Regional Municipality of Waterloo Transportation Division, 150 Frederick Street, Kitchener N2G 4J3 Telephone 519-575-4558, Fax 519-575-4453 [email protected] Road and Lane Closure Notifications Effective: Monday, November 10, 2014 – 3:30 p.m. NEW (revisions - shown in bold) Date/Duration Wed., Nov. 12 to Fri., Nov. 14 between 9 a.m. and 3 p.m. Road King Street (Reg. Rd. 15) between Columbia Street and Hickory Street Municipality Waterloo Detour LANE CLOSURE – Two-way traffic will be maintained Reason Utility Installation Contact Kelly Eitel 519-575-4757 ext. 3754 Reason CCTV Inspections Contact Chris Leishman City of Kitchener 519-741-2200 ext. 7142 Pedestrian traffic will be maintained around the work zone EXISTING (in alphabetical order by road name) Date/Duration Sat., Nov. 1 to Fri., Nov. 28 between 9 a.m. and 3 p.m. Road Bloomingdal Road (Reg. Rd. 20) between Bridge Street and Daniel Drive - Municipality Kitchener Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone Tues., Sept. 30 to Fri., Dec. 19 between 7:30 a.m. and 3 p.m. Sat., Nov. 1 to Fri., Nov. 28 between 9 a.m. and 3 p.m. Borden Avenue (Reg. Rd. 66) between Charles Street and Courtland Avenue Bridge Street (Reg. Rd. 52) between Tyson Drive and Waterloo boundary Kitchener Kitchener LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Relocation of Hydro Poles CCTV Inspections Pedestrian traffic will be maintained around the work zone Tues., Oct. 14 to Fri., Nov. 21 Caroline Street (Reg. Rd. 9) between Erb Street and Allen Street Waterloo FULL CLOSURE Detour via: King Street / Bridgeport Road / Caroline Street / Erb Street Utilities Relocation Lindsay Hemmerling 519-575-4757 ext. 3751 Steve Sieunarine 519-575-4030 Chris Leishman City of Kitchener 519-741-2200 ext. 7142 Lindsay Hemmerling 519-575-4757 ext. 3751 Kimberly Moser 519-575-4757 ext. 3461 or 519-501-6266 Page 1 of 8 Any comments please contact Donna Gill at 519-575-4587 or via email [email protected] Date/Duration Thurs., Sept. 11 to Fri., Nov. 28 between 9 a.m. and 3 p.m. Mon., Nov. 10 to Fri., Nov. 14 between 9 a.m. and 3 p.m. Mon., Nov. 3 to Fri., Nov. 14 between 9 a.m. and 4 p.m. Tues., Sept. 30 to Fri., Dec. 19 between 9 a.m. and 3 p.m. Road Charles Street (Reg. Rd. 64) between Benton Street and Water Street Concession Street (Reg. Rd. 97) at Chishol Street - Courtland Avenue (Reg. Rd. 53) between Queen Street and Benton Street Courtland Avenue (Reg. Rd. 53) between Grenville Avenue and Kent Avenue Municipality Kitchener Cambridge Kitchener Kitchener Until Further Notice Covered Bridge Drive West Montrose Covered Bridge Woolwich Mon., Sept. 22 to Fri., Dec. 19 between 7 a.m. and 7 p.m. Erb Street (Reg. Rd. 9) between Caroline Street and Menno Street Waterloo Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LOAD RESTRICTION on Bridge for heavy trucks (over 3,000 kg) Light vehicles permitted LANE CLOSURE – Two-way traffic will be maintained Reason Utility Relocation Work Contact Steve Sieunarine 519-575-4030 Restoration Works Lindsay Hemmerling 519-575-4757 ext. 3751 Splicing Works Lindsay Hemmerling 519-575-4757 ext. 3751 Relocation of Hydro Poles Steve Sieunarine 519-575-4030 Preservation of Historical Structure Shawn Buckley 519-575-4093 Road Reconstruction Kelly Eitel 519-575-4757 ext. 3754 Utility Work Lindsay Hemmerling 519-575-4757 ext. 3751 Bell Relocation Works Lindsay Hemmerling 519-575-4757 ext. 3751 Pedestrian traffic will be maintained around the work zone Mon., Nov. 3 to Mon., Nov. 20 between 7 a.m. and 7 p.m. Franklin Boulevard (Reg. Rd. 36) between Highway 401 and Pinebush Road Cambridge EXPECT DELAYS LANE CLOSURE – Two-way traffic will be maintained EXPECT DELAYS Mon., Sept. 22 to Sun., Nov. 30 Franklin Boulevard (Reg. Rd. 36) between Moorefield Street and Highway 401 