Four Sales Myths Debunked

The Weekly Bulletin
Serving the Construction Industry and Bay Area Community since 1932
2014 BOARD OF DIRECTORS
OFFICERS
Nancy Brinkerhoff, President
Ironwood Commercial Builders, Inc.
Lydia Roze, Vice President
Vista Universal, Inc.
www.bayareabx.com
October 10, 2014
Four Sales Myths Debunked
By Joe Diliberto, Sandler Training, Oakland, CA
Forrest Towe, Past President
Anvil Builders
Every profession has its own lineup of myths that need busting. Those
who have spent the majority of their career in a sales role have heard them
all. The fact is that sales is an exciting, sometimes grueling and often
rewarding profession. We're the frontline of an organization and vital to
its growth. However, like it or not, many myths exist about who the
"ideal" salesperson is and what a career in sales is like.
John C. Roeber, Past President
J. Roeber & Associates
The following four myths are among some of the most popular
assumptions about the sales profession.
Eric Kavert, Treasurer
Pacific Coast General Engineering,
Inc.
DIRECTORS
Greg Adams,
Shimmick Construction Co., Inc.
Joe Maltifano
London Construction
Thom Miles
TMA Construction Services.
John Parker
Janus Corporation
Ken Regevig
K. Regevig Roofing
EXECUTIVE DIRECTOR
Scott P Leary
DIRECTOR OF OPERATIONS
Denice McDavid
The Weekly Bulletin (USP3 3633) is published
every Week by the BAY AREA BUILDERS
EXCHANGE, 3055 Alvarado Street, San
Leandro, CA 94577-5711. Subscription rate
for non-members is $525 per year.
POSTMASTER: Send address changes to
BAY AREA Builders Exchange , 3055
Alvarado Street, San Leandro, CA 945775711.. Tel.: 510.483.8880. Fax 510.352.1509.
Can you think of any other myths that need busting?
Myth #1:
Salespeople need to be extroverts.
Reality: Contrary to popular belief, introverts excel at selling, too. While
it's not always the case introverts tend to be better listeners, more
understanding and more focused on others. Sandler believe that sales
professionals can be trained to overcome their inherent introverted
tendencies through reinforcing behaviors, attitudes and techniques.
Myth #2:
The gift of gab is all you need to be good at sales.
Reality: The phrase "telling is not selling" is a classic among the Sandler
community. That's because successful salespeople know that the prospect
should be doing at least 80% of the talking, while the salesperson fills in
the remaining 20% with questions, restating what they're hearing and
finding their way to prospects pain.
Myth #3:
If you do a good job, referrals come to you.
Reality: While word-of-mouth referrals leave you feeling warm and fuzzy,
they often are few and far between and can't be counted on for a steady
Continued on the next page …
Sales Myths
Continued from front page …
flow of business. When asking for referrals the key is to explain how you work with clients and
describe your ideal prospect. Otherwise, it's hard for your referral source to envision someone
who could be right for you. All in all, you've done a good job and earned the right to ask for
referrals. Asking for referrals is an essential part of growing your business and it's your
responsibility to take the opportunity to ask.
Myth #4:
Selling is a one-person job.
Reality: Sandler believes that selling is a team activity. A smart salesperson relies on several
people throughout the sales process. Whether you're working with marketing on a sales piece,
bouncing a tactic of a peer, seeking counsel from a sales manager or consulting with a trainer,
selling is far from a one-person job.
About Joe Diliberto
Joe specializes in working with business owners, CEO's and senior managers to maximize the
return on what is often their most underutilized resource, the sales team. To contact Joe, email
to:[email protected], or call 510/530-5060.
***
November Workers Compensation Insurance Renewals:
ASK FOR:
Group
825
“Workers Comp Insurance Quote”
State Fund + BAY AREA Builders Exchange
=
6% SAVINGS
Bay Area Builders Exchange presents
EXITING YOUR BUSINESS
PROTECTING YOUR WEALTH
Guiding Business Owners Through the Process of Exit Planning
Two Dates and Locations
Wednesday October 29th
Wednesday November 5th
8AM - 10AM
8AM - 10AM
or
3055 Alvarado St
2440 Stanwell Dr.
San Leandro, CA 94577
Concord, CA 94520
Q&A and Lunch provided following the presentation
Exiting your company is often your most significant financial event.
Exiting Your Business, Protecting Your Wealth is for owners who want
to understand their options and optimize their results. You’ll learn
about your Value Gap, the different Exit Routes, and how to
work to Protect Wealth in the process. Whether you want out
today, or years from now; whether you plan to sell, or want to hand
it to family – this planning process could be key.
Please RSVP by Friday October 24th
to Nicole Capra at 925.866.7800 or
[email protected]
Each attendee will receive a free copy of
“Exiting Your Business,
Protecting Your Wealth”
and have the opportunity to take the
BERI Survey
(Business Exit Readiness Index)
Separate from the financial plan and a Summit advisors' role as financial planner, an advisor may recommend the purchase of specific investment or insurance
products or accounts. These product recommendations are not part of the financial plan and clients are under no obligation to follow them. Summit Financial
Group LLC 2000 Crow Canyon Place Suite 450 San Ramon CA 94583 Securities and investment advisory services offered through Securian Financial Services,
Inc., Member FINRA/SIPC. Securities dealer and registered investment advisor. Summit Financial Group LLC is independently owned and operated.
TR#950605 DOFU 06/2014
Mike Brown Electric Co. is seeking MBE/DBE/WBE/DVBE subcontractors/material
for the following project:
EBMUD, Adeline Maintenance Center Complex Fire Alarm System Upgrade,
Specification 2062A
Trades include: Fire Alarm Systems, Electrical Material, Scheduling, Storage
Containers, Clean Up, Acoustical Panel Ceilings and Painting
Bid date: October 15, 2014 @ 2pm
Contact: Yuriy Vorobyev
Phone: 707-792-8100
Fax: 707-792-8111
www.
thebluebook
.com
Triple S. Electric Company is seeking MBE/DBE/WBE/DVBE subcontractors
material for the following project:
EBMUD, Adeline maintenance center complex fire alar m system upgr ade,
specification 2062A
Trades include: Fire alarm systems, electrical material, scheduling, storage
containers, clean up.
Bid date: October 15, 2014 @ 2pm
Contact: Steve Slauson
Phone: 510-846-3529
Fax: 510-523-8563
A Special Seminar
FRIDAY, NOVEMBER 7TH
8:30 A.M. to 12:30 P.M.
COST (due in advance): $150.00 per person
LOCATION: Bay Area Builders Exchange
3055 Alvarado Street, San Leandro, CA 94577 (510) 483-8880
MAKE YOUR RESERVATIONS NOW……...DEADLINE IS NOVEMBER 3RD
Contact: Larry Levy at 415-892-1497 or FAX reservation to 415-8926596. Make check payable to Larry Levy. Mail to 458 San Marin Drive,
Novato, CA 94945
Thank you, Larry. We are planning to come. Enclosed is my check.
Names of participants:
___________________________________________________________________________
___________________________________________________________________________
From (Co. or Org.)
___________________________________________________________________________
OUTLINE

Overtime Requirements as of January 2014

Overtime Exemptions

Make-up Time is Available

Alternative Workweeks — New Law

Itemization of Wage Statements

When does the Work Week begin?

Timekeeping

Minimum Wage Violations — New Law

Wage Theft — New Law

Misclassification of Independent Contractors vs. Employees — New Law

Commission Agreements — New Law

Meal and Rest Periods — New Laws

San Francisco Ordinances— New Laws

Compensable (“Comp.”) Time

On-Call Time

Waiting Time

The Company’s vs. the Employees’ Tools

Paid Vacation

Paid Sick Leave — New Law

Paid Holidays

Deductions from Paychecks

Final Paychecks

Frequency of Paying Employees

Travel Time — New Law; Heads Up, Contractors!

