The Weekly Bulletin Serving the Construction Industry and Bay Area Community since 1932 www.beac.com 2014 BOARD OF DIRECTORS August 22, 2014 OFFICERS Bidding on Public Works Jobs in California Just Got More Expensive Nancy Brinkerhoff, President Ironwood Commercial Builders, Inc. Lydia Roze, Vice President Vista Universal, Inc. Eric Kavert, Treasurer Pacific Coast General Engineering, Inc. Forrest Towe, Past President Anvil Builders Effective July 1, 2014 All Contractors Who Intend to Bid or Perform Work on Public Works Projects Must Register Online With DIR By Carrie Bushman, Brown | Cook LLP Thom Miles TMA Construction Services. With Governor Jerry Brown’s approval of SB 854, a budget trailer bill signed into law on June 20, 2014, all contractors planning to bid on future public works jobs will be required to register with the Department of Industrial Relations (DIR) and pay an annual registration fee which will be deposited into the newly created State Public Works Enforcement Fund. Monies deposited into the Fund will be used to administer the new contractor registration requirements and to fund DIR’s public works compliance monitoring, enforcement, and administration. The new law also requires public works contractors to begin submitting their certified payroll records (CPR) electronically to the Labor Commissioner. The requirement to submit electronic CPRs will be phased in gradually, applying to all public works contracts by January 1, 2016. John Parker Janus Corporation Contractor Registration Ken Regevig K. Regevig Roofing Effective July 1, 2014, all contractors (including subcontractors) who intend to bid or perform work on public works projects must register online with the DIR in order to be qualified to bid on, be listed in a bid proposal, or engage in the performance of any public works contract. The registration application can be found at https://efiling.dir.ca.gov/PWCR/ ActionServlet?action=displayPWCRegistrationForm. John C. Roeber, Past President J. Roeber & Associates DIRECTORS Greg Adams, Shimmick Construction Co., Inc. Joe Maltifano London Construction EXECUTIVE DIRECTOR Scott P Leary DIRECTOR OF OPERATIONS Denice McDavid The Weekly Bulletin (USP3 3633) is published every Week by the BAY AREA BUILDERS EXCHANGE, 3055 Alvarado Street, San Leandro, CA 94577-5711. Subscription rate for non-members is $525 per year. POSTMASTER: Send address changes to BAY AREA Builders Exchange , 3055 Alvarado Street, San Leandro, CA 945775711.. Tel.: 510.483.8880. Fax 510.352.1509. The requirement to list only registered contractors on bids becomes effective on March 1, 2015. The requirement to only use registered contractors and subcontractors on public works projects applies to all projects awarded on or after April 1, 2015. Annual Registration Fee As part of the registration process, public works contractors must pay an Public Works Continued from front page … initial nonrefundable fee of $300 and an annual renewal fee on or before July 1 of each year thereafter. The registration fee may be adjusted in the future, but no more than annually. A contractor who fails to pay the renewal fee on or before the expiration of any prior period of registration shall be prohibited from bidding on or engaging in the performance of any public works contract until once again registered. Other Registration Requirements To qualify for registration, the contractor must also meet the following minimum qualifications: Must have workers’ compensation coverage for any employees Must only use subcontractors who are registered public works contractors; Must have a CLSB license, if applicable to the trade; Must have no delinquent unpaid wage or penalty assessments due to any employee or agency Must not be under debarment Must not be in prior violation of the registration requirement once it becomes effective. However, first time violators will be able to avoid 12 month disqualification by paying an additional penalty. Impact on Bid Process SB 854 provides that an inadvertent error in listing a subcontractor who is not registered in a bid proposal shall not be grounds for filing a bid protest or for considering the bid nonresponsive, provided that (1) the subcontractor is registered prior to the bid opening; (2) within 24 hours after bid opening, the subcontractor is registered and has paid the penalty registration fee; or (3) the subcontractor is replaced by another registered subcontractor. The new law also provides that a subcontractor’s failure to be registered shall be grounds for the contractor, with the consent of the awarding body, to substitute a registered subcontractor in place of the unregistered subcontractor. SB 854 also requires contractors and subcontractors on all public works projects to submit their certified payroll reports electronically to the Labor Commissioner, unless excused from doing so. The requirement applies immediately to projects that have already been under Compliance Monitoring Unit monitoring, it will apply to new projects awarded on or after April 1, 2015 or other projects as determined by the Labor Commissioner, and will apply to all projects, new or ongoing, on and after January 1, 2016. If you have any questions about SB 854, please contact Carrie Bushman at (916) 442-3100 or [email protected]. BAY AREA BUILDERS EXCHANGE - TELEPHONE (510) 483-8880. FAX (510) 352-1509 WEEKLY PLAN LIST - Saturday, August 23, 2014 To view plans online go to: www.beac.com Engineers # of Plan Estimate Addenda # Bid Date Bid Time Location Plan Name / Scope of Work 8/22/2014 10:00 AM Palo Alto Elementary Schools Window Coverings Phase 2 MAND 8/11 @ 8AM at 1525 Middlefield Rd., Palo Alto Installing a functioning curtain system on high windows & window blinds on low windows per specifications at muliple elementasry schools ONLINE Contra Costa County Traffic Signs ONLINE 12:00 PM Prebid Information NTENT: The County of Contra Costa is seeking qualified vendors interested in supplying Contra Costa Counties Public Works Departments various Traffic Signs. The County intends to accept bids submitted on line through Bidsync, and award purchase orders to several of the lowest responsive and responsible vendors for these items. SCOPE: The County Public Works Department is seeking vendors interested in supplying their annual need for street and highway signs. Please note the following: 1). All signs to be made of .080 gauge aluminum in accordance with M.U.T.C.D. standards including the CALIFORNIA SUPPLEMENT, sheeted with High Intensity Prismatic Sheeting, INCLUDING MOUNTING AND BRACE HOLES WHERE APPROPRIATE, UNLESS OTHERWISE SPECIFIED. BRACE HOLES TO BE 32" APART CENTER TO CENTER. ALL SIGNS TO HAVE RADIUS CORNERS AS PER M.U.T.C.D. GUIDELINES. 2). ALL BLANKS ARE TO HAVE APPROPRIATE COLOR AND SIZE RECESSED BORDER, IE: CONSTRUCTION BLANK ? ORANGE WITH BLACK BORDER, GUIDE BLANK ? GREEN WITH WHITE BORDER, REGULATORY BLANK ? WHITE WITH BLACK BORDER, UNLESS OTHERWISE SPECIFIED. 2:00 PM San Francisco 3). All School, pedestrian, and bike signs to be sheeted with VIP, FLORESCENT YELLOW ? GREEN sheeting 8/6 @ 10am ONLINE Hunters View, Phase II, Blocks 7 & 11 THIS IS A CAHILL / NIBBI JV JOB. Project is located in Hunters View (Middle Point Rd. & West Point Rd.), San Francisco & divided into 3 main Phases. Phase 2 includes the construction of 107 units in apartment buildings & rowhouses on Blocks 7 & 11. Demo & Infrastructure work for Phase 2 has already been awarded & underway. Also Structural & Misc. Metals, Fire Sprinkler & Solar Thermal Water Heating System have already been bid. 2:00 PM Soquel Demolition of Residence at 2821 Rosedale Avenue $26000 Demolition of all buildings and/or other structures designated, except for the detached garage & the subsequent removal of all materials & debris from the site Page 1 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 8/22/2014 3:00 PM Family Dollar-Modesto Modesto Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Tenant Improvment for existing Family Dollar store. Trades Include: Demolition, Concrete, Masonry, Misc. & Structural Steel, Rough Carpentry, Insulation, Roofing, Doors/ Frames/ Hardware, Aluminum Storefront, Drywall & Metal Studs, Flooring, Acoustic Ceiling, Painting, FRP, Toilet Accessories, Plumbing, HVAC, Electrical, etc. 5:00 PM San Joaquin County Hazardous Material Investigation Survey Abatement Design Documentation & Observation/Monotoring - CANCELLED ONLINE The responsible parties shall be a licensed Engineer, Certified Asbestos Consultant (CAC), and a CDPH Certified Lead Inspector / Assessor and be certified / licensed in the State of California (CA). All work shall be signed, stamped and approved by the licensed professional and Engineer. Services may include, but not be limited to, hazardous materials assessments, surveys, reports, abatement design plans/ specifications (including abatement cost estimates) and monitoring/ sampling associated with the identification/ abatement of toxic and/ or hazardous substances such as, but not limited to, asbestos, lead, mercury, Title 22 Heavy Metals, Pesticides, Hydrocarbons, Volatile Organic Compounds, PCB’s, molds, etc. These services will be performed during one of the following or combination thereof: Study Phase, Preliminary Phase, Working Drawing Phase (including Bidding) and Construction Phase. 5:00 PM San Jose RFQ-Pipe Canopy Contractors for 60-Inch Brick Interceptor Phase VIA Project ONLINE The City of San Jose is requiring that all pipe canopy contractors bidding the 60-Inch Interceptor Phase VI-A project must be prequalified before sbmitting a bids on the project. It is mandatory that all contractors who intend to submit a bid for the project fully complete the pre-qualification questionnaire, provide all materials requested & be approved by the City to be on the City's final pre-qualified contractors list. The project includes demolition of the existing 54-inch lined sewer main & installation of approximately 4,500 LF of 84-inch reinforced concrete pipe. 8/25/2014 1:00 PM San Jose RFQ-Electrical Services for Various Equipment at CSJ ESD (Rebid) ONLINE The City of San Jose is seeking a Contractor to provide all labor, materials & equipment required to provide electrical servcies for various equipment located at the Environmental Services Depat Muni Water 12:00 PM Lodi Online O Smart & Final #593 This project is the remodel of an existing Smart & Final including construction of a new front facade. Trades required include: re-slurry and stripe the parking lot, demolition, concrete, masonry, structural & misc. steel, misc. rough carpentry, finish carpentry, FRP, insulation, roof patching, sheet metal, caulking, doors, frames & hardware, plaster, steel studs and drywall, tile, painting, restroom accessories, fire sprinklers, plumbing, HVAC and electrical. 2:00 PM Live Oak Live Oak Middle School Restroom Modernization MODERNIZATION OF EXISTING STUDENT RESTROOMS. DO NOT INCLUDE STAFF RESTROOMS SHOWN ON A2.2!!!! PLEASE BID PREVAILING WAGE UNLESS DIRECTED OTHERWISE. TRADES NEEDED: Demo/Sawcutting, Concrete, CMU, Rough Carpentry, Flashing & Metals, Doors, Drywall, Tile, Paint, Restroom, Plumbing, HVAC, Electric, Fire Alarm. Page 2 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 8/25/2014 2:00 PM Harbour View Apartments Richmond Prebid Information Engineers # of Plan Estimate Addenda # ONLINE 62 units, one building, 48,697 SF, including interior finishes, plumbing, HVAC, structural & electrica work 2:00 PM Fremont ONLINE Telecommunications System Repair Services The California Dept of Education is soliciting bids from potential contractors to provide telecommunication system repair services to the california School for the Blind. The contract period is from Sept 15, 2014 through Sept 14, 2015 & includes a one year option to renew Miriam Lopez @ 933-2482 3:00 PM 4:00 PM Roseville Fremont/Ne wark RFQ-Sun City Crack Seal Project ONLINE The purpose of this Request for Quotation (RFQ) is to solicit bids to provide all labor and materials for the crack / gap sealing project in the Sun City Community of Roseville. Swings Space Connections Package Phase 2 8/11 @ 2PM ONLINE Installation of temporary relocatable classrooms buildings in Newark & Fremont. 8/26/2014 11:00 AM Modesto 11:00 AM Watsonville 2:00 PM Hayward/Ric hmond/Conc ord $2443671 8/7 @ 11AM at 1010 tenth St., Modesto This project will replace and upgrade deficient water mains in the southeast portion of Modesto bounded by the following streets: La Loma Avenue on the west; sections of Encina Avenue and Edgebrook Drive on the north; Camellia Way on the east; and Yosemite Boulevard on the south. Work also includes paving street sections and alleys with varying finished or unfinished pavement conditions $483000 Signal Upgrades & Pedestrian Improvements MAND 7/31 @ 10AM & 8/4 @ 10AM Removing and replacing curb ramps, curb, gutter & sidewalks, replacing existing pedestrian heads with countdown pedestrian heads, installing accessible pedestrian crossings, relocating or replacing pedestrian push buttons, removing and replacing signs, traffic striping, markers & markings $725000 Refurbish Train Operator Facilities at Hayward, Richmond & Concord 6/25 @ 10AM Strengthen & Replace La Loma Water Mains ONLINE ONLINE ONLINE $775000 Provide all labor, equipment, tools, materials, management, coordination, professional services and other services required to refurbish the train operator facilities at the following yards: Hayward Yard, Richmond Yard and Concord Yard 2:00 PM Redwood Valley 2:00 PM Tracy Redwood Valley Lions Park Ball Field Repairs MAND 8/12 @ 9am; Mandatory ONLINE Provide & install a new ball field backstop, fence repairs & new chain link mesh fabric at the Redwood Valley Lions Park ball field ONLINE Civic Center Water Tower Repainting Repaint a 1928 built 100,000 gallon, 140-foot high steel lattice truss water tower Binh Nguyen @ 209-731-6454 Page 3 of 42 Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 8/26/2014 2:00 PM SFO Architecture & Engineering Design Services for South Field Tenant Relocations 7/29 @ 10AM San Francisco Engineers # of Plan Estimate Addenda # $5000000 - ONLINE This Project will provide improvements to non-terminal facilities, including West Field and North Field cargo buildings, for warehouse, Ground Service Equipment (GSE), maintenance, office, and client service spaces necessary to relocate Airport Commission leasing tenants, such as Third Party Airline Service Providers. The Project will include the building preparation and relocation coordination of all affected tenants in the South Field area. These improvements can range from minor modifications of the existing spaces to more extensive work towards mechanical, electrical, plumbing, utilities, ITT/communications, special security systems and fire and life safety systems. The Project will also include hazardous material abatement and any site remediation Farah Young, Contracts Mgr, at 650-821-5568 2:00 PM San Bruno* 2:00 PM Rohnert Park 2:00 PM Bay Point Tank No. 3 (Glenview) Replacement Project MAND 07/30/14 @ 1:30 pm The work includes, but is not limited to: Replacement of an existing two million gallon concrete potable water storage tank with a pre-stressed concrete tank, removal of a steel tank, site cleanup, grading and construction of a containment berm around the tank; removal of pumps and piping in an existing onsite pump station; addition of emergency seismic valve, flexible tank connections, tank mixing system, tank lighting, intrusion switch for pump station and tank hatches; and wrought iron, wood, and chain link fencing. Ancillary work includes safety, site restoration, and erosion control at the site of work. $30000 Galbreath Wildlands Preserve Water Well 8/20 @ 10:15AM Construct potable water well for domestic use that will supply water to researchers & clases located at a remote university field stattion, including boring, reaming, casing, sand, gravel & sanitary seal; Install a premium efficiency submersible pump with the capability to raise water to surface; electrical connection sufficient to use generator to run submersible pump & fill a water tank; piping Field Office Remodeling Project at Casa De Serena Public Housing 8/20 @ 10AM at 1016 Clearland Dr., Bay Point 032C ONLINE ONLINE Development 2:00 PM Napa 2:00 PM Gilroy 2:00 PM Fairfield The Housing Authority of Contra Costa County is soliciting quotation for small puchases from qualified, licensed & insured entities to provide services to HACCC, including modifying and/or remodeling existing offices/rooms within a designated area of an existing buildings $240000 Napa River & Bay Trail-Segments 7 & 8 8/21 @ 9AM Construction of approximately 3,400 linear feet of quarry fines trail along associated facilities & appurtenances Including minor drainage, approximately 2,500 linear feet fencing & gates Gavilan Pond Life Overlook Outdoor Classroom 8/12 @ 10AM Div-05-metal fabrications; Div_10-signage; Div-31-site clearing, hot-mix asphalt paving, earthwork; Div_32-site concrete, landscape bounders, pavement markings, tactile warning surfaces RFQ-Geotechnical Engineering Services MAND 8/15 @ 10AM at 360 Campus Ln, 1st Fl, Fairfield The Solano Community Collge Dist is seeking Request for Qualifications from qualified professional services firms for geotechnical engineering services for the Solano Community College Page 4 of 42 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 8/26/2014 2:00 PM Refurbish Train Operator Facilities at Hayward, Richmond and Concord Yards 06/25 @ 10am Contra Costa County 2:00 PM Berkeley 2:00 PM Monterey 3:00 PM Palo Alto 3:00 PM Cupertino 3:00 PM Northern California Engineers # of Plan Estimate Addenda # $725000 $775000 Providing all labor, equipment, tools, materials, management, coordination, professional services and other services required to refurbish the train operation facilities at the following yards: Hayward, Richmond, Concord. $260000 Lewis Hall Fire Alarm Upgrade MAND 8/12 @ 11AM Approximately 65,000 gsf of occupied laboratory, classroom & lecture hall spaces requiring fire alarm system notification upgrade & associated fire alarm system modifications to support the system enhancements Online ONLINE ONLINE Dennis The Menace Walkway/Access Improvements Phase II and Skateboard Park Renovation and Expansion In general, the work consists of demolition of existing concrete and asphalt pathways at Dennis the Menace Park that are non-ADA compliant, removal of the existing Moon Bridge, removal of several sections of the existing skate park, construction of ADA accessible walkways and ramps, concrete walls and steps at Dennis the Menace Park, construction of concrete skate park elements, and conforming new work to existing site conditions. Sanitary Sewer Rehabilitation Project 24/25 MAND 8/14 @ 2PM at 1007 Elwell Ct., Palo Alto The City of Palo Alto Utilities Department is seeking bids from qualified firms to provide services for installation of sanitary sewer mains, laterals, manholes and appurtenances perform system tie-ins, performance of required testing, and excavation, recycling and surface restoration. The required services are described in the IFB Technical Specifications. Dive Pool-Tower Removal MAND 8/13 @ 10AM at 21250 Stevens Creek Blvd., Cupertino Div_03-concrete rehabilitation CCure Maintenance & Monitoring - Bay Area Employment MAND 8/14 @ 1:30PM ONLINE ONLINE ONLINE Development Department Northern California Offices Provide system software and hardware maintenance in order to maintain the existing software and equipment. 