Regional Municipality of Waterloo

Regional Municipality of Waterloo
Transportation Division, 150 Frederick Street, Kitchener N2G 4J3
Telephone 519-575-4558, Fax 519-575-4453
[email protected]
Road and Lane Closure Notifications
Effective: Monday, October 20, 2014 – 4:00 p.m.
NEW (revisions - shown in bold)
Date/Duration
Tues., Oct. 21
between 7 a.m.
and 7 p.m.
Road
University Avenue
(Reg. Rd. 57) at
Marsland Drive
Municipality
Waterloo
Detour
FULL CLOSURE -
Reason
Storm Sewer
Reconstruction
Detour via University
Avenue / Weber Street /
Lexington Road
Contact
Jim Ellerman
Project
Manager
519-575-4100
ext. 3757
Valerie
MacQueenPearcey
519-575-4552
EXISTING (in alphabetical order by road name)
Date/Duration
Tues., Sept. 30 to
Fri., Dec. 19
between 7:30
a.m. and 3 p.m.
Wed., Apr. 30 for
approx. 6 months
(October 2014)
Road
Borden Avenue
(Reg. Rd. 66) between
Charles Street and
Courtland Avenue
Bridge Street (Reg. Rd. 52)
between Bloomingdale Road
and Stanley Avenue
Municipality
Kitchener
Kitchener
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
FULL CLOSURE
WESTBOUND TRAFFIC –
Eastbound traffic will be
maintained between Grand
Avenue and Stanley
Avenue on Sept. 3
Reason
Relocation of
Hydro Poles
Contact
Steve
Sieunarine
519-575-4030
Road
Rehabilitation
Dave Brown
Project
Manager
519-575-4757
ext. 3686
Satinderjit
Bahia
519-575-4091
Detour via: Ebycrest Road
/ Bloomingdale Road
Mon., Apr. 14 to
Fri., Oct. 31
between 6 a.m. to
7 p.m.
Bridgeport Road
(Reg. Rd. 9) between
Erb Street and
Lang Crescent
Waterloo
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Bridge
Rehabilitation
Kelly Eitel
519-575-4757
ext. 3754
Pedestrian traffic will be
maintained around the
work zone
Page 1 of 7
Any comments please contact Donna Gill at 519-575-4587 or via email [email protected]
Date/Duration
Tues., Sept. 2 to
Fri., Oct. 31
between 7 a.m.
and 5 p.m.
Tues., Oct. 14 to
Fri., Nov. 21
Thurs., Sept. 11
to Fri., Nov. 28
between 9 a.m.
and 3 p.m.
Tues., Sept. 30 to
Fri., Dec. 19
between 9 a.m.
and 3 p.m.
Road
Bridgeport Road
(Reg. Rd. 9) between
Margaret Avenue and
Weber Street
Municipality
Waterloo
Caroline Street (Reg. Rd. 9)
between Erb Street and
Allen Street
Waterloo
Charles Street
(Reg. Rd. 64) between
Benton Street and
Water Street
Kitchener
Courtland Avenue
(Reg. Rd. 53) between
Grenville Avenue and
Kent Avenue
Kitchener
Until Further
Notice
Covered Bridge Drive
West Montrose Covered
Bridge
Woolwich
Mon., Sept. 22 to
Fri., Dec. 19
between 7 a.m.
and 7 p.m.
Erb Street (Reg. Rd. 9)
between Caroline Street
and Menno Street
Waterloo
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
FULL CLOSURE
Detour via:
King Street /
Bridgeport Road /
Caroline Street /
Erb Street
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LOAD RESTRICTION on
Bridge for heavy trucks
(over 3,000 kg)
Light vehicles permitted
LANE CLOSURE –
Two-way traffic will be
maintained
Reason
Utility
Maintenance
Contact
Kelly Eitel
519-575-4757
ext. 3754
Utilities
Relocation
Kimberly Moser
519-575-4757
ext. 3461 or
519-501-6266
Utility
Relocation Work
Steve
Sieunarine
519-575-4030
Relocation of
Hydro Poles
Steve
Sieunarine
519-575-4030
Preservation of
Historical
Structure
Shawn Buckley
519-575-4093
Road
Reconstruction
Kelly Eitel
519-575-4757
ext. 3754
Utility
Maintenance
Kelly Eitel
519-575-4757
ext. 3754
Utility Work
Lindsay
Hemmerling
519-575-4757
ext. 3751
Pedestrian traffic will be
maintained around the
work zone
Tues., Sept. 2 to
Fri., Oct. 31
between 7 a.m.
and 5 p.m.