Cambridge Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone Page 2 of 8 Any comments please contact Donna Gill at 519-575-4587 or via email [email protected] Date/Duration Fri., Oct. 10 to Mon., Nov. 10 between 9 a.m. and 3 p.m. Tues., Aug. 12 to Wed., Dec. 31 between 7 a.m. and 7 p.m. Mon., Nov. 3 to Sun., Nov. 30 between 9 a.m. and 3 p.m. Mon., June 9 to Sun., Nov. 30 Mon., Nov. 10 to Mon., Nov. 24 between 7 a.m. and 7 p.m. Thurs., Apr. 24 to Fri., Nov. 11 between 7 a.m. and 7 p.m. Wed., May 21 to Fri., Nov. 14 between 7 a.m. and 7 p.m. Mon., Aug 18 to Thurs., Dec. 18 between 9 a.m. and 3 p.m. Road Franklin Boulevard (Reg. Rd. 36) between Clyde Road and Hilltop Drive Hespeler Road (Reg. Rd. 24) between Eagle Street / Pinebush Road and Coronation Boulevard / Dundas Street Hespeler Road (Reg. Rd.24) between Coronation Boulevard and Avenue Road Ira Needles Boulevard (Reg. Rd. 70) between Thorndale Drive and Highview Drive / Trussler Road King Street (Reg. Rd. 15) between Allan Street and John Street King Street (Reg. Rd. 15) between Farmer’s Market Road / Highway 85 Southbound Ramp and Martin Grove Road / Highway 85 Northbound Ramp King Street (Reg. Rd. 15) between Victoria Street and George Street King Street (Reg. Rd. 8) between River Road and Hwy 8 On-Ramp Municipality Cambridge Cambridge Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Reason Utility Relocation Contact Lindsay Hemmerling 519-575-4757 ext. 3751 Bus Stop Installation Andrew Doman Project Manager 519-575-4757 ext. 3512 Pedestrian traffic will be maintained around the work zone Cambridge Kitchener / Waterloo LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Bridge works Road Widening Jyoti Nair 519-575-4757 ext. 3325 John Stephenson (PM – Region) @519-575-4757 Mike Halloran Project Manager 519-575-4529 Expect Delays Waterloo Woolwich Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Utility Maintenance Valerie MacQueenPearcey 519-575-4552 Kelly Eitel 519-575-4757 ext. 3754 Bridge Rehabilitation Kelly Eitel 519-575-4757 ext. 3754 Utility Work Steve Sieunarine 519-575-4030 Pole Line Rebuild Steve Sieunarine 519-575-4030 Pedestrian traffic will be maintained around the work zone Kitchener / Waterloo Kitchener LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone Page 3 of 8 Any comments please contact Donna Gill at 519-575-4587 or via email [email protected] Date/Duration Sat., Nov. 1 to Fri., Nov. 28 between 9 a.m. and 3 p.m. Road Lancaster Street (Reg. Rd. 29) between Bridge Street and Hamel Avenue Municipality Kitchener Detour LANE CLOSURE – Two-way traffic will be maintained Reason CCTV Inspections Pedestrian traffic will be maintained around the work zone Mon., Nov. 10 to Fri., Nov. 14 between 8 a.m. and 4:30 p.m. Lobsinger Line (Reg. Rd. 15) between Kressler Road and Arthur Road Wellesley Until Further Notice Manitou Drive (Reg. Rd. 69) between Webster Road and Bleams Road Kitchener Tues., Aug. 12 to Wed., Dec. 31 between 9 a.m. and 3 p.m. (where there are two lanes); Manitou Drive (Reg. Rd. 69) between Fairway Road / Courtland Avenue and Bleams Road Kitchener LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LOAD RESTRICTION on Bridge over Schneider Creek for heavy trucks over 70,000 kg (70 tonnes) or 5 tonnes per axle LANE CLOSURE – Two-way traffic will be maintained Installations of Storm Infrastructure Load Restriction Pole Line Relocation Contact Chris Leishman City of Kitchener 519-741-2200 ext. 7142 Lindsay Hemmerling 519-575-4757 ext. 3751 Josh Graham 519-575-4757 ext. 3312 Wayne Cheater Project Manager 519-575-4757 ext. 3183 Steve Sieunarine 519-575-4030 Pedestrian traffic will be maintained around the work zone and 7 a.m. and 3 p.m. (where there are three or more lanes) Mon., Oct. 6 to Wed., Dec. 31 between 9 a.m. and 3 p.m. Mon., Nov. 3 to Mon., Nov. 24 between 7:30 a.m. and 6 