3:00 PM Palo Alto ONLINE RFQ-Sand, Rock & Asphalt for Utilities Construction The City of Palo Alto is requesting RFQ’s for the purchase and delivery of sand, backfill rock and asphalt material for Utilities construction, and various Community Service Departments, Park Divisions as needed per specifications provided in the RFQ 8/27/2014 1:00 PM Palo Alto Building 361, Community Living Center Clinic, Menlo Park Division, Veterans Affairs Palo Alto Health Care System $5000000 $10000000 Provide CONSTRUCTION Services for Building 361, Community Living Center Clinic (Geriatric-Psychiatric Clinic), Menlo Park Division, VA Palo Alto Health Care System, Menlo Park, CA. The work consists of the following: Contractor shall completely prepare site for building operations, including demolition and removal of existing items, and furnish labor and materials and perform work for a single-story building adjacent to Building 360H as required by drawings and specifications. Work includes general construction, alterations, roads, walks, grading, drainage, mechanical and electrical work, laboratory equipment, utility systems, and necessary removal of existing other items. Also includes asbestos abatement and testing/removal of contaminated soil. James Garror @ 415-503-6988 Page 5 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 8/27/2014 1:30 PM RFQ-Non-Leaded Brass Water Service Fittings Oakland Prebid Information Engineers # of Plan Estimate Addenda # ONLINE The scope of this project is to furnish miscellaneous non-leaded brass water service fittings as required for East Bay Municipal District use as described in the RFQ. EBMUD intends to award a three-year contract with two options to renew for one-year periods to the lowesr cost bidders whose reponse confomrs to the RFQ & meets the District's requirements. Furnish water services lateral & meter installation fittings, including corporation stops, curb stops, ball & plug stops, meter couplings & resetters Kelly Smith @ 510-287-0355 10:00 AM Ceres $350000 2014 Slurry Seal Project ONLINE Installing approximately 208,076 SY of asphalt slurry seal 11:00 AM Lodi 2:00 AM Pittsburg 2:00 PM Placerville Dewatering Polymer MAND 7/2 @ 10AM at 12751 N. Thornton Rd. Lodi Trial testing and purchase of dewatering polymer for the period of October 1, 2014 through September 30, 2015. $3000080 Water Treatment Plant Capital Improvements Project, Phase 1A 8/11 @ 10AM Div_02-demolition, asbestos cement pipe removal, site preparation, eartwork, drilled concrete piers, paving; Div_03-concrete; Div_05-anchor bolts, miscellaneous metal work, aluminum guardrails & handrails, metal grating; Div_09-coating systems; Div-11-electric motors, fabricated SS slide gates, telescoping valves, submersible sump pumps; Div_14-davit crane; Div_15-piping system, valves, Div_16-electrical; Div_17-instrumentation & control HVAC Replacement & Air Balancing Project for Placerville DMV Field 7/30 @ 10AM at 2919 Cold Springs Rd, Placerville ONLINE 014C/R0 ONLINE Office The contractor shall remove & dispose of existing single HVAC multizone unit, condensing unit, line set & related controls & replace with new unit & include all hardware required for installation & operation & all software necessary for operation of the unit Heide Turpen @ 916-657-9807 2:00 PM South Lake Tahoe ONLINE BeVMo TI Tenant Improvement (10,045 s.f.). Trades to include: sawcut concrete, concrete patching, rough carpentry, finish carpentry, frp, insulation, roofing-patch, doors/frames/hardware, impact doors, windows, window film, drywall/framing, resilient flooring, painting, ceramic tile, toilet accessories, plumbing and electrical. 2:00 PM Santa Cruz 2:00 PM San Jose 2:00 PM Sacramento $150000 Water Street Bridge Debris Removal Project The project consists of removing 1,750 cubic yard of concrete debris in the dry areas below the Water Street Bridge and erosion control of the project area. CCTV at Various Locations Phase 2 8/12 @ 10AM at 3331 N. First St, Bldg A, San Jose Furnishing, installing, programming & testing a fully functioning CCTV system within the VTA tansportation system Measure U Irrigation Improvements-Package A E809B/0 $411350 The work to be performed consists of upgrading the existing irrigation controllers at Curtis, Hite, Renfree, and Roosevelt Parks with new central irrigation controllers, install new booster pumps, tube steel fencing, concrete paving, decomposed granite paving, landscape repair, new points of connection for domestic and irrigation water. Jeff Nittka, Proj Mgr, @ 916-808-7633 Page 6 of 42 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 8/27/2014 2:00 PM Cummins/Onan Generator Parts & Service Sacramento 2:00 PM Oakland 2:00 PM Mill Valley Prebid Information Engineers # of Plan Estimate Addenda # ONLINE For furnishing to the Department of Utilities, Operation and Maintenance Division- Parts and Services used on various Cummins/Onan generators. The quantities stated in the pricing schedule are estimates for bidding purposes only, actual purchases will be made on an as needed basis. $33250000 Construction of Runway Safety Area Improvements, North Field, Strongly Recommended 8/13 @ 9:30AM at 1100 Airport Oakland International Airport Drive, Oakland The work of this 491 calendar day project consists, in general, of furnishing all labor, materials, appliances, tools, equipment, transportation, services and supervision required to complete the Runway Safety Area (RSA) Improvements at the North Field, including, but not limited to: stabilization of RSA soils through the addition of cement, re-grading the RSA and portions of the Obstacle Free Areas to meet Federal Aviation Administration (FAA) standards; installation of an Engineered Materials Arrestor System (EMAS), runway markings, and new taxiway; relocation of vehicle service roads; performing necessary excavation and grading; removal of existing drainage infrastructure; constructing drainage improvements; removal of existing electrical duct banks; and constructing new electrical duct banks, Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR) and Precision Approach Path Indicator (PAPI) upgrades and lighting improvements; and performing all associated work, all in accordance with the Contract Documents. $310000 Mill Valley-Sausalito Multi-Use Pathway Roundabout at Bayfront Park ONLINE 016C/E8 Work will include asphalt concrete resurfacing, asphalt concrete grinding, concrete sidewalk, concrete curbs, curb ramps, vegetation removal, raising utility covers, landscaping, irrigation, signage, lighting, and other park amenities on a multi-use pathway in southern Marin County. The work will also require construction of a temporary by-pass pathway, construction area signs, and fencing. Construction will take place during the daytime hours with traffic control of bicyclists and pedestrians. Complete documents will be posted as soon as we receive them 2:00 PM 2:00 PM French Camp Byron HVAC Repairs for Juvenile Detention Center & Honor Farm MAND 8/4 @ 9AM at 535 W. Matthews Rd., French Camp $55000 $60000 Final belt alignment & adjusting for maximum motor amps. Some units require replacement of fan flex connectors which requires measurement, fabication & installation and verify proper operation. Water Treatment Plant Modifications Delta Operations and 7/31 @ 10am ONLINE E805B/0 Maintenance Center Excavation of failed areas of asphaltic concrete pavement and underlying sections; Installation of new 10” underdrain pipe, with connection to existing drainage structure; Grading and compaction of material at bottom of excavation; Placement of geotextile; Placement of porous concrete layer; Encapsulating the porous concrete layer with geotextile cover; Construction of aggregate subbase course; Construction of crushed aggregate base course; Construction of new bituminous surface course; and Installation of new pavement markings, both painted and thermoplastic. 2:00 PM 2:00 PM Burlingame RFP-Automated Fleet Monitoring Services ONLINE Oakley The City of Burlingame intends to install an automated system to monitor 78 pasenger & equipment vehicles in the departments of Public Works, Parks & recreation & Building & Planning Departments in order to optimize fleet usage & productivity. Asset Management's Field Office Remodelin Project Casa De 8/21 @ 10AM at 990 Rosemary Lane, Oakley ONLINE Manana PHD The Housing Authority of Contra Costa County is soliciting quotation for small puchases from qualified, licensed & insured entities to provide services to HACCC, including modifying and/or remodeling existing offices/rooms within a designated area of an existing buildings Page 7 of 42 Engineers # of Plan Estimate Addenda # Bid Date Bid Time Location Plan Name / Scope of Work 8/27/2014 2:30 PM $850000 8/13 @ 2PM at 65 Civic Ave, Pittsburg Rehabilitation of existing asphalt concrete pavements, including patch paving, crack sealing, slurry seal, micr-surfacing, aspahlt rubber chip seal, replacement of minor quantities of curb, gutter, sidewalk, valley gutter & pavement delineation work Vincente Street & Ocean Avenue Pavement Renovation, Sewer 7/28 @ 2:30PM at 1680 Mission St., 3rd Fl, San Francisco $4000000 2:30 PM Pittsburg San Francisco Prebid Information 2014 Pavement Management Program R008/01 ONLINE Replacement & Water Main Installation Demolition, pavement renovation & curb ramp construction, sewer replacement & drainage work, water main installation, traffic signal work, traffic routing Ramon Kong, Proj Mgr, @ 415-554-8280 2:30 PM Livermore $1514000 Freisman Park City Project 2007-2066 013C/R0 The Work comprises the construction of a Park, Playground and Picnic Area in the City of Livermore for the Freisman Park. The project consists of grading, landscaping and irrigation, lighting, installation of picnic tables, trash receptacles, benches and bicycle racks, fences, construction of a parking lot. Installation of concrete curb and gutter, concrete sidewalk, asphalt walkway, installation of storm drain, concrete foundations, conduits, wires and pull boxes and the removal of existing vegetation. 2:30 PM San Francisco North Beach/Joe Dimaggio Playground Renovation 8/14 @ 9:30AM at 30 Van Ness Ave, 5th Fl, San Francisco $4000000 ONLINE Site improvements with demolition, hazmat abatement; grading; drainage; soil improvement; utility work; structural concrete work; new hard surface courts; new playground; chain link fencing; and planting & irrigation Cara Ruppert @ 415-581-2547 3:00 PM Petaluma Park Place Well Replacement 8/12 @ 3PM at 202 N. McDowell Blvd, Petaluma Demolition of existing concrete well pad, drilling of new well, development of well & installagtion of well pump & systems ONLINE 3:00 PM Sunnyvale Park Tennis & Basketball Court Resurfacing Project ONLINE Rehabilitation of outdoor tennis & basketball courts at Washington, Lakewood, Orchard Gardens & Encinal Park to asphalt overlay the existing courts, repair cracks, replace court fencing, nets & related hardware $263000 Jardin De Ninos Park Renovation MAND 8/8 @ 10:30AM ONLINE Stormwater pollution prevention plan; trenching & backfill; grading & earthwork; base for play area poured in place surfacing; concrete improvements; storm drain; sanitary sewer; site furnishings-tree grates;; solid color stain for concrete walls; metalwork; anti-graffity coating; painting; lighting, electrocal RFQ-Window Installation Pilot Project-100 McAllister MAND 7/24 @ 11AM ONLINE 3:30 PM 4:00 PM Redwood City San Francisco Removal of existing wood windows & replacement with aluminum windows that match the historic profile of the windows & maintain all means of egress functional during all stages of work Page 8 of 42 Bid Date Bid Time Location Plan Name / Scope of Work 8/27/2014 4:00 PM McAllister Street Streetscape Project 5:00 PM San Francisco Contra Costa County Prebid Information Engineers # of Plan Estimate Addenda # MAND 8/13 @ 1PM at 200 McAllister St., San Francisco Div_02-demolition; Div_03-concrete; Div_07-got fluid applied rubberized asphalt waterproofing; Div_08-vault access door: Div_10-signage; Div_12-site furnishings; Div_26-exterior lighting, electrical; Div_31-earthwork, excavation & fill, trenching & backfilling, shoring & underpinning; Div_32- cold milling asphalt paving, aggregate base courses, asphalt paving, bitumonous concrete pavement, pavement markings, cast-in-place detectable surface tiles, adjustment of frames & castings, planting; Div_33-water systems, sanitary sewerage utilities; Div_34-basic overhead materials & methods, tapered steel trolley poles & accessories, overhead contact system-special work, overhead contact system-testing & acceptance RFQ-On-Call & Pre-Qualified Shortlist for Environmental Consulting 8/12 @ 1PM at 255 Glacier Dr., Martinez ONLINE ONLINE Services (2015-2018) The Contra Costa County Public Works Department (Dept.) is requesting Statements of Qualifications (SOQs) from highly qualified and experienced environmental firms to provide on-call environmental consulting services and to establish a pre-qualified shortlist for future projects. Purpose: The purpose of this Request for Qualifications (RFQ) is to select firms to provide environmental compliance services within multiple environmental disciplines for a variety of projects for the Dept. during the 2015-2018 term. Interested Firms: For a copy of the RFQ and sample Contract, or to post and review questions, please go to www.cccounty.us/pwrfq and select the “ebidboard” link. Please see RFQ for further details. All dates are subject to change. 5:00 PM Sonoma County As-Needed Graphic & Artistic Design & Interpretation ONLINE County of Sonoma Regional parks Department is soliciting statements of qualifications for the purpose of developing as "As-Needed" agreement for work on various projects. Graphic and Artistic services may include but are not limited to the creation of graphic interpretive sign panels, park brochures and maps, and marketing materials such as posters, displays, and promotional pamphlets. Graphic and Artistic services may also include the development of original art work. 8/28/2014 10:00 AM Gilroy NEW Gilroy Hyundai Facade Improvements Landscaping, demolition (minor for roof, interiors & soffit), ACM metal panels, metal stud & framing & grid ceiling-minor, ceramic tile flooring & baths, plumbing, HVAC, electrical, lighting, asphalt striping, concrete, stucco, storefront glass, painting (exterior/interior), bathroom partitions & accessories ONLINE Email bids to Frank Dickinson @ [email protected] 11:00 AM Belvedere Beach Road Seawall & Sidewalk Repairs 8/21 @ 11AM Demolition of existing street improvements including sidewalk, curb, gutter & asphalt; excavation of backfill for the construction of thre new concrete footing & drainage improvements; backfill, compaction & replacement of the street improvements & all ancillary work John Mow @ 415-435-3838 Page 9 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 8/28/2014 11:30 AM Toyon Ave at Bella Vista Ave Retaining Wall Belvedere Prebid Information Engineers # of Plan Estimate Addenda # $30000 ONLINE Demolition of existing wall; excavation, pier drilling & placement of steel & concrete or shortcrete; installation of steel reinforcing for wall; surface & subsurface drainage & outlet components John Moe @ 415-435-3838 2:00 PM SF/East Bay/San Joaquin General Engineering (A-License), San Francisco/Peninsula/East Bay to West San Joaquin County & Stanislaus County ONLINE 8/5 @ 10AM Subcontractor opportunities may include, but not limited , to the following major types of work:building/moving/wrecking, carpentry/cabinets & millwork, cathodic protection, concrete. construction traffic control services, earthwork & paving, electrical, elevator, installation & repair, fire protection, general engineering, hazardous materials, hazardous waste & remediation service, HVAC, landscape, masonry, ornamental metals, painting/waterproofing, pipeline, plumbing, reinforcement steel, roofing, sheet metal, structural steel, tree services, trucking & hauling, welding, well drilling 2:00 PM San Francisco 2:00 PM Novato 2:00 PM San Francisco ONLINE RFQ-Project/Construction Management Services The University of California at San Francisco Medical Center seeks letters of interests & statements of qualifications from individuals or firms qualified to provide project mangement services, which the medical center will select up to three individuals to provide Healthcare Project management/Construction Management services as describe under the scope of services $1000000 Novato Housing Maintenance & Repair Electrical System 8/15 @ 10AM at 227 South Oakwood Dr., Novato ONLINE $5000000 Maintenace & repair electrical system 2:00 PM San Francisco TG16.3-Terrazzo ONLINE Webcor/Obayashi Joint Venture seeks trade subcontractors that have significant experience with terrazzo, including but not limited to, terrazo epoxy crack suppression system & epoxy terrazzo flooring on complex projects. Also included are engineering, coordination, procurement & complete installation of the respective systems in the following trade:TG16.3-Terrazo Mission Bay North N4P3 (No GC Openings) Voluntary 8/13 @ 10AM ONLINE Construction of 129 units in apartment building on Block N4P3. The following have already been awarded: Mechanical, Plumbing, Electrical, Fire Sprinklers design builds, Elevator, and Piles. MBE/WBE/SBE/LBEs encouraged to bid. Div_03-concrete; Div_04-concrete unit masonry: Div_05-structural steel, metal fabrications, glazed decorative metal railings; Div_06-rough carpentry, sheathing, wood trusses; Div_07-hot fluid-applied rubberized asphalt waterproofing, thermal insulation, weather barriers, formed metal wall paanels, sheet metal flashing & trim, roof accessories, penetration firestopping, fire-resistive joint systems, joint sealants, acoustical joint sealants; Div_08-hollow metal doors & frames, flush wood doors, integrated metal door opening systems, access doors & frames, overhead coiling grille, aluminum-framed entrances & storefronts, aluminum windows, door hardware, glazing, fixed louvers; Div_09-gypsum board shaft wall assemblies, non-structural metal framing, cement plastering, gypsum board, ceramic tiling, resilient base & accessories, resilient sheet flooring, resilient athletic flooring, exterior ainting, interior painting, high-performance coatings; Div_12-site furnishings & features; Div_32-operation & maintenance of planting, precast concrete unit paving, parking bumpers, concrete flatwork & sitework, planting irrigation, soil preparation, finish grading, planting, green roof planting; Div_33-utility area drains Page 10 of 42 Bid Date Bid Time Location Plan Name / Scope of Work 8/28/2014 2:00 PM Pole Line Road & Summit Road Pavement Improvement Project San Jose Prebid Information Engineers # of Plan Estimate Addenda # 009C Pavement repairs & microsurfacing; installing pavement striping, markings. etc. 2:00 PM Santa Cruz 2:00 PM Turlock 2:00 PM Vallejo $160000 $185000 Chestnut Street Emergency Slip-Out Repair The work to be completed consists of constructing 2 small cast-in-place cantilever concrete retaining walls approximately 30-35' in length, located on both the East and West sides of Chestnut St Extn, below Mission St. The work also includes constructing a drainage and underdrain system and other incidentals as shown in the plans and specifications. $45000 Rube Boesch Center HVAC Improvements MAND 8/21 @ 10AM at 275 North Orange St., Turlock The work consists, in general, of: Removal of existing improvements, install (1) 13 SEER 3-ton condensing unit and coil or approved equal, install (1) 45,000 BTU 80% up flow furnace with setback thermostat, shop to fab and install duct connector from the coil to the duct plenum, reconnect to the existing duct work, gas line, refrigerant lines, flue pipe, line and low voltage wiring, install condensate pump and drain line to the roof, connect the existing condensate pump to HVAC (South unit), modify the stand to match new condensing unit, supply crane to set new unit, supply HERS Rater duct test, and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place. This work shall be completed in accordance with the Standard Specifications, standard Drawings and these Special Provisions. 