Bidding on Public Works Jobs in California Just Got More Expensive

The Weekly Bulletin
Serving the Construction Industry and Bay Area Community since 1932
www.beac.com
2014 BOARD OF DIRECTORS
August 22, 2014
OFFICERS
Bidding on Public Works Jobs in California
Just Got More Expensive
Nancy Brinkerhoff, President
Ironwood Commercial Builders, Inc.
Lydia Roze, Vice President
Vista Universal, Inc.
Eric Kavert, Treasurer
Pacific Coast General Engineering,
Inc.
Forrest Towe, Past President
Anvil Builders
Effective July 1, 2014 All Contractors Who Intend to Bid or Perform
Work on Public Works Projects Must Register Online With DIR
By Carrie Bushman, Brown | Cook LLP
Thom Miles
TMA Construction Services.
With Governor Jerry Brown’s approval of SB 854, a budget trailer bill
signed into law on June 20, 2014, all contractors planning to bid on future
public works jobs will be required to register with the Department of
Industrial Relations (DIR) and pay an annual registration fee which will
be deposited into the newly created State Public Works Enforcement
Fund. Monies deposited into the Fund will be used to administer the new
contractor registration requirements and to fund DIR’s public works
compliance monitoring, enforcement, and administration. The new law
also requires public works contractors to begin submitting their certified
payroll records (CPR) electronically to the Labor Commissioner. The
requirement to submit electronic CPRs will be phased in gradually,
applying to all public works contracts by January 1, 2016.
John Parker
Janus Corporation
Contractor Registration
Ken Regevig
K. Regevig Roofing
Effective July 1, 2014, all contractors (including subcontractors) who
intend to bid or perform work on public works projects must register
online with the DIR in order to be qualified to bid on, be listed in a bid
proposal, or engage in the performance of any public works contract. The
registration application can be found at https://efiling.dir.ca.gov/PWCR/
ActionServlet?action=displayPWCRegistrationForm.
John C. Roeber, Past President
J. Roeber & Associates
DIRECTORS
Greg Adams,
Shimmick Construction Co., Inc.
Joe Maltifano
London Construction
EXECUTIVE DIRECTOR
Scott P Leary
DIRECTOR OF OPERATIONS
Denice McDavid
The Weekly Bulletin (USP3 3633) is published
every Week by the BAY AREA BUILDERS
EXCHANGE, 3055 Alvarado Street, San
Leandro, CA 94577-5711. Subscription rate
for non-members is $525 per year.
POSTMASTER: Send address changes to
BAY AREA Builders Exchange , 3055
Alvarado Street, San Leandro, CA 945775711.. Tel.: 510.483.8880. Fax 510.352.1509.
The requirement to list only registered contractors on bids becomes
effective on March 1, 2015. The requirement to only use registered
contractors and subcontractors on public works projects applies to all
projects awarded on or after April 1, 2015.
Annual Registration Fee
As part of the registration process, public works contractors must pay an
Public Works
Continued from front page …
initial nonrefundable fee of $300 and an annual renewal fee on or before July 1 of each year
thereafter. The registration fee may be adjusted in the future, but no more than annually. A
contractor who fails to pay the renewal fee on or before the expiration of any prior period of
registration shall be prohibited from bidding on or engaging in the performance of any public
works contract until once again registered.
Other Registration Requirements
To qualify for registration, the contractor must also meet the following minimum
qualifications:






Must have workers’ compensation coverage for any employees
Must only use subcontractors who are registered public works contractors;
Must have a CLSB license, if applicable to the trade;
Must have no delinquent unpaid wage or penalty assessments due to any employee or
agency
Must not be under debarment
Must not be in prior violation of the registration requirement once it becomes
effective. However, first time violators will be able to avoid 12 month disqualification by
paying an additional penalty.
Impact on Bid Process
SB 854 provides that an inadvertent error in listing a subcontractor who is not registered in a
bid proposal shall not be grounds for filing a bid protest or for considering the bid nonresponsive, provided that (1) the subcontractor is registered prior to the bid opening; (2) within
24 hours after bid opening, the subcontractor is registered and has paid the penalty registration
fee; or (3) the subcontractor is replaced by another registered subcontractor. The new law also
provides that a subcontractor’s failure to be registered shall be grounds for the contractor, with
the consent of the awarding body, to substitute a registered subcontractor in place of the
unregistered subcontractor.
SB 854 also requires contractors and subcontractors on all public works projects to submit their
certified payroll reports electronically to the Labor Commissioner, unless excused from doing
so. The requirement applies immediately to projects that have already been under Compliance
Monitoring Unit monitoring, it will apply to new projects awarded on or after April 1, 2015 or
other projects as determined by the Labor Commissioner, and will apply to all projects, new or
ongoing, on and after January 1, 2016.
If you have any questions about SB 854, please contact Carrie Bushman at (916) 442-3100 or
[email protected].
BAY AREA BUILDERS EXCHANGE - TELEPHONE (510) 483-8880. FAX (510) 352-1509
WEEKLY PLAN LIST - Saturday, August 23, 2014
To view plans online go to: www.beac.com
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
8/22/2014 10:00 AM
Palo Alto
Elementary Schools Window Coverings Phase 2
MAND 8/11 @ 8AM at 1525 Middlefield Rd., Palo Alto
Installing a functioning curtain system on high windows & window blinds on low windows per specifications at muliple elementasry schools
ONLINE
Contra
Costa
County
Traffic Signs
ONLINE
12:00 PM
Prebid Information
NTENT: The County of Contra Costa is seeking qualified vendors interested in supplying Contra Costa Counties Public Works Departments various Traffic
Signs. The County intends to accept bids submitted on line through Bidsync, and award purchase orders to several of the lowest responsive and responsible
vendors for these items.
SCOPE: The County Public Works Department is seeking vendors interested in supplying their annual need for street and highway signs. Please note the
following:
1). All signs to be made of .080 gauge aluminum in accordance with M.U.T.C.D. standards including the CALIFORNIA SUPPLEMENT, sheeted with High
Intensity Prismatic Sheeting, INCLUDING MOUNTING AND BRACE HOLES WHERE APPROPRIATE, UNLESS OTHERWISE SPECIFIED. BRACE HOLES TO
BE 32" APART CENTER TO CENTER. ALL SIGNS TO HAVE RADIUS CORNERS AS PER M.U.T.C.D. GUIDELINES.
2). ALL BLANKS ARE TO HAVE APPROPRIATE COLOR AND SIZE RECESSED BORDER, IE: CONSTRUCTION BLANK ? ORANGE WITH BLACK
BORDER, GUIDE BLANK ? GREEN WITH WHITE BORDER, REGULATORY BLANK ? WHITE WITH BLACK BORDER, UNLESS OTHERWISE SPECIFIED.
2:00 PM
San
Francisco
3). All School, pedestrian, and bike signs to be sheeted with VIP, FLORESCENT YELLOW ? GREEN sheeting
8/6 @ 10am
ONLINE
Hunters View, Phase II, Blocks 7 & 11
THIS IS A CAHILL / NIBBI JV JOB. Project is located in Hunters View (Middle Point Rd. & West Point Rd.), San Francisco & divided into 3 main Phases. Phase
2 includes the construction of 107 units in apartment buildings & rowhouses on Blocks 7 & 11. Demo & Infrastructure work for Phase 2 has already been
awarded & underway. Also Structural & Misc. Metals, Fire Sprinkler & Solar Thermal Water Heating System have already been bid.
2:00 PM
Soquel
Demolition of Residence at 2821 Rosedale Avenue
$26000
Demolition of all buildings and/or other structures designated, except for the detached garage & the subsequent removal of all materials & debris from the site
Page 1 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
8/22/2014 3:00 PM
Family Dollar-Modesto
Modesto
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Tenant Improvment for existing Family Dollar store. Trades Include: Demolition, Concrete, Masonry, Misc. & Structural Steel, Rough Carpentry, Insulation,
Roofing, Doors/ Frames/ Hardware, Aluminum Storefront, Drywall & Metal Studs, Flooring, Acoustic Ceiling, Painting, FRP, Toilet Accessories, Plumbing,
HVAC, Electrical, etc.
5:00 PM
San
Joaquin
County
Hazardous Material Investigation Survey Abatement Design
Documentation & Observation/Monotoring - CANCELLED
ONLINE
The responsible parties shall be a licensed Engineer, Certified Asbestos Consultant (CAC), and a CDPH Certified Lead Inspector / Assessor and be certified /
licensed in the State of California (CA). All work shall be signed, stamped and approved by the licensed professional and Engineer.
Services may include, but not be limited to, hazardous materials assessments, surveys, reports, abatement design plans/ specifications (including abatement
cost estimates) and monitoring/ sampling associated with the identification/ abatement of toxic and/ or hazardous substances such as, but not limited to,
asbestos, lead, mercury, Title 22 Heavy Metals, Pesticides, Hydrocarbons, Volatile Organic Compounds, PCB’s, molds, etc. These services will be performed
during one of the following or combination thereof: Study Phase, Preliminary Phase, Working Drawing Phase (including Bidding) and Construction Phase.
5:00 PM
San Jose
RFQ-Pipe Canopy Contractors for 60-Inch Brick Interceptor Phase VIA Project
ONLINE
The City of San Jose is requiring that all pipe canopy contractors bidding the 60-Inch Interceptor Phase VI-A project must be prequalified before sbmitting a bids
on the project. It is mandatory that all contractors who intend to submit a bid for the project fully complete the pre-qualification questionnaire, provide all
materials requested & be approved by the City to be on the City's final pre-qualified contractors list.
The project includes demolition of the existing 54-inch lined sewer main & installation of approximately 4,500 LF of 84-inch reinforced concrete pipe.
8/25/2014 1:00 PM
San Jose
RFQ-Electrical Services for Various Equipment at CSJ ESD (Rebid)
ONLINE
The City of San Jose is seeking a Contractor to provide all labor, materials & equipment required to provide electrical servcies for various equipment located at
the Environmental Services Depat Muni Water
12:00 PM
Lodi
Online O
Smart & Final #593
This project is the remodel of an existing Smart & Final including construction of a new front facade. Trades required include: re-slurry and stripe the parking lot,
demolition, concrete, masonry, structural & misc. steel, misc. rough carpentry, finish carpentry, FRP, insulation, roof patching, sheet metal, caulking, doors,
frames & hardware, plaster, steel studs and drywall, tile, painting, restroom accessories, fire sprinklers, plumbing, HVAC and electrical.
2:00 PM
Live Oak
Live Oak Middle School Restroom Modernization
MODERNIZATION OF EXISTING STUDENT RESTROOMS.
DO NOT INCLUDE STAFF RESTROOMS SHOWN ON A2.2!!!!
PLEASE BID PREVAILING WAGE UNLESS DIRECTED OTHERWISE.
TRADES NEEDED: Demo/Sawcutting, Concrete, CMU, Rough Carpentry, Flashing & Metals, Doors, Drywall, Tile, Paint, Restroom, Plumbing, HVAC, Electric,
Fire Alarm.
Page 2 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
8/25/2014 2:00 PM
Harbour View Apartments
Richmond
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
62 units, one building, 48,697 SF, including interior finishes, plumbing, HVAC, structural & electrica work
2:00 PM
Fremont
ONLINE
Telecommunications System Repair Services
The California Dept of Education is soliciting bids from potential contractors to provide telecommunication system repair services to the california School for the
Blind. The contract period is from Sept 15, 2014 through Sept 14, 2015 & includes a one year option to renew
Miriam Lopez @ 933-2482
3:00 PM
4:00 PM
Roseville
Fremont/Ne
wark
RFQ-Sun City Crack Seal Project
ONLINE
The purpose of this Request for Quotation (RFQ) is to solicit bids to provide all labor and materials for the crack / gap sealing project in the Sun City Community
of Roseville.
Swings Space Connections Package Phase 2
8/11 @ 2PM
ONLINE
Installation of temporary relocatable classrooms buildings in Newark & Fremont.
8/26/2014 11:00 AM
Modesto
11:00 AM
Watsonville
2:00 PM
Hayward/Ric
hmond/Conc
ord
$2443671
8/7 @ 11AM at 1010 tenth St., Modesto
This project will replace and upgrade deficient water mains in the southeast portion of Modesto bounded by the following streets: La Loma Avenue on the west;
sections of Encina Avenue and Edgebrook Drive on the north; Camellia Way on the east; and Yosemite Boulevard on the south. Work also includes paving
street sections and alleys with varying finished or unfinished pavement conditions
$483000
Signal Upgrades & Pedestrian Improvements
MAND 7/31 @ 10AM & 8/4 @ 10AM
Removing and replacing curb ramps, curb, gutter & sidewalks, replacing existing pedestrian heads with countdown pedestrian heads, installing accessible
pedestrian crossings, relocating or replacing pedestrian push buttons, removing and replacing signs, traffic striping, markers & markings
$725000 Refurbish Train Operator Facilities at Hayward, Richmond & Concord 6/25 @ 10AM
Strengthen & Replace La Loma Water Mains
ONLINE
ONLINE
ONLINE
$775000
Provide all labor, equipment, tools, materials, management, coordination, professional services and other services required to refurbish the train operator
facilities at the following yards: Hayward Yard, Richmond Yard and Concord Yard
2:00 PM
Redwood
Valley
2:00 PM
Tracy
Redwood Valley Lions Park Ball Field Repairs
MAND 8/12 @ 9am; Mandatory
ONLINE
Provide & install a new ball field backstop, fence repairs & new chain link mesh fabric at the Redwood Valley Lions Park ball field
ONLINE
Civic Center Water Tower Repainting
Repaint a 1928 built 100,000 gallon, 140-foot high steel lattice truss water tower
Binh Nguyen @ 209-731-6454
Page 3 of 42
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
8/26/2014 2:00 PM
SFO Architecture & Engineering Design Services for South Field
Tenant Relocations
7/29 @ 10AM
San
Francisco
Engineers # of
Plan
Estimate Addenda #
$5000000 -
ONLINE
This Project will provide improvements to non-terminal facilities, including West Field and North Field cargo buildings, for warehouse, Ground Service
Equipment (GSE), maintenance, office, and client service spaces necessary to relocate Airport Commission leasing tenants, such as Third Party Airline Service
Providers. The Project will include the building preparation and relocation coordination of all affected tenants in the South Field area. These improvements can
range from minor modifications of the existing spaces to more extensive work towards mechanical, electrical, plumbing, utilities, ITT/communications, special
security systems and fire and life safety systems. The Project will also include hazardous material abatement and any site remediation
Farah Young, Contracts Mgr, at 650-821-5568
2:00 PM
San Bruno*
2:00 PM
Rohnert
Park
2:00 PM
Bay Point
Tank No. 3 (Glenview) Replacement Project
MAND 07/30/14 @ 1:30 pm
The work includes, but is not limited to: Replacement of an existing two million gallon
concrete potable water storage tank with a pre-stressed concrete tank, removal of a
steel tank, site cleanup, grading and construction of a containment berm around the
tank; removal of pumps and piping in an existing onsite pump station; addition of
emergency seismic valve, flexible tank connections, tank mixing system, tank lighting,
intrusion switch for pump station and tank hatches; and wrought iron, wood, and chain link fencing. Ancillary work includes safety, site restoration, and erosion
control at the site of work.
$30000
Galbreath Wildlands Preserve Water Well
8/20 @ 10:15AM
Construct potable water well for domestic use that will supply water to researchers & clases located at a remote university field stattion, including boring,
reaming, casing, sand, gravel & sanitary seal; Install a premium efficiency submersible pump with the capability to raise water to surface; electrical connection
sufficient to use generator to run submersible pump & fill a water tank; piping
Field Office Remodeling Project at Casa De Serena Public Housing
8/20 @ 10AM at 1016 Clearland Dr., Bay Point
032C
ONLINE
ONLINE
Development
2:00 PM
Napa
2:00 PM
Gilroy
2:00 PM
Fairfield
The Housing Authority of Contra Costa County is soliciting quotation for small puchases from qualified, licensed & insured entities to provide services to
HACCC, including modifying and/or remodeling existing offices/rooms within a designated area of an existing buildings
$240000
Napa River & Bay Trail-Segments 7 & 8
8/21 @ 9AM
Construction of approximately 3,400 linear feet of quarry fines trail along associated facilities & appurtenances Including minor drainage, approximately 2,500
linear feet fencing & gates
Gavilan Pond Life Overlook Outdoor Classroom
8/12 @ 10AM
Div-05-metal fabrications; Div_10-signage; Div-31-site clearing, hot-mix asphalt paving, earthwork; Div_32-site concrete, landscape bounders, pavement
markings, tactile warning surfaces
RFQ-Geotechnical Engineering Services
MAND 8/15 @ 10AM at 360 Campus Ln, 1st Fl, Fairfield
The Solano Community Collge Dist is seeking Request for Qualifications from qualified professional services firms for geotechnical engineering services for the
Solano Community College
Page 4 of 42
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
8/26/2014 2:00 PM
Refurbish Train Operator Facilities at Hayward, Richmond and
Concord Yards
06/25 @ 10am
Contra
Costa
County
2:00 PM
Berkeley
2:00 PM
Monterey
3:00 PM
Palo Alto
3:00 PM
Cupertino
3:00 PM
Northern
California
Engineers # of
Plan
Estimate Addenda #
$725000 $775000
Providing all labor, equipment, tools, materials, management, coordination, professional services and other services required to refurbish the train operation
facilities at the following yards: Hayward, Richmond, Concord.
$260000
Lewis Hall Fire Alarm Upgrade
MAND 8/12 @ 11AM
Approximately 65,000 gsf of occupied laboratory, classroom & lecture hall spaces requiring fire alarm system notification upgrade & associated fire alarm system
modifications to support the system enhancements
Online
ONLINE
ONLINE
Dennis The Menace Walkway/Access Improvements Phase II and
Skateboard Park Renovation and Expansion
In general, the work consists of demolition of existing concrete and asphalt pathways at Dennis the Menace Park that are non-ADA compliant, removal of the
existing Moon Bridge, removal of several sections of the existing skate park, construction of ADA accessible walkways and ramps, concrete walls and steps at
Dennis the Menace Park, construction of concrete skate park elements, and conforming new work to existing site conditions.
Sanitary Sewer Rehabilitation Project 24/25
MAND 8/14 @ 2PM at 1007 Elwell Ct., Palo Alto
The City of Palo Alto Utilities Department is seeking bids from qualified firms to provide services for installation of sanitary sewer mains, laterals, manholes and
appurtenances perform system tie-ins, performance of required testing, and excavation, recycling and surface restoration. The required services are described in
the IFB Technical Specifications.
Dive Pool-Tower Removal
MAND 8/13 @ 10AM at 21250 Stevens Creek Blvd.,
Cupertino
Div_03-concrete rehabilitation
CCure Maintenance & Monitoring - Bay Area Employment
MAND 8/14 @ 1:30PM
ONLINE
ONLINE
ONLINE
Development Department Northern California Offices
Provide system software and hardware maintenance in order to maintain the existing software and equipment.
3:00 PM
Palo Alto
ONLINE
RFQ-Sand, Rock & Asphalt for Utilities Construction
The City of Palo Alto is requesting RFQ’s for the purchase and delivery of sand, backfill rock and asphalt material for Utilities construction, and various
Community Service Departments, Park Divisions as needed per specifications provided in the RFQ
8/27/2014 1:00 PM
Palo Alto
Building 361, Community Living Center Clinic, Menlo Park Division,
Veterans Affairs Palo Alto Health Care System
$5000000 $10000000
Provide CONSTRUCTION Services for Building 361, Community Living Center Clinic (Geriatric-Psychiatric Clinic), Menlo Park Division, VA Palo Alto Health
Care System, Menlo Park, CA. The work consists of the following: Contractor shall completely prepare site for building operations, including demolition and
removal of existing items, and furnish labor and materials and perform work for a single-story building adjacent to Building 360H as required by drawings and
specifications. Work includes general construction, alterations, roads, walks, grading, drainage, mechanical and electrical work, laboratory equipment, utility
systems, and necessary removal of existing other items. Also includes asbestos abatement and testing/removal of contaminated soil.
James Garror @ 415-503-6988
Page 5 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
8/27/2014 1:30 PM
RFQ-Non-Leaded Brass Water Service Fittings
Oakland
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
The scope of this project is to furnish miscellaneous non-leaded brass water service fittings as required for East Bay Municipal District use as described in the
RFQ. EBMUD intends to award a three-year contract with two options to renew for one-year periods to the lowesr cost bidders whose reponse confomrs to the
RFQ & meets the District's requirements. Furnish water services lateral & meter installation fittings, including corporation stops, curb stops, ball & plug stops,
meter couplings & resetters
Kelly Smith @ 510-287-0355
10:00 AM
Ceres
$350000
2014 Slurry Seal Project
ONLINE
Installing approximately 208,076 SY of asphalt slurry seal
11:00 AM
Lodi
2:00 AM
Pittsburg
2:00 PM
Placerville
Dewatering Polymer
MAND 7/2 @ 10AM at 12751 N. Thornton Rd. Lodi
Trial testing and purchase of dewatering polymer for the period of October 1, 2014 through September 30, 2015.
$3000080
Water Treatment Plant Capital Improvements Project, Phase 1A
8/11 @ 10AM
Div_02-demolition, asbestos cement pipe removal, site preparation, eartwork, drilled concrete piers, paving; Div_03-concrete; Div_05-anchor bolts,
miscellaneous metal work, aluminum guardrails & handrails, metal grating; Div_09-coating systems; Div-11-electric motors, fabricated SS slide gates,
telescoping valves, submersible sump pumps; Div_14-davit crane; Div_15-piping system, valves, Div_16-electrical; Div_17-instrumentation & control
HVAC Replacement & Air Balancing Project for Placerville DMV Field 7/30 @ 10AM at 2919 Cold Springs Rd, Placerville
ONLINE
014C/R0
ONLINE
Office
The contractor shall remove & dispose of existing single HVAC multizone unit, condensing unit, line set & related controls & replace with new unit & include all
hardware required for installation & operation & all software necessary for operation of the unit
Heide Turpen @ 916-657-9807
2:00 PM
South Lake
Tahoe
ONLINE
BeVMo TI
Tenant Improvement (10,045 s.f.). Trades to include: sawcut concrete, concrete patching, rough carpentry, finish carpentry, frp, insulation, roofing-patch,
doors/frames/hardware, impact doors, windows, window film, drywall/framing, resilient flooring, painting, ceramic tile, toilet accessories, plumbing and electrical.
2:00 PM
Santa Cruz
2:00 PM
San Jose
2:00 PM
Sacramento
$150000
Water Street Bridge Debris Removal Project
The project consists of removing 1,750 cubic yard of concrete debris in the dry areas below
the Water Street Bridge and erosion control of the project area.
CCTV at Various Locations Phase 2
8/12 @ 10AM at 3331 N. First St, Bldg A, San Jose
Furnishing, installing, programming & testing a fully functioning CCTV system within the VTA tansportation system
Measure U Irrigation Improvements-Package A
E809B/0
$411350
The work to be performed consists of upgrading the existing irrigation controllers at Curtis, Hite, Renfree, and Roosevelt Parks with new central irrigation
controllers, install new booster pumps, tube steel fencing, concrete paving, decomposed granite paving, landscape repair, new points of connection for domestic
and irrigation water.
Jeff Nittka, Proj Mgr, @ 916-808-7633
Page 6 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
8/27/2014 2:00 PM
Cummins/Onan Generator Parts & Service
Sacramento
2:00 PM
Oakland
2:00 PM
Mill Valley
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
For furnishing to the Department of Utilities, Operation and Maintenance Division- Parts and Services used on various Cummins/Onan generators. The
quantities stated in the pricing schedule are estimates for bidding purposes only, actual purchases will be made on an as needed basis.
$33250000
Construction of Runway Safety Area Improvements, North Field,
Strongly Recommended 8/13 @ 9:30AM at 1100 Airport
Oakland International Airport
Drive, Oakland
The work of this 491 calendar day project consists, in general, of furnishing all labor, materials, appliances, tools, equipment, transportation, services and
supervision required to complete the Runway Safety Area (RSA) Improvements at the North Field, including, but not limited to: stabilization of RSA soils through
the addition of cement, re-grading the RSA and portions of the Obstacle Free Areas to meet Federal Aviation Administration (FAA) standards; installation of an
Engineered Materials Arrestor System (EMAS), runway markings, and new taxiway; relocation of vehicle service roads; performing necessary excavation and
grading; removal of existing drainage infrastructure; constructing drainage improvements; removal of existing electrical duct banks; and constructing new
electrical duct banks, Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR) and Precision Approach Path Indicator
(PAPI) upgrades and lighting improvements; and performing all associated work, all in accordance with the Contract Documents.
$310000
Mill Valley-Sausalito Multi-Use Pathway Roundabout at Bayfront Park
ONLINE
016C/E8
Work will include asphalt concrete resurfacing, asphalt concrete grinding, concrete sidewalk, concrete curbs, curb ramps, vegetation removal, raising utility
covers, landscaping, irrigation, signage, lighting, and other park amenities on a multi-use pathway in southern Marin County. The work will also require
construction of a temporary by-pass pathway, construction area signs, and fencing. Construction will take place during the daytime hours with traffic control of
bicyclists and pedestrians.
Complete documents will be posted as soon as we receive them
2:00 PM
2:00 PM
French
Camp
Byron
HVAC Repairs for Juvenile Detention Center & Honor Farm
MAND 8/4 @ 9AM at 535 W. Matthews Rd., French Camp
$55000 $60000
Final belt alignment & adjusting for maximum motor amps. Some units require replacement of fan flex connectors which requires measurement, fabication &
installation and verify proper operation.
Water Treatment Plant Modifications Delta Operations and
7/31 @ 10am
ONLINE
E805B/0
Maintenance Center
Excavation of failed areas of asphaltic concrete pavement and underlying sections;
Installation of new 10” underdrain pipe, with connection to existing drainage structure;
Grading and compaction of material at bottom of excavation; Placement of geotextile;
Placement of porous concrete layer; Encapsulating the porous concrete layer with geotextile cover; Construction of aggregate subbase course; Construction of
crushed aggregate base course; Construction of new bituminous surface course; and
Installation of new pavement markings, both painted and thermoplastic.