p.m. Mon., Nov. 10 starting at 7 a.m. until Fri., Nov. 14 at 7 p.m. Perth Line (Reg. Rd. 7) between Road 116 and Wilmot-Easthope Road Perth Line (Reg. Rd. 7) between Road 108 and Wilmot-Easthope Road Pinebush Road (Reg. Rd. 39) between Franklin Boulevard and Wayne Court Wellesley Wellesley Cambridge LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone FULL CLOSURE – Follow Detour Business access will remain open Pole Installations Josh Graham 519-575-4757 ext. 3312 Hydro Installations Josh Graham 519-575-4757 ext. 3312 Gas Main Relocation Lindsay Hemmerling 519-575-4757 ext. 3751 Page 4 of 8 Any comments please contact Donna Gill at 519-575-4587 or via email [email protected] Date/Duration Mon., Nov. 3 to Mon., Nov. 20 between 7 a.m. and 7 p.m. Road Pinebush Road (Reg. Rd. 39) between Franklin Boulevard and Wayne Court Municipality Cambridge Detour LANE CLOSURE – Two-way traffic will be maintained Reason Utility Work Contact Lindsay Hemmerling 519-575-4757 ext. 3751 Splicing Works Lindsay Hemmerling 519-575-4757 ext. 3751 Utility Maintenance Josh Graham 519-575-4757 ext. 3312 Manhole Repairs Vic Chippindale City of Cambridge 519-740-4684 EXPECT DELAYS Mon., Nov. 3 to Fri., Nov. 14 between 9 a.m. and 4 p.m. Queen Street (Reg. Rd. 06) between Courtland Avenue and Mitchell Street Kitchener Mon., Nov. 3 to Fri., Nov. 14 between 9 a.m. and 3 p.m. Shantz Station Road (Reg. Rd. 30) between Kramp Road and Rider Road Woolwich Mon., Nov. 10 to Thurs., Nov. 13 between 9 a.m. and 3 p.m. St. Andrews Street (Reg. Rd. 75) between Southwood Drive and Churchill Drive Cambridge Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone FULL CLOSURE Detour via Kossuth Road / Fountain Street / Victoria Street LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone Mon. Apr. 14 approx. 7 months (Until mid November 2014) Thurs., Nov. 6 to Thurs., Nov. 13 between 7 a.m. and 5:30p.m. University Avenue (Reg. Rd. 57) between Weber Street and Lincoln Road / Dale Crescent University Avenue (Reg. Rd. 57) between King Street and Hazel Street Waterloo LANE CLOSURE – Two-way traffic will be maintained Storm Sewer Reconstruction Pedestrian traffic will be maintained around the work zone Waterloo LANE CLOSURE – Two-way traffic will be maintained Bus Pad Installation Pedestrian traffic will be maintained around the work zone Mon., Oct. 20 to Fri., Nov. 28 Victoria Street (Reg. Rd. 55) between Fischer-Hallman Road and Monte Carlo Street Kitchener LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone Utility Installation Lindsay Hemmerling 519-575-4757 ext. 3751 Jim Ellerman Project Manager 519-575-4100 ext. 3757 Valerie MacQueenPearcey 519-575-4552 Luke Misurka Project Manager 519-575-4738 Kelly Eitel 519-575-4757 ext. 3754 Jerry Borovicka Project Manager 519-575-4092 Kelly Eitel 519-575-4757 ext. 3754 EXPECT DELAYS Page 5 of 8 Any comments please contact Donna Gill at 519-575-4587 or via email [email protected] Date/Duration Tues., Nov. 4 to Fri., Nov. 14 between 9 a.m. and 3 p.m. Thurs., Apr. 24 to Thurs., Apr. 30, 2015 between 7 a.m. and 7 p.m. Road Victoria Street (Reg. Rd 55) at Duke Street Weber Street (Reg. Rd. 8) between College Street and Union Street Municipality Kitchener Kitchener Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Reason Utility Maintenance Contact Josh Graham 519-575-4757 ext. 3312 Road Widening Peter Linn Project Manager 519-575-4757 ext. 3773 Pedestrian traffic will be maintained around the work zone Mon., Sept. 22 to Fri., Dec. 19 between 7 a.m. and 7 p.m. Westmount Road (Reg. Rd. 50) between Columbia Street and Bearinger Road Waterloo LANE CLOSURE – Two-way traffic will be maintained Road Reconstruction Pedestrian traffic will be maintained around the work zone Steve Sieunarine 519-575-4030 Bill Gilbert Project Manager 519-575-4603 Kelly Eitel 