00 PM Palo Alto Pre-proposal Teleconference 10/7 @ 1:30PM The City of Palo Alto is seeking proposals from qualified firms to provide services to launch integrated programs to reduce traffic and parking demand in the Downtown core, and is also seeking to more effectively optimize and manage its existing parking supply. Important City goals include providing improved access to information on parking and transportation within the Downtown, and helping motorists to find available parking quickly and efficiently. ONLINE 11/12/2014 1:30 PM $3000000 NEW Eden Reservoir Replacement and Round Hill Reservoir 10/20 @ 9:30AM Castro $4000000 Rehabilitation Valley/Alam o Work includes: 1) At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million gallon bolted steel temporary tank, foundation, related piping, and appurtenances; demolish existing 1.6-MG welded steel Eden Reservoir including the exterior wooden architectural screen; construct two, 0.45 million gallon welded steel reservoirs with aluminum geodesic dome roofs, foundations, piping, valve structures, coatings, and appurtenances; disassemble and store 0.28 million gallon bolted steel temporary tank, restore temporary tank site, pave reservoir site, install irrigation and landscaping, install fencing and perform related work as specified in the Contract Documents at Eden Reservoir, located near the intersection of Coolidge Court and Summerglen Place in Castro Valley (Unincorporated Alameda County), California. 2) At Round Hill Reservoir: Construct radio communication towers and related cable and conduit; perform earthwork; provide and install 0.16 million gallon bolted steel temporary tank, foundation, piping, and appurtenances; remove exterior wooden architectural screen from existing Round Hill Reservoir; abrasive blast and recoat tank interior; low-pressure water clean, prime and top coat tank exterior; disassemble and store 0.16 million gallon bolted steel temporary tank, pave reservoir site, install fencing; and perform related work as specified in the Contract Documents at Round Hill Reservoir, located between 574 and 582 Oakshire Place in Alamo (Unincorporated Contra Costa County), California. 3) At Hink No. 2 Reservoir: Disassemble 0.28-MG bolted steel temporary tank, deliver to Eden Reservoir, remove and replace fencing, restore site, and perform related work as specified in the Contract Documents at Hink No. 2 Reservoir located at the end of Vista Bella Drive, Lafayette, California. TG13.3 Ground Level Landscaping 10/15 @ 2PM at 175 Beale St., San Francisco San Francisco Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with ground level irrigation; ground level planting planters; area trench drains; and installation of paving material, architectural concrete pavers, illuminated pavers and illuminated benches on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems. ONLINE Compete bid documents will be posted once available 2:00 PM RFP-Parking Wayfinding Page 38 of 42 ONLINE Bid Date Bid Time Location 11/12/2014 2:00 PM 3:00 PM Alameda County Los Altos 11/13/2014 2:00 PM Los Gatos 2:00 PM San Francisco Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # 10/22 @ 9:30AM at 951 Turner Ct., Rm 230, Hayward NEW On-Call Utility Potholing at Various Locations Prospecting & psoitively locating (both horizontally & vertically) various underground utility lines by "non-destructuve vacuum excavation," providing tarffic control; restoration of disturbed roadway pavement; cleaning site & miscellnaeous work; furnishing all labor, material, tools, equipment, mechanical workmanship, transportation & services necessary to be done in order to perform a complete job. Smithwick Theater Hardware Improvements-Foothill College MAND 10/22 @ 10AM at 12345 El Monte Rd., Bldg D160, Los Altos Hill Div_08-wood doors, FRP doors, door hardware; Div_09-painting NEW Janitorial Services for the Los Gatos DMV Field Office Optional 10/22 $ 8AM at 600 N Santa Cruz Ave, Los Gatos Contractor agrees to provide the Dept of Motor Vehicles all labor, tools, materials, equipment & travel necessary to perform janitorial services at the Los Gatos DMV. Kary Ride @ 916-651-2555 NEW Job Order Contract 53, Electrical (C-10 License), San Francisco, 10/9 @ 10AM E839B/0 ONLINE ONLINE ONLINE Peninsula and East Bay A Job Order Contract is an indefinite quantity contract pursuant to which the San Francisco Public Utilities Commission may accomplish a series of projects with a single, competitively bid contract awarded before the projects are identified. Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished by issuing task orders to the successful contractor during the two year term of the contract. Mindy Lee @ 415-554-3136 2:00 PM 4:00 PM San Francisco San Francisco Highly Rncouraged 8/21 @ 2PM TG08.3-Skylights Webcor/Obayashi Joint Venture issues this Request for Proposals (RFP) for the Skylights Package for the Transbay Transit Center Project from firms (Trade Subcontractors) with expertise in Design, fabrication and installation of skylights. The successful Proposer must demonstrate experience in its respective field as outlined within this RFP. RFQ-Architectural and Engineering Team Design Criteria Consulting 10/16 @ 1PM at 30 Van Ness Ave, San Francisco NEW ONLINE ONLINE fo San Francisco Sheriff's Dept Rehabilitation Detetntion Center The design team will provide programming, architectural, engineering & all related services to plan & develop the perfformance & technical criteria package necessary to assist the City with the solicitation & procurement of design build entity for the design & construction of a new Rehabilitation Detention Facility to replace existing county jails bumber 3 & 4 cirrently located on the 65th & 7th floor of the Hall of Justice 11/14/2014 2:00 PM 3:00 PM NEW Richmond Parkway Interconnect Wire and Pullbox Replacement MAND 10/24 @ 1PM at 440 Civic Center Plaza, Richmond $300000 Removal and installation of 275 (200 Base Bid + 75 Alternate) newtraffic rated boxes and construction of reinforced concrete pads around the boxes in accordanceto City Standards, removal of asphalt concrete and concrete sidewalk as required, and thecomplete re-wire of the traffic signal interconnect system along the Richmond Parkway (BaseBid) from San Pablo Avenue to I-580 and Castro Street (Alternate Bid). (See Plans Attached),and for all other work, items or details not mentioned above that are required by the Drawings,Standard Specifications, or these Special RFP-Prefabricated Modular Data Center 10/17 @ 9AM Sacramento The Request for Proposal (RFP) is not an order. The purpose of this Request for Proposal (RFP) is to purcahse a Prefrabricated Modular Data Center Container as described in the attached detailed statement of work, equipment list, and technical requirements sections. Richmond Page 39 of 42 ONLINE ONLINE Bid Date Bid Time Location 11/17/2014 2:00 PM San Francisco Plan Name / Scope of Work Prebid Information NEW SFO-Design Build Services for Long Term Parking Garage No. 2 Engineers # of Plan Estimate Addenda # ONLINE 10/10 @ 10AM Project The Long-Term Parking Garage No. 2 Project consists of the programming, design, and construction of one or more multi-level above-ground parking structure(s) within the Airport's Lot DD in order to increase on-Airport long-term parking capacity by a net 3,000 parking spaces. Tasso Mavroudis, Contracts Mgr, @ 650-821-7758 3:00 PM Fremont RFP-State Route 84 Widening from Pigeon Pass ro Interstate 680 Project Approval and Envirnmental Documents (PA&ED) Phase ONLINE 10/14 @ 1PM at 1111 Broadway, Stew 800, Oakland The Alameda County of Transportation Commission is seekinmg proposals to provide professional engineering services for the project approval & environmental document phase of the State Route 84 Widening from Pigeon Pass to Interstate 680 4:00 PM 11/18/2014 2:00 PM 2:00 PM 2:00 PM Joan Fisher @ 510-208-7466 10/29 @ 2PM at 915 I st., Rm 2000, Sacramento Sacramento NEW Auburn Boulevard at Arcade Creek Bridge Replacement Project This Auburn Boulevard Bridge is located in North Sacramento where Auburn Boulevard crosses Arcade Creek just east of Winding Way and west of Park Road and the I-80 ramps. The existing structure was constructed in 1927 and widened in 1965. In its current condition, the structure has spalling at the girders and bents and insufficient deck width to provide the City with standard lane widths and bike lanes. The existing structure is located within 150’ of the Winding Way intersection which does not have ADA compliant ramps or crossing facilities. This project will require work within the County of Sacramento. Close coordination, input, and approval, from County reviewers will be required during preliminary engineering and design of project improvements.This project will seek to replace the existing structurally deficient and functionally obsolete bridge. The new bridge will be a structure that provides a minimum of five 12’ lanes, two 6’ bike lanes, a raised median, and two 6’ sidewalks. The proposed project has the potential to impact the current configuration of the Auburn Boulevard/Winding Way signalized intersection. During the preliminary engineering and development of the Project Report, the necessity and alternatives for modifications to the intersection must be investigated. San Francisco Various Cities San Francisco ONLINE 9/18 @ 2PM at 175 Beale St., San Francisco TG13.2-Roofing/Waterproofing ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with PVC roofing, sheet waterproofing, and fluid applied waterproofing on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems. $1100000 BART Earthquake Safety Programs Seismic Retrofit and Repairs at 10/3 @ 10AM at at 300 Lakeside Drive, Oakland S009/01 $1500000 Various Locations Div_02-preservation & restoration, selective structure demolition; Div_03-concrete; Div_04-unit masonry restoration; Div-05-metal welding, metal fabrications; Div_06-rough carpentry; Div_07-modified bituminous sheet waterproofing; Div_09-cutting & patching; Div_20-restoration of facility services, raceways for facility services; Div_26-lighting, electrical; Div_32-pavement markings, plant irrigation, planting TG16.1 Drywall/Framing 