Tues., Oct. 14 to
Wed., Oct. 22
between 7 a.m.
and 7 p.m.
Erb Street (Reg. Rd. 9)
between Ellis Crescent and
Weber Street
Franklin Boulevard
(Reg. Rd. 36) between
Pinebush Road and
Saginaw Parkway
Waterloo
Cambridge
EXPECT DELAYS
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
EXPECT DELAYS
Pedestrian traffic will be
maintained around the
work zone
Page 2 of 7
Any comments please contact Donna Gill at 519-575-4587 or via email [email protected]
Date/Duration
Mon., Sept. 22 to
Sun., Nov. 30
Fri., Oct. 10 to
Mon., Nov. 10
between 9 a.m.
and 3 p.m.
Tues., Oct. 7
starting at 10 a.m.
until
Mon., Oct. 20
12 noon.
Tues., Aug. 12 to
Wed., Dec. 31
between 7 a.m.
and 7 p.m.
Mon., Oct. 20 to
Wed., Oct. 22
between 9 a.m.
and 3 p.m.
Road
Franklin Boulevard
(Reg. Rd. 36) between
Moorefield Street and
Highway 401
Franklin Boulevard
(Reg. Rd. 36) between
Clyde Road and
Hilltop Drive
Frederick Street
(Reg. Rd. 6) between
King Street and
Duke Street
Benton Street (Reg. Rd. 6)
FULL CLOSURE to
eastbound traffic between
King Street and
Charles Street
Hespeler Road
(Reg. Rd. 24) between
Eagle Street /
Pinebush Road and
Coronation Boulevard /
Dundas Street
Hespeler Road
(Reg. Rd. 24) between
Dunbar Road and
Munch Avenue
Municipality
Cambridge
Cambridge
Kitchener
Cambridge
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
FULL CLOSURE –
LANE CLOSURE –
Two-way traffic will be
maintained
Reason
Bell Relocation
Works
Contact
Lindsay
Hemmerling
519-575-4757
ext. 3751
Utility
Relocation
Lindsay
Hemmerling
519-575-4757
ext. 3751
Special Event
Patricia Heft
519-575-4743
Bus Stop
Installation
Andrew Doman
Project
Manager
519-575-4757
ext. 3512
Pedestrian traffic will be
maintained around the
work zone
Cambridge
LANE CLOSURE –
Two-way traffic will be
maintained
Horticulture
works
Pedestrian traffic will be
maintained around the
work zone
Mon., June 9 for
approx. 4 months
(October 2014)
Thurs., Apr. 24 to
Fri., Nov. 11
between 7 a.m.
and 7 p.m.
Ira Needles Boulevard
(Reg. Rd. 70) between
Thorndale Drive and
Highview Drive /
Trussler Road
King Street (Reg. Rd. 15)
between
Farmer’s Market Road /
Highway 85 Southbound
Ramp and
Martin Grove Road /
Highway 85 Northbound
Ramp
Kitchener /
Waterloo
LANE CLOSURE –
Two-way traffic will be
maintained
Road Widening
Jyoti Nair
519-575-4757
ext. 3325
Bert KleinHorsman
Project
Manager
519-653-5470
Lindsay
Hemmerling
519-575-4757
ext. 3751
Mike Halloran
Project
Manager
519-575-4529
Expect Delays
Woolwich
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Bridge
Rehabilitation
Valerie
MacQueenPearcey
519-575-4552
Kelly Eitel
519-575-4757
ext. 3754
Pedestrian traffic will be
maintained around the
work zone
Page 3 of 7
Any comments please contact Donna Gill at 519-575-4587 or via email [email protected]
Date/Duration
Wed., May 21 to
Fri., Nov. 14
between 7 a.m.
and 7 p.m.
Mon., Aug 18 to
Thurs., Dec. 18
between 9 a.m.
and 3 p.m.
Mon., Oct. 20
between 7 a.m.
and 7 p.m.