Determining the Difference between Exempt vs. Non-exempt Employees
B.O.B. Construction Contractor Academy 2014
ACPWA is offering a FREE workshop series for small & local construction contractors interested in breaking into
public works contracting or growing their business in the public contracting sector.
Four Saturday morning sessions have been designed to deliver the maximum learning experience for all in
attendance. Breakfast & course materials will be provided FREE for all participants. Attendees can expect to gain
in-depth knowledge of public works contracting from experienced industry professionals.
BOB MEETING
CALENDAR
2010
Ed Duarte, CEO of Aztec Consultants, will lead the bulk of this series. He has over 30 years of experience in
construction management on over $250 million of public works contracts & various other projects.
Session topics will cover the following:
 Improving Bid Estimation Skills & Constructing Competitive Bids
 Utilizing Local Business Certifications
 Insider Tips on Public Works Contracting & Tools for Tracking Upcoming Projects
 Marketing Strategies for Connecting with Prime Contractors
 Panel Discussion with Prime Contractors Regularly Bidding Alameda County Contracts
 Information about upcoming Contracting Opportunities with Alameda County Agencies
Schedule for 2014 BOB Contractors Academy
Bid Estimating & Preparation
Constructing Competitive Bids
Pursuing Contracting Opportunities
Connecting with Primes for Smart Partnerships
Saturday, 9-27-14
Saturday, 10-04-14
Saturday, 10-11-14
Saturday, 10-18-14
Workshops will be from 9 a.m. to 12 p.m. at 3055 Alvarado St., San Leandro, CA 94577.
Attendees will receive coaching from PWA prime contractors. Successful subcontractors who have connected with
these primes & have worked on Public Works projects will also share their techniques.
Participants who attend all four sessions will receive a certificate of completion & a FREE 90 day trial membership
for the Bay Area Builders Exchange.
Enrollment is limited. To register for the series or find out more about ACPWA’s BOB program, please contact
Sheldon Jefferson at 510-670-6407 or at [email protected]. You must register by September 25th.
Breakfast will be provided by the following sponsors:
This workshop series is organized & facilitated by:
Executive Office Space for Lease
Small Private Offices Available: TWO LOCATIONS
110 - 300 square feet
San Leandro
Concord
Ideal space for satellite office, estimators, sales &
service representatives
Amenities include:
GREAT LOCATIONS
Free WiFi
FREE PARKING
UPS SERVICE DAILY
SECURITY SYSTEM
ACCESS TO KITCHEN
JANITORIAL SERVICE
ALL UTILITIES
24 HOUR ACCESS
CONFERENCE | BOARD ROOMS
MAIL PICKUP AND DELIVERY
FAX / COPY Machines Available
San Leandro
Concord
3055 Alvarado Street
San Leandro, CA 94577
510.483.8880
2440 Stanwell Drive
Concord, CA 94520
925.685.8630
For more information call Scott Leary at 510.483.8880 (San Leandro)
or Denice McDavid at 925.685.8630 (Concord)
Misc.: Leases are month to month. 1st month and security deposit to start lease.
Credit Check. Telephone / upgraded cable internet service not included.
Advertising Rates
Weekly Bulletin
Our Bulletin runs weekly in 8 1/2 " X 11 " Size Format, Black & White
Member
(Total cost)
NonMember
(Total cost)
$100
$150
$150
$200
$75
$110
$115
$150
$35
$60
$50
$80
$30
$50
$50
$75
Full Page:
One or two weeks
Three or four weeks
1/2 PAGE:
One or two weeks
Three or four weeks
1/4 PAGE:
One or two weeks
Three or four weeks
Business Card &
MBE/WBE/SBE
Sub Bid Requests:
One or two weeks
Three or four weeks
CLASSIFIED:
Up to 7 lines
One or two weeks
$25
Three or four weeks
$35
(Each additional line)
$2.50
Note: A line is 30 Character / spaces.
$40
$55
$4.50
Please fax a typed written sample of your ad to 510-352-1509 or email copy text to
[email protected] and indicate the number of Weekly Bulletin issues the ad is to run.
Ad deadline is 12:00 P.M. Thursdays, the Weekly Bulletin is published every Friday.
**** Ads for Nonmembers must be paid in advance.
3055 Alvarado Street, San Leandro, CA 94577. Tel: 510-483-8880. Fax 510-352-1509.
www.bayareabx.com. [email protected]
BAY AREA BUILDERS EXCHANGE - TELEPHONE (510) 483-8880. FAX (510) 352-1509
WEEKLY PLAN LIST - Friday, October 10, 2014
To view plans online go to: www.beac.com
Bid Date Bid Time Location
Plan Name / Scope of Work
10/10/2014 10:00 AM
RFP-Ohlone Elementary School-Tower Dry Rot Repair and Concrete
Improvements
Watsonville
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 10/3 @ 10am
Removal of four (4) windows; removal of rotten framing members and installation of four (4) new windows; tile work; repair/replacement of an drywall stucco &
tile works from construction; removal of expansion jint in main entrance walkways & installation of non-shrink grout.
THIS IS A PREVAILING WAGE PROJECT
aDAM lINT @ 831-786-2100, EXT 2583
10:00 AM
San Bruno
RFP-Turnkey Services for City of San Bruno Streetlight Conversion
to Led
ONLINE
MAND 9/16 @ 10AM at 567 El Camino Real, San Bruno
The City of San Bruno (City) is solicitng proposals from qualified Firms/Consultants (Consultant) to enter into an Energy Service Contract in order undertake a
turnkey project for the conversion of aproximately 2,00 existing High Presure Sodium (HPS) and Metal Halide (MH) stretlights to Light Emiting Diode (LED)
throughouthe City. The requested services contemplated under the Energy Services Contract consist of furnishing al study and design services, labor, materials,
suplies, vehicles, facilties and equipment to perform the Scope of Work identified below. The proposals submited in response to this RFP wil be used as a basis
for selecting the firm to
complete the Scope of Work. The proposal wil be evaluated and ranked acording to the criteria provided in Section VI “Evaluation of Proposals” in this RFP.
William Li @ 650-616-7069
11:00 AM
Visalia
2:00 PM
Berkeley
2:00 PM
San
Francisco
Supply & Installation of Various Generators (Natural Gas & Diesel)
MAND 9/4 @ 11AM & 9/9 @ 1PM
$500000
ONLINE
Supply & install natural gas & diesel generators at various locations
$7700000
MAND 10/1 @ 10AM at 1936 University Ave., 2nd Fl,
Berkeley
Construction & installatoion of new center hung scoreboard, new bowl public announcement system, specialty lighting, acoustical treatments, broadcast cabling,
LED video boards, expansion of the video production room & electrical, mechanical & low voltage systems
Haas Pavilion Scoreboard and Sound System Modernization
General Contractor Prequalification
NEW Rental Assistance Demonstration (RAD) Relocation Consultant
The Authority is requesting proposals from qualified firms interested in leading the authority-wide relocation efforts related to the RAD conversion. The selected
firm should have extensive experience with RAD and the requirements of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970,
as amended, (URA), as they relate to the public housing conversion process.
Page 1 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
10/10/2014 2:00 PM
San
Joaquin
County
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
NEW Physical Needs Assessment, Sartini Manor
Physical inspection of the property. The successful proposer shall visit the HACSJ’s Sartini Manor Property identified below and prepare a Physical Needs
Assessments (PNA’s) in accordance with the document “Fannie Mae Physical Needs Assessment Guidance to the Property Evaluator”, except as modified
herein. The document “Fannie Mae Physical Needs Assessment Guidance to the Property Evaluator” is included as an attachment hereto by reference. 100% of
the dwelling units shall be inspected in a non-intrusive manner (lists of addresses and unit descriptions are attached). Most dwelling units are occupied. The
selected Contractor will coordinate with HACSJ staff when inspections of occupied units are to take place, as the HACSJ is required to give the tenants
advanced notice of such inspections.
All site improvements, common facilities, building exteriors, and units accessible for the handicapped shall be inspected. The inspections shall include a review
of any pertinent documentation, i.e. repair/replacement records and as-built drawings, and interviews with the property owner, management staff, and tenants as
needed. The developments to be included in this PNA will be determined by HACSJ and include: 1. Sartini Manor property located in Thornton California
2:00 PM
San Leandro
2:00 PM
Stockton
2:30 PM
San Mateo
Cornerstone Family Housing (No GC Openings)
Cannon Constructors North is the general contractor for Cornerstone Housing project in San Leandro, CA. We are soliciting subcontractor proposals for this
apartment project consisting of a concrete below grade and grade level parking and amenity space structure with four levels of modular and site-built wood
frame structure for a total of 115 living units. It is anticipated construction will start late November 2014.
Important to note:
•
There is a San Leandro local business goal of 15%
•
This is a prevailing wage job
•
Construction start is earmarked for November 2014
There will be no formal job walk, however, contractors are encouraged to visit the site to become familiar with site and neighborhood conditions, access, and
other site-specific conditions.
Janitorial Services for Stockton Metropolitan Airport
MAND 9/8 @ 9AM at 5000 S. Airport Way, Stockton
The County of San Joaquin is soliciting Request for Bids to contract with a qualified janitorial service company to provide the highest standards of professional
janitorial services. Contractor will furnish all labor, uniforms, badges, materials, equipment, transportation, supervision and management required to provide
Janitorial services in accordance with all terms and conditions of this Request for Bid.
ONLINE
ONLINE
Gina Guttierez @ 209-468-2074
3:00 PM
Alameda
3:00 PM
San
Francisco
Channel Piling and Navigation Light Installation Project
Driving a 14" square (normal size) concrete pile; installing a pre-fabricated galvanized steel platform (supplied by the narbormaster); intalling a pre-fabricated
galvanized ladder (supplied by Harbormaster); and installing a navigational light atop of the lantern stand (supplied by Harbormaster) on the platform
RFP-Central County Complete Streets Implementation
9/24 @ 1PM
Alameda CTC is requesting proposals from interested firms currently on the qualified list in the “Multimodal Transportation Planning, Design and Engineering”
and “Bicycle and Pedestrian Planning, Design and Engineering” categories of the Sustainable Communities Technical Assistance Program (“SC-TAP”) for the
Central County Complete Streets Implementation Project, pursuant to the SC-TAP Statements of Qualifications submitted by such firms in response to Alameda
CTC RFQ No. A13-0019.
$225000
Ocean Avenue Campus Entrance Door & Hardware Replacement
9/26/14 @ 3pm
Replace existing exterior doors/storefront doors at 12 locations within 5 buildings, at two of these locations replace overhead transom and or storefront window
systems.
Page 2 of 42
ONLINE
ONLINE
019C/R0
Bid Date Bid Time Location
Plan Name / Scope of Work
10/10/2014 4:00 PM
Woodland Fairfield Inn and Suites Building Package
Woodland
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Construct a new Fairfield Inn and Suites, trades needed include erosion control, pavement marking, reinforcing steel, masonry, architectural casework, damp
proofing and waterproofing, exterior insulation and finish systems, metal roof and wall panels, roof hatches, access doors, tile, flooring, visual display boards,
flagpoles, fire extinguishers and cabinets, registration equipment, laundry chute, entrance mats, fire sprinkler system, electrical, grading and paving,
underground utilities, cast-in-place concrete, rough carpentry, panel work, water repellent, fireproofing, flashing and sheet metal, joint sealants, aluminum
entrance and storefront, acoustical ceilings, painting, wall and door protection, signage, metal storage shelving, food service equipment, residential appliances,
swimming pools, plumbing, demolition, landscaping, gypsum concrete, finish carpentry, solid surfacing countertops, insulation, fire stopping, roofing, doors /
frames / hardware, gypsum board, athletic flooring, wall coverings, fireplace and stoves, metal lockers, toilet and bath accessories, laundry equipment, hydraulic
elevators and HVAC / sheet metal.
5:00 PM
Patterson
$140000
RFP-Safe Routes 2 School Improvements on American Eagle
between Peregrine and State Highway 33
ONLINE
It is the intent of the City of Patterson to hire a qualified consultant to provide design & engineering services in the design of public infrastructure projects,
demonstrate recent experience & successful completion with designs similar in size & scope & possess an engineering license issued by the California board for
professional engineers & land surveyors with demonstrated expertise. The project improvements include the installation of crosswalks, sidewalks, bike lanes,
safety lighting/in-pavement crosswalk lighting & traffic striping
5:00 PM
5:00 PM
San Bruno
San Bruno
ONLINE
RFP-Engineering Services for Design of Crystal Springs Avenue
Sewer & Water Replacement Project
The City of San Bruno, through the Public Services Dept, seeks to retain professional engineering services for the design of the sewer & water main
replacement in Crystal Springs Avenue
RFP-Engineering Services for Design Spyglass Pump Station
9/25 @ 10AM at 2085 Spyglass Dr., San Bruno
ONLINE
Rehabilitation
The City of San Bruno, through the Public Services Dept, seeks to retain professional engineering services for the design of the Spyglass wastewater pumo
station
10/13/2014 10:00 AM
2:00 PM
San
Francisco
Rodeo
10/6 @ 11AM & 10/7 @ 11AM
Larkin Street Youth Services Project
The following trades are needed: final cleaning, demo, lightweight concrete, millwork & finish carpentry, insulation, roofing, doors, frames & hardware,
glass/glazing, drywall & metal studs, tile flooring, resilient flooring & carpet, interior & exterior painting, signage, window film, light fixtures, fire sprinklers, fire
alarm, plumbing, HVAC and electrical.
$1087000
Comprehensive Wastewater Master Plan Near Term Improvements - MAND 09/24/14 @ 9:00 am at 189 Parker Avenue, Rodeo
ONLINE
ONLINE
Sewer Year 1 Improvements
Pipebursting rehabilitation of 2,400 lineal feet of 6-inch VCP sewer with same size or larger diameter HDPE SDR17 pipe; open-cut replacement of 2,400 lineal
feet of 6, 8, 10, and 15-inch VCP or PVC sewer with larger diameter PVC SDR-26 sewer; open cut installation of 1,600 lineal feet of 6, 8, and 12-inch PVC SDR26 sewer; replacement of 19 existing manholes with new manholes; installation of 14 new manholes; replacement and or reconnection of approximately 110
building laterals; abandonment of approximately 1,700 lineal feet of 6 and 8-inch VCP sewer; traffic control, SWPPP requirements, and miscellaneous surface
restoration work.
2:00 PM
West
Sacramento
ONLINE
Newport South Water Meter Project
Replacement of any pavement, concrete, sidewalk, concrete curb & gutter, concrete driveway & concrete valley gutter, or publi & private landscaping removed
or damaged as a consequence of the execution of this contract, as well as traffic stripes, pavement markings & all necessary traffic control.
Page 3 of 42
Bid Date Bid Time Location
Plan Name / Scope of Work
10/13/2014 2:00 PM
RFQ-San Leandro Transit Center-Construction Management-A & E
Design
San Leandro
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
The District is requesting statements of qualifications from Architect & Engineering firms for services associated with the San Leandro Transit Center - A&E
Design project.
2:00 PM
San Leandro
2:00 PM
Pleasant Hill
2:00 PM
San
Francisco
ONLINE
RFQ-San Leandro Transit Center-Construction Management
The District is requesting statements of qualifications from Architect & Engineering firms for services associated with the San Leandro Transit Center Construction Management project.
Diablo Vista Water System Manifold Improvement Project
MAND 9/23 @ 10AM or 9/25 @ 10AM at 100 Gregory Ln., $150000
Pleasant Hill
Removal and replacement of the Diablo Vista Water System's Pump House discharge piping, discharge manifold, surge tank, slide gate, and all other work,
items or details required to do the work. The project will require pedestrian traffic control, maintain staging area, and the safety of the project site.
ONLINE
Complete documents will be posted once available
2:30 PM
Modesto
4:00 PM
Alameda
10/14/2014 10:00 AM
San Jose
Mission Bay Block 7 West (Related) Design-Build Fire Sprinkler
ONLINE
9/29 @ 10AM at 180 Hubbel St., San Francisco
The project is approximately 230,000 sf of mixed-use residential / retail with (200) units within
the western portion of Block 7 located on 4th St. between China Basin and Mission Bay Blvd North. Construction will be one level of concrete with four levels of
wood construction above the western half of the building and three levels of wood on the eastern half. Level 1 consists of concrete garage, leasing / property
management offices, lounges, laundry room, and exercise rooms. Open space consists of a mid-block passage mews, balconies, patios, an at-grade
courtyard, and a podium courtyard. Public improvements at 4th St., Mission Bay Blvd., and China Basin St. will include site furnishings and lighting. A
landscaped access easement will be provided along the east edge of the site.
Electronic Access Control System at Tenth Street Place
MAND 9/22 @ 1PM at 1010-10th St., Modesto
The County of Stanislaus (County) on behalf of the City-County Capital Improvements and Financing Agency, a Joint Powers Agency between the City of
Modesto and the County of Stanislaus (the “JPA”) is seeking proposals from qualified, experienced and licensed Contractors for the installation of electronic
access control systems at Tenth Street Place, located at 1010 10th Street in Modesto, California. The intent of this Bid is to select a vendor to remove the former
electronic access and CCTV system(s) and replace with a new Lenel Access Control System, (LACS), and, subject to the availability of adequate funding, a new
video surveillance system.
RFP-Main Street Neighborhood Specific Plan for Alameda Point
9/22 @ 1PM at 2263 Santa Clara Ave, 3rd Fl, Alameda
The City is seeking proposals from an interdisciplinary team of consultants to assist City staff and engage the community in preparing and adopting a Specific
Plan for a 100-acre portion of Alameda Point, referred to as the Main Street Neighborhood. This sub-district of Alameda Point is envisioned to be a mixed-use
neighborhood that supports alternative modes of transportation, and will build upon existing assets and character-defining features of the NAS Alameda
Historical District.
ONLINE
ONLINE
ONLINE
Fitness Evolution-San Jose
Tenant Improvement. Trades to include: Sawcut, demolition, concrete, structural steel, illwork/finish carpentry, insulation, roofing (patch),
doors/frames/hardware, glazing/mirrors, drywall/metal raming, ceramic tile, resilient flooring, concrete sealing, painting, toilet partitions/accessories, lockers, fire
sprinklers, plumbing, HVAC and electrical
10:00 AM
Sausalito
$500000
FFIP Ross Sausalito Pipeline Replacement
This contract is for the installation of 2720 feet of 12” welded steel piping.
Page 4 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
10/14/2014 10:00 AM
Fitness Evolution-Sacramento
Sacramento
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Tenant improvement work to include: demolition, concrete patch back, masonry, strucutral steel, architectural millwork/finish carpentry, insulation, roofing, doors
& hardware, storefront/mirrors, metal stud/drywall, ceramic tile, acoustical ceiling, resilient flooring, sealed concrete, painting, toilet accessories, lockers, fire
sprinklers, plumbing, HVAC, electrical
10:00 AM
Rancho
Cordova
ONLINE
Fitness Evolution-Rancho Cordova
Tenant improvement work to include: demolition, concrete patch back, masonry, strucutral steel, architectural millwork/finish carpentry, insulation, roofing, doors
& hardware, storefront/mirrors, metal stud/drywall, ceramic tile, acoustical ceiling, resilient flooring, sealed concrete, painting, toilet accessories, lockers, fire
sprinklers, plumbing, HVAC, electrical
2:00 PM
Novato
$1000000 $1200000
LED Streetlight Retrofit Phase III
ONLINE
The work to be done includes, but is not limited to, the following: Replacing all remaining streetlights in the City with LED lighting fixtures.
2:00 PM
Tracy
Portable Water Storage Tank Cleaning Services at Deuel Vocational
Institution
ONLINE
The contractor shall remove sediment & sand from the floor & walls of each tank.
2:00 PM
Suisun City
2:00 PM
Santa Rosa
2:00 PM
San
Francisco
Well & Pump Maintenance & Repair @ Grizzly Island Wildlife Area
Complex-Rebid
Contractor shall provide an on-call, as-needed, or emergency basis all labor, materials, tools, equipment & incidentals necessary to repair pumps, well, lift
stations, mechanical, plumbing & electrical systems, including residences, apartment duplexes, offices, shops/miscellaneous buildings, hunter creek station
City Hall Annex HVAC Equipment Replacement
MAND 9/24 @ 10AM
HVAC equioment replacement, including electrical work
$99000000
RFP - Project Management Support Services for The Airport Hotel
