The Weekly Bulletin Serving the Construction Industry and Bay Area Community since 1932 2014 BOARD OF DIRECTORS OFFICERS Nancy Brinkerhoff, President Ironwood Commercial Builders, Inc. Lydia Roze, Vice President Vista Universal, Inc. Eric Kavert, Treasurer Pacific Coast General Engineering, Inc. Forrest Towe, Past President Anvil Builders John C. Roeber, Past President J. Roeber & Associates DIRECTORS Greg Adams, Shimmick Construction Co., Inc. Joe Maltifano London Construction Thom Miles TMA Construction Services. John Parker Janus Corporation Ken Regevig K. Regevig Roofing EXECUTIVE DIRECTOR Scott P Leary DIRECTOR OF OPERATIONS Denice McDavid The Weekly Bulletin (USP3 3633) is published every Week by the BAY AREA BUILDERS EXCHANGE, 3055 Alvarado Street, San Leandro, CA 94577-5711. Subscription rate for non-members is $525 per year. POSTMASTER: Send address changes to BAY AREA Builders Exchange , 3055 Alvarado Street, San Leandro, CA 945775711.. Tel.: 510.483.8880. Fax 510.352.1509. October 24, 2014 www.bayareabx.com Capitol Connection Q&A for Contractors Week of October 27, 2014 By Shauna Krause of Capitol Services, Inc. While law is law, what makes our American way great is everyone is entitled to an opinion. Let’s be clear, I am not an attorney. However, when you break the law, did your time and paid your fine, you can find a second chance if fear and extra paperwork does not deter you... Q: I r ecently r eceived a citation fr om the CSLB for doing wor k over $500.00 without a license. I would like to get a license in CA, NV, and AZ but what’s stopping me is that I heard that they all run back- ground checks now and I have a felony on my record. It’s from many years back, but will that prevent me from getting my license in those three States? A: Again, we ar e happy to pr ovide you with our opinion, however this in no way should be construed as legal advice. In discussing this issue, here in California, the Contractors Board (CSLB) requires each appli- cant to respond to a question that concerns any criminal history and provide a detailed description of each arrest/conviction. In addition, the CSLB requires a fingerprint background check, which is evaluated by the State Department Of Justice (DOJ) and the Federal Bureau of Investigation (FBI). They do not have any specific criteria concerning what type of past criminal offense would disqualify an applicant from obtaining a contractor’s license or being a license Qualifier. While it is very unlikely an applicant will be issued a license if still on parole or probation, there actually is no regulation disallowing someone from filing an application. While a felony charge would likely be evaluated carefully, it would depend on how long ago this took place; whether this was an isolated incident or one of several convictions; and how the applicant has documented their rehabilitation. Each application is evaluated on a caseby-case basis, but statistically only a small percentage of applications are ultimately denied. In some cases, the CSLB may issue a Probationary License, again depending on the severity of the crime and information provided by the applicant and obtained from the Department Of Justice. Nevada has a policy of requiring all applicants to complete a "Criminal Continued on the next page ... Q&A Continued from front page … Disclosure Statement Regarding Criminal Plea/Conviction" form and provide fingerprints. Like CA, the applicant will be required to list the arresting agency, conviction date, court location, sentence, explanation of the crime and efforts towards rehabilitation. The FBI and the Nevada Criminal History Repository will then evaluate your records and fingerprints. Any felony will cause the application to be denied at staff level and it will then be assigned to go before the Board for final determination. When reviewing convictions, the Nevada Board considers factors such as the seriousness of the crime, the time that has passed since the conviction and any evidence of rehabilitation. Arizona requires that you complete a background check online and the information is automatically transferred to the Arizona Registrar of Contractors (ROC). The ROC reviews criminal convictions to determine if the crime is substantially related to the duties, qualifications and functions of a contractor. They also review rehabilitation efforts. Arizona has a list, which is available on their website, of convictions that may result in the denial of a license so you may want to review that before you apply for a license. If you would like our assistance with completing the application forms, including guidance with completing the Criminal Disclosure statements, please call us at 866-443-0657. Remember, failing to disclose criminal history can create a considerable delay in the application process. While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com. *** www. thebluebook .com How to Avoid Affordable Care Act AUDITS & PENALTIES! My name is Don Beaton, past President of the Builders Exchange of Alameda County and 40 years a California Contractor. During the time I was on the Board of Directors and Past President of the Builders Exchange, I remember OSHA becoming a federally mandated law. The reason I mention this is because there is now another federally mandated law, called the Affordable Care Act (ACA). A business owner’s obligation to the Affordable Care Act (ACA) is of the utmost importance at this time. Non-‐compliance to this federally mandated Law can cost you hundreds, if not thousands of dollars. In an effort to help your business, I am working with a company who has designed a Reference Guide, Obamacare Compliance Kit, to get you through this maze. In all my years in business, this is by far “the best” tool and “a must have” for business owners to stay in compliance and navigate the new ACA law. The ERguide is part of an annual subscription and includes the following: Ø ERguide –Binder format (270 pages) Ø Webinar Series – Tutorials on how to use the ERguide Ø Email Call Center – Info@Healthcare-‐Compliance-‐Inc.com Ø Legislative Update – Includes recent changes, additions and deletions to the ACA Ø CD – Includes rules, regulations & notices from DOL, HHS & IRS Ø Periodic Newsletters & Bulletin Emails Ø Workshop Series – Live presentations on a variety of ACA topics You would pay, a number of experts, hundreds, if not thousands, of dollars to compile this much pertinent information. The annual subscription for the Basic ERguide -‐ $360.00. * Please note, if your company is over 50 employees, you would choose the Advanced ERguide -‐ $1,250. Healthcare Compliance Inc. (HCI) was created by Janet Mlynar, MBA, CFP®, in 2010, and incorporated in 2013, to address the problems faced by business owners and employers who now must comply with ever-‐changing mandates created by the implementation of the Affordable Care Act (ACA). Janet is an innovator and leader in both Insurance and Financial Planning. She is considered a foremost expert on the Affordable Care Act and it is my pleasure to work with the HCI team to bring you the most up-‐to-‐ date information on the ACA – especially as it relates to business owners. To receive your copy of the ERguide Subscription today, Call Don Beaton: (541)-‐997-‐8849 E-‐mail: [email protected] The Affordable Care Act – Where Healthcare Meets Compliance www.Healthcare-‐Compliance-‐Inc.com BAY AREA BUILDERS EXCHANGE - TELEPHONE (510) 483-8880. FAX (510) 352-1509 WEEKLY PLAN LIST - Friday, October 24, 2014 To view plans online go to: www.beac.com Bid Date Bid Time Location 10/24/2014 10:00 AM San Francisco Plan Name / Scope of Work Prebid Information 10/21 @ 10AM NEW Superbay Gas Line Repair and Oil Separator Engineers # of Plan Estimate Addenda # $380000 ONLINE Furnish, Install, and place in operation a new underground MDPE fused gas line and a new underground Oil Water Separator at ASIG Maintenance Building, complete with all required piping, appurtenances, components, and paving to make the system work and function as intended and as shown on the drawings and as specified in the specifications. enna Castro, Contacts Mgr, @ 650-821-5305 2:00 PM Oakland 10/3 @ 10AM @ 1600 Franklin St., Oakland AC Transit Advanced Utility Relocations $5500000 $7000000 ONLINE Relocation of sewer lines, manholes & other appurtenances as required, to clear the project area of any conflict with the future construction of bus lanes & platforms of the East Bay Rapid Transit Project. The work involves the removal of & abandonement of sections of existing sewer main & service laterlas & the installation of new sewer mains & service laterals & the installation and/or removal of existing sewer manholes & cleanouts, including sawcutting of pavement & concrete curb, gutter & sidewalk, excavation, backfill, shoring for deep excavation, pavement restoration & concrete curb, gutter & sidewalk replacement. 2:00 PM Porterville ONLINE Wingstop - Porterville Tenant improvements, including demolition, flooring, framing, interior elevations, plumbing, mechanical, fire sprinkler, lighting, electrical 2:00 PM Sacramento RFQ-Mechanical and Electrical Consulting Firms for Future Projects ONLINE The County of Sacramento, Architectural Services Division, is requesting qualifications statements from local mechanical & electrical consultants for the purpose of establishing a hiring list for future architectural services division projects, including jails, youth detention facilities, administration buildings, airport facilities, medical facilities & parks & recreation facilities 2:00 PM 2:00 PM San Francisco San Jose RFQ-2330 Post Street Pediatric Primary Care Clinic Expansion The University of California at San Francisco Medical Center, Design & Construction, is seeking responses to the RFQ for architectural/engineering (A/E) to provide A/E services for the expansion of the Pediatric Primary care Clinic located on the 2nd & 23rd floors of UCSFMC's medical office bldg on Mt Zion Campus. River Oaks Complex Building B Lobby Reconfiguration 10/9 @ 10AM at 3331 N. First St., San Jose Selective demolition, tenant improvements, CCTV & security improvements Page 1 of 44 ONLINE E836B/0 Bid Date Bid Time Location Plan Name / Scope of Work 10/24/2014 2:00 PM RFP-Eden Township Exterior Repainting San Leandro Prebid Information Engineers # of Plan Estimate Addenda # ONLINE This is a subcontracting opportunity under Alameda County's Job Order Contract (JOC) program to work for MTM Construction. For more details regarding this specific job order please contact General Contractor Joshua Lee at (626) 934-1112 or via email at [email protected] . Repaint the Exterior of the Eden Township building located at 15001 Foothill Drive San Leandro General: The scope will include the prepping and painting existing surfaces “as is” and GSA JOC program will repair/replace with like materials as necessary for paint. The preparation will require the necessary safety measures to contain flaking chips of paint during the preparation phase as based on the environmental report. - Assess the need to provide exterior scaffolding for any David Barba, Proj Mgr, @ 510-208-9586 2:00 PM Stockton Demolition of Single Family Residence (440 Clayton Avenue, Stockton) Online MAND 10/8/14 @ 10am San Joaquin County is seeking a qualified vendor for the demolition of an abated single family resoidence and the destruction of the property's septic tank. 3:00 PM 3:00 PM Napa Santa Clara County South Napa Earthquake-Water Leak Excavation Paving Project ONLINE The work generally consists of trench paving at various locations within the City of Napa due to earthquake related water main breaks, including mobilization, temporary traffic control, construction area signs, temporary pavement delineation, dust control, hot mix asphalt RFQ-Sidewalk and Gutter Replacement/Repair MAND 10/15 @ 9AM ONLINE 3:00 PM San Jose The County of Santa Clara is requesting quotes for replacing and repairing sidewalks, curbs, and gutters as per the attached scope of work and site map. All work and detailing shall conform to City of San Jose Department of Public Works curb, gutter and sidewalk standards. Contractor shall block gutter off from water and concrete sediment run-off prior to and during construction. Contractor shall obtain all applicable permits, including parking meter removal permit, from the City of San Jose, and work shall be compliant with City of San Jose regulations. RFQ-Seamless Epoxy Flooring System 10/17/14 @ 9:00 AM AT 950 N. San Pedrp Street, San Jose The Facilities and Fleet Department at the County of Santa Clara is seeking quotations relating to furnishing and installation of seamless epoxy flooring in the Mechanical Room at 70 West Hedding, San Jose, CA 95131. Work includes the furnishing of any and all labor, materials, and all the work required to construct and to complete the work in accordance with the terms and conditions herein. Price quotation shall include any and all applicable labor, material, equipment, supplies, taxes, permits, fees, and licenses necessary to perform the work required by this RFQ package 3:00 PM Oakland Underground Electrical for Gate Installation 3:00 PM Salinas ONLINE ONLINE Install electrical power to the motor for a new security gate, clean up & haul off debris ONLINE RFP-Design Build Services 123 Rico Street-HVAC Modernization, Roof Replacement and Solar The Housing Authority of the County of Monterey proposes to modernize the HVAC/Mechanical system for the headquarters office building in Salinas. In addition, the HACM is requesting replacement costs of roofing & a roof top or carport solar installation 4:00 PM Davis $5460000 RFQ Chemistry Seismic and Life Corrections The Project consists of the following work for the Chemistry and Chemistry Annex buildings: 1.Structural corrections to address seismic deficiencies. 2.New site fire service and full fire suppression system. 3.Renovations as required to incorporate the work scope above. Page 2 of 44 ONLINE Engineers # of Plan Estimate Addenda # Bid Date Bid Time Location Plan Name / Scope of Work 10/24/2014 5:00 PM Sacramento RFP - Franchise Tax Board - Butterfield Complex MAND 08/19/14 @ 10:00 am at site All Qualified Pool members are invited to review and respond to this Request for Proposal (RFP) for the installation and operation of solar photovoltaic (PV) energy generation systems under a third party ownership power purchase agreement business model. In submitting your response you must comply with all instructions as provided in this RFP. ONLINE San Rafael RFP-Essential Facilities Project Management and Pre-Construction Services ONLINE 5:00 PM Prebid Information The City of San Rafael wishes to retain the services of a project management/construction management firm to manage the essential facilities strategic plan process to guide improvements to its essential facilities . The strategic plan process will consider all of the City's public safety facilities which will include seven fire stattions & a police station 10/27/2014 10:00 AM 10:00 AM 10:00 AM Salinas San Rafael Hayward/Sa n Lorenzo NEW Dollar Tree-Salinas Tenant improvements, including demolition, masonry (door opening), steel (rtu frames), drywall, acoustical, carpentry, roofing (mechanical penetrations), glass & glazing, painting, wall covering, plumbing, fire sprinkler system, HVAC, electrical ONLINE Citywide Traffic Signal LED Relamping Project E837B/0 Relamping all vehicle indications (including indivations of programmable visibility heads) with new LED in incandescent look & all pedestrian indicatyions with new countdown LED in incandescent look Exterior Handrailing Replacement Multiple School Sites MAND 10/16 @ 10AM at 18250 Bengal Ave. Hayward ONLINE Replacing existing temporary wood railing with galvanized steel round tubing (klee kamp) had railing manufacturing system at existing exterior corridor locations at multiple sites 10:00 AM Pacifica $100000 Warning Lights School Crosswalk Project ONLINE Installation of crosswalk illumination devices, thermoplastic striping & related signage for five schools in the City of Pacifica 2:00 PM Alameda 2:00 PM Fortuna 2:00 PM San Rafael NEW Four Points Hotel This is a two part bid, one for the all work in the Guestroom Towers and the second for all of the Public Areas. Please break your bid down when submitting. NEW Remove and Replace HVAC Direct Controls at Alameda City Hall Remove & replace HVAC direct digital controls MAND 10/17 @ 9AM Provide all labor, tools, equipment, materials, licensing, permits and taxes necessary to Type I slurry seal of center’s parking lot areas and re-stripe of all parking areas including ADA stalls. Slurry Seal shall consist of mixing asphalt emulsion, aggregate, and water and spreading the mixture on a surfacing or pavement where shown on the plans, as specified in these specifications and the special provisions Fortuna Center 1500 Alamar Way, Fortuna, CA 95540. Fortuna Parking Lot Slurry Seal Project #2 Page 3 of 44 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/27/2014 3:00 PM Buffalo Wild Wings-Chico Chico Prebid Information Engineers # of Plan Estimate Addenda # ONLINE D.A. Bentley Construction, LLC has negotiated the contract for General Contracting Services for the construction of a brand new Buffalo Wild Wings Grill and Bar in Chico, CA. More specifically, the proposed project entails the ground up construction of the restaurant facility including new shell construction, limited site improvements*, and full interior build-out per the bid documents. *Please see site plans (civil and architectural) for clear delineation of landlord-direct scope that is NOT part of this contract. We are responsible for all work within five feet of building envelope (including curb and sidewalks directly surrounding the building) on a pad provided by the Landlord. The trash enclosure and grease interceptor shall be part of our contract. Any and all questions or RFI’s shall be directed to the Project Manager, Larry Brooks, via email at [email protected] or at (360) 695-9234 Ext. 103. NOTE: DA Bentley "“Ask that anyone interested in bidding please specifically review our Insurance Requirements (included with the Bid Docs) and consider the fact that awarded contractors will be required to abide by the requirements set forth”. 3:00 PM Menlo Park NEW Willow Housing (No GC Openings) New 60-unit, Davis Bacon Residential Prevailing Wage Veterans Housing in Menlo Park. This Project has been awarded to CORE Builders as the General Contractor. ONLINE PLEASE NOTE: • THIS IS A PREVAILING WAGE PROJECT AND NEEDS TO BE BID AS SUCH (RESIDENTIAL RATE/FEDERAL AND STATE) • SUBCONTRACTOR QUALIFICATION FORM NEEDS TO BE SUBMITTED WITH BID PROPOSAL. • PLEASE INDICATE WHETHER YOUR COMPANY IS MINORITY-OWNED, WOMAN-OWNED, OR VETERANS-OWNED. THIS WILL BE CONSIDERED WHEN ANALYZING BIDS. • THE DOCUMENT LABELED AS OWNER’S SPECIFICATIONS SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS AND SPECIFICATIONS IN THE CONSTRUCTION DOCUMENTS. • THIS IS A LEED SILVER PROJECT • PROJECT WILL BE AWARDED BASED ON THESE LATEST SET OF PLANS BIDS SUBMITTED BY FAX TO: (408) 294-7659, Attention: Mark Gerton BIDS SUBMITTED BY EMAIL TO: [email protected] 10/28/2014 2:00 PM 2:00 PM $450000 10/7 @ 2pm Work includes the installation of a new emergency power generator and associated work at an existing office building that will be occupied during construction. Martinez New Generator at 2530 Arnold Drive Novato LED Streetlight Retrofit Phase III $1000000 $1200000 The work to be done includes, but is not limited to, the following: Replacing all remaining streetlights in the City with LED lighting fixtures. Page 4 of 44 Online ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/28/2014 2:00 PM Whipple Road Pavement Rehabilitation Project Union City Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Road pavement 2:00 PM 2:00 PM Ukiah/Fortun a San Francisco 2:00 PM Sacramento 2:00 PM Orinda 2:00 PM Oakland 2:00 PM Citrus Heights 2:00 PM Fremont MAND 10/16 @ 10AM Flooring Replacement $20000 Replace the existing flooring in the kitchen area of the CCC Fortuna site, located at 1500 Alamar Way in Fortuna and/or the CCC Ukiah site, located at 2600 Old River Rd, Ukiah Administrative Department Operations Center Video Wall and 10/7 @ 1:30PM ONLINE ONLINE Headquarters Digital Signage System for New Police Headquarters on the Public Safety Campus Video wall solution at the SAdmin DOC in police headquarters; digital signage solution at the Admin DOC in Police headquarters; service to maintain the new system $675000 Arden Middle School Restroom Upgrades MAND 10/9 @ 2PM at 1640 Watt Ave, Sacramento Restroom upgrades $1878000 Camino Pablo Pavement Rehabilitation Recommended 10/20 @ 10AM Pavement rehabilitation, including base repairs, cold planing, asphalt pavement, HMA overlay, concrete improvements, traffic signal modifications & striping $1165000 Replace Glass Panels at Coliseum, San Leandro, Bay Fair and South 10/02/14 @ 10:00 AM at 300 Lakeside Drive, conference Hayward Stations Platforms room 1700, Oakland The work in general consists of placing and/or replacing drain culverts, placing new curb, gutter, and sidewalk, placing hot mix asphalt, and placing thermoplastic striping along Powerline Road from 15th. Avenue to north of 9th. Avenue. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed. ONLINE ONLINE ONLINE Sam's Club #4799 ONLINE General Remodel. Trades to include: demolition, earthwork, AC paving, erosion control, striping/signage, concrete, rebar, precast bollards, polished concrete, structural steel, roughcarpentry, architectural woodwork, FRP, insulation, EIFS/plaster, metal roofing, membrane roofing, sheetmetal, caulking,doors/frames/hardware, traffic doors,storefront/glazing, drywall/metal framing, ceramic tile, acoustical ceilings, resilient flooring, painting, toilet accessories, vehicle service equipment, food service equipment, seismic protection, vertical barrier net system, EMS, fire sprinklers, plumbing, refrigeration, HVAC ,electrical, rack anchoring. RFQ Design-Build Services for Technology Infrastructure at Several MAND 10/7 @ 10AM & 10/9 @ 10AM ONLINE Schools 2:00 PM Berkeley The Fremont Unified School District is requesting qualified persons, firms, partnerships, corporations, associations, or professional organizations to provide full design-build services for the technology infrastructure at Ardenwood Elem School, Brookvale Elem School, Kennedy High School & Vallejo Mill Elem School campuses Tree Removal and Pruning Services 10/15 @ 11AM 2180 Milvia St., 1st fl, Berkeley Tree removal & pruning services at various locations in City of Berkeley Page 5 of 44 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 10/28/2014 2:00 PM Regional Water System Interties No. 2, 3 and 4 10/8 @ 10AM Felton/Scott s Valley 2:00 PM Oakland 2:00 PM Fairfield Engineers # of Plan Estimate Addenda # $6500000 Demolition, site preparation, earyhwork for pipeline & structures, water system piping & accessories, drainage, paving & resurfacing, concrete curbs, gutters, sidewalks & bus stops, concrete forms & accessories, concrete joint b& acessories, reinforcing steel, cast-in-place concrete, hot-weather concreting, cold weather concreting, concrete curing, concrete finishes, grouts, repair of defective concrete, basic masonry materials & methods, concrete masonry units, structural steel fasteners, metal fabrications (miscellaneous metal), rough carpentry, metal plate connected wood trusses, modified bituminous sheet membrane waterproofing, water repellent sealer, insulation, lightweight concrete shingle roofing, fiber cement siding, flashing & sheet metal, roof accessories, joint sealants, hollow metal work, finish hardware, louvers, painting, building specialties, general equipment, electric motor drives, vertical centrifugal water pumps, lighting, electrical AC Transit Streets and Parking Lots Improvement Project 10/6 @ 10AM at 1600 Franklin St., Oakland This is a public works project and will require payment of prevailing wages. A Project Labor Agreement (PLA) is also included in the project. In order to perform the work, bidders at the time of the bid opening and for the duration of the project shall possess a valid California Class “A” Contractor’s License in order to qualify to perform the work. The work in the project, involves in general, of furnishing all permits, materials, labor, tools, and equipment, and for doing all the work involved in reconstructing a section of Derby Avenue, E 10th Street, and San Leandro Street, as shown on the plans, Pavement overlay will be constructed at Derby Avenue at its intersections with E 12th Street (NB & SB) and at the intersection of Fruitvale Avenue and E10th Street/San Leandro Street. New pavement sections will be constructed at Derby Avenue and E 10th Street. Concrete curb ramps, driveways, curb and gutter and sidewalk will be constructed. Signal and lighting will be installed or modified at two (2) intersections. Pavement delineation and signs will be installed, drainage system will be modified, and roadway lighting will be installed. ONLINE ONLINE ONLINE NEW Domino's Pizza - Travis AFB TI FOR NEW DOMINO’S RESTAURANT TRADES NEEDED: Finish Carpentry, Cabinets & Tops, Drywall, Tile, Flooring, Paint, T-Bar, FRP/Marlite, Restroom Accessories, Plumbing, HVAC, Electrical. NOTE: DO NOT CONTACT ARCHITECT/OWNER/CONSULTANTS Eden Township Repair of Damaged and Displaced Sections of Curbs, Gutters and Sidewalks Unit No. 17 2:00 PM Danville 2014/15 Pavement Rehabilitation Project 2:00 PM Daly City E834B/6 MAND 10/7 @ 10:30AM at 951 Turner Ct., Rm 230A, Hayward Removing & replacing damaged curbs, gutters, driveways, sidewalks, removal of tree roots & installation of root barrier control system 2:00 PM $2790000 Preparatory tree trimming; storm drain inlet relocation; removal & replacement of existing storm drain pipe; removal & replacement of existing Portland Cement concrete curb, sidewalk, curb ramp & valley gutter; subdrain installation; removal & replacement of existing asphalt concrete pavement (digouts); pavement cold planning; intsllation of paving mat; installation of asphalt concrete overlay; removal & replacement of asphalt concrete speed lumps; removal & replacement new traffic loop detectors; adjusting to grade of survey monument castings; water valve castings; storm drain & sanitary sewer manhole covers & other utility lids; removal & replacement of existing paving striping & markers; traffic control Janitorial Services for Daly City DMV Optional 10/7 @ 10AM Contractor agrees to provide the Dept of Motor Vehicles all labor, tools, materials, equipment & travel necessary to perform janitorial services at the Daly City DMV. Melanie Pilliard @ 916-657-6975 Page 6 of 44 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/28/2014 2:00 PM Hesperian Landscaping, Chabot College - Rebid Hayward Prebid Information Engineers # of Plan Estimate Addenda # MAND 10/15 @ 10AM at 25555 Hesperian Blvd, Bldg 3000, Hayward 017C/R0 Landscaping work ONLINE 2:30 PM Stanislaus County 3:00 PM Palo Alto RFP-Data Center and Computer Cloud Backup Implementation 10/1 @ 10AM The City of Palo Alto is seeking proposals from qualified firms to provide services to provide data center and computer cloud backup implementation services ONLINE 3:00 PM Santa Cruz RFQ- Student Life Seismic Corrections Phase 2A-Cardiff House ONLINE NEW County Road Signs, Material and Supplies Street signs The Student Life Seismic Corrections Phase 2A – Cardiff House project to address and correct seismic, life, and safety deficiencies. In addition, the project will bring the building into access compliance with the State of California Building Code and Title 24 Accessibility Standards. The Cardiff House is a contributing element to the Cowell Lime Works Historic District and listed on the National Register of Historic Places. The building's date of construction is c. 1850's. As such all work done on the Cardiff House must be consistent with the Secretary of the Interior’s Standards of Rehabilitation. The Historic Cardiff House (home to the Women's Center program) is a farmhouse near the campus main entrance. It is a one-story wood framed building with a small cellar and roughly 2,000 square feet in area. 3:00 PM Santa Cruz ONLINE RFQ-Student Life Seismic Correction Ph 2A Redwood Bldg & Student Union he Student Life Seismic Corrections Phase 2A – Student Union and Redwood Building projects to address and correct seismic, life, and safety deficiencies. In addition, the project will bring the building into access compliance with the State of California Building Code and Title 24 Accessibility Standards. The Redwood and Student Union buildings are situated adjacent to each other and located across the quad from the Baytree Bookstore on Quarry Plaza off Steinhart Way. The Redwood Building is roughly 2,500 square feet and is a two-story wood frame building situated atop a timber pole foundation. The Student Union Building is a two-story timber pole structure situated on a steep east-west sloping grade with roughly 7,000 square feet in area. 3:00 PM Palo Alto ONLINE Mitchell Park Parking Lot Project Asphalt base repairs, replacement of damaged concrete structures, removal of existing asphalt, placement of asphalt, placement of asphalt concrete paving & replacing of tsriping 3:30 PM Holly Boyd, Proj Mgr, @ 650-329-2612 Pleasant Hill NEW Oasis Christian Fellowship Church Trades include: Grading, striping, retaining wall, fence, plumbing, electrical, HVAC, rough framing, roof, window, doors, painting, drywall, finish carpentry, iron work, cabinets, flooring, foundation. ONLINE NOTE: DO NOT CALL OWNER/ARCHITECT/CONSULTANTS 4:00 PM Oakland RFP-Hazardous Material Abatement Design and Construction Services for Various School Sites MAND 10/8 @ 2PM at 955 High St., Oakland Oakland School District is requesting the submission of proposals for a hazardous material abatement consultant firm to provide hazardous material abatement design & construction monitoring associated with the various sites within district. Page 7 of 44 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/28/2014 5:00 PM San Francisco Walgreens # 887 San Francisco Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Interior remodel, including demolition, flooring, doors & hardware, interior finishes, interior elevations, plumbing, HVAC, electrical NOTE:ALL UNION TRADES FOR BUILDING CONSTRUCTION 5:00 PM Antioch Request for Information, POC HVAC Evaluation and Replacement Online Delta Diablo ("District") issues this Request for Information (RFI) via BidSync for planning and information gathering purposes. The District is in the planning phase for replacing the existing Building Management System (BMS) in operation at its Plant Operations Center building in Antioch, CA. The BMS system currently operates and monitors the heating, ventilating, and air conditioning (HVAC) equipment. 5:00 PM San Francisco ONLINE San Francisco Walgreens # 1327 Interior remodel of Walgreens, including selective dmolition, cast-in-place concrete, structural metal framing, carpentry, thermal insulation, modified bituminous membrane roofing, flashing, sheet metal, specialties & accessories, joint protection, metal doors & frames, wood doors, folding grilles, hardware, gypsum board, acoustical ceilings, resilient flooring, special wall surfacing, painting & wallcovering, toilet partitions & accessories, fire protection specialties, floor mats & frames, plumbing, hvac, testing/adjusting/balancing, ligting, special systems, fire detection & alarm ALL UNION TRADES FOR BUILDING CONSTRUCTION 10/29/2014 1:00 PM Sacramento 1:30 PM Stockton 1:30 PM Valley Springs 1:30 PM Brentwood 10:30 AM San Francisco $500000 10/15 @ 10AM The Contractor shall furnish all supervision, labor, materials, equipment and incidentals necessary to install new fencing, install new gates, and make fence additions, repairs or changes to various SMUD fences. The work generally consists of: Constructing 4’, 6’, and 8’ high chain link fence with 1”x 1” fabric; repair of existing chain link fences; furnishing temporary chain link fence, either stand alone or with imbedded posts; gate construction and repairs; installation of fence toppings on new or existing fences, including “V” arms with 4 strands of barbed wire and razor ribbon; construction of isolation panels; construction of 6’ redwood fences; fabrication and installation of 2’ wall topping; installation of security panels; and various other adjustments, repairs or replacements that may arise during the contract period RFQ-Stockton Field Operations Center Fuel Dispenser Replacement MAND 10/22 @ 11:30AM at 1804 W Main St., Stockton Replacement of the existing gasoline & diesel fuel dispensers, pumps, hoses & related appurtenances & installation of new fuel dispensers, pumps, hoses & all related appurtenances required to complete the work, start-up & calibration of new dispensers & performe required testing RFQ-Pardee Center Fuel Dispenser Replacement MAND 10/22 @ 9AM at 3535 Sandretto Rd., Valley Springs Fence Construction and Repairs As Needed Through 2016 Replacement of the existing gasoline & diesel fuel dispensers, pumps, hoses & related appurtenances & installation of new fuel dispensers, pumps, hoses & all related appurtenances required to complete the work, start-up & calibration of new dispensers & performe required testing RFQ-Bixler Maintenance Center Fuel Dispenser Replacement Project MAND 10/22 @ 1:30 PM Replacement of the existing gasoline & diesel fuel dispensers, pumps, hoses & related appurtenances & installation of new fuel dispensers, pumps, hoses & all related appurtenances required to complete the work, start-up & calibration of new dispensers & performe required testing $500000 Port Security Fences Phase 4 10/15 @ 10:30AM Environemantl management of excavated materials, fences, electronic gate operators. Division 02170 & Division 02826 were not posted in the port of san francisco website Page 8 of 44 ONLINE ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/29/2014 10:30 AM Beltline Building Project - Phase 1 San Francisco 11:00 AM Soledad 2:00 PM Fremont Prebid Information MAND 10/16 @ 10:30AM Engineers # of Plan Estimate Addenda # $300000 Installation of public men's & women's restrooms in historic Beltline Buildings 1944 addition, including selective demolition & hazardous material removal, installation of walls, doors, tile, flooring, toilet partitions, installation & repairs of plumbing, mechanical & electrical fixture and systems Little League Park Lighting 10/22 @ 10:30AM Installing new sports lighting & other electrical items at the existing Little League Park ONLINE ONLINE ONLINE Utility Infrastructure Upgrade Project Phase II Selective demolition, electrical, communcations, clearing & grubbing, excavation & fill, utility trenching & backfilling, portland cement concrete, aggregate base course, asphalt paving, water distribution center, sanitary sewerage system Notice to Bidders pages are garbled 2:00 PM 2:00 PM Santa Rosa San Francisco 2:00 PM Sacramento 2:00 PM Oakland MAND 10/15 @ 10AM at 69 Stony Circle, Santa Rosa Water Pump Station 3 Modifications $1200000 $1300000 Water pollution control, traffic control, clearing & grubbing, earthwork, roadway excavation (F), subgrade stabilization, stabilization fabric, class 2 aggregate base, slurry seal, asphalt concrete surface, concrete curb, pump station addition concrete slab foundation, concrete apron, median curb, chain link fence, gates, removal of existing fence & gate, asphalt concrete dike, generator bldg concrete slab foundation, precast drainage structures, storm drain, pump station water pipe & sppurtenances, 100 HP booster pump, pump station building addition & roof, generator building, miscellaneous electrical work, motor control center, PG&E meter & main switchboard, antenna mast assembly. 230kw generator set $200000 TG15.1-Dock Levelers & Bumpers Optional 8/26 @ 2PM at 175 Beale St. San Francisco Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with with furnishing and installing dock levelers, bumpers, truck restraints and bin lifters on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems. Groundwater Well Rehabilitation Ph 3 MAND 10/14 @ 9AM at 3904 Rio Linda Blvd, Sacramento $3450000 The City of Sacramento seeks bids from qualified Contractors to rehabilitate Wells 94, 107, 120, 122, 126, 129, 133, and 138. The project consists of two major components, well casing rehabilitation, and installation and construction of new site improvements. Site improvements include but are not limited to new fencing, pumping, electrical, and chemical systems, paving, switchgear enclosures, piping fabrication, and wellhead demolition and construction. Contractors are to provide all labor, materials, and equipment necessary to successfully complete the project ONLINE ONLINE ONLINE Megan Thomas, Associate Engr, @ 916-808-1729 Removal of Rubber Deposits and Painted Ground Markings from Airport Pavements 10/15 @ 99:30AM at 8500 Earhart Rd., Oakland $300000 ONLINE The work of this annual contract consists generally of removing approximately 1,000,000 square feet per year of rubber deposits and approximately 10,000 square feet per year of painted ground markings from airport pavements using high-pressure water. 2:00 PM Fremont ONLINE Telecommunication System Repair Services The California Department of Education is soliciting bids from potential bidders to provide telecommunication system repair services located at the California School for the Deaf (CSD), 39350 Gallaudet Drive, Fremont, CA 94536 and Diagnostic Center North (DCN), 39100 Gallaudet Drive, Fremont, CA 94536The contractor shall provide services in accordance with the specification contained herein the IFB. The contract period is from December 1, 2014 through November 30, 2015 and includes a one-year option to renew. Page 9 of 44 Bid Date Bid Time Location Plan Name / Scope of Work 10/29/2014 2:00 PM Bodega Bay Bodega Bay Aquaculture Reroof 2:00 PM Sacramento North Natomas Regional Park Phase 5B Rebid-Farmer's Market & Parking Lot Prebid Information Engineers # of Plan Estimate Addenda # $98500 MAND 10/15/14 @ 10:30 am Provide all labor, materials, equipment, tools, transportation, insurance and services to remove the top layer existing Hypalon roofing material and prepare the existing built-up roofing substrate to receive the new roofing application. Patch and repair with like materials any dry-rotted existing roof decking encountered. Install sloping underlayment on low flat roof section, sloping to existing roof drains. Reroof with a new fleece backed TPO roofing system, approximately 15,825 square feet. $746876 ONLINE ONLINE The work to be performed consists of developing the North Natomas Regional Park, Phase 5B-Farmer’s Market and Additional Parking in Sacramento. The improvements will consist of finish grading, drainage, concrete walkway, curbs, asphalt paving, installation of metal shade structures, automatic irrigation system, electrical, drinking fountain, landscaping, parking lot, signage, and site furniture. Dennis Day @ 916-808-7633 2:30 PM Sacramento 2:30 PM San Pablo Online MAND 10/9/14 @ 11am Asbestos Abatement for DMV Headquarters. Asbestos Abatement for DMV Headquarters. $250568 Davis Park Play Area Renovation ONLINE Replacement & installation of new play structure & resurfacing of Davis Park. 3:00 PM Sunnyvale 3:00 PM Sunnyvale 3:00 PM Walnut Creek Optional 10/22 # 2:30PM at 456 W. Olive Ave, Sunnyvale Construction of ADA ramps & remove & reconstruct certain curbs, gutters & sidewalks, adjust to grade, existing traffic boxes, meters & others city-owned facilities within the limits of the new ADA curb ramps. Curb Ramps Installation CDBG 2015 ONLINE Chucky Lambert @ 408-730-7406 Concrete Sidewalk, Curb, Gutter and Driveway Approaches CGBG 2015 Optional 10/22 @ 2:30PM at 456 W. Olive Ave, Sunnyvale ONLINE Concrete sidewalks, gutter, driveway approaches & curb ramps 3:00 PM Novato ONLINE The Orchards at Walnut Creek Bid Package 5 Project consists of 195,000 sf with ten (10) individual buildings. Grocery, restaurant, and other retail. A multi level fitness center. Parking structure. Structural work for Building A & B consists of Tilt up Concrete walls, Precast concrete columns, precast parking deck planks, Multi layered topping slab over Parking deck, structural steel. Buildings C-K traditional Footing/Fnd package.Extensive site work (24.7 acres), paving, concrete, landscaping packages. Walking paths will provide multi-point access from Ygnacio Valley, Oak Grove and shadelands drive. NEW Indian Valley Campus POMO Cluster Roofing MAND 10/21 @ 9AM Limited asbestos & lead survey; rough carpentry; roof deck & insulation, metal roofing Page 10 of 44 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/29/2014 3:00 PM Winter 2014/15 Preparation Work for the Phase Shifting Transformer Strongly Recommended 10/7 @ 10:30AM at 1500 Project Warburton Ave, Santa Clara Santa Clara Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Site demolition; asphalt concrete demolition; earthwork; utility trenching & backfill; storm water pollution prevention; caissons; asphalt concrete paving; cast-inplace concrete, concrete reinforcement; cast-in-place concrete; concrete curing; structural steel; metal fabrications; concrete