2014 UL, LL & Main Comprehensive Replacement Project $1696405 The Work consists of replacing 4,673 linear feet of existing SS mains with 8-inch SS Main by pipeburtsting method, replacing 1,340 linear feet of existing SS mains with 10-inch SS main by pipebursting method, replacing Upper laterals, Lower laterals, District Cleanouts, Rodding inlets with Sanitary Sewer Manholes, property restoration, and slurry seal complete and in place. Page 11 of 42 ONLINE ONLINE ONLINE Bid Date Bid Time Location 8/28/2014 2:00 PM Walnut Creek Plan Name / Scope of Work Prebid Information NEW Corepower Yoga – Walnut Creek Engineers # of Plan Estimate Addenda # Online 8/22/14 @ 11am Remodel of an existing 5,812 sq. ft. two-story space for new Corepower Yoga, located at: 1375 N. Main St., Walnut Creek, CA 94596. This is our project. Projected start date: 9/19/14. Project valuation: $600,000. Contact number for project questions during bidding process: 858-864-5903. Project Manager, Phil Roehrs, will conduct the Job Walk. If you are unable to locate him, while on-site, please contact Phil on his cell phone, which is: 858-333-1005. Please review plans prior to attending Job Walk. Bids can either be sent via E-mail, to: [email protected] , or faxed to: 858-500-7441. Required trades: 0127 Final Clean 0207 Sawcutting/Hard Demolition 0300 Concrete 0620 Rough Carpentry 0720 Insulation 0810 Doors & Frames 0840 Mirrors/Shower Doors/Glazing 0925 Framing/Drywall 0930 Ceramic Tile 0950 Acoustical Ceiling 0964 Flooring 0990 Painting 0996 Wallcovering 1261 Blinds/Shades 1540 Plumbing 1580 HVAC 1610 Electrical 1670 Low Voltage (Communications/Data) ELLIS CONTRACTING INC. 2:00 PM Sacramento Sacramento International Airport Reconstruct Earhart Drive at Taxiway W. $170000 - Online The project is to eliminate adverse grade transitions and pavement displacement due to heavy vehicular traffic crossing Taxiway W. Reconstruction will raise the grades for Earhart Drive between Taxiway W. and the apron, a new drainage inlet and drainage pipe will be constructed, and some utility manholes will be as required for the revised grades on Earhart. 2:00 PM 2:00 PM Santa Clara NEW Kipling -Valley Fair (Specs on Plans) Cast-im-place concrete, concrete repair, structural steel, miscellaneous metals, carpebtry, millwork/casework, insulation & waterproofing, fireproofing, fire strop insulation & sealing, caulking & sealant, hollow metal doors & frames, wood doors, finish hardware, glass & glazing, gypsum drywall systems, tile & marble, resilient flooring, resilient base, painting & finishing, fire extinguishers & cabinets, toilet room accessories, equipment RFQ-Engine & Generator Maintenance & Repair Martinez The Central Contra Costa Sanitary District is reqquesting quotations from qualified & experienced firms to provide engine & generator maintenance & repair for the District. Page 12 of 42 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 8/28/2014 2:00 PM Belmont Marsten Avenue Storm Drain Repair Project Belvedere Tiburon Storm Drain Cleaning Maintenance Project 2:00 PM Prebid Information Engineers # of Plan Estimate Addenda # 8/12 @ 10AM at 1 Twin Pines Ln, Ste 385, Belmont Providing traffic control, providing construction area signs, providing water pollution control, install HDPE, backfill gully with small size rip rap materials, install filter fabric for erosion protection, cleaning of the site at the end of the job $80000 $85000 ONLINE ONLINE Cleaning storm drain pipes & structures within the Town of Tiburon; collecting & disposing of waste generated from the cleaning; providing TV inspection & maintaining traffic Matt Swalberg @ 415-435-7354 2:00 PM Oakley Main Street Median Improvement Project MAND 8/19 @ 10AM at 3231 Main St, Oakley Mobilization, traffic control & construction area signs, clearing & grubbing, portland cement concrete, root prune & root barrier installation, curb ramp, thermoplastic striping, pavement markings & markers, pedestrian barricade, solar flashing blinker signs, solar rectangular rapid flashing beacon, solar radar feedback signs, advanced warning signs, street sign posts 1B poles, removal of markings ONLINE 2:00 PM Cupertino 2014 Pavement Maintenance Project-Phase 3 ONLINE Placing various roadway surfaces treatments including micro-surfacing, slurry seal, conventional chip seal & rubberized chip seal, replacing traffic striping & pavement markers, installing a colored bike lanes & other miscellaneous work Roger Lee @ 408-777-3354 2:00 PM Merced 2:00 PM Napa County 2:00 PM Ross ONLINE CMAQ-Bike Rack Project 8/12 @ 10AM at 678 W. 18th St., Merced Installation of bike racks, bike corral & removal of existing bike racks at various locations Install Aggregate Base MAND 8/21 @ 9:30AM $90000 ONLINE $120000 ONLINE Install aggregate base on existing roadway/levee & miscellaneous work at Napa-Sonoma Marshes Wildlife Area 2014 Roadway Improvements Pavement grinding & overlay; minor roadway repairs & edge widening; raising of utility covers & pavement marking on three streets Rich Isaacs @ 70-7-544-6274 Voluntary 8/7 @ 2PM at 250 FRank Ogawa Plaza, Oakland $125295 The proposed work consists, in general, of rectangular rapid flashing beacon installation for crosswalk on Fruitvale Ave at E16th St and on 98th Ave at Cherry St, sidewalk extension at the southeast corner of Ney Ave and Richie St, curb ramp installation at the Ney Ave/Richie St intersection, and other work specifically shown in the project documents. 2:00 PM Oakland Safe Routes to School (SR2S), Cycle 10 2:00 PM Oroville Installation of Non-Contact Reversing System on Roll-Up Doors at Dept of Water Serevices ONLINE Si Lau, Proj Mgr, @ 510-238-6105 MAND 8/20 @ 10AM at 460 Glen Dr., Oroville The contractor shall furnish all labor, materials, equipment, tools, permits & licenses necessary to install commercial grade non-contact reversing system on rollup doors at various locations of the Dept iof Water resources Page 13 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 8/28/2014 2:00 PM Rio Vista Municipal Airport Enhancements-Rebid 2:00 PM 2:30 PM Rio Vista Citrus Heights Ceres/Mode sto Prebid Information Engineers # of Plan Estimate Addenda # 8/22 @ 10AM at 3000 Bauman Rd., Rio Vista Mobilization/demobilization; airfield construction area control; temporary air & water pollution, soil erosion & siltation control; runway & taxiway painting, emulsified asphalt slurry seal surface treatment, airport guidane lighting systems (signage), electrical work 2014 Residential Street Resurfacing Project-Rebid MAND 8/19 @ 9:30AM Placing asphalt concrete overlayon various streets including placement of leveling course; minor pavement reconstruction; pavement grinding; reconstructing accessible curb ramps; adjusting manholes & valve boxes to grade; replacing striping, legends & markling Carpet Projects for Ceres Library & Community Services Agency A-2 MAND 8/19 @ 9AM at 2250 Magnolia St,, Ceres ONLINE ONLINE ONLINE & B-2 Installation of carpet at the Ceres Library & Community Services Agency 2:30 PM Morgan Hill ONLINE Community & Cultural Center Splash Pad Equipment Relocation reocate the splash pad underground equipment vault to an above ground enclosure; abandon & remove existing surge tank; refit existing equipment vault to new surge tank; and construct an above ground concrete masonry unit for the Splash Pad equipment 3:00 PM San Jose $210000 7329-Chris Hotts Park Improvements Project ONLINE Div_02-demolition; Div_03-concrete; Div-05-metal fabrications; Div_10-signage; Div_12-site furnishings; Div_31-site clearing, grading, soil treatment; Div_32base courses, rigid paving, chain link fences & gates, decorative metal fences & gates, cast-in-place concrete, planting irrigation Stacey Palomar, Proj Mgr, @ 408-535-8300 3:00 PM Placerville 3:00 PM Pollock Pines 3:30 PM Napa 4:00 PM East Palo Alto 4:00 PM Lodi 4:00 PM Modesto RFQ-Blakeley Reservoir Outlet Conduit Remediation Project $600000 $650000 El Dorado Iriigation District is seeking construction contractors to bid on the Blakeley Reservoir Conduit Remediation project Flume 42/43 Replacement MAND 8/6 @ 9AM at 7225 highway 50, Pollock Pines Div_02-demolition, earthwork, rock riprap, geotextile, aggregate base roadway, subdrain system, drainage composites, mechanically stabilized earthen rertaining walls, landscape & restoration; Div_03-concrete; Div_05-structural stel, anchor bolts & expansion anchors, miscellaneous metal; Div_06-rough carpentry; Div_09-painting Napa County Hall of Justice Generator Fuel Line Project MAND 8/12 @ 10AM at 1125 Third St., Napa Disposal of existing fuel piping & installing new piping with secondary contaimment & electronic monitoring system ONLINE ONLINE ONLINE ONLINE RFQ-Affordable Housing Development The Successor Housing Agency of the City of East Palo Alto (Agency) is seeking developer letters of interest and affordable housing development concepts for a 2.52 acre site located at 965 Weeks Street, East Palo Alto, CA. $200000 Loel Center & Gardens Parking Expansion MAND 8/13 @ 4PM Prevailing rate of wages (federal determination) project consisting of the expansion of the parking at the Loel Center and Gardens in Lodi. Federal wage rates are posted amongst the bid docs. Local and Disadvantaged businesses are encouraged to bid. The following are possible sub contractor trades to bid: Excavating, Filling, Compacting, and Grading, Concrete Paving, Precast Concrete Unit Paving Sand Set, Planting Irrigation, Planting, Piped Utility Materials $1500000 RFP Center for Human Services Main Office Construction MAND 8/20 @ 8AM Non prevailing rate of wages project for the construction of the main office for Center for Human Services Page 14 of 42 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 8/28/2014 4:00 PM RFP-Meadowview Road/24th Street Streetscape Imrovements Sacramento 4:00 PM San Jose 5:00 PM Saratoga Prebid Information Engineers # of Plan Estimate Addenda # Highly Recommended 8/8 @ 1PM at 915 I St., Sacramento This Request for Proposals (RFP) solicits consultants to provide professional services to complete all necessary preliminary engineering plans and studies, environmental studies and plans, specifications, and estimates, for new streetscape construction along Meadowview Road between the LRT Station and I-5 and 24th Street from Meadowview Road north to Florin Road. Funding for this project is available through federal and local funds and Federal procurement rules apply. This project was awarded federal funds by the SACOG Community Design Program. Eucalyptus Tree Removal at Hellyer County Park 8/20 @ 10AM Eucalyptus tree removal at Hellyer County Park ONLINE ONLINE Ubaldo Perez, Proj Mgr, @ 408-355-2231 RFP-Provide Professional Design Services for Hakone Gardens Master Plan ONLINE MAND 8/7 @ 2PM The City of Saratoga is requesting proposals from qualified consulting professionals experienced in developing master plans & environmental review documents required by CEQA for historically significant sites. 8/29/2014 1:00 PM San Jose ONLINE RFQ-Street Light Poles10B & Union Metal 13 Foot Ornamental One Piece Lighting The City of San Jose is seeking quotes for street light poles 10B to include pole, mast arm, scroll, anchor bolts & all hardware associated with the pole & union metal 13 foot ornamental one piece lighting standard with access door in support of the Dept of Transportation requirements 10:00 AM Oakland ONLINE RFP-Pre Finished Cabinetry at Various Scattered Sites The Oakland Housing Authority invites qualified & interested vendors/manufacurers that can provide pre-finished cabinetry to submit responses to tyhe RFP Courtney Creswell @ 510-587-2165 12:00 PM South San Francisco ONLINE On-Call Architectural, Engineering & Other Professional Services The City of South San Francisco's Public Works/Engineering Division is soliciting Statement of Qualifications (SOQs) from qualified consultants to provide architectural, engineering, planning, environmental, and various professional services for the term, October 1, 2014 through September 20, 2015, to facilitate the implementation of the City's Capital Improvement Program. 2:00 PM San Jose RFQ-Chemicals for Water Treatment Services in the HVAC System $17000 ONLINE The City of San Jose is seeking a vendor to purchase & deliver for water treatment services in the HVAC system at the San Jose International Airport on an asneeded basis per the scope of services. The HVAC system consists of both chilled water & hot water closed loops, as well as condenser loops, including two cooling towers, each consisting of two-cells Priscilla Lourangrath @ 408-535-7058 2:00 PM San Francisco Transbay Block 7 Voluntary 8/14 @ 10AM at 425 California St., 22nd Fl, San Francisco Cahill is requesting bids for:Design-Build Mechanical, Electrical, Plumbing, Fire Sprinkler & Solar Hot Water System. Design Build Exterior Building Maintenance Systems. Page 15 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 8/29/2014 3:00 PM Construction Sequencing & Scheduling for the Van Ness Corridor Transit Improvement Project San Francisco Prebid Information Engineers # of Plan Estimate Addenda # ONLINE SFMTA has developed a 30% design and draft construction sequence for the Van Ness Corridor Transit Improvement Project. The Van Ness Corridor Transit Improvement Project consists of the Van Ness Avenue Bus Rapid Transit Project and its respective parallel projects which will completely rebuild Van Ness Ave between Mission Street and South Van Ness Avenue and Lombard Street and Van Ness Avenue. As part of our effort to prepare a complete and comprehensive Construction Sequencing Plan and develop a Construction Schedule, we are issuing this Request for Information (RFI) in order to solicit comments from the industry. In particular, we are seeking ideas on how the SFMTA can shorten the construction schedule and/or minimize the construction impacts to the community. Complete documents will be posted once available 3:00 PM Santa Cruz Cowell College-Fireside Lounge Renovation $105000 MAND 8/11 @ 2PM This is a Barrier Removal Project in an interior room, the Fireside Lounge, at Cowell College. The room is approximately 1000 square feet. Demolish raised wood floor platform and wood stairs. Rebuild wood stairs and add new handrails. Add new wainscot to match existing redwood paneling throughout. Remove paint, sandblast and seal existing concrete bench, concrete fireplace mantle and hearth. Relocate some electrical convenience outlets. Install University provided carpet throughout including stairs. Replace room entry door with new door, frame and hardware. Minor painting as required. No additional electrical work is anticipated. There are no modifications to existing lighting, HVAC, fire sprinkler or fire alarm systems. The area of work is limited to the room interior and entry door from an interior building corridor. There is no exterior work. ONLINE 4:00 PM San Joaquin County RFQ-Design Engineering Services for the Walnut Grove Bridge (29C131) Replacement Project ONLINE 5:00 PM Rancho Cordova 5:00 PM Sacramento 5:00 PM Stockton The selected consulting team shall provide engineering services for the Walnut Grove Road Bridge Replacement project, constructing a new moveable bridge structure that will accommodate RFP - California Technology Agency - Gold Camp MAND 07/08/14 @ 10:00 am at site All Qualified Pool members are invited to review and respond to this Request for Proposal (RFP) for the installation and operation of solar photovoltaic (PV) energy generation systems under a third party ownership power purchase agreement business model. In submitting your response you must comply with all instructions as provided in this RFP. Florin Creek Vegetation & Tree Removal 8/20 @ 10AM at 7460 Persimmon Ave, Sacramento This is a performance-based service contract for the South Sacramento County