Road
King Street (Reg. Rd. 15)
between Victoria Street and
George Street
King Street (Reg. Rd. 8)
between River Road and
Hwy 8 On-Ramp
King St (Reg. Rd. 15)
at John Street
Municipality
Kitchener /
Waterloo
Kitchener
Waterloo
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
FULL CLOSURE –
Southbound Traffic Only
Reason
Utility Work
Contact
Steve
Sieunarine
519-575-4030
Pole Line
Rebuild
Steve
Sieunarine
519-575-4030
Utility
Installation
Valerie
MacQueenPearcey
519-575-4552
Hydro
Maintenance
Josh Graham
519-575-4757
ext. 3312
Load
Restriction
Wayne Cheater
Project
Manager
519-575-4757
ext. 3183
Steve
Sieunarine
519-575-4030
Detour via John Street /
Park Street / Union Street
Mon., Oct. 20 to
Fri., Oct. 31
between 7 a.m.
and 5 p.m.
Line 86
(Reg. Rd 86) at
Northfield Drive
Woolwich
Until Further
Notice
Manitou Drive
(Reg. Rd. 69)
between Webster Road
and Bleams Road
Kitchener
Tues., Aug. 12 to
Wed., Dec. 31
between 9 a.m.
and 3 p.m.
(where there are
two lanes);
Manitou Drive (Reg. Rd. 69)
between Fairway Road /
Courtland Avenue and
Bleams Road
Kitchener
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LOAD RESTRICTION on
Bridge over Schneider
Creek for heavy trucks
over 70,000 kg (70 tonnes)
or 5 tonnes per axle
LANE CLOSURE –
Two-way traffic will be
maintained
Pole Line
Relocation
Pedestrian traffic will be
maintained around the
work zone
and
7 a.m. and 3 p.m.
(where there are
three or more
lanes)
Thurs, Oct. 16 to
Wed, Oct. 22
between 9 a.m.
and 3 p.m.
Mon., Oct. 6 to
Wed., Dec. 31
between 9 a.m.
and 3 p.m.
Nafziger Road (Reg. Rd 5)
between Lisbon Road and
Gerber Road
Perth Line (Reg. Rd. 7)
between Road 116 and
Wilmot-Easthope Road
Wilmot
Wellesley
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Bridge
Inspections
Josh Graham
519-575-4757
ext. 3312
Pole
Installations
Josh Graham
519-575-4757
ext. 3312
Pedestrian traffic will be
maintained around the
work zone
Page 4 of 7
Any comments please contact Donna Gill at 519-575-4587 or via email [email protected]
Date/Duration
Mon. Apr. 14
approx. 7 months
(Until mid
November 2014)
Mon., Oct. 20 to
Fri., Nov. 28
Road
University Avenue
(Reg. Rd. 57) between
Weber Street and
Lincoln Road /
Dale Crescent
Victoria Street
(Reg. Rd. 55) between
Fischer-Hallman Road and
Monte Carlo Street
Municipality
Waterloo
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Reason
Storm Sewer
Reconstruction
Pedestrian traffic will be
maintained around the
work zone
Kitchener
LANE CLOSURE –
Two-way traffic will be
maintained
Utility
Installation
Pedestrian traffic will be
maintained around the
work zone
Thurs., Apr. 24 to
Thurs., Apr. 30,
2015 between
7 a.m. and 7 p.m.
Weber Street (Reg. Rd. 8)
between College Street
and Union Street
Kitchener
EXPECT DELAYS
LANE CLOSURE –
Two-way traffic will be
maintained
Westmount Road
(Reg. Rd. 50) between
Columbia Street and
Bearinger Road
Waterloo
LANE CLOSURE –
Two-way traffic will be
maintained
Road Widening
Road
Reconstruction
Pedestrian traffic will be
maintained around the
work zone
Mon., Oct. 20
between 9 a.m.
and 3 p.m.
Westmount Road
(Reg. Rd. 50) at
Laurentian Drive
Kitchener
LANE CLOSURE –
Two-way traffic will be
maintained
Valerie
MacQueenPearcey
519-575-4552
Jerry Borovicka
Project
Manager
519-575-4092
Kelly Eitel
519-575-4757
ext. 3754
Pedestrian traffic will be
maintained around the
work zone
Mon., Sept. 22 to
Fri., Dec. 19
between 7 a.m.
and 7 p.m.