9/23 @ 10AM
ONLINE
ONLINE
ONLINE
Program
The Airport Hotel Program encompasses three separate projects, which will need significant and careful planning and coordination. All three projects will require
thoughtful phasing and scheduling coordination from the planning phase to Grand Opening. The selected Branded Hotel Operator ("Operator") will work closely
with Airport Project Manager, the PMSS and Design/Build teams to develop a building program that meets the Hotel Project's requirements. The Operator will
provide programming and product-standard guidelines and input throughout the project duration. Proposer will coordinate, as required and identified by the
Airport, with the Operator throughout the design, construction, activation and close-out phases.
Judi Mosqueda, Contract Mgr, @ 650-821-0163
2:00 PM
Sacramento
$53000
MAND 9/30 @ 10AM at 625 Q St., Sacramento
The Contractor shall provide all labor, equipment, and materials required to remove the specified existing steam and condensate expansion joints identified in
Table-A, Equipment List, install new steam or condensate expansion joints provided by the State of California, Building Manager.
Expansion Joints Installation Central Plant Building
Page 5 of 42
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
10/14/2014 2:00 PM
Rodeo
2:00 PM
Vallejo
$75000
MAND 9/2 @ 10AM at 470 Parker Ave, Rodeo
The Contra Costa County Public Works Department (County) is soliciting proposals from qualified firms and/or individuals to provide Landscape Maintenance
Services (Project) for Countywide Lighting and Landscaping District (LL-2) Zone 38. The purpose of the Project is to maintain landscape features at four
locations in Rodeo, as further described in this Request for Proposal (RFP) under Section V, Scope of Work: a) Parker Avenue Trees, located in the Parker
Avenue frontages between San Pablo Boulevard and First Street; b) Rodeo Creek Trail, from Mariner’s Point Boulevard to Investment Avenue; c) Lefty Gomez
Recreation Center and Ball Field Complex, located at 470 Parker Avenue in Rodeo and; d) Rodeo Sign Board Area, located at the southwest intersection of
Parker Avenue and San Pablo Avenue in Rodeo. A map of the area is attached to this RFP as Exhibit H.
RFP for HVAC Maintenance and Repairs 2014
MAND 9/30 @ 10AM
The Vallejo Sanitation and Flood Control District (District) is seeking a qualified firm to provide a comprehensive maintenance and repair program for the
District. The work will include the provision of a total maintenance program including, but not limited to the inspection, preventative maintenance, repair,
programming and other tasks and services necessary to insure safe, well maintained HVAC systems providing quality air for District employees and the public.
2:00 PM
Ceres
2:00 PM
Pittsburg
2:00 PM
Menlo Park
2:00 PM
Menlo Park
Prebid Information
RFP-Landscape Maintenance Services LL-2 Zone 38
$530000
Ryno Park Improvement
The work consists of in general of installing storm drain lines,7,996 sf of 4” concrete, 590 lf of 6” concrete curb, concrete picnic tables, bike racks, benches,
drinking fountain, BBQ fixtures, play structures, kids cabin, swings, basketball standard, 30’ x 30’ pavillion, concrete seat walls, sod, shrubs, trees, irrigation
system, fencing, security lighting and associated work.
$158300
Maintenance and Emergency Equipment Storage Structure
9/9 @ 9AM at 2600 Pittsburg-Antioch Hwy. Pittsburg
Demolition, cutting & patching; excavation, bedding & backfill; concrete; reinforcement steel; metal fabrications; joint sealants; painting & protective coatings; preengineered structures
$20000
Belle Haven Pool Variable Frequency Drive Upgrades
MAND 10/2 @ 3PM at 100 Terminal Ave, Menlo Park
Install & startup of variable frequency drive systems at Belle haven Pool
$60000
Burgess Aquatic Center Lap and Instructional Pools Variable
MAND 10/2 @ 2PM at 501 Laurel St., Menlo Park
Frequency Drive Upgrades
Install & startip of variable frequency drive systems & install new impellers on each pump & instructional pools
Page 6 of 42
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
10/14/2014 2:00 PM
Coral St. and Fountain Ave. Pump Stations Wet Well and Castroville MAND 9/18 @ 10AM at 14811 Del Monte Blvd, Marina
Pump Station Vault Rehabilitation
Marina
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Coral St. Pump Station:
Rehabilitation of the wet well structure which includes but is not limited to the following:
bypass pumping, repair to the concrete structure (hydroblasting or abrasive blasting the surface,
resurfacing, and coating the structures), repair of leaking sluice gate, demolition and install new bar
rack at Coral St., bubbler modification work, demolition and installation of anti-vortex plates and a suction elbow, and miscellaneous demolition work. The Work
includes performance of construction activities in a permit-required confined space (wet well structure and manhole) and fall protection shall also be provided by
theContractor.
Fountain Ave. Pump Station:
Rehabilitation of the wet well structure which includes but is not limited to the following: bypass
pumping, repair to the concrete structure (hydroblasting or abrasive blasting the surface,
resurfacing, and coating the structures), demolition and install new bar rack, bubbler modification work, modification of the stop gates, demolition and installation
of anti-vortex plates, and miscellaneous demolition work
Documents will be posted once available
2:00 PM
Fairfield
2:00 PM
Fairfield
MAND 9/30 @ 10AM at 5110 Water Works Ln, Fairfield
Removal & replacement of the sand & granular activated carbon media in a two-bay filter.
North Bay Regional Water Treatment Plant Filter Influent and Waste MAND 9/30 @ 10AM at 5110 Water Works Ln, Fairfield
Replacement of Media in Filter #3
$300000
ONLINE
$650000
ONLINE
Gate Valve Replacement
Miscellaneous metalwork, protective coating, identifying devices, valves, valve actuators, butterfly valves
2:00 PM
Danville
Holiday Tree Lights Repairs and Maintenance
ONLINE
2:00 PM
Oakland
The contractor shall repair, replace & maintain the tree lights so that the minimum of 95% of the lights on each tree is lit from Non 25, 2014 until January 9, 2015
RFP-Bi-Annual Maintenance of Underwater Structures and
MAND 10/2 @ 10AM
ONLINE
Equipment at Lake Merritt Pump Station
The Alameda County Flood Control & Water Conservation District is requesting proposals for the Bi-Annual Maintenance of Underwater facilities of Lake Merritt
Pump Station, including but not limited to cleaning heat exchangers, apron areas, sediment trenches, & trash racks. The contract awarded will include on-call
diving services at additional Alameda County locations should the need arise
3:00 PM
Roseville
ONLINE
Roseville Historic Old Town Lighting Upgrade
Lighting upgrades
3:00 PM
Palo Alto
3:00 PM
Palo Alto
$85000
Pre-proposal Teleconference 10/2 @ 10AM
The City of Palo Alto is seeking proposals from qualified firms to provide professional services for surveying services for Gas Main Replacement (GMR) 22/23
and Sanitary Sewer Rehabilitation (SSR) 27/28 design. The City has budgeted a maximum of $85,000 for these services in the 2013/2014 Fiscal Year. The
required services are described in the Scope of Services.
RFP-Surveying Services for GMR 22/23 and SSR 27/28 Design
NEW RFQ-Anthracite Cole for Dual Media Filters 1.2-.14mm<1.5uc
The City of Palo Alto is seeking quotes for the purchase, installation and delivery Anthracite Cole For Dual Media Filters 1.2-.14mm<1.5uc, as per the
specifications in the Request for Quotation and the requirements of the City of Palo Alto. Bid documents are attached.
Page 7 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
10/14/2014 3:00 PM
Coast Casey Storm Water Pump Station Access Manhole Installation 10/2 @ 11AM
Mountain
View
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
The work to be performed under this contract consists of, in general, the installation of three (3) access manholes at Coast Casey Storm Water Pump Station.
Contract work includes, but is not limited to, saw cutting the existing slab over the existing wet well, installation of steel reinforcing, and placing forms and
concrete.
3:00 PM
5:00 PM
Palo Alto
Albany
ONLINE
RFP-Palo Alto Landfill Groundwater, Leachate, Landfill Gas and
Storm Water Environmental Monitoring and Colnsulting Services
The City of Palo Alto, Department of Public Works Environmental Services Division is seeking proposals for professional services for conducting sampling and
analyses, providing onsite monitoring and preparing reports related to the landfill’s gas, leachate, stormwater, and groundwater monitoring systems at the Palo
Alto Landfill. On –call services also include the completion of technical reports or studies related to the landfill or other facilities as requested by the City. The
required services and performance conditions are described in the Scope of Services.
RFP-Professional Architectural Services for the Senior Center ADA MAND 10/6 @ 2PM
ONLINE
Renovation Project
The City of Albany is seeking proposals from qualified professional architectural firms to demonstrate qualifications, experience & proposed approach for
architectural design & preparation of construction plans, specifications & estimate & bid and construction support for the Senior Center ADA Renovation project.
5:00 PM
10/15/2014 1:30 PM
1:30 PM
$975000
Sacramento NEW RFQ-Remodel for Brachytherapy Room
Project consists of renovating an existing CT room for brachytherapy procedures and a future CT scanner. Room will be divided between control and treatment
spaces. Project includes door and wall relocations. Doors, walls and ceiling to be shielded with lead bricks. Includes structural steel frame to support lead bricks.
New doors, walls, ceiling, flooring, lighting, casework, all finishes, HVAC, electrical, structural support, IT, equipment anchoring, and radiation shielding are
planned.
ONLINE
Richmond
RFQ-Reverse Osmosis Membrane Elements-ON HOLD
ONLINE
Oakland
It is the intent of these specificatuibs, terms & conditions to describe the requirements for the fabrication & F.O.B. shipment of Reverse Osmosis membrane
elements to the EBMUD's RARE Recycled Water Treatment Plant located in Richmond. The RO membrane will be used to purify water from brackish
secoindary effluent from West County Wasterwater District. The secondary effluent will receive pretreatment by MicroFiltration prior to the RO system.
$500000 Adeline Maintenance Center Complex Fire Alarm System Upgrade
9/23 @ 10AM at 100-21st St., Oakland
E829B/0
$850000
Work includes the replacement of the existing fire alarm system (FAS) for the six buildings at the Adeline Maintenance Center (AMC) complex with a new FAS
utilizing new fire alarm control units (FACU). The Contractor shall demolish the existing FAS and furnish, install, test, and commission the new FAS for the AMC
complex buildings. Work includes, but is not limited to, removing existing conduit and wiring, salvaging existing equipment (as noted), providing fire alarm final
design and permit ready submittals to the Oakland Fire Department, obtaining fire alarm construction permits, furnishing new equipment as indicated, installing
new conduit and wiring, installing new equipment as noted, testing wiring and new FAS equipment, coordinating and providing FAS training for EBMUD staff,
commissioning the new FAS with the Oakland Fire Department, and associated ancillary work related to the tasks above.
10:00 AM
10:00 AM
Santa Rosa NEW Dollar Tree Store
Tenant fit out expansion
NEW See's Candy-Salinas
Salinas
Demolition, drywall/acoustical/carpentry, finish carpentry, dryvit/EIFS (patch storefront & rear door), door/frame/hardware, HVAC, fire alarm, glass/glazing (new
storefront, new entry doors), flooring (VCT, SHT Vinyl) diamond grind floor, paint/wall covering, plumbing, sprinkler, electroical, restroom accessories
Page 8 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
10/15/2014 11:00 AM
Aluminum Chlorohydate Chemical Supply Contract 2015-2016
11:00 AM
2:00 PM
2:00 PM
Lodi
Prebid Information
Engineers # of
Plan
Estimate Addenda #
The work consists of supply and delivery of Aluminum Chlorohydrate to the City's Surface Water Treatment Facility. This chemical is used for the application of
drinking water to meet regulatory compliance and must be NSF certified.
$75000
10/2 @ 9AM
San Rafael* NEW Shop and Admin Building Remodel 2014
Div_02-mobilization, selective demolition; Div_05-pipe & tube railings; Div_06-interior arch woodwork; Div_08-hollow metal doors & frames, flush wood doors,
aluminum windows, door hardware, glazing; Div_09-gypsum board assemblies, acoustical panel ceilings, resilient flooring, resilient base & accessories, carpet,
painting; Div_22-plumbing; Div_23-HVAC; Div_26-lighting, testing, electrical work
TG15.2-Facade Access Equipment (Window Washing Equipment)
Encouraged 8/28 @ 2PM at 175 Beale St., San Francisco
San
Francisco
Webcor/Obayashi Joint Venture seeks trade suncontractors that have significant experience with furnishing, designing & installation of davit sockets, davit arms
& fall arrest systems on complex projects which require significant coordination with adjacent properties & traffic relocation located in an urban environment;
including the engineering, coordination, pocurement & complete installation of their respective systems in the following trade:Facade Access Equipment
$120000
Bertolini Student Center Restoration Project (Prequalified
MAND 10/3 @ 10AM
Santa Rosa
ONLINE
E838B/0
ONLINE
ONLINE
Contractors Only)
2:00 PM
San Jose
2:00 PM
Redwood
City
Installing protective barriers to prevent contamination on the third floorto furniture, computers, personal & work related items; Setting up contaminents &
extablishing a negative air containment to prevent the spread of dust to the other floors; placing crfitical barriers over the air supply vents & openings to the
HVAC systems; removing all ceiling tiles on the third floor; removing all sound insulation above the ceiling tiles; cleaning all surfaces in the attic; claning all
surfaces on the third floor; cleaning all HVAC systems, installation of new ceiling tiles; performing a final air washing & cleaning of both floors; final testing to
verify that cleaning has been accomplished
Office Management Services for VTA Facilities
9/23 @ 10AM at 3331 North First St, Bldg A, San Jose
Perform office management services for VTA facilities
Mills Way Building Improvement (Lease-Leaseback Project
10/7 @ 10AM at 1090 Mills Way, Redwood City
E822B
ONLINE
Alten Construction is the selected general contractor for this lease-leaseback project.
2:00 PM
El Dorado
Hills
Trades Needed, but not limited to:demolition; earthwork; erosion control; site drainage; water distribution: sanitary sewer; asphalt paving; pavement markings;
site signage; fences & gates; concrete reinforcement; site & structurak concrete; structural & misc steel; rough & finish carpentry; cabinets; waterproofing;
insulation; roof patching; sheet metal flashing; vapor control systems; joint sealants; doors, frames, hardware; overhead doors; storefront systems; glass &
glazing; cement plaster; gypsum board; acoustical ceilinfs; resilient flooring; frp p[anels; painting; window coverings; fire sprinklers; plumbing; HVAC; electrical
Francisco Drive Right-Turn Pocket
10/7/14 @ 2pm
The project is located along Francisco Drive and El Dorado Hills Blvd., in El Dorado Hills in County of El Dorado. The Work to be done is shown on the Plans,
and generally consists of, but is not
limited to: Widening 300 feet of Francisco Drive and 900 feet of El Dorado Hills Blvd. to Francisco Drive and El Dorado Hills Blvd. intersection, roadway
improvements, including multi-use trail on Francisco Drive, Class I bike lane on El Dorado Hills Blvd. HMA paving, curb ramp, signing and striping, cold planing,
permanent and temporary fence removal & construction, stage construction to facilitate grading, clearing and grubbing. Other items or details not mentioned
above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed, constructed or installed.
Page 9 of 42
Online O
Bid Date Bid Time Location
10/15/2014 2:00 PM
Citrus
Heights
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
NEW Harbor Freight Tools Retail Store (No GC Openings)
Construct 12,376 SF of tenant improvements in an existing strip center, trades needed include demolition, concrete, masonry (door openings, in-fills), steel
(bollards, RTU frames, lintels), drywall, acoustical, carpentry, roofing (at façade / parapet), EIFS, glass / glazing, paint, wall covering, plumbing, sprinklers,
HVAC, electrical, fire alarm and burglar alarm.
**This project originally bid on 9/26 and Marco Contractors was awarded the bid, if you have not already submitted a bid, they invite you to do so now.
2:00 PM
Burlingame NEW Skyline Boulevard Pavement Repair-Informal Bid
Mobilization, excavation, provide a traffic control plan for review, install traffic stripe, reconstruct approximately 120-foot long 2-foot wide curb & gutter on the
east side of Skyhline Blvd, reconstruct 120-foot by 18-foot area with a structural section of 7-inches asphalt concrete
ONLINE
Sundaresh Begur @ 650-375-7444
2:00 PM
ONLINE
San Rafael
Sprouts Farmers Market-San Rafael
2:30 PM
San
Francisco
This is a tenant improvement for a new Sprouts Market in San Rafael. Scope consists of demo for utility trenching and areas of slab replacement, new interior
finishes and decor, cases, cooler boxes, etc
$700000
Landscaping and Tree Maintenance Various Locations Contract - 1
09/25/14 @9:30 am at 30 Van Ness, 5th Floor, San
Francisco
Furnish & install trees; provide a 3-year long term plant establishment period for all newly planted trees; tree maintenance & pruning of existing trees; tree
removal; stump grinding; emergency tree services & related tree maintenance work
2:30 PM
San
Francisco
ONLINE
Carla Short, Proj Mgr, @ 415-554-5349
Pavement Renovation, Sewer Replacement & WaterMain
Installation - Height Street & Hayes Street
9/17 @ 1:30PM at 1680 Mission St., San Francisco
$13000000
ONLINE
Demolition, pavement renovation, curb ramp construction, sewer replacement & drainage work, matermain installation, AWSS relocation traffic signal conduits,
audible pedestrian signal installation, traffic control
Ramon Kong, Proj Mgr, @ 415-554-8280
2:30 PM
2:30 PM
San
Francisco
Soquel
RFQ-As-Needed Civil Engineering Services 2014
9/25 @ 1:30PM at 30 Van Ness Ave, 5th Fl, San Francisco $2700000
The City & County of San Francisco announces a Request for Qualifications for the provision of professional civil engineering & related services on an asneeded basis which will include services for roadway, curb ramp, sewer system & site improvement project
$715000
Aptos Pump Station Project
Optional 10/1 @ 2:30PM at 5180 Soquel Dr., Soquel
Div-02-existing facilities; Div_03-concrete; Div-04-concrete unit masonry, glass masonry; Div_05-metal fabrications; Div_06-rough carpentry, glued laminated
construction; Div_07-masonry water repellent coating, asphalt shingle roofing, flashing & sheet metal, roof specialties, joint sealers; Div_08-steel doors, frames
& hardware, louvers; Div_09-painting; Div_22-plumbing; Div-26-lighting, electrical; Div_31-geotextile, clearing & demolition, trenching, backfilling & compacting,
structural excavation, structural fill, rolled erosion control produstc; Div_32-asphalt paving & seals; chain link fences, planting; Div_33-utilities
Page 10 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
10/15/2014 3:00 PM
Recreation Park Solar Project
Auburn
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 9/23 @ 9AM at 123 Recreation Dr., Auburn
The project consists of 204 photovoltaic modules & (4) utility interactive inverters. PV modules shall be mounted parallel on an existing composite shingle roog
using quick mount PV/Everest racking
ONLINE
Pamela Vann, Landscape Architect, @ 530-885-0611, Ext 102
4:00 PM
Berkeley
$7000000 $10000000
RFQ-Architectural Services for Moffitt Library 4th and 5th Floor
Renovations
ONLINE
The select firm will prepare conceptual, design & construction documents, support the bid process & provide construction phase services & will be responsible
for engaging & coordinating all sub consultants including, but not limited to, electrical, mechanical. telecpm & fire protection
Beth Piatnitza @ 510-643-2082
10/16/2014 1:00 PM
Various
Cities
$5400000
Hazardous and Universal Waste Removal and Disposal Services
ONLINE
This is a Master Agreement in which the Contractor shall provide all labor, materials, supplies, equipment, travel, per diem and every other item of expense
necessary for the collection, removal, packaging, loading, transportation and disposal of all hazardous and universal waste from the designated locations to the
final disposition for the California Department of Corrections and Rehabilitation (CDCR) and the California Prison Industry Authority (CAL-PIA) as indicated in
Exhibit E, List of Participating Institutions/Facilities.
1:00 PM
Cupertino
10:00 AM
Concord
MOT Restrooms Remodel at Operations Center
ONLINE
MAND 10/1 @ 9:30AM at 10301 Vista Dr., Cupertino
Remodel MOT Department's women's and men's restroom
Concord Boulevard Paving and Striping (From Sixth Street to Farm
Bureau Road)
$150000 $250000
ONLINE