Streams, Florin Creek Vegetation Removal Project. The major work elements described herein includes; felling, bucking, limbing, pruning and cutting vegetation growing within the creek corridor. It involves felling trees, pruning branches and limbs protruding through fences and removing the debris, repairing fences, paving and soil grades, and seeding grasses. The overall responsibility of the Contractor is to design, plan, coordinate, organize, manage, and perform the activities described herein. ONLINE ONLINE Healon Knight @ 916-557-7228 RFQ-San Joaquin County Fair Commercial Development Project 7/15 @ 10AM Long-term ground lease to develop a high quality community and/or neighborhood commercial & retail project on a protion of the existing San Joaquin Fair site in Stockton. Page 16 of 42 ONLINE Bid Date Bid Time Location 8/29/2014 5:00 PM Milpitas Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # ONLINE NEW RFO-On-Call Licensed Structural Engineer Services & Sound Wall Design The City of Milpitas is seeking the professional services of qualified licensed Structural Engineers for on-call inspection and analysis, design services, preparation of construction plans and specifications, construction support services, and other services related to the completion of the City of Milpitas Capital Improvement Program. Services could include, depending upon available funding, the related inspection and analysis of City owned structures or construction projects; minor on-call design services for miscellaneous building improvement and repair projects; and the design and preparation of construction drawings and specifications for the removal and replacement of precast concrete sound walls. Steve Erickson @ 408-586-3301 9/1/2014 5:00 PM Sacramento 5:00 PM Sacramento 12:00 PM Martinez 2:00 PM Hollister 5:00 PM Tulare MAND 08/19/14 @ 10:00 am at site All Qualified Pool members are invited to review and respond to this Request for Proposal (RFP) for the installation and operation of solar photovoltaic (PV) energy generation systems under a third party ownership power purchase agreement business model. In submitting your response you must comply with all instructions as provided in this RFP. RFP - California Energy Commission - Headquarters MAND 07/09/14 @ 10:00 am at site All Qualified Pool members are invited to review and respond to this Request for Proposal (RFP) for the installation and operation of solar photovoltaic (PV) energy generation systems under a third party ownership power purchase agreement business model. In submitting your response you must comply with all instructions as provided in this RFP. ONLINE Tree Trimming ONLINE RFP - Franchise Tax Board - Butterfield Complex MAND 8/21 @ 2PM at 2647 Waterbird Way, Martinex The County of Contra Costa is seeking qualified vendors interested in providing sublet tree trimming services. Vendors will be asked to for pricing on several types of tree maintenance with several degrees of hardness. All bids submitted will be reviewed. Points will be awarded based on costs. Several vendors will be offered a chance to return to make a presentation on their companies and their potential. Points will again be awarded based on this presentation. The judging panel will decide the final award based on these points, comments from references, training programs, technological knowledge and other assembled criteria. NEW Fairfield Inn Hollister New construction of an 82 room 4 story Fairfield Inn & Suites, located in Hollister CA All trades needed and welcomed All inqiries must be submitted to Chadmorgan @primegroupconstruction.com - 406-250-7910 or [email protected] - 760-605-8866 DO NOT CONTACT ONWER, ARCHITECT, OR ENGINEER $3595750 RFP-Design & Build Solar Photovoltaic (PV) Systems at Various 8/12 @ 9AM ONLINE ONLINE ONLINE Schools Owner is seeking turn-key proposals from qualified solar contractors to design, engineer, procure, install, interconnect & commission solar photovoltaic systems at various schools. The project may be split into two or more stages or phases if the District determines, after reviewing responses to this RFP, that staging is advisable. 9/2/2014 11:00 AM San Leandro Public Safety Building HVAC Equipment Replacement 8/15 @ 10AM, 8/19 @ 2PM & 8/20 @ 11AM $100000 $500000 The work to be done consists of replacing HVAC equipment and associated ductwork within the second floor mechanical room of the City’s Public Safety Building, and doing all appurtenant work in place and ready for use. Page 17 of 42 ONLINE Bid Date Bid Time Location 9/2/2014 11:00 AM 2:00 PM Oakland San Francisco 2:00 PM Oakland 2:00 PM Antioch Plan Name / Scope of Work Prebid Information RFP-Installation of Metering System for Monitoring Based Commissioning Program Under Prop 39 & CCC/IOU Engineers # of Plan Estimate Addenda # ONLINE MAND 8/20 @ 9AM at 333 East 8th St., Oakland The Peralta Community College District requires a wewb-based monitoring system for the ternding & viewing of energy use for in several of its campuses $550000 Civic Center Bicycle Facility 8/13 @ 9AM at 300 Lakeside Dr., Oakland ONLINE $650000 Div_02-selective structure demolition; Div_03-non-shrink grout; Div_05-metal welding, structural steel framing, cold-formed metal framing, metal fabrications, perforated metal panels; Div_06-rough carpentry; Div-07-aluminum plate panel system; Div_08-metal doors & frames, door hardware, glazing; Div_09-tile replacement & restoration, tiling, painting, grafitti-resistant coating; Div-10-stainless steel standoff system; Div_12-bicycle racks; Div_20-facility services; Div_26lighting & electrical work; Div_27-communications General Offices Fire Sprinkler Compliance Project 2011 Recommended 8/12 @ 10AM at 1600 Franklin St., Oakland Correct fire sprinkler deficiencies in an existing fire sprinkler system Duplex Conversion at Bridgemont Public Housing Development-Unit 8/26 @ 10AM ONLINE ONLINE 161 & 162 The Housing Authority of Contra Costa County is soliciting Quotation from Small Purchases from qualified, licensed & insured entities to provide services to HACCC, including providing all labor & materials for the conversion of an existing office building into a duplex residential unit, one 3-bedroom unit & 1-bedroom unit, single-story building Ted Ancheta @ 925-957-8035 2:00 PM Oakland RFP-111 Jackson Street Information Technology Upgrade ONLINE Installation of Eight (8( new 10' x 12' IT rooms & improving of existing MPOE in an existing nine-story building, including electrical, mechanical, cabling, concrete coring, sheetrock, door, lockable cage, flooring, painting, cable trays, data racks NOTE:THIS IS A SUBCONTRACTING OPPORTUNITY ONLY. FOR MORE INFORMATION, CONTACT THE GENERAL CONTRACTOR: DEETS, INC., CARE OF DAVE DEETS - 510.889.9454 / [email protected]. Brian Lackzo, Proj Mgr, @ 510-208-9617 3:00 PM Palo Alto Facilities Repair & Retrofit Project No. 3 3:00 PM San Leandro San Leandro Ball Park Locker/Restroom Refurbishment MAND 8/19 @ 1PM at 2501 Embarcadero Way, Palo Alto The City of Palo Alto is seeking bids from qualified firms to repair and retrofit facilities at the Palo Alto Regional Water Quality Control Plant. Work for this project includes all labor, materials and equipment necessary for the construction of the project including structural, concrete, and repairs on tanks, basins, pipe, platforms, and structural members in accordance with the project documents, plans, and specifications. ONLINE Tom Kapushinski, Proj Mgr, @ 650-617-3130 $250000 Encouraged 8/18 @ 1:30PM at 835 East 14th St., San $500000 Leandro The work to be done consists of accessibility and aesthetic upgrade to the public restroom and locker facilities at the San Leandro Ball Park, and doing all appurtenant work in place and ready for use. Page 18 of 42 ONLINE Bid Date Bid Time Location 9/2/2014 5:00 PM San Francisco Plan Name / Scope of Work Prebid Information Mission Bay SOMA Hotel, Block One, San Francisco 8/18 @ 10AM at 290 Channel St., San Francisco Engineers # of Plan Estimate Addenda # ONLINE This Request for Qualifications (“RFQ”) is issued for the professional design, engineering, and consulting services for the new Mission Bay SOMA HOTEL. SOMA Hotel LLC intends to build the new Mission Bay SOMA Hotel on a vacant development site fronting the corner of 3rd and Channel Streets in San Francisco, California. The total site is approximately 23,000 square feet. The Mission Bay SOMA Hotel will be comprised of 250 guestrooms in a tower of up to 16 levels which will include a 3-level podium designed to accommodate parking, public and back-of-house spaces. The meeting space will total approximately 8,000 square feet and includes multiple general purpose meeting and collaborative work spaces as well as a pre-function/living room. A restaurant and bar will seat up to 120. The total gross area of the Mission Bay SOMA Hotel will be 215,000 GSF. Structured parking for 24 cars will occupy approximately 10,000 sf. The project will include a podium rooftop garden and outdoor use area of approximately 12,000 square feet and a tower rooftop amenity area and outdoor deck of approximately 3,000 square feet. The Mission Bay SOMA Hotel has previously received its hotel use entitlements and planning approvals with the City of San Francisco through a Major Phase Application under the Mission Bay South Redevelopment Plan. SBE/MBE/WBE/LBEs are encouraged to apply. 9/3/2014 1:30 PM 1:30 PM Amador County/Cala veras County Richmond Camanche South Shore to North Shore Pipeline 8/21 @ 10AM Work includes furnish and install approximately 8,200 LF of 10-inch HDPE pipe including all appurtenances and fittings; furnish and install approximately 230 concrete ballasts; and perform related required work, located in Amador County and Calaveras County as shown on Drawing 105.00-Z-002.1. $500000 Richmond Advanced Recycled Expansion (RARE) Chloramination 8/19 @ 9:30AM at 525 Castro St., Richmond 085C/E8 ONLINE $600000 System 10:00 AM $650000 $800000 Work includes: Selective demolition of the chemical process pumps and piping; procurement and installation of a new 3,000-gallon chemical storage tank; foundation and piping installations; replacement of piping, valves, and flow meters; electrical and instrumentation installations, and startup and testing services. $60000 Pleasant Hill NEW Elinora Drive Storm Drain Repair Project 8/26 @ 10AM at 100 Gregory Ln, Pleasant Hill ONLINE $65000 Remove and replace approximately 80 linear feet of existing 42" storm drain pipe, install manhole, utility protection, remove and replace fence, remove tree, maintain existing storm drain system, demolition, excavation, compaction, and landscape restoration $42899 Oakland Coliseum Janitorial Services Optional 8/14 @ 9AM at 501 85th Ave, Oakland Janitorial services to be provided two (2) times per day at the Oakland Coliseum DMV Field Office. Term:1/1/15 through 12/31/16 2:00 PM Oakland 2:00 PM NEW Riverview International Addition & Remodel Project West Sacramento Project consists of an addition and remodel of the Parts, Sales and Office Area for a Truck, Sales, and Service facility. There will be approximately 3,180 SF of remodeled space along with a new 2,056 SF addition. The existing exterior canopy will be removed and replaced with a 2,056 SF wood framed addition which will contain 8 offices, a conference room, customer lounge, and storage room. The existing Parts Sales Area will be enlarged and the existing Administrative Area will be remodeled including the main Restrooms. Crafts to be subcontracted include: demolition, parking lot striping, concrete, reinforcing steel, structural steel, rough carpentry, finish carpentry,building insulation, roofing, sheet metal flashing, joint sealer, doors/frames/hardware, storefront/glazing, plaster,gypboard/metal studs, acoustical ceilings, resilient flooring/carpet, painting, toilet partitions/accessories, fire sprinklers, plumbing, hvac, electrical. Under no circumstances should the owner or architect be contacted regarding this project. Please direct all questions and RFI's to SD Deacon Page 19 of 42 ONLINE ONLINE Bid Date Bid Time Location 9/3/2014 2:00 PM Stockton 2:00 PM San Francisco 2:00 PM San Francisco Plan Name / Scope of Work Prebid Information Janitorial Services for Human Service's Agency & Rail Road Square Building Engineers # of Plan Estimate Addenda # MAND 8/13 @ 9AM at 102 S. San Joaquin St, 5th Fl, Stockton ONLINE 8/20 @ 10AM at 180 Hubbel St., San Francisco ONLINE Jantorial services Pier 70-Bldg 113/114 Only-Safety, Security & Restoration (No GC Openings) Demolition, earthwork, rebar, piles, structural steel, miscellaneous steel, rough carpentry, waterproofing, elevators, fire sprinklers, plumbing & electrical ONLINE Panera Bakery Cafe Tenant improvenment for a new Panera Bread Bakery, including carpentry, finish carpentry, insulation, storefronts, metal stud drywall, ceramic tile, acoustical ceiling, painting, restroom accessories, plumbing, HVAC, lighting, electrical, fire alarm No estimating is done from Tilton Pacific’s San Jose office. All bids must be sent to the Rocklin office only. You may fax to (916) 630-4982 or email to [email protected] RFI’s should be directed to the estimator Nam at [email protected] This project currently has no union only requirements! 2:00 PM Sacramento Fence Corrections at Three City Facilities 8/25 @ 9AM at 5303 Franklin Blvd., Sacramento At three locations (300 Richards Blvd., 3550 Marysville Blvd., & 5303 Franklin Blvd.), $105000 ONLINE the work performed under these Special Provisions consists of: a.Install fence extensions on top of existing metal fence & block wall at Rooney & Kinney, b.Remove (e) chain link & install 7’ high fence along Sequoia Pacific, c.Fill fence gaps between building at Rooney, d.Install 3 strand barbed wire on top of (e) chain link fence at Richards and, e.Clear and grub on each side of fence as needed to complete the work. 2:00 PM $124463 Sacramento NEW Pollock Ranch Park Renovations The work to be performed consists of renovations to Pollock Ranch Park in South Sacramento at 3800 Robinridge Way. The improvements will consist of 0.75 acres, demolition, clearing and grubbing, drainage and grading, concrete flatwork, basketball goals, benches and landscape plantings. 2:00 PM Oroville ONLINE Dennis Day, Proj Mgr, @ 916-808-7633 Radial Gates 6, 7 & 8 Seals Replacement 8/14 @ 10AM Div_02-selective demolition; Div_05-miscellaneous metalworek; Div_09-coatings; Div_11-radial gates; Div_13-hazardous substances recovery & disposal; Div_15-piping, tubing, fittings & appurtenances Page 20 of 42 065C Bid Date Bid Time Location 9/3/2014 2:00 PM Oakdale Plan Name / Scope of Work Prebid Information Valley View River Access Trail 8/20/14 @ 9am To bid this project, plans and specs must be purchased through the City of Oakdale. Engineers # of Plan Estimate Addenda # $625000 Online The work to be performed in general consists of trail and park improvements 2:00 PM 2:00 PM Gonzales Gonzales Early Learning Center Re-Roof Project ONLINE Gilroy Remove & dispose of existing wood shake roofing, buil-up roofing & underlayments; prepare roof sheathing, decking for new roofing materials; provide flashing for all existing penetrations, vents, piping, fascia; & provide new asphalt shingle roofing & PVC membrane roofing Re-Roofing Project for City/SCRWA (South County Regional MAND 8/26 @ 8AM at 1500 Southside Dr., Gilroy ONLINE Wastewater Authority) Buildings Re-Roofing several city & SCRWA buildings 2:00 PM Antioch 2:00 PM Alameda Unit C605 Repair at Elder Winds Public Housing Development 8/27 @ 10:30AM at 2100 Buchanan Rd., Antiocj The Housing Authority of Contra Costa County is soliciting quotations for small purchases from qualified, lincensed & insured entities to provide services for the repair of Unit C605 at Elder Winds Public Housing Bay Friendly Landscape Maintenance Services for Scattered MAND 8/13 @ 2PM at 701 Atlantic Ave, Alameda ONLINE ONLINE Residential Sites The Housing Authority of the City of Alameda (AHA) is requesting proposals from licensed C27 landscape firms for Bay Friendly landscape maintenance services for (12) twelve AHA residential sites and (1) AHA administrative office which are located throughout the City of Alameda. AHA retains the right to exercise the option to renew the contract for a maximum of (2) two additional one-year terms based on satisfactory service results and budget approval. 