waterproofing; yard lighting; electrical Voula Margelos Brown @ 408-261-5036 3:00 PM 4:30 PM Sebastopol Modesto MAND 10/7 @ 10AM at 390 Morris St., Sebastapol Div_03-cast-in-place concrete; Div_06-interior architectural woodwork; Div_07-joint sealants; Div_08-aluminum windows, door hardware, glazing; Div_09ceramic tile, painting; Div_10-sheet vinyl, door mat, microflex structures, toilet accessories, drinking fountain, lighting, electrical Sebastopol Community Cultural Center Office Remodel NOTICE TO CONTRACTORS:In order to be eligible to submit a bid for this project, contractors must be included on the plan holders list maintained by the Sebastopol Engineering Department. Buds must be submitted on forms provided by the City as described in the Notice to Bidders included in this document 2605 Alexia Way MAND 10/16 @ 2PM at 2605 Alexia Way, Modesto Reroof, replace some doors, replaced HVAC system and new flooring and painting the exterior of house ONLINE ONLINE Gregory Williams @ 209-577-5392 5:00 PM Lodi 5:00 PM Sacramento 5:00 PM San Jose RFQ-U.S. EPA Brownfield Grant Application and Implementation Assistance The City of Lodi, CA (the City) through this Request for Qualifications (RFQ), is seeking a qualified environmental consulting and/or planning firm to provide assistance with: (a) securing United States Environmental Protection Agency (U.S. EPA) and potentially other federal or state grants for the assessment, cleanup, or redevelopment of brownfields properties and (b) implementation of environmental assessment, remedial planning, community outreach, and other environmental or planning components of grants for which funding is secured. The focus for the contract will be for securing one or more U.S. EPA assessment grants as part of the U.S. EPA’s annual Brownfields Grant Competition for FY2015. This solicitation is being issued in part to comply with Federal procurement standards outlined in CFR §31.36 that are applicable to the hiring of consulting firms to assist communities with grants awarded by U.S. EPA. Relocate and Construct CSA Auxiliary Boiler System MAND 10/1 @ 10AM at 5000-83rd St., Sacramento Remove, transport, design/execute integration of, and commission a fully functional and complete Auxillary Boiler (#2) to SCA Cogeneration Plant using SMUDprovided boiler and appurtenances currently stored at off-site location. Scope includes modification to existing boiler storage site (e.g. sliding door area and roof) as needed to safely remove the boiler equipment, transport of the equipment to new foundations, and restoration and clean-up of modified areas to preconstruction functional condition and cleanlines. Contractor has the option to use any or all SMUD-provided equipment and/or appurtenances, or to supply new or refurbished replacement equipment/appurtenances. RFQ-Master Agreement for Landscape Architectural Services The Department of Public Works, City Facilities Architectural Services Division, is seeking firms or individuals (“Consultant”) to provide a full compliment of architectural consultant design services. The Consultant will be required to provide multi-discipline architectural services for the projects identified and for various citywide projects. The City of San José- is seeking to provide. Based on this RFQ, the City will enter into one (1) or more consultant agreement(s) with the highest ranked Consultant(s). The agreement(s) will have a maximum compensation limit of $270,000 and shall expire approximately five (5) years from the date of execution, unless the compensation level is reached earlier Page 11 of 44 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/30/2014 1:30 PM Sludge Thickening System Replacement San Rafael Prebid Information Engineers # of Plan Estimate Addenda # $2631000 10/9 @ 11AM at 1301 Andersen Dr., San Rafael The Project consists of removing and replacing the sludge thickening system, as described in the Contract Documents. The work includes demolition of the two (2) existing dissolved air flotation thickeners and associated equipment and piping, furnish and installation of two (2) rotary drum thickeners and associated equipment to provide a complete, functional installation, control integration of new equipment into the existing treatment plant process control system and testing of the completed system to ensure proper operation ONLINE Brian Thomas @ 415-459-1455, extension 121 2:00 PM Rancho Cordova 2:00 PM Various Cities 2:00 PM Tracy 2:00 PM South San Francisco MAND 10/21 @ 10AM at 2729 Prospect Park Dr., Rancho $1050000 Cordova Traffic Signal Interconnect Project - The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for the installation and testing of new signal interconnect conduit and cable, for furnishing and placement of new interconnect cable in existing conduit, for the furnishing and installation of interconnect pull boxes and splice vaults (alternate bid item) for removal of existing controller cabinets and for the installation of City furnished controller cabinets, for furnishing and placement of CCTV video cameras and camera cables, for the installation of conduit for CCTV cables, for minor curb, gutter, sidewalk and pavement removal and replacement and for replacement of thermoplastic pavement striping and marking along Coloma Road from Malaga Way to Sunrise Boulevard in the City of Rancho Cordova as well as other items and details not mentioned above but described in the Special Provisions or shown on the Plans or as designated by the Engineer. Coloma Rd Traffic Signal Interconnect Project and Aramon Dr./Studarus Dr. and Coloma Rd. Traffic Signal Project Traffic Signal Project - The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for the installation and testing of a new vehicle and pedestrian traffic signal and LED street light improvements, for the furnishing and placement of slurry seal and for the placement of thermoplastic pavement striping and pavement markings all within the limits of work at the intersection of Coloma Road and Aramon Drive / Studarus Drive in the City of Rancho Cordova as well as other items and details not mentioned above but described in the Special Provisions or shown on the Plans or as designated by the Engineer. NEW ARV Vault Maintenance Project 10/23 @ 10AM at 450 Sycamore Ave, Mill Valley Excavation & backfill, surface restoration, cast-in-place concrete, painting, pipework NEW Kimball High School-Swimming Pool Heater Replacement MAND 10/22 @ 10AM at 3200 Jaguar Run, Tracy Removal/demolition of the existing 3,000,000 BTU input swimming pool heater & installation of pool heater, piping, valves & other items ONLINE E342B/0 ONLINE Anthony Continente @ 925-766-4107 2:00 PM Santa Rosa Turbo Blower #2 at Water Quality Control Plant $250000 Fabricating, assembling, testing & delivering of a 300 to 335 horsepower high speed motor driven turbo blower system, including specified spare pats & providing field testing & start-up services King St Sewer and Water Improvements - Phase 2 10/23 @ 10AM at 69 Stony Circle, Santa Rosa Dust control, traffic control, earthwork, landscaping, aggregate base, asphalt concrete, asphalt concrete trench paving, signs, soil & groundwater disposal, sanitary sewer system, concrete curb & sidewalks, traffic stripes & pavement markings, raised pavement markers, portland cement & sand slurry, water system, material recycling Page 12 of 44 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/30/2014 2:00 PM RFP-Hilltop and Marina Landscape Maintenance Assessment Districts Annual Engineer's Report Richmond Prebid Information Engineers # of Plan Estimate Addenda # ONLINE The purpose of this invitation is to identify a company that will, as a result of passage of Proposition 218, prepare a new Engineer's report for the Hilltop & Marina Landscape Maintenance Assessment Districts Yader Bermudez @ 510-774-6300 2:00 PM Pleasanton 2:00 PM Milpitas Janitorial Services for the Pleasanton DMV Field Office ONLINE 10/9/14 @ 10am Janitorial Services 2:00 PM Hayward 2:00 PM Davis 2:00 PM Davis McCarthy Blvd. Lighting and Landscape Improvements Phase 1 MAND 10/2 @ 10AM $275000 $325000 Demolition, lighting, refurbish existing fence/sign, paving, planting, irrigation, water pollution control & traffic control. $30000 Old Student Union Flooring - CANCELLED MAND 10/17 @ 2PM at 25800 Carlos Bee Blvd, Hayward Remove existing carpet & resurfacing existing concrete floor with acid stain & seal $875000 CNPRC Cage Wash Facility MAND 10/16/14 @ 1:00 pm Provide all labor, materials, equipment, tools, transportation, insurance, and services required to install approximately 100 feet of roof mounted steam and condensate piping, 400 feet of underground steam and condensate piping, and general tenant improvements to an unimproved bay of the CNPRC Shop Building for the purpose of serving a future cage wash machine. Site work shall include excavation, installation of underground piping, poured in place insulation and patching of asphalt roadway. Tenant improvements to the 2,200 sq. foot open bay shall include concrete slab, concrete flatwork, plumbing, steam fitting, electrical, HVAC and architectural sheet metal improvements. Work will be performed within the California National Primate Center and shall require health screenings for all workers. UC Davis International Complex-Subcontractor Bids for Select Bid Packages Construct a new 60,000 SF office and classroom building which will include a Commons area, Multi-purpose room, offices, meeting rooms, Media Resource room, classrooms, misc. support rooms and all associated site improvements; bid packages include 1) pavement markings and site signage, 2) precast unit pavers, 3) decomposed granite, 4) landscaping, 5) CMU masonry, 6) aluminum column covers, 7) architectural millwork and wood paneling, 8) fireproofing, 9) joint sealants, 10) tile, 11) acoustical ceilings and wood ceilings, 12) flooring, 13) concrete sealer and stain, 14) architectural sheetmetal, 15) paint, 16) toilet accessories and partitions, 17) visual display surfaces, 18) signage, 19) operable partitions, 20) fire protections specialties, 21) lockers, 22) projection screens, 23) entrance floor mats, 24) window coverings, 25) elevator smoke curtains and 26) sun shades. **MEP trades, steel, concrete, glazing, doors and hardware, metal framing and drywall, stucco, elevator, metal decking, rebar, roofing, stone veneer, fire suppression, and sitework are EXCLUDED and have been selected through the Design-Build process. Page 13 of 44 014C ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/30/2014 2:00 PM Hyde Middle School Interim Housing Portables Cupertino Prebid Information Engineers # of Plan Estimate Addenda # MAND Pre-Bid Conference 10/13 @ 3:30PM and Site Visit $180000 10/16 @ 3:30PM The Project consists of providing all material, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to relocate storage sheds and fence post & fabric, provide and install a new transformer & distribution panel, install all low voltage wiring for Power, Fire Alarm, Clock\Bell Paging, Intercom Phone, Data, install new fence posts & fabric for the New Interim Housing Portables at Hyde Middle School. ONLINE Mark Casini @ 408-483-7599 Complete documents will be posted once available 2:00 PM Concord 2:00 PM Antioch 2:00 PM Pine Grove 2:00 PM Santa Cruz 2:30 PM Walnut Creek 09/29/14 @ 10:00 am at 2477 Arnold Industrial Way SCOPE OF WORK. It is the intent of County Connection to have the contractor furnish and install the necessary labor and materials to upgrade and replace the existing security gates per the technical specifications of this bid package and the Contractor’s bid. Diablo Vista Elementary School Roof Coating Project MAND 10/22 @ 1PM at 4791 Prewett Ranch Dr., Antioch Remove all walk pads & debris from roof; inspect roof for open seams; punctures & seal to make water-tight as recommended by coating manufacturer; wash & clean roof as recommended by coating manufacturer; reinforce all seams on horizontal roof & curb flashings CHP Enhanced Radio System Replace Towers and Vaults MAND 10/7 @ 10AM Div_02-site preparation, chain link fence, gravel surfacing, demolition, blasting, concrete mat & pad foundation, groundwork for structures, rock removal; Div_03concrete; Div_04-concrete unit masonry; Div_05-metal decking, metal fabrications, welding, structural steel, ladders; Div_06-rough carpentry; Div_07-cold fluid applied waterproofing, metal roof panels, metal wall panels, roof hatches, sealants; Div_08-hollow metal frames, hollow metal doors, door hardware; Div-09painting, elastomeric coating; Div_13-self-supporting steel communication tower; Div_22-plumbing; Div_23-HVAC; Siv_26-stand-by generator, automatic transfer switches, electrical work $120000 Moran Pump Station Upgrade MAND 10/23 @ 10AM The Moran Pump Station Upgrade project will provide for removal of the existing shaft driven pumps and installation of new 3 new pumps, concrete bases, valves and associated piping, etc. Upgrade and Installation of Security Gates 066C ONLINE ONLINE ONLINE Marcella Bailey @ 831-454-2803 $45000 Tennis Courts Resurfacing Project The Project includes, but is not limited to, performing the following Work: •Courts preparation •Clean out the cracks and crack seal •Clean surface •Leveling for only two (2) courts at Larkey Park, as determined in the field by the engineer •Apply special surface coating •Apply color coat •Provide line painting, including pickleball lines for two courts at Rudgear Park •Restore pipe netting, netting, and perimeter courts fencing Page 14 of 44 ONLINE Bid Date Bid Time Location 10/30/2014 2:30 PM San Francisco 3:00 PM San Jose 3:00 PM San Jose Plan Name / Scope of Work Prebid Information 10/23 @ 10:30 AM NEW Trocadero Clubhouse Porch Replacement Engineers # of Plan Estimate Addenda # $400000 This is a City and County of San Francisco, CMD Micro-LBE Set-Aside Construction Contract for CSLB License B, General Building contractors. Under Section 14B.7(K)(1) of the Ordinance, the City may set aside for competitive award to Micro-LBEs any construction contract estimated to be $400,000 or less. To be eligible for a micro set-aside contract the bidder must be a CMD Certified Micro-LBE in a certification category that corresponds with the contractor licensing requirements called out by the Contract Awarding Authority. A bidder that has a certification, that has had its certification revoked or that is in the process of appealing an CMD denial or revocation at the date and time the bid is due is not a Micro-LBE and is not eligible to bid on the contract even if the firm is later certified or ultimately prevails in its appeal. Remove and replace existing porch deck, structure, guardrail and accessible ramp at Trocadero Clubhouse in Stern Grove, San Francisco, CA. Drawings for this project are included both as part of the solicitation and separately for your convenience. 7585-Demolition of Kelley House 10/20 @ 10AM at 1300 Senter Rd., San Jose Materials disposal, hazmat protection procedures, back fill, demolition ONLINE ONLINE Raj Verma, Proj Mgr, @ 408-535-8443 7458-Police Administration and Communication Buildings (PAB/C) Chiller Replacements Project MAND 10/16 @ 10AM at 201 W. Mission St., San Jose ONLINE MAND 10/23 @ 10AM ONLINE Div-15-plumbing, HVAC, testing, adjusting & balancing; Div-16-electrical work 3:00 PM Redwood City 3:00 PM Cupertino 3:00 PM Napa 4:00 PM Sacramento Jim Wilson, proj Mgr, @ 408-535-8441 NEW La Honda Creek Fence Installation @ McDonald Ranch The purpose of this project is to provide the installation of a new barbed wire livestock fence in Pastures 2 and 3 of the McDonald Ranch in La Honda Creek Open Space Preserve. The furnishing of all labor, materials and services required for the following designated scope of work include: installation of approximately 8,900 linear feet of a new 5-strand barbed wire livestock fence, installation of 5 livestock gates, and removal of approximately 100 linear feet of 5strand barbed wire livestock fence. All materials are to be supplied by the contractor. $260000 Miller Middle School Interim Housing Portables MAND Pre-Bid Conference 10/14 @ 3:30PM & Site Visit 10/17 @ 3:30 PM The Project consists of providing all material, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to relocate storage sheds and fence post & fabric, install new fire suppression line & hydrant, provide and install a new transformer & distribution panel, install all low voltage wiring for Power, Fire Alarm, Clock/Bell Paging, Intercom Phone, Data, install new fence posts & fabric for the New Interim Housing Portables at Miller Middle School. RFQ-Construction and Modernization of Napa Technology Center MAND 10/16 @ 1PM at 1610 Lincoln Ave, Napa Napa Valley Unified School District invites responses from qualified firms, partnerships, corporations, associations, persons or professional organizations to enter into an agreement wth the District to construction improvements to the the Napa Technology Center pursuant to the lease leaseback structure & to leaseback a "turn key" project to the District. ONLINE ONLINE ONLINE 2015 Pre-Selected Consultants RFQ This Request for Qualifications (RFQ) solicits qualified firms to provide an array of Pre-Selected professional services to the Department of Public Works (DPW).Respondents to this RFQ must demonstrate experience and capacity to deliver the services offered, as well as sufficient understanding of Public Works needs and to tailor its services to successfully address them. Page 15 of 44 Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 10/30/2014 4:00 PM RFQ-As-Needed Design, Engineering, & Professional Consulting Services Treasure Island Project 10/14 @ 2:30PM San Francisco Engineers # of Plan Estimate Addenda # ONLINE TICD is soliciting Statements of Interest and Qualifications from qualified design, engineering and professional consulting firms to provide As-Needed Professional Services for components of the development of the Treasure Island Project ("Project”). The selected consulting firms will be added to a Qualified Vendor List, and, subsequent to a future fee proposal submittal process, may contract directly with a joint venture managed by TICD, the Master Developer of the Project, who will provide direct oversight and management of the scope of work. 10/31/2014 11:00 AM 10/10 no time provided Construct a new 21,043 SF church meetinghouse with associated parking lot, landscaping, recreational pavilion / storage building and offsite roadway and utility work. Lincoln Lincoln CA Stake Meetinghouse New Construction (Select Bidders) 11:00 AM San Rafael East Sir Francis Drake Boulevard Highway Safety Improvements Program 2:00 PM Rodeo ONLINE **Many of the major trades require a pre-qualification process for subcontractors, which will be announced by addendum prior to bidding. Installing 600 LF of metal beam guardrail, installing two (2) radar feedback signs & improving existing shoulder conditions NEW Bayo Vista Office Window Replacement Project 10/28 @ 10AM at 2 California St., Rodeo The work includes: A. Removal of 86 existing single-glazed, aluminum-framed retrofit windows, associated trim, exterior window screens and interior window blinds. B. Reframing of 16 of 86 total windows to accommodate new window sizing details. C. Installation of 86 new dual-glazed retrofit windows - supplied by HACCC. D. Removal of existing glazing at 7 window and 4 door locations, and installation of new glazing (supplied by HACCC) and stops. E. Reinstallation of approximately 10,262 L.F. of existing window trim and installation of approximately 4,842 L.F. of new window trim. F. Caulking of all window trim, both new and reinstalled. G. Complete painting of all new window trim and touch-up painting of reinstalled trim to cover all holes, attachment hardware and caulk. H. Reinstallation of all existing window blinds and exterior windows screens. Details regarding the full scope of work can be found in Attachment 1, Technical Specifications. Page 16 of 44 $125000 E340B/0 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/31/2014 2:00 PM Janitorial Services for Employment and Economic Development Department Building Stockton Prebid Information Engineers # of Plan Estimate Addenda # MAND 10/07 @ 10AM at 56 S. Lincoln St., Stockton ONLINE MAND 10/7 @ 10AM at 12345 El Monte Rd., Los Altos Hill ONLINE Janitorial services 2:00 PM Los Altos Hills RFQ-Lease-Leaseback Services for New District Offices The Foothill-DeAnza Community College Dist is issuing the RFQ requesting statements of qualifications from contractors qualified to provide the District with services deescribed in this document for construction of the New District Offices at the Foothill College campus in Los Altos Hills 2:00 PM 3:00 PM Modesto West Sacramento ONLINE RFP-Transportation Engineering Services for Federal Project CML 5059 State Route 132 (D Street-14th Street) Intersection developments The City of Modesto is soliciting requests for proposals for Transportation Engineering Services, which consists of a traffic study that will include a technical analysis report. NEW CHP Academy Water Conservation Landscaping Services MAND 10/22 @ 9AM ONLINE Water conservation landscaping services fo the CA Highway Patrol Academy Cassandra Stanton @ 916-843-3610 4:00 PM San Francisco RFQ Holloway Avenue Development Opportunity MAND 10/1 @ 11AM ONLINE SF State and UCorp are requesting qualifications from interested entities as a first step toward identifying qualified developers to plan, finance, construct and derive income from the operation of a development project on property located at the campus of San Francisco State University in San Francisco, California. 