Contact
Jim Ellerman
Project
Manager
519-575-4100
ext. 3757
Well Sampling
and Monitoring
Peter Linn
Project
Manager
519-575-4757
ext. 3773
Steve
Sieunarine
519-575-4030
Bill Gilbert
Project
Manager
519-575-4603
Kelly Eitel
519-575-4757
ext. 3754
Kelly Eitel
519-575-4757
ext. 3754
Pedestrian traffic will be
maintained around the
work zone
Page 5 of 7
Any comments please contact Donna Gill at 519-575-4587 or via email [email protected]
UPCOMING (in alphabetical order by road name)
Date/Duration
Sat., Dec. 13
starting at 6 a.m.
until 12 noon
Fri., Oct. 24 to
Mon. Oct. 27
between 7 a.m.
and 5 p.m.
Road
Bearinger Road
(Reg. Rd. 58) between
Fischer Hallman Road and
Westmount Road
Fountain Street
(Reg. Rd. 28) at
Limerick Road
Municipality
Waterloo
Cambridge
Sat., Oct. 25
between 7 a.m.
and 5 p.m.
Fountain Street
(Reg. Rd. 28) at
Limerick Road
Cambridge
Mon., Nov. 3 to
Mon., Nov. 20
between 7 a.m.
and 7 p.m.
Franklin Boulevard
(Reg. Rd. 36) between
Highway 401 and
Pinebush Road
Cambridge
Detour
FULL CLOSURE
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
FULL CLOSURE –
Follow Detour.
LANE CLOSURE –
Two-way traffic will be
maintained
Reason
Special Event
Watermain
Installation
Watermain
Installation
Utility Work
Contact
Helga Bowman
City of Waterloo
519-886-2310
ext. 30270
Patricia Heft
519-575-4743
Lindsay
Hemmerling
519-575-4757
ext. 3751
Lindsay
Hemmerling
519-575-4757
ext. 3751
Lindsay
Hemmerling
519-575-4757
ext. 3751
EXPECT DELAYS
Thurs., Oct. 23
between 7 p.m.
and 7 a.m.
Mon., Oct. 27 to
Tues., Oct. 28
between 9 a.m.
and 3 p.m.
Thurs., Oct. 23 to
Fri., Oct. 24
between 9 a.m.
and 3 p.m.
Mon., Nov. 3 to
Fri. Nov. 7
between 9 a.m.
and 3 p.m.
Ira Needles /
Erbsville Road
(Reg. Rd. 70) at
Erb Street (roundabout)
King Street
(Reg. Rd. 15) between
Weber Street and
Blue Springs Drive
Waterloo
Waterloo
King Street
(Reg. Rd. 8) between
Limerick Drive /
Gateway Park Drive and
Highway 401
Kitchener
Lobsinger Line
(Reg. Rd. 15) at
Kressler Road
Wellesley
Pedestrian traffic will be
maintained around the
work zone
FULL CLOSURE
Detour via
Notre Dame Drive /
Snyder’s Road /
Ira Needles Boulevard /
University Avenue /
Fischer-Hallman Road /
Columbia Street.
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained
Spot Repairs
Well Sampling
and Monitoring
Ian Young
Project
Manager
519-575-4757
ext.3079
Satinderjit
Bahia
519-575-4091
Lindsay
Hemmerling
519-575-4757
ext. 3751
Well Sampling
and Monitoring
Lindsay
Hemmerling
519-575-4757
ext. 3751
Monitoring Well
Sampling
Lindsay
Hemmerling
519-575-4757
ext. 3751
Pedestrian traffic will be
maintained around the
work zone
Page 6 of 7
Any comments please contact Donna Gill at 519-575-4587 or via email [email protected]
Date/Duration
Mon., Nov. 3 to
Mon., Nov. 20
between 7 a.m.
and 7 p.m.
Road
Pinebush Road
(Reg. Rd. 39) between
Franklin Boulevard and
Wayne Court
Municipality
Cambridge
Detour
LANE CLOSURE –
Two-way traffic will be
maintained
Reason
Utility Work
Contact
Lindsay
Hemmerling
519-575-4757
ext. 3751
Service
Connection
Lindsay
Hemmerling
519-575-4757
ext. 3751
EXPECT DELAYS
Tues., Oct. 21
Thurs., Oct 23
between 7 a.m.
and 5 p.m.
Swan Street (Reg. Rd. 58)
at Hilltop Drive
North
Dumfries
Pedestrian traffic will be
maintained around the
work zone
LANE CLOSURE –
Two-way traffic will be
maintained via flagging
Pedestrian traffic will be
maintained around the
work zone
Page 7 of 7
Any comments please contact Donna Gill at 519-575-4587 or via email [email protected]