The Work to be done, in general, consists of saw cut up to 7' from lip of gutter, dig out existing pavement and base, reconstruct base, replace pavement and
striping. The width of te work varies as shown on the plans. Necessary work to construct these items shall include, but not limited to: Clearing and grubbing,
roadway excavation, traffic control, and adjustment of valve box, and all other work as specified in the plans and specifications.
For information regarding this project, contact: Mark Migliore, PE, Project Manager at 925-671-3422.
10:00 AM
Elk Grove
Bartholomew Sports Park Metal Maintenance Building
$160000
ONLINE
Includes design, fabricate, permitting and construction of a 950 SF metal maintenance building, which includes onsite clearing and grubbing, excavation, offhaul and minor grading; installation of concrete paving, curbs, decomposed granite surfacing, electrical work, chain link fencing, irrigation modifications and
landscaping.
Sheri Noblett @ 916-405-5354
2:00 PM
Fremont
Unity Art and The Gladys Williamson Memorial
$91500
Div_02-demolition, earthwork, aggregate base & subbase, irrigation, site furnishings, planting; Div_03-concrete framework, concrete reinforcement, cast-in-place
concrete, pre-cast concrete; Div_16-design-build electrical
Eva Lee, Proj Mgr, @ 510-494-4776
Page 11 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
10/16/2014 2:00 PM
RFP-Mangement Services for the Operation of Off-Street Downtown
Parking Facilities and Metered On-Street Parking Spaces
Stockton
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 9/24 @ 9AM at 425 North El Dorado St., Stockton
The Parking Authority of Stockton is soilicting proposals from qualified parking management firms to provide the operation & management of Parking Authority's
downtown off-street parking lots & garages & metered on-street parking spaces. If selected, the goal of the parking operator will be to provide the highest quality
of service at the least cost to manage, operate, mao=intain & improve Parking Authority's downtown off-street parking facilities & metered on-street parking
spaces.
Alan Montaneli @ 209-937-8350
2:00 PM
Sonora
2:00 PM
San
Francisco
MAND 10/9 @ 10AM at 21925 Lyons Bald Mountain Rd.,
Sonora
Div_02-demolition; Div_05-miscellaneous metal; Div_06-rough carpentry, finish carpentry; Div_07-insulation, sheet metal, sealants & caulking; Div_08-flush
wood doors & frames, access panels & frames, finish hardware; Div_09-gypsum board, resilient flooring-linoleum flooring, epoxy flooring, fiber reinforced wall
coating, painting; Div_10-toilet partitions, wall protection, identifhying devices, toilet accessories; Div_12-plastic laminate casework, solid surface countertops;
Div_16-fire alarm, lighting, electrical; Div_22-plumbing, HVAC
$4107880
Boarding Area 'G' 400 Hertz System Infrastructure Improvements
10/1 @ 10AM
Foothill Horizons Shower and Restroom Upgrade
ONLINE
ONLINE
This project calls for the completion of upgrading the existing 400 Hertz system at Boarding Area 'G' by installing new equipment such as cables, conduits,
pantographs, circuit breakers, disconnect switches, and gate boxes.
2:00 PM
San
Francisco
2:00 PM
Hughson
2:00 PM
Berkeley
Tin Nguyen, Contract Mgr, @ 650-821-5540
NEW Communications/Resident Engagement Consultant
$100000
The San Francisco Housing Authority is interested in contracting with a consultant for communications and resident engagement consulting for an initial one
year period with options to renew annually for a cumulative total of four (4) years. The services this consultant will provide will include an overall communications
assessment, development of communication and resident engagement plans, actively participating in the implementation of the plans, acting as the point of
contact for emergency communications, and assisting in the re-imaging of the Authority.
Keyes Union School District Admin Building
10/10 @ 10AM at 5277 Washington Rd., Hughson
Cast-in-place concrete; rough carpentry; sheathing; shop fabricated wood trusses, arch wood casework; thermal insulation; asphalt shingles; sheet metal
flashing; joint sealants; hollow metal doors; flush wood doors; door hardware; glzing; portland cement plastering; gypsum board, tiling, acoustical ceilings;
resileint flooring; carpeting; painting & coating; signage; toilet compartments; wall & door protection; fire protection specialties, plumbing, HVAC, lighting;
electrical; site clearing; earth moving; chain link fence
$134000
NEW College of Chemistry 1st Riser
MAND 10/7 @ 11AM
nstallation of new communication riser from new main Telecom Room Located in 113 Lewis Hall to Ground Level floor, First Floor, Second Floor, and Third
Floor, cable trays for horizontal distribution, cabling infrastructure build out of tel/data room. Work includes all conduit, cabling, equipment, devices and minor
patching/painting and restoration of finishes. Lewis Hall is a fully occupied Laboratory Research and Classroom Building. **Note: The pulling of data cables and
termination are NOT part of the scope of this project. The actual cable work will be bid under a separate project.**
Page 12 of 42
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
10/16/2014 2:00 PM
2:00 PM
2:00 PM
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Water Treatment Plant PLC Replacement Project
Encouraged 10/1 @ 9AM
Replacement of existing GE Fanuc 90-70 Series PLC, 1. hardwired trip units, vintage power supplies, terminal blocks and fork connectors and associated I/O
boards.
2. Installation of GE RX3i PLC with new backpanel, redundant switching supplies, screw clamp terminal blocks, and install internal panel wiring per UL508A
standards.
3. Associated electrical and instrumentation work not specifically defined above but described in the specifications and shown on the drawings.
RFP-HVAC Upgrades
10/1 @ 10AM
Atwater/Wint
on
Remove, replace & upgrade HVAC systems for two (2) residential housing projects in the City of Atwater & community of Winton.
Foothill College Modernization Project 121-Library and Learning
MAND 9/16 @ 11AM and 9/25 @ 11AM
Los Altos
Center Renovation (Lease-Leaseback Project)
Hills
The project will be constructed utilizing multiple trade conctracvtors, each working under a separate contract with Kitchell CEM, who is the lease/lease back
contractor for the new library moderniation at Foothill College.
Benicia
ONLINE
ONLINE
ONLINE
The Following is a list of varius Trade Bid packages:
Trade Bid Package 00 44 01:Demolition
Trade Bid Package 00 44 02:Misc Trades
Trade Bid Package 00 44 03:Roofing
Trade Bid Package 00 44 04:Doors & Hardware
Trade Bid Package 00 44 05:Glazing
Trade Bid Package 00 44 06:Painting
Trade Bid Package 00 44 07:Framing, Insulation & GWB
Trade Bid package 00 44 08: Flooring
Trade Bid Package 00 44 09:Acoustical
Trade Bid Package 00 44 10:Mechanical, Plumbing & Fire Sprinkler
Trade Bid Package 00 44 11:Electrical
Trade Bid Package 00 44 12:Landscaping
3:00 PM
San Jose
NOTE: Bidders must be prequalified to submit a bid to Kitchell. The prequalification application must be submiited to Kitchell by no later than September 30,
2014.
7749-Fire Station No. 16 Repiping, Restroom and Kitchen Renovation MAND 10/1 @ 10AM at 2001 S. King Rd., San Jose
Div_02-drilling, sawcutting & removal of concrete, minor demolition & remodeling, trenching & backfilling for utilities; Div_03-concrete; Div_06-rough carpentry,
finish carpentry, custom cabinetwrok, fiberglass reinforced plastic panels; Div_07-underslab vapor barrier, insulation; Div_08-access panels; Div_09-gypsum
board, ceramic tile, concrete polishing flooring & base, retro-plate special concrete floor finishes, with colored dye specifications, painting; Div_10-toilet
accessories & fixtures; Div_15-plumbing, machanical sir curtain; Div_16-electrical
Edwin Garcia, proj Mgr, @ 408-975-7249
Page 13 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
10/16/2014 3:00 PM
7645-Miscellaneous Sanitary Sewer Repairs FY 2014-2015 (Package
II)
San Jose
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Dust control, mobilization, water pollution control, clearing & grubbing, watering, finishing roadway, aggregate bases, deep lift asphalt base, asphalt concrete,
concrete structures, reinforcement, concrete, curbs & sidewalks, monuments, traffic stripes & pavement markings, signals, lighting & electrical systems,
asphaltic emulsions, pipes & structures, trench excavation, bedding & backfill, pipe installation, sanitary sewer rehabilitation, cleaning pipelines, sanitary
manhole rehabilitation
3:00 PM
Lincoln
Dustin Shitanishi, Proj Mgr, @ 408-793-5517
NEW Waste Water Treatment Plant Decommissioning, Grading &
$400000
ONLINE
Asbestos Pipe Removal (Lincoln WWTP
Includes asbestos pipe location and removal, grading activities and erosion control provisions.
3:00 PM
Dixon
Traffic Signal and Electrical Maintenance Services (3 Years)
ONLINE
Providing traffic signal, flashing beacon & street, park & facility light maintenance services to include:preventive maintenance; emergency on-call 24 hours a
day, seven days a week; repair or replacement of electrical equipment; inspection & tuning of electrical equipment; and inspection & repair of emergency vehicle
pre-emption equipment
3:00 PM
Stockton
Technology - Cyber Security Assessment Project
ONLINE
Deployment of outdoor fiber optic cable plant; centralized communications facilities & field hubs, WAN/LAN/WLAN services, virtualization, storage, network
management, firewall/gateway, & backup solutions
In order to receive the RFP, the vendor must sign and return the attached Non-Disclosure Agreement to me via email, [email protected], or fax (209)4657244.
3:00 PM
San Jose
6915-Ryegate Court and Scottsville Court Sanitary Sewer
ONLINE
Dust control, mobilization, water pollution control, clearing & grubbing, watering, finishing roadway, aggregate bases, deep lift asphalt base, asphalt concrete,
concrete structures, reinforcement, concrete, curbs & sidewalks, monuments, traffic stripes & pavement markings, signals, lighting & electrical systems,
asphaltic emulsions, pipes & structures, trench excavation, bedding & backfill, pipe installation, sanitary sewer rehabilitation, cleaning pipelines, sanitary
manhole rehabilitation
4:30 PM
San
Francisco
James Thompson, Proj Mgr, @ 408-535-5300
NEW Generator and Diesel Fuel System Testing, Maintenance and Repair
ONLINE
This project encompasses several fuel distribution and underground tank-related tasks, including the replacement of an aboveground tank, repair of
underground fuel lines, testing and certification of leak monitoring systems, Visible Emissions Examination of emergency generators, replacement of leak
monitoring panels, sensors and annunciators, and several miscellaneous fueling facility safety and code upgrades.
Libi Yap @ 650-821-7730
5:00 PM
Petaluma
ONLINE
NEW Pool Maintenance
Pool maintenance services
Page 14 of 42
Bid Date Bid Time Location
10/17/2014 11:00 AM
Sonora
Plan Name / Scope of Work
Prebid Information
NEW Public Health Window Treatment Installation
Fabrication & installation of six (6) vinyl vertical window blinds
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 10/13 @ 10AM at 20011 N Cedar Rd., Sonora
Byron Johnson @ 209-533-5660
2:00 PM
San
Francisco
San Francisco Roadway Bridges Replacement Project
9/4 @ 9AM at 1250 San Carlos Ave, San Carlos
$8000000
008C
Remove/replace existing two-span steel-through girder bridges due to deteriorated condition; remove/relocate/reconstruct existing utility lines; provide temporary
support as applicable at each bridge
2:00 PM
Vacaville
2:00 PM
Stockton
2:00 PM
Fairfield
2:00 PM
Eldridge
2:00 PM
Tracy
ONLINE
NEW Solano Credit Union (No GC Openings)
Tenant Improvements.
DO NOT CALL OWNER?ARCHITECT/CONSULTANTS
9/30 @ 11AM
REVAILING RATE OF WAGES (STATE DETERMINATION) PROJECT: NUMBER OF STORIES: TWO, FIRE SPRINKLERS: YES, ZONING: GENERAL
INDUSTRIAL (I G) , GENERAL PLAN DESIGNATION: ADMINISTRATIVE PROFESSIONAL BUILDING CODE: WRITTEN STATEMENT: PROJECT AREA:
THIS PROJECT TO COMPLY WITH 2013 CBC, CPC, CMC, CFC, CEC, CEES & 2013 CGBS (CALIFORNIA GREEN BUILDING STANDARDS) THIS
PROJECT IS A NON-STRUCTURAL TENANT IMPROVEMENT FOR THE SAN JOAQUIN COUNTY OFFICE OF EDUCATION'S VENTURE ACADEMY II.
SCOPE OF WORK TO INCLUDE THE RENOVATION OF AN EXISTING FOOD SERVICE SPACE ADDING NEW PARTITION WALLS, PLUMBING,
MECHANICAL, ELECTRICAL & EQUIPMENT, ALONG WITH THE RELOCATION OF EXISTING ELECTRICAL, MECHANICAL, AND FIRE SPRINKLERS;
PROJECT AREA: 904SF *The specifications for the project are a sheet spec included in the project plans. Please see the A0 sheet in the plan set.
Ventureland Cafe/Deli
NEW Ford Lincoln Fairfield
Div_02-selective structure demolition; Div_04-unit masonry; Div_06-rough carpentry, sheathing, finish carpentry, interior arch woodwork, plastic paneling;
Div_07-thermal insulation, vapor emission & alkalinity control, sheet metal flashing & trim, penetration firestopping, joint sealants; Div_08-hollow metal doors &
frames, aluminim window frames, flush wood doors, access doors & frames, aluminum-framed entrances & storefronts, finish hardware, glazing; Div_09-gypsum
board, tiling, acoustical panel ceilings, resilient flooring, carpeting, painting; Div_10-toilet compartments; Div_13-metal building systems; Div_22-plumbing;
Div_23-HVAC, testing, adjusting & balancing HJVAC; Div_26-lighting, electrical
$120000
Arnold Drive Tree Maintenance
Optional 10/15 @ 10AM at 15000 Arnold Dr., Eldridge
ontractor to furnish all labor, materials, tools, equipment and transportation necessary to remove 12 trees, replace 5 of the removed Red Oak trees, haul, chip,
grind stumps, excavate, supply topsoil, chemical nutrients and replacement trees. In addition, prune, make structural augmentations, remove dead wood,
crossing, broken or hazardous branches, remove mistletoe and apply growth inhibitor to approximately 31 additional trees and 2 Oaks in the backyard of
Residence House 139.
Diablo Homes 2014 Water Assembly Analysis and Site Repair
Designs
ONLINE
ONLINE
ONLINE
ONLINE
The Hosuing Authorityof the County of San Joaquin is seeking quotes for the licensed Civil Engineer to perform surveying, geotechnical engineering & civil site
engineering design services for the Diablo Homes Water Meter Replacement & Driveway Repairs
3:00 PM
Oakley
Uninterruptible Power Supply for Randall Bold Water Treatment
Plant
The Contra Costa Water District is seeking bids from qualified firms to provide an Uniterruptible Power Supply system to be utilized at the CCWD's Randall Bold
Water Treatment Plant facility (electrical room)
Page 15 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
10/17/2014 4:00 PM
RFP-Design Engineering Services for the Walnut Grove Road Bridge
(29C-131) Replacement Project
San
Joaquin
County
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
San Joaquin County Department of Public Works will solicit qualified consultants to provide professional & technical engineering services for the design of the
proposed in-kind replacement Walnut Grove Road Bridge. The objective of the project, in general, is to construct a new in-kind brisge that will accommodate two12-foot travel lanes with shoulders to replace the existing single swing steel truss structure over the Mokelumne Rover
5:00 PM
Danville
ONLINE
RFP-2015-2020 Comprehensive Economic Development Plan
Prepare a comprehensive economic development plan with policies & implementation measures that will guide the Economic Development Division's vision &
work plan for the next five years
10/20/2014 1:00 PM
10:00 AM
2:00 PM
MAND 8/22 @ 10AM at 7900 Beryessa-Knoxville Rd., Napa $1429500
Cosntruction of an environmental education camp, including grading; paving of roadways; parking lots & trails; watr system, water treatment, tank & distribution
greywater system with subsurface drip disposal; camp host site; tent cabins; c ombination restroom shower building with composting toilets; covered activity
areas; boat boarding dock; electrical system with photovoltaic array & miscellaneous other site improvements/modification. Permits for this work shall be
secured by the District.
Interim Fire Alarm System
MAND 9/17 @ 10AM at 43600 Mission Blvd., Fremont
Fremont
Fire alarm system & electrical work
$121500
MAND 10/14 @ 10AM at 4300 Llano Rd., Santa Rosa
Santa Rosa NEW Laguna Treatment Plant Belt Press Building ReRoof and HVAC
Napa
Camp Berryessa Improvement Project
ONLINE
ONLINE
ONLINE
Improvements
Mobilization & demobilization, demolition & disposal of existing roofing syste, installation of roofing system, mechanical ductwork improvements
2:00 PM
Watsonville
2:00 PM
Hollister
ONLINE
RFP-Asebstos Hazard Emergency Response Act (AHERA) Triennial
Inspection and Management Plan Development
Pajaro Valley Unified School District is seeking qualified firms to provide hazardous material surveying, testing and on-site observations at District facilities
Elevator Maintenance Services
$9000 $12000
ONLINE
$200000
ONLINE
Elevator Maintenance Services to (4) Four County-owned elevators
10/21/2014 11:00 AM
2:00 PM
2:00 PM
2:00 PM
Watsonville
Well 8 Emergency Power Project
Installation of a 250 KW diesel engine generator with concrete pad, an automatic transfer switch, and a five (5) foot tall masonry retaining wall.
NEW Swing Space - Music Department
MAND 10/13 @ 1PM
Tile carpeting, acosutical wall panels
Carpet Replacement at Pacific Station
Strongly Encouraged 10/8 @ 9AM at 920 Pacific Ave,
Santa Cruz
Santa Cruz
Carpet replacement
$900000
TG07.8 Expansion Joints
9/3 @ 2PM at 175 Beale St., San Francisco
San
Francisco
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with expansion joints, miscellaneous metals and engineering on
complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems.
Fremont
Page 16 of 42
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
10/21/2014 2:00 PM
TG16.9 Prefabricated Buildings
2:00 PM
San
Francisco
Rohnert
Park
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with Prefabricated Buildings, including but not limited to, security
station/guard booths, transit bus driver operation booth(s) with restrooms and transit operations office with ramps on complex projects. Also included are
engineering, coordination, procurement and complete installation of the respective systems in the following trade:TG16.9 Prefabricated Buildings
$35000
NEW Student Recreation Center South Window Remodel
10/10 @ 10AM
ONLINE
Remove & replace six (6) pairs of windows at the Recreation Center
2:00 PM
2:00 PM
09/16/14 @ 10:00 AM
$375000 $425000
Oakland
Refurbish Breakroom
Marina
The Contractor shall perform all of the work specified in Table -1, Section 01 11 00 page 4 of Summary of Work. The Contractor shall remove the tables, chairs
and appliances during construction. Furniture and appliances shall be cleaned and stored in a protected area and returned upon breakroom completion.
Contractor shall clean interior of breakroom, paint, install ceiling tiles, where applicable, provide and
install bulletin boards. The contractor is required to work a minimum of two breakrooms per week until completed. Each location shall be completed within 5
working days.
Repair Asphalt Concrete Paving at Hangar 510 at the Marina
10/8 @ 10AM at 3240 Imjin Rd., Marina
ONLINE
ONLINE
Municipal Airport
Mobilization, sawcut, removal & disposal, earthwork, aggregate base, asphalt concrete pavement
2:00 PM
Fremont
$2700000
2014 Pavement Rehabilitation Project
ONLINE
Remove asphalt roadway surfacing by grinding; install deep lift hot mix asphalt base repairs; seal cracks; replace traffic signal detector loops & related facilities;
place hot mix asphalt overlay on designated street segments; conctruct concrete curb ramps & passageways; construct curn, gutter & sidewalk & place traffic
stripes, pavement markings & reflective pavement markers
Edward Nakayama, Proj Mgr, @ 510-494-4775
2:00 PM
Fairfield
2:00 PM
Danville
$240000
MAND 10/14 @ 9AM
Furnishing all labor, materials, equipment & other services necessary for the complete maintenance of all the landscape areas, playgrounds, hardscapes &
irrigatrion in areas as described in these special provisions & as directed by the City of Engineer
Landscape Maintenance District No. 15 Goldridge
ONLINE
Complete documents will be posted once available
2:00 PM
Berkeley
$2790000
2014/15 Pavement Rehabilitation Project
Preparatory tree trimming; storm drain inlet relocation; removal & replacement of existing storm drain pipe; removal & replacement of existing Portland Cement
concrete curb, sidewalk, curb ramp & valley gutter; subdrain installation; removal & replacement of existing asphalt concrete pavement (digouts); pavement cold
planning; intsllation of paving mat; installation of asphalt concrete overlay; removal & replacement of asphalt concrete speed lumps; removal & replacement new
traffic loop detectors; adjusting to grade of survey monument castings; water valve castings; storm drain & sanitary sewer manhole covers & other utility lids;
removal & replacement of existing paving striping & markers; traffic control
$1020000
Sanitary
Sewer Rehabilitation - Martin Luther King Jr. Way, Fifth
NEW
10/15 @ 10:30 AM
Street, Cedar Street
The work to be done consists, in general, of rehabilitation and construction of approximately 4036 linear feet of 8-inch diameter sanitary sewer, construction of
manholes, manhole rehabilitation, excavation, replacement of approximately 2025 linear feet of 4-inch and 6-inch diameter sewer laterals, and related work.