5:00 PM Hayward 5:00 PM Martinez NEW Chase Bank Hayward Downtown Demolsih teller line counter & BR glass; install new teller counter, install one new office; install new furniture, equipment & finishes; modify existing HVAC & electrical per new furniture, teller & office layout; no exterior building modifications . The work associated with this branch will be night work, Some site work may be completed during the day, However the majority of the work must be completed in off hours NEW Solar Powered School Zone Safety Systems Revised Requirements CONTRA COSTA COUNTY EXPECTS TO PURCHASE TWO (2) SOLAR POWERED SCHOOL ZONE SAFETY SYSTEMS FOR INSTALLATION AT THE LAS JUNTAS ELEMENTARY SCHOOL ON PACHECO BLVD., WHICH IS IN THE UNINCORPORATED AREA OF MARTINEZ, CA. 94553. EQUIPMENT WILL REQUIRE INSTALLATION BY THE AWARDED VENDOR AND A LICENSED CONTRACTOR. PRODUCT SPECIFICATIONS ARE FOR REFERENCE ONLY. PLEASE SUBMIT YOUR OFFER ON A UNIT THAT IS EQUIVALENT TO UNIT OUTLINED IN THIS BID. CONTRA COSTA COUNTY RESERVES THE RIGHT TO SELECT THE PRODUCT THAT BEST SUITS OUR NEEDS. Page 17 of 44 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 10/31/2014 5:00 PM Essential Facilities Strategic Plan San Rafael Prebid Information Engineers # of Plan Estimate Addenda # ONLINE The scope of work for the first RFP (“Essential Facilities Strategic Plan”) is to update the 2003 facility condition assessments, develop space needs of essential facilities, feasibility studies of improving existing or new public safety facilities, developing project budgets and funding plan, prioritizing projects, and developing a phasing and implementation schedule. The second scope of work (“Essential Facilities Project Management and Pre-Construction Services”) is for project management and pre-construction services related to the Strategic Plan process. Jim Shultz @ 415-485-3475 5:00 PM Sonoma County RFP-Civil and Geotechnical Engineering Services for Central Sonoma Valley Trail ONLINE The County of Sonoma, Regional Parks Dept, is soliciting proposals from experienced professionals to design & engineer an 8 feet wide Class I bike path & brisge abutments/piers for a prefabricated pedestrian/bicycle brisge. The scope of work includes the preparation of construction plans, technical specifications & cost estimate for public bidding in late Winter 2015 & construction in Spring/Summer 2015. 11/3/2014 11:00 AM 2:00 PM 3:00 PM NEW Building 19 Swing Space Renovation MAND 10/23 @ 10AM Demolition, relocate telephone/data or electrical during demolition, tile carpeting, lighting, doors, glazing, painting Roof Replacement Project Greenhouse Offices and Storage Facility MAND 10/24 @ 1:30PM Sacramento Replace the roof & exterior siding of the California Dept of Food & Agriculture's Greenhouse offices & storage facility $225488 Sims Road Gate Modification 10/22 @ 9AM at 8521 Laguna Station Rd, Elk Grove Elk Grove Div_02-site preparation, earthwork, cold plane AC pavement, high visibility fencing, stationaty bollard, base material, hot mix asphalt concrete, portland cement concrete, traffic stripes & pavement markings, signs; Div_03-concrete structures; Div-05-reinforcement; Div_13-prefabricated security building; Div_16-electrical Fremont 4:00 PM Oakland 4:00 PM Sacramento Tamblynn Stewart @ 916-875-9014 NEW RFP AB Cooling Tower Recycled Water Project MAND 10/16 @ 2PM EBMUD is soliciting a proposal for plumbing/mechanical contractor services to install a CPVC riser pipe to transport recycled water to our cooling towers on the roof of our administration building. The District intends to award one contract for this work, but to also create a short list of pre-qualified contractors who can bid on future plumbing/mechanical projects. RFP-Pilot Parklet for Temporary Sidewalk Extensions ONLINE ONLINE ONLINE ONLINE ONLINE This Request for Proposals (RFP) solicits qualified applicants “Sponsors” to install a Parklet in the public right of way. Parklets are a new type of public space that serve as a “mini parks” and are intended to provide space for people to sit, relax and enjoy the city around them, especially where narrow sidewalks would otherwise preclude such activities. They are intended to be seen as pieces of street furniture, providing aesthetic enhancements to the overall streetscape. Parklets secure this space by repurposing on street parking spots. In the place of car parking, a platform is built to bring the grade of the sidewalk out into the street. Once the platform is installed, benches, café tables and chairs, landscaping, and bike parking can all be placed on top in order to provide a welcoming public space along the street. Parklets are sponsored by a private partner (merchant, resident, insti¬tution, etc.) but all amenities on a Parklet must remain free and open for any member of the public to use. 5:00 PM Santa Rosa/Winds or RFP-Design Engineering and Landscape Architecture Services for Highway 101 at Airport Blvd Interchange The County of Sonoma, Dept of Transportation & Public Works, is seeking a licensed firm for design engineering & landscape architecture services for the Highway 101 at Airport Blvd Interchange. The scope of services will include all work necessary to produce final plans, specifications & estimates. bid documents for land scaping improvements acceptable to Caltrans and the County & provide design support services during construction. Page 18 of 44 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 11/3/2014 5:00 PM On-Call and Pre-Qualified Shortlist for Transportation Engineering Services (2015 - 2018) 10/16 @ 2PM at 255 Glacier Dr., Martinez Contra Costa County Engineers # of Plan Estimate Addenda # ONLINE The Contra Costa County Public Works Department is requesting Statements of Qualifications (SOQ) from transportation engineering consultants to: 1. Select firms for “on-call” transportation engineering services; and, 2. Establish a shortlist of transportation engineering firms that the County may contract with for future projects. Each firm should indicate in the cover letter for the SOQ if they would like to be considered for the “on-call” contract, the pre-qualified shortlist for future project specific contracts, or both categorie 11/4/2014 10:00 AM Daly City Jefferson Elementary School Dist Wireless Network Upgrade MAND 10/14 @ 9AM at 101 Lincoln Ave, Daly City ONLINE Project will be implemented in two (2) phases. Phase 1:Work shall include the District Office, Fernado Rivera Intermediate School & Franklin Middle School 10:00 AM Daly City Phase 2: This work shall include Susan B. Anthony Elementary School, Daniel Webster Elementary School, Woodrow Wilson School, M.P Brown School, General Pershing School, West Lake School, M.H. Tobias Elementary, Thomas R. Pollicita School, John F. Kennedy School, Franklin D. Roosevelt School, Thomas Edison School, George Washington School, Garden Village School, Jefferson Elementary and Maintenance and Operations/Central Kitchen. Jefferson Elementary School District-Structured Cabling MAND 10/14 @ 9AM at 101 Lincoln Ave, San Mateo Project shall be implemented in two (2) phases ONLINE Phase 1: This work shall include the District Office, Fernando Rivera Intermediate School & Benjamin Franklin Middle School. Phase 2: This work shall include Susan B. Anthony Elementary School, Daniel Webster Elementary School, Woodrow Wilson School, M.P Brown School, General Pershing School, West Lake School, M.H. Tobias Elementary, Thomas R. Pollicita School, John F. Kennedy School, Franklin D. Roosevelt School, Thomas Edison School, George Washington School, Garden Village School, Jefferson Elementary and Maintenance and Operations/Central Kitchen. 10:00 AM Marin County 10:00 AM Palo Alto 12:00 PM Martinez/Ric hmond MMWD South Pipeline Replacement Project ONLINE Div_02-earthwork, asphaltic concrete paving & resurfacing, cathodic protection magnesium anodes, distribution piping system; Div_03-concrete; Div_09-field applied tape coating systems; Div_18-environmental protection $80000 Gunn Signal and Sidewalk Replacement MAND 10/14 @ 10AM at 780 Arastradero Rd. Palo Alto Removal and installation of a street signal, sidewalk & striping. Associated work includes relocation & reinstallation of pull boxes, conduits, traffic detection loops & signal light related appurtenances ONLINE Complete documents will be posted once available. RFP-Repainting and Recarpeting of Court Facilities Repainting & recarpeting of court facilities Page 19 of 44 MAND 10/21 @ 9AM at 725 Court St., Martinez ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/4/2014 2:00 PM TG12-.2 Overhead Contact System (OCS) Upgrade San Francisco 2:00 PM Stockton 2:00 PM Various Cities 2:00 PM Saratoga Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with Overhead Contact Systems including but not limited to, OCS attachments, structures and integration with the San Francisco Municipal Transportation Agency, and connection to existing Traction Power system, routing and splicing through existing feeder duct banks on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems in the following trade:TG12.2 Overhead Contact System (OCS) Upgrade $1200000 Elevator Alterations Project MAND 10/21 @ 1PM at 5151 Pacific Ave, Stockton The project was reviewed and approved by the Division of State Architect (DSA) and it consists of: Repair and Renovation of 10 elevators including HVAC, fire alarm and hardware upgrades; maintenance of all elevators included in this project during the construction phase and as more specifically defined in the elevator specifications. There is also an additive alternate for an extended (5 year) maintenance contract after the completion of this project but this will not be a part of the basis of award. San Joaquin Delta Community College Regional Specialty Job Order Contract Roofing, Paving, Painting MAND 9/29 @ 1PM, 9/30 @ 1PM & 10/1 @ 1PM Various Locations The California State University, Office of the Chancellor is seeking qualified contractors for the furnishing of all labor, materials, and equipment to implement and administer a Regional Job Order Contract (JOC) for roofing work, qualified contractors for the furnishing of all labor, materials, and equipment to implement and administer a Regional Job Order Contract (JOC) for paving work and qualified contractors for the furnishing of all labor, materials, and equipment to implement and administer a Regional Job Order Contract (JOC) for painting work to be used by campuses within the CSU system. MAND 10/16 @ 3PM Unit J Modernization at Prospect High School ONLINE ONLINE ONLINE • Modernization of existing 'Unit J' to serve as Fine Arts Center • Band, Choir, 2D Art, 3D Art, Stagecraft • Complete demolition and abatement of all interior finishes • Mechanical, Electrical and Plumbing components • Data, Fire Alarm and other low voltage components • Complete Fire Sprinkler System • Outdoor Art Courtyard — with masonry kiln shed 2:00 PM San Jose 2:00 PM Fort Bragg Complete documents will be posted once available NEW Automated Pedestrian Protection Sensor Installation Project Installing county-furnished microwave pedestrian sensors, furnishing & installing pedestrian sensor related cable, furnishing & installing detector lead-in cable, wiring & performing all other improvements 075C Rikti Dalal @ 408-494-1345 MAND 10/21 @ 10AM at 790 S. Franklin St., Fort Bragg Avila Center Carpet Replacement Remove the existing carpet & install new carpeting Page 20 of 44 ONLINE Bid Date Bid Time Location 11/4/2014 2:00 PM Danville Plan Name / Scope of Work Prebid Information NEW Monte Vista High School Increment 1 Bleacher Replacement 10/29 @ 10AM at 3131 Stone Valley Rd., Danville Engineers # of Plan Estimate Addenda # $140000 ONLINE Project - Electrical Package Electrical work •It is the responsibility of all bidders to ascertain prior to bid whether addenda have been issued on the project. •Prequalification is required for this project and applications were to be submitted 10 business days before the date for the opening of bids on the Project (November 4, 2014), which would have been October 21, 2014. A list of currently qualified contractors is posted on San ramon valley Unified School District website and will be updated 5 days before the opening of bid. 2:00 PM Castro Valley Christensen Lane and Lake Chabot Road Sidewalk Improvements in Castro Valley 10/14 @ 10AM $401000 070C Earthwork & concrete removal; installing minor concrete standard curbs & gutters, sidewalks, driveways, pedestrian ramps & a valley gutter; installing class V reinforced concrete pipe, drop inlet with box & manhole with frame & cover; performing pavement milling & asphalt concrete base failure repair; installing pavement reinforcing fabric & asphalt concrete, type A, roadway pavement, adjust utility structures & adjustment of existing manholes; installing thermoplastic traffic stripes, thermoplastic pavement marklings & roadside signs & survey monument preservation 2:00 PM 2:00 PM Antioch Berkeley $235000 ONLINE Mobilization, lines & grades, watering, temporary pavement markers, trench excavation & backfill, sheeting & shoring, water mains, blow-off assemblies, cathodic protection system, miscellaneous iron & steel, traffic stripes & pavement markings $220000 NEW Sanitary Sewer Rehabilitation - Parker Street (Bayer Healthcare 10/28 @ 11AM ONLINE Williamson Ranch Plaza Water Main Replacement Easement) 3:00 PM Sacramento The work to be done consists, in general, of rehabilitation and construction of approximately 963 linear feet of 10-inch diameter sanitary sewer, construction of manholes, manhole rehabilitation, excavation, replacement of approximately 135 linear feet of 4-inch and 6-inch diameter sewer laterals, and related work. Sacramento River Watershed Sanitary Survey 2015 Update 10/16 @ 10AM at 1391-35th Ave, Sacramento The California Code of Regulations, Title 22, Chapter 17 establishes the California Surface Water Treatment Rule (SWTR) which requires that all surface water suppliers conduct a sanitary survey of their watershed(s) at least once every five years. The first of these studies was required to be completed prior to January 1, 1996 or prior to issuance of a Department of Public Health (DPH) permit for a new or expanded surface water treatment facility, whichever comes first. In December 1995, the City and West Sacramento submitted a sanitary survey of the Sacramento River watershed to DPH; in December 2000, the City and West Sacramento submitted the required first update of the sanitary survey to DPH, in April 2006 the City, West Sacramento, EBMUD, and SCWA submitted the required second update of the sanitary survey to DPH, and in December 2010 the City, Roseville, West Sacramento, EBMUD, PCWA, SCWA, and WDCWA submitted the third update of the sanitary survey to DPH. The next update to the sanitary survey is due to the State Water Resources Control Board Division of Drinking Water (State Division of Drinking Water, previously known as DPH), by December 2015. ONLINE Elissa Callman @ 916-808-1424 11/5/2014 10:00 AM San Anselmo MAND 10/23 @ 10AM Elda Drive Tank Coating Project This contract is for preparing surfaces and applying protective coatings to all interior and exterior surfaces of Elda Drive Tank. Page 21 of 44 $245000 ONLINE Bid Date Bid Time Location 11/5/2014 11:00 AM 11:00 AM Lodi San Francisco 12:00 PM Santa Cruz 2:00 PM Sacramento Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $55000 NEW City Hall Boiler Replacement MAND 10/28 @ 10AM The work consists of removing and replacing the existing City Hall boiler and other incidental and related work, all as described in the specifications for the above project. RFP-As-Needed Construction Management Services 10/10 @ 10AM The SFPUC, a department of the City & County of San Francisco, seeks to retain the services of up to four (4) qualified Proposers to provide the SFPUC with AsNeeded Construction Management (CM) Services. The programs/projects that may be served fall under, but are not limited to, the Sewer System Improvement Program (SSIP), Water System Improvement Program (WSIP), Hetchy System Improvement Program (HSIP), Emergency Firefighting Water System (EFWS), Water and Wastewater Repair and Replacement (R&R) Programs and other water, power, and wastewater capital projects. These services may include, but not be limited to, Construction Contract Management, Quality Control Inspection, Quality Assurance Inspection, Green Infrastructure Construction Inspection, Project Controls, Environmental Inspection, Supplier Quality Surveillance, Special Laboratory Testing, Start-Up & Testing Assistance, Surveying, Construction Safety Inspection and Document Control. Alterations to Room 301B JBEB BME Lab MAND 10/23 @ 11:30AM at 1156 Hight St., Barn G, Santa $510000 Cruz Construction of Biomolecular Engineering Instructional Lab in the Baskiin Engineering Building on the UCSC campus ONLINE ONLINE Pending Documents will be posted after 10/21 Supply Shade Structures for North Natomas Regional Park Farmer's Market $200000 ONLINE The work to be performed consists of: Supply and deliver three (3) metal shade structures for the Farmer’s Market at the North Natomas Regional Park in Sacramento at 2501 New Market Drive. Tim Hopper - 916-808-8173 2:00 PM Ceres 2:00 PM Fairfield 2:00 PM Mountain View Mitchell Road Sewer Trunk Line and Lift Station $1100000 Furnishing and Installing 12" thru 30" Sanitary Sewer Pipe, 48" and 60" manholes, connecting to existing sanitary sewer, furnishing and installing lift station pumps and piping and installing a city supplied control panel. Utility Infrastructure Upgrade (Energy) HVAC/EMS Efficiency Project MAND 10/16 @ 2PM at 4000 Suisun Valley Rd, Bldg 100, Asbestos Abatement Fairfield The work under this contract will be in 2 phases. First phase (Buildings 800 & 1500) will be performed during Winter break of 2014 and second phase (Buildings 100, 500, 700, 1400, 1600 & 1700) will be performed during Summer of 2015 which includes, but not limited to, the removal of existing HVAC unit at Building 1600, Dry Wall, TSI/Duct Seam Tape, Lead, Gypsum Board Ceiling, and 2’x4’ false ceiling panels. Demolition, removal, and disposal of all asbestos containing materials detailed in the Asbestos Abatement Specifications for Solano Community College, and as indicated on HMS front end documents, HMS and Kleinfelder reports. All work to be performed is under a single prime contract. $2800000 2012-2013 Miscellaneous Water and Sewer Main Replacements Encouraged 10/16 @ 11AM $3000000 The work to be performed under this contract includes the replacement of water and sanitary sewer mains. Contract work includes abandonment or removal of existing facilities, replacement of new pipelines by both open trench and pipe bursting methods, replacement of water service line and sewer lateral, reconnection to existing pipelines, sidewalk replacement, and doing all other incidental work necessary to complete the projects. Page 22 of 44 ONLINE ONLINE ONLINE Bid Date Bid Time Location 11/5/2014 2:00 PM 2:00 PM 2:00 PM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # Sacramento NEW Walmart #6530-00 New Wal Mart Neighborhood Market. Trades to include demolition, rebar, concrete, burnished concrete finishes, masonry, structural steel, rough carpentry, finish carpentry, casework, FRP, insulation, roofing, sheet metal, joint sealers, D/F/H, storefront, skylights, plaster, drywall & metal studs, tile acoustical ceilings, flooring, painting, pre-fabricated metal canopies, toilets accessories, seismic protection, fire protection, plumbing, HVAC, and electrical. Playground Asphalt Replacement at Meyerholtz Elementary School MAND 10/24 @ 10:30AM at 6990 Melvin