2:00 PM
2:00 PM
Burlingame
RFP-Automated Fleet Monitoring Services
ONLINE
Oakley
The City of Burlingame intends to install an automated system to monitor 78 pasenger & equipment vehicles in the departments of Public Works, Parks &
recreation & Building & Planning Departments in order to optimize fleet usage & productivity.
Asset Management's Field Office Remodelin Project Casa De
8/21 @ 10AM at 990 Rosemary Lane, Oakley
ONLINE
Manana PHD
The Housing Authority of Contra Costa County is soliciting quotation for small puchases from qualified, licensed & insured entities to provide services to
HACCC, including modifying and/or remodeling existing offices/rooms within a designated area of an existing buildings
Page 7 of 42
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
8/27/2014 2:30 PM
$850000
8/13 @ 2PM at 65 Civic Ave, Pittsburg
Rehabilitation of existing asphalt concrete pavements, including patch paving, crack sealing, slurry seal, micr-surfacing, aspahlt rubber chip seal, replacement of
minor quantities of curb, gutter, sidewalk, valley gutter & pavement delineation work
Vincente Street & Ocean Avenue Pavement Renovation, Sewer
7/28 @ 2:30PM at 1680 Mission St., 3rd Fl, San Francisco $4000000
2:30 PM
Pittsburg
San
Francisco
Prebid Information
2014 Pavement Management Program
R008/01
ONLINE
Replacement & Water Main Installation
Demolition, pavement renovation & curb ramp construction, sewer replacement & drainage work, water main installation, traffic signal work, traffic routing
Ramon Kong, Proj Mgr, @ 415-554-8280
2:30 PM
Livermore
$1514000
Freisman Park City Project 2007-2066
013C/R0
The Work comprises the construction of a Park, Playground and Picnic Area in the City of Livermore for the Freisman Park. The project consists of grading,
landscaping and irrigation, lighting, installation of picnic tables, trash receptacles, benches and bicycle racks, fences, construction of a parking lot. Installation of
concrete curb and gutter, concrete sidewalk, asphalt walkway, installation of storm drain, concrete foundations, conduits, wires and pull boxes and the removal
of existing vegetation.
2:30 PM
San
Francisco
North Beach/Joe Dimaggio Playground Renovation
8/14 @ 9:30AM at 30 Van Ness Ave, 5th Fl, San Francisco $4000000
ONLINE
Site improvements with demolition, hazmat abatement; grading; drainage; soil improvement; utility work; structural concrete work; new hard surface courts; new
playground; chain link fencing; and planting & irrigation
Cara Ruppert @ 415-581-2547
3:00 PM
Petaluma
Park Place Well Replacement
8/12 @ 3PM at 202 N. McDowell Blvd, Petaluma
Demolition of existing concrete well pad, drilling of new well, development of well & installagtion of well pump & systems
ONLINE
3:00 PM
Sunnyvale
Park Tennis & Basketball Court Resurfacing Project
ONLINE
Rehabilitation of outdoor tennis & basketball courts at Washington, Lakewood, Orchard Gardens & Encinal Park to asphalt overlay the existing courts, repair
cracks, replace court fencing, nets & related hardware
$263000
Jardin De Ninos Park Renovation
MAND 8/8 @ 10:30AM
ONLINE
Stormwater pollution prevention plan; trenching & backfill; grading & earthwork; base for play area poured in place surfacing; concrete improvements; storm
drain; sanitary sewer; site furnishings-tree grates;; solid color stain for concrete walls; metalwork; anti-graffity coating; painting; lighting, electrocal
RFQ-Window Installation Pilot Project-100 McAllister
MAND 7/24 @ 11AM
ONLINE
3:30 PM
4:00 PM
Redwood
City
San
Francisco
Removal of existing wood windows & replacement with aluminum windows that match the historic profile of the windows & maintain all means of egress
functional during all stages of work
Page 8 of 42
Bid Date Bid Time Location
Plan Name / Scope of Work
8/27/2014 4:00 PM
McAllister Street Streetscape Project
5:00 PM
San
Francisco
Contra
Costa
County
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 8/13 @ 1PM at 200 McAllister St., San Francisco
Div_02-demolition; Div_03-concrete; Div_07-got fluid applied rubberized asphalt waterproofing; Div_08-vault access door: Div_10-signage; Div_12-site
furnishings; Div_26-exterior lighting, electrical; Div_31-earthwork, excavation & fill, trenching & backfilling, shoring & underpinning; Div_32- cold milling asphalt
paving, aggregate base courses, asphalt paving, bitumonous concrete pavement, pavement markings, cast-in-place detectable surface tiles, adjustment of
frames & castings, planting; Div_33-water systems, sanitary sewerage utilities; Div_34-basic overhead materials & methods, tapered steel trolley poles &
accessories, overhead contact system-special work, overhead contact system-testing & acceptance
RFQ-On-Call & Pre-Qualified Shortlist for Environmental Consulting 8/12 @ 1PM at 255 Glacier Dr., Martinez
ONLINE
ONLINE
Services (2015-2018)
The Contra Costa County Public Works Department (Dept.) is requesting Statements of Qualifications (SOQs) from highly qualified and experienced
environmental firms to provide on-call environmental consulting services and to establish a pre-qualified shortlist for future projects.
Purpose:
The purpose of this Request for Qualifications (RFQ) is to select firms to provide environmental compliance services within multiple environmental disciplines for
a variety of projects for the Dept. during the 2015-2018 term.
Interested Firms:
For a copy of the RFQ and sample Contract, or to post and review questions, please go to www.cccounty.us/pwrfq and select the “ebidboard” link.
Please see RFQ for further details.
All dates are subject to change.
5:00 PM
Sonoma
County
As-Needed Graphic & Artistic Design & Interpretation
ONLINE
County of Sonoma Regional parks Department is soliciting statements of qualifications for the purpose of developing as "As-Needed" agreement for work on
various projects. Graphic and Artistic services may include but are not limited to the creation of graphic interpretive sign panels, park brochures and maps, and
marketing materials such as posters, displays, and promotional pamphlets. Graphic and Artistic services may also include the development of original art work.
8/28/2014 10:00 AM
Gilroy
NEW Gilroy Hyundai Facade Improvements
Landscaping, demolition (minor for roof, interiors & soffit), ACM metal panels, metal stud & framing & grid ceiling-minor, ceramic tile flooring & baths, plumbing,
HVAC, electrical, lighting, asphalt striping, concrete, stucco, storefront glass, painting (exterior/interior), bathroom partitions & accessories
ONLINE
Email bids to Frank Dickinson @ [email protected]
11:00 AM
Belvedere
Beach Road Seawall & Sidewalk Repairs
8/21 @ 11AM
Demolition of existing street improvements including sidewalk, curb, gutter & asphalt; excavation of backfill for the construction of thre new concrete footing &
drainage improvements; backfill, compaction & replacement of the street improvements & all ancillary work
John Mow @ 415-435-3838
Page 9 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
8/28/2014 11:30 AM
Toyon Ave at Bella Vista Ave Retaining Wall
Belvedere
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$30000
ONLINE
Demolition of existing wall; excavation, pier drilling & placement of steel & concrete or shortcrete; installation of steel reinforcing for wall; surface & subsurface
drainage & outlet components
John Moe @ 415-435-3838
2:00 PM
SF/East
Bay/San
Joaquin
General Engineering (A-License), San Francisco/Peninsula/East Bay
to West San Joaquin County & Stanislaus County
ONLINE
8/5 @ 10AM
Subcontractor opportunities may include, but not limited , to the following major types of work:building/moving/wrecking, carpentry/cabinets & millwork, cathodic
protection, concrete. construction traffic control services, earthwork & paving, electrical, elevator, installation & repair, fire protection, general engineering,
hazardous materials, hazardous waste & remediation service, HVAC, landscape, masonry, ornamental metals, painting/waterproofing, pipeline, plumbing,
reinforcement steel, roofing, sheet metal, structural steel, tree services, trucking & hauling, welding, well drilling
2:00 PM
San
Francisco
2:00 PM
Novato
2:00 PM
San
Francisco
ONLINE
RFQ-Project/Construction Management Services
The University of California at San Francisco Medical Center seeks letters of interests & statements of qualifications from individuals or firms qualified to provide
project mangement services, which the medical center will select up to three individuals to provide Healthcare Project management/Construction Management
services as describe under the scope of services
$1000000 Novato Housing Maintenance & Repair Electrical System
8/15 @ 10AM at 227 South Oakwood Dr., Novato
ONLINE
$5000000
Maintenace & repair electrical system
2:00 PM
San
Francisco
TG16.3-Terrazzo
ONLINE
Webcor/Obayashi Joint Venture seeks trade subcontractors that have significant experience with terrazzo, including but not limited to, terrazo epoxy crack
suppression system & epoxy terrazzo flooring on complex projects. Also included are engineering, coordination, procurement & complete installation of the
respective systems in the following trade:TG16.3-Terrazo
Mission Bay North N4P3 (No GC Openings)
Voluntary 8/13 @ 10AM
ONLINE
Construction of 129 units in apartment building on Block N4P3. The following have already been awarded: Mechanical, Plumbing, Electrical, Fire Sprinklers
design builds, Elevator, and Piles. MBE/WBE/SBE/LBEs encouraged to bid.
Div_03-concrete; Div_04-concrete unit masonry: Div_05-structural steel, metal fabrications, glazed decorative metal railings; Div_06-rough carpentry,
sheathing, wood trusses; Div_07-hot fluid-applied rubberized asphalt waterproofing, thermal insulation, weather barriers, formed metal wall paanels, sheet metal
flashing & trim, roof accessories, penetration firestopping, fire-resistive joint systems, joint sealants, acoustical joint sealants; Div_08-hollow metal doors &
frames, flush wood doors, integrated metal door opening systems, access doors & frames, overhead coiling grille, aluminum-framed entrances & storefronts,
aluminum windows, door hardware, glazing, fixed louvers; Div_09-gypsum board shaft wall assemblies, non-structural metal framing, cement plastering, gypsum
board, ceramic tiling, resilient base & accessories, resilient sheet flooring, resilient athletic flooring, exterior ainting, interior painting, high-performance coatings;
Div_12-site furnishings & features; Div_32-operation & maintenance of planting, precast concrete unit paving, parking bumpers, concrete flatwork & sitework,
planting irrigation, soil preparation, finish grading, planting, green roof planting; Div_33-utility area drains
Page 10 of 42
Bid Date Bid Time Location
Plan Name / Scope of Work
8/28/2014 2:00 PM
Pole Line Road & Summit Road Pavement Improvement Project
San Jose
Prebid Information
Engineers # of
Plan
Estimate Addenda #
009C
Pavement repairs & microsurfacing; installing pavement striping, markings. etc.
2:00 PM
Santa Cruz
2:00 PM
Turlock
2:00 PM
Vallejo
$160000 $185000
Chestnut Street Emergency Slip-Out Repair
The work to be completed consists of constructing 2 small cast-in-place cantilever concrete retaining walls approximately 30-35' in length, located on both the
East and West sides of Chestnut St Extn, below Mission St. The work also includes constructing a drainage and underdrain system and other incidentals as
shown in the plans and specifications.
$45000
Rube Boesch Center HVAC Improvements
MAND 8/21 @ 10AM at 275 North Orange St., Turlock
The work consists, in general, of: Removal of existing improvements, install (1) 13 SEER 3-ton condensing unit and coil or approved equal, install (1) 45,000
BTU 80% up flow furnace with setback thermostat, shop to fab and install duct connector from the coil to the duct plenum, reconnect to the existing duct work,
gas line, refrigerant lines, flue pipe, line and low voltage wiring, install condensate pump and drain line to the roof, connect the existing condensate pump to
HVAC (South unit), modify the stand to match new condensing unit, supply crane to set new unit, supply HERS Rater duct test, and furnishing all necessary
labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place. This work shall
be completed in accordance with the Standard Specifications, standard Drawings and these Special Provisions.
2014 UL, LL & Main Comprehensive Replacement Project
$1696405
The Work consists of replacing 4,673 linear feet of existing SS mains with 8-inch SS Main by pipeburtsting method, replacing 1,340 linear feet of existing SS
mains with 10-inch SS main by pipebursting method, replacing Upper laterals, Lower laterals, District Cleanouts, Rodding inlets with Sanitary Sewer Manholes,
property restoration, and slurry seal complete and in place.
Page 11 of 42
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
8/28/2014 2:00 PM
Walnut
Creek
Plan Name / Scope of Work
Prebid Information
NEW Corepower Yoga – Walnut Creek
Engineers # of
Plan
Estimate Addenda #
Online
8/22/14 @ 11am
Remodel of an existing 5,812 sq. ft. two-story space for new Corepower Yoga, located at: 1375 N. Main St., Walnut Creek, CA 94596. This is our project.
Projected start date: 9/19/14. Project valuation: $600,000. Contact number for project questions during bidding process: 858-864-5903. Project Manager, Phil
Roehrs, will conduct the Job Walk. If you are unable to locate him, while on-site, please contact Phil on his cell phone, which is: 858-333-1005. Please review
plans prior to attending Job Walk. Bids can either be sent via E-mail, to: [email protected] , or faxed to: 858-500-7441.
Required trades:
0127 Final Clean
0207 Sawcutting/Hard Demolition
0300 Concrete
0620 Rough Carpentry
0720 Insulation
0810 Doors & Frames
0840 Mirrors/Shower Doors/Glazing
0925 Framing/Drywall
0930 Ceramic Tile
0950 Acoustical Ceiling
0964 Flooring
0990 Painting
0996 Wallcovering
1261 Blinds/Shades
1540 Plumbing
1580 HVAC
1610 Electrical
1670 Low Voltage (Communications/Data)
ELLIS CONTRACTING INC.
2:00 PM
Sacramento
Sacramento International Airport Reconstruct Earhart Drive at
Taxiway W.
$170000 -
Online
The project is to eliminate adverse grade transitions and pavement displacement due to heavy vehicular traffic crossing Taxiway W. Reconstruction will raise
the grades for Earhart Drive between Taxiway W. and the apron, a new drainage inlet and drainage pipe will be constructed, and some utility manholes will be
as required for the revised grades on Earhart.
2:00 PM
2:00 PM
Santa Clara NEW Kipling -Valley Fair (Specs on Plans)
Cast-im-place concrete, concrete repair, structural steel, miscellaneous metals, carpebtry, millwork/casework, insulation & waterproofing, fireproofing, fire strop
insulation & sealing, caulking & sealant, hollow metal doors & frames, wood doors, finish hardware, glass & glazing, gypsum drywall systems, tile & marble,
resilient flooring, resilient base, painting & finishing, fire extinguishers & cabinets, toilet room accessories, equipment
RFQ-Engine & Generator Maintenance & Repair
Martinez
The Central Contra Costa Sanitary District is reqquesting quotations from qualified & experienced firms to provide engine & generator maintenance & repair for
the District.
Page 12 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
8/28/2014 2:00 PM
Belmont
Marsten Avenue Storm Drain Repair Project
Belvedere
Tiburon
Storm Drain Cleaning Maintenance Project
2:00 PM
Prebid Information
Engineers # of
Plan
Estimate Addenda #
8/12 @ 10AM at 1 Twin Pines Ln, Ste 385, Belmont
Providing traffic control, providing construction area signs, providing water pollution control, install HDPE, backfill gully with small size rip rap materials, install
filter fabric for erosion protection, cleaning of the site at the end of the job
$80000 $85000
ONLINE
ONLINE
Cleaning storm drain pipes & structures within the Town of Tiburon; collecting & disposing of waste generated from the cleaning; providing TV inspection &
maintaining traffic
Matt Swalberg @ 415-435-7354
2:00 PM
Oakley
Main Street Median Improvement Project
MAND 8/19 @ 10AM at 3231 Main St, Oakley
Mobilization, traffic control & construction area signs, clearing & grubbing, portland cement concrete, root prune & root barrier installation, curb ramp,
thermoplastic striping, pavement markings & markers, pedestrian barricade, solar flashing blinker signs, solar rectangular rapid flashing beacon, solar radar
feedback signs, advanced warning signs, street sign posts 1B poles, removal of markings
ONLINE
2:00 PM
Cupertino
2014 Pavement Maintenance Project-Phase 3
ONLINE
Placing various roadway surfaces treatments including micro-surfacing, slurry seal, conventional chip seal & rubberized chip seal, replacing traffic striping &
pavement markers, installing a colored bike lanes & other miscellaneous work
Roger Lee @ 408-777-3354
2:00 PM
Merced
2:00 PM
Napa
County
2:00 PM
Ross
ONLINE
CMAQ-Bike Rack Project
8/12 @ 10AM at 678 W. 18th St., Merced
Installation of bike racks, bike corral & removal of existing bike racks at various locations
Install Aggregate Base
MAND 8/21 @ 9:30AM
$90000
ONLINE
$120000
ONLINE
Install aggregate base on existing roadway/levee & miscellaneous work at Napa-Sonoma Marshes Wildlife Area
2014 Roadway Improvements
Pavement grinding & overlay; minor roadway repairs & edge widening; raising of utility covers & pavement marking on three streets
Rich Isaacs @ 70-7-544-6274
Voluntary 8/7 @ 2PM at 250 FRank Ogawa Plaza, Oakland $125295
The proposed work consists, in general, of rectangular rapid flashing beacon installation for crosswalk on Fruitvale Ave at E16th St and on 98th Ave at Cherry
St, sidewalk extension at the southeast corner of Ney Ave and Richie St, curb ramp installation at the Ney Ave/Richie St intersection, and other work specifically
shown in the project documents.
2:00 PM
Oakland
Safe Routes to School (SR2S), Cycle 10
2:00 PM
Oroville
Installation of Non-Contact Reversing System on Roll-Up Doors at
Dept of Water Serevices
ONLINE
Si Lau, Proj Mgr, @ 510-238-6105
MAND 8/20 @ 10AM at 460 Glen Dr., Oroville
The contractor shall furnish all labor, materials, equipment, tools, permits & licenses necessary to install commercial grade non-contact reversing system on rollup doors at various locations of the Dept iof Water resources
Page 13 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
8/28/2014 2:00 PM
Rio Vista Municipal Airport Enhancements-Rebid
2:00 PM
2:30 PM
Rio Vista
Citrus
Heights
Ceres/Mode
sto
Prebid Information
Engineers # of
Plan
Estimate Addenda #
8/22 @ 10AM at 3000 Bauman Rd., Rio Vista
Mobilization/demobilization; airfield construction area control; temporary air & water pollution, soil erosion & siltation control; runway & taxiway painting,
emulsified asphalt slurry seal surface treatment, airport guidane lighting systems (signage), electrical work
2014 Residential Street Resurfacing Project-Rebid
MAND 8/19 @ 9:30AM
Placing asphalt concrete overlayon various streets including placement of leveling course; minor pavement reconstruction; pavement grinding; reconstructing
accessible curb ramps; adjusting manholes & valve boxes to grade; replacing striping, legends & markling
Carpet Projects for Ceres Library & Community Services Agency A-2 MAND 8/19 @ 9AM at 2250 Magnolia St,, Ceres
ONLINE
ONLINE
ONLINE
& B-2
Installation of carpet at the Ceres Library & Community Services Agency
2:30 PM
Morgan Hill
ONLINE
Community & Cultural Center Splash Pad Equipment Relocation
reocate the splash pad underground equipment vault to an above ground enclosure; abandon & remove existing surge tank; refit existing equipment vault to new
surge tank; and construct an above ground concrete masonry unit for the Splash Pad equipment
3:00 PM
San Jose
$210000
7329-Chris Hotts Park Improvements Project
ONLINE
Div_02-demolition; Div_03-concrete; Div-05-metal fabrications; Div_10-signage; Div_12-site furnishings; Div_31-site clearing, grading, soil treatment; Div_32base courses, rigid paving, chain link fences & gates, decorative metal fences & gates, cast-in-place concrete, planting irrigation
Stacey Palomar, Proj Mgr, @ 408-535-8300
3:00 PM
Placerville
3:00 PM
Pollock
Pines
3:30 PM
Napa
4:00 PM
East Palo
Alto
4:00 PM
Lodi
4:00 PM
Modesto
RFQ-Blakeley Reservoir Outlet Conduit Remediation Project
$600000 $650000
El Dorado Iriigation District is seeking construction contractors to bid on the Blakeley Reservoir Conduit Remediation project
Flume 42/43 Replacement
MAND 8/6 @ 9AM at 7225 highway 50, Pollock Pines
Div_02-demolition, earthwork, rock riprap, geotextile, aggregate base roadway, subdrain system, drainage composites, mechanically stabilized earthen
rertaining walls, landscape & restoration; Div_03-concrete; Div_05-structural stel, anchor bolts & expansion anchors, miscellaneous metal; Div_06-rough
carpentry; Div_09-painting
Napa County Hall of Justice Generator Fuel Line Project
MAND 8/12 @ 10AM at 1125 Third St., Napa
Disposal of existing fuel piping & installing new piping with secondary contaimment & electronic monitoring system
ONLINE
ONLINE
ONLINE
ONLINE
RFQ-Affordable Housing Development
The Successor Housing Agency of the City of East Palo Alto (Agency) is seeking developer letters of interest and affordable housing development concepts for
a 2.52 acre site located at 965 Weeks Street, East Palo Alto, CA.
$200000
Loel Center & Gardens Parking Expansion
MAND 8/13 @ 4PM
Prevailing rate of wages (federal determination) project consisting of the expansion of the parking at the Loel Center and Gardens in Lodi. Federal wage rates
are posted amongst the bid docs. Local and Disadvantaged businesses are encouraged to bid. The following are possible sub contractor trades to bid:
Excavating, Filling, Compacting, and Grading, Concrete Paving, Precast Concrete Unit Paving Sand Set, Planting Irrigation, Planting, Piped Utility Materials
$1500000
RFP Center for Human Services Main Office Construction
MAND 8/20 @ 8AM
Non prevailing rate of wages project for the construction of the main office for Center for Human Services
Page 14 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
8/28/2014 4:00 PM
RFP-Meadowview Road/24th Street Streetscape Imrovements
Sacramento
4:00 PM
San Jose
5:00 PM
Saratoga
Prebid Information
Engineers # of
Plan
Estimate Addenda #
Highly Recommended 8/8 @ 1PM at 915 I St., Sacramento
This Request for Proposals (RFP) solicits consultants to provide professional services to complete all necessary preliminary engineering plans and studies,
environmental studies and plans, specifications, and estimates, for new streetscape construction along Meadowview Road between the LRT Station and I-5 and
24th Street from Meadowview Road north to Florin Road. Funding for this project is available through federal and local funds and Federal procurement rules
apply. This project was awarded federal funds by the SACOG Community Design Program.
Eucalyptus Tree Removal at Hellyer County Park
8/20 @ 10AM
Eucalyptus tree removal at Hellyer County Park
ONLINE
ONLINE
Ubaldo Perez, Proj Mgr, @ 408-355-2231
RFP-Provide Professional Design Services for Hakone Gardens
Master Plan
ONLINE
MAND 8/7 @ 2PM
The City of Saratoga is requesting proposals from qualified consulting professionals experienced in developing master plans & environmental review documents
required by CEQA for historically significant sites.
8/29/2014 1:00 PM
San Jose
ONLINE
RFQ-Street Light Poles10B & Union Metal 13 Foot Ornamental One
Piece Lighting
The City of San Jose is seeking quotes for street light poles 10B to include pole, mast arm, scroll, anchor bolts & all hardware associated with the pole & union
metal 13 foot ornamental one piece lighting standard with access door in support of the Dept of Transportation requirements
10:00 AM
Oakland
ONLINE
RFP-Pre Finished Cabinetry at Various Scattered Sites
The Oakland Housing Authority invites qualified & interested vendors/manufacurers that can provide pre-finished cabinetry to submit responses to tyhe RFP