10/2 @ 2PM at 175 Beale St., San Francisco Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with drywall, metal framing, building insulation, penetration firestopping, toilet accessories, miscellaneous metals for own work, bird deterrent, ballistic resistant panels, acoustic ceiling tiles & acoustic wall treatments on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems Page 40 of 42 ONLINE Bid Date Bid Time Location 11/18/2014 2:00 PM Daly City Plan Name / Scope of Work Prebid Information NEW Replace Glass Panels at Daly City Station Platform 10/23 @ 10AM at 300 Lakeside Dr., Oakland Engineers # of Plan Estimate Addenda # $80000 $100000 ONLINE Contractor shall provide all labor, equipment, materials & services required for replacing non-tempered glass panels with tempered glass at the platform level at the BART Daly City Station Anita Maynar @ 510-464-6543 Complete documents will be posted once available 11/19/2014 2:00 PM San Francisco ONLINE 9/25 @ 2PM TG07.4-Concrete Masonry Units Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with furnishing and installing concrete masonry units, miscellaneous metals to brace own work, associated membranes, and, other related accessories on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems. 11/21/2014 5:00 PM Various Cities RFP-Solar PV Energy California Department of Corrections and Rehabilitation ONLINE MAND 9/4 @ 5PM A qualified pool members are invited to review & respond to this Request for Proposal for the installation & operation of solar photovoltaic energy generation systems under a third party ownership power purchase agreement business model 11/28/2014 2:00 PM Novato 12/5/2014 12:00 PM Napa County Novato Housing Maintenance & Repair Electrical System 8/15 @ 10AM at 227 South Oakwood Dr., Novato Maintenance & repair electrical system NEW Contractor Prequalification for Napa County South Campus $1000000 $5000000 ONLINE $11400000 ONLINE Improvement Project South campus improvements project prequalification's 12/18/2014 2:00 PM 2:00 PM San Francisco San Francisco TG08.7 Glass Floor Construction Services Package 10/7/14 @ 2pm Webcor/Obayashi Joint Venture seeks responses to a Request for Proposals (RFP) from Trade Subcontractors interested in submitting a proposal for the TG08.7 Glass Floors Construction Services trade package on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California. Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with design, fabrication and installation of structural glass floors including but not limited to structural supports and expansion joints on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems in the following trade: TG08.7 GLASS FLOORS TG08.10 Glass Curtain Walls 9/23 @ 2PM at 175 Beale St., San Francisco Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with glass curtain wall assemblies, aluminum color covers & aluminum extrusions on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems Page 41 of 42 Online ONLINE Bid Date Bid Time Location 12/31/2014 5:00 PM Fremont 6/30/2015 6:00 PM Rohnert Park Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW Fremont Unified School District Qualified Bidders for the Year 2014 Contractors must provide the name and address to which a Notice to Contractors or proposal should be mailed, a phone number at which the contractor may be reached, their business fax number, the type of work in which the contractor is interested and currently licensed to do (earthwork, pipelines, electrical, painting, general building, etc.) together with the class of contractor’s license(s) held and contractor license number(s), proof of general liability insurance and maximum project bonding capacity. Contractors that were previously included on the list will need to resubmit to be included on the list for the current calendar year. Various Public Works Projects-Sonoma State University Sonoma State University is seeking qualified contractors and service providers to perform various projects and services beginning July 1, 2014 through June 30, 2015. The University shall establish a shortlist of qualified contractors for possible future minor capital projects ranging in value from $5,000.00 up to $634,000.00. Carolyn Faulconer of the Sonoma State University says that from July 1, 2014 through June 30, 2015 the university will be accepting contractors who wish to be added to its list to perform various projects & services for the university. Right now there are no projects yet out to bid. The bid date, June 30, 2015, is the last day the University will be accepting qualified contractors to its list. REMOVE, REPLACE, REPAIR REMODEL, RENOVATE, CONSTRUCT AND/OR MAINTAIN: Includes, but not limited to, demolition, miscellaneous site improvements, flooring, walls, doors, windows, roofing, mechanical and plumbing systems; electrical and telecommunication systems, audio and video systems, radio and communications systems, security and surveillance systems, fire alarm systems and signage; HVAC equipment; water heaters; automatic doors; ADA; pathways; wall coverings Page 42 of 42 ONLINE ONLINE
© Copyright 2024