Page 17 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
10/21/2014 2:00 PM
Berkeley
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Sanitary Sewer Rehabilitation - Hearst Avenue from Bonita Avenue
$455000
ONLINE
to Shattuck Avenue
2:00 PM
Bay Area
Cities
2:00 PM
Milpitas
2:30 PM
San Mateo
3:00 PM
El Dorado
Hills
3:00 PM
Santa Cruz
3:00 PM
Palo Alto
3:00 PM
Roseville
10/22/2014 10:00 AM
10:00 AM
The work to be done consists of, but is not limited to, the rehabilitation and construction of 1001 linear feet of 8-inch diameter sanitary sewer pipe via
pipebursting (Method 'B'), manhole rehabilitation, excavation of approximately 821 linear feet of 4-inch and 6-inch diameter sanitary sewer laterals, and related
work.
$3000000
RFQ-Sustaining Construction Management Services
9/23 @ 1PM at 300 Lakeside Dr., 15th Fl, Oakland
ONLINE
Consultants shall assist & advice the San Francisco Bay Area Rapid Transit District in construction management & related issues associated with BART
construction projects
$275000 McCarthy Blvd. Lighting and Landscape Improvements Phase 1
MAND 10/2 @ 10AM
014C
$325000
Demolition, lighting, refurbish existing fence/sign, paving, planting, irrigation, water pollution control & traffic control.
$231000
NEW Coyote Point Maina Fuel Dock Improvements
10/15 @ 10AM at 1900 Coyote point Dr., San Mateo
Mobilization, water pollution control, maintaining traffic, erosion &sediment control, signs & markers, chain link fence, marina fuel piping & monitoring system
NEW RFP-El Dorado Hills WWTP Odor Control Design Professional
ONLINE
Services
Provide engineering services to modify the existing 24,000 cfm above ground biofilter, two rectangular primary clarifiers, two MG steel equalization tanks and grit
chamber to further enhance odor control at the El Dorado Wastewater Treatment Plant.
Marine Mammal Pools Renovation Phase 1
MAND 9/30 @ 2PM at 1156 High St., Santa Cruz
Renovation of mammal tanks, relocation of fiberglass pool & shed, providing & installing new FRP metabolic tank, constructing new ramps, bridges, gates,
concrete curbs & associated work including utilities
RFP-Boranda Lake Aquatic Vegetation Removal
10/6 @ 10:30AM
The City of Palo Alto is seeking proposals from qualified firms to provide services to remove Aquatic Vegetation at Boranda Lake located at Foothills Park, Palo
Alto CA. The required services are described in the Scope of Services.
NEW RFP-Turf Convesions & On-Call General Site Construction Services
The City of Roseville (hereinafter “City”), is soliciting proposals for Turf Conversions & On-Call General Site Construction Services. This will be a competitive
negotiation process. Qualified individuals, firms, contractors, consultants or entities (hereinafter “Contractor(s)”), that meet the requirements set forth in this
Request for Proposals (hereinafter “RFP”), and are capable of providing the services requested are encouraged to participate.
MAND 10/10 @ 10AM at 18250 Bengal Ave. Hayward
Hayward/Sa NEW Exterior Handrailing Replacement Multiple School Sites
n Lorenzo
Replacing existing temporary wood railing with galvanized steel round tubing (klee kamp) had railing manufacturing system at existing exterior corridor locations
at multiple sites
Rancho
Cordova
ONLINE
Complete documents will be posted once available
NEW Sunrise Blvd Sidewalk Improvements
$80000
nstallation of new PCC sidewalk and sidewalk ramps on Sunrise Blvd from Gold Country Blvd to S. Bridge Street in the City of Rancho Cordova.
Page 18 of 42
ONLINE
ONLINE
ONLINE
Pending
ONLINE
Bid Date Bid Time Location
10/22/2014 11:00 AM
Oakland
12:00 PM
Oakland
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW RFQ-District-Wide Security Safety Maintenance and Training Project
The project comprises of maintenance & training of previously installed cameras, servers, switches & associated infrastructure district-wide at seven (7) campus
locations. Also includes monitors & equipment in the PCCD Control Center, & maintenance of all previously installed electrical & data infrastructure
$900000
RFP-As-Needed Electrical Testing and Engineering Services at
10/8 @ 9:30AM at 530 Water St., Oakland
ONLINE
ONLINE
Oakland International Airport and Maritime Area
2:00 PM
Emeryville
The Port of Oakland (“Port”) is soliciting proposals from NETA-certified firms for electrical engineering testing, power distribution coordination, protection
engineering, design support, revenue/non-revenue utility meter calibration and technical consulting services to enhance the reliability of the electrical power
distribution system at the Oakland International Airport and the Port of Oakland, Seaport. The Port may enter into more than one contract for this work. The
aggregate compensation for all such contracts shall not exceed $900,000 over the three-year term of the contract.
$1000000
Fire Station Improvements
MAND 10/9 @ 10AM at 2333 Powell St., Emeryville
The City of Emeryville Fire Station Improvements Project consists of but is not limited to:
ONLINE
1.Demolition of standing seam metal roofing, and built-up roofing and sloped plywood and 2x sleepers, flashing, thin brick veneer, interior finishes, furnishings,
equipment, mechanical, electrical and plumbing as shown on drawings
2.Replacement of thin brick veneer, glazing, standing seam metal and built-up roofing, flashing, gutters,
3.New Accessible parking space.
4.New interior finishes where designated.
5.New kitchens and toilet rooms & renovated toilet rooms.
6.Repair and refinishing of designated surfaces.
7.New casework for reception area.
8.New doors and hardware as indicated.
9.New mechanical (HVAC) equipment and distribution as indicated.
10.Extension of existing automatic fire sprinkler system.
11.New electrical distribution as indicated.
12.New lighting as indicated.
13.New fire alarm system detection and signal components as indicated.
2:00 PM
Stanislaus
County
Pete Miller Road Bridge at Delta Mendota Canal
$570000
ONLINE
$8600000
ONLINE
Bridge seismic retrofit & barrier replacement
2:00 PM
San
Francisco
9/10 @2PM
TGO7.3-Miscellaneous Metals
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with rails, metal covers, fences, metal plate and covers on walls
and columns, bike racks, site metal fabrications, enclosing profile, façade access track, and overhead catenary system on complex projects which require
significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and
complete installation of their respective systems.
2:00 PM
San
Francisco
$7500000
NEW Buchanan Park Apartments
Modifications & rehabiulitation to the existing four buildings, 68-unit residential low-income apartment units. Trades needed, but not limited to, site work,
concrete, metals, wood & plastics, thermal & moisture protection, doors & windows, finishes, specialties, equipment, special construction, plumbing, mechanical,
electrical & hazmat
Page 19 of 42
T001
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
10/22/2014 2:00 PM
Furnishing Maintenance and On-Call Service for Various Elevators,
Escalators and Moving Walkways at Port of Oakland Facilities
10/8 @ 9AM at 530 Water St., Oakland
Oakland
2:00 PM
Corte
Madera
2:00 PM
Sacramento
Engineers # of
Plan
Estimate Addenda #
$300000
Maintenance of elevators, escalators, lifts, conveyors & moving walkways; hydraulic leveling & door controls upfrade
$15000
HVAC Duct Cleaning at the Corte Madera DMV Field Office-Rebid
MAND 10/1 @ 10:30AM at 75 Tamal Vista Blvd, Corte
Madera
The Contractor agrees to provide to the Department of Motor Vehicles all labor, tools, materials and equipment necessary to provide HVAC Duct Cleaning
Services.
ONLINE
ONLINE
Kevin Childers @ 916-657-7822
MAND 10/14 @ 9AM at 3904 Rio Linda Blvd, Sacramento $3450000
The City of Sacramento seeks bids from qualified Contractors to rehabilitate Wells 94, 107, 120, 122, 126, 129, 133, and 138. The project consists of two major
components, well casing rehabilitation, and installation and construction of new site improvements. Site improvements include but are not limited to new
fencing, pumping, electrical, and chemical systems, paving, switchgear enclosures, piping fabrication, and wellhead demolition and construction. Contractors
are to provide all labor, materials, and equipment necessary to successfully complete the project
Groundwater Well Rehabilitation Ph 3
ONLINE
Megan Thomas, Associate Engr, @ 916-808-1729
2:30 PM
San
Francisco
NEW Various Locations Pavement Renovation No. 17 Sewer Replacement
$5800000
ONLINE
$80000
ONLINE
and Watermain Installation
Pavement renovation, sewer replacement, watermain installation, traffic control
Ramon Kong, Proj Mgr, @ 415-554-8280
3:00 PM
Lodi
Handicap Ramp Improvements 2014
The work in general consists of constructing new handicap ramp returns at various locations in Ripon. Related work items shall be but are not limited to: asphalt
removal, concrete removal, tree removal, pavement striping, catch basin installation/adjustment, pot hole existing utilities
and sign relocation
$175000 Aldea Housing Gutter Replacement
MAND 10/8 @ 9AM at 155 Johnstone Dr., San Francisco
3:00 PM
San
Francisco
3:30 PM
Sonora
MAND 10/10 @ 10AM
A General Contract for the Building F Reconstruction, a one-story classroom building, at Sonora Elementary School; including selective demolition, concrete,
architectural, structural, mechanical, plumbing, electrical, and other work as necessary or indicated to construct The Project.
4:00 PM
San
Francisco
RFP-Landscape Architecture Consultant Candlestick Point-Hunters
Point Shipyard Phase 2
ONLINE
$185000
Div_07-asphalt shingles, sheet metal flashing & trim; Div_09-exterior painting
Sonora Elementary School Building F Reconstruction Increment 2
10/8 @ 2PM at One Sansome St., Ste 3200, San Francisco
1) Streetscape design for all streets in Sub Phase 02 03 04 CP Street (Exhibit A, use PDF layers to view Sub Phase boundaries). 2)Community engagement
and streetscape design for Gilman Avenue between Arelious Walker Drive and Third Street. 3)Wedge Plaza park design. MBEs,WBEs,SBEs and LBEs are
encouraged to submit proposals.
Page 20 of 42
ONLINE
ONLINE
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
10/22/2014 5:00 PM
Sacramento
Relocate and Construct CSA Auxiliary Boiler System
MAND 10/1 @ 10AM at 5000-83rd St., Sacramento
Remove, transport, design/execute integration of, and commission a fully functional and complete Auxillary Boiler (#2) to SCA Cogeneration Plant using SMUDprovided boiler and appurtenances currently stored at off-site location. Scope includes modification to existing boiler storage site (e.g. sliding door area and roof)
as needed to safely remove the boiler equipment, transport of the equipment to new foundations, and restoration and clean-up of modified areas to preconstruction functional condition and cleanlines. Contractor has the option to use any or all SMUD-provided equipment and/or appurtenances, or to supply new
or refurbished replacement equipment/appurtenances.
ONLINE
10/23/2014 1:00 PM
Alameda
USCGC Stratton (WMSL 752) Dockside Repairs FQ1 FY15
ONLINE
2:00 PM
Mountain
View
Prebid Information
The Contractor shall furnish all the necessary labor, material services, equipment, supplies, power, accessories, facilities and such other things as are
necessary, except as otherwise specified, to perform dry docking repairs, and alterations to the vessel, in accordance with the solicitation and attached
specifications. Failure to read the specifications in their entirety will not relieve the offeror from the responsibility for properly estimating the difficulty or price of
successfully performing the work. Failure to do so will be at the offerors risk. All proposals submitted in response to this solicitation shall stand firm for 90
calendar days from the response date of this solicitation.
$2800000 2012-2013 Miscellaneous Water and Sewer Main Replacements
Encouraged 10/16 @ 11AM
ONLINE
$3000000
The work to be performed under this contract includes the replacement of water and sanitary sewer mains. Contract work includes abandonment or removal of
existing facilities, replacement of new pipelines by both open trench and pipe bursting methods, replacement of water service line and sewer lateral,
reconnection to existing pipelines, sidewalk replacement, and doing all other incidental work necessary to complete the projects.
2:00 PM
Union City
2:00 PM
Stockton
2:00 PM
Sonora
NEW Whipple Road Pavement Rehabilitation Project
Road pavement
MAND 10/6 @ 1PM at 2101 E. Earhart Ave. Stockton
The County of San Joaquin is soliciting Request for Bids to contract with a qualified janitorial service company to provide the highest standards of professional
janitorial services.
Sonora High School Measure J Improvements
MAND 10/8 @ 3:30PM & 10/13 @ 3:30PM
The work is generally described as:
• New Track and Field Surfacing
• New Aquatics Facility and Support Buildings
• New Pedestrian Foot Bridge
• Modernization of Humanities Two-Story Classroom (Building D)
• Modernization and Addition to Cafeteria (Building F)
• Access, Compliance Ramps, Paving and Parking
• Fire Lanes, Hydrants, and Sprinkler Systems
• Related Underground Wet and Dry Utility Infrastructure
• Related Landscape and Irrigation Improvements
DVBE Contract Goal is 3%.
All prospective bidders must register with A&I Reprographics in order to receive notification of project addenda and/or other pertinent information. WLC
Construction Services, Inc. cannot be responsible for missing documents for plan holders not registered with A&I Reprographics.
Janitorial Services-Robert J. Cabral Agricultural Center
Page 21 of 42
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
10/23/2014 2:00 PM
2:00 PM
Sonora
San Jose
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$728600
NEW Jamestown Sidewalks Project
MAND 10/1 @ 10AM
Prevailing rate of wages (State & Davis Bacon - higher of the two) project consisting of, in general, of demolition and removal of existing sidewalks, sawcutting
and removal of asphalt concrete and base, construction of new sidewalk, curb and gutter, minor concrete, installation of sidewalk plaques, patch paving with hot
mix asphalt, construction of bus turnouts with shelters, lighted crosswalks, striping, remove and replace fence, and drainage improvements. Work is anticipated
to take place in the spring of 2015. The County has designated both onsite and nearby disposal sites for excess earthwork and broken concrete (without rebar).
Construction and equipment staging will be allowed within the County right-of-way on Willow Street, Fifth Avenue, Seco Street and Ninth Street. Willow Street
and Ninth Street may be restricted to one-way traffic control during working hours with an approved traffic control plan. Curb, gutter and sidewalk may be poured
monolithically. The Engineer’s Estimate for this project is: $728,600 The DBE contract goal for this project is: 4.86%
NEW Capitol Expressway Pavement Repair Between Seven Trees Blvd
ONLINE
ONLINE
and Hwy 101
2:00 PM
2:00 PM
2:00 PM
2:00 PM
San
Francisco
San
Francisco
Roadway excavation, pavement repair, crack sealing, removal & replacement of curb & gutter, removal of concrete sidewalk & pedestrian ramps, construction of
ADA curb ramps, retrofit ADA curb ramps, replace & modify drainage inlets & other details of work not mentioned above that are required by the project plans
$8000000 As-Needed Spot Sewer Replacement
10/7 @ 10am
Online
The objective of the project is to provide contingency-based as-needed replacement of sections of existing sewer pipelines on short notice at locations to be
determined within the City and County of San Francisco. The work is to be performed in San Francisco, California. The Engineer's estimate is $8,000,000. The
Contract will be awarded to the lowest responsible and responsive bidder.
TG10.4 Electrical, Communications, Security & Integrated Networks 02/18/14 @ 2:00 pm
ONLINE
Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) and concurrent Invitation for Bids (IFB) from Trade Subcontractors
interested in bidding the TG10.4 Electrical, Communications, Security and Integrated Networks Construction Services on the contract for the Transbay Transit
Center (TTC) Project located in San Francisco, California. Bidders that have already pre-qualified do not need to respond to the RFQ.
CRC HVAC Infrastructure Renovation
10/8 @ 11am
Sacramento
Procurement and installation of HVAC equipment and infrastructure.
$115000
NEW Blue Rock Springs Golf Course-Cart Barn Project
10/14 @ 2PM at 555 Santa Clara St., Vallejo
Vallejo
Design, plan review process, procurement, fabrication, and construction of a metal building system including all associated ventilation, electrical, signage, doors,
and hardware as specified in the plans and specifications
Online
ONLINE
Roland Rojas, Proj Mgr, @ 707-648-4557
2:00 PM
Marshall
2:00 PM
Los Banos
10/9 @ 1PM at 18863 Highway 1, Shoreline Hwy, Marshall $810000
This project involves the construction of on-lot septic tank and effluent pumping systems, approximately one mile of collection force main, a secondary treatment
system at the existing Marshall Community Wastewater site, and addition of 600 lineal feet of standard gravity leaching trench to the existing leach field system
serving the community of Marshall, California.
Marshall Phase 2 Community Wastewater Project
Documents will be posted once available
NEW New Middle School (Lease-leaseback Project)
10/16 @ 2PM
The Work includes consists of a new middle school campus of four steel frame buildings with on-site and off-site improvements.
Page 22 of 42
E835B/0
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
10/23/2014 2:00 PM
Fremont
NEW American High School Modular Site Work-Informal Bid
Modular site work.
2:00 PM
Fremont
Cafe and Freight Office at Centerville Train Depot
2:00 PM
Fremont
2:00 PM
Felton/Scott
s Valley
MAND 10/9 @ 4PM at 36300 Fremont Blvd., Fremont
Engineers # of
Plan
Estimate Addenda #
$100000
10/7 @ 10AM at 37260 Fremont Blvd, Fremont
The City has prepared a scope for prospective operators in RFP #15-003 which generally includes: lease and operation of the Cafe/Restaurant space, and/or
lease and operation of the Freight Office Building space. The City has set forth on RFP Exhibit “A,” requirements for a business plan, background information
and description of the areas for lease (Café and Freight Office), the City’s general expectations for use of the spaces and an outline of proposed lease terms and
conditions. The description of proposed lease terms and conditions set forth on RFP Exhibit “A” and the standard sample lease attached to this RFP are
presented for the primary purpose of allowing the City to compare proposals. The final terms and conditions of the Lease Agreement will be based upon RFP
Exhibit “A” as well as Proposal Exhibit “A” to be submitted by the Proposer as a part of the proposal and may be the subject of negotiations between the City and
the successful Proposer
NEW Utility Infrastructure Upgrade Project Phase II
Selective demolition, electrical, communcations, clearing & grubbing, excavation & fill, utility trenching & backfilling, portland cement concrete, aggregate base
course, asphalt paving, water distribution center, sanitary sewerage system
016C
ONLINE
ONLINE
Notice to Bidders pages are garbled
2:00 PM
Sacramento
3:00 PM
San Jose
10/8 @ 10AM
Regional Water System Interties No. 2, 3 and 4
$6500000
Demolition, site preparation, earyhwork for pipeline & structures, water system piping & accessories, drainage, paving & resurfacing, concrete curbs, gutters,
sidewalks & bus stops, concrete forms & accessories, concrete joint b& acessories, reinforcing steel, cast-in-place concrete, hot-weather concreting, cold
weather concreting, concrete curing, concrete finishes, grouts, repair of defective concrete, basic masonry materials & methods, concrete masonry units,
structural steel fasteners, metal fabrications (miscellaneous metal), rough carpentry, metal plate connected wood trusses, modified bituminous sheet membrane
waterproofing, water repellent sealer, insulation, lightweight concrete shingle roofing, fiber cement siding, flashing & sheet metal, roof accessories, joint
sealants, hollow metal work, finish hardware, louvers, painting, building specialties, general equipment, electric motor drives, vertical centrifugal water pumps,
lighting, electrical
$1800000
HVAC Infrastructure Renovation @ Cosumnes River College
10/8 @ 11AM
Procure and install HVAC equipment and infrastructure
7744-Norman Y. Mineta San Jose International Airport Building
Trades Contract 14-15
Under this contract, Task Orders shall be issued for project work, which may include, but not limited to performing the repair, remodeling, addition to and/or
renovation of an existing building, new building work, moving, maintenance, rough & finish carpentry, millwork, architectural finishes, glazing, signage, door &
window installation & hardware & other building miscellaneous components
Ravi Parimanam, Preoj Mgr, @ 408-392-1168
Page 23 of 42
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
10/23/2014 5:00 PM
San
Francisco
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
NEW As Needed Lead-Based Paint, Mold and Asbestos Contractor
Services
This Solicitation will award two (2) contracts to Contractors that specialize in asbestos and lead based paint stabilization, encapsulation and/or removal in