2:00 PM Rancho Cordova 2:30 PM Santa Cruz 2:30 PM San Francisco Kevian Abidi @ 510-747-4328 NEW Rivergate Shopping Center Pad 2 ONLINE 5,624 sf pad building. Trades to include surveying, earthwork, underground, paving, site concrete, fencing & gates, landscaping, rebar, concrete, masonry, metal fabrications, handrails, rough carpentry, insulation, roofing, sheet metal, D/F/H, storefront, plaster, drywall, painting, awnings, fire protection, plumbing, and electrical. $45000 126 Front Street Bathroom Remodel Project MAND 8/19 @ 10AM at 126 Front St., Santa Cruz Demolition of existing flooring, electrical & plumbing fixtures & installation of new fixtures, tile, windows & doors. $490000 SOMARTS Cultural Center Roof Replacement 8/21 @ 10AM at 30 Van Ness Ave, San Francisco Furnish & install new nailable wood framing over the existing roof material; new roof substrate & cover board material; a new adhered tpo roofing system; replacement of roof drains & overflow, vents ducts, a new roof hatch & all appurtenant work Glenn Hunt, Proj Mgr, @ 415-557-4782 Page 21 of 42 ONLINE ONLINE Bid Date Bid Time Location 9/3/2014 2:30 PM San Francisco Plan Name / Scope of Work Prebid Information Ruth Williams Memorial Theater Bayview Opera House 8/26 @ 3:00PM at 5075-3rd St., San Francisco Engineers # of Plan Estimate Addenda # $1900000 ONLINE Hardscape & landscape improvements; ADA walkways & curb ramps; enhancement of site lighting; replacement of existing outdoor stage & seating; accessible upgrades of the main entrance; two restrooms & the stage; mechanical ventilation upgrade, electrical 3:00 PM Petaluma 3:00 PM San Jose 4:00 PM Concord Oscar Gee, Proj Mgr, @ 415-558-4582 NEW School Crosswalk Removal & Replace Removal of existing thermoplastic crosswalk striping, pavement markings and pavement markers. Installation of crosswalk (ladder style) striping and pavement markings. NEW RFQ-Juvenile Hall Turf Removal MAND 8/22 @ 9AM at 840 Guadalupe Parkway, San Jose The County of Santa Clara is seeking quotes relating to various activities related to removing turf and making various improvements to the landscaping to comply with the Santa Clara Municipal Water District Landscaping Rebate Program at the County Juvenile Hall facility RFP-Temporary Relocation Improvements District Center Seismic 8/19 @ 10AM at 2411 Bisso Lane, Concord ONLINE ONLINE ONLINE Improvements Project Construction of security & accessibility improvments to existing facilities, including doorway framing, window security bars/grating, site fencing & parking improvements; installation of electrical utilities for temporary modular office buildings, including PG&E temporary electrical service connection; installation of electrical & HVAC systems improvements for build-out of a temporary information systems date center server room & electrical connection fore stand-by generator; miscellaneous other facility improvements, including painting & signage 5:00 PM Santa Cruz ONLINE RFQ - Special Inspection Services for Coastal Biology Building The University of California Santa Cruz is selecting firms to provide special inspection service for the Coastal Biology Buildings & Infrastructure Project. Submit requests for forms and further information by email ([email protected]) 5:00 PM Santa Cruz ONLINE RFQ for Geotechnical Services for Coastal Biology Building The University of California Santa Cruz is selecting design firms to provide Engineering services for the Coastal Biology Building & Infrastructure project. Submit requests for forms and further information by email ([email protected]) 9/4/2014 5:00 PM Stockton Rear Range Light ALTON Relocation/Replacement 8/19 @ 9AM D Square Construction, LLC and Au’ Authum Ki, Inc., a joint venture invites your company to competitively bid on the Rear Range Light ATON project, including Div_02-demolition; Div_03-cast-in-place concrete; Div_05-structural steel. metal fabrications; Div_31-excavation & fill; Div_32-fences & gates ONLINE 1:00 PM Antioch Field Office Remodeling Project at Elder Winds Online 11:30 AM Mill Valley 8/27 @ 11:30am Asset Management Offices-Remodel Project; Various trades. $1600000 2014 Street & Sewer Rehabilitation Project Water pollution control; landscape restoration; saw cut existing pavement; clearing & grubbing; concrete removal; asphalt pavement removal; cold millimg & wedge grinding; earthwork; subgrade preparation; base failure repair; aspahlt repair; aggregate base; roadway widening; pavement fabric; asphalt concrete; crack cleaning & weed abatement; crack sealing; slurry seal; pavement markings & striping; pavement markers; traffic signs; miscellaneous concrete, utility concrete cap; excavation, bedding, pipe installation & backfill; excavation dewatering; sewage flow control; sanitary sewer rehabilitation; sanitary sewer lateral repalcement Page 22 of 42 ONLINE Bid Date Bid Time Location 9/4/2014 2:00 PM 2:00 PM 2:00 PM Salinas Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # Fire Damage Repair for John Steinbeck Library 8/20 @ 10AM at 350 Lincoln Ave, Salinas Div_02-delective demolition work; Div_05-structural & metal fabrications; Div_06-rough carpentry, glued laminated wood, finish carpentry; Div_07-sheet metal, caulking & sealants; Div_08-wood doors, aluminum storefront & awning windows, door hardware, glass & glazing; Div_09-gypsum wallboard, acoustical ceilings, resilient flooring, painting; Div_10-building specialties; Div_11-kitchen equipment; Div_15-mechanical; Div_16-electrical NEW Putah Creek Floorplain Restoration (Phase 3) MAND 8/26 @ 10am Winters Work shall include construction of approximately 1,200 feet of new creek channel, diversion of active streamflow, filling of existing channel and grading to reestablish functional floodplains along Putah Creek near the City of Winters. $1490620 8/28/14 @2pm Santa Rosa NEW Montgomery Dr, Pierce St and 2nd St Sewer and Water ONLINE Online Online Improvements Montgomery Dr, Pierce St and 2nd St Sewer and Water Improvements 2:00 PM San Francisco ONLINE TG16-5 Paint Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with Paint, including but not limited to, painting, site paints, and high performance coatings on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems in the following trade:TG16.5: Paint Salinas East Market Street Improvements Phase III ONLINE 2:00 PM Richmond Hauling, grading, clearing & grubbing, earthwork, asphalt concrete, sawcut pavement, aggregate base, construct concrete sidewalk, construct commercial concrete driveway, construct concrete type "c" curb & gutter, signing, landscaping $450000 Information Technology Center MAND 8/6 @ 2PM at 1300 Potrero Ave, Richmond Div_02-selective demolition; Div_06-rough carpentry; Div_07-roof & deck insulation, thermoplastic membrane roofing, sheet metal flashing & trim, roof accessories, joint sealants; Div-08-tubular unit skylights; Div_09-exterior painting; Div_10-roof screens ONLINE 2:00 PM Los Gatos Rinconada Water Treatment Plant Reliability Improvement Project MAND 8/7 @ 1PM The Rinconada Water Treatment Plant project includes demolition of existing clarifiers & filters & construction of the following major project components:raw water ozone & liquid oxygen systems, flash mixing & carbon dioxide injection, flocculation & sedimentation basins, filtration, watershed recovery facility, new & modified chemical systems, & major electrical & instrumentation upgrades. The project will be constructed in sequential order & the construction is scheduled to be completed in five years at the total cost of approximately $160 million to $200 Million. ONLINE 2:00 PM Gonzales HVAC Unit Replacement at Medical Building & Daycare Building ONLINE 2:00 PM Juan Garrahan @ 510-307-4540 Remove & dispose of existing HVAC unit on roof of existing medical building & in closet of existing daycare bldg; provide new HVAC units; provide flashing for unit & connections to existing duct system 2:00 PM Gilroy ONLINE Eigleberry Water Service & Water main Replacement Construction of new fire hydrants, including mobilization & demobilization, traffic control, parking restrictions & signage, storm water pollution control program, pavement repairs, water main construction 2:00 PM Davis $660000 2014 Crack Seal & Base Repair Program Asphalt (dig outs), over-excavation (unsuitable material), asphalt cold planing, crack fill/sealing, asphalt overlay, utility adjustments, striping & pavement markers Page 23 of 42 ONLINE Bid Date Bid Time Location 9/4/2014 2:00 PM 2:00 PM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # Sacramento NEW North Truxel Streetscapes Provide all labor, equipment, and materials necessary to maintain the North Truxel Streetscapes as specified in the Scope of Services, Service Schedules, and the City of Sacramento Landscape Maintenance Services General Specifications and Provisions, LS14. $75000 San Mateo NEW Kingridge Sanitary Sewer Line Improvements - Mitigation Site ONLINE 010C/E8 $85000 The Kingridge Sanitary Sewer Line Improvement - Mitigation Site Project consists of installing a riparian mitigation site within Laurelwood Park, adjacent to Laurel Creek. The work includes but is not limited to temporary fence installation, site preparation, irrigation system retrofit, seeding, planting, split rail fence and mulch buffer installation, and a long term maintenance period. Morgan Hill Recreation Facility Irrigation Controllers ONLINE 2:30 PM Santa Cruz ONLINE 2:30 PM Walnut Creek Furnish and install/retrofit irrigation controllers at the Centennial Recreation Center (2 controllers), Community and Cultural Center (2 controllers) and Aquatics Center (1 controller). Main Jail Polished Concrete Flooring Project MAND 8/20 @ 10AM Concrete flooring $400000 Boundary Oak Golf Clubhouse Interior/Exterior Renovation 8/20 @ 2PM at 3800 Valley Vista Rd., Walnut Creekl 2:30 PM ONLINE Exterior accessibility upgrades, restroom renovation, front entry door remodel, ADA compliant doors and hardware. 3:00 PM San Jose 3:00 PM Santa Clara $1500000 NEW 6909-Martha Gardens Green Alleys Pilot Project Clearing & grubbing, earthwork, subgrade preparation, finishing roadway, aggregate subbbases, deep lift asphalt base, asphalt concrete, portland cement concrete pavement, concrete structures, reinforcement, concrete curbs, gutters, sidewalks, driveways, monuments, traffic stripes & pavement markings, signals, lighting & electrical systems, portland & cement concrete, pipe & structures, asphaltic emusions, pipeline structures, acceptance tests for storm sewers, cleaning pipelines, sewer rehabilitation ONLINE Ellen Yuen, Proj Mgr, @ 408-535-8489 ONLINE RFP-Underground Facility Locating Service The City of Santa Clara is seeking propsals from qualified firms to provide underground facility locating services for various projects over a year involving underground electrical conduit installation and associated underground structures 3:00 PM San Jose ONLINE 7660-Public Works General Engineering Contract for Underground Pipe Facilities 2014-2016 Dust control, mobilization, construction area traffic control devices, water pollution control, clearing & grubbing, watering, aggregate subbases, aggergate bases, deep lift asphalt base, asphalt concrete, concrete curbs & sidewalks, monuments, traffic stripes & pavement markings, signals, lighting & electical systems, asphaltic emulsions, pipe & fittings, valves, hydrants & appurtenances, pipes & structures, trench excavation, bedding & backfill, pipe installation, pipeline structures, acceptance tests for sanitary sewers, sanitary sewer rehabilitatrion, manhole rehabilitation Ellen Yuen, Proj Mgr, @ 408-535-8489 3:00 PM San Jose Old Main Hospital Seismic Safety Project, Ancillary Building:Change MAND 7/17 @ 10AM at 800 Thornton Way, San Jose Order 4 (MEP). Change Order 5 (Link & Stairwell, & Tenant Improvements (Basement & 2nd Floor) $20000000 Construction of multiple related projects, consisting of (1) changes to the MEP systems (change order 4), (2) new link & stairwell (change order 5) & (3) ancillary basement & 2nd floor tenant improvements Page 24 of 42 ONLINE Bid Date Bid Time Location 9/4/2014 Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # 5:00 PM San Francsico RFQ-General Contractor/Office Building Renovation 8/20 @ 10AM at 525 Golden Gate Ave., 2nd Fl, San Francisco The San Francisco Public Utilities Commission is issuing the Request for Qualifications in search for candidates who have necessary qualifications as set forth in this RFQ to be pre-qualified to respond to the forthcoming bid to provide general contracting & construction services for the renovation of an existing SFPUC office building. ONLINE 5:00 PM Tracy RFP-Construction Management Services for the 11th Street-East Tracy Overhead Bridge Replacement Project ONLINE The City of Tracy proposes to replace the existing 1441 foot long Eleventh Street Bridge over the Union Pacific Railroad tracks with a shorter single span structure in combination with retaining walls and approach fill at the approaches. Anticipated work generally consists of replacement of the existing bridge, modifying the signalized intersection of North MacArthur Drive and 11th Street and relocating existing utilities. Proposed new bridge will accommodate two 12 foot lanes in each direction, one four foot wide median, 8 foot shoulders/Class II bike lanes, and 8 foot wide separated sidewalks on each side of the structure that are protected with traffic side barriers. The proposed alternative involves constructing a temporary on-site detour with a prefabricated steel truss bridge on the south side of 11th Street during demolition of the existing and construction of the new bridge. 9/5/2014 2:00 PM Bolinas 2:00 PM Jenner NEW 2014 Wharf Road Retaining Wall Repair Grinding, resurfacing, paving fabric, carpentry, welding, excavation, traffic control Salt Point State Park-Salt Point Trail Pavement Rehabilitation MAND 8/21 @ 11AM at 25050 Highway 1, Jenner $600000 E819B $20000 $35000 ONLINE Storm water soil loss precention plan; earth moving; asphalt paving 4:00 PM San Franbcisco/ Oakland RFQ-San Francisco-Oakland Bay Bridge West Span Bicycle, Pedestrian & Maintenance Path Project MAND 7/31 @ 1PM at 101-8th St., Oakland ONLINE The Bay Area Toll Authority invites interested parties to respond to a Request for Qualifications (RFQ) to assist BATA in completing the Project Approval/Environmental Document (PA/ED) for the San Francisco-Oakland Bay Bridge West Span Bicycle, Pedestrian, and Maintenance Path Project. BATA is currently awaiting approval of a draft Project Study Report – Project Development Support (PSR-PDS) for the project. BATA’s objective is to complete a PA/ED for the San Francisco-Oakland Bay Bridge West Span Bicycle, Pedestrian, and Maintenance Path Project (the Project). The Project, as identified in the draft PSR-PDS, proposes to address the lack of bicycle, pedestrian, and maintenance (BPM) access on the West Span of the San Francisco-Oakland Bay Bridge (SFOBB) by constructing a BPM path from downtown San Francisco to Yerba Buena Island (YBI). The project is located in the San Francisco Bay Area and the SFOBB connects Interstate 80 (I-80) across San Francisco Bay. The total length of the BPM path is 27,735 feet and the project limits are from approximately PM 5.5 to 7.8 (from westbound off-ramp to Fremont Street to east end of the YBI Tunnel). 4:00 PM Windsor Peter Lee, Proj Mgr, @ 510-817-5716 NEW Dorma ED800 Door Hardware and Install Dorma ED800 Door closures with the power assist mode Fasteners, Connectors, Conduit, and Misc. Installation Hardware Labor to Install Electric Stike, Wall Switches and Receiver to Existing ED800 Operator. Install the parts on existing low voltage openers for bathrooms throughout the building. Page 25 of 42 ONLINE Bid Date Bid Time Location 9/5/2014 5:00 PM Jolon Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW COE Sacramento Bldg. 339 & WWTP Au’ Authum Ki, Inc. invites you to propose on the fully designed upgrades for the water treatment plant, and upgrades within building 339. The water treatment plant upgrades includes a new equipment pad, and the demolition of existing effluent pumps with valves, raw sewage pumps, conduit, and power to the pumps. Installation of new effluent & sewage pumps, compressor, pump control panels, transformer, main distribution panel, associated cabling, and conduit are included in the scope. Building 339 upgrades include the demolition of fencing, construction of a new equipment pad, new lighting fixtures, dry pipe sprinkler system, fire alarm system, unit heater, and plumbing. Online Trades Include: Demolition, CIP, Misc. Metal fabrication, Joint Sealants, Thermal Insulation, Doors/Frames/Hardware, Drywall & Framing, Painting, Resilient Base, Signage, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Fire Alarm, and Site Utilities. 9/8/2014 10:00 AM Oakland 10:00 AM Turlock 12:00 PM Antioch 2:00 PM Oakdale 3:00 PM La Honda 3:00 PM Petaluma Roof Replacement for 1621 Harrison Street ONLINE 8/22@ 10AM at 1801 harrison St, 1st Fl, Oakland Roofing & waterproofing $376000 NEW Intersection Improvements at Christoffersen Pkwy MAND 8/26 @ 2PM at 156 S. Broadway, Turlock The work consists, in general, of: remove surface improvements, clearing and grubbing, earthwork, trenching, install traffic signal, construct minor concrete (curb, gutter, sidewalk, curb ramps), hot mix asphalt reconstruction, traffic striping and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place. Walmart 2697-01 Antioch NEW This project consists of the expansion (approx. 39,742 SF) of an existing 141,485 SF store: Civil Trades Needed: Survey, Erosion Control, Demolition, Grading, Paving, Striping/Signage, Concrete, Seal Coat, Utilities, Site Lighting, Detectable Warning Systems, Fencing, Landscaping Building Trades Needed: Structural Shoring, Demolition, Fencing, Concrete, Concrete Polishing, Masonry, Structural Steel, Carpentry, Millwork, FRP, Insulation, EIFS, Roofing, Sheet Metal, Caulking / Sealants, Doors, Glazing, Stucco, Metal Framing/Drywall, Tile, Acoustical Ceilings, Flooring, Painting, Toilet Accessories, Seismic, Fire Sprinklers, Plumbing, Refrigeration, HVAC, Electrical. NEW Steel Fencing On Sierra Ave Between G & H Street Installation of fencing along Sierra Avenue $210000 Skyline Field Office HVAC Replacment Project MAND 8/21 @ 10:30AM Provide construction services to replace existing heating, ventilation, air-conditioning system at Skyline Field Offic e $50000 NEW RFQ-On-Call Geotechnical Engineering, Materials Testing & Inspection Services for Various Facility Peroject ONLINE Online ONLINE ONLINE ONLINE $100000 The City of Petaluma is requesting statement of qualifications from qualified firms interested in providing on-call geotechnical engineering services for various capital improvement design & construction projects including, but not limited to airport, building, road, pipeline & facility capital improvement projects Dan Herrera @ 707-778-4589 3:00 PM Petaluma NEW RFQ-On-Call Surveying Services for Various Facility Projects $50000 $100000 The City of Petaluma is requesting statement of qualifications from qualified firms interested in providing on-call surveing services for various capital improvement design & construction projects including, but not limited to airport, building, road, pipeline & facility capital improvement projects Dan Herrera @ 707-778-4589 Page 26 of 42 ONLINE Bid Date Bid Time Location 9/8/2014 3:00 PM Rocklin Plan Name / Scope of Work Prebid Information RFP-Generation-Condition Assessment of Roseville Electric's RPP2 Generating Facility Engineers # of Plan Estimate Addenda # ONLINE MAND 8/20 @ 10AM at 2155 Nichols Ave. Rocklin The successful contractor shall perform a comprehensive condition assessment of the RPP2 Facility (“Facility”) and prepare a report which, at a minimum documents investigation findings and provides an estimated scope, schedule and budgetary cost estimate for refurbishment of the facility which results in safe, compliant, and reliable operation. 