Courtney Creswell @ 510-587-2165
12:00 PM
South San
Francisco
ONLINE
On-Call Architectural, Engineering & Other Professional Services
The City of South San Francisco's Public Works/Engineering Division is soliciting Statement of Qualifications (SOQs) from qualified consultants to provide
architectural, engineering, planning, environmental, and various professional services for the term, October 1, 2014 through September 20, 2015, to facilitate the
implementation of the City's Capital Improvement Program.
2:00 PM
San Jose
RFQ-Chemicals for Water Treatment Services in the HVAC System
$17000
ONLINE
The City of San Jose is seeking a vendor to purchase & deliver for water treatment services in the HVAC system at the San Jose International Airport on an asneeded basis per the scope of services. The HVAC system consists of both chilled water & hot water closed loops, as well as condenser loops, including two
cooling towers, each consisting of two-cells
Priscilla Lourangrath @ 408-535-7058
2:00 PM
San
Francisco
Transbay Block 7
Voluntary 8/14 @ 10AM at 425 California St., 22nd Fl, San
Francisco
Cahill is requesting bids for:Design-Build Mechanical, Electrical, Plumbing, Fire Sprinkler & Solar Hot Water System. Design Build Exterior Building Maintenance
Systems.
Page 15 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
8/29/2014 3:00 PM
Construction Sequencing & Scheduling for the Van Ness Corridor
Transit Improvement Project
San
Francisco
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
SFMTA has developed a 30% design and draft construction sequence for the Van Ness Corridor Transit Improvement Project. The Van Ness Corridor Transit
Improvement Project consists of the Van Ness Avenue Bus Rapid Transit Project and its respective parallel projects which will completely rebuild Van Ness Ave
between Mission Street and South Van Ness Avenue and Lombard Street and Van Ness Avenue. As part of our effort to prepare a complete and
comprehensive Construction Sequencing Plan and develop a Construction Schedule, we are issuing this Request for Information (RFI) in order to solicit
comments from the industry. In particular, we are seeking ideas on how the SFMTA can shorten the construction schedule and/or minimize the construction
impacts to the community.
Complete documents will be posted once available
3:00 PM
Santa Cruz
Cowell College-Fireside Lounge Renovation
$105000
MAND 8/11 @ 2PM
This is a Barrier Removal Project in an interior room, the Fireside Lounge, at Cowell College. The room is approximately 1000 square feet. Demolish raised
wood floor platform and wood stairs. Rebuild wood stairs and add new handrails. Add new wainscot to match existing redwood paneling throughout. Remove
paint, sandblast and seal existing concrete bench, concrete fireplace mantle and hearth. Relocate some electrical convenience outlets. Install University
provided carpet throughout including stairs. Replace room entry door with new door, frame and hardware. Minor painting as required. No additional electrical
work is anticipated. There are no modifications to existing lighting, HVAC, fire sprinkler or fire alarm systems. The area of work is limited to the room interior and
entry door from an interior building corridor. There is no exterior work.
ONLINE
4:00 PM
San
Joaquin
County
RFQ-Design Engineering Services for the Walnut Grove Bridge (29C131) Replacement Project
ONLINE
5:00 PM
Rancho
Cordova
5:00 PM
Sacramento
5:00 PM
Stockton
The selected consulting team shall provide engineering services for the Walnut Grove Road Bridge Replacement project, constructing a new moveable bridge
structure that will accommodate
RFP - California Technology Agency - Gold Camp
MAND 07/08/14 @ 10:00 am at site
All Qualified Pool members are invited to review and respond to this Request for Proposal (RFP) for the installation and operation of solar photovoltaic (PV)
energy generation systems under a third party ownership power purchase agreement business model. In submitting your response you must comply with all
instructions as provided in this RFP.
Florin Creek Vegetation & Tree Removal
8/20 @ 10AM at 7460 Persimmon Ave, Sacramento
This is a performance-based service contract for the South Sacramento County Streams, Florin Creek Vegetation Removal Project. The major work elements
described herein includes; felling, bucking, limbing, pruning and cutting vegetation growing within the creek corridor. It involves felling trees, pruning branches
and limbs protruding through fences and removing the debris, repairing fences, paving and soil grades, and seeding grasses. The overall responsibility of the
Contractor is to design, plan, coordinate, organize, manage, and perform the activities described herein.
ONLINE
ONLINE
Healon Knight @ 916-557-7228
RFQ-San Joaquin County Fair Commercial Development Project
7/15 @ 10AM
Long-term ground lease to develop a high quality community and/or neighborhood commercial & retail project on a protion of the existing San Joaquin Fair site
in Stockton.
Page 16 of 42
ONLINE
Bid Date Bid Time Location
8/29/2014 5:00 PM
Milpitas
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
NEW RFO-On-Call Licensed Structural Engineer Services & Sound Wall
Design
The City of Milpitas is seeking the professional services of qualified licensed Structural Engineers for on-call inspection and analysis, design services,
preparation of construction plans and specifications, construction support services, and other services related to the completion of the City of Milpitas Capital
Improvement Program. Services could include, depending upon available funding, the related inspection and analysis of City owned structures or construction
projects; minor on-call design services for miscellaneous building improvement and repair projects; and the design and preparation of construction drawings and
specifications for the removal and replacement of precast concrete sound walls.
Steve Erickson @ 408-586-3301
9/1/2014
5:00 PM
Sacramento
5:00 PM
Sacramento
12:00 PM
Martinez
2:00 PM
Hollister
5:00 PM
Tulare
MAND 08/19/14 @ 10:00 am at site
All Qualified Pool members are invited to review and respond to this Request for Proposal (RFP) for the installation and operation of solar photovoltaic (PV)
energy generation systems under a third party ownership power purchase agreement business model. In submitting your response you must comply with all
instructions as provided in this RFP.
RFP - California Energy Commission - Headquarters
MAND 07/09/14 @ 10:00 am at site
All Qualified Pool members are invited to review and respond to this Request for Proposal (RFP) for the installation and operation of solar photovoltaic (PV)
energy generation systems under a third party ownership power purchase agreement business model. In submitting your response you must comply with all
instructions as provided in this RFP.
ONLINE
Tree Trimming
ONLINE
RFP - Franchise Tax Board - Butterfield Complex
MAND 8/21 @ 2PM at 2647 Waterbird Way, Martinex
The County of Contra Costa is seeking qualified vendors interested in providing sublet tree trimming services. Vendors will be asked to for pricing on several
types of tree maintenance with several degrees of hardness. All bids submitted will be reviewed. Points will be awarded based on costs. Several vendors will be
offered a chance to return to make a presentation on their companies and their potential. Points will again be awarded based on this presentation. The judging
panel will decide the final award based on these points, comments from references, training programs, technological knowledge and other assembled criteria.
NEW Fairfield Inn Hollister
New construction of an 82 room 4 story Fairfield Inn & Suites, located in Hollister CA All trades needed and welcomed All inqiries must be submitted to
Chadmorgan @primegroupconstruction.com - 406-250-7910 or [email protected] - 760-605-8866 DO NOT CONTACT ONWER,
ARCHITECT, OR ENGINEER
$3595750
RFP-Design & Build Solar Photovoltaic (PV) Systems at Various
8/12 @ 9AM
ONLINE
ONLINE
ONLINE
Schools
Owner is seeking turn-key proposals from qualified solar contractors to design, engineer, procure, install, interconnect & commission solar photovoltaic systems
at various schools. The project may be split into two or more stages or phases if the District determines, after reviewing responses to this RFP, that staging is
advisable.
9/2/2014
11:00 AM
San Leandro
Public Safety Building HVAC Equipment Replacement
8/15 @ 10AM, 8/19 @ 2PM & 8/20 @ 11AM
$100000 $500000
The work to be done consists of replacing HVAC equipment and associated ductwork within the second floor mechanical room of the City’s Public Safety
Building, and doing all appurtenant work in place and ready for use.
Page 17 of 42
ONLINE
Bid Date Bid Time Location
9/2/2014
11:00 AM
2:00 PM
Oakland
San
Francisco
2:00 PM
Oakland
2:00 PM
Antioch
Plan Name / Scope of Work
Prebid Information
RFP-Installation of Metering System for Monitoring Based
Commissioning Program Under Prop 39 & CCC/IOU
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 8/20 @ 9AM at 333 East 8th St., Oakland
The Peralta Community College District requires a wewb-based monitoring system for the ternding & viewing of energy use for in several of its campuses
$550000 Civic Center Bicycle Facility
8/13 @ 9AM at 300 Lakeside Dr., Oakland
ONLINE
$650000
Div_02-selective structure demolition; Div_03-non-shrink grout; Div_05-metal welding, structural steel framing, cold-formed metal framing, metal fabrications,
perforated metal panels; Div_06-rough carpentry; Div-07-aluminum plate panel system; Div_08-metal doors & frames, door hardware, glazing; Div_09-tile
replacement & restoration, tiling, painting, grafitti-resistant coating; Div-10-stainless steel standoff system; Div_12-bicycle racks; Div_20-facility services; Div_26lighting & electrical work; Div_27-communications
General Offices Fire Sprinkler Compliance Project 2011
Recommended 8/12 @ 10AM at 1600 Franklin St., Oakland
Correct fire sprinkler deficiencies in an existing fire sprinkler system
Duplex Conversion at Bridgemont Public Housing Development-Unit 8/26 @ 10AM
ONLINE
ONLINE
161 & 162
The Housing Authority of Contra Costa County is soliciting Quotation from Small Purchases from qualified, licensed & insured entities to provide services to
HACCC, including providing all labor & materials for the conversion of an existing office building into a duplex residential unit, one 3-bedroom unit & 1-bedroom
unit, single-story building
Ted Ancheta @ 925-957-8035
2:00 PM
Oakland
RFP-111 Jackson Street Information Technology Upgrade
ONLINE
Installation of Eight (8( new 10' x 12' IT rooms & improving of existing MPOE in an existing nine-story building, including electrical, mechanical, cabling, concrete
coring, sheetrock, door, lockable cage, flooring, painting, cable trays, data racks
NOTE:THIS IS A SUBCONTRACTING OPPORTUNITY ONLY. FOR MORE INFORMATION, CONTACT THE GENERAL CONTRACTOR: DEETS, INC., CARE
OF DAVE DEETS - 510.889.9454 / [email protected].
Brian Lackzo, Proj Mgr, @ 510-208-9617
3:00 PM
Palo Alto
Facilities Repair & Retrofit Project No. 3
3:00 PM
San Leandro
San Leandro Ball Park Locker/Restroom Refurbishment
MAND 8/19 @ 1PM at 2501 Embarcadero Way, Palo Alto
The City of Palo Alto is seeking bids from qualified firms to repair and retrofit facilities at the Palo Alto Regional Water Quality Control Plant. Work for this project
includes all labor, materials and equipment necessary for the construction of the project including structural, concrete, and repairs on tanks, basins, pipe,
platforms, and structural members in accordance with the project documents, plans, and specifications.
ONLINE
Tom Kapushinski, Proj Mgr, @ 650-617-3130
$250000 Encouraged 8/18 @ 1:30PM at 835 East 14th St., San
$500000
Leandro
The work to be done consists of accessibility and aesthetic upgrade to the public restroom and locker facilities at the San Leandro Ball Park, and doing all
appurtenant work in place and ready for use.
Page 18 of 42
ONLINE
Bid Date Bid Time Location
9/2/2014
5:00 PM
San
Francisco
Plan Name / Scope of Work
Prebid Information
Mission Bay SOMA Hotel, Block One, San Francisco
8/18 @ 10AM at 290 Channel St., San Francisco
Engineers # of
Plan
Estimate Addenda #
ONLINE
This Request for Qualifications (“RFQ”) is issued for the professional design, engineering, and consulting services for the new Mission Bay SOMA HOTEL.
SOMA Hotel LLC intends to build the new Mission Bay SOMA Hotel on a vacant development site fronting the corner of 3rd and Channel Streets in San
Francisco, California. The total site is approximately 23,000 square feet. The Mission Bay SOMA Hotel will be comprised of 250 guestrooms in a tower of up to
16 levels which will include a 3-level podium designed to accommodate parking, public and back-of-house spaces. The meeting space will total approximately
8,000 square feet and includes multiple general purpose meeting and collaborative work spaces as well as a pre-function/living room. A restaurant and bar will
seat up to 120. The total gross area of the Mission Bay SOMA Hotel will be 215,000 GSF. Structured parking for 24 cars will occupy approximately 10,000 sf.
The project will include a podium rooftop garden and outdoor use area of approximately 12,000 square feet and a tower rooftop amenity area and outdoor deck
of approximately 3,000 square feet. The Mission Bay SOMA Hotel has previously received its hotel use entitlements and planning approvals with the City of San
Francisco through a Major Phase Application under the Mission Bay South Redevelopment Plan. SBE/MBE/WBE/LBEs are encouraged to apply.
9/3/2014
1:30 PM
1:30 PM
Amador
County/Cala
veras
County
Richmond
Camanche South Shore to North Shore Pipeline
8/21 @ 10AM
Work includes furnish and install approximately 8,200 LF of 10-inch HDPE pipe including all appurtenances and fittings; furnish and install approximately 230
concrete ballasts; and perform related required work, located in Amador County and Calaveras County as shown on Drawing 105.00-Z-002.1.
$500000 Richmond Advanced Recycled Expansion (RARE) Chloramination
8/19 @ 9:30AM at 525 Castro St., Richmond
085C/E8
ONLINE
$600000
System
10:00 AM
$650000 $800000
Work includes: Selective demolition of the chemical process pumps and piping; procurement and installation of a new 3,000-gallon chemical storage tank;
foundation and piping installations; replacement of piping, valves, and flow meters; electrical and instrumentation installations, and startup and testing services.
$60000 Pleasant Hill NEW Elinora Drive Storm Drain Repair Project
8/26 @ 10AM at 100 Gregory Ln, Pleasant Hill
ONLINE
$65000
Remove and replace approximately 80 linear feet of existing 42" storm drain pipe, install manhole, utility protection, remove and replace fence, remove tree,
maintain existing storm drain system, demolition, excavation, compaction, and landscape restoration
$42899
Oakland Coliseum Janitorial Services
Optional 8/14 @ 9AM at 501 85th Ave, Oakland
Janitorial services to be provided two (2) times per day at the Oakland Coliseum DMV Field Office. Term:1/1/15 through 12/31/16
2:00 PM
Oakland
2:00 PM
NEW Riverview International Addition & Remodel Project
West
Sacramento
Project consists of an addition and remodel of the Parts, Sales and Office Area for a Truck, Sales, and Service facility. There will be approximately 3,180 SF of
remodeled space along with a new 2,056 SF addition. The existing exterior canopy will be removed and replaced with a 2,056 SF wood framed addition which
will contain 8 offices, a conference room, customer lounge, and storage room. The existing Parts Sales Area will be enlarged and the existing Administrative
Area will be remodeled including the main Restrooms. Crafts to be subcontracted include: demolition, parking lot striping, concrete, reinforcing steel, structural
steel, rough carpentry, finish carpentry,building insulation, roofing, sheet metal flashing, joint sealer, doors/frames/hardware, storefront/glazing,
plaster,gypboard/metal studs, acoustical ceilings, resilient flooring/carpet, painting, toilet partitions/accessories, fire sprinklers, plumbing, hvac, electrical.
Under no circumstances should the owner or architect be contacted regarding this project. Please direct all questions and RFI's to SD Deacon
Page 19 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
9/3/2014
2:00 PM
Stockton
2:00 PM
San
Francisco
2:00 PM
San
Francisco
Plan Name / Scope of Work
Prebid Information
Janitorial Services for Human Service's Agency & Rail Road Square
Building
Engineers # of
Plan
Estimate Addenda #
MAND 8/13 @ 9AM at 102 S. San Joaquin St, 5th Fl,
Stockton
ONLINE
8/20 @ 10AM at 180 Hubbel St., San Francisco
ONLINE
Jantorial services
Pier 70-Bldg 113/114 Only-Safety, Security & Restoration (No GC
Openings)
Demolition, earthwork, rebar, piles, structural steel, miscellaneous steel, rough carpentry, waterproofing, elevators, fire sprinklers, plumbing & electrical
ONLINE
Panera Bakery Cafe
Tenant improvenment for a new Panera Bread Bakery, including carpentry, finish carpentry, insulation, storefronts, metal stud drywall, ceramic tile, acoustical
ceiling, painting, restroom accessories, plumbing, HVAC, lighting, electrical, fire alarm
No estimating is done from Tilton Pacific’s San Jose office. All bids must be sent to the Rocklin office only. You may fax to (916) 630-4982 or email to
[email protected]
RFI’s should be directed to the estimator Nam at [email protected]
This project currently has no union only requirements!
2:00 PM
Sacramento
Fence Corrections at Three City Facilities
8/25 @ 9AM at 5303 Franklin Blvd., Sacramento
At three locations (300 Richards Blvd., 3550 Marysville Blvd., & 5303 Franklin Blvd.),
$105000
ONLINE
the work performed under these Special Provisions consists of:
a.Install fence extensions on top of existing metal fence & block wall at Rooney & Kinney,
b.Remove (e) chain link & install 7’ high fence along Sequoia Pacific,
c.Fill fence gaps between building at Rooney,
d.Install 3 strand barbed wire on top of (e) chain link fence at Richards and,
e.Clear and grub on each side of fence as needed to complete the work.
2:00 PM
$124463
Sacramento NEW Pollock Ranch Park Renovations
The work to be performed consists of renovations to Pollock Ranch Park in South Sacramento at 3800 Robinridge Way. The improvements will consist of 0.75
acres, demolition, clearing and grubbing, drainage and grading, concrete flatwork, basketball goals, benches and landscape plantings.
2:00 PM
Oroville
ONLINE
Dennis Day, Proj Mgr, @ 916-808-7633
Radial Gates 6, 7 & 8 Seals Replacement
8/14 @ 10AM
Div_02-selective demolition; Div_05-miscellaneous metalworek; Div_09-coatings; Div_11-radial gates; Div_13-hazardous substances recovery & disposal;
Div_15-piping, tubing, fittings & appurtenances
Page 20 of 42
065C
Bid Date Bid Time Location
9/3/2014
2:00 PM
Oakdale
Plan Name / Scope of Work
Prebid Information
Valley View River Access Trail
8/20/14 @ 9am
To bid this project, plans and specs must be purchased through the City of Oakdale.
Engineers # of
Plan
Estimate Addenda #
$625000
Online
The work to be performed in general consists of trail and park improvements
2:00 PM
2:00 PM
Gonzales
Gonzales Early Learning Center Re-Roof Project
ONLINE
Gilroy
Remove & dispose of existing wood shake roofing, buil-up roofing & underlayments; prepare roof sheathing, decking for new roofing materials; provide flashing
for all existing penetrations, vents, piping, fascia; & provide new asphalt shingle roofing & PVC membrane roofing
Re-Roofing Project for City/SCRWA (South County Regional
MAND 8/26 @ 8AM at 1500 Southside Dr., Gilroy
ONLINE
Wastewater Authority) Buildings
Re-Roofing several city & SCRWA buildings
2:00 PM
Antioch
2:00 PM
Alameda
Unit C605 Repair at Elder Winds Public Housing Development
8/27 @ 10:30AM at 2100 Buchanan Rd., Antiocj
The Housing Authority of Contra Costa County is soliciting quotations for small purchases from qualified, lincensed & insured entities to provide services for the
repair of Unit C605 at Elder Winds Public Housing
Bay Friendly Landscape Maintenance Services for Scattered
MAND 8/13 @ 2PM at 701 Atlantic Ave, Alameda
ONLINE
ONLINE
Residential Sites
The Housing Authority of the City of Alameda (AHA) is requesting proposals from licensed C27 landscape firms for Bay Friendly landscape maintenance
services for (12) twelve AHA residential sites and (1) AHA administrative office which are located throughout the City of Alameda. AHA retains the right to
exercise the option to renew the contract for a maximum of (2) two additional one-year terms based on satisfactory service results and budget approval.
2:00 PM
Rancho
Cordova
2:30 PM
Santa Cruz
2:30 PM
San
Francisco
Kevian Abidi @ 510-747-4328
NEW Rivergate Shopping Center Pad 2
ONLINE
5,624 sf pad building. Trades to include surveying, earthwork, underground, paving, site concrete, fencing & gates, landscaping, rebar, concrete, masonry, metal
fabrications, handrails, rough carpentry, insulation, roofing, sheet metal, D/F/H, storefront, plaster, drywall, painting, awnings, fire protection, plumbing, and
electrical.
$45000
126 Front Street Bathroom Remodel Project
MAND 8/19 @ 10AM at 126 Front St., Santa Cruz
Demolition of existing flooring, electrical & plumbing fixtures & installation of new fixtures, tile, windows & doors.
$490000
SOMARTS Cultural Center Roof Replacement
8/21 @ 10AM at 30 Van Ness Ave, San Francisco
Furnish & install new nailable wood framing over the existing roof material; new roof substrate & cover board material; a new adhered tpo roofing system;
replacement of roof drains & overflow, vents ducts, a new roof hatch & all appurtenant work
Glenn Hunt, Proj Mgr, @ 415-557-4782
Page 21 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
9/3/2014
2:30 PM
San
Francisco
Plan Name / Scope of Work
Prebid Information
Ruth Williams Memorial Theater Bayview Opera House
8/26 @ 3:00PM at 5075-3rd St., San Francisco
Engineers # of
Plan
Estimate Addenda #
$1900000
ONLINE
Hardscape & landscape improvements; ADA walkways & curb ramps; enhancement of site lighting; replacement of existing outdoor stage & seating; accessible
upgrades of the main entrance; two restrooms & the stage; mechanical ventilation upgrade, electrical
3:00 PM
Petaluma
3:00 PM
San Jose
4:00 PM
Concord
Oscar Gee, Proj Mgr, @ 415-558-4582
NEW School Crosswalk Removal & Replace
Removal of existing thermoplastic crosswalk striping, pavement markings and pavement markers. Installation of crosswalk (ladder style) striping and pavement
markings.
NEW RFQ-Juvenile Hall Turf Removal
MAND 8/22 @ 9AM at 840 Guadalupe Parkway, San Jose
The County of Santa Clara is seeking quotes relating to various activities related to removing turf and making various improvements to the landscaping to
comply with the Santa Clara Municipal Water District Landscaping Rebate Program at the County Juvenile Hall facility
RFP-Temporary Relocation Improvements District Center Seismic
8/19 @ 10AM at 2411 Bisso Lane, Concord
ONLINE
ONLINE
ONLINE
Improvements Project
Construction of security & accessibility improvments to existing facilities, including doorway framing, window security bars/grating, site fencing & parking
improvements; installation of electrical utilities for temporary modular office buildings, including PG&E temporary electrical service connection; installation of
electrical & HVAC systems improvements for build-out of a temporary information systems date center server room & electrical connection fore stand-by
generator; miscellaneous other facility improvements, including painting & signage
5:00 PM
Santa Cruz
ONLINE
RFQ - Special Inspection Services for Coastal Biology Building
The University of California Santa Cruz is selecting firms to provide special inspection service for the Coastal Biology Buildings & Infrastructure Project.
Submit requests for forms and further information by email ([email protected])
5:00 PM
Santa Cruz
ONLINE