compliance with HUD, Cal OSHA and local ordinances on an emergency standby and a task assignment basis, in an amount not to exceed $50,000 each.
Solomon Gebala @ 415-715-3152
The Contractors are required to provide a detailed cost estimate proposal within 3 calendar days after request using unit prices and provide fast abatement
services after Notice to Proceed (NTP) is faxed to their office.
Scope includes notifying residents, CalOSHA, SFDPH, signage and safety equipment per attached requirements as provided in Detailed Scope of Work,
Exhibits A, B and C.
10/24/2014 12:00 PM
2:00 PM
San
Joaquin
County
Oakland
NEW Site General Building Contractor, Mountain View Revitalization Pilot
ONLINE
10/14 @ 10AM at 741 Flint Ave, Stockton
Program, Conway Homes and Sierra Vista Homes
The Housing Authority of the County of San Joaquin (HACSJ) is seeking bids from licensed and bonded General Contractors (“Contractor”) to provide
construction services for the Site General Building Contractor, Mountain View Revitalization Pilot Program, Conway Homes and Sierra Vista Homes. Bid
packages & specifications may be downloaded from the HACSJ website at HACSJ.com under the “Vendors & Contractors” tab.
$5500000 AC Transit Advanced Utility Relocations
10/3 @ 10AM @ 1600 Franklin St., Oakland
ONLINE
$7000000
Relocation of sewer lines, manholes & other appurtenances as required, to clear the project area of any conflict with the future construction of bus lanes &
platforms of the East Bay Rapid Transit Project. The work involves the removal of & abandonement of sections of existing sewer main & service laterlas & the
installation of new sewer mains & service laterals & the installation and/or removal of existing sewer manholes & cleanouts, including sawcutting of pavement &
concrete curb, gutter & sidewalk, excavation, backfill, shoring for deep excavation, pavement restoration & concrete curb, gutter & sidewalk replacement.
2:00 PM
2:00 PM
Sacramento
San Jose
RFQ-Mechanical and Electrical Consulting Firms for Future Projects
The County of Sacramento, Architectural Services Division, is requesting qualifications statements from local mechanical & electrical consultants for the purpose
of establishing a hiring list for future architectural services division projects, including jails, youth detention facilities, administration buildings, airport facilities,
medical facilities & parks & recreation facilities
River Oaks Complex Building B Lobby Reconfiguration
10/9 @ 10AM at 3331 N. First St., San Jose
Selective demolition, tenant improvements, CCTV & security improvements
Page 24 of 42
ONLINE
E836B/0
Bid Date Bid Time Location
Plan Name / Scope of Work
10/24/2014 2:00 PM
RFP-Eden Township Exterior Repainting
San Leandro
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
This is a subcontracting opportunity under Alameda County's Job Order Contract (JOC) program to work for MTM Construction. For more details regarding this
specific job order please contact General Contractor Joshua Lee at (626) 934-1112 or via email at [email protected]
.
Repaint the Exterior of the Eden Township building located at 15001 Foothill Drive San Leandro
General: The scope will include the prepping and painting existing surfaces “as is” and GSA JOC program will repair/replace with like materials as necessary for
paint. The preparation will require the necessary safety measures to contain flaking chips of paint during the preparation phase as based on the environmental
report. - Assess the need to provide exterior scaffolding for any
David Barba, Proj Mgr, @ 510-208-9586
2:00 PM
3:00 PM
3:00 PM
Stockton
Demolition of Single Family Residence (440 Clayton Avenue,
Stockton)
Online O
MAND 10/8/14 @ 10am
San Joaquin County is seeking a qualified vendor for the demolition of an abated single family resoidence and the destruction of the property's septic tank.
MAND 10/15 @ 9AM
Santa Clara NEW RFQ-Sidewalk and Gutter Replacement/Repair
County
The County of Santa Clara is requesting quotes for replacing and repairing sidewalks, curbs, and gutters as per the attached scope of work and site map. All
work and detailing shall conform to City of San Jose Department of Public Works curb, gutter and sidewalk standards. Contractor shall block gutter off from
water and concrete sediment run-off prior to and during construction. Contractor shall obtain all applicable permits, including parking meter removal permit, from
the City of San Jose, and work shall be compliant with City of San Jose regulations.
RFP-Design Build Services 123 Rico Street-HVAC Modernization,
Salinas
ONLINE
ONLINE
Roof Replacement and Solar
The Housing Authority of the County of Monterey proposes to modernize the HVAC/Mechanical system for the headquarters office building in Salinas. In
addition, the HACM is requesting replacement costs of roofing & a roof top or carport solar installation
4:00 PM
Davis
$5460000
RFQ Chemistry Seismic and Life Corrections
ONLINE
The Project consists of the following work for the Chemistry and Chemistry Annex buildings:
1.Structural corrections to address seismic deficiencies.
2.New site fire service and full fire suppression system.
3.Renovations as required to incorporate the work scope above.
5:00 PM
5:00 PM
San Rafael
Sacramento
RFP-Essential Facilities Project Management and Pre-Construction
Services
The City of San Rafael wishes to retain the services of a project management/construction management firm to manage the essential facilities strategic plan
process to guide improvements to its essential facilities . The strategic plan process will consider all of the City's public safety facilities which will include seven
fire stattions & a police station
RFP - Franchise Tax Board - Butterfield Complex
MAND 08/19/14 @ 10:00 am at site
All Qualified Pool members are invited to review and respond to this Request for Proposal (RFP) for the installation and operation of solar photovoltaic (PV)
energy generation systems under a third party ownership power purchase agreement business model. In submitting your response you must comply with all
instructions as provided in this RFP.
Page 25 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
10/27/2014 10:00 AM
Warning Lights School Crosswalk Project
Pacifica
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$100000
Pending
Installation of crosswalk illumination devices, thermoplastic striping & related signage for five schools in the City of Pacifica
Complete documents will be posted once available
10:00 AM
10/28/2014 2:00 PM
2:00 PM
2:00 PM
San Rafael NEW Citywide Traffic Signal LED Relamping Project
Relamping all vehicle indications (including indivations of programmable visibility heads) with new LED in incandescent look & all pedestrian indicatyions with
new countdown LED in incandescent look
E837B/0
10/6 @ 10AM at 1600 Franklin St., Oakland
This is a public works project and will require payment of prevailing wages. A Project Labor Agreement (PLA) is also included in the project. In order to perform
the work, bidders at the time of the bid opening and for the duration of the project shall possess a valid California Class “A” Contractor’s License in order to
qualify to perform the work. The work in the project, involves in general, of furnishing all permits, materials, labor, tools, and equipment, and for doing all the
work involved in reconstructing a section of Derby Avenue, E 10th Street, and San Leandro Street, as shown on the plans, Pavement overlay will be constructed
at Derby Avenue at its intersections with E 12th Street (NB & SB) and at the intersection of Fruitvale Avenue and E10th Street/San Leandro Street. New
pavement sections will be constructed at Derby Avenue and E 10th Street. Concrete curb ramps, driveways, curb and gutter and sidewalk will be constructed.
Signal and lighting will be installed or modified at two (2) intersections. Pavement delineation and signs will be installed, drainage system will be modified, and
roadway lighting will be installed.
$20000
MAND 10/16 @ 10AM
Ukiah/Fortun NEW Flooring Replacement
a
Replace the existing flooring in the kitchen area of the CCC Fortuna site, located at 1500 Alamar Way in Fortuna and/or the CCC Ukiah site, located at 2600 Old
River Rd, Ukiah
Administrative Department Operations Center Video Wall and
San
10/7 @ 1:30PM
Headquarters Digital Signage System for New Police Headquarters
Francisco
ONLINE
Oakland
AC Transit Streets and Parking Lots Improvement Project
ONLINE
ONLINE
on the Public Safety Campus
2:00 PM
2:00 PM
2:00 PM
2:00 PM
2:00 PM
Video wall solution at the SAdmin DOC in police headquarters; digital signage solution at the Admin DOC in Police headquarters; service to maintain the new
system
NEW Tree Removal and Pruning Services
10/15 @ 11AM 2180 Milvia St., 1st fl, Berkeley
Berkeley
Tree removal & pruning services at various locations in City of Berkeley
$675000
Arden Middle School Restroom Upgrades
MAND 10/9 @ 2PM at 1640 Watt Ave, Sacramento
Sacramento
Restroom upgrades
$1878000
NEW Camino Pablo Pavement Rehabilitation
Recommended 10/20 @ 10AM
Orinda
Pavement rehabilitation, including base repairs, cold planing, asphalt pavement, HMA overlay, concrete improvements, traffic signal modifications & striping
$450000 New Generator at 2530 Arnold Drive
10/7 @ 2pm
Martinez
Work includes the installation of a new emergency power generator and associated work at an existing office building that will be occupied during construction.
NEW Hesperian Landscaping, Chabot College - Rebid
MAND 10/15 @ 10AM at 25555 Hesperian Blvd, Bldg 3000,
Hayward
Hayward
Landscaping work
Plans will be posted once available
Page 26 of 42
ONLINE
ONLINE
ONLINE
Online
ONLINE
Bid Date Bid Time Location
10/28/2014 2:00 PM
Fremont
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW RFQ Design-Build Services for Technology Infrastructure at Several MAND 10/7 @ 10AM & 10/9 @ 10AM
ONLINE
Schools
2:00 PM
Daly City
2:00 PM
Eden
Township
2:00 PM
Oakland
3:00 PM
Palo Alto
The Fremont Unified School District is requesting qualified persons, firms, partnerships, corporations, associations, or professional organizations to provide full
design-build services for the technology infrastructure at Ardenwood Elem School, Brookvale Elem School, Kennedy High School & Vallejo Mill Elem School
campuses
NEW Janitorial Services for Daly City DMV
Optional 10/7 @ 10AM
Contractor agrees to provide the Dept of Motor Vehicles all labor, tools, materials, equipment & travel necessary to perform janitorial services at the Daly City
DMV.
ONLINE
Melanie Pilliard @ 916-657-6975
MAND 10/7 @ 10:30AM at 951 Turner Ct., Rm 230A,
Hayward
Removing & replacing damaged curbs, gutters, driveways, sidewalks, removal of tree roots & installation of root barrier control system
$1165000
Replace Glass Panels at Coliseum, San Leandro, Bay Fair and South 10/02/14 @ 10:00 AM at 300 Lakeside Drive, conference
Hayward Stations Platforms
room 1700, Oakland
The work in general consists of placing and/or replacing drain culverts, placing new
curb, gutter, and sidewalk, placing hot mix asphalt, and placing thermoplastic striping along Powerline Road from 15th. Avenue to north of 9th. Avenue. Other
such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or
installed.
Repair of Damaged and Displaced Sections of Curbs, Gutters and
Sidewalks Unit No. 17
NEW Mitchell Park Parking Lot Project
Asphalt base repairs, replacement of damaged concrete structures, removal of existing asphalt, placement of asphalt, placement of asphalt concrete paving &
replacing of tsriping
E834B/6
ONLINE
ONLINE
Holly Boyd, Proj Mgr, @ 650-329-2612
3:00 PM
Palo Alto
4:00 PM
Oakland
10/1 @ 10AM
The City of Palo Alto is seeking proposals from qualified firms to provide services to provide data center and computer cloud backup implementation services
NEW RFP-Hazardous Material Abatement Design and Construction
MAND 10/8 @ 2PM at 955 High St., Oakland
RFP-Data Center and Computer Cloud Backup Implementation
ONLINE
ONLINE
Services for Various School Sites
Oakland School District is requesting the submission of proposals for a hazardous material abatement consultant firm to provide hazardous material abatement
design & construction monitoring associated with the various sites within district.
5:00 PM
Antioch
Request for Information, POC HVAC Evaluation and Replacement
Delta Diablo ("District") issues this Request for Information (RFI) via BidSync for planning and information gathering purposes. The District is in the planning
phase for replacing the existing Building Management System (BMS) in operation at its Plant Operations Center building in Antioch, CA. The BMS system
currently operates and monitors the heating, ventilating, and air conditioning (HVAC) equipment.
Page 27 of 42
Online
Bid Date Bid Time Location
10/29/2014 1:00 PM
10:30 AM
10:30 AM
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$500000
10/15 @ 10AM
Sacramento NEW Fence Construction and Repairs As Needed Through 2016
The Contractor shall furnish all supervision, labor, materials, equipment and incidentals necessary to install new fencing, install new gates, and make fence
additions, repairs or changes to various SMUD fences. The work generally consists of: Constructing 4’, 6’, and 8’ high chain link fence with 1”x 1” fabric; repair of
existing chain link fences; furnishing temporary chain link fence, either stand alone or with imbedded posts; gate construction and repairs; installation of fence
toppings on new or existing fences, including “V” arms with 4 strands of barbed wire and razor ribbon; construction of isolation panels; construction of 6’ redwood
fences; fabrication and installation of 2’ wall topping; installation of security panels; and various other adjustments, repairs or replacements that may arise during
the contract period
$500000
Port Security Fences Phase 4
10/15 @ 10:30AM
San
Francisco
Environemantl management of excavated materials, fences, electronic gate operators.
San
Francisco
Division 02170 & Division 02826 were not posted in the port of san francisco website
NEW Beltline Building Project - Phase 1
MAND 10/16 @ 10:30AM
$300000
ONLINE
ONLINE
ONLINE
Installation of public men's & women's restrooms in historic Beltline Buildings 1944 addition, including selective demolition & hazardous material removal,
installation of walls, doors, tile, flooring, toilet partitions, installation & repairs of plumbing, mechanical & electrical fixture and systems
2:00 PM
$746876
Sacramento NEW North Natomas Regional Park Phase 5B Rebid-Farmer's Market &
ONLINE
Parking Lot
The work to be performed consists of developing the North Natomas Regional Park, Phase 5B-Farmer’s Market and Additional Parking in Sacramento. The
improvements will consist of finish grading, drainage, concrete walkway, curbs, asphalt paving, installation of metal shade structures, automatic irrigation
system, electrical, drinking fountain, landscaping, parking lot, signage, and site furniture.
Dennis Day @ 916-808-7633
2:00 PM
2:00 PM
2:00 PM
San
Francisco
Optional 8/26 @ 2PM at 175 Beale St. San Francisco
TG15.1-Dock Levelers & Bumpers
$200000
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with with furnishing and installing dock levelers, bumpers, truck
restraints and bin lifters on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems.
$98500
MAND 10/15/14 @ 10:30 am
Bodega Bay NEW Bodega Bay Aquaculture Reroof
Provide all labor, materials, equipment, tools, transportation, insurance and
services to remove the top layer existing Hypalon roofing material and prepare the existing built-up roofing substrate to receive the new roofing application.
Patch and repair with like materials any dry-rotted existing roof decking encountered. Install sloping underlayment on low flat roof section, sloping to existing roof
drains. Reroof with a new fleece backed TPO roofing system, approximately 15,825 square
feet.
$1200000 MAND 10/15 @ 10AM at 69 Stony Circle, Santa Rosa
Santa Rosa NEW Water Pump Station 3 Modifications
$1300000
Water pollution control, traffic control, clearing & grubbing, earthwork, roadway excavation (F), subgrade stabilization, stabilization fabric, class 2 aggregate
base, slurry seal, asphalt concrete surface, concrete curb, pump station addition concrete slab foundation, concrete apron, median curb, chain link fence, gates,
removal of existing fence & gate, asphalt concrete dike, generator bldg concrete slab foundation, precast drainage structures, storm drain, pump station water
pipe & sppurtenances, 100 HP booster pump, pump station building addition & roof, generator building, miscellaneous electrical work, motor control center,
PG&E meter & main switchboard, antenna mast assembly. 230kw generator set
Page 28 of 42
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
10/29/2014 2:00 PM
Removal of Rubber Deposits and Painted Ground Markings from
Airport Pavements
10/15 @ 99:30AM at 8500 Earhart Rd., Oakland
Oakland
2:30 PM
Sacramento
2:30 PM
San Pablo
3:00 PM
Sunnyvale
3:00 PM
Sunnyvale
Engineers # of
Plan
Estimate Addenda #
$300000
The work of this annual contract consists generally of removing approximately 1,000,000 square feet per year of rubber deposits and approximately 10,000
square feet per year of painted ground markings from airport pavements using high-pressure water.
Asbestos Abatement for DMV Headquarters.
MAND 10/9/14 @ 11am
Asbestos Abatement for DMV Headquarters.
$250568
NEW Davis Park Play Area Renovation
Replacement & installation of new play structure & resurfacing of Davis Park.
NEW Curb Ramps Installation CDBG 2015
Optional 10/22 # 2:30PM at 456 W. Olive Ave, Sunnyvale
Construction of ADA ramps & remove & reconstruct certain curbs, gutters & sidewalks, adjust to grade, existing traffic boxes, meters & others city-owned
facilities within the limits of the new ADA curb ramps.
ONLINE
Online O
ONLINE
ONLINE
Chucky Lambert @ 408-730-7406
Concrete Sidewalk, Curb, Gutter and Driveway Approaches CGBG
2015
Optional 10/22 @ 2:30PM at 456 W. Olive Ave, Sunnyvale
ONLINE
Concrete sidewalks, gutter, driveway approaches & curb ramps
3:00 PM
3:00 PM
Sebastopol
Santa Clara
MAND 10/7 @ 10AM at 390 Morris St., Sebastapol
Div_03-cast-in-place concrete; Div_06-interior architectural woodwork; Div_07-joint sealants; Div_08-aluminum windows, door hardware, glazing; Div_09ceramic tile, painting; Div_10-sheet vinyl, door mat, microflex structures, toilet accessories, drinking fountain, lighting, electrical
Sebastopol Community Cultural Center Office Remodel
NOTICE TO CONTRACTORS:In order to be eligible to submit a bid for this project, contractors must be included on the plan holders list maintained by the
Sebastopol Engineering Department. Buds must be submitted on forms provided by the City as described in the Notice to Bidders included in this document
Winter 2014/15 Preparation Work for the Phase Shifting Transformer Strongly Recommended 10/7 @ 10:30AM at 1500
Project
Warburton Ave, Santa Clara
Site demolition; asphalt concrete demolition; earthwork; utility trenching & backfill; storm water pollution prevention; caissons; asphalt concrete paving; cast-inplace concrete, concrete reinforcement; cast-in-place concrete; concrete curing; structural steel; metal fabrications; concrete waterproofing; yard lighting;
electrical
ONLINE
ONLINE
Voula Margelos Brown @ 408-261-5036
4:30 PM
Modesto
NEW 2605 Alexia Way
MAND 10/16 @ 2PM at 2605 Alexia Way, Modesto
Reroof, replace some doors, replaced HVAC system and new flooring and painting the exterior of house
Gregory Williams @ 209-577-5392
Page 29 of 42
ONLINE
Bid Date Bid Time Location
10/29/2014 5:00 PM
San Jose
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW RFQ-Master Agreement for Landscape Architectural Services
The Department of Public Works, City Facilities Architectural Services Division, is seeking firms or individuals (“Consultant”) to provide a full compliment of
architectural consultant design services. The Consultant will be required to provide multi-discipline architectural services for the projects identified and for
various citywide projects. The City of San José- is seeking to provide.
ONLINE
Based on this RFQ, the City will enter into one (1) or more consultant agreement(s) with the highest ranked Consultant(s). The agreement(s) will have a
maximum compensation limit of $270,000 and shall expire approximately five (5) years from the date of execution, unless the compensation level is reached
earlier
10/30/2014 1:30 PM
San Rafael
$2631000
10/9 @ 11AM at 1301 Andersen Dr., San Rafael
The Project consists of removing and replacing the sludge thickening system, as described in the Contract Documents. The work includes demolition of the two
(2) existing dissolved air flotation thickeners and associated equipment and piping, furnish and installation of two (2) rotary drum thickeners and associated
equipment to provide a complete, functional installation, control integration of new equipment into the existing treatment plant process control system and testing
of the completed system to ensure proper operation
Sludge Thickening System Replacement
ONLINE
Brian Thomas @ 415-459-1455, extension 121
2:00 PM
Davis
2:00 PM
San
Francisco
$875000
MAND 10/16/14 @ 1:00 pm
Provide all labor, materials, equipment, tools, transportation, insurance, and services required to install approximately 100 feet of roof mounted steam and