5:00 PM Albany ONLINE Planning Consulting Services for the Albany Neck & Bulb Transition Improvement Plan The City of Albany is requesting proposals from qualified firms or individuals in preparing a plan for the improvement of the Alabany Bulb area to be transitioned to the operation as part of a State Park by the East Bay Regional Parks Dist. 9/9/2014 1:00 PM 10:00 AM 11:00 AM 11:00 AM 11:00 AM Rohnert Park NEW Student Center Water Softener Project-Rebid 8/27 @ 2PM at $130000 Sonoma State University is seeking proposals from qualified bidders for the installation of a turnkey water softener system San Rafael NEW Safe Routes To School At James B. Davidson Middle School This project consists of all the associated work described in the attached specifications and plans and "the provisions of this document for excavation, removal of existing concrete sidewalk, curb, gutter, and construction of new sidewalk, curb ramps, curb, gutter, hot mix asphalt pavement, storm drain, radar speed feedback sign, and traffic signing and striping modifications all located on Lindaro Street and Andersen Drive in the City of San Rafael, California. $245468 Transit Building Restroom Remodel 8/19 @ 11AM at 1010 Tenth St., Modesto Modesto Div-02-selective demolition; Div_03-cast-in-place concrete; Div_05-structural metal framing, cold-formed metal framing, miscellaneous metals; Div_06-rough carpentry, finish carpentry; Div-07-bldg insulation, sheet metal, sealants & caulking; Div_08-steel doors & frames, finish hardware; Div_09-lath & plaster, gypsum board, stainless steel wainscot system, resinous flooring, painting; Div-10-toilet partitions, washroom accessories; Div_12-plastic laminate casework & countertops; Div_15-plumbing, HVAC; Div_16-electrical $740000 Collector & Arterial Rehabilitation Project Modesto 8/21 @ 11AM at 1010 Tenth St., Modesto This project will rehabilitate the pavement and improve bicycle facilities on numerous street segments with slurry seal and restriping. The base bid is on 9th Street and will connect MJC East with MJC West Campus with a class I bicycle route. RFQ-Consultant Services for the City of Larkspur's Schematic 8/14 @ 2:00 PM at 400 Magnolia Ave, Larkspur Larkspur ONLINE 011C/E8 ONLINE ONLINE Online Design of the Community Facility Parcel The City of Larkspur is accepting statements of qualifications to perform schematic design & complete design revire for the community facility parcel. The project consists of the preparation of a comprehensive & detailed design for the development of the City's Community Facility Parcel at the Rose Lane development. 2:00 PM Los Altos ONLINE Annual Street Striping Mobilization, traffic control,grinding off some existing striping & markings, apply thermoplastic on existing striping & marking, installing poles & signs & some new layouts for striping & markings Page 27 of 42 Bid Date Bid Time Location 9/9/2014 2:00 PM 2:00 PM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $4300000 8/27 @ 2PM at 1850 Broadway St., Vallejo Div_02-demolition, site demolition; Div_03-concrete; Div_05-structural steel, metal decking, cold-formed metal framing, metal fabrications, metal ladders, pipe bollards; Div_06-rough carpentry, finish carpentry, interior arch casework, solid surface countertops; Div_07-thermal & acosutical insulation, composite wall panels, TPO roofing, sheet metal work, metal roofing & walls, penetration firestopping, joint penetration, expansion joint cover assemblies; Div_08-hollow metal doors & frames, flush wood doors, access doors & grames, overhead coiling doors, aluminum-framed entrances & storefront, aluminum windows, finish hadrware, glazing; Div_09-non-structural metal framing, gypsum board, tile, acoustical ceiling systems, resilient base & accessories, resilient tile flooring, static control resilient flooring, fluid-applied flooring, tile carpeting, stretched fabric wall systems, exterior painting, interior painting; Div_10-signage, toilet compartments, folding panel partitions, fiberglass reinforced protective wall covering, toilet room accessories, fire extinguisher & cabinets, metal lockers; Div_11vehicle service equipment, vault equipment, money depositories, residential appliances, projection screens, video mounts; Div_12-roll-down blinds, entrance mats & grilles; Div_22-plumbing; Div_23-HVAC, Testing, adjusting & balancing; Div_26-interior & exterior lighting, engine generators, electrical; Div_27communications; Div_28-access control & alarm monitoring system, intrusion detection, video surveillance, fire alarm, natural gas detection system; Div_31excavation & fill, trenching & backfilling, earthwork; Div_32-aggregate base, asphaltic paving, concrete curbs, gutters & walks, pavement markings, chain link fences & gates, underground irrigation systems, landscape planting; Div_33-site drainage MAND 8/25 @ 9AM at 5297 Sonoma Mountain Rd., Santa $125000 Santa Rosa NEW North Sonoma Mountain Vehicle Bridge $135000 Rosa Construction of the North Sonoma Mountain Vehicle Bridge, including demolition of the existing bridge & grading of the stream banks to a slope of 2:1 to minimize wrosion & increase creek flow capacity. Concrete piers & abutments will be poured & a 20' by 40' orefab rail car bridge will be installed & A/C road repair & road widening for a turn-out on the south side of the bridge will be paved Vallejo Operations & Maintenance Facility Improvement Project ONLINE ONLINE Karen Davis-Brown, Proj Mgr, @ 707-565-2041 2:00 PM San Leandro/Oak land Reroof Fruitvale Station Train Control Facilities & Bay Fair Station Entrance Canopy 8/6 @ 10AM at 300 Lakeside Dr., Oakland E808B/0 Remove the existing roof membrane & gravel, insulation & all other related items to the roof deck; install new roofing system by applying specified styrenebutadiene-styrene modified bitumen roofing system using heat welded application per NRCA & manufacturer's recommendation. 2:00 PM Various Cities RFP-Systemwide Parking Lot Sweeping Services 8/6 @ 10AM at 300 Lakeside Dr, 15th Fl, Oakland The San Francisco Bay Area Rapid Transit Dist intends to engage the services of one or more firms to provide sweeping services at various BARt Stations, parking garages, maintenance yards & parking lots Page 28 of 42 ONLINE Bid Date Bid Time Location 9/9/2014 2:00 PM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # 8/27 @ 10AM Sacramento NEW ESC-Kings Sacramento New Basketball Arena. All subcontractors MUST be Pre-Qualified to submit a Proposal. THE DUE DATE FOR PRE-QUALIFICATION PACKAGES IS @ August 29, 2014 by 10:00 A.M. ONLY PRE-QUALIFIED AND APPROVED SUBCONTRACTOR’S PROPOSALS WILL BE ACCEPTED. Pre-qualification information may be requested from Lauren Bennett at 916-444-4421 or via e-mail at [email protected] Turner Construction is signatory to the Carpenters and Laborers Union. Bid Packages Currently Bidding: BP-21 Bldg Conc & Reinf. $12 Mil BP-23 Masonry $3 Mil BP-24 Misc. Metals $3 Mil BP-25 Finish Carpentry $1 Mil BP-26 Exterior Terracotta Facade $1 Mil BP-27 Roofing approx $3 Mil BP-28 Practice Facility Ext. Glass $1 Mil BP-29 Interior Glass approx $2 Mil BP-30 Framing/Drywall/Plaster $20 Mil BP-31 Floor Seal/Staining $2 Mil BP-32 Tile and Stone $2 Mil BP-33 Acoustical Ceilings $3 Mil BP-34 Toilet Partitions $1 Mil BP-35 Lockers, approx $0.25 Mil BP-36 Seating approx $6 Mil BP-37 Fire Protection approx $3 Mil BP-38 Plumbing approx $9 Mil BP-39 HVAC approx $25 Mil BP-40 Electrical approx $30 Mil BP-42 Site Concrete $1 Mil BP-57 Site Pavers $1 Mil BP-58 Landscape $1 Mil BP-59 Site Precast Concrete $1 Mil Page 29 of 42 ONLINE Bid Date Bid Time Location 9/9/2014 Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $17800000 MAND 8/6 @ 10AM at 5000 Valley View Rd., El Sobrante Div_02-site preparation & plant protection, selective demolition, site clearing, earthwork, subgrade preparation & base material, water distribution, sanitary sewer, storm drainage system, asphalt paving & surfacing, portland cement concrete pavement, painted traffic lines & markings, tactile warning surfacing, permeable base for synthetic turf system, play court surfacing, synthetic turf system, irrigation system, chain link fencing, ornamental fencing & gates, side gate operators, parking appurtenances, site furnishings, play field equipment, planting; Div_03-concrete; Div_04-reinforced grouted concrete masonry; Div_05structural steel, metal deck, cold-formed metal framing, metal fabrications, expansion joint cover assemblies; Div_06-rough carpentry, finish carpentry, laminateclad wood cabinets, transparent-finish wood cabinets, framed decorative panel system; Div_07-modified bituminous sheet waterproofing, bldg insulation, bldg envelope underlayment, under-slab vapo barrier, vapor reduction system, composite panels, modified bituminous sheet roofing, fluid applied roofing, flashing & sheet metal, elastomeric sheet flashing, roof accessories, cementitous fireproofing, firestopping, joint sealers; Div_08-steel doors & frames, wood doors, access panels, overhead coiling doors, aluminum windows, metal framed skylights, door hardware, glazing, glazed aluminum curtain wall, translucent wall assemblies; Div_09-metal support systems, portlan cement plaster, gypsum board, ceramic tile, exterior tile, acoustical ceilings, linear metal ceilings, resilient flooring, epoxy terrazo flooring with recycled glass matrix, fabric covered tack paneling, fiberglass reinforced plastic paneling, paints & coatings, graffiti-resistant coatings; Div_10-visual dispaly boards, solid color reinforced composite toilet compartment doors, cubicle curtains & track, corner guards, flagpoles, marquee sign, signage, metal lockers, fire extinguishers & cabinets, walkway covers, metal shelving, sun shades, toilet accessories, miscellaneous specialties; Div_11projection screens, production AV systems, scoreboards; Div_12-floor mats & frames, window blinds, blackout shades; Div_13-bleachers, fire alarm system; Div_15-plumbing, HVAC, testing, adjusting & balancing; Div_16-lighting, electrical; Div_17-intrusion system, access control systems, digital video surveillance system, assisted listening system , communications 2:00 PM El Sobrante De Anza High School Component # 7:Building 10 Linked Learning 2:00 PM Copperropoli s Copper Cove Sewer Lift Station # 22 Replacement Project ONLINE NOTE:Addendum 1 included in original plan set 2:00 PM Contra Costa County 8/21 @ 10AM $1400000 Prevailing rate of wages (state determination) project consisting of furnishing and installing a nominal 10-ft dia. x 20-'ft deep fiberglass wet well, two nominal75hp submersible pumps, site piping, valves, vaults, drop manhole,390 gallon surge tank, 10-ft x20-ft masonry building, 600- amp electrical service, 600-amp motor control center with variable frequency drives, instrumentation, antenna, SCADA/PLC control panel and other miscellaneous work. The work also includes installation of a District furnished 20DkW diesel generator and demolition of the ,existing pumping plant. Telecommunications Facility Ground Lease-Mt Diablo MAND 7/29 @ 10AM ONLINE ONLINE The Department of General Services (DGS), on behalf of California Department of Parks and Recreation (CDPR), is seeking Bid Proposals to Lease Ground Space of approximately .18± acres in the Mt. Diablo State Park (MDSP), South Peak Telecommunication Site 2:00 PM Berkeley ONLINE Hotel at 1499 University Avenue New construction of 19,000 SF three-story hotel building with site improvements Work to include, but not limited to, the following: grading, utilities, landscaping, site furnishing, concrete, strucutral and misc steel, rough carpentry, casework, waterproofing, insulation, TPO roofing, sheet metal, caulking, doors / frames / hardware, coiling grilles, storefront, wood windows, glass & glazing, louvers, metal stud framing, drywall, lath and plaster, ceramic tile, wood ceilings, flooring, FRP, painting and coatings, elevators, plumbing, HVAC, electrical, fire sprinklers, telecommunications, fire alarm Page 30 of 42 Bid Date Bid Time Location 9/9/2014 2:00 PM Fairfield 2:00 PM San Jose 2:15 PM San Mateo 3:00 AM Antioch 3:00 PM Antioch Plan Name / Scope of Work Prebid Information North Bay Regional Water Treatment Plant Sludge Lagoon No. 1 Decant Stucture Improvements Project Engineers # of Plan Estimate Addenda # ONLINE MAND 8/21 @ 1:30 PM at 5110 Water Works Ln, Fairfield Div-02-geotextile fabric, site preparation, demolition, salvage & bandonement, control of water, trenching, aggregate base course material, asphalt pavement, pavement restoration; Div_03-concrete; Div-05-anchor bolts & anchoring devices, miscellaneous metal, handrail, aluminum grating; Div_09-jigh performance coatings; Siv_10-warning signs; Div_11-equiment mounting, fabricated weir slide gates; Div_15-piping systems; Div_16-instrumentation, electrical Oak Grove High School Modenization - Building U & I 8/20 @ 1PM at 285 Blossom Hill, San Jose Complete renovation of the Theater Building I & Classroom Building U:Removal & replacement of interior finishes, roofing, mechanical, electrical, plumbing & seating. The rebuild consists of ADA upgrades, interior finishes, electrical, plumbing, mechanaical, roofing, painting, flooring, theatrical lighting & rigging & theatrical seating. Additionally, there is site work & the installation of a new Campus Marquee Sign Replace & Install Fencing & Gates MAND 8/21 @ 10AM at Pier 1, Foster City Contractor shall provide all labor, tools, materials, vehicles, equipment & incidentals necessary to remove & dispose chain link fences & replace with new wrought iron fences & gates at various sizes, including reconnecting & making operational the existing motorized gate system ONLINE ONLINE Christine Rivera @ 916-227-6028 $235000 MAND 9/2 @ 10AM at 425 Fulton Shipyard Rd., Antioch Construction of a reinforced concrete trash enclosure & ramp structure, including concrete & asphalt concrete removals; clearing, grubbing & water pollution control $600000 Piping Reconfiguration of Canal Pumps 2 & 4 & Pump 2 MAND 9/2 @ 2PM Fulton Shipyard Road Transfer Station Trash Enclosure ONLINE ONLINE Replacement 3:00 PM Santa Cruz 3:00 PM Modesto 3:00 PM Santa Cruz Demolish & replace existing discharge piping & appurtenances for Canal Pump 2 & Canal Pump 4 & provide & install a replacement for Canal Pump No. 2, including pump, motor & reduces voltage solid state starter $300000 2300 Delaware Elevators 72 & 73 Modernization MAND 8/21 @ 2PM Selective demolition of existing elevators but not including existing shaft rails & cab frames; new elevator controls & machinery; modifications to existing electrical power & fire alarm systems as required to accommodate the elevator remodeling work; doorway modifications at freight elevator machine room NEW Fire Stations 31 & 36-Re-Roofing MAND 8/28 @ 2:30PM at 461 Mitchell Rd., Modesto Div_02-demolition; Div_06-rough carpentry, finish carpentry; Div_07-gypsum underlayment board, mechanically attached TPO, sheet metal, roofing abatement specs, sealants & caulking Parking Lot 9 Low-Impact Development (LID) Project $25000 The City of Santa Cruz (City) Department of Public Works is soliciting proposals for design services to retrofit the City-owned municipal lot, Parking Lot No. 9, located at 120 Elm Street in Downtown Santa Cruz, with Low-Impact Development (LID) features. The objective of this project is to reduce the flow and volume of storm water runoff through the use of LID Structural Control Measures (SCMs), including bio-swales, rain gardens, and permeable pavement. In addition to reducing runoff, the project goal is to minimize the amount of pollutants discharged to the street and storm drain system, and ultimately the San Lorenzo River. This project, once constructed, will provide a LID SCM demonstration site for the community. It will also become a pay-by-space parking facility. 4:00 PM San Francisco NEW RFQ-Landscaping Services Air Station San Francisco requires a grounds & maintenance team to manage the existing landscape. All services must be complete by licensed & insured landscaping contractors Page 31 of 42 ONLINE ONLINE Online O Bid Date Bid Time Location Plan Name / Scope of Work 9/10/2014 2:00 PM Secondary Clarifier #4 Recoating (CIP 15-P002) Pleasanton Prebid Information Engineers # of Plan Estimate Addenda # $180000 MAND 9/4 @ 10AM at 7399 Johnson Dr., Pleasanton The work to be performed shall be at the Wastewater Treatment Plant. Typical work to be performed includes cleaning and recoating existing secondary clarifier #4 components such as submerged and below walk level equipment including influent diffusing well, drive cage(the drive will be protected from any sand blasting or operation that would introduce grit and debris into the drive), sludge collector mechanism, scum skimmer, scum trough, scum baffle, effluent trough, support, brackets and piping, steel bridge, outside drive mechanism equipment and piping at or above walk level, and other items within the secondary clarifier #4, and doing all appurtenant work in place and ready for use, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as mentioned within the contract documents, to which reference is hereby made for further particulars. ONLINE The work to be performed under this contract consists of furnishing all tools, equipment, materials, supplies, and manufactured articles as needed. It shall also include the furnishing of all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the contract in strict accordance with the Contract Documents and District’s Standard Specifications and Details currently in effect. John Yee @ 925-875-2258 2:00 PM Sacramento NEW Sacramento Marina & Miller Park Boat Ramp Maintenance Dredging $270000 9/4 @ 10:30AM Sacramento Marina Entrance Channel Dredging: This project consists of thedredging of a maximum of 1,700 cubic yards of silt from the Sacramento Marina entrance channel to a depth of -2ft (NAVD 88). The dredging must be performedby clamshell. All work shall be completed to the satisfaction of the MarinaManager. This wet material shall be hauled to the “City overflow lot” for dewatering.Existing vegetation may be trimmed, but not removed, toaccommodate equipment.Miller Park Boat Ramp Dredging: This project consists of the dredging of amaximum of 500 cubic yards of material from the Miller Park boat ramp. The dredging may be either by excavation or clamshell, whichever is more costeffective. The silt shall be hauled to the “City overflow lot” for dewatering. Allwork to be completed to the satisfaction of the Old Sacramento Manager/MarinaManage ONLINE 2:00 PM Sacramento NEW Mid-Central Streetscapes Provide all labor, equipment, and materials necessary to maintain the Mid-Central Streetscapes as specified in the Scope of Services, Service Schedules, and the City of Sacramento Landscape Maintenance Services General Specifications and Provisions, LS14. Centennial Place Apartments Hanford Div_02-selective site demolition, removal & salvage of construction materials; Div_03-concrete; Div-05-miscellaneous metals, decorative form metal; Div_06miscellaneous rough carpentry, glue-laminated construction, shop-fabricated structural wood, finish carpentry, interior arch wood work, arch wood