RFQ for Geotechnical Services for Coastal Biology Building
The University of California Santa Cruz is selecting design firms to provide Engineering services for the Coastal Biology Building & Infrastructure project.
Submit requests for forms and further information by email ([email protected])
9/4/2014
5:00 PM
Stockton
Rear Range Light ALTON Relocation/Replacement
8/19 @ 9AM
D Square Construction, LLC and Au’ Authum Ki, Inc., a joint venture invites your company to competitively bid on the Rear Range Light ATON project, including
Div_02-demolition; Div_03-cast-in-place concrete; Div_05-structural steel. metal fabrications; Div_31-excavation & fill; Div_32-fences & gates
ONLINE
1:00 PM
Antioch
Field Office Remodeling Project at Elder Winds
Online
11:30 AM
Mill Valley
8/27 @ 11:30am
Asset Management Offices-Remodel Project; Various trades.
$1600000
2014 Street & Sewer Rehabilitation Project
Water pollution control; landscape restoration; saw cut existing pavement; clearing & grubbing; concrete removal; asphalt pavement removal; cold millimg &
wedge grinding; earthwork; subgrade preparation; base failure repair; aspahlt repair; aggregate base; roadway widening; pavement fabric; asphalt concrete;
crack cleaning & weed abatement; crack sealing; slurry seal; pavement markings & striping; pavement markers; traffic signs; miscellaneous concrete, utility
concrete cap; excavation, bedding, pipe installation & backfill; excavation dewatering; sewage flow control; sanitary sewer rehabilitation; sanitary sewer lateral
repalcement
Page 22 of 42
ONLINE
Bid Date Bid Time Location
9/4/2014
2:00 PM
2:00 PM
2:00 PM
Salinas
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
Fire Damage Repair for John Steinbeck Library
8/20 @ 10AM at 350 Lincoln Ave, Salinas
Div_02-delective demolition work; Div_05-structural & metal fabrications; Div_06-rough carpentry, glued laminated wood, finish carpentry; Div_07-sheet metal,
caulking & sealants; Div_08-wood doors, aluminum storefront & awning windows, door hardware, glass & glazing; Div_09-gypsum wallboard, acoustical ceilings,
resilient flooring, painting; Div_10-building specialties; Div_11-kitchen equipment; Div_15-mechanical; Div_16-electrical
NEW Putah Creek Floorplain Restoration (Phase 3)
MAND 8/26 @ 10am
Winters
Work shall include construction of approximately 1,200 feet of new creek channel, diversion of active streamflow, filling of existing channel and grading to
reestablish functional floodplains along Putah Creek near the City of Winters.
$1490620
8/28/14 @2pm
Santa Rosa NEW Montgomery Dr, Pierce St and 2nd St Sewer and Water
ONLINE
Online
Online
Improvements
Montgomery Dr, Pierce St and 2nd St Sewer and Water Improvements
2:00 PM
San
Francisco
ONLINE
TG16-5 Paint
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with Paint, including but not limited to, painting, site paints, and
high performance coatings on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems in
the following trade:TG16.5: Paint
Salinas
East Market Street Improvements Phase III
ONLINE
2:00 PM
Richmond
Hauling, grading, clearing & grubbing, earthwork, asphalt concrete, sawcut pavement, aggregate base, construct concrete sidewalk, construct commercial
concrete driveway, construct concrete type "c" curb & gutter, signing, landscaping
$450000
Information Technology Center
MAND 8/6 @ 2PM at 1300 Potrero Ave, Richmond
Div_02-selective demolition; Div_06-rough carpentry; Div_07-roof & deck insulation, thermoplastic membrane roofing, sheet metal flashing & trim, roof
accessories, joint sealants; Div-08-tubular unit skylights; Div_09-exterior painting; Div_10-roof screens
ONLINE
2:00 PM
Los Gatos
Rinconada Water Treatment Plant Reliability Improvement Project
MAND 8/7 @ 1PM
The Rinconada Water Treatment Plant project includes demolition of existing clarifiers & filters & construction of the following major project components:raw
water ozone & liquid oxygen systems, flash mixing & carbon dioxide injection, flocculation & sedimentation basins, filtration, watershed recovery facility, new &
modified chemical systems, & major electrical & instrumentation upgrades. The project will be constructed in sequential order & the construction is scheduled to
be completed in five years at the total cost of approximately $160 million to $200 Million.
ONLINE
2:00 PM
Gonzales
HVAC Unit Replacement at Medical Building & Daycare Building
ONLINE
2:00 PM
Juan Garrahan @ 510-307-4540
Remove & dispose of existing HVAC unit on roof of existing medical building & in closet of existing daycare bldg; provide new HVAC units; provide flashing for
unit & connections to existing duct system
2:00 PM
Gilroy
ONLINE
Eigleberry Water Service & Water main Replacement
Construction of new fire hydrants, including mobilization & demobilization, traffic control, parking restrictions & signage, storm water pollution control program,
pavement repairs, water main construction
2:00 PM
Davis
$660000
2014 Crack Seal & Base Repair Program
Asphalt (dig outs), over-excavation (unsuitable material), asphalt cold planing, crack fill/sealing, asphalt overlay, utility adjustments, striping & pavement markers
Page 23 of 42
ONLINE
Bid Date Bid Time Location
9/4/2014
2:00 PM
2:00 PM
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
Sacramento NEW North Truxel Streetscapes
Provide all labor, equipment, and materials necessary to maintain the North Truxel Streetscapes as specified in the Scope of Services, Service Schedules, and
the City of Sacramento Landscape Maintenance Services General Specifications and Provisions, LS14.
$75000 San Mateo NEW Kingridge Sanitary Sewer Line Improvements - Mitigation Site
ONLINE
010C/E8
$85000
The Kingridge Sanitary Sewer Line Improvement - Mitigation Site Project consists of installing a riparian mitigation site within Laurelwood Park, adjacent to
Laurel Creek. The work includes but is not limited to temporary fence installation, site preparation, irrigation system retrofit, seeding, planting, split rail fence and
mulch buffer installation, and a long term maintenance period.
Morgan Hill
Recreation Facility Irrigation Controllers
ONLINE
2:30 PM
Santa Cruz
ONLINE
2:30 PM
Walnut
Creek
Furnish and install/retrofit irrigation controllers at the Centennial Recreation Center (2 controllers), Community and Cultural Center (2 controllers) and Aquatics
Center (1 controller).
Main Jail Polished Concrete Flooring Project
MAND 8/20 @ 10AM
Concrete flooring
$400000
Boundary Oak Golf Clubhouse Interior/Exterior Renovation
8/20 @ 2PM at 3800 Valley Vista Rd., Walnut Creekl
2:30 PM
ONLINE
Exterior accessibility upgrades, restroom renovation, front entry door remodel, ADA compliant doors and hardware.
3:00 PM
San Jose
3:00 PM
Santa Clara
$1500000
NEW 6909-Martha Gardens Green Alleys Pilot Project
Clearing & grubbing, earthwork, subgrade preparation, finishing roadway, aggregate subbbases, deep lift asphalt base, asphalt concrete, portland cement
concrete pavement, concrete structures, reinforcement, concrete curbs, gutters, sidewalks, driveways, monuments, traffic stripes & pavement markings, signals,
lighting & electrical systems, portland & cement concrete, pipe & structures, asphaltic emusions, pipeline structures, acceptance tests for storm sewers, cleaning
pipelines, sewer rehabilitation
ONLINE
Ellen Yuen, Proj Mgr, @ 408-535-8489
ONLINE
RFP-Underground Facility Locating Service
The City of Santa Clara is seeking propsals from qualified firms to provide underground facility locating services for various projects over a year involving
underground electrical conduit installation and associated underground structures
3:00 PM
San Jose
ONLINE
7660-Public Works General Engineering Contract for Underground
Pipe Facilities 2014-2016
Dust control, mobilization, construction area traffic control devices, water pollution control, clearing & grubbing, watering, aggregate subbases, aggergate bases,
deep lift asphalt base, asphalt concrete, concrete curbs & sidewalks, monuments, traffic stripes & pavement markings, signals, lighting & electical systems,
asphaltic emulsions, pipe & fittings, valves, hydrants & appurtenances, pipes & structures, trench excavation, bedding & backfill, pipe installation, pipeline
structures, acceptance tests for sanitary sewers, sanitary sewer rehabilitatrion, manhole rehabilitation
Ellen Yuen, Proj Mgr, @ 408-535-8489
3:00 PM
San Jose
Old Main Hospital Seismic Safety Project, Ancillary Building:Change MAND 7/17 @ 10AM at 800 Thornton Way, San Jose
Order 4 (MEP). Change Order 5 (Link & Stairwell, & Tenant
Improvements (Basement & 2nd Floor)
$20000000
Construction of multiple related projects, consisting of (1) changes to the MEP systems (change order 4), (2) new link & stairwell (change order 5) & (3) ancillary
basement & 2nd floor tenant improvements
Page 24 of 42
ONLINE
Bid Date Bid Time Location
9/4/2014
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
5:00 PM
San
Francsico
RFQ-General Contractor/Office Building Renovation
8/20 @ 10AM at 525 Golden Gate Ave., 2nd Fl, San
Francisco
The San Francisco Public Utilities Commission is issuing the Request for Qualifications in search for candidates who have necessary qualifications as set forth
in this RFQ to be pre-qualified to respond to the forthcoming bid to provide general contracting & construction services for the renovation of an existing SFPUC
office building.
ONLINE
5:00 PM
Tracy
RFP-Construction Management Services for the 11th Street-East
Tracy Overhead Bridge Replacement Project
ONLINE
The City of Tracy proposes to replace the existing 1441 foot long Eleventh Street Bridge over the Union Pacific Railroad tracks with a shorter single span
structure in combination with retaining walls and approach fill at the approaches. Anticipated work generally consists of replacement of the existing bridge,
modifying the signalized intersection of North MacArthur Drive and 11th Street and relocating existing utilities.
Proposed new bridge will accommodate two 12 foot lanes in each direction, one four foot wide median, 8 foot shoulders/Class II bike lanes, and 8 foot wide
separated sidewalks on each side of the structure that are protected with traffic side barriers.
The proposed alternative involves constructing a temporary on-site detour with a prefabricated steel truss bridge on the south side of 11th Street during
demolition of the existing and construction of the new bridge.
9/5/2014
2:00 PM
Bolinas
2:00 PM
Jenner
NEW 2014 Wharf Road Retaining Wall Repair
Grinding, resurfacing, paving fabric, carpentry, welding, excavation, traffic control
Salt Point State Park-Salt Point Trail Pavement Rehabilitation
MAND 8/21 @ 11AM at 25050 Highway 1, Jenner
$600000
E819B
$20000 $35000
ONLINE
Storm water soil loss precention plan; earth moving; asphalt paving
4:00 PM
San
Franbcisco/
Oakland
RFQ-San Francisco-Oakland Bay Bridge West Span Bicycle,
Pedestrian & Maintenance Path Project
MAND 7/31 @ 1PM at 101-8th St., Oakland
ONLINE
The Bay Area Toll Authority invites interested parties to respond to a Request for Qualifications (RFQ) to assist BATA in completing the Project
Approval/Environmental Document (PA/ED) for the San Francisco-Oakland Bay Bridge West Span Bicycle, Pedestrian, and Maintenance Path Project. BATA is
currently awaiting approval of a draft Project Study Report – Project Development Support (PSR-PDS) for the project.
BATA’s objective is to complete a PA/ED for the San Francisco-Oakland Bay Bridge West Span Bicycle, Pedestrian, and Maintenance Path Project (the
Project). The Project, as identified in the draft PSR-PDS, proposes to address the lack of bicycle, pedestrian, and maintenance (BPM) access on the West Span
of the San Francisco-Oakland Bay Bridge (SFOBB) by constructing a BPM path from downtown San Francisco to Yerba Buena Island (YBI). The project is
located in the San Francisco Bay Area and the SFOBB connects Interstate 80 (I-80) across San Francisco Bay. The total length of the BPM path is 27,735 feet
and the project limits are from approximately PM 5.5 to 7.8 (from westbound off-ramp to Fremont Street to east end of the YBI Tunnel).
4:00 PM
Windsor
Peter Lee, Proj Mgr, @ 510-817-5716
NEW Dorma ED800 Door Hardware and Install
Dorma ED800 Door closures with the power assist mode Fasteners, Connectors, Conduit, and Misc. Installation Hardware Labor to Install Electric Stike, Wall
Switches and Receiver to Existing ED800 Operator. Install the parts on existing low voltage openers for bathrooms throughout the building.
Page 25 of 42
ONLINE
Bid Date Bid Time Location
9/5/2014
5:00 PM
Jolon
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW COE Sacramento Bldg. 339 & WWTP
Au’ Authum Ki, Inc. invites you to propose on the fully designed upgrades for the water treatment plant, and upgrades within building 339. The water treatment
plant upgrades includes a new equipment pad, and the demolition of existing effluent pumps with valves, raw sewage pumps, conduit, and power to the pumps.
Installation of new effluent & sewage pumps, compressor, pump control panels, transformer, main distribution panel, associated cabling, and conduit are
included in the scope. Building 339 upgrades include the demolition of fencing, construction of a new equipment pad, new lighting fixtures, dry pipe sprinkler
system, fire alarm system, unit heater, and plumbing.
Online
Trades Include: Demolition, CIP, Misc. Metal fabrication, Joint Sealants, Thermal Insulation, Doors/Frames/Hardware, Drywall & Framing, Painting, Resilient
Base, Signage, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Fire Alarm, and Site Utilities.
9/8/2014
10:00 AM
Oakland
10:00 AM
Turlock
12:00 PM
Antioch
2:00 PM
Oakdale
3:00 PM
La Honda
3:00 PM
Petaluma
Roof Replacement for 1621 Harrison Street
ONLINE
8/22@ 10AM at 1801 harrison St, 1st Fl, Oakland
Roofing & waterproofing
$376000
NEW Intersection Improvements at Christoffersen Pkwy
MAND 8/26 @ 2PM at 156 S. Broadway, Turlock
The work consists, in general, of: remove surface improvements, clearing and grubbing, earthwork, trenching, install traffic signal, construct minor concrete
(curb, gutter, sidewalk, curb ramps), hot mix asphalt reconstruction, traffic striping and furnishing all necessary labor, materials, tools, equipment and incidentals
needed to perform the improvements as shown on the contract plans complete and in place.
Walmart
2697-01 Antioch
NEW
This project consists of the expansion (approx. 39,742 SF) of an existing 141,485 SF store: Civil Trades Needed: Survey, Erosion Control, Demolition, Grading,
Paving, Striping/Signage, Concrete, Seal Coat, Utilities, Site Lighting, Detectable Warning Systems, Fencing, Landscaping Building Trades Needed: Structural
Shoring, Demolition, Fencing, Concrete, Concrete Polishing, Masonry, Structural Steel, Carpentry, Millwork, FRP, Insulation, EIFS, Roofing, Sheet Metal,
Caulking / Sealants, Doors, Glazing, Stucco, Metal Framing/Drywall, Tile, Acoustical Ceilings, Flooring, Painting, Toilet Accessories, Seismic, Fire Sprinklers,
Plumbing, Refrigeration, HVAC, Electrical.
NEW Steel Fencing On Sierra Ave Between G & H Street
Installation of fencing along Sierra Avenue
$210000
Skyline Field Office HVAC Replacment Project
MAND 8/21 @ 10:30AM
Provide construction services to replace existing heating, ventilation, air-conditioning system at Skyline Field Offic e
$50000 NEW RFQ-On-Call Geotechnical Engineering, Materials Testing &
Inspection Services for Various Facility Peroject
ONLINE
Online
ONLINE
ONLINE
ONLINE
$100000
The City of Petaluma is requesting statement of qualifications from qualified firms interested in providing on-call geotechnical engineering services for various
capital improvement design & construction projects including, but not limited to airport, building, road, pipeline & facility capital improvement projects
Dan Herrera @ 707-778-4589
3:00 PM
Petaluma
NEW RFQ-On-Call Surveying Services for Various Facility Projects
$50000 $100000
The City of Petaluma is requesting statement of qualifications from qualified firms interested in providing on-call surveing services for various capital
improvement design & construction projects including, but not limited to airport, building, road, pipeline & facility capital improvement projects
Dan Herrera @ 707-778-4589
Page 26 of 42
ONLINE
Bid Date Bid Time Location
9/8/2014
3:00 PM
Rocklin
Plan Name / Scope of Work
Prebid Information
RFP-Generation-Condition Assessment of Roseville Electric's RPP2
Generating Facility
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 8/20 @ 10AM at 2155 Nichols Ave. Rocklin
The successful contractor shall perform a comprehensive condition assessment of the RPP2 Facility (“Facility”) and prepare a report which, at a minimum
documents investigation findings and provides an estimated scope, schedule and budgetary cost estimate for refurbishment of the facility which results in safe,
compliant, and reliable operation.
5:00 PM
Albany
ONLINE
Planning Consulting Services for the Albany Neck & Bulb Transition
Improvement Plan
The City of Albany is requesting proposals from qualified firms or individuals in preparing a plan for the improvement of the Alabany Bulb area to be transitioned
to the operation as part of a State Park by the East Bay Regional Parks Dist.
9/9/2014
1:00 PM
10:00 AM
11:00 AM
11:00 AM
11:00 AM
Rohnert
Park
NEW Student Center Water Softener Project-Rebid
8/27 @ 2PM at
$130000
Sonoma State University is seeking proposals from qualified bidders for the installation of a turnkey water softener system
San Rafael NEW Safe Routes To School At James B. Davidson Middle School
This project consists of all the associated work described in the attached specifications and plans and "the provisions of this document for excavation, removal
of existing concrete sidewalk, curb, gutter, and construction of new sidewalk, curb ramps, curb, gutter, hot mix asphalt pavement, storm drain, radar speed
feedback sign, and traffic signing and striping modifications all located on Lindaro Street and Andersen Drive in the City of San Rafael, California.
$245468
Transit Building Restroom Remodel
8/19 @ 11AM at 1010 Tenth St., Modesto
Modesto
Div-02-selective demolition; Div_03-cast-in-place concrete; Div_05-structural metal framing, cold-formed metal framing, miscellaneous metals; Div_06-rough
carpentry, finish carpentry; Div-07-bldg insulation, sheet metal, sealants & caulking; Div_08-steel doors & frames, finish hardware; Div_09-lath & plaster, gypsum
board, stainless steel wainscot system, resinous flooring, painting; Div-10-toilet partitions, washroom accessories; Div_12-plastic laminate casework &
countertops; Div_15-plumbing, HVAC; Div_16-electrical
$740000
Collector & Arterial Rehabilitation Project
Modesto
8/21 @ 11AM at 1010 Tenth St., Modesto
This project will rehabilitate the pavement and improve bicycle facilities on numerous street segments with slurry seal and restriping. The base bid is on 9th
Street and will connect MJC East with MJC West Campus with a class I bicycle route.
RFQ-Consultant Services for the City of Larkspur's Schematic
8/14 @ 2:00 PM at 400 Magnolia Ave, Larkspur
Larkspur
ONLINE
011C/E8
ONLINE
ONLINE
Online
Design of the Community Facility Parcel
The City of Larkspur is accepting statements of qualifications to perform schematic design & complete design revire for the community facility parcel. The project
consists of the preparation of a comprehensive & detailed design for the development of the City's Community Facility Parcel at the Rose Lane development.
2:00 PM
Los Altos
ONLINE
Annual Street Striping
Mobilization, traffic control,grinding off some existing striping & markings, apply thermoplastic on existing striping & marking, installing poles & signs & some
new layouts for striping & markings
Page 27 of 42
Bid Date Bid Time Location
9/9/2014
2:00 PM
2:00 PM
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$4300000
8/27 @ 2PM at 1850 Broadway St., Vallejo
Div_02-demolition, site demolition; Div_03-concrete; Div_05-structural steel, metal decking, cold-formed metal framing, metal fabrications, metal ladders, pipe
bollards; Div_06-rough carpentry, finish carpentry, interior arch casework, solid surface countertops; Div_07-thermal & acosutical insulation, composite wall
panels, TPO roofing, sheet metal work, metal roofing & walls, penetration firestopping, joint penetration, expansion joint cover assemblies; Div_08-hollow metal
doors & frames, flush wood doors, access doors & grames, overhead coiling doors, aluminum-framed entrances & storefront, aluminum windows, finish
hadrware, glazing; Div_09-non-structural metal framing, gypsum board, tile, acoustical ceiling systems, resilient base & accessories, resilient tile flooring, static
control resilient flooring, fluid-applied flooring, tile carpeting, stretched fabric wall systems, exterior painting, interior painting; Div_10-signage, toilet
compartments, folding panel partitions, fiberglass reinforced protective wall covering, toilet room accessories, fire extinguisher & cabinets, metal lockers; Div_11vehicle service equipment, vault equipment, money depositories, residential appliances, projection screens, video mounts; Div_12-roll-down blinds, entrance
mats & grilles; Div_22-plumbing; Div_23-HVAC, Testing, adjusting & balancing; Div_26-interior & exterior lighting, engine generators, electrical; Div_27communications; Div_28-access control & alarm monitoring system, intrusion detection, video surveillance, fire alarm, natural gas detection system; Div_31excavation & fill, trenching & backfilling, earthwork; Div_32-aggregate base, asphaltic paving, concrete curbs, gutters & walks, pavement markings, chain link
fences & gates, underground irrigation systems, landscape planting; Div_33-site drainage
MAND 8/25 @ 9AM at 5297 Sonoma Mountain Rd., Santa $125000 Santa Rosa NEW North Sonoma Mountain Vehicle Bridge
$135000
Rosa
Construction of the North Sonoma Mountain Vehicle Bridge, including demolition of the existing bridge & grading of the stream banks to a slope of 2:1 to
minimize wrosion & increase creek flow capacity. Concrete piers & abutments will be poured & a 20' by 40' orefab rail car bridge will be installed & A/C road
repair & road widening for a turn-out on the south side of the bridge will be paved
Vallejo
Operations & Maintenance Facility Improvement Project
ONLINE
ONLINE
Karen Davis-Brown, Proj Mgr, @ 707-565-2041
2:00 PM
San
Leandro/Oak
land
Reroof Fruitvale Station Train Control Facilities & Bay Fair Station
Entrance Canopy
8/6 @ 10AM at 300 Lakeside Dr., Oakland
E808B/0
Remove the existing roof membrane & gravel, insulation & all other related items to the roof deck; install new roofing system by applying specified styrenebutadiene-styrene modified bitumen roofing system using heat welded application per NRCA & manufacturer's recommendation.
2:00 PM
Various
Cities
RFP-Systemwide Parking Lot Sweeping Services
8/6 @ 10AM at 300 Lakeside Dr, 15th Fl, Oakland
The San Francisco Bay Area Rapid Transit Dist intends to engage the services of one or more firms to provide sweeping services at various BARt Stations,
parking garages, maintenance yards & parking lots
Page 28 of 42
ONLINE
Bid Date Bid Time Location
9/9/2014
2:00 PM
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
8/27 @ 10AM
Sacramento NEW ESC-Kings Sacramento
New Basketball Arena.
All subcontractors MUST be Pre-Qualified to submit a Proposal. THE DUE DATE FOR PRE-QUALIFICATION PACKAGES IS @ August 29, 2014 by 10:00 A.M.
ONLY PRE-QUALIFIED AND APPROVED SUBCONTRACTOR’S PROPOSALS WILL BE ACCEPTED. Pre-qualification information may be requested from
Lauren Bennett at 916-444-4421 or via e-mail at [email protected]
Turner Construction is signatory to the Carpenters and Laborers Union.
Bid Packages Currently Bidding:
BP-21 Bldg Conc & Reinf. $12 Mil
BP-23 Masonry $3 Mil
BP-24 Misc. Metals $3 Mil
BP-25 Finish Carpentry $1 Mil
BP-26 Exterior Terracotta Facade $1 Mil
BP-27 Roofing approx $3 Mil
BP-28 Practice Facility Ext. Glass $1 Mil