condensate piping, 400 feet of underground steam and condensate piping, and general tenant improvements to an unimproved bay of the CNPRC Shop
Building for the purpose of serving a future cage wash machine. Site work shall include excavation, installation of underground piping, poured in place
insulation and patching of asphalt roadway. Tenant improvements to the 2,200 sq. foot open bay shall include concrete slab, concrete flatwork, plumbing, steam
fitting, electrical, HVAC and architectural sheet metal improvements. Work will be performed within the California National Primate Center and shall require
health screenings for all workers.
TG07.9 Bollards & Barriers
8/27 @ 2PM at 175 Beale St., San Francisco
NEW CNPRC Cage Wash Facility
ONLINE
ONLINE
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with designing, furnishing and installing bollards, wedge barriers,
impact attenuators, hydraulic power units, controls and piping, and integration with safety and security systems on complex projects. Also included are
engineering, coordination, procurement and complete installation of the respective systems.
2:00 PM
Richmond
ONLINE
RFP-Hilltop and Marina Landscape Maintenance Assessment
Districts Annual Engineer's Report
The purpose of this invitation is to identify a company that will, as a result of passage of Proposition 218, prepare a new Engineer's report for the Hilltop &
Marina Landscape Maintenance Assessment Districts
Yader Bermudez @ 510-774-6300
2:00 PM
Pleasanton
Janitorial Services for the Pleasanton DMV Field Office
Janitorial Services
Page 30 of 42
10/9/14 @ 10am
Online O
Bid Date Bid Time Location
10/30/2014 2:00 PM
2:00 PM
Pine Grove
Oakland
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 10/7 @ 10AM
Div_02-site preparation, chain link fence, gravel surfacing, demolition, blasting, concrete mat & pad foundation, groundwork for structures, rock removal; Div_03concrete; Div_04-concrete unit masonry; Div_05-metal decking, metal fabrications, welding, structural steel, ladders; Div_06-rough carpentry; Div_07-cold fluid
applied waterproofing, metal roof panels, metal wall panels, roof hatches, sealants; Div_08-hollow metal frames, hollow metal doors, door hardware; Div-09painting, elastomeric coating; Div_13-self-supporting steel communication tower; Div_22-plumbing; Div_23-HVAC; Siv_26-stand-by generator, automatic
transfer switches, electrical work
$2531165
NEW The Rehabilitation of Sanitary Sewers in the area bounded by Park
Voluntary 10/14 @ 10:30AM at 250 Frank Ogawa Plaza,
Boulevard, Hollywood Avenue, Sunnyhills Road, and Brighton
Oakland
CHP Enhanced Radio System Replace Towers and Vaults
ONLINE
ONLINE
Avenue
The proposed work consists, in general, of rehabilitating approximately 2,953 linear feet of existing 6” diameter sewer pipes and approximately 13,774 linear feet
of existing 8” diameter sewer pipes by pipe-expanding method; rehabilitating sewer structures; reconnecting house connection sewers; rehabilitating house
connections sewers, and other related works as indicated on the plans and specifications.
2:00 PM
Davis
David Ng, Proj Mgr, @ 510-238-7267
NEW UC Davis International Complex-Subcontractor Bids for Select Bid
ONLINE
Packages
Construct a new 60,000 SF office and classroom building which will include a Commons area, Multi-purpose room, offices, meeting rooms, Media Resource
room, classrooms, misc. support rooms and all associated site improvements; bid packages include 1) pavement markings and site signage, 2) precast unit
pavers, 3) decomposed granite, 4) landscaping, 5) CMU masonry, 6) aluminum column covers, 7) architectural millwork and wood paneling, 8) fireproofing, 9)
joint sealants, 10) tile, 11) acoustical ceilings and wood ceilings, 12) flooring, 13) concrete sealer and stain, 14) architectural sheetmetal, 15) paint, 16) toilet
accessories and partitions, 17) visual display surfaces, 18) signage, 19) operable partitions, 20) fire protections specialties, 21) lockers, 22) projection screens,
23) entrance floor mats, 24) window coverings, 25) elevator smoke curtains and 26) sun shades.
**MEP trades, steel, concrete, glazing, doors and hardware, metal framing and drywall, stucco, elevator, metal decking, rebar, roofing, stone veneer, fire
suppression, and sitework are EXCLUDED and have been selected through the Design-Build process.
2:00 PM
Cupertino
MAND Pre-Bid Conference 10/13 @ 3:30PM and Site Visit $180000
10/16 @ 3:30PM
The Project consists of providing all material, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to relocate storage sheds and
fence post & fabric, provide and install a new transformer & distribution panel, install all low voltage wiring for Power, Fire Alarm, Clock\Bell Paging, Intercom
Phone, Data, install new fence posts & fabric for the New Interim Housing Portables at Hyde Middle School.
Hyde Middle School Interim Housing Portables
Pending
Mark Casini @ 408-483-7599
Complete documents will be posted once available
2:00 PM
Concord
09/29/14 @ 10:00 am at 2477 Arnold Industrial Way
SCOPE OF WORK. It is the intent of County Connection to have the contractor furnish and install the necessary labor and materials to upgrade and replace the
existing security gates per the technical specifications of this bid package and the Contractor’s bid.
Upgrade and Installation of Security Gates
Page 31 of 42
066C
Bid Date Bid Time Location
10/30/2014 2:00 PM
Oakland
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$170250
NEW The Rehabilitation of Sanitary Sewers at Lakeside Park Pump Station Voluntary 10/14 @ 10:30AM at 250 FRank Ogawa Plaza,
Oakland
The proposed work consists, in general, of remove of the existing sanitary sewer pumps, excavation, dewatering, shoring and installation of a pre-engineered
and pre-fabricated complete pump station system with associated electrical and alarm systems, install precast holding tank, and other items of work state in the
Special Provisions and the project plans or as required for a fully functional sanitary sewer pump station.
ONLINE
Gunawan Santoso, Proj Mgr, @ 510-238-7260
2:30 PM
Walnut
Creek
3:00 PM
San Jose
3:00 PM
Cupertino
3:00 PM
San Jose
$45000
Tennis Courts Resurfacing Project
The Project includes, but is not limited to, performing the following Work:
•Courts preparation
•Clean out the cracks and crack seal
•Clean surface
•Leveling for only two (2) courts at Larkey Park, as determined in the field by the engineer
•Apply special surface coating
•Apply color coat
•Provide line painting, including pickleball lines for two courts at Rudgear Park
•Restore pipe netting, netting, and perimeter courts fencing
NEW 7585-Demolition of Kelley House
10/20 @ 10AM at 1300 Senter Rd., San Jose
Materials disposal, hazmat protection procedures, back fill, demolition
ONLINE
ONLINE
Raj Verma, Proj Mgr, @ 408-535-8443
MAND Pre-Bid Conference 10/14 @ 3:30PM & Site Visist $260000
10/17 @ 3:30 PM
The Project consists of providing all material, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to relocate storage sheds and
fence post & fabric, install new fire suppression line & hydrant, provide and install a new transformer & distribution panel, install all low voltage wiring for Power,
Fire Alarm, Clock/Bell Paging, Intercom Phone, Data, install new fence posts & fabric for the New Interim Housing Portables at Miller Middle School.
7458-Police
Administration and Communication Buildings (PAB/C)
NEW
MAND 10/16 @ 10AM at 201 W. Mission St., San Jose
Miller Middle School Interim Housing Portables
Pending
ONLINE
Chiller Replacements Project
Div-15-plumbing, HVAC, testing, adjusting & balancing; Div-16-electrical work
Jim Wilson, proj Mgr, @ 408-535-8441
4:00 PM
Sacramento
ONLINE
2015 Pre-Selected Consultants RFQ
This Request for Qualifications (RFQ) solicits qualified firms to provide an array of Pre-Selected professional services to the Department of Public Works
(DPW).Respondents to this RFQ must demonstrate experience and capacity to deliver the services offered, as well as sufficient understanding of Public Works
needs and to tailor its services to successfully address them.
Page 32 of 42
Bid Date Bid Time Location
10/30/2014 4:00 PM
San
Francisco
Plan Name / Scope of Work
Prebid Information
NEW RFQ-As-Needed Design, Engineering, & Professional Consulting
Engineers # of
Plan
Estimate Addenda #
10/14 @ 2:30PM
ONLINE
Services Treasure Island Project
TICD is soliciting Statements of Interest and Qualifications from qualified design, engineering and professional consulting firms to provide As-Needed
Professional Services for components of the development of the Treasure Island Project ("Project”).
The selected consulting firms will be added to a Qualified Vendor List, and, subsequent to a future fee proposal submittal process, may contract directly with a
joint venture managed by TICD, the Master Developer of the Project, who will provide direct oversight and management of the scope of work.
10/31/2014 2:00 PM
Los Altos
Hills
RFQ-Lease-Leaseback Services for New District Offices
MAND 10/7 @ 10AM at 12345 El Monte Rd., Los Altos Hill
ONLINE
The Foothill-DeAnza Community College Dist is issuing the RFQ requesting statements of qualifications from contractors qualified to provide the District with
services deescribed in this document for construction of the New District Offices at the Foothill College campus in Los Altos Hills
2:00 PM
Modesto
ONLINE
NEW RFP-Transportation Engineering Services for Federal Project CML
5059 State Route 132 (D Street-14th Street) Intersection
developments
2:00 PM
Stockton
The City of Modesto is soliciting requests for proposals for Transportation Engineering Services, which consists of a traffic study that will include a technical
analysis report.
Janitorial Services for Employment and Economic Development
MAND 10/07 @ 10AM at 56 S. Lincoln St., Stockton
ONLINE
Department Building
Janitorial services
4:00 PM
San
Francisco
RFQ Holloway Avenue Development Opportunity
MAND 10/1 @ 11AM
ONLINE
SF State and UCorp are requesting qualifications from interested entities as a first step toward identifying qualified developers to plan, finance, construct and
derive income from the operation of a development project on property located at the campus of San Francisco State University in San Francisco, California.
4:00 PM
San Jose
RFP-Design Engineering Consultant Services for Charcot Ave
Extension over I-880
ONLINE
The City of San Jose's Department of Transportation is seeking qualified consultant engineering firms or Partnering Organizations to provide transportation
planning and engineering services related to the preparation of scoping, environmental studies, project reports, plans, specifications and estimate for the
Charcot Avenue Extension Over I-880.
5:00 PM
San Rafael
ONLINE
Essential Facilities Strategic Plan
The scope of work for the first RFP (“Essential Facilities Strategic Plan”) is to update the 2003 facility condition assessments, develop space needs of essential
facilities, feasibility studies of improving existing or new public safety facilities, developing project budgets and funding plan, prioritizing projects, and developing
a phasing and implementation schedule. The second scope of work (“Essential Facilities Project Management and Pre-Construction Services”) is for project
management and pre-construction services related to the Strategic Plan process.
Jim Shultz @ 415-485-3475
11/3/2014 2:00 PM
Sacramento
MAND 10/24 @ 1:30PM
Replace the roof & exterior siding of the California Dept of Food & Agriculture's Greenhouse offices & storage facility
Roof Replacement Project Greenhouse Offices and Storage Facility
Page 33 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
11/3/2014 4:00 PM
RFP-Pilot Parklet for Temporary Sidewalk Extensions
Sacramento
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
This Request for Proposals (RFP) solicits qualified applicants “Sponsors” to install a Parklet in the public right of way. Parklets are a new type of public space
that serve as a “mini parks” and are intended to provide space for people to sit, relax and enjoy the city around them, especially where narrow sidewalks would
otherwise preclude such activities. They are intended to be seen as pieces of street furniture, providing aesthetic enhancements to the overall streetscape.
Parklets secure this space by repurposing on street parking spots. In the place of car parking, a platform is built to bring the grade of the sidewalk out into the
street. Once the platform is installed, benches, café tables and chairs, landscaping, and bike parking can all be placed on top in order to provide a welcoming
public space along the street. Parklets are sponsored by a private partner (merchant, resident, insti¬tution, etc.) but all amenities on a Parklet must remain free
and open for any member of the public to use.
5:00 PM
5:00 PM
NEW RFP-Design Engineering and Landscape Architecture Services for
Santa
Highway 101 at Airport Blvd Interchange
Rosa/Winds
or
The County of Sonoma, Dept of Transportation & Public Works, is seeking a licensed firm for design engineering & landscape architecture services for the
Highway 101 at Airport Blvd Interchange. The scope of services will include all work necessary to produce final plans, specifications & estimates. bid documents
for land scaping improvements acceptable to Caltrans and the County & provide design support services during construction.
On-Call
and Pre-Qualified Shortlist for Transportation Engineering
NEW
10/16 @ 2PM at 255 Glacier Dr., Martinez
Contra
Services (2015 - 2018)
Costa
County
The Contra Costa County Public Works Department is requesting Statements of
Qualifications (SOQ) from transportation engineering consultants to:
ONLINE
ONLINE
1. Select firms for “on-call” transportation engineering services; and,
2. Establish a shortlist of transportation engineering firms that the County may contract with for future projects.
Each firm should indicate in the cover letter for the SOQ if they would like to be considered for the “on-call” contract, the pre-qualified shortlist for future project
specific contracts, or both categorie
11/4/2014 10:00 AM
Palo Alto
$80000
NEW Gunn Signal and Sidewalk Replacement
MAND 10/14 @ 10AM at 780 Arastradero Rd. Palo Alto
Removal and installation of a street signal, sidewalk & striping. Associated work includes relocation & reinstallation of pull boxes, conduits, traffic detection loops
& signal light related appurtenances
ONLINE
Complete documents will be posted once available.
12:00 PM
Martinez/Ric
hmond
RFP-Repainting and Recarpeting of Court Facilities
Repainting & recarpeting of court facilities
Page 34 of 42
MAND 10/21 @ 9AM at 725 Court St., Martinez
ONLINE
Bid Date Bid Time Location
11/4/2014 2:00 PM
Saratoga
Plan Name / Scope of Work
Prebid Information
NEW Unit J Modernization at Prospect High School
• Modernization of existing 'Unit J' to serve as Fine Arts Center
• Band, Choir, 2D Art, 3D Art, Stagecraft
• Complete demolition and abatement of all interior finishes
• Mechanical, Electrical and Plumbing components
• Data, Fire Alarm and other low voltage components
• Complete Fire Sprinkler System
• Outdoor Art Courtyard — with masonry kiln shed
Engineers # of
Plan
Estimate Addenda #
MAND 10/16 @ 3PM
Pending
Complete documents will be posted once available
2:00 PM
Various
Cities
2:00 PM
San
Francisco
2:00 PM
Fort Bragg
2:00 PM
Castro
Valley
MAND 9/29 @ 1PM, 9/30 @ 1PM & 10/1 @ 1PM Various
Locations
The California State University, Office of the Chancellor is seeking qualified contractors for the furnishing of all labor, materials, and equipment to implement and
administer a Regional Job Order Contract (JOC) for roofing work, qualified contractors for the furnishing of all labor, materials, and equipment to implement and
administer a Regional Job Order Contract (JOC) for paving work and qualified contractors for the furnishing of all labor, materials, and equipment to implement
and administer a Regional Job Order Contract (JOC) for painting work to be used by campuses within the CSU system.
Regional Specialty Job Order Contract Roofing, Paving, Painting
NEW TG12-.2 Overhead Contact System (OCS) Upgrade
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with Overhead Contact Systems including but not limited to, OCS
attachments, structures and integration with the San Francisco Municipal Transportation Agency, and connection to existing Traction Power system, routing and
splicing through existing feeder duct banks on complex projects. Also included are engineering, coordination, procurement and complete installation of the
respective systems in the following trade:TG12.2 Overhead Contact System (OCS) Upgrade
NEW Avila Center Carpet Replacement
MAND 10/21 @ 10AM at 790 S. Franklin St., Fort Bragg
Remove the existing carpet & install new carpeting
$401000
Christensen Lane and Lake Chabot Road Sidewalk Improvements in 10/14 @ 10AM
ONLINE
ONLINE
ONLINE
070C
Castro Valley
Earthwork & concrete removal; installing minor concrete standard curbs & gutters, sidewalks, driveways, pedestrian ramps & a valley gutter; installing class V
reinforced concrete pipe, drop inlet with box & manhole with frame & cover; performing pavement milling & asphalt concrete base failure repair; installing
pavement reinforcing fabric & asphalt concrete, type A, roadway pavement, adjust utility structures & adjustment of existing manholes; installing thermoplastic
traffic stripes, thermoplastic pavement marklings & roadside signs & survey monument preservation
2:00 PM
Antioch
$235000
NEW Williamson Ranch Plaza Water Main Replacement
Mobilization, lines & grades, watering, temporary pavement markers, trench excavation & backfill, sheeting & shoring, water mains, blow-off assemblies,
cathodic protection system, miscellaneous iron & steel, traffic stripes & pavement markings
Page 35 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
11/4/2014 3:00 PM
10/16 @ 10AM at 1391-35th Ave, Sacramento
Sacramento NEW Sacramento River Watershed Sanitary Survey 2015 Update
The California Code of Regulations, Title 22, Chapter 17 establishes the California Surface Water Treatment Rule (SWTR) which requires that all surface water
suppliers conduct a sanitary survey of their watershed(s) at least once every five years. The first of these studies was required to be completed prior to January
1, 1996 or prior to issuance of a Department of Public Health (DPH) permit for a new or expanded surface water treatment facility, whichever comes first. In
December 1995, the City and West Sacramento submitted a sanitary survey of the Sacramento River watershed to DPH; in December 2000, the City and West
Sacramento submitted the required first update of the sanitary survey to DPH, in April 2006 the City, West Sacramento, EBMUD, and SCWA submitted the
required second update of the sanitary survey to DPH, and in December 2010 the City, Roseville, West Sacramento, EBMUD, PCWA, SCWA, and WDCWA
submitted the third update of the sanitary survey to DPH. The next update to the sanitary survey is due to the State Water Resources Control Board Division of
Drinking Water (State Division of Drinking Water, previously known as DPH), by December 2015.
11/5/2014 12:00 PM
Santa Cruz
ONLINE
Elissa Callman @ 916-808-1424
MAND 10/23 @ 11:30AM at 1156 Hight St., Barn G, Santa
Cruz
Construction of Biomolecular Engineering Instructional Lab in the Baskiin Engineering Building on the UCSC campus
NEW Alterations to Room 301B JBEB BME Lab
$510000
Pending
$1100000
ONLINE
Documents will be posted after 10/21
2:00 PM
Ceres
2:00 PM
Fairfield
3:00 PM
San Jose
4:00 PM
Merced
11/6/2014 2:00 PM
Roseville
Mitchell Road Sewer Trunk Line and Lift Station
Furnishing and Installing 12" thru 30" Sanitary Sewer Pipe, 48" and 60" manholes, connecting to existing sanitary sewer, furnishing and installing lift station
pumps and piping and installing a city supplied control panel.
NEW Utility Infrastructure Upgrade (Energy) HVAC/EMS Efficiency Project MAND 10/16 @ 2PM at 4000 Suisun Valley Rd, Bldg 100,
Asbestos Abatement
Fairfield
The work under this contract will be in 2 phases. First phase (Buildings 800 & 1500) will be performed during Winter break of 2014 and second phase (Buildings
100, 500, 700, 1400, 1600 & 1700) will be performed during Summer of 2015 which includes, but not limited to, the removal of existing HVAC unit at Building
1600, Dry Wall, TSI/Duct Seam Tape, Lead, Gypsum Board Ceiling, and 2’x4’ false ceiling panels. Demolition, removal, and disposal of all asbestos containing
materials detailed in the Asbestos Abatement Specifications for Solano Community College, and as indicated on HMS front end documents, HMS and
Kleinfelder reports. All work to be performed is under a single prime contract.
$270000
NEW Traffic Loop Replacement Services
The City of San José hereinafter “City") is soliciting bids from qualified Contractors (hereinafter “Bidder") to provide Traffic Loop Replacement Services including
all labor, material, and equipment necessary to perform such services as specified in the bid document scope of work/services. The replacement will be of 37
existing loops at 25 locations with three locatioons being Caltrans off ramps maintained bu the City of San Jose
$12500
NEW Entrance Doors Retrofit at Trident Center
MAND 10/15 @ 10AM at 777 W. 22nd St., Merced
Provide & install replacement entrance doors
NEW Lobby and Staff Lounge Remodel