casework, solid surface fabrications; Div_07-concete roof tiles, metal wall panels, thermoplastic membrane roofing, frestopping; Div-08-doors & franes, hollow metal doors, wood doors, fiberglass doors, door hardware, windows; Div_09-gypsum board, acoustical panel, ceiling, tiling, resilient flooring, resilient tile flooring, carpeting, painting; Div-10-signage, postal specialties; Div-11-equipment; Div_12-stone countertops; Div_13-swimming pools & equipment; Div_31-earthwork; Div_32asphalt paving, chain link fences & gates, landscaping; Div-15-plumbing, HVAC; Div_16-lighting, electrical Franklin-Arlington Streetscapes NEW Sacramento Provide all labor, equipment, and materials necessary to maintain the Franklin-Arlington Streetscapes as specified in the Scope of Services, Service Schedules, and the City of Sacramento Landscape Maintenance Services General Specifications and Provisions, LS14. Vallejo Veterans Hall North Parking Lot Paving/Striping, Walkways & MAND 8/26 @ 2PM at 420 Admiral Callaghan Ln, Vallejo NEW Vallejo ONLINE 2:00 PM 2:00 PM 2:00 PM Curb Ramps Div_02-selective demolition; Div_03-miscellaneous cast-in-place concrete; Div_05-pipe & tube railings; Div_31-earth moving; Div_32-asphalt paving, concrete paving & tactile warning surfacing Page 32 of 42 ONLINE ONLINE ONLINE Bid Date Bid Time Location 9/10/2014 2:00 PM Mill Valley 2:00 PM Ceres 2:00 PM Capitola 2:00 PM Napa 2:00 PM Oakdale Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW Boyle Park Tennis Courts The Scope of Work as described in the Bid Schedule includes, but is not limited to, removal of existing tennis court improvements, installation of electrical improvements, lighting, concrete retaining walls, concrete pavement, fencing, gates, select areas of grind and overlay asphalt repair, tennis court surfacing, drainage, grading, soil import and all other work as shown on the Plans and as called for in the Special Provisions and as directed by the Engineer. NEW Service Road Sanitary Sewer Extension (Moffett Rd to Mitchell Rd) Furnishing and Installing 12” thru 42” Vitrified Clay Pipe, 60” manholes, connecting to existing sanitary sewer, jack & bore across Service Road, State Route 99 and the Union Pacific Railroad. $830000 McGregor Drive Booster Pump Station Optional 8/27 @ 2PM Div_02-existing facilties; Div_03-concrete; Div_04-concrete unit masonry, glass masonry: Div_05-metal fabrications; Div_06-rough carpentry, glue-laminated construction; Div_07-masonry water repellant coating, asphalt shingle roofing, flashing & sheet metal, roof specialties, joint sealers; Div_08-steel doors, frames & hardware, louvers; Div_09-painting & coating; Div_22-plumbing; Div_26-lighting, control systems, electrical; Div_31-geotextile, clearing & demolition, trenching, backfilling & compacting, structural evacuation, structural fill; Div_32-asphalt paving & seals, chain link fence, modular retaining wall system, planting; Div_33-utilities; Div_40-automatic valves; Div_41-portable davit cranes; Div_43-axial fans $22000000 Construct New Main Kitchen @ Napa State Hospital 8/20 @ 9:30AM Construct a new single-story 29,000 SF central kitchen, including abatement and demolition of existing structures, site clearing and grubbing, earthwork, excavation, underground utilities, landscaping and irrigation, walks, curbs, gutters, parking, concrete slab on grade, steel structure, plaster exterior, single ply roofing with skylights, new kitchen equipment, high capacity food storage racks, large refrigerator and freezer walk-ins, loading docks with overhead coiling doors, card key access system, CCTV, diesel power engine generator and related work. ONLINE ONLINE ONLINE ONLINE ONLINE Landscape Lighting & Maintenance District Services Project Furnishing of Landscape Maintenance Services for the Bridle Ridge/Vineyard/Reinman Court/Sunset Meadows and Sterling Hills/ Landscape Lighting and Maintenance Districts. 2:30 PM San Francisco Pavement Renovation & Sewer Replacement-Various Locations No. 18 8/28 @ 2:30PM at 1680 Mission St., San Francisco $1700000 ONLINE $1400000 $1500000 ONLINE Pavement renovation, curb ramp construction, sewer replacement, traffic routing & all other associated work. Ramon Kong, Proj Mgr, @ 415-554-8280 3:00 PM Kelseyville NEW 2014 Water System Upgrades Project MAND 8/26 @ 10AM The project consists of constructing a 200,000-gallon welded steel potable water storage tank, activated carbon filters, SCADA improvements, and appurtenances complete. Rick Browser or Tom Warnock @ 530-244-0202 3:00 PM Sunnyvale ONLINE Repaint Steet Light Poles Project Painting existing City light poles, including preparing the pole surfaces, removing existing paint & applying prime coat David Gakle @ 408-730-7403 Page 33 of 42 Bid Date Bid Time Location 9/11/2014 2:00 PM Fairfield 2:00 PM Turlock 2:00 PM Stockton 2:00 PM Sausalito 2:00 PM San Francisco Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW Animal Care New Kennel Building-Mechanical Package MAND 8/26 @ 10AM at 675 Texas St., Ste 2500, Fairfield Div_21-fire suppression; Div_22-plumbing; Div_23-HVAC; Div_26-lighting, electrical $22100 NEW 901 Hedstrom Road Curb Return Repair The work consists, in general, of: Best Management Practices (BMP's), saw cutting, removal of existing improvements, dig out sewer line trench, earthwork, install curb return, install curb and gutter, cross gutter reconstruct, aggregate base, hot mix asphalt, crack seal, striping and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place. This work shall be completed in accordance with the Standard Specifications, standard Drawings and these Special Provisions. NEW Oxidation Ponds #2 & #3 External Levees Repair Project 8/28 @ 10AM Clearing & grubbing, asphalt paving, pavement markings Sausalito City Hall Ceiling Tile Replacement Project 8/14 @ 9AM at 420 Litho St., Sausalito Removal of existing ceiling tiles, t-bar ceiling & existing lighting & furnish & install new ceiling tiles & grid system & new LED lighting fixtures. Contractor shall be responsible for removal & replacement of sprinklers & fire alarm devices. ONLINE ONLINE ONLINE ONLINE Loren Umbertis @ 415-289-4113 TG16.8 Fireproofing Encouraged 7/31 @ 2PM $6200000 ONLINE Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) and concurrent Invitation for Bids (IFB) from Trade Subcontractors interested in bidding the TG16.8 Fireproofing Construction Services on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California. Bidders that have already pre-qualified do not need to respond to the RFQ. 2:00 PM 2:00 PM San Francisco San Francisco 3:00 PM Gilroy 3:00 PM San Jose Online NEW TG17.1 Signage/Graphics/Directory Systems Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with Signage/Graphics/Directory Systems, including but not limited to, cast and etched graphics, dimensional lettering signage, pylon signage, illuminated panel signage, non-illuminated panel signage, photo-luminescent exit accessories (PLEA), electronic panel signage, floating signage, glass signage, interpretive graphics, and informational kiosks on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems in the following trade: TG17.1 Signage/Graphics/Directory Systems Elevator Modernization at Five Sites 8/12 @ 10AM Modernize two (2) geared passenger elevators in each 13 story building, including new microprocessor motion & operation controls, new power factor one regenerative drive systems, new AC gearless hoist machines, new fixtures, new door operators & door equipment, refurbishment of retained elevator equipment $65000 NEW Sunset Gardens Exterior Site Lighting Replacement Project MAND 8/26 @ 9AM at 7750 Wren Ave., Gilroy Remove existing light fixtures from the xisting poles & dispose fixtures offsite. $75000 NEW Huff Gardens Exterior Site Lighting Replacement Project MAND 8/26 @ 2pm Housing Authority of the County of Santa Clara (HACSC) on behalf of its affiliate Huff Avenue Associates, LP (Owner) is soliciting bids from qualified contractors to provide all labor, equipment and materials required for the replacement of exterior site lighting at Huff Gardens Family Apartments located at 3021 Huff Avenue, San Jose, CA 95128. See Scope of Work (Attachment A) and related documents for details. Contractor shall warrant all labor and material for a period of 12 months from project completion. Page 34 of 42 ONLINE ONLINE Online Bid Date Bid Time Location Plan Name / Scope of Work 9/11/2014 3:00 PM 7121-Police Administration Building Security Card Access SystemRebid San Jose Prebid Information MAND 8/21 @ 9AM at 201 W. Mission St, San Jose Engineers # of Plan Estimate Addenda # $400000 ONLINE $207000 ONLINE Security card access system 3:00 PM San Jose NEW 7641-White Road Streetlight Improvements Streetlight improvements Greg Jobe, Proj Mgr, @ 408-793-4128 3:00 PM Dixon 3:00 PM San Jose NEW 2014 Sewer Repair Project Removal & replacement of pipe sections ranging from 6" to 8" diameter at a depth ranging between 3.5 feet & 8.5 feet to the invert, manhole replacements & constructio of new manholes $1057200 NEW 6430-Mackey Ave, Dawson Ave & Cross Way Sanitary Sewer ONLINE ONLINE Replacement Clearing & grubbing, watering, finishing roadway, aggregate subbases, aggergate bases, deep lift asphalt base, asphalt concrete, concrete curbs & sidewalks, traffic stripes & pavement markings, pavement markers, signals, lighting & electrical systems, asphaltic emulsions, pipe & structures, trench excavation, bedding & backfill, pipe installation, pipeline structures, cleaning pipelines, sanitray sewer rehabilitation Erwin Wong, Proj Mgr, @ 408-793-4112 4:00 PM 4:00 PM 9/12/2014 12:00 PM 2:00 PM Concord Napa RFP-Concord Citywide Bicycle & Pedestrian Safe Routes to Transit Project The City of Concord is seeking qualified firms to submit a proposal to prepare the City's first comprehensive bicycle & pedestrian plan, which wil lbe used as a blueprint to develop a network that promotes safe alternative modes of transportation & helps position the City for future funding for bicycle & pedestrian improvement projects that benefit the entire community. NEW RFQ/RFP Design-Build Tulocay Creek Bicycle/Pedestrian Bridge 8/27 @ 2pm The design build team shall prepare a proposal that specifies a scope of work that will provide all necessary work for the design and construction of the bridge and conforms to the trail alignment on both sides. The proposed bridge must be designed as a clear span over New Tulocay Creek and meet the minimum length and elevation specified in Appendix G in order to not impede creek flows under current conditions and in the future with proposed improvements for the Napa Flood Project. Healdsburg NEW RFP-Annual Backflow Testing & Repair Services The City of Healdsburg is requesting proposals from prosepctive contractors to provide annual testing & certification of City-owned backflow prevention devices, including inspection, testing, repair & submission of a writtem report on backflow prevention devices located on property indentified by the City. RFQ-Consulting Services for WETA Vallejo Ferry Terminal 2015 8/27 @ 1PM Vallejo Dredging Project The Water Emergency Transportation Authority is seeking submittals from qualified firms in response to a RFQ for consulting services to obtain all necessary permits for the dredging; perform all requisite tests; perform all sampling, tests, analyses & surveys as required; preparation of contract documents to enable WETA to go out to bid and for project; on-site inspection & safety monitoring personnel; quality assurance; ensure dredging contractor compliance with regulatory agencies; & certified payroll collection & verification for the dredging work. Page 35 of 42 ONLINE Online ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 9/15/2014 10:00 AM Napa Camp Berryessa Improvement Project San Francisco Police Dept's Traffic Company & Forensic Services Divsion Facility 4:00 PM Prebid Information Engineers # of Plan Estimate Addenda # MAND 8/22 @ 10AM at 7900 Beryessa-Knoxville Rd., Napa $1429500 Cosntruction of an environmental education camp, including grading; paving of roadways; parking lots & trails; watr system, water treatment, tank & distribution greywater system with subsurface drip disposal; camp host site; tent cabins; c ombination restroom shower building with composting toilets; covered activity areas; boat boarding dock; electrical system with photovoltaic array & miscellaneous other site improvements/modification. Permits for this work shall be secured by the District. RFQ-Architectural & Engineering Team for a new San Francisco 8/19 @ 1:30PM at 30 Van Ness Avew, 4th Fl, San Francisco ONLINE ONLINE The Dept of Public Works announces a RFQ for an architectural & engineering team led by an executive architect to provide architectural, engineering & related services to design a new facility to house the San Francisco Police Department's Traffic Company & Forenseic Services Division Facility 9/16/2014 11:00 AM Modesto 11:00 AM Modesto 2:00 PM Fairfield 2:00 PM Marina 2:00 PM San Jose $2585618 8/27 @ 11AM at 1010 Tenth St., Modeato This project will replace and upgrade deficient water mains, associated water valves and fire hydrants in the southwest area of Modesto to increase service reliability of the City of Modesto’s water system, incouding protecting existing underground utilities; equipment, piping & materials demolition; cast-in-place cocncrete; trenching, backfilling & compacting; asphalt paving; utilities $159000 Tank 7 Recoat 8/27 @ 10AM at 1010 Tenth St., Modesto The City of Modesto periodically schedules recoating of the inside of the tanks as part of the routine maintenance of the City’s water storage tanks. This project will include the preparation and recoating of Tank 7, which is located at 1533 Plumas Avenue in Modesto. $200000 Waterman Water Treatment Plant Replacement C02 Project MAND 8/28 @ 9:30AM at 2900 Vista Grande, Fairfield Cast-in place concrete, grouting, miscellaneous metalswork, aluminum railings, fiber glass reinforced plastic foundations, sealants & cauling, electrical, earthwork, A.C. pavement & base, process control & instrumentation, mass flow measuring, temperature measuring, control panels, field indicators, piping $95000 Re-Roofing of Hangar 524 at the Marina Muncipal Airport 8/26 @ 10AM Completely clean & recover the existing roof at Hanagr 524 Strengthen & Replace Water System-South Modesto Phase 2 NEW RFQ-Sewer Camera for City of San Jose Department of $40000 ONLINE ONLINE ONLINE ONLINE ONLINE Transportation The City of San Jose is seeking quotes for a sewer camera and accessories in support of the Department of Transportation. Priscilla Lourangrath @ 408-535-7058 2:00 PM Turlock 3:00 PM Palo Alto Job Order Contract #8947-California State University Stanislaus MAND 8/26 @ 10AM The scope of work includes a collection of detailed repair & construction tasks & specs that have extablisjed unit prices. It is placed with the contractor for the accomplishent of repair, alteration, modernization, maintenance, rehabilitation, demolition & construction of infrastructure, buildings, structures or other real property RFP-Design, Construction, Operation, Maintenance of a Compost Pre-Proposal Webinar 7/16 @ 9AM Family for Yard Trimmings & Residential Food Scraps The City is seeking Proposals from interested companies to permit, design, build, operate and maintain (DBOM) a Compost Facility to be located on the relatively flat 3.8-acre portion of the Measure E site in accordance with the requirements in the Scope of Services. The City will act as owner and financier. The Compost Facility will utilize Aerobic Composting. Services are to be provided for a 20-year period following the commencement of full-scale operations. This RFP covers the aerobic composting of residential Yard Trimmings and Residential Food Scraps. Proposers must submit a price for Yard Trimmings mixed with Residential Food Scraps (Base Case) and for Yard Trimmings only (Required Alternative Proposal), subject to the required services described in the Scope of Services Page 36 of 42 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 9/16/2014 3:00 PM Republican Alley 16-Inch Water Main Rehabilitation Project Roseville Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Div_02-earthwork, trenching, water distribution pipeline (open cut installation) and accessories, water transmission pipeline (cured in place pipe installation) & accessories, aggregate base, subbase & concrete, pavement markings, landscaping, pavement restoration & rehabilitation; Div_03-concrete George Hanson @ 916-746-1764 3:00 PM Los Altos 4:00 PM San Francisco Signage Phase II - Foothill College Div_10-signage NEW Infrastructure Improvements, Candlestick Point Redevelopment 8/21 @ 10AM at 12345 El Monte Rd., Bldg D160, Los Altos $100000 ONLINE 8/27 @ 10AM at 101 Horne Ave, San Francisco ONLINE The Project will include removal and relocation of stockpiled surcharge material, excavation, installation of new infrastructure, including storm and sanitary sewer, domestic and reclaimed water, joint trench utilities, landscaping, street surfacing, sidewalks, street lights, curbs, and gutters, Auxiliary Water Supply System (AWSS), and Auxiliary Waste Collection System (AWCS). SBEs, MBEs, WBEs, and LBEs are encouraged to submit proposals. 