BP-29 Interior Glass approx $2 Mil
BP-30 Framing/Drywall/Plaster $20 Mil
BP-31 Floor Seal/Staining $2 Mil
BP-32 Tile and Stone $2 Mil
BP-33 Acoustical Ceilings $3 Mil
BP-34 Toilet Partitions $1 Mil
BP-35 Lockers, approx $0.25 Mil
BP-36 Seating approx $6 Mil
BP-37 Fire Protection approx $3 Mil
BP-38 Plumbing approx $9 Mil
BP-39 HVAC approx $25 Mil
BP-40 Electrical approx $30 Mil
BP-42 Site Concrete $1 Mil
BP-57 Site Pavers $1 Mil
BP-58 Landscape $1 Mil
BP-59 Site Precast Concrete $1 Mil
Page 29 of 42
ONLINE
Bid Date Bid Time Location
9/9/2014
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$17800000
MAND 8/6 @ 10AM at 5000 Valley View Rd., El Sobrante
Div_02-site preparation & plant protection, selective demolition, site clearing, earthwork, subgrade preparation & base material, water distribution, sanitary
sewer, storm drainage system, asphalt paving & surfacing, portland cement concrete pavement, painted traffic lines & markings, tactile warning surfacing,
permeable base for synthetic turf system, play court surfacing, synthetic turf system, irrigation system, chain link fencing, ornamental fencing & gates, side gate
operators, parking appurtenances, site furnishings, play field equipment, planting; Div_03-concrete; Div_04-reinforced grouted concrete masonry; Div_05structural steel, metal deck, cold-formed metal framing, metal fabrications, expansion joint cover assemblies; Div_06-rough carpentry, finish carpentry, laminateclad wood cabinets, transparent-finish wood cabinets, framed decorative panel system; Div_07-modified bituminous sheet waterproofing, bldg insulation, bldg
envelope underlayment, under-slab vapo barrier, vapor reduction system, composite panels, modified bituminous sheet roofing, fluid applied roofing, flashing &
sheet metal, elastomeric sheet flashing, roof accessories, cementitous fireproofing, firestopping, joint sealers; Div_08-steel doors & frames, wood doors, access
panels, overhead coiling doors, aluminum windows, metal framed skylights, door hardware, glazing, glazed aluminum curtain wall, translucent wall assemblies;
Div_09-metal support systems, portlan cement plaster, gypsum board, ceramic tile, exterior tile, acoustical ceilings, linear metal ceilings, resilient flooring, epoxy
terrazo flooring with recycled glass matrix, fabric covered tack paneling, fiberglass reinforced plastic paneling, paints & coatings, graffiti-resistant coatings;
Div_10-visual dispaly boards, solid color reinforced composite toilet compartment doors, cubicle curtains & track, corner guards, flagpoles, marquee sign,
signage, metal lockers, fire extinguishers & cabinets, walkway covers, metal shelving, sun shades, toilet accessories, miscellaneous specialties; Div_11projection screens, production AV systems, scoreboards; Div_12-floor mats & frames, window blinds, blackout shades; Div_13-bleachers, fire alarm system;
Div_15-plumbing, HVAC, testing, adjusting & balancing; Div_16-lighting, electrical; Div_17-intrusion system, access control systems, digital video surveillance
system, assisted listening system , communications
2:00 PM
El Sobrante
De Anza High School Component # 7:Building 10 Linked Learning
2:00 PM
Copperropoli
s
Copper Cove Sewer Lift Station # 22 Replacement Project
ONLINE
NOTE:Addendum 1 included in original plan set
2:00 PM
Contra
Costa
County
8/21 @ 10AM
$1400000
Prevailing rate of wages (state determination) project consisting of furnishing and installing a nominal 10-ft dia. x 20-'ft deep fiberglass wet well, two nominal75hp submersible pumps, site piping, valves, vaults, drop manhole,390 gallon surge tank, 10-ft x20-ft masonry building, 600- amp electrical service, 600-amp
motor control center with variable frequency drives, instrumentation, antenna, SCADA/PLC control panel and other miscellaneous work. The work also includes
installation of a District furnished 20DkW diesel generator and demolition of the ,existing pumping plant.
Telecommunications Facility Ground Lease-Mt Diablo
MAND 7/29 @ 10AM
ONLINE
ONLINE
The Department of General Services (DGS), on behalf of California Department of Parks and Recreation (CDPR), is seeking Bid Proposals to Lease Ground
Space of approximately .18± acres in the Mt. Diablo State Park (MDSP), South Peak Telecommunication Site
2:00 PM
Berkeley
ONLINE
Hotel at 1499 University Avenue
New construction of 19,000 SF three-story hotel building with site improvements
Work to include, but not limited to, the following: grading, utilities, landscaping, site furnishing, concrete, strucutral and misc steel, rough carpentry, casework,
waterproofing, insulation, TPO roofing, sheet metal, caulking, doors / frames / hardware, coiling grilles, storefront, wood windows, glass & glazing, louvers, metal
stud framing, drywall, lath and plaster, ceramic tile, wood ceilings, flooring, FRP, painting and coatings, elevators, plumbing, HVAC, electrical, fire sprinklers,
telecommunications, fire alarm
Page 30 of 42
Bid Date Bid Time Location
9/9/2014
2:00 PM
Fairfield
2:00 PM
San Jose
2:15 PM
San Mateo
3:00 AM
Antioch
3:00 PM
Antioch
Plan Name / Scope of Work
Prebid Information
North Bay Regional Water Treatment Plant Sludge Lagoon No. 1
Decant Stucture Improvements Project
Engineers # of
Plan
Estimate Addenda #
ONLINE
MAND 8/21 @ 1:30 PM at 5110 Water Works Ln, Fairfield
Div-02-geotextile fabric, site preparation, demolition, salvage & bandonement, control of water, trenching, aggregate base course material, asphalt pavement,
pavement restoration; Div_03-concrete; Div-05-anchor bolts & anchoring devices, miscellaneous metal, handrail, aluminum grating; Div_09-jigh performance
coatings; Siv_10-warning signs; Div_11-equiment mounting, fabricated weir slide gates; Div_15-piping systems; Div_16-instrumentation, electrical
Oak Grove High School Modenization - Building U & I
8/20 @ 1PM at 285 Blossom Hill, San Jose
Complete renovation of the Theater Building I & Classroom Building U:Removal & replacement of interior finishes, roofing, mechanical, electrical, plumbing &
seating. The rebuild consists of ADA upgrades, interior finishes, electrical, plumbing, mechanaical, roofing, painting, flooring, theatrical lighting & rigging &
theatrical seating. Additionally, there is site work & the installation of a new Campus Marquee Sign
Replace & Install Fencing & Gates
MAND 8/21 @ 10AM at Pier 1, Foster City
Contractor shall provide all labor, tools, materials, vehicles, equipment & incidentals necessary to remove & dispose chain link fences & replace with new
wrought iron fences & gates at various sizes, including reconnecting & making operational the existing motorized gate system
ONLINE
ONLINE
Christine Rivera @ 916-227-6028
$235000
MAND 9/2 @ 10AM at 425 Fulton Shipyard Rd., Antioch
Construction of a reinforced concrete trash enclosure & ramp structure, including concrete & asphalt concrete removals; clearing, grubbing & water pollution
control
$600000
Piping Reconfiguration of Canal Pumps 2 & 4 & Pump 2
MAND 9/2 @ 2PM
Fulton Shipyard Road Transfer Station Trash Enclosure
ONLINE
ONLINE
Replacement
3:00 PM
Santa Cruz
3:00 PM
Modesto
3:00 PM
Santa Cruz
Demolish & replace existing discharge piping & appurtenances for Canal Pump 2 & Canal Pump 4 & provide & install a replacement for Canal Pump No. 2,
including pump, motor & reduces voltage solid state starter
$300000
2300 Delaware Elevators 72 & 73 Modernization
MAND 8/21 @ 2PM
Selective demolition of existing elevators but not including existing shaft rails & cab frames; new elevator controls & machinery; modifications to existing
electrical power & fire alarm systems as required to accommodate the elevator remodeling work; doorway modifications at freight elevator machine room
NEW Fire Stations 31 & 36-Re-Roofing
MAND 8/28 @ 2:30PM at 461 Mitchell Rd., Modesto
Div_02-demolition; Div_06-rough carpentry, finish carpentry; Div_07-gypsum underlayment board, mechanically attached TPO, sheet metal, roofing abatement
specs, sealants & caulking
Parking Lot 9 Low-Impact Development (LID) Project
$25000
The City of Santa Cruz (City) Department of Public Works is soliciting proposals for design services to retrofit the City-owned municipal lot, Parking Lot No. 9,
located at 120 Elm Street in Downtown Santa Cruz, with Low-Impact Development (LID) features. The objective of this project is to reduce the flow and volume
of storm water runoff through the use of LID Structural Control Measures (SCMs), including bio-swales, rain gardens, and permeable pavement. In addition to
reducing runoff, the project goal is to minimize the amount of pollutants discharged to the street and storm drain system, and ultimately the San Lorenzo River.
This project, once constructed, will provide a LID SCM demonstration site for the community. It will also become a pay-by-space parking facility.
4:00 PM
San
Francisco
NEW RFQ-Landscaping Services
Air Station San Francisco requires a grounds & maintenance team to manage the existing landscape. All services must be complete by licensed & insured
landscaping contractors
Page 31 of 42
ONLINE
ONLINE
Online O
Bid Date Bid Time Location
Plan Name / Scope of Work
9/10/2014 2:00 PM
Secondary Clarifier #4 Recoating (CIP 15-P002)
Pleasanton
Prebid Information
Engineers # of
Plan
Estimate Addenda #
$180000
MAND 9/4 @ 10AM at 7399 Johnson Dr., Pleasanton
The work to be performed shall be at the Wastewater Treatment Plant. Typical work to be performed includes cleaning and recoating existing secondary clarifier
#4 components such as submerged and below walk level equipment including influent diffusing well, drive cage(the drive will be protected from any sand
blasting or operation that would introduce grit and debris into the drive), sludge collector mechanism, scum skimmer, scum trough, scum baffle, effluent trough,
support, brackets and piping, steel bridge, outside drive mechanism equipment and piping at or above walk level, and other items within the secondary clarifier
#4, and doing all appurtenant work in place and ready for use, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as
mentioned within the contract documents, to which reference is hereby made for further particulars.
ONLINE
The work to be performed under this contract consists of furnishing all tools, equipment, materials, supplies, and manufactured articles as needed. It shall also
include the furnishing of all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work,
or other operations required for the fulfillment of the contract in strict accordance with the Contract Documents and District’s Standard Specifications and Details
currently in effect.
John Yee @ 925-875-2258
2:00 PM
Sacramento NEW Sacramento Marina & Miller Park Boat Ramp Maintenance Dredging
$270000
9/4 @ 10:30AM
Sacramento Marina Entrance Channel Dredging: This project consists of thedredging of a maximum of 1,700 cubic yards of silt from the Sacramento Marina
entrance channel to a depth of -2ft (NAVD 88). The dredging must be performedby clamshell. All work shall be completed to the satisfaction of the
MarinaManager. This wet material shall be hauled to the “City overflow lot” for dewatering.Existing vegetation may be trimmed, but not removed, toaccommodate
equipment.Miller Park Boat Ramp Dredging: This project consists of the dredging of amaximum of 500 cubic yards of material from the Miller Park boat ramp.
The dredging may be either by excavation or clamshell, whichever is more costeffective. The silt shall be hauled to the “City overflow lot” for dewatering. Allwork
to be completed to the satisfaction of the Old Sacramento Manager/MarinaManage
ONLINE
2:00 PM
Sacramento NEW Mid-Central Streetscapes
Provide all labor, equipment, and materials necessary to maintain the Mid-Central Streetscapes as specified in the Scope of Services, Service Schedules, and
the City of Sacramento Landscape Maintenance Services General Specifications and Provisions, LS14.
Centennial Place Apartments
Hanford
Div_02-selective site demolition, removal & salvage of construction materials; Div_03-concrete; Div-05-miscellaneous metals, decorative form metal; Div_06miscellaneous rough carpentry, glue-laminated construction, shop-fabricated structural wood, finish carpentry, interior arch wood work, arch wood casework,
solid surface fabrications; Div_07-concete roof tiles, metal wall panels, thermoplastic membrane roofing, frestopping; Div-08-doors & franes, hollow metal doors,
wood doors, fiberglass doors, door hardware, windows; Div_09-gypsum board, acoustical panel, ceiling, tiling, resilient flooring, resilient tile flooring, carpeting,
painting; Div-10-signage, postal specialties; Div-11-equipment; Div_12-stone countertops; Div_13-swimming pools & equipment; Div_31-earthwork; Div_32asphalt paving, chain link fences & gates, landscaping; Div-15-plumbing, HVAC; Div_16-lighting, electrical
Franklin-Arlington
Streetscapes
NEW
Sacramento
Provide all labor, equipment, and materials necessary to maintain the Franklin-Arlington Streetscapes as specified in the Scope of Services, Service Schedules,
and the City of Sacramento Landscape Maintenance Services General Specifications and Provisions, LS14.
Vallejo
Veterans Hall North Parking Lot Paving/Striping, Walkways & MAND 8/26 @ 2PM at 420 Admiral Callaghan Ln, Vallejo
NEW
Vallejo
ONLINE
2:00 PM
2:00 PM
2:00 PM
Curb Ramps
Div_02-selective demolition; Div_03-miscellaneous cast-in-place concrete; Div_05-pipe & tube railings; Div_31-earth moving; Div_32-asphalt paving, concrete
paving & tactile warning surfacing
Page 32 of 42
ONLINE
ONLINE
ONLINE
Bid Date Bid Time Location
9/10/2014 2:00 PM
Mill Valley
2:00 PM
Ceres
2:00 PM
Capitola
2:00 PM
Napa
2:00 PM
Oakdale
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Boyle Park Tennis Courts
The Scope of Work as described in the Bid Schedule includes, but is not limited to, removal of existing tennis court improvements, installation of electrical
improvements, lighting, concrete retaining walls, concrete pavement, fencing, gates, select areas of grind and overlay asphalt repair, tennis court surfacing,
drainage, grading, soil import and all other work as shown on the Plans and as called for in the Special Provisions and as directed by the Engineer.
NEW Service Road Sanitary Sewer Extension (Moffett Rd to Mitchell Rd)
Furnishing and Installing 12” thru 42” Vitrified Clay Pipe, 60” manholes, connecting to existing sanitary sewer, jack & bore across Service Road, State Route 99
and the Union Pacific Railroad.
$830000
McGregor Drive Booster Pump Station
Optional 8/27 @ 2PM
Div_02-existing facilties; Div_03-concrete; Div_04-concrete unit masonry, glass masonry: Div_05-metal fabrications; Div_06-rough carpentry, glue-laminated
construction; Div_07-masonry water repellant coating, asphalt shingle roofing, flashing & sheet metal, roof specialties, joint sealers; Div_08-steel doors, frames
& hardware, louvers; Div_09-painting & coating; Div_22-plumbing; Div_26-lighting, control systems, electrical; Div_31-geotextile, clearing & demolition,
trenching, backfilling & compacting, structural evacuation, structural fill; Div_32-asphalt paving & seals, chain link fence, modular retaining wall system, planting;
Div_33-utilities; Div_40-automatic valves; Div_41-portable davit cranes; Div_43-axial fans
$22000000
Construct New Main Kitchen @ Napa State Hospital
8/20 @ 9:30AM
Construct a new single-story 29,000 SF central kitchen, including abatement and demolition of existing structures, site clearing and grubbing, earthwork,
excavation, underground utilities, landscaping and irrigation, walks, curbs, gutters, parking, concrete slab on grade, steel structure, plaster exterior, single ply
roofing with skylights, new kitchen equipment, high capacity food storage racks, large refrigerator and freezer walk-ins, loading docks with overhead coiling
doors, card key access system, CCTV, diesel power engine generator and related work.
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Landscape Lighting & Maintenance District Services Project
Furnishing of Landscape Maintenance Services for the Bridle Ridge/Vineyard/Reinman Court/Sunset Meadows and Sterling Hills/ Landscape Lighting and
Maintenance Districts.
2:30 PM
San
Francisco
Pavement Renovation & Sewer Replacement-Various Locations No.
18
8/28 @ 2:30PM at 1680 Mission St., San Francisco
$1700000
ONLINE
$1400000 $1500000
ONLINE
Pavement renovation, curb ramp construction, sewer replacement, traffic routing & all other associated work.
Ramon Kong, Proj Mgr, @ 415-554-8280
3:00 PM
Kelseyville
NEW 2014 Water System Upgrades Project
MAND 8/26 @ 10AM
The project consists of constructing a 200,000-gallon welded steel potable water storage tank, activated carbon filters, SCADA improvements, and
appurtenances complete.
Rick Browser or Tom Warnock @ 530-244-0202
3:00 PM
Sunnyvale
ONLINE
Repaint Steet Light Poles Project
Painting existing City light poles, including preparing the pole surfaces, removing existing paint & applying prime coat
David Gakle @ 408-730-7403
Page 33 of 42
Bid Date Bid Time Location
9/11/2014 2:00 PM
Fairfield
2:00 PM
Turlock
2:00 PM
Stockton
2:00 PM
Sausalito
2:00 PM
San
Francisco
Plan Name / Scope of Work
Prebid Information
Engineers # of
Plan
Estimate Addenda #
NEW Animal Care New Kennel Building-Mechanical Package
MAND 8/26 @ 10AM at 675 Texas St., Ste 2500, Fairfield
Div_21-fire suppression; Div_22-plumbing; Div_23-HVAC; Div_26-lighting, electrical
$22100
NEW 901 Hedstrom Road Curb Return Repair
The work consists, in general, of: Best Management Practices (BMP's), saw cutting, removal of existing improvements, dig out sewer line trench, earthwork,
install curb return, install curb and gutter, cross gutter reconstruct, aggregate base, hot mix asphalt, crack seal, striping and furnishing all necessary labor,
materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place. This work shall be
completed in accordance with the Standard Specifications, standard Drawings and these Special Provisions.
NEW Oxidation Ponds #2 & #3 External Levees Repair Project
8/28 @ 10AM
Clearing & grubbing, asphalt paving, pavement markings
Sausalito City Hall Ceiling Tile Replacement Project
8/14 @ 9AM at 420 Litho St., Sausalito
Removal of existing ceiling tiles, t-bar ceiling & existing lighting & furnish & install new ceiling tiles & grid system & new LED lighting fixtures. Contractor shall be
responsible for removal & replacement of sprinklers & fire alarm devices.
ONLINE
ONLINE
ONLINE
ONLINE
Loren Umbertis @ 415-289-4113
TG16.8 Fireproofing
Encouraged 7/31 @ 2PM
$6200000
ONLINE
Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) and concurrent Invitation for Bids (IFB) from Trade Subcontractors
interested in bidding the TG16.8 Fireproofing Construction Services on the contract for the Transbay Transit Center (TTC) Project located in San Francisco,
California. Bidders that have already pre-qualified do not need to respond to the RFQ.
2:00 PM
2:00 PM
San
Francisco
San
Francisco
3:00 PM
Gilroy
3:00 PM
San Jose
Online
NEW TG17.1 Signage/Graphics/Directory Systems
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with Signage/Graphics/Directory Systems, including but not limited
to, cast and etched graphics, dimensional lettering signage, pylon signage, illuminated panel signage, non-illuminated panel signage, photo-luminescent exit
accessories (PLEA), electronic panel signage, floating signage, glass signage, interpretive graphics, and informational kiosks on complex projects. Also included
are engineering, coordination, procurement and complete installation of the respective systems in the following trade: TG17.1 Signage/Graphics/Directory
Systems
Elevator Modernization at Five Sites
8/12 @ 10AM
Modernize two (2) geared passenger elevators in each 13 story building, including new microprocessor motion & operation controls, new power factor one
regenerative drive systems, new AC gearless hoist machines, new fixtures, new door operators & door equipment, refurbishment of retained elevator equipment
$65000
NEW Sunset Gardens Exterior Site Lighting Replacement Project
MAND 8/26 @ 9AM at 7750 Wren Ave., Gilroy
Remove existing light fixtures from the xisting poles & dispose fixtures offsite.
$75000 NEW Huff Gardens Exterior Site Lighting Replacement Project
MAND 8/26 @ 2pm
Housing Authority of the County of Santa Clara (HACSC) on behalf of its affiliate Huff Avenue Associates, LP (Owner) is soliciting bids from qualified contractors
to provide all labor, equipment and materials required for the replacement of exterior site lighting at Huff Gardens Family Apartments located at 3021 Huff
Avenue, San Jose, CA 95128. See Scope of Work (Attachment A) and related documents for details. Contractor shall warrant all labor and material for a period
of 12 months from project completion.
Page 34 of 42
ONLINE
ONLINE
Online
Bid Date Bid Time Location
Plan Name / Scope of Work
9/11/2014 3:00 PM
7121-Police Administration Building Security Card Access SystemRebid
San Jose
Prebid Information
MAND 8/21 @ 9AM at 201 W. Mission St, San Jose
Engineers # of
Plan
Estimate Addenda #
$400000
ONLINE
$207000
ONLINE
Security card access system
3:00 PM
San Jose
NEW 7641-White Road Streetlight Improvements
Streetlight improvements
Greg Jobe, Proj Mgr, @ 408-793-4128
3:00 PM
Dixon
3:00 PM
San Jose
NEW 2014 Sewer Repair Project
Removal & replacement of pipe sections ranging from 6" to 8" diameter at a depth ranging between 3.5 feet & 8.5 feet to the invert, manhole replacements &
constructio of new manholes
$1057200
NEW 6430-Mackey Ave, Dawson Ave & Cross Way Sanitary Sewer
ONLINE
ONLINE
Replacement
Clearing & grubbing, watering, finishing roadway, aggregate subbases, aggergate bases, deep lift asphalt base, asphalt concrete, concrete curbs & sidewalks,
traffic stripes & pavement markings, pavement markers, signals, lighting & electrical systems, asphaltic emulsions, pipe & structures, trench excavation, bedding
& backfill, pipe installation, pipeline structures, cleaning pipelines, sanitray sewer rehabilitation
Erwin Wong, Proj Mgr, @ 408-793-4112
4:00 PM
4:00 PM
9/12/2014 12:00 PM
2:00 PM
Concord
Napa
RFP-Concord Citywide Bicycle & Pedestrian Safe Routes to Transit
Project
The City of Concord is seeking qualified firms to submit a proposal to prepare the City's first comprehensive bicycle & pedestrian plan, which wil lbe used as a
blueprint to develop a network that promotes safe alternative modes of transportation & helps position the City for future funding for bicycle & pedestrian
improvement projects that benefit the entire community.
NEW RFQ/RFP Design-Build Tulocay Creek Bicycle/Pedestrian Bridge
8/27 @ 2pm
The design build team shall prepare a proposal that specifies a scope of work that will provide all necessary work for the design and construction of the bridge
and conforms to the trail alignment on both sides. The proposed bridge must be designed as a clear span over New Tulocay Creek and meet the minimum
length and elevation specified in Appendix G in order to not impede creek flows under current conditions and in the future with proposed improvements for the
Napa Flood Project.
Healdsburg NEW RFP-Annual Backflow Testing & Repair Services
The City of Healdsburg is requesting proposals from prosepctive contractors to provide annual testing & certification of City-owned backflow prevention devices,
including inspection, testing, repair & submission of a writtem report on backflow prevention devices located on property indentified by the City.
RFQ-Consulting Services for WETA Vallejo Ferry Terminal 2015
8/27 @ 1PM
Vallejo
Dredging Project
The Water Emergency Transportation Authority is seeking submittals from qualified firms in response to a RFQ for consulting services to obtain all necessary
permits for the dredging; perform all requisite tests; perform all sampling, tests, analyses & surveys as required; preparation of contract documents to enable
WETA to go out to bid and for project; on-site inspection & safety monitoring personnel; quality assurance; ensure dredging contractor compliance with