519-575-4757 ext. 3754 UPCOMING (in alphabetical order by road name) Date/Duration Fri., Nov. 14 between 7 a.m. and 5 p.m.. Sat., Dec. 13 starting at 6 a.m. until 12 noon Mon., Nov. 17 to Fri., Nov. 21 between 9 a.m. and 3 p.m. Road Arthur Street (Reg. Rd 21) between Ernst Street and Church Street Bearinger Road (Reg. Rd. 58) between Fischer Hallman Road and Westmount Road Cedar Street (Reg. Rd. 97) between Ramore Street and Dale Avenue Municipality Woolwich Waterloo Cambridge Detour LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone FULL CLOSURE LANE CLOSURE – Two-way traffic will be maintained Reason Watermain Maintenance Contact Josh Graham 519-575-4757 ext. 3312 Special Event Helga Bowman City of Waterloo 519-886-2310 ext. 30270 Manhole Repairs Pedestrian traffic will be maintained around the work zone Tues., Nov. 25 starting at 9 a.m. until Wed., Nov. 26 at 3 p.m. Eagle Street (Reg. Rd. 39) between King Street and Concession Road Cambridge FULL CLOSURE CP Rail Works Patricia Heft 519-575-4743 Vic Chippindale City of Cambridge 519-740-4684 Lindsay Hemmerling 519-575-4757 ext. 3751 Lindsay Hemmerling 519-575-4757 ext. 3751 Page 6 of 8 Any comments please contact Donna Gill at 519-575-4587 or via email [email protected] Date/Duration Tues., Nov. 11 between 9 a.m. and 12:30 p.m. Wed., Nov. 12 to Mon., Nov. 17 between 9 a.m. and 3 p.m. Sat., Nov. 15 between 3:30 p.m. and 8:30 p.m. Road Frederick Street (Reg. Rd. 6) between King Street and Weber Street Hespeler Road (Reg. Rd. 24) between Munch Avenue and Can-Amera Parkway Hespeler Road (Reg. Rd. 24) between Dunbar Road and Langs Drive Municipality Kitchener Cambridge Detour FULL CLOSURE LANE CLOSURE – Two-way traffic will be maintained Reason Special Event Utility Works Contact Stephanie Brasseur City of Kitchener 519-741-2200 ext. 7373 Patricia Heft 519-575-4743 Lindsay Hemmerling 519-575-4757 ext. 3751 Cambridge Pedestrian traffic will be maintained around the work zone FULL CLOSURE Special Event Patricia Heft 519-575-4743 Waterloo FULL CLOSURE Special Event Helga Bowman City of Waterloo 519-886-2310 ext. 30270 and Sat., Nov. 15 between 7 a.m. and 1 p.m. Tues., Nov. 11 to Wed., Nov. 12 between 9 a.m. and 3 p.m. Fri., Nov. 14 between 9 a.m. and 3 p.m. Tues., Nov. 11 to Fri., Nov. 14 between 7 a.m. and 7 p.m. Mon., Nov. 17 to Tues., Nov. 18 between 9 a.m. and 3 p.m. Bishop Street (Reg. Rd. 41) between Industrial Road and Industrial Road King Street (Reg. Rd. 15) between University Avenue and Borden Avenue Sawmill Road (Reg. Rd. 17) between New Jerusalem Road and Weeby Place St. Andrews Street (Reg. Rd. 75) between Cedar Street and Victoria Avenue Swan Street (Reg. Rd. 28) at Hilltop Drive Trussler Road (Reg. Rd 70) between Huron Road and Cedar Creek Road Woolwich Cambridge North Dumfries Kitchener North Dumfries LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Pedestrian traffic will be maintained around the work zone LANE CLOSURE – Two-way traffic will be maintained Hydro Maintenance Patricia Heft 519-575-4743 Josh Graham 519-575-4757 ext. 3312 Well Monitoring and Sampling Lindsay Hemmerling 519-575-4757 ext. 3751 Service Connection Lindsay Hemmerling 519-575-4757 ext. 3751 Bore Hole Drilling Josh Graham 519-575-4757 ext. 3312 Pedestrian traffic will be maintained around the work zone Page 7 of 8 Any comments please contact Donna Gill at 519-575-4587 or via email [email protected] Date/Duration Mon., Nov. 17 starting at 9 a.m. until Fri., Nov. 21 at 3 p.m. Road Water Street (Reg. Rd. 24) between Concession Street and Ainslie Street Municipality Cambridge Detour FULL ROAD – Detour via Ainslie Street Reason Service Connections Contact Lindsay Hemmerling 519-575-4757 ext. 3751 Page 8 of 8 Any comments please contact Donna Gill at 519-575-4587 or via email [email protected]
© Copyright 2024