Dr., San jose San Jose The project consists of all materials, labor, equipment, and apparatus, whether specifically mentioned or not, necessary to remove old asphalt and complete grading, paving, and INSTALLATION of 18,520 s.f. of new asphalt at Meyerholz Elementary SCHOOL'S playground. MAND 10/28 @ 10AM at 2011 Park Loop Rd, San Ramon $400000 San Ramon NEW Geologic Hazard Abatement District Removal of weeds & debris from all around concrete 1-ditches; weed abatement on hillsides; crack sealing of v-ditches; clean out of subdrain systems; installartion of temporary drainage measures; installartion of erosion control fabric, hydroseed & other erosion control measures; repair of landslides; emetgency stabilization of landslides ONLINE ONLINE ONLINE Robin Bartlett @ 925-973-2683 2:00 PM 2:00 PM 2:00 PM MAND 10/15 @ 1PM at 965 Sonoma Ave, Santa Rosa The City of Santa Rosa is seeking proposals from qualified Contractors for the purchase, of video and audio equipment and required software for the Police Department interview rooms as per the specifications listed herein. The contract will be for a five year period, with one five year renewal option, not exceed a total ten year contract. RFQ-Renewable Energy Cleaning and Maintenance MAND 10/16 @ 9AM at 4300 Llano Rd., Santa Rosa Santa Rosa The City of Santa Rosa desires to contract for solar photovoltaic system maintenance and cleaning in accordance with the terms, conditions and specifications herein. $40000 Watsonville NEW Elkhorn Slough Water System Maintenance MAND 10/28 @ 10AM Contractor shall provide all supplies and materials needed for water sampling, disinfection, residual monitoring, and repairs to the California Department of Fish and Wildlife, Elkhorn Slough Ecological Reserve, Water System No. 2702226, Transient Non-Community Water System, Elkhorn Slough Ecological Reserve, (CDFW,ESER), located at 1700 Elkhorn Road, Watsonville, CA 95076. Santa Rosa RFP-Police Interview Room Video/Audio Equipment and Software Page 23 of 44 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/5/2014 2:00 PM RFQ-Technical Design Services for Zinfandel Complex Project Rancho Cordova Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Rancho Cordova Public Works is soliciting Statement of Qualification (SOQs) from qualified firms for Technical Design Services for the Zinfandel Complex Project. The City intends to significantly improve the operations of the existing Zinfandel Drive/Route 50 interchange, alleviate congestion on the surrounding roadway network, and provide a safer route for vehicles, bicycles and pedestrians. Improvements include the following: • Eastbound Off-Ramp/Zinfandel Drive Improvements- Providing an additional through lane on northbound Zinfandel Drive, modifying the eastbound US50 entrance ramp, modifying the eastbound exit ramp to provide two dedicated right turn lanes, and squaring up the two eastbound entrance ramps to make it bicycle and pedestrian friendly. Consider a two-phase signal and implied geometric improvements. • Zinfandel Drive Overcrossing Improvements – Providing an additional through lane for southbound Zinfandel Drive by widening the existing overcrossing. • Westbound Entrance Ramp – Squaring up the westbound loop entrance ramp to make it bicycle and pedestrian friendly. • Zinfandel Drive/White Rock Road Intersection – Providing an additional northbound through lane, pedestrian improvements, and updated bus turnout. 2:30 PM San Francisco The project will require a full service consultant with the ability to deliver a wide range of services including, but not limited to: project scoping, cost analysis, technical design, environmental clearances, equipment procurement, preparation of plans, specifications and estimates for construction documents, construction bid assistance and construction assistance. $550000 Proposition K Curb Ramps Fiscal Year 2013-2014 10/20 @ 1PM at 1680 Mission St., 3rd Fl, San Francisco ONLINE Curb ramp construction, sewer replacement, traffic routing & striping Amay lam, Proj Mgr, @ 415-437-7048 2:30 PM San Francisco Various Locations Pavement Preservation FY 2014-2015 No. 2 10/22 @ 1PM at 1680 Mission St, 4th Fl, San Francisco $1250000 ONLINE Pavement preservation using type 2 & type 3 micro-surfacing, traffic routing, temporary pavement markings & all associated work. Ramon Kong, Proj Mgr, @ 415-554-8280 3:00 PM Petaluma 3:00 PM San Jose Landscape Maintenance for Landscape Assessment District and City of Petaluma Landscape Areas ONLINE 10/21 @ 10AM at 202 N. McDowell Blvd, Petaluma Landscape maintenance 4:00 PM Merced $270000 Traffic Loop Replacement Services The City of San José hereinafter “City") is soliciting bids from qualified Contractors (hereinafter “Bidder") to provide Traffic Loop Replacement Services including all labor, material, and equipment necessary to perform such services as specified in the bid document scope of work/services. The replacement will be of 37 existing loops at 25 locations with three locatioons being Caltrans off ramps maintained bu the City of San Jose $12500 Entrance Doors Retrofit at Trident Center MAND 10/15 @ 10AM at 777 W. 22nd St., Merced Provide & install replacement entrance doors Page 24 of 44 ONLINE ONLINE Bid Date Bid Time Location 11/5/2014 5:00 PM Richmond 5:00 PM Richmond 11/6/2014 1:30 PM Sacramento Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW As-Needed Carpet Installation/Removal Services The Richmond Housing Authority (RHA) is soliciting proposals from qualified contractors to provide as-needed carpet installation and removal for the properties owned and operated by Richmond Housing Authority. Allison Bolduc - 510-307-8017 NEW RFP for Elevator Maintenance Services The Richmond Housing Authority (RHA) is soliciting proposals from qualified contractors to provide Elevator Maintenance Services for the properties owned and operated by Richmond Housing Authority. The properties include: Hacienda Senior Development | 1300 Roosevelt Avenue| 6 stories high, 2 elevators; Nevin Plaza Senior Development |2400 Nevin Avenue | 7 stories high, 2 elevators Inspection, Maintenance and Repair Services for Automatic Sliding/Swinging Doors at DMV Headquarters Complex MAND 10/23 @ 9AM at 2415 First Ave, Sacramento ONLINE ONLINE ONLINE Inspection, maintenance & non-scheduled repair services for sliding/swinging doors at the DMV Headquarters Complex in Sacramento Julie Phang @ 916-651-2556 1:30 PM Hayward 2:00 PM Roseville 2:00 PM Modesto 2:00 PM Vallejo 2:00 PM Turlock $75000 MAND 10/23 @ 9AM at 2451 W. Tennyson Rd., Hayward Removal and replacement of tennis courts. Existing asphalt surface and base rock be removed and 8” of new compacted base rock, 4” of asphalt and new surfacing material be installed. $375000 Lobby and Staff Lounge Remodel MAND 10/17 @ 10AM at 651 Commerce Dr., Roseville Div_02-demolition; Div_03-concrete; Div_06-rough carpentry, wood veneer-faced cabinets; Div_07-built-up bituminous roofing, joint sealants; Div_08-hollow metal doors & frames, wood doors, aluminum-framed entrances & storefronts, pass windows, door hardware, glazing; Div_09-gypsum board assemblies, acoustical ceilings, resilient flooring, carpeting, painting & coating; Div_10-signage, fire protection specialties; Div_11-kitchen appliances; Div_12-window shades; Div_15-automatic fire protection; Div_22-plumbing & utilities; Div_23-HVAC-Div_26-lighting, electrical Replacement of Tennis Courts at Mt. Eden Park ONLINE ONLINE Knat Holben, Proj Mgr, @ 916-781-4208 10/30 @ 2PM at 461 Mitchell Rd., Modesto Div_02-selective demolition; Div_03-cast-in-place concrete; Div_06-rough carpentry; Div_07-sealants & caulking; Div_09-gyspsum board, resilient wall base, painting; Div_16-ligting, electrical work $115000 Blue Rock Springs Golf Course-Cart Barn Project 10/14 @ 2PM at 555 Santa Clara St., Vallejo Design, plan review process, procurement, fabrication, and construction of a metal building system including all associated ventilation, electrical, signage, doors, and hardware as specified in the plans and specifications NEW Exterior Improvements at Stanislaus Consolidated Fire Station #31 Roland Rojas, Proj Mgr, @ 707-648-4557 $995000 NEW Hawkeye Avenue Rehabilitation This project consist primarily of: grinding of the roadway including wedge grinding and conforming grinding, removing and replacing concrete access ramps to meet ADA, removing various minor concrete to meet ADA access, placing RHMA overlay, raising lids and frames for manholes and valve boxes, thermoplastic traffic striping and installing traffic signal induction detectors. This project is federally funded and all laws applicable to federally funded projects apply. A DBE Goal in the amount of 6.2% has been established for this project. In accordance with SB 854, contractors shall register with the Department of Industrial Relations prior to submitting a bid for this project. Page 25 of 44 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/6/2014 2:00 PM Pump Station Alarm Installation and Monitoring Stockton Prebid Information Engineers # of Plan Estimate Addenda # ONLINE The City of Stockton is seeking bids from qualified vendors to provide alarm installation & monitoring for pump stations for the Municipal Utiulities department. At present, there are 27 sanitary pump stations & 72 storm-water pump stations. Additionally, one (1) is under construction. The selected vendor will be responsible to install alarms & monitor as required i n strict accordance with the bid specifications 2:00 PM 2:00 PM Diane Samples @ 209-937-7130 Optional 10/23 @ 10AM at 670 Del Ganado Rd., San Rafael San Rafael NEW Terra Linda Pool House Renovation Project Earthwork, clearing, water systems, chain link fence. concrete, structural steel, rough carpentry, glued laminayed construction, wood I jists, waterproofing, bldg insulation, slab-on-grade vapor barrier, bldg envelope underlayment, modified membrane roof, flashing & sheet metal, firestopping, joint sealers, access doors & panels, aluminum window walls, door hardware, glazing, gypsum board assemblies, epoxy floor, wood doors, resilient base, fiberglass wall panels, cultured marble panels, paints & coatings, room finish schedule, lockers, fire extinguisher cabinets, window shades, plumbing, fire sprinkler systems, HVAV piping, lighting, electrical Job Order Contract 52, Electrical (C-10 License), San Francisco, 10/9 @ 10AM San Peninsula and East Bay Francisco A Job Order Contract is an indefinite quantity contract pursuant to which the San Francisco Public Utilities Commission may accomplish a series of projects with a single, competitively bid contract awarded before the projects are identified. Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished by issuing task orders to the successful contractor during the two year term of the contract. 021C/R0 ONLINE Regina Du @ 415-554-4335 2:00 PM San Francisco Regional Groundwater Storage and Recovery-WILL NOT BE ONLINE 10/7 @ 10am $47000000 $50000000 178C The objective of the project is to drill, install, and construct 13 groundwater well facilities, including site preparation; clearing/grubbing and grading; various work on existing groundwater wells; building foundations, temporary shoring and retaining walls; new pumps, motors and related appurtenances; ventilation system; trenching and pipeline and conduit construction; cathodic protection system; chemical treatment equipment, tanks and pumping systems; electrical power distribution systems, SCADA and I&C control systems; perimeter security fence; security monitoring and control systems; final grading and drainage; landscape and irrigation systems; sanitary and storm drain piping and connections to municipal systems; paving and various other site improvements; construct approximately 7,100 feet of 8-inch and 12-inch diameter ductile iron water transmission pipeline. The work is to be performed in San Mateo, California. The Engineer's estimate is approximately between $47 to $50 million. The Contract will be awarded to the lowest responsible and responsive bidder. 2:00 PM 2:00 PM 2:00 PM $78038 Sacramento NEW McKinley Park Shade Structure Improvements The work to be performed consists of installing a shade structure over the existing picnic area at McKinley Park in Sacramento at 601 Alhambra Blvd., Sacramento. The improvements will consist of temporary construction fencing, removing and replacing concrete flatwork, furnishing and installing a 30’ X 30’ metal shade structure, installing trash receptacles, trees and turf sod planting, and placement of bark mulch and landscape weed fabric. CIPP Corrosion Rehabilitation Project Los Altos Line approximately 475 lf of existing 30" sewer main in Springer Road with cured-in-place pipe Village Park Restroom Replacement 2014-2015 NEW MAND 10/23 @ 1PM at 1535 California Dr., Burlingane Burlingame Removal of existing wood-framed toilet building & replacement with new concrete masonry unit toilet building consisting of two single occupant toilet rooms, a storage room & utility room Page 26 of 44 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/6/2014 2:00 PM Replacement of Embarcadero Bridge Over Lake Merritt ChannelRebid Oakland Prebid Information Engineers # of Plan Estimate Addenda # MAND 10/6 @ 3:30PM & 10/9 @ 2:30PM at 250 Frank Ogawa Plaza, Oakland The proposed work consists, in general, of the bridge replacement. Said work consists of, but is not limited to, bridge removal, structural excavation and backfill, grading, structural concrete, furnishing and driving cast-in-drilled hole concrete piles, reinforcement steel and miscellaneous metal work, new restroom building, environmental protection, traffic control and other work specifically shown on the plans or included in the specifications and these special ONLINE Nader Rabahat, Proj Mgr, @ 510-238-6605 2:00 PM 2:00 PM Hayward Placerville Pre-Construction Tree Removal, Floodwall Improvements along Line MAND 10/21 @ 10AM at 951 Turner Ct., Rm 301, Hayward D Phase 2 Between Huntwood and Bart Implementing water pollution measures; providing traffic control; removing trees, chipping resulting tree material; stabilizing chipped material stockpile and all miscellaneous work necessary to complete the project HVAC Replacement and Air Balancing Project for Placerville DMV MAND 10/16 @ 10AM at 2919 Cold Springs Rd, Placerville E341B/0 ONLINE Office-Rebid HVAC replacement & air balanxing & electrical work Julie Phang @ 916-651-2556 2:00 PM Los Altos Hills Foothill College Modernization Project 121-Library and Learning Center Renovation (Lease-Leaseback Project) MAND 9/16 @ 11AM and 9/25 @ 11AM The project will be constructed utilizing multiple trade conctracvtors, each working under a separate contract with Kitchell CEM, who is the lease/lease back contractor for the new library moderniation at Foothill College. The Following is a list of varius Trade Bid packages: Trade Bid Package 00 44 01:Demolition Trade Bid Package 00 44 02:Misc Trades Trade Bid Package 00 44 03:Roofing Trade Bid Package 00 44 04:Doors & Hardware Trade Bid Package 00 44 05:Glazing Trade Bid Package 00 44 06:Painting Trade Bid Package 00 44 07:Framing, Insulation & GWB Trade Bid package 00 44 08: Flooring Trade Bid Package 00 44 09:Acoustical Trade Bid Package 00 44 10:Mechanical, Plumbing & Fire Sprinkler Trade Bid Package 00 44 11:Electrical Trade Bid Package 00 44 12:Landscaping NOTE: Bidders must be prequalified to submit a bid to Kitchell. The prequalification application must be submiited to Kitchell by no later than September 30, 2014. Page 27 of 44 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/6/2014 2:00 PM 55 Inch LCD Flat Monitor Signage for Oakland Airport Operations Center Oakland Prebid Information Engineers # of Plan Estimate Addenda # ONLINE The Port of Oakland is soilicting competitive bids to supply the Oakland International Airport with fourteen (14) units of 55 inch LCD flat panel monitor signage of its airport operations center. Kyle Mobley @ 510-563-6588 2:00 PM Oakland The Rehabilitation of Sanitary Sewers in the area bounded by Park Boulevard, Hollywood Avenue, Sunnyhills Road, and Brighton Avenue Voluntary 10/21 @ 11:00 AM at 250 Frank Ogawa Plaza, Oakland $2531165 ONLINE The proposed work consists, in general, of rehabilitating approximately 2,953 linear feet of existing 6” diameter sewer pipes and approximately 13,774 linear feet of existing 8” diameter sewer pipes by pipe-expanding method; rehabilitating sewer structures; reconnecting house connection sewers; rehabilitating house connections sewers, and other related works as indicated on the plans and specifications. David Ng, Proj Mgr, @ 510-238-7267 2:00 PM Oakland The Rehabilitation of Sanitary Sewers at Lakeside Park Pump Station Voluntary 10/21 @ 11:00AM at 250 FRank Ogawa Plaza, $170250 ONLINE Oakland The proposed work consists, in general, of remove of the existing sanitary sewer pumps, excavation, dewatering, shoring and installation of a pre-engineered and pre-fabricated complete pump station system with associated electrical and alarm systems, install precast holding tank, and other items of work state in the Special Provisions and the project plans or as required for a fully functional sanitary sewer pump station. Gunawan Santoso, Proj Mgr, @ 510-238-7260 2:15 PM San Joaquin County 2:30 PM Turlock 3:00 PM San Jose NEW Minor B - Repair Existing Pavement Delineation $281000 Repait existing pavement delineation $960000 NEW Geer Road Rehabilitation This project consist primarily of: grinding of the roadway including wedge grinding and conforming grinding, removing and replacing concrete access ramps to meet ADA, removing various minor concrete to meet ADA access, placing RHMA overlay, raising lids and frames for manholes and valve boxes, thermoplastic traffic striping and installing traffic signal induction detectors. This project is federally funded and all laws applicable to federally funded projects apply. A DBE Goal in the amount of 8.7% has been established for this project. In accordance with SB 854, contractors shall register with the Department of Industrial Relations prior to submitting a bid for this project 7405-Public Works General Engineering Contract for Sewer Repairs 2013-2015 (Contract III) ONLINE ONLINE ONLINE Clearing & grubbing, watering, aggregate subbases, aggregate bases, deep lift asphalt base, asphalt concrete, concrete curbs & sidewalks, monuments, traffic stripes & pavement markings, signals, lighting & electrical systems, asphaltic emuslions, pipe & structures, trench excavation, bedding & backfill, pipe installation, pipeline structures, acceptance tests for sanitary sewers, cleaning pipelines, sanitary sewer rehabilitation, manhole reheabilitation Lorimer Ancheta, Proj Mgr, @ 408-975-7398 3:00 PM San Jose ONLINE 7753-On-Call CCTV Inspection FY 2014-2016 Mobilization, traffic control, drainage & sewer facilities, television inspection, cleaning pipelines, plugging & diversion of sewage flow Page 28 of 44 Bid Date Bid Time Location 11/7/2014 10:00 AM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW State of Good Repair Bus Stop Improvements 10/20 @ 1PM at 3501 Civic Center Dr., San Rafael Mill Valley/Ross, San Rafael/Novat o Temporary traffic control, water pollution control, landscape, aggregate base, hot mix asphalt, signage, wood & plastic lumber structures, concrete curbs & sidewalks, painting ONLINE Kristin MacDonald @ 209-370-1908 2:00 PM San Francisco Design Build Services for New Boarding Area B Reconstruction Project and Terminal 1 Center Renovation Project 10/20 @ 9:30AM ONLINE Design Build Services for the programming, design and construction for the redevelopment of Terminal 1 Center Renovation Project and of New Boarding Area B Reconstruction Project. Reuben Hailii, Contracts Mgr, @ 650-821-7803 2:00 PM San Francisco 2015 Prequalification for SFUSD Projects Eligible for State Funding 10/9 @ 3PM at 135 Van Ness Ave, San Francisco ONLINE The San Francisco Unified School Dist is prequalifying general contractors,, mechanical, electrical, plumbing, fire protection & underground pipeline subcontractors to bid on state-funding eligible projects 2:00 PM Modesto 2:00 PM Stockton 2:30 PM Visalia 4:00 PM San Jose 5:00 PM San Francisco NEW Traffic Counting Services for Signal Re-Timing in the Downtown The City of Modesto is soliciting requests for proposals for traffic data collection services at all signalized intersections in the downtown area. Demolition of Partially Built Single Family Residence 10/24 @ 10AM at 1444 N. Chrocicle Ave, Stockton San Joaquin County is seeking qualified vendors for the demoltion of a fire-damaged, partially built single family residence. The structure is being ordered demolished as a public nuisance. RFB-14-15-36 Recreation Park Stadium Lighting Project, Phase 2 10/28/14 @ 9amMAND 10/30/14 @ 9am Recreation Park Stadim Lighting Project, Phase 2...This project requires the Contractor to have a Class A or combination of Class C licenses to perform all aspects of work. RFP-Design Engineering Consultant Services for Charcot Ave Extension over I-880 The City of San Jose's Department of Transportation is seeking qualified consultant engineering firms or Partnering Organizations to provide transportation planning and engineering services related to the preparation of scoping, environmental studies, project reports, plans, specifications and estimate for the Charcot Avenue Extension Over I-880. RFP-Parking Garage Management at 1650 Mission Street 10/22 @ 10AM at 25 Van Ness Ave, Ste 70, San Francisco ONLINE ONLINE Online ONLINE ONLINE Manage the complete Parking Lot Operation at 1650 Mission Street Parking Garage. The current lot has 105 parking stalls. 