regulatory agencies; & certified payroll collection & verification for the dredging work.
Page 35 of 42
ONLINE
Online
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
9/15/2014 10:00 AM
Napa
Camp Berryessa Improvement Project
San
Francisco
Police Dept's Traffic Company & Forensic Services Divsion Facility
4:00 PM
Prebid Information
Engineers # of
Plan
Estimate Addenda #
MAND 8/22 @ 10AM at 7900 Beryessa-Knoxville Rd., Napa $1429500
Cosntruction of an environmental education camp, including grading; paving of roadways; parking lots & trails; watr system, water treatment, tank & distribution
greywater system with subsurface drip disposal; camp host site; tent cabins; c ombination restroom shower building with composting toilets; covered activity
areas; boat boarding dock; electrical system with photovoltaic array & miscellaneous other site improvements/modification. Permits for this work shall be
secured by the District.
RFQ-Architectural & Engineering Team for a new San Francisco
8/19 @ 1:30PM at 30 Van Ness Avew, 4th Fl, San Francisco
ONLINE
ONLINE
The Dept of Public Works announces a RFQ for an architectural & engineering team led by an executive architect to provide architectural, engineering & related
services to design a new facility to house the San Francisco Police Department's Traffic Company & Forenseic Services Division Facility
9/16/2014 11:00 AM
Modesto
11:00 AM
Modesto
2:00 PM
Fairfield
2:00 PM
Marina
2:00 PM
San Jose
$2585618
8/27 @ 11AM at 1010 Tenth St., Modeato
This project will replace and upgrade deficient water mains, associated water valves and fire hydrants in the southwest area of Modesto to increase service
reliability of the City of Modesto’s water system, incouding protecting existing underground utilities; equipment, piping & materials demolition; cast-in-place
cocncrete; trenching, backfilling & compacting; asphalt paving; utilities
$159000
Tank 7 Recoat
8/27 @ 10AM at 1010 Tenth St., Modesto
The City of Modesto periodically schedules recoating of the inside of the tanks as part of the routine maintenance of the City’s water storage tanks. This project
will include the preparation and recoating of Tank 7, which is located at 1533 Plumas Avenue in Modesto.
$200000
Waterman Water Treatment Plant Replacement C02 Project
MAND 8/28 @ 9:30AM at 2900 Vista Grande, Fairfield
Cast-in place concrete, grouting, miscellaneous metalswork, aluminum railings, fiber glass reinforced plastic foundations, sealants & cauling, electrical,
earthwork, A.C. pavement & base, process control & instrumentation, mass flow measuring, temperature measuring, control panels, field indicators, piping
$95000
Re-Roofing of Hangar 524 at the Marina Muncipal Airport
8/26 @ 10AM
Completely clean & recover the existing roof at Hanagr 524
Strengthen & Replace Water System-South Modesto Phase 2
NEW RFQ-Sewer Camera for City of San Jose Department of
$40000
ONLINE
ONLINE
ONLINE
ONLINE
ONLINE
Transportation
The City of San Jose is seeking quotes for a sewer camera and accessories in support of the Department of Transportation.
Priscilla Lourangrath @ 408-535-7058
2:00 PM
Turlock
3:00 PM
Palo Alto
Job Order Contract #8947-California State University Stanislaus
MAND 8/26 @ 10AM
The scope of work includes a collection of detailed repair & construction tasks & specs that have extablisjed unit prices. It is placed with the contractor for the
accomplishent of repair, alteration, modernization, maintenance, rehabilitation, demolition & construction of infrastructure, buildings, structures or other real
property
RFP-Design, Construction, Operation, Maintenance of a Compost
Pre-Proposal Webinar 7/16 @ 9AM
Family for Yard Trimmings & Residential Food Scraps
The City is seeking Proposals from interested companies to permit, design, build, operate and maintain (DBOM) a Compost Facility to be located on the
relatively flat 3.8-acre portion of the Measure E site in accordance with the requirements in the Scope of Services. The City will act as owner and financier. The
Compost Facility will utilize Aerobic Composting. Services are to be provided for a 20-year period following the commencement of full-scale operations. This
RFP covers the aerobic composting of residential Yard Trimmings and Residential Food Scraps. Proposers must submit a price for Yard Trimmings mixed with
Residential Food Scraps (Base Case) and for Yard Trimmings only (Required Alternative Proposal), subject to the required services described in the Scope of
Services
Page 36 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
9/16/2014 3:00 PM
Republican Alley 16-Inch Water Main Rehabilitation Project
Roseville
Prebid Information
Engineers # of
Plan
Estimate Addenda #
ONLINE
Div_02-earthwork, trenching, water distribution pipeline (open cut installation) and accessories, water transmission pipeline (cured in place pipe installation) &
accessories, aggregate base, subbase & concrete, pavement markings, landscaping, pavement restoration & rehabilitation; Div_03-concrete
George Hanson @ 916-746-1764
3:00 PM
Los Altos
4:00 PM
San
Francisco
Signage Phase II - Foothill College
Div_10-signage
NEW Infrastructure Improvements, Candlestick Point Redevelopment
8/21 @ 10AM at 12345 El Monte Rd., Bldg D160, Los Altos $100000
ONLINE
8/27 @ 10AM at 101 Horne Ave, San Francisco
ONLINE
The Project will include removal and relocation of stockpiled surcharge material, excavation, installation of new infrastructure, including storm and sanitary
sewer, domestic and reclaimed water, joint trench utilities, landscaping, street surfacing, sidewalks, street lights, curbs, and gutters, Auxiliary Water Supply
System (AWSS), and Auxiliary Waste Collection System (AWCS). SBEs, MBEs, WBEs, and LBEs are encouraged to submit proposals.
9/17/2014 1:30 PM
10:00 AM
Orinda
Redwood
City
Orinda Water Treatment Plant Washwater Tank Rehabilitation
8/26 @ 10AM
$500000 $800000
Div_02-construction surveying, selective site demolition, lead hazard control activities; Div_03-concrete; Div_05-hot-dip galvanizing, pipe welding, flange bolting,
metal fabrications; Div_07-bituminous waterproofing, joint sealants; Div_08-vault hatches; Div_09-painting, zinc-rich coatings, high-build epoxy coatings,
mechanical & electrical coating systems; Div_22-pipe identification; Div_26-pipeline cathodic protection; Div_31-clearing & grubbing, excavation, dewatering, fill,
imported backfill & drain rock materials, controlled density fill, geosynthetic filter fabric, drilled concrete piers; Div_32-asphalt pavement replacement, chain link
fences & gates, planting irrigation, plantin; Div_33-utilities; Div_40-mechanical piping
$250000
F-Dock Dredging Project
MAND 8/27 @ 10AM at 675 Seaport Blvd, Redwood City
021C/E8
ONLINE
Mechanical dredging of sediment from Port of Redwood City's F-Dock & disposing of the sediment at the San Francisco Deep Ocean Disposal Site.
2:00 PM
Union City
3:00 PM
Los Altos
9/18/2014 2:00 PM
Fairfield
$500000
NEW 2014-15 Slurry Seal Project
2014-15 Slurry Seal Project
District Office Building Roofing Replacement
8/19 @ 10AM at 12345 El Monte Rd., Bldg D160, Los Altos
Div_02-selective bldg demolition; Div_06-rough carpentry; Div_07-sheet metal waterproofing, composition shingle roofing, thermoplastic membrane roofing;
Div_08-metal framed skylights; Div_09-exterior painting; Div_22-roof drainage
NEW Center for Positive Change Modifications & Tenant Improvements-
MAND 8/26 @ 11:30AM at 675 Texas St., Ste 2500, Fairfield
Online
ONLINE
ONLINE
Fairfield Probation
2:00 PM
Stockton
Div_02-selective demolition; Div_07-thermal insulation, joint sealants; Div_08-hollow metal doors & frames, flush wood doors, access doors & frames, door
hardware, glazing; Div_09-non-structural metal framing, gypsum board, interior painting; Div_10-fire protection cabinets & extinguishers; Div_11-audio-visual
equipment; Div_12-horizontal louvers; div-23-HVAC; Div_26-electrical; Div_27-communications; Div_28-fire detection & alarm; Div_32+-pavement markings
NEW 2015 CCTV Inspection Services of Sanitary Pipelines
8/27 @ 10AM
CCTV inspection services of sanitary pipeliens at various locations
Lorin Gardner, Proj Mgr, @ 209-937-5428
Page 37 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
9/18/2014 2:00 PM
TG10.4 Electrical, Communications, Security & Integrated Networks
02/18/14 @ 2:00 pm
San
Francisco
2:00 PM
Richmond
2:00 PM
Manteca
2:00 PM
Fremont
2:00 PM
El Cerrito
2:00 PM
French
Camp
2:30 PM
San
Francisco
Engineers # of
Plan
Estimate Addenda #
ONLINE
Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) and concurrent Invitation for Bids (IFB) from Trade Subcontractors
interested in bidding the TG10.4 Electrical, Communications, Security and Integrated Networks Construction Services on the contract for the Transbay Transit
Center (TTC) Project located in San Francisco, California. Bidders that have already pre-qualified do not need to respond to the RFQ.
Improvements at the Richmond Veterans Memorial Hall
8/26 @ 10am
Div_02-removal work, minor demolition for remodeling; Div_06-framing & sheathing, finish carpentry; Div_07-self-adhering flashing membrane, insulation, fravel
built-up roof restoration, smooth built-up roof restoration, sheet metal flashing, copper flashing & trim, joint sealers; Div_09-resilient tile flooring, vinyl sheet
flooring, wall base, carpet, painting
NEW Morenzone Ballfield Renovation
Div_02-structure demolition; Div_03-cast-im-place concrete; Div_05-pipe & tube railings; Div_12-site furnishings; Div_31-site clearing, earth moving; Div_32concrete paving, baseball field surfacing, chain link fences & gates, sport netting system, planting irrigation, turf & grasses.
Fremont Campus Parking Lot Light KIM LED Retrofit
MAND 8/26 @ 10AM
Parking lot light Kim Led Retrofit
HVAC Cleaning & Repair at El Cerrito DMV Field Office
MAND 8/28 @ 11AM at 6400 Manila Ave, El Cerrito
HVAC duct cleaning & repair
Kevin Childers @ 916-957-7822
NEW San Joaquin General Hospital Chiller Installation Project (Specs on MAND 8/27 @ 9AM at 500 W. Hospital Rd, French Camp
ONLINE
ONLINE
ONLINE
ONLINE
$62000 $72000
ONLINE
Plans)
Remove an existing chiller unit & replace it with a new chiller unit, including structural & electrical work.
Little Hollywood Park Renovation - Upper Section
9/4 @ 10AM
$400000
ONLINE
This project is for City of San Francisco Contract Monitoring Division certified Micro-LBE contractors only (CSLB License A or C-27). Little Hollywood park
upgrades including irrigation, landscaping, parking improvements, site furniture installation and landscape planting.
Matt Jasmin, Proj Mgr, @ 415-581-2552
9/19/2014 11:00 AM
2:00 PM
Visalia
San
Francisco
Supply & Installation of Various Generators (Natural Gas & Diesel)
Supply & install natural gas & diesel generators at various locations
NEW 1500 Page Street (no GC Openings)
MAND 9/4 @ 11AM & 9/9 @ 1PM
$500000
Voluntray 9/4 @ 10AM at 1500 Page St., San Francisco
THIS IS A CAHILL JOB. It is a renovation of a 4 story building into 17 units of housing for the developmentally disabled. The area of the building is
approximately 16,000 sf. The Ground floor includes office, utility, storage and gathering spaces. The upper floors include 16 studio units and 1 one bedroom
unit. There is no parking garage and there is a modest amount of landscaping and hardscape scope. The units are NOT for sale (i.e. these are NOT condos),
but affordable apartment rentals
Page 38 of 42
ONLINE
ONLINE
Bid Date Bid Time Location
9/22/2014 2:00 PM
San
Francisco
Plan Name / Scope of Work
Prebid Information
NEW Transbay Block 9
Engineers # of
Plan
Estimate Addenda #
ONLINE
9/5 @ 2PM at 299 Second St., San Francisco
ransbay Block 9 project is a new residential apartment building which borders Folsom Street, Clementina Street and First Street and is adjacent to the Fremont
Street exit ramp. The Project will consist of a single 42 story high rise building of Type 1A construction with 436 market rate units and 109 affordable units. The
basement will consist of 6 below grade parking and mechanical levels with 267 parking stalls. SBEs, MBEs, WBEs and LBEs are encouraged to submit
proposals
9/23/2014 2:00 PM
Oakland
NEW Laney College Boiler Retrofit at Laney College
MAND 9/2 @ 10AM at 333 East 8th St., Oakland
Turn-key retrofit replacement of three existing forced draft package burner systems, controls & natural gas supply to meet or exceed current bay area air quality
management air emission regulation 9, Rule 7 & no soot byproducts for the three existing hot water boilers at Laney College's Central Plant.
ONLINE
Seraphine Nzomo @ 510-+466-7255
2:00 PM
4:00 PM
Richmond
San
Francisco
Richmond Intermodal Improvement Project
8/14 @ 9AM at 300 Lakeside Dr., 17th Fl, Oakland
$2200000 $2800000
Div_02-demolition; Div_03-concrete; Div-04-concrete unit masonry; Div-05-metal welding, structural steel framing, metal decking, cold-formed metal framing,
metal fabrications, metal railings; Div_07-modified bituminous sheet waterproofing, vapor retarders, flashing & sheet metal, sheet metal roofing, joint protection;
Div-07-door hardware; Div_09-painting, grafitti-resistant coatings; Div_10-bus shelters; Div_12-site furnishings; Div_20-raceway for facility services,
underground ductwork & structures foir facility services; Div_26-low voltage wires & cables, lighting; Div_31-earthwork, clearing & grubbing, bioretention
facilities, excvation support & protection; Div-32-aggregate subbase courses, aggergate base courses, aggregate drainage layer, asphalt paving, concrete
paving, concrete curbs, gutters & walks, pavement markings, traffic signage, tactile warning surfacing, planting irrigation, planting; Div_33-utilities
Candlestick Park Stadium Demolition & Abatement
8/20 @ 10AM at 397 Candlestick Park, San Francisco
ONLINE
ONLINE
The Project includes hazardous material abatement and remediation, complete demolition and disposal of the Candlestick Stadium and all associated buildings
identified within the project boundary limits, including but not limited to, outbuildings, stair cases, ramps, retaining walls light towers, pedestrian bridges,
underground facilities, fencing, pavements, sheds, etc. as indicated on the project drawings; concrete crushing, material processing and recycling, removal of
foundations as indicated, plus incidental work. SBEs, MBEs, WBEs, and LBEs are encouraged to submit proposals.
9/24/2014 2:00 PM
2:00 PM
San Jose
Vallejo
Snell Pipeline (Coyote Creek Line Valve to Aborn Line Valve)
Rehabilitation Project
MAND 9/3 @ 9AM at 5750 Almaden Expressway, San Jose $1500000 -
Mobilization, clearing & grubbing, demolition, control of water, excavation & backfill, aggregate base course, pipe bedding-select backfill, pipe bedding-controlled
density fill, shoring, asphalt paving, slurry seal, curb, gutter, sidewalk & driveway restoration, utility structures, precast concrete vaults, traffic control, concrete,
grout, general piping, valves & actuators, steel structures, roofs, electrical, flow instruments, corrosion control, coating & paints
$1440000
NEW Dining Hall Conversion to Student Services Cal Maritime
Encouraged 9/3 @ 10AM
In general, the work consists of interior renovations to Cal Maritime Building 16, including minor demolition to prepare existing surfaces for new work,
construction of new interior offices, including floor finishes, wall construction and finishes, and new ceilings. Work includes new plumbing, mechanical systems,
electrical systems and fire alarm.
Complete documents will be posted after 8/29.
Page 39 of 42
ONLINE
$2000000
Pending
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
9/29/2014 2:00 PM
San Francisco Roadway Bridges Replacement Project
9/4 @ 9AM at 1250 San Carlos Ave, San Carlos
San
Francisco
Engineers # of
Plan
Estimate Addenda #
$8000000
008C
Remove/replace existing two-span steel-through girder brisges due to deteriorated condition; remove/relocate/reconstruct existing utility lines; provide temporary
support as applicable at each bridge
9/30/2014 11:00 AM
12:00 PM
2:00 PM
Modesto
San
Francisco
Fairield/Vac
aville
$2242000
ONLINE
Div_02-demolition, cutting & patching, topsoiling & finished grading, earthwork, excavation & backfill, erosion & sediment control, water main construction,
flexible pavement; Div_03-concrete; Div_05-metal fabrications; Div_08-access doors & panels; Div_09-painting & protective coatings; Div-10-identification
devices; Div_11-pumping equipment:sump; Div_13-measurement & control instrumentation, instruments, boxes, panels & control center, PLC control system;
Div_15-pipe systems; Div_16-interior & exterior lighting, electrical work
TG08.2R-Exterior Awning
Encouraged 8/14 @ 2PM at 175 Beale St., San Francisco
ONLINE
Webcor/Obayashi Joint Venture seeks trade subcontractors that have significant experience with design, furnish & installation of perforated, prefinished
aluminum panel clad assembly on complex projects which require significant coordination with adjacent properties & traffic relocation located in an urban
environment, including the engineering, coordination, procurement & complete installation of their respective systems in the following trade:Exterior Awning
$30000000 Fairfield/Vacaville Train Station Project
MAND 8/21 @ 10AM at 1000 Webster St., Fairfield
ONLINE
Downstream Water System Improvements Tier 2 Pressure
Regulating Valves
5/14 @ 11AM at 1010 Tenth St., Modesto
$34000000
Train Station
1. 40’ x 800’ center island platform with amenities including shelters, lights, Public
Address and Variable Message Sign Systems – constructed on Union Pacific
Railroad (UPRR) property.
2. 20’ x 150’ pedestrian underpass with stairs and ADA ramp both north and south.
3. North plaza area with 6 bus bays and bus shelters.
4. South plaza area.
5. Plaza foundations near UPRR tracks.
6. Parking areas with lighting, drainage, and landscaping.
Roadways
1. Widening of Peabody Road to 6 lanes from Vanden to Huntington Road.
2. 1600’ pre-cast and cast-in-place 6-lane overpass over UPRR tracks with MSE
walls and embankment. Must be constructed from summer 2015 to summer 2016.
3. New 2-lane transit access road through station.
4. Extension of Vanderbilt road south to the new transit access road.
5. 20-ft wide temporary access road approximately 60 feet west of Peabody Road.
6. Street lights and landscaping.
Civil Work for Track Work
1. Grading and subballast for 6000 track feet that meets UPRR standards.
2. 36 inch diameter culverts and v-ditches
Page 40 of 42
Engineers # of
Plan
Estimate Addenda #
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
10/2/2014 2:00 PM
8-Inch Ductile Iron Pipe Main Installation on Cement Street From
Arguello Blvd to 14th Ave
5/13 @ 10:30AM at 1990 Newcomb Abe, San Francisco
San
Francisco
$2270000
ONLINE
Subcontracting opportunities may include, but not limited, to the following major types of work: trucking, hauling, shoring, pavement restoration, sawcutting, and
traffic control.
Div_02-excavation & backfill, pavement restoration, ductile iron & fittings, polythylene encasement of ductile iron pipe & fittings, removal ofd SFWD-owned valve
box & cover, installation of screw taps, service pipe & fittings, repair & replacement of side sewer
10/8/2014 4:00 PM
Half Moon
Bay
ONLINE
RFQ-Testing, Inspection & Analysis Report for Historic Main Street
Bridge
The City of Half Moon Bay is seeking proposals from qualified & experienced engineering consultants for providing professional services for testing, inspection &
analysis of the historic Main Street Bridge
10/14/2014 2:00 PM
2:00 PM
Rodeo
San
Francisco
$75000
NEW RFP-Landscape Maintenance Services LL-2 Zone 38
MAND 9/2 @ 10AM at 470 Parker Ave, Rodeo
The Contra Costa County Public Works Department (County) is soliciting proposals from qualified firms and/or individuals to provide Landscape Maintenance
Services (Project) for Countywide Lighting and Landscaping District (LL-2) Zone 38. The purpose of the Project is to maintain landscape features at four
locations in Rodeo, as further described in this Request for Proposal (RFP) under Section V, Scope of Work: a) Parker Avenue Trees, located in the Parker
Avenue frontages between San Pablo Boulevard and First Street; b) Rodeo Creek Trail, from Mariner’s Point Boulevard to Investment Avenue; c) Lefty Gomez
Recreation Center and Ball Field Complex, located at 470 Parker Avenue in Rodeo and; d) Rodeo Sign Board Area, located at the southwest intersection of
Parker Avenue and San Pablo Avenue in Rodeo. A map of the area is attached to this RFP as Exhibit H.
$200000
TG15.1-Dock Levelers & Bumpers
Optional 8/26 @ 2PM at 175 Beale St. San Francisco
ONLINE
ONLINE
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with with furnishing and installing dock levelers, bumpers, truck
restraints and bin lifters on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems.
10/15/2014 2:00 PM
San
Francisco
TG15.2-Facade Access Equipment (Window Washing Equipment)
ONLINE
Encouraged 8/28 @ 2PM at 175 Beale St., San Francisco
Webcor/Obayashi Joint Venture seeks trade suncontractors that have significant experience with furnishing, designing & installation of davit sockets, davit arms
& fall arrest systems on complex projects which require significant coordination with adjacent properties & traffic relocation located in an urban environment;
including the engineering, coordination, pocurement & complete installation of their respective systems in the following trade:Facade Access Equipment
10/16/2014 2:00 PM
San
Francisco
TG07.9 Bollards & Barriers
ONLINE
8/27 @ 2PM at 175 Beale St., San Francisco
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with designing, furnishing and installing bollards, wedge barriers,
impact attenuators, hydraulic power units, controls and piping, and integration with safety and security systems on complex projects. Also included are
engineering, coordination, procurement and complete installation of the respective systems.
10/21/2014 2:00 PM
San
Francisco
TG07.8 Expansion Joints
9/3 @ 2PM at 175 Beale St., San Francisco
$900000
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with expansion joints, miscellaneous metals and engineering on
complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems.
Page 41 of 42
ONLINE
Bid Date Bid Time Location
Plan Name / Scope of Work
Prebid Information
11/13/2014 2:00 PM
TG08.3-Skylights
Highly Rncouraged 8/21 @ 2PM
San
Francisco
Engineers # of
Plan
Estimate Addenda #
Webcor/Obayashi Joint Venture issues this Request for Proposals (RFP) for the Skylights Package for the Transbay Transit Center Project from firms (Trade
Subcontractors) with expertise in Design, fabrication and installation of skylights. The successful Proposer must demonstrate experience in its respective field as
outlined within this RFP.
Page 42 of 42
ONLINE
HELP WANTED
Bay Area general contractor seeking a full time full charge bookkeeper. Must
have construction experience! Knowledge of American Contractor software is a
benefit. Please submit resume, salary requirement, and a cover letter in PDF
format to [email protected]
October:
ASK FOR:
Workers Compensation Insurance Renewals:
Group 825
“Insurance Quote”
Group
825
State Fund + BAY AREA Builders Exchange
= 6% SAVINGS
www.
thebluebook
.com
A Special Seminar
FRIDAY, SEPTEMBER 19TH
8:30 A.M. to 12:30 P.M.
COST (due in advance): $150.00 per person
LOCATION: Bay Area Builders Exchange
3055 Alvarado Street, San Leandro, CA 94577 (510) 483-8880
MAKE YOUR RESERVATIONS NOW……...DEADLINE IS SEPTEMBER 12TH
Contact: Larry Levy at 415-892-1497 or FAX reservation to 415-8926596. Make check payable to Larry Levy. Mail to 458 San Marin Drive,
Novato, CA 94945
Thank you, Larry. We are planning to come. Enclosed is my check.
Names of participants:
___________________________________________________________________________
___________________________________________________________________________
From (Co. or Org.)
___________________________________________________________________________
OUTLINE