MAND 10/17 @ 10AM at 651 Commerce Dr., Roseville
Div_02-demolition; Div_03-concrete; Div_06-rough carpentry, wood veneer-faced cabinets; Div_07-built-up bituminous roofing, joint sealants; Div_08-hollow
metal doors & frames, wood doors, aluminum-framed entrances & storefronts, pass windows, door hardware, glazing; Div_09-gypsum board assemblies,
acoustical ceilings, resilient flooring, carpeting, painting & coating; Div_10-signage, fire protection specialties; Div_11-kitchen appliances; Div_12-window
shades; Div_15-automatic fire protection; Div_22-plumbing & utilities; Div_23-HVAC-Div_26-lighting, electrical
Knat Holben, Proj Mgr, @ 916-781-4208
Page 36 of 42
ONLINE
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
11/6/2014 2:00 PM
Regional Groundwater Storage and Recovery-WILL NOT BE ONLINE
10/7 @ 10am
2:00 PM
San
Francisco
San
Francisco
Engineers # of
Plan
Estimate Addenda #
$47000000 $50000000
The objective of the project is to drill, install, and construct 13 groundwater well facilities, including site preparation; clearing/grubbing and grading; various work
on existing groundwater wells; building foundations, temporary shoring and retaining walls; new pumps, motors and related appurtenances; ventilation system;
trenching and pipeline and conduit construction; cathodic protection system; chemical treatment equipment, tanks and pumping systems; electrical power
distribution systems, SCADA and I&C control systems; perimeter security fence; security monitoring and control systems; final grading and drainage; landscape
and irrigation systems; sanitary and storm drain piping and connections to municipal systems; paving and various other site improvements; construct
approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water transmission pipeline. The work is to be performed in San Mateo, California. The
Engineer's estimate is approximately between $47 to $50 million. The Contract will be awarded to the lowest responsible and responsive bidder.
NEW Job Order Contract 52, Electrical (C-10 License), San Francisco,
10/9 @ 10AM
178C
ONLINE
Peninsula and East Bay
A Job Order Contract is an indefinite quantity contract pursuant to which the San Francisco Public Utilities Commission may accomplish a series of projects with
a single, competitively bid contract awarded before the projects are identified. Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished
by issuing task orders to the successful contractor during the two year term of the contract.
Regina Du @ 415-554-4335
2:00 PM
Los Altos
2:00 PM
Oakland
2:00 PM
Placerville
ONLINE
CIPP Corrosion Rehabilitation Project
Line approximately 475 lf of existing 30" sewer main in Springer Road with cured-in-place pipe
Replacement of Embarcadero Bridge Over Lake Merritt ChannelMAND 10/6 @ 3:30PM & 10/9 @ 2:30PM at 250 Frank
Rebid
Ogawa Plaza, Oakland
The proposed work consists, in general, of the bridge replacement. Said work consists of, but is not limited to, bridge removal, structural excavation and backfill,
grading, structural concrete, furnishing and driving cast-in-drilled hole concrete piles, reinforcement steel and miscellaneous metal work, new restroom building,
environmental protection, traffic control and other work specifically shown on the plans or included in the specifications and these special
ONLINE
Nader Rabahat, Proj Mgr, @ 510-238-6605
HVAC Replacement and Air Balancing Project for Placerville DMV
Office-Rebid
MAND 10/16 @ 10AM at 2919 Cold Springs Rd, Placerville
ONLINE
10/9 @ 3PM at 135 Van Ness Ave, San Francisco
ONLINE
HVAC replacement & air balanxing & electrical work
Julie Phang @ 916-651-2556
11/7/2014 2:00 PM
2:00 PM
San
Francisco
Stockton
2015 Prequalification for SFUSD Projects Eligible for State Funding
The San Francisco Unified School Dist is prequalifying general contractors,, mechanical, electrical, plumbing, fire protection & underground pipeline
subcontractors to bid on state-funding eligible projects
NEW Demolition of Partially Built Single Family Residence
10/24 @ 10AM at 1444 N. Chrocicle Ave, Stockton
San Joaquin County is seeking qualified vendors for the demoltion of a fire-damaged, partially built single family residence. The structure is being ordered
demolished as a public nuisance.
Page 37 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
11/10/2014 2:00 PM
Light Rail Efficiency Project:Mountain View Phase 2
9/24 @ 10AM at 3331 N. First St., Bldg A, San Jose
Mountain
View
Engineers # of
Plan
Estimate Addenda #
The project will add a second light rail track over a distance of approximately 3,000 feet, including closure & removal of the existing Evelyn Light Rail Station,
installation of light rail support systems & modeification to the municipal drain system
University Park-North Garden Apartment Building #1,3,4,5&10
MAND 10/13 @ 10AM at 1600 Holloway Ave, Capital
Asbestos Aba
Planning & Construction, San Francisco
Work consists of all labor and materials necessary to remove and dispose of asbestos-containing thermal system insulation from piping systems within the crawl
spaces of Apartment Buildings #1, 3, 4, 5 & 10 at University Park North on campus. Work also includes the removal & disposal of all asbestos debris, all foreign
matter, all insulation remnants existing on the surfaces of the “rat slab,” concrete footings and wood framing members throughout the crawl spaces in
accordance with plans and specifications prepared by WSR Architects
E824B/0
Pending
2:00 PM
San
Francisco
11/11/2014 3:00 PM
Palo Alto
Pre-proposal Teleconference 10/7 @ 1:30PM
The City of Palo Alto is seeking proposals from qualified firms to provide services to launch integrated programs to reduce traffic and parking demand in the
Downtown core, and is also seeking to more effectively optimize and manage its existing parking supply. Important City goals include providing improved access
to information on parking and transportation within the Downtown, and helping motorists to find available parking quickly and efficiently.
ONLINE
11/12/2014 1:30 PM
$3000000 NEW Eden Reservoir Replacement and Round Hill Reservoir
10/20 @ 9:30AM
Castro
$4000000
Rehabilitation
Valley/Alam
o
Work includes: 1) At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million gallon bolted steel temporary tank, foundation, related piping, and
appurtenances; demolish existing 1.6-MG welded steel Eden Reservoir including the exterior wooden architectural screen; construct two, 0.45 million gallon
welded steel reservoirs with aluminum geodesic dome roofs, foundations, piping, valve structures, coatings, and appurtenances; disassemble and store 0.28
million gallon bolted steel temporary tank, restore temporary tank site, pave reservoir site, install irrigation and landscaping, install fencing and perform related
work as specified in the Contract Documents at Eden Reservoir, located near the intersection of Coolidge Court and Summerglen Place in Castro Valley
(Unincorporated Alameda County), California. 2) At Round Hill Reservoir: Construct radio communication towers and related cable and conduit; perform
earthwork; provide and install 0.16 million gallon bolted steel temporary tank, foundation, piping, and appurtenances; remove exterior wooden architectural
screen from existing Round Hill Reservoir; abrasive blast and recoat tank interior; low-pressure water clean, prime and top coat tank exterior; disassemble and
store 0.16 million gallon bolted steel temporary tank, pave reservoir site, install fencing; and perform related work as specified in the Contract Documents at
Round Hill Reservoir, located between 574 and 582 Oakshire Place in Alamo (Unincorporated Contra Costa County), California. 3) At Hink No. 2 Reservoir:
Disassemble 0.28-MG bolted steel temporary tank, deliver to Eden Reservoir, remove and replace fencing, restore site, and perform related work as specified in
the Contract Documents at Hink No. 2 Reservoir located at the end of Vista Bella Drive, Lafayette, California.
TG13.3 Ground Level Landscaping
10/15 @ 2PM at 175 Beale St., San Francisco
San
Francisco
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with ground level irrigation; ground level planting planters; area
trench drains; and installation of paving material, architectural concrete pavers, illuminated pavers and illuminated benches on complex projects which require
significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and
complete installation of their respective systems.
ONLINE
Compete bid documents will be posted once available
2:00 PM
RFP-Parking Wayfinding
Page 38 of 42
ONLINE
Bid Date Bid Time Location
11/12/2014 2:00 PM
3:00 PM
Alameda
County
Los Altos
11/13/2014 2:00 PM
Los Gatos
2:00 PM
San
Francisco
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
10/22 @ 9:30AM at 951 Turner Ct., Rm 230, Hayward
NEW On-Call Utility Potholing at Various Locations
Prospecting & psoitively locating (both horizontally & vertically) various underground utility lines by "non-destructuve vacuum excavation," providing tarffic
control; restoration of disturbed roadway pavement; cleaning site & miscellnaeous work; furnishing all labor, material, tools, equipment, mechanical
workmanship, transportation & services necessary to be done in order to perform a complete job.
Smithwick Theater Hardware Improvements-Foothill College
MAND 10/22 @ 10AM at 12345 El Monte Rd., Bldg D160,
Los Altos Hill
Div_08-wood doors, FRP doors, door hardware; Div_09-painting
NEW Janitorial Services for the Los Gatos DMV Field Office
Optional 10/22 $ 8AM at 600 N Santa Cruz Ave, Los Gatos
Contractor agrees to provide the Dept of Motor Vehicles all labor, tools, materials, equipment & travel necessary to perform janitorial services at the Los Gatos
DMV.
Kary Ride @ 916-651-2555
NEW Job Order Contract 53, Electrical (C-10 License), San Francisco,
10/9 @ 10AM
E839B/0
ONLINE
ONLINE
ONLINE
Peninsula and East Bay
A Job Order Contract is an indefinite quantity contract pursuant to which the San Francisco Public Utilities Commission may accomplish a series of projects with
a single, competitively bid contract awarded before the projects are identified. Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished
by issuing task orders to the successful contractor during the two year term of the contract.
Mindy Lee @ 415-554-3136
2:00 PM
4:00 PM
San
Francisco
San
Francisco
Highly Rncouraged 8/21 @ 2PM
TG08.3-Skylights
Webcor/Obayashi Joint Venture issues this Request for Proposals (RFP) for the Skylights Package for the Transbay Transit Center Project from firms (Trade
Subcontractors) with expertise in Design, fabrication and installation of skylights. The successful Proposer must demonstrate experience in its respective field as
outlined within this RFP.
RFQ-Architectural
and Engineering Team Design Criteria Consulting 10/16 @ 1PM at 30 Van Ness Ave, San Francisco
NEW
ONLINE
ONLINE
fo San Francisco Sheriff's Dept Rehabilitation Detetntion Center
The design team will provide programming, architectural, engineering & all related services to plan & develop the perfformance & technical criteria package
necessary to assist the City with the solicitation & procurement of design build entity for the design & construction of a new Rehabilitation Detention Facility to
replace existing county jails bumber 3 & 4 cirrently located on the 65th & 7th floor of the Hall of Justice
11/14/2014 2:00 PM
3:00 PM
NEW Richmond Parkway Interconnect Wire and Pullbox Replacement
MAND 10/24 @ 1PM at 440 Civic Center Plaza, Richmond $300000
Removal and installation of 275 (200 Base Bid + 75 Alternate) newtraffic rated boxes and construction of reinforced concrete pads around the boxes in
accordanceto City Standards, removal of asphalt concrete and concrete sidewalk as required, and thecomplete re-wire of the traffic signal interconnect system
along the Richmond Parkway (BaseBid) from San Pablo Avenue to I-580 and Castro Street (Alternate Bid). (See Plans Attached),and for all other work, items or
details not mentioned above that are required by the Drawings,Standard Specifications, or these Special
RFP-Prefabricated Modular Data Center
10/17 @ 9AM
Sacramento
The Request for Proposal (RFP) is not an order. The purpose of this Request for Proposal (RFP) is to purcahse a Prefrabricated Modular Data Center Container
as described in the attached detailed statement of work, equipment list, and technical requirements sections.
Richmond
Page 39 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
11/17/2014 2:00 PM
San
Francisco
Plan Name / Scope of Work
Prebid Information
NEW SFO-Design Build Services for Long Term Parking Garage No. 2
Engineers # of
Plan
Estimate Addenda #
ONLINE
10/10 @ 10AM
Project
The Long-Term Parking Garage No. 2 Project consists of the programming, design, and construction of one or more multi-level above-ground parking
structure(s) within the Airport's Lot DD in order to increase on-Airport long-term parking capacity by a net 3,000 parking spaces.
Tasso Mavroudis, Contracts Mgr, @ 650-821-7758
3:00 PM
Fremont
RFP-State Route 84 Widening from Pigeon Pass ro Interstate 680
Project Approval and Envirnmental Documents (PA&ED) Phase
ONLINE
10/14 @ 1PM at 1111 Broadway, Stew 800, Oakland
The Alameda County of Transportation Commission is seekinmg proposals to provide professional engineering services for the project approval & environmental
document phase of the State Route 84 Widening from Pigeon Pass to Interstate 680
4:00 PM
11/18/2014 2:00 PM
2:00 PM
2:00 PM
Joan Fisher @ 510-208-7466
10/29 @ 2PM at 915 I st., Rm 2000, Sacramento
Sacramento NEW Auburn Boulevard at Arcade Creek Bridge Replacement Project
This Auburn Boulevard Bridge is located in North Sacramento where Auburn Boulevard crosses Arcade Creek just east of Winding Way and west of Park Road
and the I-80 ramps. The existing structure was constructed in 1927 and widened in 1965. In its current condition, the structure has spalling at the girders and
bents and insufficient deck width to provide the City with standard lane widths and bike lanes. The existing structure is located within 150’ of the Winding Way
intersection which does not have ADA compliant ramps or crossing facilities. This project will require work within the County of Sacramento. Close coordination,
input, and approval, from County reviewers will be required during preliminary engineering and design of project improvements.This project will seek to replace
the existing structurally deficient and functionally obsolete bridge. The new bridge will be a structure that provides a minimum of five 12’ lanes, two 6’ bike
lanes, a raised median, and two 6’ sidewalks. The proposed project has the potential to impact the current configuration of the Auburn Boulevard/Winding Way
signalized intersection. During the preliminary engineering and development of the Project Report, the necessity and alternatives for modifications to the
intersection must be investigated.
San
Francisco
Various
Cities
San
Francisco
ONLINE
9/18 @ 2PM at 175 Beale St., San Francisco
TG13.2-Roofing/Waterproofing
ONLINE
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with PVC roofing, sheet waterproofing, and fluid applied
waterproofing on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment;
including the engineering, coordination, procurement and complete installation of their respective systems.
$1100000 BART Earthquake Safety Programs Seismic Retrofit and Repairs at
10/3 @ 10AM at at 300 Lakeside Drive, Oakland
S009/01
$1500000
Various Locations
Div_02-preservation & restoration, selective structure demolition; Div_03-concrete; Div_04-unit masonry restoration; Div-05-metal welding, metal fabrications;
Div_06-rough carpentry; Div_07-modified bituminous sheet waterproofing; Div_09-cutting & patching; Div_20-restoration of facility services, raceways for facility
services; Div_26-lighting, electrical; Div_32-pavement markings, plant irrigation, planting
TG16.1 Drywall/Framing
10/2 @ 2PM at 175 Beale St., San Francisco
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with drywall, metal framing, building insulation, penetration
firestopping, toilet accessories, miscellaneous metals for own work, bird deterrent, ballistic resistant panels, acoustic ceiling tiles & acoustic wall treatments on
complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering,
coordination, procurement and complete installation of their respective systems
Page 40 of 42
ONLINE
Bid Date Bid Time Location
11/18/2014 2:00 PM
Daly City
Plan Name / Scope of Work
Prebid Information
NEW Replace Glass Panels at Daly City Station Platform
10/23 @ 10AM at 300 Lakeside Dr., Oakland
Engineers # of
Plan
Estimate Addenda #
$80000 $100000
ONLINE
Contractor shall provide all labor, equipment, materials & services required for replacing non-tempered glass panels with tempered glass at the platform level at
the BART Daly City Station
Anita Maynar @ 510-464-6543
Complete documents will be posted once available
11/19/2014 2:00 PM
San
Francisco
ONLINE
9/25 @ 2PM
TG07.4-Concrete Masonry Units
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with furnishing and installing concrete masonry units,
miscellaneous metals to brace own work, associated membranes, and, other related accessories on complex projects which require significant coordination with
adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their
respective systems.
11/21/2014 5:00 PM
Various
Cities
RFP-Solar PV Energy California Department of Corrections and
Rehabilitation
ONLINE
MAND 9/4 @ 5PM
A qualified pool members are invited to review & respond to this Request for Proposal for the installation & operation of solar photovoltaic energy generation
systems under a third party ownership power purchase agreement business model
11/28/2014 2:00 PM
Novato
12/5/2014 12:00 PM
Napa
County
Novato Housing Maintenance & Repair Electrical System
8/15 @ 10AM at 227 South Oakwood Dr., Novato
Maintenance & repair electrical system
NEW Contractor Prequalification for Napa County South Campus
$1000000 $5000000
ONLINE
$11400000
ONLINE
Improvement Project
South campus improvements project prequalification's
12/18/2014 2:00 PM
2:00 PM
San
Francisco
San
Francisco
TG08.7 Glass Floor Construction Services Package
10/7/14 @ 2pm
Webcor/Obayashi Joint Venture seeks responses to a Request for Proposals (RFP) from Trade Subcontractors interested in submitting a proposal for the
TG08.7 Glass Floors Construction Services trade package on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California.
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with design, fabrication and installation of structural glass floors
including but not limited to structural supports and expansion joints on complex projects which require significant coordination with adjacent properties and traffic
relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems in the
following trade: TG08.7 GLASS FLOORS
TG08.10 Glass Curtain Walls
9/23 @ 2PM at 175 Beale St., San Francisco
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with glass curtain wall assemblies, aluminum color covers &
aluminum extrusions on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment;
including the engineering, coordination, procurement and complete installation of their respective systems
Page 41 of 42
Online
ONLINE
Bid Date Bid Time Location
12/31/2014 5:00 PM
Fremont
6/30/2015 6:00 PM
Rohnert
Park
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Fremont Unified School District Qualified Bidders for the Year 2014
Contractors must provide the name and address to which a Notice to Contractors or proposal should be mailed, a phone number at which the contractor may be
reached, their business fax number, the type of work in which the contractor is interested and currently licensed to do (earthwork, pipelines, electrical, painting,
general building, etc.) together with the class of contractor’s license(s) held and contractor license number(s), proof of general liability insurance and maximum
project bonding capacity. Contractors that were previously included on the list will need to resubmit to be included on the list for the current calendar year.
Various Public Works Projects-Sonoma State University
Sonoma State University is seeking qualified contractors and service providers to perform various projects and services beginning July 1, 2014 through June 30,
2015. The University shall establish a shortlist of qualified contractors for possible future minor capital projects ranging in value from $5,000.00 up to
$634,000.00.
Carolyn Faulconer of the Sonoma State University says that from July 1, 2014 through June 30, 2015 the university will be accepting contractors who wish to be
added to its list to perform various projects & services for the university. Right now there are no projects yet out to bid. The bid date, June 30, 2015, is the last
day the University will be accepting qualified contractors to its list.
REMOVE, REPLACE, REPAIR REMODEL, RENOVATE, CONSTRUCT AND/OR MAINTAIN:
Includes, but not limited to, demolition, miscellaneous site improvements, flooring, walls, doors,
windows, roofing, mechanical and plumbing systems; electrical and telecommunication systems, audio and video systems, radio and communications systems,
security and surveillance systems, fire alarm systems and signage; HVAC equipment; water heaters; automatic doors; ADA; pathways; wall coverings
Page 42 of 42