9/17/2014 1:30 PM 10:00 AM Orinda Redwood City Orinda Water Treatment Plant Washwater Tank Rehabilitation 8/26 @ 10AM $500000 $800000 Div_02-construction surveying, selective site demolition, lead hazard control activities; Div_03-concrete; Div_05-hot-dip galvanizing, pipe welding, flange bolting, metal fabrications; Div_07-bituminous waterproofing, joint sealants; Div_08-vault hatches; Div_09-painting, zinc-rich coatings, high-build epoxy coatings, mechanical & electrical coating systems; Div_22-pipe identification; Div_26-pipeline cathodic protection; Div_31-clearing & grubbing, excavation, dewatering, fill, imported backfill & drain rock materials, controlled density fill, geosynthetic filter fabric, drilled concrete piers; Div_32-asphalt pavement replacement, chain link fences & gates, planting irrigation, plantin; Div_33-utilities; Div_40-mechanical piping $250000 F-Dock Dredging Project MAND 8/27 @ 10AM at 675 Seaport Blvd, Redwood City 021C/E8 ONLINE Mechanical dredging of sediment from Port of Redwood City's F-Dock & disposing of the sediment at the San Francisco Deep Ocean Disposal Site. 2:00 PM Union City 3:00 PM Los Altos 9/18/2014 2:00 PM Fairfield $500000 NEW 2014-15 Slurry Seal Project 2014-15 Slurry Seal Project District Office Building Roofing Replacement 8/19 @ 10AM at 12345 El Monte Rd., Bldg D160, Los Altos Div_02-selective bldg demolition; Div_06-rough carpentry; Div_07-sheet metal waterproofing, composition shingle roofing, thermoplastic membrane roofing; Div_08-metal framed skylights; Div_09-exterior painting; Div_22-roof drainage NEW Center for Positive Change Modifications & Tenant Improvements- MAND 8/26 @ 11:30AM at 675 Texas St., Ste 2500, Fairfield Online ONLINE ONLINE Fairfield Probation 2:00 PM Stockton Div_02-selective demolition; Div_07-thermal insulation, joint sealants; Div_08-hollow metal doors & frames, flush wood doors, access doors & frames, door hardware, glazing; Div_09-non-structural metal framing, gypsum board, interior painting; Div_10-fire protection cabinets & extinguishers; Div_11-audio-visual equipment; Div_12-horizontal louvers; div-23-HVAC; Div_26-electrical; Div_27-communications; Div_28-fire detection & alarm; Div_32+-pavement markings NEW 2015 CCTV Inspection Services of Sanitary Pipelines 8/27 @ 10AM CCTV inspection services of sanitary pipeliens at various locations Lorin Gardner, Proj Mgr, @ 209-937-5428 Page 37 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 9/18/2014 2:00 PM TG10.4 Electrical, Communications, Security & Integrated Networks 02/18/14 @ 2:00 pm San Francisco 2:00 PM Richmond 2:00 PM Manteca 2:00 PM Fremont 2:00 PM El Cerrito 2:00 PM French Camp 2:30 PM San Francisco Engineers # of Plan Estimate Addenda # ONLINE Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) and concurrent Invitation for Bids (IFB) from Trade Subcontractors interested in bidding the TG10.4 Electrical, Communications, Security and Integrated Networks Construction Services on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California. Bidders that have already pre-qualified do not need to respond to the RFQ. Improvements at the Richmond Veterans Memorial Hall 8/26 @ 10am Div_02-removal work, minor demolition for remodeling; Div_06-framing & sheathing, finish carpentry; Div_07-self-adhering flashing membrane, insulation, fravel built-up roof restoration, smooth built-up roof restoration, sheet metal flashing, copper flashing & trim, joint sealers; Div_09-resilient tile flooring, vinyl sheet flooring, wall base, carpet, painting NEW Morenzone Ballfield Renovation Div_02-structure demolition; Div_03-cast-im-place concrete; Div_05-pipe & tube railings; Div_12-site furnishings; Div_31-site clearing, earth moving; Div_32concrete paving, baseball field surfacing, chain link fences & gates, sport netting system, planting irrigation, turf & grasses. Fremont Campus Parking Lot Light KIM LED Retrofit MAND 8/26 @ 10AM Parking lot light Kim Led Retrofit HVAC Cleaning & Repair at El Cerrito DMV Field Office MAND 8/28 @ 11AM at 6400 Manila Ave, El Cerrito HVAC duct cleaning & repair Kevin Childers @ 916-957-7822 NEW San Joaquin General Hospital Chiller Installation Project (Specs on MAND 8/27 @ 9AM at 500 W. Hospital Rd, French Camp ONLINE ONLINE ONLINE ONLINE $62000 $72000 ONLINE Plans) Remove an existing chiller unit & replace it with a new chiller unit, including structural & electrical work. Little Hollywood Park Renovation - Upper Section 9/4 @ 10AM $400000 ONLINE This project is for City of San Francisco Contract Monitoring Division certified Micro-LBE contractors only (CSLB License A or C-27). Little Hollywood park upgrades including irrigation, landscaping, parking improvements, site furniture installation and landscape planting. Matt Jasmin, Proj Mgr, @ 415-581-2552 9/19/2014 11:00 AM 2:00 PM Visalia San Francisco Supply & Installation of Various Generators (Natural Gas & Diesel) Supply & install natural gas & diesel generators at various locations NEW 1500 Page Street (no GC Openings) MAND 9/4 @ 11AM & 9/9 @ 1PM $500000 Voluntray 9/4 @ 10AM at 1500 Page St., San Francisco THIS IS A CAHILL JOB. It is a renovation of a 4 story building into 17 units of housing for the developmentally disabled. The area of the building is approximately 16,000 sf. The Ground floor includes office, utility, storage and gathering spaces. The upper floors include 16 studio units and 1 one bedroom unit. There is no parking garage and there is a modest amount of landscaping and hardscape scope. The units are NOT for sale (i.e. these are NOT condos), but affordable apartment rentals Page 38 of 42 ONLINE ONLINE Bid Date Bid Time Location 9/22/2014 2:00 PM San Francisco Plan Name / Scope of Work Prebid Information NEW Transbay Block 9 Engineers # of Plan Estimate Addenda # ONLINE 9/5 @ 2PM at 299 Second St., San Francisco ransbay Block 9 project is a new residential apartment building which borders Folsom Street, Clementina Street and First Street and is adjacent to the Fremont Street exit ramp. The Project will consist of a single 42 story high rise building of Type 1A construction with 436 market rate units and 109 affordable units. The basement will consist of 6 below grade parking and mechanical levels with 267 parking stalls. SBEs, MBEs, WBEs and LBEs are encouraged to submit proposals 9/23/2014 2:00 PM Oakland NEW Laney College Boiler Retrofit at Laney College MAND 9/2 @ 10AM at 333 East 8th St., Oakland Turn-key retrofit replacement of three existing forced draft package burner systems, controls & natural gas supply to meet or exceed current bay area air quality management air emission regulation 9, Rule 7 & no soot byproducts for the three existing hot water boilers at Laney College's Central Plant. ONLINE Seraphine Nzomo @ 510-+466-7255 2:00 PM 4:00 PM Richmond San Francisco Richmond Intermodal Improvement Project 8/14 @ 9AM at 300 Lakeside Dr., 17th Fl, Oakland $2200000 $2800000 Div_02-demolition; Div_03-concrete; Div-04-concrete unit masonry; Div-05-metal welding, structural steel framing, metal decking, cold-formed metal framing, metal fabrications, metal railings; Div_07-modified bituminous sheet waterproofing, vapor retarders, flashing & sheet metal, sheet metal roofing, joint protection; Div-07-door hardware; Div_09-painting, grafitti-resistant coatings; Div_10-bus shelters; Div_12-site furnishings; Div_20-raceway for facility services, underground ductwork & structures foir facility services; Div_26-low voltage wires & cables, lighting; Div_31-earthwork, clearing & grubbing, bioretention facilities, excvation support & protection; Div-32-aggregate subbase courses, aggergate base courses, aggregate drainage layer, asphalt paving, concrete paving, concrete curbs, gutters & walks, pavement markings, traffic signage, tactile warning surfacing, planting irrigation, planting; Div_33-utilities Candlestick Park Stadium Demolition & Abatement 8/20 @ 10AM at 397 Candlestick Park, San Francisco ONLINE ONLINE The Project includes hazardous material abatement and remediation, complete demolition and disposal of the Candlestick Stadium and all associated buildings identified within the project boundary limits, including but not limited to, outbuildings, stair cases, ramps, retaining walls light towers, pedestrian bridges, underground facilities, fencing, pavements, sheds, etc. as indicated on the project drawings; concrete crushing, material processing and recycling, removal of foundations as indicated, plus incidental work. SBEs, MBEs, WBEs, and LBEs are encouraged to submit proposals. 9/24/2014 2:00 PM 2:00 PM San Jose Vallejo Snell Pipeline (Coyote Creek Line Valve to Aborn Line Valve) Rehabilitation Project MAND 9/3 @ 9AM at 5750 Almaden Expressway, San Jose $1500000 - Mobilization, clearing & grubbing, demolition, control of water, excavation & backfill, aggregate base course, pipe bedding-select backfill, pipe bedding-controlled density fill, shoring, asphalt paving, slurry seal, curb, gutter, sidewalk & driveway restoration, utility structures, precast concrete vaults, traffic control, concrete, grout, general piping, valves & actuators, steel structures, roofs, electrical, flow instruments, corrosion control, coating & paints $1440000 NEW Dining Hall Conversion to Student Services Cal Maritime Encouraged 9/3 @ 10AM In general, the work consists of interior renovations to Cal Maritime Building 16, including minor demolition to prepare existing surfaces for new work, construction of new interior offices, including floor finishes, wall construction and finishes, and new ceilings. Work includes new plumbing, mechanical systems, electrical systems and fire alarm. Complete documents will be posted after 8/29. Page 39 of 42 ONLINE $2000000 Pending Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 9/29/2014 2:00 PM San Francisco Roadway Bridges Replacement Project 9/4 @ 9AM at 1250 San Carlos Ave, San Carlos San Francisco Engineers # of Plan Estimate Addenda # $8000000 008C Remove/replace existing two-span steel-through girder brisges due to deteriorated condition; remove/relocate/reconstruct existing utility lines; provide temporary support as applicable at each bridge 9/30/2014 11:00 AM 12:00 PM 2:00 PM Modesto San Francisco Fairield/Vac aville $2242000 ONLINE Div_02-demolition, cutting & patching, topsoiling & finished grading, earthwork, excavation & backfill, erosion & sediment control, water main construction, flexible pavement; Div_03-concrete; Div_05-metal fabrications; Div_08-access doors & panels; Div_09-painting & protective coatings; Div-10-identification devices; Div_11-pumping equipment:sump; Div_13-measurement & control instrumentation, instruments, boxes, panels & control center, PLC control system; Div_15-pipe systems; Div_16-interior & exterior lighting, electrical work TG08.2R-Exterior Awning Encouraged 8/14 @ 2PM at 175 Beale St., San Francisco ONLINE Webcor/Obayashi Joint Venture seeks trade subcontractors that have significant experience with design, furnish & installation of perforated, prefinished aluminum panel clad assembly on complex projects which require significant coordination with adjacent properties & traffic relocation located in an urban environment, including the engineering, coordination, procurement & complete installation of their respective systems in the following trade:Exterior Awning $30000000 Fairfield/Vacaville Train Station Project MAND 8/21 @ 10AM at 1000 Webster St., Fairfield ONLINE Downstream Water System Improvements Tier 2 Pressure Regulating Valves 5/14 @ 11AM at 1010 Tenth St., Modesto $34000000 Train Station 1. 40’ x 800’ center island platform with amenities including shelters, lights, Public Address and Variable Message Sign Systems – constructed on Union Pacific Railroad (UPRR) property. 2. 20’ x 150’ pedestrian underpass with stairs and ADA ramp both north and south. 3. North plaza area with 6 bus bays and bus shelters. 4. South plaza area. 5. Plaza foundations near UPRR tracks. 6. Parking areas with lighting, drainage, and landscaping. Roadways 1. Widening of Peabody Road to 6 lanes from Vanden to Huntington Road. 2. 1600’ pre-cast and cast-in-place 6-lane overpass over UPRR tracks with MSE walls and embankment. Must be constructed from summer 2015 to summer 2016. 3. New 2-lane transit access road through station. 4. Extension of Vanderbilt road south to the new transit access road. 5. 20-ft wide temporary access road approximately 60 feet west of Peabody Road. 6. Street lights and landscaping. Civil Work for Track Work 1. Grading and subballast for 6000 track feet that meets UPRR standards. 2. 36 inch diameter culverts and v-ditches Page 40 of 42 Engineers # of Plan Estimate Addenda # Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 10/2/2014 2:00 PM 8-Inch Ductile Iron Pipe Main Installation on Cement Street From Arguello Blvd to 14th Ave 5/13 @ 10:30AM at 1990 Newcomb Abe, San Francisco San Francisco $2270000 ONLINE Subcontracting opportunities may include, but not limited, to the following major types of work: trucking, hauling, shoring, pavement restoration, sawcutting, and traffic control. Div_02-excavation & backfill, pavement restoration, ductile iron & fittings, polythylene encasement of ductile iron pipe & fittings, removal ofd SFWD-owned valve box & cover, installation of screw taps, service pipe & fittings, repair & replacement of side sewer 10/8/2014 4:00 PM Half Moon Bay ONLINE RFQ-Testing, Inspection & Analysis Report for Historic Main Street Bridge The City of Half Moon Bay is seeking proposals from qualified & experienced engineering consultants for providing professional services for testing, inspection & analysis of the historic Main Street Bridge 10/14/2014 2:00 PM 2:00 PM Rodeo San Francisco $75000 NEW RFP-Landscape Maintenance Services LL-2 Zone 38 MAND 9/2 @ 10AM at 470 Parker Ave, Rodeo The Contra Costa County Public Works Department (County) is soliciting proposals from qualified firms and/or individuals to provide Landscape Maintenance Services (Project) for Countywide Lighting and Landscaping District (LL-2) Zone 38. The purpose of the Project is to maintain landscape features at four locations in Rodeo, as further described in this Request for Proposal (RFP) under Section V, Scope of Work: a) Parker Avenue Trees, located in the Parker Avenue frontages between San Pablo Boulevard and First Street; b) Rodeo Creek Trail, from Mariner’s Point Boulevard to Investment Avenue; c) Lefty Gomez Recreation Center and Ball Field Complex, located at 470 Parker Avenue in Rodeo and; d) Rodeo Sign Board Area, located at the southwest intersection of Parker Avenue and San Pablo Avenue in Rodeo. A map of the area is attached to this RFP as Exhibit H. $200000 TG15.1-Dock Levelers & Bumpers Optional 8/26 @ 2PM at 175 Beale St. San Francisco ONLINE ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with with furnishing and installing dock levelers, bumpers, truck restraints and bin lifters on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems. 10/15/2014 2:00 PM San Francisco TG15.2-Facade Access Equipment (Window Washing Equipment) ONLINE Encouraged 8/28 @ 2PM at 175 Beale St., San Francisco Webcor/Obayashi Joint Venture seeks trade suncontractors that have significant experience with furnishing, designing & installation of davit sockets, davit arms & fall arrest systems on complex projects which require significant coordination with adjacent properties & traffic relocation located in an urban environment; including the engineering, coordination, pocurement & complete installation of their respective systems in the following trade:Facade Access Equipment 10/16/2014 2:00 PM San Francisco TG07.9 Bollards & Barriers ONLINE 8/27 @ 2PM at 175 Beale St., San Francisco Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with designing, furnishing and installing bollards, wedge barriers, impact attenuators, hydraulic power units, controls and piping, and integration with safety and security systems on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems. 10/21/2014 2:00 PM San Francisco TG07.8 Expansion Joints 9/3 @ 2PM at 175 Beale St., San Francisco $900000 Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with expansion joints, miscellaneous metals and engineering on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems. Page 41 of 42 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 11/13/2014 2:00 PM TG08.3-Skylights Highly Rncouraged 8/21 @ 2PM San Francisco Engineers # of Plan Estimate Addenda # Webcor/Obayashi Joint Venture issues this Request for Proposals (RFP) for the Skylights Package for the Transbay Transit Center Project from firms (Trade Subcontractors) with expertise in Design, fabrication and installation of skylights. The successful Proposer must demonstrate experience in its respective field as outlined within this RFP. Page 42 of 42 ONLINE HELP WANTED Bay Area general contractor seeking a full time full charge bookkeeper. Must have construction experience! Knowledge of American Contractor software is a benefit. Please submit resume, salary requirement, and a cover letter in PDF format to [email protected] October: ASK FOR: Workers Compensation Insurance Renewals: Group 825 “Insurance Quote” Group 825 State Fund + BAY AREA Builders Exchange = 6% SAVINGS www. thebluebook .com A Special Seminar FRIDAY, SEPTEMBER 19TH 8:30 A.M. to 12:30 P.M. COST (due in advance): $150.00 per person LOCATION: Bay Area Builders Exchange 3055 Alvarado Street, San Leandro, CA 94577 (510) 483-8880 MAKE YOUR RESERVATIONS NOW……...DEADLINE IS SEPTEMBER 12TH Contact: Larry Levy at 415-892-1497 or FAX reservation to 415-8926596. Make check payable to Larry Levy. Mail to 458 San Marin Drive, Novato, CA 94945 Thank you, Larry. We are planning to come. Enclosed is my check. Names of participants: ___________________________________________________________________________ ___________________________________________________________________________ From (Co. or Org.) ___________________________________________________________________________ OUTLINE Overtime Requirements as of January 2014 Overtime Exemptions Make-up Time is Available Alternative Workweeks — New Law Itemization of Wage Statements When does the Work Week begin? Timekeeping Minimum Wage Violations — New Law Wage Theft — New Law Misclassification of Independent Contractors vs. Employees — New Law Commission Agreements — New Law Meal and Rest Periods — New Laws San Francisco Ordinances— New Laws Compensable (“Comp.”) Time On-Call Time Waiting Time The Company’s vs. the Employees’ Tools Paid Vacation Paid Sick Leave — New Law Paid Holidays Deductions from Paychecks Final Paychecks Frequency of Paying Employees Travel Time — New Law; Heads Up, Contractors! Determining the Difference between Exempt vs. Non-exempt Employees Advertising Rates Weekly Bulletin Our Bulletin runs weekly in 8 1/2 " X 11 " Size Format, Black & White Member (Total cost) NonMember (Total cost) $100 $150 $150 $200 $75 $110 $115 $150 $35 $60 $50 $80 $30 $50 $50 $75 Full Page: One or two weeks Three or four weeks 1/2 PAGE: One or two weeks Three or four weeks 1/4 PAGE: One or two weeks Three or four weeks Business Card & MBE/WBE/SBE Sub Bid Requests: One or two weeks Three or four weeks CLASSIFIED: Up to 7 lines One or two weeks $25 Three or four weeks $35 (Each additional line) $2.50 Note: A line is 30 Character / spaces. $40 $55 $4.50 Please fax a typed written sample of your ad to 510-352-1509 or email copy text to [email protected] and indicate the number of Weekly Bulletin issues the ad is to run. Ad deadline is 12:00 P.M. Thursdays, the Weekly Bulletin is published every Friday. **** Ads for Nonmembers must be paid in advance. 3055 Alvarado Street, San Leandro, CA 94577. Tel: 510-483-8880. Fax 510-352-1509. www.bayareabx.com. [email protected]
© Copyright 2024