11/10/2014 10:00 AM Tracy NEW Landscape, Parks and Channelways Maintenance 10/23 @ 9AM The general scope of services includes approximately 226 acres of landscape, including turf, shrubs, groundcover & spacialized maintenance services for streetscapes, medians, channelways & LMD parks Page 29 of 44 ONLINE Bid Date Bid Time Location 11/10/2014 11:30 PM 2:00 PM 2:00 PM 2:00 PM Cotati Concord Mountain View San Francisco Plan Name / Scope of Work Prebid Information NEW 2014 Pavement Maintenance Project Digout, crack seal, slurry seal & associated re-striping NEW Farm Bureau Road Safe Routes to School Project Engineers # of Plan Estimate Addenda # MAND 10/27 @ 10AM at 1435 Gasoline Alley, Concord $490000 E343B $800000 $850000 ONLINE The work to be done in general consists of mobilization, traffic control, storm water pollution control, open trench construction of storm drain, street pavement, concrete curb and gutter construction, concrete sidewalk construction, concrete ADA ramp construction, tree removal, potholing of existing utilities, traffic striping and markings, street lighting and landscape and irrigation construction and all other work as shown on the Plans and as specified in the Special Provisions. Light Rail Efficiency Project:Mountain View Phase 2 9/24 @ 10AM at 3331 N. First St., Bldg A, San Jose The project will add a second light rail track over a distance of approximately 3,000 feet, including closure & removal of the existing Evelyn Light Rail Station, installation of light rail support systems & modeification to the municipal drain system University Park-North Garden Apartment Building #1,3,4,5&10 MAND 10/13 @ 10AM at 1600 Holloway Ave, Room 200 Asbestos Aba - CANCELLED Capital Planning & Construction, San Francisco Work consists of all labor and materials necessary to remove and dispose of asbestos-containing thermal system insulation from piping systems within the crawl spaces of Apartment Buildings #1, 3, 4, 5 & 10 at University Park North on campus. Work also includes the removal & disposal of all asbestos debris, all foreign matter, all insulation remnants existing on the surfaces of the “rat slab,” concrete footings and wood framing members throughout the crawl spaces in accordance with plans and specifications prepared by WSR Architects E824B/0 Pending Compete bid documents will be posted once available 11/11/2014 1:00 PM 1:00 PM 10:00 AM Sacramento $2000000 10/28 @ 3PM The Contractor shall furnish all supervision, labor, materials, equipment and incidentals necessary to accomplish the work in accordance with the Contract. The work generally consists of various landscape design and construction, road/area grading, walkway paving and repairs, retaining walls, and associated work to support the tasks to be performed at SMUD’s various facilities during normal business hours. Landscape and Engineering Services Phleacia Christopher @ 916-732-5262 10/28 @ 3PM Sacramento NEW Landscaping and Engineering Services (3 Years) Perform various landscape design and construction, road / area grading, walkway paving and repairs, retaining walls and associated work to support tasks to be performed at SMUD's various facilities during normal business hours. Greenfield ONLINE ONLINE ONLINE Magnolia Place Senior Apartments Construction of a 32-unit, 26,220 SF building complete with architectural, civil, electrical, landscaping, plumbing, mechanical & structural trades. Page 30 of 44 Bid Date Bid Time Location 11/11/2014 2:00 PM Vallejo Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW JOC.14/15PW.CMA - Job Order Contract MAND 10/28 @ 2PM This Notice to Contractors is for the award of up to three (3) Job Order Contracts (JOC). A JOC is a competitively bid, firm fixed priced, indefinite quantity contract. The scope of work includes a collection of detailed repair and construction tasks and specifications that have established unit prices. It is placed with the “Contractor” for the accomplishment of repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure, buildings, structures, or other real property. Work is accomplished by means of issuance of individual job orders against the JOC. Under the JOC concept, the Contractor furnishes all management, documentation, labor, materials, and equipment needed to perform the work. A JOC awarded under this solicitation will have a minimum value of $50,000.00 and a maximum value of $1,000,000.00, with one option to extend the maximum value of work that can be ordered during the term or the contract by two hundred and fifty thousand dollars ($250,000.00). Options will be extended by mutual consent of both parties, California Maritime Academy and the JOC Contractor. ONLINE Additional Documents will be available at the mandatory walk 3:00 PM Palo Alto 11/12/2014 1:00 PM Capitola Pre-proposal Teleconference 10/7 @ 1:30PM The City of Palo Alto is seeking proposals from qualified firms to provide services to launch integrated programs to reduce traffic and parking demand in the Downtown core, and is also seeking to more effectively optimize and manage its existing parking supply. Important City goals include providing improved access to information on parking and transportation within the Downtown, and helping motorists to find available parking quickly and efficiently. RFP-Parking Wayfinding NEW Cable Plant and Hardware, Conduit Pathway and Network ONLINE ONLINE MAND 10/29 @ 1PM at 620 Monterey Ave, Capitola Electronics at Four of the District's School Campuses 1:30 PM 11:00 AM Castro Valley/Alam o Oakland Network infrastructure including but not limited to internal connections of cabling, network electronics, servers, installation of four schools in the district $3000000 Eden Reservoir Replacement and Round Hill Reservoir 10/20 @ 9:30AM 002C/B6 $4000000 Rehabilitation Work includes: 1) At Eden Reservoir: Perform earthwork; install District-furnished 0.28 million gallon bolted steel temporary tank, foundation, related piping, and appurtenances; demolish existing 1.6-MG welded steel Eden Reservoir including the exterior wooden architectural screen; construct two, 0.45 million gallon welded steel reservoirs with aluminum geodesic dome roofs, foundations, piping, valve structures, coatings, and appurtenances; disassemble and store 0.28 million gallon bolted steel temporary tank, restore temporary tank site, pave reservoir site, install irrigation and landscaping, install fencing and perform related work as specified in the Contract Documents at Eden Reservoir, located near the intersection of Coolidge Court and Summerglen Place in Castro Valley (Unincorporated Alameda County), California. 2) At Round Hill Reservoir: Construct radio communication towers and related cable and conduit; perform earthwork; provide and install 0.16 million gallon bolted steel temporary tank, foundation, piping, and appurtenances; remove exterior wooden architectural screen from existing Round Hill Reservoir; abrasive blast and recoat tank interior; low-pressure water clean, prime and top coat tank exterior; disassemble and store 0.16 million gallon bolted steel temporary tank, pave reservoir site, install fencing; and perform related work as specified in the Contract Documents at Round Hill Reservoir, located between 574 and 582 Oakshire Place in Alamo (Unincorporated Contra Costa County), California. 3) At Hink No. 2 Reservoir: Disassemble 0.28-MG bolted steel temporary tank, deliver to Eden Reservoir, remove and replace fencing, restore site, and perform related work as specified in the Contract Documents at Hink No. 2 Reservoir located at the end of Vista Bella Drive, Lafayette, California. Renovation of 3824 West St., Oakland NEW Voluntary 10/23 @ 10AM at 250 Frank Ogawa Plaza, 4th Fl, $196000 Oakland Rrenovation of a two story single family home built in 1915 at 3824 West St. in Oakland, including selective demolition; cast-in-place concrete; metal fabrications; miscellaneous rough carpentry; wood decking; finish carpentry; solid surface paneling; Div_07-thermal insulation; weather barriers; wood shingles & shake siding; joint sealants; residential doors; wood window repair; vinyl windows; door hardware; glazing; fixed louvers, wall vents; gypsum board; tile; resilient flooring, painting; toilet accessories; residential cabinetry; plumbing; bathroom exhaust fans, electrical; exterior improvements Page 31 of 44 ONLINE Bid Date Bid Time Location 11/12/2014 2:00 AM 2:00 PM Sausalito Rohnert Park Plan Name / Scope of Work Prebid Information NEW Miscellaneous Upgrades Project This project consists of 6 tasks: 1.Exterior painting of several small buildings. 2.Structural improvements to foundation supports. 3.Replacement of 4 air relief valves on the District’s sewer force main. 4.Collector system modifications to two sewer sediment tanks. 5.One sewer pump replacement. 6.Modifications to a pump station wet well. NEW A&F Salazar Hall Offices Engineers # of Plan Estimate Addenda # MAND 11/4 @ 10AM at 1 East Road, Sausalito $205000 ONLINE 10/29 @ 3PM $130000 ONLINE Perfom tenant improvments & construct offices in Admin & Finance at Sonoma State University, including demolition, storefront, doors & hardware, painting, partitions, ceilings, dlooring, HVAC, lighting, electrical 2:00 PM San Jose 2:00 PM San Francisco $28000 NEW New 2014 Godwin 4" and 6" Pumps Modifications The City of San Jose is seeking quotes from qualified vendors to modify new 2014 Godwin CD150M and CD103M model Pumps for the Public Works Department as described in the Specification. NEW Moving and Storage Services San Francisco Unified School District ONLINE ONLINE Moving & storage services 2:00 PM Alameda County 10/22 @ 9:30AM at 951 Turner Ct., Rm 230, Hayward On-Call Utility Potholing at Various Locations E839B/0 Prospecting & psoitively locating (both horizontally & vertically) various underground utility lines by "non-destructuve vacuum excavation," providing tarffic control; restoration of disturbed roadway pavement; cleaning site & miscellnaeous work; furnishing all labor, material, tools, equipment, mechanical workmanship, transportation & services necessary to be done in order to perform a complete job. 2:00 PM Dublin NEW Santa Rita Jail Asphalt Re-Paving Service Road Remove cattle grate & designated roadway areas of failed asphalt; perform off-haul all materials & drbris for recylcing; clean & prepare all cracks1/4 or wider & fill with hot rubberized crack filler; scarify re-grade & compact base materials in areas identified in jint scope meeting; supply & install 2" ofd new compacted asphalt concrete. ONLINE THIS IS A SUBCONTRACTING OPPORTUNITY to work for Agbayani Construction under Alameda County's Job Order Contract (JOC)program. For details regarding this job please contact Micheal Schalchi 650.994.9380 or via email at [email protected]. Alameda County ECOP requirements apply. 2:00 PM 2:00 PM Dublin Napa NEW Santa Rita Jail Water Tank Paint Job Prepare & paint exterior of 1 million gallon metal water tank 93' across & 20' high utilizing specifications as provided by Kelly Moore. THIS IS A SUBCONTRACTING OPPORTUNITY to work for Agbayani Construction under Alameda County's Job Order Contract (JOC)program. For details regarding this job please contact Micheal Schalchi 650.994.9380 or via email at [email protected]. Alameda County ECOP requirements apply. $500000 Fire Alarm and Fire Pump Testing MAND 10/31 @ 9AM at 2100 Napa Valley Hwy, Napa The department is seeking bids for a contractor to perform Fire Alarm and Fire Pump Testing Services to the Department of State Hospitals—Napa (DSH-Napa) Page 32 of 44 ONLINE ONLINE Bid Date Bid Time Location 11/12/2014 2:30 PM San Francisco Plan Name / Scope of Work Prebid Information NEW Ocean Avenue and Persia Avenue Pavement Renovation and Sewer Engineers # of Plan Estimate Addenda # 10/24 @ 1:30 PM at 1680 MIssion St., 4th Fl, San Francisco $3000000 ONLINE Replacement Pavement renovation, TEP b ulbout & curb ramp construction, sewer replacement, water support work, traffic signal & streetlight support work, traffic routing & all associated work. 2:30 PM San Francisco Ramon Kong, Proj Mgr, @ 415-554-8280 NEW Pavement Renovation and Sewer Replacement Cresent and Husdon ONLINE 10/30 @ 2PM at 1680 Mission St., 3rd Fl, san Francisco Avenues Demolition, pavement renovation, sewer replacement & drainage work, curb ramp construction, traffic routing Ramon Kong, Proj Mgr, @ 415-554-8280 3:00 PM Sunnyvale NEW Fire Station Roll Up Door Replacement Optional 11/4 @ 10:30AM at 171 N. Mathilda Ave, Sunnyvale ONLINE MAND 10/22 @ 10AM at 12345 El Monte Rd., Bldg D160, Los Altos Hill ONLINE Replacing eleven (11) roll-up doors at three fire stations in the City of Sunnyvale 3:00 PM Los Altos Smithwick Theater Hardware Improvements-Foothill College 3:00 PM Petaluma Victoria Lift Station Upgrades 3:00 PM Stockton 4:00 PM Atherton Div_08-wood doors, FRP doors, door hardware; Div_09-painting MAND 11/04/14 @ 10:00 am The WORK includes: Modifications to the existing pump station including but not limited to the following: forcemain tie-in, dry pit valve replacement, removal and replacement of submersible pumps, wet well top replacements, electrical equipment, controls and instrumentation, bypass pumping during construction, site work, and related work as shown in the Contract Documents. Work also includes electrical improvements at the La Cresta Water Tanks for SCADA upgrades .. BNSF/Port of Stockton Navy Drive BNSF Underpass Project MAND 10/15 @ 10AM at 2201 W. Washington St., Stockton Water pollution control, earthwork, erosion control, subbases & bases, hot mix asphalt, concrete pavement, piling, concrete structures, waterproofing, steel structures, painting, pumping equipment & controls, miscellaneous metal, fences ONLINE ONLINE ONLINE NEW RFP for Phase 1-El Camino Real Safety and Lane Reduction Traffic Study The Town of Atherton intends to retain a qualified professional engineering consultant to provide traffic engineering services required to prepare a traffic study for the Atherton-El Camino Real Lane Reduction Study 11/13/2014 1:00 PM Daly City 10/30/14 @ 11:00 am at site Extension of Westlake Warehouse $150000 $220000 Design and construction of a pre-fabricated warehouse as detailed in the plans and specifications; including but not limited to: Construct warehouse foundation based on soils report recently completed; construct warehouse, coordinate with City's Inspector to design and construct an extension of the fire sprinklers; installation of a ramp, installation of electrical equipment and acquire all necessary permits and any other work required for acomplete and fully functional warehouse. Page 33 of 44 ONLINE Bid Date Bid Time Location 11/13/2014 11:00 AM 2:00 PM 2:00 PM Lodi San Francisco San Francisco Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $152000 NEW Northern Plume Monitoring Well Installation Project The work consists of installing a nested groundwater monitoring well at location as shown on the vicinity map in the project specifications. Contractor will be required to obtain all permits associated with monitoring well construction and will include a California-licensed Professional Geologist or Engineer. The work includes collecting groundwater samples and procuring analyses from a State certified lab as outlined in the project specifications. This project is being completed under the regulatory oversight of the California Regional Water Quality Control Board, Central Valley Region (RWQCB). The monitoring well shall be constructed in accordance with California and San Joaquin County Well Standards. The well shall be constructed as a nested monitoring well. TG08.3-Skylights Highly Rncouraged 8/21 @ 2PM Webcor/Obayashi Joint Venture issues this Request for Proposals (RFP) for the Skylights Package for the Transbay Transit Center Project from firms (Trade Subcontractors) with expertise in Design, fabrication and installation of skylights. The successful Proposer must demonstrate experience in its respective field as outlined within this RFP. Job Order Contract 53, Electrical (C-10 License), San Francisco, 10/9 @ 10AM ONLINE ONLINE ONLINE Peninsula and East Bay A Job Order Contract is an indefinite quantity contract pursuant to which the San Francisco Public Utilities Commission may accomplish a series of projects with a single, competitively bid contract awarded before the projects are identified. Contractors bid an adjustment factor to pre-set unit prices. Work is accomplished by issuing task orders to the successful contractor during the two year term of the contract. Mindy Lee @ 415-554-3136 2:00 PM 2:00 PM 2:00 PM 2:00 PM 2:00 PM Sacramento NEW Access Barrier Removal Only - Automatic Door Opener & Push Plates MAND 10/23/14 @ 10:30 at 1501 Capitol Mall, Sacramento Major components of Project Work consist of: Minor demolition, door operator, push plates, signage, new fire rated door, electrical and related work. Replace Drinking Water Fountains Public Utilities Commission MAND 10/29 @ 10:30AM at 505 Van Ness Ave, Rm 2012, San Building 418 San Francisco Francisco The Contractor shall provide all labor, equipment and materials required to remove, dispose of and re-install new drinking water fountains and water chiller units for the drinking fountains. $1800000 HVAC Infrastructure Renovation @ Cosumnes River College 10/8 @ 11AM Sacramento Procure and install HVAC equipment and infrastructure CRC HVAC Infrastructure Renovation 10/8 @ 11am Sacramento Procurement and installation of HVAC equipment and infrastructure. 