Overtime Requirements as of January 2014

Overtime Exemptions

Make-up Time is Available

Alternative Workweeks — New Law

Itemization of Wage Statements

When does the Work Week begin?

Timekeeping

Minimum Wage Violations — New Law

Wage Theft — New Law

Misclassification of Independent Contractors vs. Employees — New Law

Commission Agreements — New Law

Meal and Rest Periods — New Laws

San Francisco Ordinances— New Laws

Compensable (“Comp.”) Time

On-Call Time

Waiting Time

The Company’s vs. the Employees’ Tools

Paid Vacation

Paid Sick Leave — New Law

Paid Holidays

Deductions from Paychecks

Final Paychecks

Frequency of Paying Employees

Travel Time — New Law; Heads Up, Contractors!

Determining the Difference between Exempt vs. Non-exempt Employees
Advertising Rates
Weekly Bulletin
Our Bulletin runs weekly in 8 1/2 " X 11 " Size Format, Black & White
Member
(Total cost)
NonMember
(Total cost)
$100
$150
$150
$200
$75
$110
$115
$150
$35
$60
$50
$80
$30
$50
$50
$75
Full Page:
One or two weeks
Three or four weeks
1/2 PAGE:
One or two weeks
Three or four weeks
1/4 PAGE:
One or two weeks
Three or four weeks
Business Card &
MBE/WBE/SBE
Sub Bid Requests:
One or two weeks
Three or four weeks
CLASSIFIED:
Up to 7 lines
One or two weeks
$25
Three or four weeks
$35
(Each additional line)
$2.50
Note: A line is 30 Character / spaces.
$40
$55
$4.50
Please fax a typed written sample of your ad to 510-352-1509 or email copy text to
[email protected] and indicate the number of Weekly Bulletin issues the ad is to run.
Ad deadline is 12:00 P.M. Thursdays, the Weekly Bulletin is published every Friday.
**** Ads for Nonmembers must be paid in advance.
3055 Alvarado Street, San Leandro, CA 94577. Tel: 510-483-8880. Fax 510-352-1509.
www.bayareabx.com. [email protected]