REFERENCES Peter Madsen Rederi A/S Hydrographical Survey, Video and Geo inspections Visuals Project Description of project Neptune Quay, Newcastle Complete survey package in connetion with dredging of contaminated soil. 2013 ongoing G O'Brien & Sons In-, interim- & out-surveys In-, interim- & out-survey in connection with scour protection around 80 foundations. Type multi Amrumbank OWF beam Year Customer 2013 ongoing E.ON Helsingborg Multi beam survey in port of Helsingborg following dredging operations ongoing Aarhus havn Multi beam survey of the entire port of Aarhus following dredging operations ongoing Stigsnæsværket Multi beam survey of coal harbour and ash harbour with our Reson Seabat 7125 SV 2013 Dong Energy Sejerø Harbour Singel beam echo sounder survey of the harbour and breakwater 2012 Cowi Mariager Fjord outlet pipe In-, interim- & out-survey in connection with trenching and backfilling for Ø800 mm PEH pipe. Including as-build positioning of the pipe. Totalt length 4km Mariager Fjord 2012 Vand 2013 Port of Helsingborg 2013 Port of Aarhus 1 REFERENCES Peter Madsen Rederi A/S Hydrographical Survey, Video and Geo inspections Visuals Project Kalundborg oil pier Anholt Offshore Wind Farm Description of project Year Customer In-, interim- & out-survey type multi-beam of 545.650 m2 working area and 475.400 m2 dumping ground in connection with dredging work at oil pier and aproach channel. Multible series of multibeam surveys during dredging, levelling of stone bed and perimetric scour protection of a Sub station. Area 250x250m. Depth -19,5m 2012 Statoil Refining 2011 Pihl & Züblin Stigsnæs & Agersø Singlebeam survey of two ferry berths in a 3x3 meter grid, water depths between 2-5 meters 2011 Arccon A/S Kirkwall & Stronsay Orkney Harbour Full Multi Beam Survey of seabed before and after dredging in harbour. Area 100x1000m. OIC - Orkney 2011 Island Council Mejl Flak, Aarhus Full multi beam survey of seabed to verify suitability for placing a testfacility Offshore. Total area surveyed 62.500m2 2011 OSK-ship Tech Lyness - Orkney Harbour Nord Stream Gas pipeline Full Multi Beam Survey of seabed before and after dredging in harbour. Area 50x200m. 2011 Currie Brothers Ltd. Full Multi Beam Survey, Back Scatter and Side Scan Sonar of stone reefs and seabed. 50km surveyed, depths between 3-20m. 2x2km survey of dump 2010/2 location. 011 Nord Stream 2 REFERENCES Peter Madsen Rederi A/S Hydrographical Survey, Video and Geo inspections Visuals Project Description of project Year Customer Baltic 1 Offshore Wind Farm Full Multi Beam Survey and video recording of stone works round 21 monopiles, total 84 surveys of 100x100m area. Up to 18m depth. EnBW Systeme Infrastruktur 2010 Support GmbH Baltic 1 Offshore Wind Farm Underwater video recording of stone works round 21 monopiles, Up to 18m depth. EnBW Systeme Infrastruktur 2010 Support GmbH Kalundborg Harbour Full Single Beam and/ or Multibeam Survey of harbour. Approx 1km2 in depths up to 10m. 2012& 2011& 2010& 2009& Kalundborg 2007 Harbour Kontek Cable DK to D Construction of Ships Collision friendly stonewall, full Multi Beam Survey and underwater Video inspection 2010 E-ON Sweden Full Multi Beam Survey of seabed from Gedser Denmark to Germany, approx 50km in depths up to 18m. And Underwater Video inspection of Cable before backfill 2010 Energinet.dk Kontek Cable DK to D Underwater Video recording of cable placement on seabed and in trenches. 2010 Energinet.dk Sprogø Offshore Wind Farm Underwater video recording of all stone work, Scour Protection and ballast in concrete foundatinos. Positioning with GPS RTK, +/-10cm. ABJV (Joint Venture Aarsleff/Bilfinger) and 2009 Sund og Bælt A/S Rødsand 2 Offshore Wind Farm 3 REFERENCES Peter Madsen Rederi A/S Hydrographical Survey, Video and Geo inspections Visuals Project Description of project Year Customer Sprogø Offshore Wind Farm Full Multi Beam Survey of seabed and stone constructions after dredging of cable trenches and various stone work. ABJV (Joint Venture Aarsleff/Bilfinger) and 2009 Sund og Bælt A/S Rødsand 2 Offshore Wind Farm Full Multibeam Survey after stonework round 13 monopiles, in water depths up to 14m. Full Multi Beam Survey of seabed and stone constructions after dredging for cable trenches and various stone work. Approx 70km surveyed. depth-7-14 m Anholt offshore Wind farm Assistance in investigation of seabed with GEO Denmark. Vessel was used as diving vessel and as facility for CPT tests. 2008 GEO (Denmark) Sprogø Offshore Wind Farm Assistance in investigation of seabed with GEO Denmark. Vessel was used as diving vessel and as facility for CPT tests. 2008 GEO (Denmark) Robin Rigg Wind Farm Dredging in Singlebeam Survey in Leixöes harbour - harbor up to 10m after dredging Portugal 2009 MT Højgaard E-on Sweden and ABJV (Joint Venture 2008 Aarsleff/Bilfinger) Ferroviarias e 2008 Martinas, S.A. 4 REFERENCES Peter Madsen Rederi A/S Hydrographical Survey, Video and Geo inspections Visuals Project Description of project Year Customer København Havn Full Multi Beam Survey of seabed. 2008 København Havn Storebælt Bridge Single beam of and Layout of 1.250.000ton stones on 80 positions for protection of 1991piers. 1995 Sund og Bælt A/S 5
© Copyright 2024