10/27 @ 10AM at 100 Gregory Ln, Pleasant Hill Pleasant Hill NEW RFP for Golf Club Road/Old Quarry Road Improvement Project Design Services City of Pleasant Hill is soliciting proposals to perform survey, engineering, design, and right of way services for the Golf Club Road/Old Quarry Road Improvement Project. The project intends to implement "complete street" elements along Golf Club Road and Old Quarry Road near the Diablo Valley College campus, including two new traffic signals, potential roundabout, sidewalk, bike lanes, LED street lighting, and landscaping. Page 34 of 44 ONLINE ONLINE ONLINE Online ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/13/2014 2:00 PM Janitorial Services for the Los Gatos DMV Field Office 2:00 PM 2:00 PM 2:00 PM 2:00 PM 2:30 PM 3:00 PM Los Gatos Prebid Information Engineers # of Plan Estimate Addenda # Optional 10/22 $ 8AM at 600 N Santa Cruz Ave, Los Gatos Contractor agrees to provide the Dept of Motor Vehicles all labor, tools, materials, equipment & travel necessary to perform janitorial services at the Los Gatos DMV. Kary Ride @ 916-651-2555 MAND 11/6 @ 9AM at 860 Chanticleer Way, Healdsburg Healdsburg NEW Villa Annex Restroom Upgrade Div_02-selective demolition; Div_06-miscellaneous rough carpentry, interior arch woodwork, platic paneling; Div-07-penetration firestopping, joint sealants; Div08-flush wood doors, door hardware; Div-09-gypsum board, resilient base & accessories, resilient sheet flooring, interior painting; Div-10-panel signage, toilet compartments, toilet accessories; Div_22-plumbing; Div-26-electrical $128000 NEW Operations Equipment and Storage Facilities 11/3 @ 9AM Antioch Concrete; metal fabrications; rough carpentry; joint sealants; painting & protective coatings, insulated metal wall panels, pipe & pipe fittings; electrical Construct Communications Towers & Vaults MAND 10/23/14 @ 10:00 am at 995 Fir Street, Chico Colby Mountain Major components of Project Work consist of: Labor, material and services necessary for construction of a new telecommunication tower and supporting infrastructure at an existing tower site in Tehama County. Work includes transporting, erecting and installing owner furnished premanufactured 120' tower from West Sacramento to Colby Mountain. Tower is a self-supporting, 4 legged metal improvement. Foundations, separate generator building with emergency backup generator, photovoltaic panel field, propane fuel system, and electrical utilities are also a part. Selective demolition of existing towers, vault and infrastructure identified will be delayed until construction is complete. Zarah at Roseville Galleria Roseville Shell work for proposed tenant improvemnt. Trades to include: demolition, concrete, rebar, masonry, structural steel, insulation, caulking, drywall/metal framing, ceramic tile, painting and electrical. $820000 San Mateo NEW Memorial Park Water Treatment Improvement Project Encouraged 11/4 @ 2:30PM County Mobilization, maintaining traffic, clearing & grubbing, erosion & sediment control, temporary silt fence, temporary erosion control, asphalt concrete, aspahltic emulsion, liquid asphalt, fences, cosntruction staking & layout, water pollutuion control, PVC pressure pipe, miscellaneous piping, valves, fittings & appurtenances, pressure pipeline testing & disinfection, utility trenching, potholing, pump station, water treatment plant tanks, cast-in-place concrete, domestic water tanks, ductile iron fittings, polywrap, protective coating, electrical, demolition Lot Street Light System Repairs and Installation MAND 10/28 @ 10AM at 231 N Whisman Rd., Mountain Mountain View View Install ten (10) street light poles & street lights & ten (10) concrete footing in various locations throughout the City of Mountain View. 11/14/2014 10:00 AM Palo Alto 10:15 AM Palo Alto NEW Corporation Yard Fire Alarm Replacement MAND 11/4 @ 10am at Churchill Ave, Bldg D, Palo Alto The removal of all existing fire alarm equipment & furnishing & installing new fire alarm system $82000 Complete documents will be posted once available NEW Relocation and Modification of Modular Building Corporation Yard MAND 11/4 @ 1PM at 25 Churchill Ave, Bldg D, Palo Alto $115000 Work includes but is not limited to:new interior walls, roofing, lighting, data/phones, wall framing, drywall, tack board, cabinets, plumbing, electrical, modification of existing HVAC system, lighting, alarm systems, cabinet, flooring Page 35 of 44 ONLINE ONLINE ONLINE ONLINE ONLINE ONLINE ONLINE Pending ONLINE Bid Date Bid Time Location 11/14/2014 2:00 PM 2:00 PM 2:00 PM 3:00 PM 3:00 PM 5:00 PM 11/17/2014 2:00 PM 2:00 PM Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # $450000 NEW RFQ for Phase 1-Staff Facilities Locker Room The Carmel Area Water District is seeking qualified construction/building contractor or firm with the expertise, successful project history & current capability to ensure successful construction of a new staff facilities locker room. Richmond Parkway Interconnect Wire and Pullbox Replacement MAND 10/24 @ 1PM at 440 Civic Center Plaza, Richmond $300000 Richmond Removal and installation of 275 (200 Base Bid + 75 Alternate) newtraffic rated boxes and construction of reinforced concrete pads around the boxes in accordanceto City Standards, removal of asphalt concrete and concrete sidewalk as required, and thecomplete re-wire of the traffic signal interconnect system along the Richmond Parkway (BaseBid) from San Pablo Avenue to I-580 and Castro Street (Alternate Bid). (See Plans Attached),and for all other work, items or details not mentioned above that are required by the Drawings,Standard Specifications, or these Special Avaya Telecom Switch Maintenance Sacramento NEW Sacramento State is seeking an AVAYA Platinum certified partner to provide maintenance service for the University’s existing AVAYA Telecom Switch system. The service shall be AVAYA Hardware Support, Support Advantage, Upgrade Advantage and Terminal Coverage. All bidders must be an AVAYA certified at the Platinum level to resell AVAYA Direct Maintenance and Support at the time of submitting this Invitation for Bid B140006 to the University. All bids shall be for 100% delivered AVAYA Services only. NEW Commons at Folsom - Assisted Living Facility (No GC Openings) Folsom Construct a two-story residential health-care assisted living facility and related site improvements consisting of 91 units total in the assisted living facility, 19 units in the Memory Care, +/- 3,000 SF of dining and living spaces and associated therapy areas, food service and offices. RFP-Prefabricated Modular Data Center 10/17 @ 9AM Sacramento The Request for Proposal (RFP) is not an order. The purpose of this Request for Proposal (RFP) is to purcahse a Prefrabricated Modular Data Center Container as described in the attached detailed statement of work, equipment list, and technical requirements sections. Oro Loma Project NEW Mountain View The project consists of 8 buildings / 28 Townhomes / 2 accessible lots 11 & 4 with associated on site and off site work. The project will be constructed in one phase. Construction will begin January 15, 2015. ONLINE Los Altos Annual Concrete Repair ONLINE Performing concrete curb, gutter, driveway & sidewalk repairs; pruning existing tree roots; installing city-standard cast-iron truncated domes; installing root barrier & replacing existing asphalt concrete patches & patching existinf AC after completion of the installation of new concrete gutters, curbs & sidewalks alongside the concrete improvements SFO-Design Build Services for Long Term Parking Garage No. 2 10/10 @ 10AM ONLINE Carmel San Francisco Project The Long-Term Parking Garage No. 2 Project consists of the programming, design, and construction of one or more multi-level above-ground parking structure(s) within the Airport's Lot DD in order to increase on-Airport long-term parking capacity by a net 3,000 parking spaces. Tasso Mavroudis, Contracts Mgr, @ 650-821-7758 Page 36 of 44 ONLINE ONLINE ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 11/17/2014 3:00 PM RFP-State Route 84 Widening from Pigeon Pass ro Interstate 680 Project Approval and Envirnmental Documents (PA&ED) Phase 10/14 @ 1PM at 1111 Broadway, Stew 800, Oakland Fremont Engineers # of Plan Estimate Addenda # ONLINE The Alameda County of Transportation Commission is seekinmg proposals to provide professional engineering services for the project approval & environmental document phase of the State Route 84 Widening from Pigeon Pass to Interstate 680 Joan Fisher @ 510-208-7466 4:00 PM 11/18/2014 10:00 AM 2:00 PM Sacramento Concord Fremont 10/29 @ 2PM at 915 I st., Rm 2000, Sacramento This Auburn Boulevard Bridge is located in North Sacramento where Auburn Boulevard crosses Arcade Creek just east of Winding Way and west of Park Road and the I-80 ramps. The existing structure was constructed in 1927 and widened in 1965. In its current condition, the structure has spalling at the girders and bents and insufficient deck width to provide the City with standard lane widths and bike lanes. The existing structure is located within 150’ of the Winding Way intersection which does not have ADA compliant ramps or crossing facilities. This project will require work within the County of Sacramento. Close coordination, input, and approval, from County reviewers will be required during preliminary engineering and design of project improvements.This project will seek to replace the existing structurally deficient and functionally obsolete bridge. The new bridge will be a structure that provides a minimum of five 12’ lanes, two 6’ bike lanes, a raised median, and two 6’ sidewalks. The proposed project has the potential to impact the current configuration of the Auburn Boulevard/Winding Way signalized intersection. During the preliminary engineering and development of the Project Report, the necessity and alternatives for modifications to the intersection must be investigated. ONLINE NEW Bollman WTP Sodium Hypochlorite Tank T-46 Repair Project 10/30 @ 10AM at 2015 Bates Ave, Concord The Work includes supply, erection, and removal of scaffolding; the supply, erection, operation, and removal of an environment control (ventilation) system and lighting for activities inside the tank; the supply, erection, operation, and removal of an abrasive and dust containment enclosure; pressure washing of interior surfaces and removal and disposal of all wash water rinsate; removal of existing resin lining; removal and proper disposal of debris materials; welding steel plates as patches over pits and corroded areas on the tank interior as directed; repair of the hole in the tank wall by welding steel plates on the tank interior and exterior; preparation of surfaces for new coatings; application and curing of multiple layers of new vinyl ester resin lining system; replacement of flanges, hardware, and gaskets on the four nozzles on the bottom of the tank; furnishing emergency rescue services while personnel are working inside the tank; reconnection of all inlet, outlet, and drain piping; hydrostatic test of tank for leakage; and supplying tools, materials, and appurtenant equipment as required for a complete rehabilitation of Sodium Hypochlorite Tank T-46. The Work also includes supply, erection and removal of scaffolding, the supply, erection, operation, and removal of an environment control (ventilation) system and lighting for inspection activities inside each tank, and furnishing emergency rescue services while personnel are inside each tank to facilitate the inspection of the two other sodium hypochlorite tanks T-44 and T-45. NEW Warm Springs Extension Wetland Mitigation Site 10/28 @ 11AM The Work of this Contract includes furnishing all labor, equipment, materials (except for District-furnished plants and cuttings), and services to construct a wetland mitigation site adjacent to the Warm Springs Extension trackway in the City of Fremont, California. The Work includes but is not limited to the following: 1. Mobilization, construction staging, temporary fences and barricades, demolition, clearing and grubbing, grading, earthwork, and Jobsite maintenance during construction. 2. Modifications to existing Alameda County Flood Control and Water Conservation District (ACFCD) drainage facilities. 3. Temporary drainage diversions. 4. Planting of District-furnished plants and cuttings. 5. Irrigation. 6. Fencing, gates, and signage. 7. Minor concrete facilities E345B/0 Auburn Boulevard at Arcade Creek Bridge Replacement Project Page 37 of 44 ONLINE Engineers # of Plan Estimate Addenda # Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 11/18/2014 2:00 PM Various Cities BART Earthquake Safety Programs Seismic Retrofit and Repairs at Various Locations 10/3 @ 10AM at at 300 Lakeside Drive, Oakland 2:00 PM Santa Cruz Div_02-preservation & restoration, selective structure demolition; Div_03-concrete; Div_04-unit masonry restoration; Div-05-metal welding, metal fabrications; Div_06-rough carpentry; Div_07-modified bituminous sheet waterproofing; Div_09-cutting & patching; Div_20-restoration of facility services, raceways for facility services; Div_26-lighting, electrical; Div_32-pavement markings, plant irrigation, planting $350000 Wastewater Treatment Facility Digester # 4 Cleaning MAND 11/5/14 @ 11am Full service removal and disposal of all liquids and solids from Digester # 4 and wash down of interior. Digester # 4 is 95' inside diameter at a depth of 31 feet. The City will reduce the amount of material to approximately 18.5' just above the upper draw off line. The Contractor shall break the seal. The amount of material the Contractor shall remove is approximatley 994,000 gallons. 2:00 PM $2444000 San Ramon NEW I-680 Auxiliary Lanes, Segment 2, Landscape Project & Danville Install highway planting & irrigation systems Plaza San Pablo Roadway Improvements Project Phases 1 and 2 NEW San Pablo Demolition of existing concrete sidewalk, curb & gutter, AC pavement & select utilities; installation of new underground utilities, storm drain piping & inlets, sanitary sewer main pipe & sanitary sewer manhole, fine grading & placement of baserock, concrete sidewalk, curb & gutter, AC pavement, ADA ramps, signage & striping, bio-swales, landscaping & planting & irrigation system; construction of a water fountain & installation of street lighting & traffic signals TG07.9 Bollards & Barriers 8/27 @ 2PM at 175 Beale St., San Francisco San Francisco Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with designing, furnishing and installing bollards, wedge barriers, impact attenuators, hydraulic power units, controls and piping, and integration with safety and security systems on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems. $80000 Replace Glass Panels at Daly City Station Platform Daly City 10/29/14 @ 10AM at 300 Lakeside Dr., Oakland 2:00 PM 2:00 PM 2:00 PM $1100000 $1500000 S009/01 Online O E344B/0 ONLINE ONLINE ONLINE $100000 Contractor shall provide all labor, equipment, materials & services required for replacing non-tempered glass panels with tempered glass at the platform level at the BART Daly City Station Anita Maynar @ 510-464-6543 Complete documents will be posted once available 2:00 PM Cupertino 2:00 PM Alameda 2:00 PM San Francisco NEW Quinlan Community Center Interior Upgrades 11/4 @ 2PM at 10185 N. Stelling Rd., Cupertino Interior finishes upgrade to the existing Quinlan Community Center Building NEW Storm Drain Video Inspection and Cleaning Phase I Work consists of cleaning and video inspection of storm drains using CCTV, including proper logging of storm drain video inspection reports. Digital CCTV data acquisition software program shall be Granite XP. $900000 TG07.8 Expansion Joints 9/3 @ 2PM at 175 Beale St., San Francisco Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with expansion joints, miscellaneous metals and engineering on complex projects. Also included are engineering, coordination, procurement and complete installation of the respective systems. Page 38 of 44 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 11/18/2014 3:00 PM Integrated Pest Management Services for Structural Facilities 5:00 PM Santa Clara County Novato Prebid Information Engineers # of Plan Estimate Addenda # ONLINE MAND 10/31 @ 8AM The County of Santa Clara will be requesting proposals from qualified contractors to provide structural & related pest control services for structural facilities NEW RFP for Hill Recreation Area/Margaret Todd Senior Center Master ONLINE Plan and Design 5:00 PM El Dorado County The City of Novato (City) is seeking a firm to provide professional planning and design services in the development of a Parks and Recreation Area Master Plan and then detailed plans and specifications for the Hill Recreation Area/Margaret Todd Senior Center Capital Improvement Project 01-005 Union Valley Generator Rehabilitation Project NEW MAND 10/28 @ 9AM ONLINE Provide SMUD with a rehabilitated Union Valley Powerhouse generator rated at 50 MVA, power factor 0.95, 13.8kV, 60 hertz, including complete rehabilitation of Union Valley generator (excluding new rotors), to 50 MVA, power factor 0.95, wye connected, 13.8kV, 60 hertz, and to include the following: all design, calculations, material for the stator coils, surge rings, neutral rings, field poles refurbishment, turbine guide bearings, and packing box; assembling new replacement generator stator windings and resistance temperature devices (RTD’s); removal / disposal of existing generator winding coils; refurbishing existing rotor field pole pieces with new insulation; disposal of existing field pole insulation and full testing and commissioning. 11/19/2014 2:00 PM San Francisco 2:00 PM Aptos 4:00 PM San Francisco 9/10 @2PM TG07.3-Miscellaneous Metals $8600000 Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with rails, metal covers, fences, metal plate and covers on walls and columns, bike racks, site metal fabrications, enclosing profile, façade access track, and overhead catenary system on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems. NEW Building 1550 and 1600 HVAC and Lighting Renovations MAND 11/4 @ 11AM at 6500 Soquel Dr., Bldg 2030, Aptos Selective demolition, rough carpentry, gypsum board assemblies, paints & coatings, HVAC, testing & balancing, lighting, electrical NEW 376 Larkin Parking Garage Repairs MAND 10/30 @ 1PM at 200 McAllister St., San Francisco ONLINE ONLINE ONLINE Parking garage repairs. 11/20/2014 11:00 AM 2:00 PM Lodi San Francisco Brian Agiius @ 415-565-4717 $75000 NEW Lodi Lake Storm Drain Outfall Improvement Project MAND 10/28 @ 10AM at 2001 W. Turner Rd., Lodi The work consists of trenching and installation of 56 lineal feet of 54-inch Class III reinforced concrete pipe, concrete outfall structures, 48-inch aluminum slide gate, and other incidental and related work, all as shown on the plans and specifications for the above project $4250000 Schwerin Street Sewer System Improvement Networking Confedrence 10/29 @ 10AM Div_02-demolition, environmental management of excavated materials, jet grouting, premeation grouting, ground movement, vibration instrument & monitoring, pavement cutting, trench excavation & support work, backfilling & compaction, dewatering & groundwater control, microtunneling, stormwater & erosion control, asphalt concrete planing, asphaltic concrete paving, portland cement concrete paving, reinforced concrete pipe, glass fiber-reinforced thermosetting resin jacking pipe, glass fiber reinforced thermosetting resin pipe sewerage systems; Div_03-concrete; Div_05-stainless steel; Div_09-cast-in-place detectable surface tiles. Page 39 of 44 ONLINE ONLINE Bid Date Bid Time Location 11/20/2014 2:00 PM Stockton Plan Name / Scope of Work Prebid Information Engineers # of Plan Estimate Addenda # NEW MSC Conveyor System Maintenance and Repair Services MSC conveyor system maintenance & repair services at California Health Care Facility Suzanne Livingston @ 916-255-6136 2:00 PM San Francisco ONLINE NEW Booker T. Washington Community Service Center Demolition, concrete and rebar, shotcrete, gypsum underlayment, stone countertops, structural steel and metal fabrications, rough carpentry, casework, waterproofing, insulation, roofing, cement siding, sheet metal flashing, expansion joints, doors frames - hardware, sectional doors, storefronts and windows, plaster, gypsum board assemblies, tile, acoustical ceilings, wood athletic flooring, carpet and resilient, painting, signage, toilet partitions and accessories, wire mesh partitions, operable partitions, lockers, appliances, projection screens, athletic equipment, play structures, window shades, entry grilles, bleachers, site furnishings, bike racks, elevators, trash chutes, fire suppression, plumbing, HVAC, electrical, fire alarm, earthwork, A/C paving, site concrete, playground surfacing, metal and wood fences and gates, planting and irrigation, underground utilities. Plans will be posted once available 2:00 PM Los Altos NEW Rehabilitation of Loyola Overcrossing at Foothill Expressway (Bridge No. 37C0117) MAND 11/10 @ 10AM at 101 Skyport Dr., San Jose 011C Bridge removal (portions); adding additional traffic lanes & bicycle lanes in each direction; reconstruct bridge railing; placing CIDH piles behind existing abutment walls, columns to the pier; protecting in place a retaining wall as well as associated roadway work for the structure briefly described as: Loyola Overcrossing at Foothill Expressway 2:00 PM 2:30 PM 4:00 PM Gilroy NEW Eigleberry Street Resurfacing Project Temporary traffic control, hot mix asphalt, pavement markers $3214000 Livermore NEW Livermore Pleasanton Fire Station No. 9 11/4 @ 10:30AM at 1919 Cordoba St., Livermore Div_02-bldg demolition, HazMat abatement; Div_03-concrete; Div_04-masonry mortar, unit masonry, adhered mansonry veneer; Div_05-structural steel framing, metal fabrications, metal ladders; Div_06-rough carpentry, shop-fabricated wood trusses, glue-laminated construction, finish carpentry, wood-veneer-faced arch cabinets; Div_07-water repellents, blanket insulation, nailable insulated sheathing, TPR, sheet metal roofing, sheet metal flashing & trim, manufactured guttes & downspouts, roof hatches, firestopping, joint sealants; Div_08-hollow metal doors & frames, wood doors, access doors & frames, overhead coiling doors, aluminum windows, tubular skylights, door hardware, glazing; Div_09-gypsum board assemblies, cement plastering, acoustical panel ceiling, resilient flooring, tile carpeting, fiber reinforced plastic panel, painting, utility protective systems, graffiti resistant coating; Div_10-markerboards & tackboards, signage, toilet accessories, fire protection specialties, flagpoles, grilles & screens; Div_11-vehicle exhaust removal system, miscellaneous equipment; Div_12-vertical louver blinds; Div_21-fire suppression sprinkler