REFERENCES
Peter Madsen Rederi A/S
Hydrographical Survey, Video and Geo inspections
Visuals
Project
Description of project
Neptune Quay,
Newcastle
Complete survey package in
connetion with dredging of
contaminated soil.
2013
ongoing G O'Brien & Sons
In-, interim- & out-surveys
In-, interim- & out-survey in
connection with scour
protection around 80
foundations. Type multi
Amrumbank OWF beam
Year Customer
2013
ongoing
E.ON
Helsingborg
Multi beam survey in port of
Helsingborg following
dredging operations
ongoing
Aarhus havn
Multi beam survey of the
entire port of Aarhus
following dredging
operations
ongoing
Stigsnæsværket
Multi beam survey of coal
harbour and ash harbour
with our Reson Seabat 7125
SV
2013 Dong Energy
Sejerø Harbour
Singel beam echo sounder
survey of the harbour and
breakwater
2012 Cowi
Mariager Fjord
outlet pipe
In-, interim- & out-survey in
connection with trenching
and backfilling for Ø800 mm
PEH pipe. Including as-build
positioning of the pipe.
Totalt length 4km
Mariager Fjord
2012 Vand
2013
Port of Helsingborg
2013
Port of Aarhus
1
REFERENCES
Peter Madsen Rederi A/S
Hydrographical Survey, Video and Geo inspections
Visuals
Project
Kalundborg
oil pier
Anholt Offshore
Wind Farm
Description of project
Year Customer
In-, interim- & out-survey
type multi-beam of 545.650
m2 working area and
475.400 m2 dumping
ground in connection with
dredging work at oil pier and
aproach channel.
Multible series of multibeam
surveys during dredging,
levelling of stone bed and
perimetric scour protection
of a Sub station. Area
250x250m. Depth -19,5m
2012 Statoil Refining
2011 Pihl & Züblin
Stigsnæs &
Agersø
Singlebeam survey of two
ferry berths in a 3x3 meter
grid, water depths between
2-5 meters
2011 Arccon A/S
Kirkwall &
Stronsay Orkney
Harbour
Full Multi Beam Survey of
seabed before and after
dredging in harbour. Area
100x1000m.
OIC - Orkney
2011 Island Council
Mejl Flak,
Aarhus
Full multi beam survey of
seabed to verify suitability
for placing a testfacility
Offshore. Total area
surveyed 62.500m2
2011 OSK-ship Tech
Lyness - Orkney
Harbour
Nord Stream
Gas pipeline
Full Multi Beam Survey of
seabed before and after
dredging in harbour. Area
50x200m.
2011 Currie Brothers Ltd.
Full Multi Beam Survey,
Back Scatter and Side Scan
Sonar of stone reefs and
seabed. 50km surveyed,
depths between 3-20m.
2x2km survey of dump
2010/2
location.
011 Nord Stream
2
REFERENCES
Peter Madsen Rederi A/S
Hydrographical Survey, Video and Geo inspections
Visuals
Project
Description of project
Year Customer
Baltic 1 Offshore
Wind Farm
Full Multi Beam Survey and
video recording of stone
works round 21 monopiles,
total 84 surveys of
100x100m area. Up to 18m
depth.
EnBW Systeme
Infrastruktur
2010 Support GmbH
Baltic 1 Offshore
Wind Farm
Underwater video recording
of stone works round 21
monopiles, Up to 18m
depth.
EnBW Systeme
Infrastruktur
2010 Support GmbH
Kalundborg
Harbour
Full Single Beam and/ or
Multibeam Survey of
harbour. Approx 1km2 in
depths up to 10m.
2012&
2011&
2010&
2009& Kalundborg
2007 Harbour
Kontek Cable
DK to D
Construction of Ships
Collision friendly stonewall,
full Multi Beam Survey and
underwater Video inspection 2010 E-ON Sweden
Full Multi Beam Survey of
seabed from Gedser Denmark to Germany,
approx 50km in depths up to
18m. And Underwater Video
inspection of Cable before
backfill
2010 Energinet.dk
Kontek Cable
DK to D
Underwater Video recording
of cable placement on
seabed and in trenches.
2010 Energinet.dk
Sprogø Offshore
Wind Farm
Underwater video recording
of all stone work, Scour
Protection and ballast in
concrete foundatinos.
Positioning with GPS RTK,
+/-10cm.
ABJV (Joint
Venture
Aarsleff/Bilfinger)
and
2009 Sund og Bælt A/S
Rødsand 2
Offshore
Wind Farm
3
REFERENCES
Peter Madsen Rederi A/S
Hydrographical Survey, Video and Geo inspections
Visuals
Project
Description of project
Year Customer
Sprogø Offshore
Wind Farm
Full Multi Beam Survey of
seabed and stone
constructions after dredging
of cable trenches and
various stone work.
ABJV (Joint
Venture
Aarsleff/Bilfinger)
and
2009 Sund og Bælt A/S
Rødsand 2
Offshore
Wind Farm
Full Multibeam Survey after
stonework round 13
monopiles, in water depths
up to 14m.
Full Multi Beam Survey of
seabed and stone
constructions after dredging
for cable trenches and
various stone work. Approx
70km surveyed. depth-7-14
m
Anholt offshore
Wind farm
Assistance in investigation
of seabed with GEO
Denmark. Vessel was used
as diving vessel and as
facility for CPT tests.
2008 GEO (Denmark)
Sprogø Offshore
Wind Farm
Assistance in investigation
of seabed with GEO
Denmark. Vessel was used
as diving vessel and as
facility for CPT tests.
2008 GEO (Denmark)
Robin Rigg
Wind Farm
Dredging in
Singlebeam Survey in
Leixöes harbour - harbor up to 10m after
dredging
Portugal
2009 MT Højgaard
E-on Sweden and
ABJV (Joint
Venture
2008 Aarsleff/Bilfinger)
Ferroviarias e
2008 Martinas, S.A.
4
REFERENCES
Peter Madsen Rederi A/S
Hydrographical Survey, Video and Geo inspections
Visuals
Project
Description of project
Year Customer
København Havn
Full Multi Beam Survey of
seabed.
2008 København Havn
Storebælt Bridge
Single beam of and Layout
of 1.250.000ton stones on
80 positions for protection of 1991piers.
1995 Sund og Bælt A/S