The Hon’ble GERC, vide Letter No. GERC /Tech/2014/1378 dated 24 Jun

The Hon’ble GERC, vide Letter No. GERC /Tech/2014/1378 dated 24th Jun
2014 has approved to recover following charges from the prospective LT
consumers.
Schedule of Charges
New Connection / Extension / Reduction / Shifting out of premise
Load in kW (aggregate)
Amount Rs.
i
Not exceeding 2 kW
Rs. 3,500
ii
Exceeding 2 kW but Not exceeding 6 kW
Rs. 5,000
iii
Exceeding 6 kW but Not exceeding 12 kW
Rs. 12,000
iv
Exceeding 12 kW but Not exceeding 20 kW
Rs. 21,000
v
Exceeding 20 kW but Not exceeding 40 kW
Rs 21,000 + Rs 1100 / KW
vi
Exceeding 40 kW but Not exceeding 60 kW
Rs 21,000 + Rs 1100 / KW
vii
Exceeding 60 kW but Not exceeding 80 kW
Rs 21,000 + Rs 1100 / KW
viii
Exceeding 80 kW but Not exceeding 100 kW
Rs 21,000 + Rs 1100 / KW
For example, if customer applies for 25 KW Load demand then charges would be
Rs 21000+ (5 x 1100) = Rs 26500
All categories of prospective new consumers for Load Extension /
Reduction / Shifting / PDC reconnection etc. at the rates stated as
above, except Agriculture Tatkal Category, LTP-V category.
The above charges shall not be applicable for Temporary connections.
Registered office : Sardar Patel Vidhyut bhavan, Race Course, vadodara-390 007
Website: www.mgvcl.com
email:[email protected]
 Following points are to be taken care of while considering the
charges.
o While releasing the connections under Agriculture-Tatkal,
Green house and Schemes approved by the grant from State
Government/ Central Government the charges from the
applicants are to be recovered as per the norms approved
under respective scheme.
o DISCOMs shall entertain single phase lighting connection upto
3 KW in agriculture land including the cases , where
agriculture does not exists in the same survey number.
However, in such cases, DISCOMs are allowed recovered
actual cost as per the latest cost data subject to maximum
amount of Rs. 1.0 Lakh.
o In case of infrastructure development for housing
colony/Industrial estate/ Street Light Network etc. The
DISCOMs may create distribution network on its own , where if
there is any potential development in that areas and as such
the DISCOMs need not create network where there is no
consumer to be supplied power and recovery for individual
application should be made according to the service line
charges on “PER KW basis” approved by the commission.
o The revised charges shall be effective for the applications
received on or after 1st July 2014 , and will continue to remain
in force till any further revision.
Registered office : Sardar Patel Vidhyut bhavan, Race Course, vadodara-390 007
Website: www.mgvcl.com
email:[email protected]
The Hon’ble GERC vides Letter No. GERC /Tech/2014/1654 dated 2nd Aug
2014 has approved to recover following charges in case of shifting of LT
connection within same premise.
Load in kW (aggregate)
Amount Rs.
i
Not exceeding 2 kW
Rs. 1000
ii
Exceeding 2 kW but Not exceeding 6 kW
Rs. 2600 (For 1Ph)
Rs 3100 (For 3Ph)
iii
Exceeding 6 kW but Not exceeding 12 kW
Rs. 4200
iv
Exceeding 12 kW but Not exceeding 20 kW
Rs. 4200
v
Exceeding 20 kW but Not exceeding 40 kW
Rs 5600
vi
Exceeding 40 kW but Not exceeding 60 kW
Rs 9100
vii
Exceeding 60 kW but Not exceeding 80 kW
Rs 14,000
viii
Exceeding 80 kW but Not exceeding 100 kW
Rs 17,500
Registered office : Sardar Patel Vidhyut bhavan, Race Course, vadodara-390 007
Website: www.mgvcl.com
email:[email protected]