system; Div_22-plumbing; Div_23-hvac, testing, adjusting & balancing for hvac; Div_26-generator, electrical; Div_27-tv signal distribution system, sound system; Div_28-fire alarm system; Div_31-rough grading, finish grading, excavation, backfilling, trenching; Div_32-asphalt paving, concrete paving, chain link fences & gatews, automatic gates, ladscaping, irrigation system; Div_33-utilities 10/30 @ 2PM at 915 I St., Sacramento Sacramento NEW Roseville Road Bridge Replacement Project This Request for Proposals (RFP) solicits a proposal for consultant services to provide Resident Engineer, inspection, specialized sole source inspection, construction staking, materials testing, labor compliance and contract administration services for the Roseville Road Bridge Replacement Project. Page 40 of 44 ONLINE ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 11/20/2014 4:00 PM RFQ-Architectural and Engineering Team Design Criteria Consulting fo San Francisco Sheriff's Dept Rehabilitation Detention Center 10/16 @ 1PM at 30 Van Ness Ave, San Francisco San Francisco Engineers # of Plan Estimate Addenda # ONLINE The design team will provide programming, architectural, engineering & all related services to plan & develop the perfformance & technical criteria package necessary to assist the City with the solicitation & procurement of design build entity for the design & construction of a new Rehabilitation Detention Facility to replace existing county jails bumber 3 & 4 cirrently located on the 65th & 7th floor of the Hall of Justice 11/21/2014 11:00 AM 5:00 PM Oakland Various Cities $250000 NEW RFP On-Calll Asbestos and Lead Paint Consulting 10/27 @ 9AM at 530 Water St., Oakland The Port of Oakland (Port) is requesting proposals from qualified firms to provide asbestos and lead-based paint consulting services on an as-needed basis, in support of the Port’s Environmental Programs and Planning Division. It is the intent of the Port to enter into three separate comprehensive on-call consultant contracts RFP-Solar PV Energy California Department of Corrections and MAND 9/4 @ 5PM ONLINE ONLINE Rehabilitation A qualified pool members are invited to review & respond to this Request for Proposal for the installation & operation of solar photovoltaic energy generation systems under a third party ownership power purchase agreement business model 11/24/2014 10:00 AM San Joaquin County Site General Building Contractor, Mountain View Revitalization Pilot Program, Conway Homes and Sierra Vista Homes ONLINE 10/14 @ 10AM at 741 Flint Ave, Stockton The Housing Authority of the County of San Joaquin (HACSJ) is seeking bids from licensed and bonded General Contractors (“Contractor”) to provide construction services for the Site General Building Contractor, Mountain View Revitalization Pilot Program, Conway Homes and Sierra Vista Homes. Bid packages & specifications may be downloaded from the HACSJ website at HACSJ.com under the “Vendors & Contractors” tab. 2:00 PM Dublin Pending NEW Design-Build East County Hall of Justice Bid Package 2 Bid Package 2:Steel reinforcing, structural steel, stairs, metal deck, fireproofing, roofing, waterproofing, elevators Project is subject ro Project labor Agreement. 11/25/2014 1:30 PM Complete documents will be available after 11/3/14 Sacramento NEW Upgrade Existing Facility Equipment for Alerton Building Energy ONLINE MAND 11/6 @ 9AM at 2415 First Ave, Sacramento Management System 2:00 PM Upgrade existing facility equipment for Alerton Building Energy Management System (ABEMS) compatibility, provide ABEMS upgrades, and provide as-needed ABEMS technical support and repair services at the DMV Headquarters Campus. MAND 10/29 @ 3:30PM at 1715 Quesada Way, Burlingame Burlingame NEW Burlingame Intermediate School Classroom Building Construction of a new classroom building on existing middle school site; remove existing toilet room building; clear existing site; perform selective demolition of existing structures & elements as indicated & construct a new building, site work & utility infrastructure, including associated architectural, civil, structural, mechanical, plumbing, fire protection, electrical & landscaping work Pending Complete documents will be posted once available 11/28/2014 2:00 PM Novato Novato Housing Maintenance & Repair Electrical System Maintenance & repair electrical system Page 41 of 44 8/15 @ 10AM at 227 South Oakwood Dr., Novato $1000000 $5000000 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work 12/1/2014 3:00 PM Islais Creek Facility Phase II-Maintenance and Operations Building San Francisco Prebid Information Engineers # of Plan Estimate Addenda # ONLINE Pre bid conference 11/6 @ 1:30 PM & Site Visit 11/6 @ 3:30PM Construction of a new maintenance & operations Building which will supplement the existing fuel/wash & annex buildings previously constructed. Joon Park @ 415-701-4742 12/4/2014 2:00 PM Elk Grove 10/30 @ 9:30AM or 11/4 @ 9:30AM at 12500 Bruceville Rd, $567000 Elk Grove Replacement of the existing fire alarm system or installation of the new fire alarm system at multiple facilities of the Rio Cosumnes Correctional Center NEW Elihu Harris State Building 602-Access Barrier Removal Project MAND 11/5 @ 10:30AM at 1515 Clay St., Oakland Constructing new accessible parking stalls (including re-striping & wheel stops); correcting slopes of driveways, passenger loading, walkways, on-site sidewalks & ramps; installation of truncated domes, lowering control panels & correcting threshold gaps in 17 passenger elevators; replacement of two building entrance doors; replacement of battery powered door openers with door openers hard wired to power genertors, replacement of signage; demolition of existing concrete pavement, parking lot striping & exterior doors. NEW Rio Cosumnes Correctional Center (RCCC) Fire Alarm System ONLINE Upgrade Phase 2A 2:00 PM Oakland ONLINE Pamela Mendoza @ 916-376-1731 12/5/2014 5:00 PM Napa County $11400000 Contractor Prequalification for Napa County South Campus Improvement Project ONLINE South campus improvements project prequalification's 12/9/2014 11:00 AM Oakland ONLINE NEW RFP for Pre-Fabricated Restroom Facility at Oakland International Airport Taxi Cab Lot 2:00 PM 12/11/2014 2:00 PM Alameda County San Francisco The Port of Oakland & Oakland International Airport seek qualified suppliers to provide & install a complete pre-engineered rstroom for the taxi cab staging lot at OAK NEW Alameda County Flood Control and Water Conservation Dist Networking.Proposers conferences 11/4 @ 2pm and 11/12 Engineering Professional Services @ 2PM The Alameda County Flood Control & Water Conservation Dist is seeking proposals from firms that are interested in providing on-call construction management (resident engineering, inspection & materials testing) services for district projects 10/21 @ 2PM at 175 Beale St., San Francisco TG08.9-Roll-Up Doors and Grilles Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) and concurrent Invitation for Bids (IFB) from Trade Subcontractors interested in bidding the TG08.9 Roll-Up Doors and Grilles Construction Services on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California. Bidders that have already pre-qualified do not need to respond to the RFQ. Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with installation of Roll-Up Doors, Grilles and Elevator Smoke Curtains on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems Page 42 of 44 ONLINE ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 12/18/2014 2:00 PM TG08.7 Glass Floor Construction Services Package 10/7/14 @ 2pm 2:00 PM San Francisco San Francisco Engineers # of Plan Estimate Addenda # Webcor/Obayashi Joint Venture seeks responses to a Request for Proposals (RFP) from Trade Subcontractors interested in submitting a proposal for the TG08.7 Glass Floors Construction Services trade package on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California. Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with design, fabrication and installation of structural glass floors including but not limited to structural supports and expansion joints on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems in the following trade: TG08.7 GLASS FLOORS TG08.10 Glass Curtain Walls 9/23 @ 2PM at 175 Beale St., San Francisco Online ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with glass curtain wall assemblies, aluminum color covers & aluminum extrusions on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems 12/31/2014 5:00 PM Fremont ONLINE Fremont Unified School District Qualified Bidders for the Year 2014 Contractors must provide the name and address to which a Notice to Contractors or proposal should be mailed, a phone number at which the contractor may be reached, their business fax number, the type of work in which the contractor is interested and currently licensed to do (earthwork, pipelines, electrical, painting, general building, etc.) together with the class of contractor’s license(s) held and contractor license number(s), proof of general liability insurance and maximum project bonding capacity. Contractors that were previously included on the list will need to resubmit to be included on the list for the current calendar year. 1/20/2015 2:00 PM San Francisco 10/29 @ 2PM TG08.6-Metal Ceiling ONLINE Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) and concurrent Invitation for Bids (IFB) from Trade Subcontractors interested in bidding the TG08.6 Metal Ceiling Construction Services on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California. Bidders that have already pre-qualified do not need to respond to the RFQ. Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with aluminum ceilings on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems. 2/18/2015 2:00 PM San Francisco 9/25 @ 2PM TG07.4-Concrete Masonry Units ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with furnishing and installing concrete masonry units, miscellaneous metals to brace own work, associated membranes, and, other related accessories on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems. 3/12/2015 2:00 PM San Francisco 10/15 @ 2PM at 175 Beale St., San Francisco TG13.3 Ground Level Landscaping Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with ground level irrigation; ground level planting planters; area trench drains; and installation of paving material, architectural concrete pavers, illuminated pavers and illuminated benches on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems. Page 43 of 44 ONLINE Bid Date Bid Time Location Plan Name / Scope of Work Prebid Information 3/12/2015 2:00 PM TG13.2-Roofing/Waterproofing 9/18 @ 2PM at 175 Beale St., San Francisco San Francisco Engineers # of Plan Estimate Addenda # ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with PVC roofing, sheet waterproofing, and fluid applied waterproofing on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems. 3/17/2015 2:00 PM San Francisco 10/2 @ 2PM at 175 Beale St., San Francisco TG16.1 Drywall/Framing ONLINE Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with drywall, metal framing, building insulation, penetration firestopping, toilet accessories, miscellaneous metals for own work, bird deterrent, ballistic resistant panels, acoustic ceiling tiles & acoustic wall treatments on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems 6/30/2015 6:00 PM Rohnert Park Various Public Works Projects-Sonoma State University Sonoma State University is seeking qualified contractors and service providers to perform various projects and services beginning July 1, 2014 through June 30, 2015. The University shall establish a shortlist of qualified contractors for possible future minor capital projects ranging in value from $5,000.00 up to $634,000.00. Carolyn Faulconer of the Sonoma State University says that from July 1, 2014 through June 30, 2015 the university will be accepting contractors who wish to be added to its list to perform various projects & services for the university. Right now there are no projects yet out to bid. The bid date, June 30, 2015, is the last day the University will be accepting qualified contractors to its list. REMOVE, REPLACE, REPAIR REMODEL, RENOVATE, CONSTRUCT AND/OR MAINTAIN: Includes, but not limited to, demolition, miscellaneous site improvements, flooring, walls, doors, windows, roofing, mechanical and plumbing systems; electrical and telecommunication systems, audio and video systems, radio and communications systems, security and surveillance systems, fire alarm systems and signage; HVAC equipment; water heaters; automatic doors; ADA; pathways; wall coverings Page 44 of 44 ONLINE Gary A. Duckworth, CPCU, ARM Insurance Broker / Cook, Disharoon & Greathouse, Inc. / Oakland, CA Workers’ Compensation PLUS Program * Comparative Pricing * Bureau Review * Classification Review * Audit Review * Claims Management * Local Representation Ph. 510-437-1900, x 2006 / Fax 510-437-1979 [email protected] www.cdginsurance.com December: ASK FOR: Workers Compensation Insurance Renewals: Group 825 “Insurance Quote” Group 825 State Fund + BAY AREA Builders Exchange = 6% SAVINGS Visit our Website www.beac.com Plans & Specs Online Project Leads Bid Lists / Bid Results Education, Events, Safety & Industry News SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT OFFICE OF CIVIL RIGHTS Invites you to attend our Informational Seminars on How To Do Business With BART The San Francisco Bay Area Rapid Transit District (“BART”) Office of Civil Rights invites you to attend two up-coming workshops. Space is limited and registrations will be accepted until seating capacity is met. Please complete the attached registration form and submit to Ron A. Granada at [email protected]. How To Do Business With BART #1 · Up-Coming Bidding Opportunities. · BART’s Bidding Process. · Effective Bidding. How To Do Business With BART #2 · · · Bonding, Insurance and Short Term Loans. BART’s Disadvantage & Small Business Programs. How to Become Certified. Monday November 10, 2014 4:00-7:00 PM Wednesday November 19, 2014 4:00-7:00 PM MTC Building Auditorium 101 Eighth Street Oakland, CA MTC Building Auditorium 101 Eighth Street Oakland, CA SAN FRANCISCO BAY AREA RAPID TRANSIT DISTRICT OFFICE OF CIVIL RIGHTS Registration Form Informational Seminars: How To Do Business With BART #1: Up-Coming Bidding Opportunities, Bart’s Bidding Process and Effective Bidding. (Monday, November 10, 2014 from 4:00 – 7:00 PM) How To Do Business With BART #2: Bonding & Insurance and Short Term Loans, BART’s Disadvantage and Small Business Programs and How to Become Certified. (Wednesday, November 19, 2014 from 4:00 – 7:00 PM) LOCATION Metropolitan Transportation Commission Auditorium 101 Eighth Street, Oakland, California 94607 (Conveniently located across from the Lake Merritt BART Station.) ***** Please check the session(s) you’ll be attending and forward to Ron A. Granada at [email protected] or fax: 510-464-7282. Attendee Name & Title: ____________________________________________________________________ Agency/Company: __________________________________________________________________________ Address: ____________________________________________________________________________________ City State & Zip Phone: _____________________________________Fax:_____________________________________________ Email: _____________________________________Website:________________________________________ Describe the major type(s) of services your firm provides: ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ ________________________________________________________________________________________________ www.alameda.k12.ca.us Bay Area Builders Exchange presents EXITING YOUR BUSINESS PROTECTING YOUR WEALTH Guiding Business Owners Through the Process of Exit Planning Two Dates and Locations Wednesday October 29th Wednesday November 5th 8AM - 10AM 8AM - 10AM or 3055 Alvarado St 2440 Stanwell Dr. San Leandro, CA 94577 Concord, CA 94520 Q&A and Lunch provided following the presentation Exiting your company is often your most significant financial event. Exiting Your Business, Protecting Your Wealth is for owners who want to understand their options and optimize their results. You’ll learn about your Value Gap, the different Exit Routes, and how to work to Protect Wealth in the process. Whether you want out today, or years from now; whether you plan to sell, or want to hand it to family – this planning process could be key. Please RSVP by Friday October 24th to Nicole Capra at 925.866.7800 or [email protected] Each attendee will receive a free copy of “Exiting Your Business, Protecting Your Wealth” and have the opportunity to take the BERI Survey (Business Exit Readiness Index) Separate from the financial plan and a Summit advisors' role as financial planner, an advisor may recommend the purchase of specific investment or insurance products or accounts. These product recommendations are not part of the financial plan and clients are under no obligation to follow them. Summit Financial Group LLC 2000 Crow Canyon Place Suite 450 San Ramon CA 94583 Securities and investment advisory services offered through Securian Financial Services, Inc., Member FINRA/SIPC. Securities dealer and registered investment advisor. Summit Financial Group LLC is independently owned and operated. TR#950605 DOFU 06/2014 A Special Seminar FRIDAY, NOVEMBER 7TH 8:30 A.M. to 12:30 P.M. COST (due in advance): $150.00 per person LOCATION: Bay Area Builders Exchange 3055 Alvarado Street, San Leandro, CA 94577 (510) 483-8880 MAKE YOUR RESERVATIONS NOW……...DEADLINE IS NOVEMBER 3RD Contact: Larry Levy at 415-892-1497 or FAX reservation to 415-8926596. Make check payable to Larry Levy. Mail to 458 San Marin Drive, Novato, CA 94945 Thank you, Larry. We are planning to come. Enclosed is my check. Names of participants: ___________________________________________________________________________ ___________________________________________________________________________ From (Co. or Org.) ___________________________________________________________________________ OUTLINE Overtime Requirements as of January 2014 Overtime Exemptions Make-up Time is Available Alternative Workweeks — New Law Itemization of Wage Statements When does the Work Week begin? Timekeeping Minimum Wage Violations — New Law Wage Theft — New Law Misclassification of Independent Contractors vs. Employees — New Law Commission Agreements — New Law Meal and Rest Periods — New Laws San Francisco Ordinances— New Laws Compensable (“Comp.”) Time On-Call Time Waiting Time The Company’s vs. the Employees’ Tools Paid Vacation Paid Sick Leave — New Law Paid Holidays Deductions from Paychecks Final Paychecks Frequency of Paying Employees Travel Time — New Law; Heads Up, Contractors! Determining the Difference between Exempt vs. Non-exempt Employees Executive Office Space for Lease Small Private Offices Available: TWO LOCATIONS 110 - 300 square feet San Leandro Concord Ideal space for satellite office, estimators, sales & service representatives Amenities include: GREAT LOCATIONS Free WiFi FREE PARKING UPS SERVICE DAILY SECURITY SYSTEM ACCESS TO KITCHEN JANITORIAL SERVICE ALL UTILITIES 24 HOUR ACCESS CONFERENCE | BOARD ROOMS MAIL PICKUP AND DELIVERY FAX / COPY Machines Available San Leandro Concord 3055 Alvarado Street San Leandro, CA 94577 510.483.8880 2440 Stanwell Drive Concord, CA 94520 925.685.8630 For more information call Scott Leary at 510.483.8880 (San Leandro) or Denice McDavid at 925.685.8630 (Concord) Misc.: Leases are month to month. 1st month and security deposit to start lease. Credit Check. Telephone / upgraded cable internet service not included. Advertising Rates Weekly Bulletin Our Bulletin runs weekly in 8 1/2 " X 11 " Size Format, Black & White Member (Total cost) NonMember (Total cost) $100 $150 $150 $200 $75 $110 $115 $150 $35 $60 $50 $80 $30 $50 $50 $75 Full Page: One or two weeks Three or four weeks 1/2 PAGE: One or two weeks Three or four weeks 1/4 PAGE: One or two weeks Three or four weeks Business Card & MBE/WBE/SBE Sub Bid Requests: One or two weeks Three or four weeks CLASSIFIED: Up to 7 lines One or two weeks $25 Three or four weeks $35 (Each additional line) $2.50 Note: A line is 30 Character / spaces. $40 $55 $4.50 Please fax a typed written sample of your ad to 510-352-1509 or email copy text to [email protected] and indicate the number of Weekly Bulletin issues the ad is to run. Ad deadline is 12:00 P.M. Thursdays, the Weekly Bulletin is published every Friday. **** Ads for Nonmembers must be paid in advance. 3055 Alvarado Street, San Leandro, CA 94577. Tel: 510-483-8880. Fax 510-352-1509. www.bayareabx.com. [email protected]
© Copyright 2024